2040 COMPREHENSIVE PLAN 5 YEAR UPDATE

OCTOBER 2022

As Amended January 2025

⬚ figure

⬚ figure

⬚ figure

Prepared by: Community Development Agency Planning Division

⬚ figure

2040 COMPREHENSIVE PLAN

VISION FOR A NEW ERA

5-Year Update

⬚ figure

Cobb County...Expect the Best!

⬚ figure

APPROVED

OCTOBER 2022

LAST UPDATED

JANUARY 2025

Community Development Agency

P.O. Box 649 Marietta, Georgia 30061-0649 www.cobbcounty.org

BOARD OF COMMISSIONERS

Lisa Cupid, Commission Chairwoman Kelli Gambrill – District 1 Commissioner Jerica Richardson – District 2 Commissioner JoAnn K. Birrell – District 3 Commissioner Monique Sheffield – District 4 Commissioner

PLANNING COMMISSION

Stephen Vault – At Large Fred Beloin – District 1 David Anderson – District 2 Christine Lindstrom – District 3 Michael Hughes – District 4

COUNTY MANAGER

Dr. Jackie R. McMorris

COMMUNITY DEVELOPMENT AGENCY

Jessica Guinn, Director Phillip Westbrook, Senior Planner/Project Manager Mandy Elliott, Planner III Donald Wells, Planner III Sharon Qin, Planner III

⬚ figure

COBB COUNTY

2040 COMPREHENSIVE PLAN

⬚ figure

Table of Contents

INTRODUCTION ................................................................................................1

PURPOSE.......................................................................................................... 1

PLAN ORGANIZATION ...................................................................................... 2

COMMUNITY PROFILE ..................................................................................... 3

HISTORICAL CONTEXT & DEVELOPMENT PATTERNS....................................... 4

VISION 2040 .................................................................................................... 6

COMMUNITY GOALS & POLICIES .................................................................... 7

LAND USE ........................................................................................................... 8

TRANSPORTATION ............................................................................................ 13

HOUSING........................................................................................................... 17

BROADBAND .................................................................................................... 20

ECONOMIC DEVELOPMENT ............................................................................... 24

INTERGOVERNMENTAL COORDINATION .......................................................... 27

SENIOR SERVICES ............................................................................................ 31

NATURAL & HISTORIC RESOURCES ................................................................. 35

LIBRARY ............................................................................................................ 39

PUBLIC SAFETY................................................................................................. 41

PARKS............................................................................................................... 44

PLACE MAKING ................................................................................................ 48

COMMUNITY WORK PROGRAM ..................................................................... 51

INTRODUCTION

Cobb County has thrived in recent decades. Its natural resources, location, economy, education and most, importantly, its people, have made Cobb County a desirable place to live, work and play. These attributes have contributed to sustained growth over the past few decades and will continue to attract visitors, residents and business interests for years to come.

As Cobb County continues to flourish, changes are inevitable. As new development and redevelopment emerges, the provision of public services and adequate infrastructure continue to become increasingly important. Creating a sense of place by promoting positive community characteristics is also a significant aspect of moving Cobb toward its vision.

⬚ figure

The existing 2040 Comprehensive Plan was adopted in 2017 and is the long-range planning document that has helped guide Cobb County over the last 5-years. As mandated by the 1989 Georgia Planning Act, the Comprehensive Plan is a policy document that assists decision-making and administrative actions in an effort to steer Cobb County towards the community's preferred future.

The Comprehensive Plan is designed to be dynamic and capable of being revised based on the changing needs and desires of the community. This limited scope 5-year update is mandated by the State in order to maintain Qualified Local Government Status.

As the County continues to grow, changes are inevitable. Based on the state’s minimum standards and procedures, certain components of the Comprehensive Plan should be updated every 5-years. Cobb County's 2040 Comprehensive Plan 5-Year Update focuses on the following:

  • Determining if existing needs are still relevant and if there are any new needs that should be addressed;
  • Gathering feedback and potential changes related to future land use guidelines and policy;
  • Include a Broadband element;
  • Provide a Report of Accomplishments;
  • Establish a new 5-year work program;

⬚ figure

PURPOSE

In the interest of providing healthy and vibrant communities that are vital to the State's economic prosperity, the State of Georgia requires all local jurisdictions to coordinate and conduct comprehensive planning activities through the Georgia Planning Act of 1989. The State has given authority to the Department of Community Affairs (DCA) to set the minimum standards for local comprehensive planning and to provide oversight of the planning processes. The purpose of the minimum standards is to provide a framework for development, management and implementation of local comprehensive plans.

The purpose of the 2040 Comprehensive Plan is to bring together all sectors within the County, including residents, the business community, and non-profit organizations, to develop a growth strategy that aims to make Cobb County an attractive place to invest, conduct business, and raise a family. The Comprehensive Plan is

intentionally broad, providing policy direction and guidance for elected officials, appointed officials, and the public at-large. It informs and guides decision-making processes, articulates the County’s vision in a manner that creates an environment of predictability for residents, property owners, investors, businesses and industry, and anyone interested in the County’s future. The plan is also intended to assist in recognizing the need for, and the subsequent implementation of, important economic development and revitalization initiatives.

PLAN ORGANIZATION

The 2040 Comprehensive Plan consists of three core elements and twelve planning elements. The three core elements are required by the Department of Community Affairs’ minimum standards and procedures and are integrated into each of the planning elements. The planning elements include four required elements based on factors unique to Cobb County and eight optional elements that have been chosen to supplement the comprehensive plan based on policy consistency and value.

CORE ELEMENTS

  • Needs and Opportunities List of needs and issues that Cobb intends to address via the plan
  • Community Goals Vision and goals the community seeks to work toward and policies that provide guidance and direction
  • Community Work Program Prioritized action items that the County and community partners intend to undertake over the next five years

PLANNING ELEMENTS

Required:

  • Land Use
  • Transportation
  • Housing
  • Broadband

Optional:

  • Economic Development
  • Intergovernmental Coordination
  • Senior Services
  • Natural & Historic Resources
  • Parks
  • Library
  • Public Safety
  • Place Making

COMMUNITY PROFILE

AGE

25+ By 2050 Ages 35 to 44 will be largest age Cohort

Ages 65+ will Double

⬚ figure

POPULATION FORECAST

2050 1,035,796

POVERTY

2010 13.9% 2019 8.1%

Since 2010 percentage of population living below poverty has decreased

POPULATION INCREASE

BUT AT A SLOWER RATE 2015-2020 32.8% 2020-2050 35.2%

DIVERSITY

Cobb County is more diverse than in the past and is projected to increase in diversity

POPULATION

2000 607,751 2020 766,149 2050 1,035,796

WELL EDUCATED

Over 50% have college degrees

COBB COUNTY DEMOGRAPHIC DATA SUMMARY

HOME VALUES

Home values have Increased since 2015

2015 $224,300 2017 $234,100 2019 $283,300

MEDIUM HOUSEHOLD INCOME

HOUSEHOLD 2015 $70,246 2017 $75,654 2019 $79,601

PER CAPITA INCOME 2015 $34,806 2017 $38,231 2019 $42,005

HOUSING TENURE

The majority of homes are owner occupied

In recent years: Owner occupied has increased 2015 62.4% 2019 65.7%

Renter occupied has decreased 2015 37.6% 2019 34.3%

# OF HOUSEHOLDS

44% Increase by 2050

COST BURDEN

Almost half of renters are cost burdened

Rental Occupied Units: 2015 37.6% 2017 34.9% 2019 34.3%

Owner Occupied Units: 2015 62.4% 2017 65.1% 2019 65.7%

SOURCE: U.S. CENSUS BUREAU & ATLANTA REGIONAL COMMISSION

HISTORICAL CONTEXT & DEVELOPMENT PATTERNS

The abundance of railroads and early industrial development helped establish Cobb County and its incorporated cities in the late 1800s and early 1900s. During that time, unincorporated Cobb County experienced little growth, with Marietta being the only area with a significant population.

During the early 1900s, the County's total population slowly grew to around 38,000 people. Later, during World War II, Cobb experienced an onset of growth. Marietta Army Airfield was built in 1943, bringing with it the opening of the Bell Aircraft Corporation bomber plant and nearly 30,000 jobs. The end of the war lead Bell to close the plant. However, the subsequent Korean War led Lockheed, an aircraft manufacturing company, to reopen the plant in 1951. Around the same time, Marietta Army Airfield became Dobbins Air Force Reserve Base, with Naval Air Station Atlanta added to the campus a short time later. The combination of the three helped drive the economic engine of the County and set the stage for rapid growth that was to come.

Because of jobs that were available in the 1950s and 1960s, combined with the lack of a robust transportation network, there was a need for housing near employment. The southern and central areas of Cobb, which served as the commercial/industrial core of the County, began to experience rapid residential growth in a traditional neighborhood development pattern with affordable homes, well-connected streets and pedestrian scale blocks. At that time, there was still considerable separation between Cobb County and the City of Atlanta.

The completion of Interstate 75 in the 1970s significantly decreased travel times, altering growth and development patterns. A second phase of intense growth began, and Cobb became more integrated into the Atlanta Metropolitan area. Through the 1970s, 1980s and 1990s, east Cobb and later north Cobb experienced character changes through the arrival of automobile-oriented, higher density, cul-de-sac subdivisions and strip commercial developments along transecting arterial roadways.

As land availability in east and north Cobb became scarce, the County's residential growth continued to progress in a seemingly counterclockwise fashion toward west Cobb in the 1990s and 2000s. During this time, large-lot residential subdivisions were being developed in relatively rural areas. Learning from the inadequacies of strip commercial corridors that had occurred in previous decades in other parts of the county, commercial centers in west Cobb are mostly characterized by well-defined, compact commercial nodes at strategic intersections of arterial roadways.

Development pressures in west Cobb continue to put a strain on services and infrastructure in the area.

Throughout this period, Cobb County led the state of Georgia by creating two Community Improvement Districts (CID), the Cumberland CID (1988) and the Town Center CID (1997).

⬚ figure

Cobb County Growth Patterns

These quasi-governmental entities aid in developing infrastructure within the County’s two largest commercial activity areas to support the intense development that has been experienced near the junctions of two major freeways.

As the “counterclockwise” development progression of Cobb County has come full circle, redevelopment initiatives have started to renew the southern region of the County, along with revitalization in the cities of Marietta and Smyrna. As these locations were the first to experience the rapid growth of Cobb, they are now the first to experience the redevelopment and revitalization of underperforming commercial centers and destabilized neighborhoods

VISION 2040

The Community Vision has dual significance.

  • Vision statement, which articulates the long-term ideals and desires of the community
  • Future Land Use plan and associated guidelines that guide future development patterns.

The Vision Statement was initially drafted following a series of public meetings and community engagement activities in 2017. Based on the most recent 5-Year update (2022) and feedback received from the community the current Vision remains applicable.


OUR GOVERNMENT WILL PROVIDE ALL STATUTORY PUBLIC SERVICES IN AN ATMOSPHERE THAT UNLEASHES THE HUMAN SPIRIT AND CREATIVITY, IS MARKED BY OPENNESS AND TRANSPARENCY, AND MAKES US THE CHOICE DESTINATION FOR PEOPLE TO SAFELY WORK, LIVE, RECREATE AND PURSUE THEIR DREAMS


COMMUNITY GOALS & POLICIES

LAND USELU
TRANSPORTATIONTR
HOUSINGHO
BROADBANDBB
ECONOMIC DEVELOPMENTED
INTERGOVERNMENTAL COORDINATIONIC
SENIOR SERVICESSS
NATURAL & HISTORIC RESOURCESNH
LIBRARYLI
PUBLIC SAFETYPS
PARKSPR
PLACE MAKINGPM

LAND USE

⬚ figure

The purpose of the Land Use element is to manage growth in a way that provides for the enhancement of existing neighborhoods, commercial nodes, corridors, and job centers. This is achieved through goals and polices, the community work program, and the Future Land Use Plan (Appendix 1). In addition, the Land Use element includes a list of Supplemental Plans that have been accepted or approved by the Board of Commissioners. Those guidelines and recommendations associated with the Supplemental Plans are incorporated in the 2040 Comprehensive Plan 5-Year update by reference.

While the population growth rate in Cobb County is anticipated to slow, the county is still expected to reach one million people by 2050. Employment is expected to grow as well. To ensure the County can meet future population and employment demands and preserve the existing character of the distinct areas, growth management policies are highly encouraged. These policies should meet the needs and desires of an entire community to ensure prosperity and to improve overall quality of life. This means ensuring the availability of housing, employment, services and entertainment options for existing and future residents with a variety of ideas, values and cultures.

For the community to grow and provide a high level of service to all residents, property owners, and businesses, the County needs to constantly seek a balance through quality redevelopment, new greenfield development, and the preservation of stable suburban neighborhoods. The County's past growth transformed it from a small rural community into an integral part of one the fastest-growing metropolitan regions in the United States. As Cobb continues to mature and embrace a combination of urban, suburban and rural development patterns, more emphasis will need to be placed on redevelopment, neighborhood revitalization and infill development due to constraints on land availability and the desires of the community to preserve existing suburban neighborhoods and increase protected greenspace.

The following Needs reflect the desires of the community and help guide the Community Work Program.

⬚ figure

LU – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Land Use needs were deemed a priority moving forward.

Need:

  • Growth management
  • Redevelopment / revitalization
  • Land use and transportation coordination
  • Protect uses that provide jobs

⬚ figure

LU – GOALS & POLICIES

KEY STRATEGIES

Grow responsibly Protect existing communities Redevelop Build safe and active communities


LU-GOAL 1

Manage growth by promoting compatible land uses, while preserving established suburban and rural communities and respecting individual property rights


POLICIES

LU1-P1Facilitate projected growth while preserving and protecting existing stable neighborhoods and community character
LU1-P2Guide growth to areas that have infrastructure in place
LU1-P3Encourage nodal development in appropriate locations and discourage “strip” development patterns with multiple access points
LU1-P4Promote development, redevelopment, and mixed use within Regional and Community Activity Centers as a means to protecting existing stable suburban and rural areas from development pressure
LU1-P5Ensure that new development/redevelopment incorporates necessary on-site enhancements to improve infrastructure
LU1-P6Consider ways a revised zoning code can help mitigate stormwater management issues
LU1-P7Encourage uses in locations where necessary public facilities can be located
LU1-P8Consider impacts to area residents and address compatibility between land uses when making land use decisions
LU1-P9Coordinate land use and transportation decisions to improve mobility and reduce demand for long-distance vehicular travel while creating opportunities for walking, biking and transit use
LU1-P10Ensure a variety of residential land uses that support all types and densities of housing to meet the needs of a growing and diverse population
LU1-P11Promote infill development and ensure compatibility with adjacent land uses
LU1-P12Encourage appropriate transitions between lower and higher density residential uses and from residential to non-residential uses

LU-GOAL 2

Encourage safe, attractive, and well-maintained neighborhoods and activity centers that promote a healthy active lifestyle by fostering quality, safe, pedestrian-oriented and environmentally friendly elements

POLICIES

LU2-P1Promote mixed-use development patterns within Regional Activity Centers and other areas as designated by Master Plans and Small Area Policy Guidelines
LU2-P2Encourage strategies and creative design to accommodate innovative land development techniques that promote an active lifestyle
LU2-P3Provide Code Enforcement strategies that promote safety, property preservation and community enhancement
LU2-P4Coordinate with Department of Transportation and Keep Cobb Beautiful on landscaping opportunities along newly created or improved roadway infrastructure projects

LU2-P5 Encourage walkable, nodal developments at strategic locations

LU2-P6 Promote development patterns that encourage connectivity between residential, commercial, civic, cultural and recreational uses

LU2-P7 Encourage land use strategies that allow for live-work opportunities in applicable areas

LU2-P8 Support development patterns designed to improve safety and the well-being of the community

LU2-P9 Encourage the preservation of environmentally sensitive natural resources and open space

LU2-P10 Explore opportunities of creating a more active lifestyle and improved quality of life through land use and transportation coordination

LU2-P11 Encourage development flexibility to protect and preserve open space and sensitive natural resources

LU2-P12 Continue to support the preservation of floodplains and wetlands

LU2-P13 Encourage relationships between developers and neighborhoods to address neighborhood concerns

LU2-P15 Consider the Chattahoochee Riverlands project when new development or redevelopment occurs along the Chattahoochee River

LU-GOAL 3

Encourage the re-investment and redevelopment of deteriorating, under-utilized, blighted, and abandoned sites to accommodate future economic and population growth

POLICIES

LU3-P1 Support efforts to revitalize and/or redevelop abandoned or blighted commercial areas

LU3-P2 Promote the reuse, redevelopment and/or revitalization of brownfield and greyfield sites

LU3-P3 Encourage incentivized regulatory strategies that assist the redevelopment of underperforming commercial areas and neighborhoods

LU3-P4 Evaluate development proposals in underserved areas to ensure services are provided in a manner consistent with existing and future infrastructure demands

LU3-P5 Encourage collaborative planning and seek opportunities to leverage public/private partnerships for the revitalization of communities

LU3-P6 Strengthen underperforming sites by encouraging landscaping and beautification efforts and façade programs

LU3-P7 Coordinate with economic development on complimentary uses that could help redevelop sites

LU3-P8 Encourage and consider incentives for clean-up of sites with known toxic containments to allow for the utilization of productive commercial and/or industrial uses

LU3-P9 Promote mixed-use developments in appropriate revitalization or redevelopment areas

LU3-P10 Leverage transportation projects in areas that can assist redevelopment or revitalization of land uses

LU3-P11 Support and regularly evaluate redevelopment sites within new and existing small area plans, corridor studies, design guidelines and other appropriate projects

TRANSPORTATION

⬚ figure

Residents and visitors alike rely on transportation to access education, health care, and jobs, while surrounding cities and industries rely on the functional network to keep the region moving. The County's Comprehensive Transportation Plan (CTP), considers how Cobb County will grow in the next 30 years to 2050. Cobb County last completed a Comprehensive Transportation Plan (CTP) in 2015 and much has changed in that time. Population has increased, and transportation needs, and opinions have shifted within the County and region. At the same time, new technologies and transportation solutions are now available that can enhance and transform Cobb’s future transportation system. To leverage these new tools and strategies the County and the Cities have updated the County’s CTP for 2050. The update is known as CobbForward.

CobbForward offers a program of policies and multimodal improvements to the transportation network and helps position Cobb County for implementation through local, state, and federal funding strategies. The CTP process included three overarching steps: Existing Conditions, Needs Assessment, and Recommendations. The policy chapter of CobbForward provides policy direction and recommendations that influence all aspects of transportation in Cobb County. Maintaining a high level of coordination among government agencies and stakeholder groups is increasingly important as the County’s transportation infrastructure continues to promote multimodal travel. The Recommendations Report reflects the results of the CobbForward development process and includes a variety of transportation projects identified and prioritized through substantial technical analyses and a robust public engagement effort. Stakeholder and community engagement played an important role in guiding the process - from the initial visioning and development of goals to the determination of needs and the vetting of draft recommendations.

⬚ figure

CobbForward will serve as the blueprint for transportation investment in Cobb, including roadways, public transit, freight, and bicycle/pedestrian mobility, for the next 30 years. The plan links land use and transportation within the County and the cities to efficiently and effectively address the needs identified for the transportation network through 2050. It is the intent of the 2040 Comprehensive Plan 5-Year Update, to incorporate the analytical aspects of CobbForward by reference and integrate the needs, goals and policies, and action items into the 2040 Comprehensive Plan. In doing so, CobbForward will serve as the Transportation Element.

TR – NEEDS

Part of the CobbForward planning process included an Existing Conditions and Needs Assessment Report. The needs are the results of collaboration between technical stakeholder groups, the Project Management Team (PMT), and the public.

⬚ figure Improve Health and Safety

⬚ figure Enhance Mobility

⬚ figure Use Innovative Technology

⬚ figure Be Cost Effective

⬚ figure Support Equitable Access

⬚ figure Integrate Land Use/Design

⬚ figure

TR – GOALS & POLICIES

KEY STRATEGIES

Safety Multi-Modal Accessibility Connectivity

⬚ figureTR-GOAL 1Provide a transportation system that is safe and supports healthy living for all users
⬚ figureTR-GOAL 2Improve travel times for all users with multi-modal solutions
⬚ figureTR-GOAL 3Use innovative transportation technologies and access to information to enhance the efficiency of the transportation network
⬚ figureTR-GOAL 4Prioritize investments that maintain reliable transportation infrastructure and maximizes return on investment
⬚ figureTR-GOAL 5Provide mobility choices that are accessible and equitable for all communities and users
⬚ figureTR-GOAL 6Support land use and urban design that enhances accessibility and connectivity between land uses for all users

⬚ figure

POLICIES

⬚ figureTR-POLICY 1Smart Cities: Leverage technology focusing on priority, opportunity, and resources
⬚ figureTR-POLICY 2Emerging technologies: Strategically integrate advanced technologies to existing and future developments
⬚ figureTR-POLICY 3Freight: Provide freight policy recommendations for truck route designations, freight lane restrictions, freight demand management, rail, and truck parking.
⬚ figureTR-POLICY 4Transportation and Land Use: Coordinate land use and transportation decisions to improve mobility and reduce demand for long distance vehicular travel while creating opportunities for walking, biking, and transit usage
⬚ figureTR-POLICY 5Asset Management: Focus on maintaining transportation as-sets at a rate that stays ahead of deterioration and plans for end-of-life replacement and upgrades
⬚ figureTR-POLICY 6Transportation Demand Management (TDM): Coordinated effort to shift trips away from single occupancy vehicle trips toward alternative modes of transportation
⬚ figureTR-POLICY 7Safety: Provide transportation options that are safe and efficient for all users of the system
⬚ figureTR-POLICY 8Sidewalk Framework: Prioritize new sidewalk infrastructure based on readily available data and input from the public

HOUSING

⬚ figure

Housing is an essential element of the community and plays a critical role in opportunities for individuals, families, employees, and employers. The mix of housing types, age, condition, tenure, and cost of housing can impact the health and economic prosperity of the community. As the population in Cobb continues to increase along with diversity, and with economic development policies attracting corporate businesses and working to establish small businesses, it is critical to ensure the county is equipped with a balance mix of housing types and price points. The policies described below, in conjunction with partnerships via federal programs, non-profits and development interests, will guide the progression towards achieving these goals.

Cobb County citizens should have access to housing that is safe, affordable and suitable for their household and location preferences. These housing choices should be in safe, livable neighborhoods and they should provide a sense of connection to the community with convenient access to schools, parks, shopping, amenities and jobs. Characteristics that enhance livability, such as walkability, access to transit, low maintenance, and convenient access to goods and services, are becoming more valued by a large segment of the population. In order to establish neighborhoods of choice, a range of housing options should be available to complement community facilities, including the following: schools, parks, community centers and compatible neighborhood-oriented commercial uses that contribute to the neighborhood livability. Finally, safe and sustainable housing served by housing programs, which aid those who live in the community (including the most vulnerable), should be available. This includes services and provisions for low- and moderate-income persons, youth, seniors and the physically disabled.

The Housing Element establishes a vision for housing development, redevelopment and affordability. This element is closely related to Cobb’s Five-Year Consolidated Plan that is maintained by Cobb’s Community Development Block Grant Program (CDBG) office. The Consolidated Plan, which is required by the U.S. Department of Housing and Urban Development due to receiving federal grant funds, was last updated in 2021 and is effective through 2025. The plan identifies the community’s affordable housing, community development and economic development needs and outlines comprehensive and coordinated strategies for addressing them. Along with other goals, policies and work program items identified in this housing element, the 2021-2025 Consolidated & Action Plan will be incorporated into the 2040 Comprehensive Plan 5-Year update plan by reference

⬚ figure

HO – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Housing needs were deemed a priority moving forward.

Need:

  • Variety of Housing Types
  • Workforce Housing
  • Neighborhood Revitalization and Reinvestment

HO – GOALS & POLICIES

KEY STRATEGIES

Mix of Housing Types Attainable Housing Equitable housing Safe Housing Convenient Housing


HO-GOAL 1

Ensure the provision of adequate, attainable, and safe housing for all existing and future residents of Cobb County


Policies

HO-P1Encourage the distribution of all housing types while preserving the character of the surrounding neighborhoods
HO-P2Ensure future land use designations are adequate to accommodate projected household growth
HO-P3Promote equal-housing opportunities for all persons
HO-P4Focus housing near locations accessible to services and employment
HO-P5Encourage quality, attainable housing options for all people
HO-P6Ensure residential uses are compatible with surrounding neighborhoods
HO-P7Encourage new and innovative housing types that meet the needs of a diverse community

⬚ figure

HO-P8Encourage an adequate supply of housing for a growing senior population while considering unintended consequences of an oversupply senior housing
HO-P9Promote development of higher density housing, including attainable housing, as part of redevelopment efforts within Regional Activity Centers
HO-P10Coordinate and collaborate with the Marietta Housing Authority and Community Development Block Grant program on creative ways to increase the supply of affordable housing
HO-P11Promote a diverse supply of attainable and accessible housing that meets the needs of older adults and people with disabilities, especially in activity centers and other places that are near services and public transit
HO-P12Coordinate and collaborate with Cobb County's Community Development Block Grant (CDBG) program and other organizations whose mission is to enhance the quality of life for low- to moderate-income residents and the homeless
HO-P13Promote stability and livability of established residential neighborhoods through proactive code enforcement efforts
HO-P14Promote continued viability of established neighborhoods

BROADBAND

⬚ figure

In today's society, access to high-speed internet, computer processing, and information storage is the backbone to information and economic growth. Broadband can provide a community access to services such as healthcare, public safety, educational and economic opportunities, e-commerce, social connectivity, and other information resources. It is also vital to the success of businesses, whether they are operating within the regional, national or global economy.

In 2018, the Comprehensive Plan Minimum Standards and Procedures were modified in response to the Georgia General Assembly amending provisions of the Georgia Planning Act aimed at facilitating the enhancement and extension of high-speed internet infrastructure, known as the "Achieving Connectivity Everywhere (ACE) Act". The amended statutes require all jurisdictions to include a Broadband element within their Comprehensive Plans.

According to the minimum standards, local governments must address the availability of broadband services within the community and the deployment of broadband by service providers into unserved areas. The Broadband element must provide steps for the promotion of reasonable and cost-effective access to broadband in parts of the county designated as unserved areas.

⬚ figure

Percentage of Population with Access to Broadband
25 Mbps100 Mbps1 Gig
Cobb County100%97.90%60.82%

Source: Federal Communications Commission (FCC) Form 477

There does not appear to be any deficiencies in the availability of broadband services in Cobb County. Residents and businesses enjoy widespread access to broadband. According to the Federal Communications Commission (FCC), as of June 2021, one hundred percent of Cobb's population has access to the minimum speeds as defined by broadband services.

| Download / Upload Speeds of 25 Mbps / 3 Mbps (25Mbps) | | | | | :--- | :--- | :--- | :--- | :--- | | Area | No providers | 1 or more providers | 2 or more providers | 3 or more providers | | Cobb County | 0.00% | 100% | 100% | 98.09% | | Download / Upload Speeds of 100 Mbps / 10 Mbps (100 Mbps) | | | | | Cobb County | 2.10% | 97.90% | 83.55% | 11.81% | | Download / Upload Speeds of 1000 Mbps / 100 Mbps (1 Gig) | | | | | Cobb County | 39.18% | 60.82% | 23.90% | 0.00% | Source: Federal Communications Commission (FCC) Form 477

Not only does the entire County has access to minimum broadband services, they have at least two broadband service providers to choose from and most have access to three or more broadband service providers. Overall, Cobb is sufficiently served with broadband availability and service providers throughout the County.

⬚ figure

BROADBAND

BB – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine Broadband needs. The following Broadband needs were deemed a priority moving forward.

Need:

  • Expand higher-speed broadband services
  • Reliable broadband services
  • Affordable broadband access
  • Consistency in broadband service

BB – GOALS & POLICIES

KEY STRATEGIES

Affordable service Reliable Consistent


BB-GOAL 1

Ensure the availability of broadband and communications in a manner that satisfies the current and future needs of residents, businesses, industries, and public safety


Policies

BB-P1Identify unserved areas and target them through collaboration with public/private partnerships
BB-P2Promote broadband services that enable greater opportunity for redevelopment efforts and businesses
BB-P3Work to establish public/private partnerships that could develop consistent and affordable broadband coverage for all
BB-P4Coordinate with city and state governments to seek certification as a Broadband Ready Community
BB-P5Consider broadband infrastructure in roadway projects where necessary infrastructure may be included in the right-of-way
BB-P6Maintain and widen broadband access to wireless platforms to improve productivity at all public facilities

BB-P7 Ensure consistent broadband availability for businesses as part of economic development efforts

ECONOMIC DEVELOPMENT

⬚ figure

The Economic Development Element for Cobb County is an optional element that is designed to supplement the 2040 Comprehensive Plan. The Economic Development element provides an overview of the strategies, programs and projects to improve the economy as well as policy direction to promote job growth.

From global corporations to the home-based entrepreneur, Cobb County’s Economic Development division is the liaison to the business community. The Economic Development division works with elected officials and other economic development partners with the shared mission of growing jobs and expanding Cobb County’s economic growth. Current economic development strategies include attracting and retaining businesses, growing small business/entrepreneurship, targeting strategic industries, creating a more educated workforce and revitalizing communities and infrastructure.

Understanding employment rates, labor force trends, occupations and the make-up of the industries that call Cobb home is important to help identify needs in housing, infrastructure, land use and other services. Insight and awareness of employment characteristics in the County help guide policies involving job creation, industry diversification, business retention and expansion. Overall, economic development is a critical component that drives economic growth. It creates jobs, leads to increased tax revenue and improves the overall quality of life for the community. The analytical data pertaining the Cobb’s economy can be found in the Community Profile - Appendix 2.

⬚ figure

ED – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Economic Development needs were deemed a priority moving forward.

Need:

  • Support small businesses & entrepreneurs
  • Revitalization of abandoned and under-utilized buildings
  • Incentives
  • Remain active in international economic affairs

ED – GOAL & POLICIES

KEY STRATEGIES

Increase Jobs Maintain low taxes Focus on Targeted Industries

ED-GOAL 1

Promote the retention, expansion and creation of small businesses and targeted industries in order to provide job opportunities for a growing and diverse community

POLICIES

ED-P1:Collaborate with economic development partners in their efforts to reinforce and strengthen the economic vitality of Cobb County
ED-P2:Participate in regional economic development planning with the public and private sectors
ED-P3:Promote workforce development programs to target the needs of expanding and relocating businesses with the local area technical and post-secondary educational institutions
ED-P4:Encourage and promote environmentally clean industries
ED-P5:Create economic development opportunities utilizing tools that will foster growth
ED-P6:Develop programs that leverage capital for small business growth and development
ED-P7:Support opportunities to expand and increase the number of locally owned businesses
ED-P10:Encourage, promote, and guide small business startups and enable them to expand
ED-P11:Encourage economic diversity through a mix of small and large businesses that provide a healthy balance of goods, services and jobs
ED-P12:Provide incentives to encourage the redevelopment and revitalization of older commercial sites/buildings
ED-P13:Encourage reinvestment in existing industrial areas while minimizing impacts to surrounding

residential areas

ED-P14: Maintain redevelopment site inventory

ED-P15: Ensure land use opportunities for locating a variety of desirable, livable wage industries that are compatible with adjacent land uses and support a range of employment types

ED-P16: Promote continued development of major business districts that serve as a hub for the community to support employment growth and retail services

INTERGOVERNMENTAL COORDINATION IC

⬚ figure

A concerted coordination effort between local governmental entities is essential to the effective delivery of services to the general public. Cobb County maintains working relationships with the six (6) municipal governments within the County. Collaborative partnerships exist with other authorities, agencies, and non-profits at the local, state, and federal level. By including this element, it ensures that intergovernmental relations are consistent and in the best interest of the communities they serve.

⬚ figure

⬚ figure

⬚ figure

⬚ figure

⬚ figure

⬚ figure

⬚ figure

Cobb County... Expect the Best!

⬚ figure

⬚ figure

⬚ figure

⬚ figure

IC – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Intergovernmental Coordination needs were deemed a priority moving forward.

Need:

Proactively engage in multi-jurisdictional coordinationImprove governmental and community relationsCoordinate with Cobb School District on land use and population growthUnderstand the impact of incorporations and annexations

Cobb County Municipalities

⬚ figure

INTERGOVERNMENTAL COOORDINATION

IC – GOALS & POLICIES

KEY STRATEGIES

Coordinate service delivery Communicate Cultivate partnerships

IC-GOAL 1

Coordinate planning and policy making between the County, cities, regional, state, federal agencies and other special authorities to ensure consistency in provisions of services and compatibility with adjacent developments

POLICIES

IC-P1: Maintain and comply with the Service Delivery Strategy and monitor new or revised legislative actions

IC-P2: Coordinate planning and government services to address common issues of growth management, resource conservation and provision of public facilities and services

IC-P3: Assess existing intergovernmental agreements across all County agencies and revise as needed

IC-P4: Ensure all County agencies and departments are aware of Service Delivery Strategies and changes

IC-P5: Support and collaborate economic development efforts across county municipalities and other special authorities

IC-P6: Coordinate and collaborate with the Cobb School District on planning efforts, Service Delivery Strategy and the development review process

IC-P7: Seek innovative ways to communicate and inform communities on public initiatives

IC-P8: Leverage services provided through the Atlanta Regional Commission (ARC) and other regional and state agencies

IC-P9: Engage appropriate groups and agencies in dialog on regional issues

IC-P10: Evaluate plans and investments from adjacent counties and municipalities to ensure

compatibility with the County's land use goals and policies

IC-P11: Partner with adjacent jurisdictions on planning issues that help manage growth

IC-P12: Communicate and coordinate appropriate land use planning functions with the Cobb County School District, Dobbins Air Reserve Bases, cities, adjacent counties and regional partners

IC-P13: Evaluate the impact that new incorporations and annexations will have on unincorporated Cobb County.

SENIOR SERVICES

⬚ figure

The purpose of Senior Services is to improve the quality of life of Cobb’s older population. As of 2019, the senior population (65 years and up) was more than 89,040 strong and expected to reach a population of 234,922 by 2050. This trend is not unique to Cobb but is a trend across the entire nation. Over the next 30 years, Senior Services will become more and more important as the senior population continues to grow and become more diverse. Cobb Senior Services already provides an array of services to meet the needs of today’s seniors and continues to work toward solutions to the challenges of tomorrow.

⬚ figure

SS – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Senior Services needs were deemed a priority moving forward.

Need:

  • Adequate senior service facilities
  • Senior mobility services
  • Senior programming
  • Easier access to health care facilities
  • Advocacy & volunteerism

Cobb County Senior Service Centers

⬚ figure

The Cobb Senior Services Center is also home to the Senior Wellness Center and the Marietta Neighborhood Center.

Senior Service CentersAddress
Austell Senior Center4915 Austell-Powder Springs Rd., Austell
Marietta Neighborhood Center1150 Powder Springs St., Marietta
C. Freeman Poole Senior Center4025 South Hurt Rd., Smyrna
North Cobb Senior Center3900 South Main St., Acworth
Senior Wellness Center1150 Powder Springs St., Marietta
Tim D. Lee Senior Center3332 Sandy Plains Rd., Marietta
West Cobb Senior Center4915 Dallas Hwy., Powder Springs

SENIOR SERVICES

SS – GOALS & POLICIES

KEY STRATEGIES

Improve Quality of Life Mobility Options Health & Wellness Caregiving Information & Advocacy

SS-GOAL 1

Improve the quality of life of senior citizens through innovative programs and state-of-art facilities that meet all levels of need

POLICIES

SS-P1: Design and locate senior service facilities with good access to major roadways and public transit routes, where available

SS-P2: Monitor and assess senior services needs/demands and consider improvements/additions where necessary

SS-P3: Ensure the provisions of services that will meet the demand of a more diverse and growing older adult population

SS-P4: Identify innovative funding techniques to provide for future senior services facilities and programs

SS-P5: Consider cooperative agreements with public/private organizations for adaptive reuse and joint use of senior facilities

SS-P6: Coordinate with other public/private organizations that provide similar services

SS-P7: Maintain a focus on educating the senior community, staff and volunteers on all services and programs available

SS-P8: Seek innovative ways to recruit volunteers

SS-P9: Monitor the changing needs of the senior community and adjust services and programming to meet those needs

SS-P10: Coordinate public/private, local/regional transportation services for seniors

SS-P11: Ensure senior transit routes are well-connected to all medical facilities and wellness centers

NATURAL & HISTORIC RESOURCES

⬚ figure

The Natural & Historic Resources element is an optional element chosen and designed to supplement the core elements of the 2040 Comprehensive Plan. Its intent is to establish goals and policies that support the need to protect the County's unique natural and historic identity, while planning for orderly development in appropriate areas throughout the County. These sensitive community features cannot be regained once destroyed.

Over the past three decades, there has been a steady increase in growth of new businesses and residential communities; while that development may slow somewhat, progress is still anticipated in the next 30 years. The inevitable increase in new residents will need to be accommodated, and it will be important that Cobb's natural and historic resources are considered in the planning process. This allows future growth without destroying the rich cultural heritage of the County that makes it a desirable place to live.

⬚ figure

NH – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Natural & Historic Resource needs were deemed a priority moving forward.

Need:

Protect, preserve, and provide greenspaceProtect, preserve, and maintain historic resources and cemeteriesPreserve environmentally sensitive areasProtect plant and wildlife habitats, especially trees and tree canopiesProtect water resources

WETLANDS

⬚ figure

FLOOD ZONES

⬚ figure

WATERSHEDS AND GROUND WATER RECHARGE AREAS

⬚ figure

COBB COUNTY AND NATIONAL RECOGNIZED HISTORIC SITES

⬚ figure

NH – GOALS & POLICIES

KEY STRATEGIES

Stewardship Promote Local Heritage Preserve Local Heritage

NH-GOAL 1

Protect sensitive natural resources while allowing for growth and development

POLICIES

NH1-P1: Actively protect floodplains, wetlands, creeks, streams, rivers and other environmentally sensitive lands

NH1-P2: Identify funding mechanisms that could assist in the purchase of property for greenspace

NH1-P3: Proactively plan for the preservation of greenspace/open space throughout the County

NH1-P4: Monitor and revise policies that utilize best management practices to improve the management of natural resources

NH1-P5: Continue to support water conservation education, enforcement and outreach efforts and create new programs to target large water users

NH1-P6: Identify and monitor sensitive plant and wildlife habitats and encourage the preservation of native plants and animals

NH1-P7: Promote awareness and protection of sensitive steep slopes and ridgelines

NH1-P8: Adhere to state and federal regulations related to environmental protection when considering development, redevelopment and transportation goals

NH1-P9: Encourage the development of multi-use greenways in floodplains and easements to all for the maintenance of natural open space while accommodating citizens needs for passive recreation opportunities, bicycle networks, and public access to lakes and streams for low intensity recreation

NH-GOAL 2

Protect, promote, educate, document and maintain historic, archeological, and cultural resources

POLICIES

NH2-P1: Encourage developers to preserve and/or document historic, archeological and cultural significant resources when considering new developments and/or redevelopments

NH2-P3: Encourage the preservation of natural, historic, archeological and cultural resources when considering County projects

NH2-P4: Protect and preserve buildings, neighborhoods or sites of historical, architectural or cultural significance

NH2-P5: Work with individuals who may be interested in having their potentially historic property listed in the Cobb County and/or National Registers of Historic Places

NH2-P6: Maintain an inventory of properties that may be eligible for the Cobb County and/or National Registers of Historic Places

NH2-P7: Update when necessary, design guidelines for properties listed in the local register and aid those required to follow approved guidelines

NH2-P8: Encourage the preservation and maintenance of significant Civil War earthworks and other archaeological features located in the County

NH2-P9: Educate citizens, local officials and land developers as to the value of natural, historic, archaeological and cultural resources, and the consequences of their destruction and alternatives for protection

NH2-P10: Encourage the protection of cemeteries

LIBRARY

⬚ figure

Public libraries are important public facilities for residents of Cobb County. With an increase in the senior population, the library system will continue to experience increasing demands from patrons with more leisure time and rising expectations for educational and personal achievement.

The Library System vision is to move beyond traditional library services by strategically integrating new technology services, creating engaging community centers, and providing life enriching library and cultural experiences for all who enter our doors.

Recent Library Facility Projects

  • The Switzer Library - $9.6 million project - funded through the 2011 and 2016 SPLOST and grants from the Georgia Public Library Service (GPLS), and appropriations from the Cobb County Board of Commissioners

  • The South Cobb Regional Library underwent a three-month renovation that included interior and exterior repairs.

  • Gritters Library is currently under construction. It is being rebuilt using 2016 SPLOST and GPLS funds. The new Gritters Library is expected to be complete in 2023.

⬚ figure

LI – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Library needs were deemed a priority moving forward.

Need:

  • Adequate library facilities
  • Access to library facilities

LI – GOALS & POLICIES

KEY STRATEGIES

Technology Services Engaging Community Centers Enriching Cultural Experiences

LI-GOAL 1

Provide equitable access to and utilization of library facilities, information, materials, and services to enrich people's lives

POLICIES

LI-P1: Monitor and assess library usage, regional service potential and growth patterns for necessary facility improvements

LI-P2: Consider co-locations with other public facilities

LI-P3: Develop innovative funding techniques to support future library facilities and programming

LI-P4: Improve accessibility to all libraries and their resources, including business hours, programming and technology

LI-P5: Identify adequate funding to implement library facility plan

LI-P6: Implement the facility plan that identifies current conditions and future needs

LI-P7: Expand and efficiently deliver library services and programs to county residents

LI-P8: Achieve the highest level of efficiency and flexibility through layout and management of library facilities to meet the demands and needs of the community as well as changing technology

LI-P9: Continue to improve and update library technology and information services

PUBLIC SAFETY

⬚ figure

Public Safety is vital to the development of a vibrant and growing community. Effective delivery of Public Safety services impacts economic development, population growth, and ultimately, the fiscal well-being of Cobb County. The fear of crime and/or the perception of crime is often cited as a primary factor in the quality of life within communities as well as a contributing factor in business and family relocation decisions.

As mentioned throughout the 2040 Comprehensive Plan, the County will continue to see population and economic growth in coming decades. This growth will impact resources required to provide the desired level of public safety response and protection. Careful assessment, innovative approaches to service delivery, incorporation of viable emerging technologies, community outreach and strategic planning will lead the public safety efforts to properly allocate staff, direct resources, and ensure adequate facilities and training resources. Cobb County Public Safety will strive to provide a safe and secure community through highly trained and qualified personnel, innovative equipment and facilities, as well as operations emphasizing community outreach.

⬚ figure

PS – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Public Safety needs were deemed a priority moving forward.

Need:

  • Quality Public Safety Personnel
  • Crime Prevention Programs
  • Community Outreach
  • Public Safety Facility Planning
  • Multi-Jurisdictional Coordination
  • Maintain Investments in Public Safety Technology and Equipment

PS – GOALS & POLICIES

KEY STRATEGIES

Safe and Secure Cobb Build Community Relationships Leverage Innovation and Technology


PS-GOAL 1

Provide a safe and secure community through highly trained, compassionate personnel, state of the art equipment systems, and educational services and programs


POLICIES

PS-P1: Ensure adequate public safety personnel as growth-related demand for services occurs

PS-P2: Evaluate public safety personnel to ensure a diverse and effective allocation of highly trained and equipped workforce

PS-P3: Emphasize training, educational programs, and certification levels

PS-P4: Focus on response times to ensure efficient distribution of public safety facilities, equipment, and services

⬚ figure

PS-P5: Prioritize purchase of equipment, apparatus, and personnel needs with respect to changing technology

PS-P6: Continue to build trust within all communities

PS-P7: Create collaborative and creative partnerships to reduce and prevent crime through community outreach

PS-P8: Continue to provide advanced comprehensive safety training and educational

environment for all residents

PS-P9: Coordinate with neighboring jurisdictions, including state and regional agencies

PS-P10: Establish and maintain innovative programs that promote crime prevention

PS-P11: Coordinate with Community Development, as relates to the design of major development proposals, in order to promote crime prevention type design

PARKS

⬚ figure

Cobb County is responsible for a variety of parks, programming and facilities. The objective of the Parks element is to integrate needs, goals and policies that work in conjunction with the 10 Year Parks Master Plan, which was adopted in 2018. The goal of the Parks Master Plan is to assist Cobb County P.A.R.K.S in guiding its plans for future improvements to parks, recreation greenspace and trails within Cobb County over the next ten years.

The Parks Master Plan analyzes existing facilities and programs and provides recommendations for additional programs and facilities to serve the community. Along with the facilities analysis, a review of current and forecasted characteristics of the population was performed, giving an overview of historical trends, current status, and what future changes to the population are anticipated. Community Engagement was an important part of the plan, with input sought through various public meetings and community survey.

The information gleaned from these steps are necessary in determining the facilities and programs the agency should provide. While a variety of programming, facilities and opportunities are currently provided by the county, making certain that appropriate planning is in place for continued growth is essential.

⬚ figure

PR – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Parks needs were deemed a priority moving forward.

Need:

  • More park land (both active & passive)
  • Park connectivity
  • Recreational programming services for all ages
  • Maintenance of existing facilities
  • Development of park master plan sites
  • Cost effective Park operations
  • Staffing levels to support demand

PR – GOALS & POLICIES

KEY STRATEGIES

Marketing and Branding Program Development Health and Wellness Facility Development & Maintenance

PR-GOAL 1

Provide active and passive parks, facilities, and programming for recreational opportunities, arts, and cultural activities

POLICIES

PR-P1:Provide recreational and arts programming to meet the needs of existing and future residents of all ages
PR-P2:Ensure adequate funding for maintenance and improvements of existing recreational and cultural facilities
PR-P3:Seek opportunities for land and funding for future park needs and the development of future facilities and programs

PR-P4: Strategically target areas where facilities and services are lacking or do not exist

PR-P5: Consider co-locations with other public facilities when considering new parks and programming

PR-P6: Assess recreational facility needs and consider new facilities, improvements, and/or additions that are flexible

PR-P7: Provide both active and passive park experiences that enhances wellness and fosters healthy attitudes

PR-P8: Leverage partnerships with other County departments and outside groups to provide opportunities for healthy lifestyle options

PR-P9: Improve connectivity between trails, parks, recreational facilities and surrounding neighborhoods

PR-P10: Ensure access to major roadways and public transit routes where available

PR-P11: Work to expand audiences for arts and recreational programming and activities

PR-P12: Maximize the use of public land and facilities for recreation and cultural activities

PR-P13: Develop innovative funding techniques to provide for the upkeep of existing and the development of future park facilities and programs

PR-P14: Improve the condition of existing recreational facilities to a consistent standard of high quality

PR-P15: Develop diverse arts programming to meet the various needs of the community

PR-P16: Encourage the development of multi-use greenways in floodplains and easements to accommodate citizens' needs for passive recreation and public health benefit, while allowing for the preservation of greenspace

PR-P17: Coordinate with community groups, local schools and other appropriate organizations to promote the arts

PR-P18: Coordinate with Community Development in creating a sense of place for identified areas by providing opportunities for parks, plazas, and public art

PR-P19: Provide venues, and when feasible, financial support for performing and visual arts and music events

PR-P20: Encourage expansion of parks and the trail network into low- and moderate-income residential areas

PR-P21: Support exiting community gardens through public/private partnerships, including schools, neighborhoods groups, Friends groups, senior services, businesses, and civic and gardening organizations

PR-P22: Consider the Chattahoochee Riverlands Project when developing or redeveloping park infrastructure along the Chattahoochee River

PR-P23: Ensure all facilities, whether new or redeveloped, are inclusive to disabled individuals and ADA compliant.

PLACE MAKING

⬚ figure

Place-Making is the physical design and management of public space and the way that space is experienced and used. Public space includes the totality of spaces used freely on a day-to-day basis by the general public, such as streets, sidewalks, plazas, parks and public infrastructure.

The Place-Making Element for Cobb County is an optional element intended to supplement the 2040 Comprehensive Plan. The objective is to establish broad policies that support the need for a design tool that enhances the livability and vitality of Cobb’s residents.

The intent of this element is to promote and guide decisions toward a healthy, safe and sustainable community by encouraging walkable neighborhoods and active commercial centers.

As Cobb County continues to grow and change, place-making will become increasingly important. Place-making policies help conserve and enhance aspects of the physical environment, guide growth to fit the old with the new and provide for healthy lifestyles. Place-making strategies can raise the standards for how public and private developments contribute to the holistic appearance and functionality of the built and natural environment and provide positive impacts to the overall quality of an area.

⬚ figure

PM – NEEDS

As part of the 5-Year update process, a needs assessment survey was conducted during the community engagement phase of the project to determine if the existing needs are still relevant. The following Place Making needs were deemed a priority moving forward.

Need:

  • Pedestrian and Bike Friendly development
  • Circulation and Connectivity
  • Public Places
  • Landscaping

PM – GOALS & POLICIES

KEY STRATEGIES

Sense of Place Connectivity Active Living

PM-GOAL

Create attractive, well-designed activity centers and neighborhoods that consider the existing character and the environment and promote public health through pedestrian-oriented facilities. This will enhance community image and attract private investment.

POLICIES

PM-P1:Employ place-making design principles within small area plans
PM-P2:Promote multi-modal circulation and connectivity of the transportation network
PM-P3:Coordinate with DOT to develop effective strategies on creating pedestrian and bike-oriented place-making standards
PM-P4:Encourage uses and amenities that create an active and vibrant environment to create community sense of place
PM-P5:Promote pedestrian-friendly connectivity between public spaces
PM-P6:Use place-making standards to guide landmarks, gateways, street intersections and open spaces to help cultivate a sense of place
PM-P7:Establish unique place-making standards within appropriate activity center districts that are architecturally compatible with the physical characteristics and boundaries for the areas
PM-P8:Consider the needs of a diverse and aging population in the design of public space
PM-P9:Integrate practices aimed at improving environmental quality with innovative green

infrastructure approaches

PM-P10: Encourage unique landscaping features and art that exhibit local culture and values in the design of public space

PM-P11: Consider connecting large parks and open spaces to each other and to activity centers

PM-P12: Consider strengthening the applicability of existing and new design guidelines and ensuring their focus is on the functional interrelationships between land uses, site design, neighborhood character and transportation systems

2040 COMMUNITY WORK PROGRAM 2022-2027

The purpose of the Community Work Program is to identify specific implementation actions the local government, or other entities, intend to undertake over the course of the next five (5) year planning period. This includes, but is not limited to, new facilities, expansion of facilities, new ordinances, revisions of existing ordinances, administrative actions, community improvements or investments, infrastructure, financing arrangements, or other programs or initiatives to be put in place to implement the plan. To facilitate the division of work among various County Divisions, the community work program is segmented by the following elements: Land Use, Transportation, Housing, Community Facilities, Natural and Historic Resources, Human Services, Economic Development, Public Safety, Disaster Resilience, Intergovernmental Coordination, Military Compatibility, and Place-Making.

The following are abbreviations that are used throughout the Community Work Program

ACFBAtlanta Community Food BankCOMCobb County CommunicationsLILibrary
ACSAmerican Cancer SocietyCTTCobb Travel & TourismMHAMarietta Housing Authority
AHAAmerican Heart AssociationDADevelopment AuthorityNPSNational Park Service
ALAAmerican Lung AssociationDARBDobbins Air Reserve BaseP.A.R.K.S.Parks, Recreation, & Cultural Affairs
ARCAtlanta Regional CommissionDCADepartment of Community AffairsPCPlanning Commission
BOCBoard of CommissionersDOTDepartment of TransportationPMProperty Management
CAOCounty Attorney's OfficeEDEconomic DevelopmentPSPublic Safety
CCESCobb County Extension ServicesTAPTechnical Advisory PanelSCRASouth Cobb Redevelopment Authority
CCIDCumberland Community Improvement DistrictEMAEmergency Management AgencySKCCSafe Kids Cobb County
CCSDCobb County School DistrictESGEmergency Solutions GrantSPLOSTSpecial Local Option Sales Tax
CCWSCobb County Water SystemGDOTGeorgia Department of TransportationSSSenior Services
CDCommunity DevelopmentHOMEHome Investment Partnership ActSWSolid Waste
CDBGCommunity Development Block GrantHPCHistoric Preservation CommissionTBDTo Be Determined
CDHOCommunity Development Housing OrganizationsCOMCobb County CommunicationsTCCIDTown Center Community Improvement District
CDPHCobb Douglas Public HealthCTTCobb Travel & TourismUGAUniversity of Georgia
Cobb 2020Community organizations dedicated to public healthISInformation ServicesWAWater
COCChamber of CommerceKCBKeep Cobb BeautifulULIUrban Land Institute
CCPSCobb County Public ServiceKSUKennesaw State UniversityARPAAmerican Rescue Plan Act

LAND USE - LU

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
LU-1Create a Unified Development Code (UDC) that preserves the character of surrounding areasXCD$100,000General Fund
LU-2Ensure appropriate zoning categories are compatible with the future land use classificationsXCDStaff ResourcesGeneral Fund
LU-3Reevaluate redevelopment site criteriaXCDStaff ResourcesGeneral Fund
LU-4Update Redevelopment Inventory on annual basisXCD, EDStaff ResourcesGeneral Fund
LU-5Integrate permitting and business license geographical information systems dataset into data management softwareXCDStaff ResourcesGeneral Fund
LU-6Transition data management from Central Address Repository (CAR) to ESRI's address data management solutionXCD, GISStaff ResourcesGeneral Fund
LU-7Provide high-level 3-dimensional land use data based on land use regulations and guidelines for analysisXCD, GISStaff ResourcesGeneral Fund
LU-8Update the Northwest Cobb Vulnerability StudyXCD, CommunityStaff ResourcesGeneral Fund
LU-9Develop a Small Area Master Plan around the Due West Rd., Acworth Due West Rd., and Kennesaw Due West Rd. commercial nodeXCD, CommunityStaff ResourcesGeneral Fund
LU-10Consider healthy living code language within appropriate zoning districts when creating UDC (FKA: LU-7 2017 CWP)XCDStaff ResourcesGeneral Fund
LU-11Update undeveloped land inventory (FKA: LU-34 2017 CWP)XCDStaff ResourcesGeneral Fund
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
LU-12Update industrial land inventoryXCD, EDStaff ResourcesGeneral Fund
LU-13Implement recommendations from the Mableton Technical Advisory PanelXCDTBDGeneral Fund
LU-14Update Central Addressing Repository to include input of multi-unit addressing and parcel polygon data<br>(FKA: LU-6 2017 CWP)XCD, IS$100,000General Fund
LU-15Coordinate, collaborate and consider LCI studies, small area plans and/or other Master Plans conducted and sponsored by Cobb's CIDsXCD, CCID, TCCIDStaff resourcesGeneral Fund
LU-16Update and amend the Community Work Program on an annual basis to include implementation items from approved Master Plans and other studies as necessary, related to each of the 2040 Comprehensive Plan ElementsXCD, DOT, CDBG, ED, PARKS, SS, LI, PS, EMA, WAStaff resourcesGeneral Fund
LU-17Consider implementation of items from the Mableton TAP that would assist in creating more private sector involvement in Mableton's redevelopment<br>(FKA: LU-37 2017 CWP)XED, CD, SCRAStaff resourcesGeneral Fund
LU-18Prepare 3D renderings throughout the county based on zoning designations and regulations, including existing structures and terrain<br>(FKA: LU-45 2017 CWP)XCD, IS$4,000General Fund
LU-19Continue to coordinate development plan review and rezoning applications with Dobbins ARBXCD, DARB$30,000General Fund/Grant
LU-20Implement as necessary recommendations from the JLUSXCD, DARB$30,000General Fund/Grant
LU-21Pursue grants associated with implementing the Dobbins JLUSXCD, DARBStaff resourcesGeneral Fund
LU-22As part of the UDC review existing architectural guidelines and determine their effectiveness<br>(FKA: LU-50 2017 CWP)XCDStaff resourcesGeneral Fund

TRANSPORTATION - TR

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
CONGESTION RELIEF/MOBILITY – IMPROVEMENTS
TR-1Lake Acworth Dr./Cowan Rd (SR 92) – N Cobb Pkwy (SR 3/US 41) to Glade Rd – Widen to 4 Land Divided (D4190/CO-301/0006862) (FKA: TR-5 2017 CWP)XGDOTTBDSPLOST GDOT
TR-2Metro Arterial Connector/Dallas Acworth Hwy (SR 92) - Paulding Co to U.S. 41 - Widen to 4 Lane Divided (D4200/CO-329/0006866 (FKA: TR-6 2017 CWP)XGDOTTBDSPLOST GDOT
TR-3Windy Hill Rd - Boulevard concept from S Cobb Dr. to Atlanta Rd that includes widening, addition of medians and pedestrian improvements, includes engineering (City of Smyrna) (E4040) (FKA: TR-7 2017 CWP)XDOT$40,000,000SPLOST GDOT
TR-4Windy Hill Road/Terrell Mill Road Connector (FKA: TR-9 2017 CWP)XDOT$32,164,893SPLOST & GDOT
TR-5Windy Hill Road (FKA: TR-10 2017 CWP)XDOT$18,000,000SPLOST GDOT
TR-6South Barrett Reliever Phase 3 (FKA: TR-12 2017 CWP)XDOT$31,505,248SPLOST, GDOT, TCCID
TR-7I-75 / Akers Mill Road Managed Land Ramp (CO-AR-308/0015051) (FKA: TR-14 2017 CWP)XDOT, GDOT$25,000,000SPLOST, CCID, GDOT
TR-8SR 92 widen from 2 to 4 lanes, from US 41 to Glade Road (FKA: TR-15 2017 CWP)XGDOT$50,541,677GDOT
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
SAFETY & OPERATIONAL IMPROVEMENTS
TR-9Macland Rd (SR 360)- widen from 2 to 4 lanes (CO-367/0006049) (FKA: TR-16 2017 CWP)XDOT, GDOTTBD (GDOT)SPLOST
TR-10RESURFACING (FKA: TR-17 2017 CWP)XDOT$213,067,821.872022 SPLOST
TR-11BIG SHANTY RD CHASTAIN RD (FKA: TR-37 2017 CWP)XDOT$2,500,000SPLOST
TR-12CANTON RD AT SHALLOWFORD RD HIGHLAND TER SOUTHERN INTERSECTION (FKA: TR-38 2017 CWP)XDOT$800,000SPLOST
TR-13DALLAS HWY AT LOST MOUNTAIN RD/MARS HILL RD (FKA: TR-39 2017 CWP)XDOT$2,900,000SPLOST
TR-14RAILROAD QUIET ZONE IMPROVEMENTS (FKA: TR-47 2017 CWP)XDOT$400,000SPLOST
TR-15SHILOH RD AT ROYAL DR APARTMENT DR (FKA: TR-48 2017 CWP)XDOT$400,000SPLOST
TR-16CANTON RD CORRIDOR (FKA: TR-54 2017 CWP)XDOT$3,000,000SPLOST
TR-17MACK DOBBS RD (FKA: TR-54 2017 CWP)XDOT$1,000,000SPLOST
TR-18OLD 41 HWY (FKA: TR-61 2017 CWP)XDOT$4,300,000SPLOST
TR-19OLD STILESBORO RD @ COUNTY LINE RDXDOT2,840,000SPLOST, FEDERAL, STATE, & GRANTS
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
SAFETY & OPERATIONAL IMPROVEMENTS (CONT.)
TR-20DUE WEST ROAD @ ANTIOCH ROADXDOT2,960,000SPLOST, FEDERAL, STATE, & GRANTS
TR-21HOLLY SPRINGS CORRIDOR IMPROVEMENTSXDOT$3,910,000SPLOST, FEDERAL, STATE, & GRANTS
TR-22CUMBERLAND PKWY FROM PACES WALK TO PACES FERRY RDXDOT$370,000SPLOST, FEDERAL, STATE, & GRANTS
TR-23CHURCH RD PLANT/ATKINSON RD @ N CHURCH LANEXDOT$2,645,000SPLOST, FEDERAL, STATE, & GRANTS
TR-24SHALLOWFORD ROAD @ GORDY PKWY WESTXDOT$700,000SPLOST, FEDERAL, STATE, & GRANTS
TR-25CANTON RD CORRIDOR IMPROVEMENTSXDOT$2,415,000SPLOST, FEDERAL, STATE, & GRANTS
TR-26E/W CONNECTOR CORRIDOR IMPROVEMENTSXDOT$670,000SPLOST, FEDERAL, STATE, & GRANTS
TR-27RIVERSIDE PKWY @ WHITE ROADXDOT$1,465,000SPLOST, FEDERAL, STATE, & GRANTS
TR-28S GORDON ROAD @ PISGAH ROADXDOT$3,220,000SPLOST, FEDERAL, STATE, & GRANTS
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
SIDEWALK AND TRAILS
TR-29SIDEWALK IMPROVEMENTS – LOCATIONS TO BE DETERMINED ($2,875,000 per District)XDOT$11,500,000SPLOST, FEDERAL, STATE, & GRANTS
TR-30TOWN CENTER MALL/NOONDAY CREEK TRAIL/KSUBIKE/PEDESTRIAN CONNECTOR (FKA: TR-72 2017 CWP)XDOTTBDFederal Funding
TR-31BOB CALLAN TRUNK TRAIL PHASE II, SECTION B (FKA: TR-74 2017 CWP)XDOT$7,278,000SPLOST, CCID, GDOT
TR-32MABLETON PKWY TRAIL, FACTORY SHOALS TO CHATTAHOOCHEE RIVER (FKA: TR-75 2017 CWP)XDOT$4,000,000SPLOST GDOT
TR-33WEST ATLANTA TRAIL, DUNN AVE. TO PEARL STREET (FKA: TR-76 2017 CWP)XDOT$2,000,000SPLOST GDOT
TR-34PEDESTRIAN IMPROVEMENT PROJECTS FOR DISTRICTS 3 (FKA: TR-78 2017 CWP)XDOT$1,600,000SPLOST
TR-35PEDESTRIAN IMPROVEMENT PROJECTS FOR DISTRICTS 4 (FKA: TR-77 2017 CWP)XDOT$18,500,000SPLOST
TR-36PEDESTRIAN IMPROVEMENT PROJECTS FOR DISTRICTS 1-4 (FKA: TR-79 2017 CWP)XDOT$15,000,000SPLOST
TR-37CHATTAHOOCHEE RIVER TRAILXDOT$3,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-38TRAILSXDOT$4,000,000 (Local Match)SPLOST, FEDERAL, STATE
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
SIDEWALK AND TRAILS (Cont.)
TR-39PACES MILL UNIT REHABILITATION TRAILSXDOT$1,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-40TRANSIT ORIENTED SIDEWALKSXDOT$1,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-41Expand and implement trail networks throughout Cobb County (FKA: TR-1.1 2017 CWP)XXDOTTBDSPLOST, FEDERAL, STATE, & GRANTS
TRANSIT
TR-42IMPLEMENT TRAVEL TRAINING PROGRAM (FKA: TR-117 2017 CWP)XDOTTBDTBD
TR-43TRANSIT CAPITAL IMPROVEMENTSXDOT$4,600,000SPLOST, FEDERAL, STATE, & GRANTS
TR-44TRANSIT FACILITIESXDOT$2,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-45AUSTELL TRANSFER CENTERXDOT$1,600,000 (Local Match)SPLOST, FEDERAL, STATE
BRIDGES & CULVERTS
TR-46BELLS FERRY RD OVER NOONDAY CREEKXDOT$2,800,0002022 SPLOST
TR-47COLLINS RD OVER LITTLE ALLATOONA CREEKXDOT$2,800,0002022 SPLOST
TR-48JAMES RD OVER PINE CREEKXDOT$2,400,0002022 SPLOST
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
BRIDGES & CULVERTS (CONT.)
TR-49ERNEST BARRETT PKWY OVER NOSES/WARD CREEKXDOT$1,200,0002022 SPLOST
TR-50BELLS FERRY ROAD OVER TATE CREEKXDOT$300,0002022 SPLOST
TR-51MANER RD OVER CHATTAHOOCHEE RIVER TRIBUTARYXDOT$300,0002022 SPLOST
TR-52MAXHAM ROAD OVER BUTTERMILK CREEKXDOT$300,0002022 SPLOST
TR-53MCDUFFIE RD OVER OLLEY CREEK TRIBUTARYXDOT$300,0002022 SPLOST
TR-54MURDOCK RD OVER SEWELL MILL CREEKXDOT$300,0002022 SPLOST
TR-55NORTH ELIZABETH LANE OVER GILMORE CREEKXDOT$300,0002022 SPLOST
TR-56STILLHOUSE ROAD OVER CAMP BERT ADAMS CREEKXDOT$300,0002022 SPLOST
TR-57ADDITIONAL LOCATIONS TO BE DETERMINEDXDOT$300,0002022 SPLOST
DRAINAGE SYSTEM
TR-57.1DRAINAGE SYSTEMXDOT, SWM$10,350,0002022 SPLOST
TRANSPORTATION PLANNING
TR-58Implement Safe Routes to School Program (FKA: TR-128 2017 CWP)XDOT, GDOTTBDSPLOST
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
TRANSPORTATION PLANNING (Cont.)
TR-59Implement Complete Streets Program for 40% of Cobb's Major Thoroughfares<br>(FKA: TR-130.1 2017 CWP)XDOT, GDOTTBDSPLOST, STATE, FEDERAL
TR-60COBB PARKWAY TRANSIT SIGNAL PRIORITY PLAN<br>(FKA: TR-137 2017 CWP)XDOT$3,500,000SPLOST, FEDERAL
TR-61Demand Response Service Improvements<br>(FKA: TR-146 2017 CWP)XDOT$3,500,000SPLOST, FEDERAL
TR-62Multimodal Transportation Plans<br>(FKA: TR-147 2017 CWP)XDOT$3,500,000SPLOST, FEDERAL
TRAFFIC MANAGEMENT, TRANSPORTATION TECHNOLOGY, & PLANNING
TR-63TRAFFIC SIGNAL SYSTEM PRESERVATIONXDOT$3,115,000SPLOST, FEDERAL, STATE, & GRANTS
TR-64ADVANCED TRANSPORTATION MANAGEMENT SYSTEMSXDOT$4,500,000SPLOST, FEDERAL, STATE, & GRANTS
TR-65INCIDENT MANAGEMENTXDOT$3,000,000SPLOST, FEDERAL, STATE, & GRANTS
TR-66INTEGRATED CORRIDOR MANAGEMENTXDOT$2,000,000SPLOST, FEDERAL, STATE, & GRANTS
TR-67PLANNING STUDIESXDOT$2,000,000SPLOST, FEDERAL, STATE, & GRANTS
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
TRAFFIC MANAGEMENT, TRANSPORTATION TECHNOLOGY, & PLANNING (Cont.)
TR-68TRAFFIC SIGNAL TIMINGXDOT3,000,000SPLOST, FEDERAL, STATE, & GRANTS
TR-69TRAFFIC SIGNALSXDOT$2,500,000SPLOST, FEDERAL, STATE, & GRANTS
TR-70TRANSPORTATION TECHNOLOGYXDOT$3,000,000SPLOST, FEDERAL, STATE, & GRANTS
SCHOOL ZONE IMPROVEMENTS
TR-71SCHOOL ZONE IMPROVEMENTS – LOCATIONS TO BE DETERMINEDXDOT$4,140,000SPLOST, FEDERAL, STATE, & GRANTS
DEPARTMENT OF TRANSPORTATION FACILITY IMPROVEMENTS
TR-72DOT FACILITY IMPROVEMENTS – CONSTRUCTION OF NEW SIGNAL & SIGN SHOPXDOT$3,100,000SPLOST, FEDERAL, STATE, & GRANTS
MCCOLLUM AIRPORT IMPROVEMENTS
TR-73MCCOLLUM AIRPORT TAXIWAY IMPROVEMENTSXDOT$5,000,000 (Local Match)2022 SPLOST
CORRIDOR IMPROVEMENTS
TR-74OAKDALE ROAD CORRIDOR IMPROVEMENTSXDOT$2,000,000 (Local Match)2022 SPLOST
TR-75CUMBERLAND CORE LOOPXDOT$2,600,000 (Local Match)2022 SPLOST
TR-76I-285 @ SOUTH COBB DRIVE INTERCHANGEXDOT$5,000,000 (Local Match)2022 SPLOST
TR-77EAST WEST CONNECTOR IMPROVEMENTSXDOT$5,000,000 (Local Match)2022 SPLOST
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
CORRIDOR IMPROVEMENTS (CONT.)
TR-78ROADWAY SAFETY AUDITSXDOT$2,000,000 (Local Match)2022 SPLOST
TR-79BELLS FERRY ROAD IMPROVEMENTSXDOT$3,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-80BIG SHANTY ROAD IMPROVEMENTSXDOT$3,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-81HICKORY GROVE ROAD IMPROVEMENTSXDOT$2,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-82CH JAMES PKWY/SR6/US278 IMPROVEMENTSXDOT$6,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-83CIRCLE 75 PKWY IMPROVEMENTSXDOT$4,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-84COBB PKWY/US41/SR3 IMPROVEMENTSXDOT$8,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-85DALLAS HWY/SR120 IMPROVEMENTSXDOT$2,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-86GATEWAY IMPROVEMENTSXDOT$400,000 (Local Match)SPLOST, FEDERAL, STATE
TR-87I-285 EB / WB AUXILLIARY LANESXDOT$1,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-88ROSWELL ROAD/SR120 WIDENINGXDOT$12,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-89CORRIDOR IMPROVEMENTS TO ADDRESS I-285 EXPRESS LANE TRAFFICXDOT$3,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-90BARRETT LAKES BOULEVARD CORRIDOR IMPROVEMENTSXDOT$1,400,000 (Local Match)SPLOST, FEDERAL, STATE
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
CORRIDOR IMPROVEMENTS (CONT.)
TR-91GEORGE BUSBEE PKWY CORRIDOR IMPROVEMENTSXDOT$3,000,000 (Local Match)SPLOST, FEDERAL, STATE
INTERSECTION IMPROVEMENTS
TR-92JOHNSON FERRY ROAD @ ROSWELL ROAD INTERSECTIONXDOT$5,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-93ACWORTH DUE WEST ROAD @ COBB PKWY AND MCCLURE ROAD INTERSECTIONSXDOT$3,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-94COBB PKWY @ MCCOLLUM PKWY/KENNESAW DUE WEST ROAD/OLD 41 HIGHWAY REALIGNMENTXDOT$5,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-95SOUTH COBB DRIVE @ FAIRGROUND STREET INTERSECTIONXDOT$2,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-96AUSTELL ROAD @ HOSPITAL DRIVE SOUTH INTERSECTIONXDOT$200,000 (Local Match)SPLOST, FEDERAL, STATE
TR-97AUSTELL ROAD @ MULKEY DRIVE INTERSECTIONXDOT$200,000 (Local Match)SPLOST, FEDERAL, STATE
TR-98COBB PARKWAY @ WINDY HILL ROAD INTERSECTIONXDOT$12,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-99SOUTH COBB DRIVE @ WINDY HILL ROAD INTERSECTIONXDOT$12,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-100GENERAL INTERSECTION IMPROVEMENTSXDOT$5,000,000 (Local Match)SPLOST, FEDERAL, STATE
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
TECHNOLOGY
TR-101TRANSPORTATION TECHOLOGYXDOT$1,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-102CONNECTED/AUTONOMOUS VEHICLESXDOT$1,000,000 (Local Match)SPLOST, FEDERAL, STATE
TR-103TRAFFIC MANAGEMENT CENTER (TMC) UPGRADESXDOT$800,000 (Local Match)SPLOST, FEDERAL, STATE
TR-104TRAFFIC SIGNAL TIMINGXDOT$800,000 (Local Match)SPLOST, FEDERAL, STATE
DEPARTMENT OF TRANSPORTATION COMMUNITY IMPACT PROJECTS
TR-105EWING ROAD SIDEWALKXDOT$800,0002022 SPLOST
TR-106SCHAFFER ROAD SIDEWALKXDOT$350,0002022 SPLOST
TR-107HOLLYDALE GATEWAY SIGN REPLACEMENTXDOT$50,0002022 SPLOST
TR-108Cobb Pkwy Signal Pre-Emption Upgrades - Cumberland Galleria area to Town Center area (E10B0)XDOT, CCT
TR-109Cobb Pkwy Queue Jumper Lanes - Cumberland Galleria area to Town Center area (E10B0)XDOT, CCT
TR-110Coordinate programs between Cobb DOT, KCB, and local volunteers to assist in roadside litter pick-upXDOT, KCB, VolunteersStaff ResourcesGeneral Fund

HOUSING - HO

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
HO-1Housing Assessment through the Community Development Assistance Program<br>(FKA: HO-3 2017 CWP)XCD$10,000General Fund
HO-2Strategic Housing Plan<ul><li>Identify housing characteristics and inventory of Cobb’s housing supply</li><li>Provide information regarding housing supply and demand</li><li>Analyze housing data and provide recommendations that will help provide safe and diverse housing opportunities to the needs of current and future residents</li><li>Provide data and analysis to inform about future housing planning and budgeting activities</li></ul>XCD, BOCTBDARPA
HO-3Establish program to inspect multi-family and rental properties to ensure residential code compliance<br>(FKA: HO-8 2017 CWP)XCDStaff ResourcesGeneral Fund

BROADBAND - BB

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
BB-1Seek certified “Broadband Ready Community” designation through DCAXCD, IT, BOCTBDTBD
BB-2Develop a Broadband MasterplanXCD, IT, BOCTBDTBD
BB-3Technology Infrastructure upgradesXIT$6,000,0002022 SPLOST
BB-4Cyber SecurityXIT$2,000,0002022 SPLOST
BB-5Digital Government/Smart CommunityXIT$9,000,0002022 SPLOST

ECONOMIC DEVELOPMENT - ED

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
ED-1Coordinate with Chamber on marketing small businesses and large corporations (FKA: ED-5 2017 CWP)XCD, ED, COCTBDTBD
ED-2Re-evaluate census tracts to determine if new areas could benefit from local, state, and federal economic development incentivesXCD, CAO, Cities, & BOCStaff ResourcesGeneral Fund
ED-3Provide annual or quarterly reports on compliance with incentive agreements and economic development activities (FKA: ED-14 2017 CWP)XCDStaff ResourcesGeneral Fund
ED-4Develop online GIS storybook of progress associated with redevelopment (FKA: LU-43 2017 CWP)XCD, EDStaff ResourcesGeneral Fund
ED-5Create a quick reference, interactive industrial land application for prospective industrial developers or builders (FKA: LU-35 2017 CWP)XCD, EDStaff ResourcesGeneral Fund
ED-6Establish system to highlight South Cobb Implementation strategy success; consider GIS storybook implementation (FKA: LU-38 2017 CWP)XCD, SCRA, EDStaff ResourcesGeneral Fund
ED-7Update and enhance the South Cobb marketing website to ensure accuracy and communication with local businesses and the community (FKA: LU-39 2017 CWP)XCD, SCRA, EDStaff ResourcesGeneral Fund
ED-8Create arts initiative (Arts Triangle) that supports a structure for art communities in order to broaden their reach and improve economic developmentXCD, P.A.R.K.S.TBDTBD
ED-9Revaluate areas throughout the county that would benefit from an Enterprise/Opportunity Zone designation (FKA: ED-7 2017 CWP)XEDStaff resourcesGeneral Fund
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
ED-10Assist with the creation of CIDs in appropriate areasXED, CD, BOCStaff resourcesGeneral Fund
ED-11Develop Economic Development Strategic Plan (As amended January 2024)XED, ED Partners, CD, BOC$100,000ARPA Fund

INTERGOVERNMENTAL COORDINATION - IC

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
IC-1Conduct impact analysis on new annexations/de-annexationsXCDTBDTBD
IC-2Work with cities to revise Service Delivery Strategy to ensure an effective and cost-efficient delivery of servicesXCD, CAO, Cities, & BOCStaff ResourcesGeneral Fund
IC-3Institute a more streamline filing system for annexations/de-annexations, city zoning notices, DRI files, MRPA files, and other intergovernmental coordination work-flowsXCDStaff ResourcesGeneral Fund
IC-4Coordinate with CCS on ED-SPLOST V Projects, when necessary (2019-2023)XCCSTBDEd-SPLOST

SENIOR SERVICES– SS

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
SS-1Implement Senior Service 10-Year Plan (FKA: HS-SS-2 2017 CWP)XSSStaff ResourcesGeneral Fund
SS-2Complete upgrades at various facilities (FKA: HS-SS-14 2017 CWP)XCCPS, SS$578,0002022 SPOST
SS-3Work with Cobb cities to establish agreement on Senior Service initiatives to reduce duplication of services (FKA: HS-SS-15 2017 CWP)XCD, SS, CitiesStaff ResourcesGeneral Fund
SS-4Addition of portico to provide covered drop offs and covered walkway to connect to new portico to the front entrance of North Cobb Senior CenterXCCPS, SS$200,0002022 SPLOST
SS-5Senior Wellness Center renovations, replacement of furniture, and parking lot reconfigurationXCCPS, SS$300,0002022 SPLOST
SS-6West Cobb Senior Center; Kitchen renovation and Restroom renovationXCCPS, SS$78,0002022 SPLOST
SS-7Construct a new portico to provide for covered drop offs at the pre-function area and covered walkway to connect the new portico to the front entrance at the North Cobb Senior CenterXCCPS, SS$200,000.002022 SPLOST
SS-8Conduct necessary interior and exterior renovations for the Senior Wellness Center to include installation of new exhaust fan in art room, lobby renovations, replacement of furniture and fixtures, and parking lot reconfiguration,XCCPS, SS$300,000.002022 SPLOST
SS-9Convert existing warming kitchen into a teaching kitchen to offer cooking classes to Cobb Senior Citizens, and upgrade restroom fixtures to better meet the needs of the aging population at the West Cobb Senior CenterXCCPS, SS$78,000.002022 SPLOST

WATER – WA

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
WA-1Continue to acquire wetlands and other environmentally sensitive areas.XCCWSTBDGeneral Fund/Grants
WA-2Comply with requirements of sewer system Capacity, Maintenance, Operation, and Management programXCCWSStaff resourcesGeneral Fund
WA-3Work with CCMWA to ensure quality of potable water provided to customers meets regulationsXCCWSStaff resourcesGeneral Fund
WA-4Continue the replacement of aging and substandard water mains.XCCWS$10,000,000 / YearGeneral Fund
WA-5Conduct condition assessments of appropriate county sewers and pump stations each year in accordance with the CCWS Asset Management Program and make appropriate repairs or replacements. (FKA: CF-WA-7 2017 CWP)XCCWS$8,000,000 / YearGeneral Fund
WA-6Partner with private entities for replacement of non-conserving water fixtures in commercial establishments. (FKA: CF-WA-8 2017 CWP)XCCWS$1,000,000 / YearPrivate Sector
WA-7Reduce reliance on private septic systems where possible through ongoing sewer extensions (FKA: CF-WA-9 2017 CWP)XCCWS$1,000,000 / YearGeneral Fund
WA-8Continue to operate and maintain the Watershed Stewardship Program (FKA: CF-WA-10 2017 CWP)XCCWSStaff resourcesGeneral Fund
WA-9Continue to support Water supply and Water conservation programs and educational outreach initiatives (FKA: CF-WA-11 2017 CWP)XCCWSStaff resourcesGeneral Fund
WA-10Evaluate opportunities to own and retrofit existing impoundment facilities for regional detention to create additional storage volume to store flood flows and mitigate downstream flooding. (FKA: CF-WA-12 2017 CWP)XCCWSStaff resourcesGeneral Fund/Grants
WA-11Operate four WRFs to ensure quality of discharges to Allatoona Lake and Chattahoochee River meet or exceed regulatory requirements and make appropriate repairs and replacements. (FKA: CF-WA-5 2017 CWP)XCCWS$22,000,000 / YearGeneral Fund

NATURAL & HISTORIC RESOURCES– NH

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
NH-1Update existing Historic Resources surveyXHPC, CD$12,000General Fund/Grant
NH-2Research the historic significance of residential structure on Elizabeth Lane for inclusion to the Cobb and/or National Register of Historic PlacesXCD, HPCStaff ResourcesGeneral Fund
NH-3Research the historic significance of residential structure at corner of Bells Ferry Road and Barrett Parkway for includes to the Cobb and/or National Register of Historic PlacesXCD, HPCStaff ResourcesGeneral Fund
NH-4Research and document the historic significance of the Rose Garden are of Cobb CountyXCD, HPCStaff ResourcesGeneral Fund
NH-5Research and work to create an historic battlefield sites trail that connects all historic battle sitesXCDTBDTBD

LIBRARY– LI

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
LI-1Complete renovations of Gritters Library (FKA: CF-LI-7 2017 CWP)XLI$2,900,0002016 SPLOST
LI-2Expand access to technology, specifically computer stations (FKA: CF-LI-1 2017 CWP)XLI/ISTBDGeneral Fund
LI-3Expand digital collection (FKA: CF-LI-2 2017 CWP)XLITBDGeneral Fund
LI-4Expand online programming and digital access to materials (FKA: CF-LI-3 2017 CWP)XLITBDGeneral Fund
LI-5Library Renovations & Video Surveillance; Renovations; teen spaces, flexible/adaptable spaces, updated infrastructure, computer stations, and interior design @ Mountain View, South Cobb, West Cobb, Lewis A. Ray, Stratton, Kemp Memorial, and Vinings; Video Surveillance Equipment; 12 locations to promote safety of customers and staffXLI$3,850,0002022 SPLOST
LI-6Complete necessary interior and exterior renovations for the North Cobb Regional Library to include installation of window blinds, sound baffles, automated material handling systems, and community room sound equipment.XLI$200,000.002022 SPLOST
LI-7East Cobb Library AV equipmentxLITBDTBD
LI-8East Cobb Library new locationxLI/Property Management$10,634,898.002022 SPLOST

PUBLIC SAFETY – PS

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
PS-1Police Headquarters & Training Center (firing range & additional infrastructure not covered under 2016 SPLOST)XPS$82,000,0002022 SPLOST
PS-2Police Vehicle ReplacementXPS$10,000,0002022 SPLOST
PS-3New E-911 Call Center (FKA: PS-16, PS-18 & PS-20 2017 CWP)XPS$14,000,0002022 SPLOST
PS-4Radio Equipment ReplacementXPS$16,000,0002022 SPLOST
PS-5Fire Facility Replacement/Renovations<br>• Fire Training Renovation<br>• Fire Station #12XPS$24,000,0002022 SPLOST
PS-6New 800 MHz Radio TowersXPS$7,000,0002022 SPLOST
PS-7New Animal Services FacilityXPS$15,000,0002022 SPLOST
PS-8Adult Detention Center Access Control System ReplacementXPS$6,000,0002022 SPLOST
PS-9Sheriff's office exterior maintenanceXPS$4,000,0002022 SPLOST
PS-10Complete staffing of Public Safety personnel for new Precinct 6XPSTBDGeneral Fund
PS-11Increase staffing levels at Precinct 4XPSTBDGeneral Fund
PS-12Police Precinct in NE Cobb (FKA: PS-38 2017 CWP)XPS$5,000,0002016 SPLOST

PARKS, RECREATION, & CULTURAL AFFAIRS – PR

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
PR-1Install or upgrade technological features that will improve communication, recordkeeping, and safety for visitors and staff as well as security improvements to protect county’s investments in its park system.XP.A.R.K.S.$750,000.002022 SPLOST
PR-2Complete PARKS building renovations and improvements to replace or upgrade structures that have reached their intended service life. Examples include metal roofs, gym floors, restroom renovations, shade structures, and playgrounds.XP.A.R.K.S.$4,500,000.002022 SPLOST
PR-3Convert existing natural turf fields to lower maintenance synthetic turf and replace existing synthetic turf fields at the end of their useful life.XP.A.R.K.S.$7,480,000.002022 SPLOST
PR-4Utilize LED lighting technology to replace old and inefficient metal halide lights on athletic fields, tennis courts, and high bay lighting in recreation and aquatic centers.XP.A.R.K.S.$3,430,000.002022 SPLOST
PR-5Replace HVAC and Dehumidification systems that have reached the end of their useful like in buildings throughout PARKS system.XP.A.R.K.S.$3,420,000.002022 SPLOST
PR-6Resurface existing facility roadways and parking lots to maintain quality and avoid more expensive future repairs. And identify certain park trails and sidewalks that will benefit from reconstruction or fortification with concrete or crushed slate materials.XP.A.R.K.S.$1,000,000.002022 SPLOST
PR-7Provide for safe and more enjoyable recreation experience for all park visitors through installation and replacement of park site amenities such as bleachers, pavilions, shade structures, water fountains, and playground safety surfaces.XP.A.R.K.S.$500,000.002022 SPLOST
ItemProjectOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
PR-8Provide storm water management and unique recreation opportunities by addressing erosion and drainage issues on park properties. This includes renovating existing dams and expanding streambank stabilization measures.XP.A.R.K.S.$500,000.002022 SPLOST
PR-9Install new, renovate, or replace existing sanitary sewer, stormwater management, potable water, irrigation, and fire protection piping throughout the counties park system.XP.A.R.K.S., CCWS, DOT$1,500,000.002022 SPLOST
PR-10Establish and implement a consistent and coordinated park signage and wayfinding system to allow better locating of park entrances and navigation of various facilities in the park systemXP.A.R.K.S., DOT$920,000.002022 SPLOST
PR-11Complete first phase of development for Kemp Family Park including parking, walking trails, and a restroom.XP.A.R.K.S.$1,000,000.002022 SPLOST
PR-12Construct additional parking and a pedestrian bridge for Price ParkXP.A.R.K.S.$1,000,000.002022 SPLOST
PR-13Install synthetic turf and LED lighting at Al Bishop ParkXP.A.R.K.S.$1,750,000.002022 SPLOST
PR-14Install Synthetic Turf and LED field lighting at Lost Mountain ComplexXP.A.R.K.S.$2,172,000.002022 SPLOST
PR-15Construct additional parking to service the Art Station and Tennis Courts at Big Shanty ParkXP.A.R.K.S.$300,000.002022 SPLOST
PR-16Conduct necessary interior and exterior renovations for the Ward Recreation CenterXP.A.R.K.S.$750,000.002022 SPLOST
PR-17Complete necessary repairs and activities to restore the safety and stability of cart paths at Cobblestone Golf Course.XP.A.R.K.S.$250,000.002022 SPLOST
PR-18Purchase the remaining 20 acres of property adjacent to East Cobb Park and Fullers Park to expand the usable amenities and offer a mix of active and passive recreation opportunities for the citizens of East Cobb CountyXP.A.R.K.S.$8,000,000.002022 SPLOST
ItemProjectOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
PR-19Repurpose Shaw Park to better meet the recreational needs and desires of the surrounding community.XP.A.R.K.S.$4,000,000.002022 SPLOST
PR-20Based on public input included in the 2018 PARKS Comprehensive Master Plan, develop a passive park in Northern Cobb County located at Ebenezer Downs ParkXP.A.R.K.S.$3,000,000.002022 SPLOST
PR-21Construct a County Veterans Memorial to honor veterans from all branches of the military who protect our nation's freedom during all major conflicts.XP.A.R.K.S., Other Boards$1,000,000.002022 SPLOST
PR-22Construct new Recreation Center in Osborne Area (FKA: CF-PR-35 2017 CWP)XP.A.R.K.S.12,000,000.002016 & 2022 SPLOST
PR-23Construct new restroom facility at Mable House Complex (FKA: CF-PR-38 2017 CWP)XP.A.R.K.S.$100,000.002022 SPLOST
PR-24Construct new passive park elements for Powder Springs ParkXP.A.R.K.S.$100,000.002022 SPLOST
PR-25Initiate new Park Master Plan for Bartlett Park to include trails, archery, restroom facility, and parking.XP.A.R.K.S.$100,000.002022 SPLOST
PR-26Initiate new Park Master Plan for Furr Park to include playground, pavilion, dog park, trails, and restroom facilityXP.A.R.K.S.$100,000.002022 SPLOST
PR-27Construct new facility improvements for Heritage ParkXP.A.R.K.S.$100,000.002022 SPLOST
PR-28Expand Adult Athletics Programs to attract participation by young professionals.XP.A.R.K.S., VolunteersStaff ResourcesGeneral Fund
PR-29Identify gaps in youth sports programs and develop programs to fill those gapsXP.A.R.K.S., VolunteersStaff ResourcesGeneral Fund
PR-30Target and develop active programs for baby boomer demographic offered outside the operating hours of Senior Service CentersXP.A.R.K.S., SS, VolunteersStaff ResourcesGeneral Fund
PR-31Develop small scale, unique special events that maximize community impact and require minimal resourcesXP.A.R.K.S.Staff ResourcesGeneral Fund
PR-32Develop and implement strategies to expand therapeutic recreation programs.XP.A.R.K.S.Staff ResourcesGeneral Fund
ItemProjectOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
PR-33Collaborate with Senior Services to identify gaps in senior programs, and develop strategies for new program developmentXP.A.R.K.S., SS, VolunteersStaff ResourcesGeneral Fund
PR-34Expand programming, special events, concerts, and festivals at Mable House Amphitheatre, Civic Center, and Jim R. Miller Park with an emphasis on tourism DevelopmentXP.A.R.K.S., CTT, Other BoardsStaff ResourcesGeneral Fund
PR-35Create an arts festival as a community wide signature special event. Develop a volunteer committee and sponsors to support the event.XP.A.R.K.S., CTT, Other BoardsStaff ResourcesGeneral Fund
PR-36Conduct an ADA Site Assessment and Transitional Plan for all County PARKS facilitiesXP.A.R.K.S.TBDGeneral Fund
PR-37Conduct Phase 1 construction at Stout Park to include renovation of existing barn, entrance improvements, Sweetwater Creek bridge, parking, public restrooms, horse arena, and access road improvements. (FKA: CF-PR-37 2017 CWP)XP.A.R.K.S., DOT$3,121,000.002016 SPLOST, Endowment Fund
PR-38Develop new Community Center at Old Clarkdale Park (FKA: CF-PR-39 2017 CWP)XP.A.R.K.S.$700,000.002016 SPLOST
PR-39Construct new LAND / Construction Division Operations Building at PARKS Administrative Complex.XP.A.R.K.S.$1,000,000.002016 SPLOST
PR-40Convert existing natural turf baseball/softball fields to synthetic turf.XP.A.R.K.S.$1,000,000.002016 SPLOST
PR-41Complete National Accreditation through the Commission for Accreditation of Parks and Recreation Agencies (CAPRA)XP.A.R.K.S.TBDGeneral Fund
PR-42Establish Schmidt-Anderson Park Friends Group with goal of fundraising and developing master plan conceptXP.A.R.K.S. COMMUNITYTBDGeneral Fund
PR-43Complete 2016 PARKS SPLOST projectsXP.A.R.K.S.TBD2016 SPLOST
PR-44Begin prioritized 2022 PARKS SPLOST projectsXP.A.R.K.S.$27,850,0002022 SPLOST

PLACE MAKING – PM

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
PM-1Integrate Dallas Highway Design Guidelines into Unified Development CodeXCDStaff ResourcesGeneral Fund
PM-2Update Dallas Highway Design Guidelines consistent with county existing building and transportation standards and regulations. (FKA: PM-2 2017 CWP)XCDStaff ResourcesGeneral Fund
PM-3Integrate Atlanta Road Design Guidelines into Unified Development CodeXCDStaff ResourcesGeneral Fund
PM-4Update Atlanta Road Design Guidelines consistent with County's building and transportation standards and regulations. (FKA: PM-3 2017 CWP)
PM-5Modify zoning code to reinforce implementation of Design Guidelines. (FKA: PM-4 2017 CWP)XCDStaff ResourcesGeneral Fund
PM-6Update and integrate new Architectural Design Guidelines into Unified Development Code. (FKA: PM-7 2017 CWP)XCDStaff ResourcesGeneral Fund
PM-7Track Canton Road development for inclusion into pedestrian light district implementation. (FKA: PM-5 2017 CWP)XCDStaff ResourcesGeneral Fund

WATER - WA

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
WA-1Continue to acquire wetlands and other environmentally sensitive areas.XCCWSTBDGeneral Fund/Grants
WA-2Comply with requirements of sewer system Capacity, Maintenance, Operation, and Management programXCCWSStaff resourcesGeneral Fund
WA-3Work with CCMWA to ensure quality of potable water provided to customers meets regulationsXCCWSStaff resourcesGeneral Fund
WA-4Continue the replacement of aging and substandard water mains.XCCWS$10,000,000 / YearGeneral Fund
WA-5Conduct condition assessments of appropriate county sewers and pump stations each year in accordance with the CCWS Asset Management Program and make appropriate repairs or replacements.XCCWS$8,000,000 / YearGeneral Fund
WA-6Partner with private entities for replacement of non-conserving water fixtures in commercial establishments.XCCWS$1,000,000 / YearPrivate
WA-7Reduce reliance on private septic systems where possible through ongoing sewer extensionsXCCWS$1,000,000 / YearGeneral Fund
WA-8Continue to operate and maintain the Watershed Stewardship ProgramXCCWSStaff resourcesGeneral Fund
WA-9Continue to support Water supply and Water conservation programs and educational outreach initiativesXCCWSStaff resourcesGeneral Fund
WA-10Evaluate opportunities to own and retrofit existing impoundment facilities for regional detention to create additional storage volume to store flood flows and mitigate downstream flooding.XCCWSStaff resourcesGeneral Fund/Grants

DISASTER RESILIENCE - DR

ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
DR-1Acquisitions of residential and commercial structures in the floodplain.XEMA & Cities$2,000,000Water Fund/ Grant
DR-2Acquisition of vacant floodplain land. (FKA: DR-4 2017 CWP)XEMA & Cities$1,000,000Grant
DR-3Promote floodplain mapping including updates / enhancements using GIS. (FKA: DR-5 2017 CWP)XEMA & Cities$1,000General Fund
DR-4Promote educational opportunities for county and city floodplain managers. (FKA: DR-7 2017 CWP)XEMA & Cities$1,000General Fund/Water Fund
DR-5Increase network of stream monitoring gauges. (FKA: DR-8 2017 CWP)XEMA & Cities$25,000Federal Government
DR-6Increase monitoring and enforcement of routine maintenance at private-owned stormwater detention facilities. (FKA: DR-9 2017 CWP)XEMA & Cities$1,000Water Fund
DR-7Promote structural adjustments such as elevation for homes in floodplain areas. (FKA: DR-10 2017 CWP)XEMA & Cities$25,000General Fund/Water Fund
DR-8Install major upgrades to warning sirens throughout. (FKA: DR-13 2017 CWP)XEMA & Cities$1,000,000SPLOST/ Grant
DR-9Identify safer areas within county government buildings for people in the event of a tornado. (FKA: DR-17 2017 CWP)XEMA & CitiesStaff resourcesGeneral Fund
DR-10Provide weather radios to vulnerable populations to provide warning of approaching severe thunderstorms. (FKA: DR-18 2017 CWP)XEMA & Cities$50,000General Fund/Grant
DR-11Promote the use of lightning rods and surge protectors as part of a public awareness initiative. (FKA: DR-20 2017 CWP)XEMA & CitiesStaff resourcesGeneral Fund
ItemCommunity Work Program ItemOngoing20232024202520262027Responsible PartyCost EstimateFunding Source
WORK PROGRAM ITEMS
DR-12Retrofit existing dams using Cobb County's Storage Volume Purchase Program to create additional freeboard and volume to store flood waters. (FKA: DR-24 2017 CWP)XEMA & CitiesTBDWater Fund/ Grant
DR-13Fund ongoing HAZMAT training to help maintain the required skills, knowledge, and abilities of the Cobb HAZMAT Response Team. (FKA: DR-28 2017 CWP)XEMA & Cities$10,000General Fund, Grant, FEMA
DR-14Identify ground-water recharge areas in County near transportation routes and assess/correct for vulnerabilityXDOT & EMATBDCities/General Fund/Grant
DR-15Perform field survey including dams, spillways, downstream cross section and downstream structures within dam breach zone. (FKA: DR-22 2017 CWP)XWA & EMATBDCities/General Fund/Grant