Transcript — Verbatim
0:06

Good morning, everybody.

0:07

Welcome to the Greatest Show on Earth, Public Works and Infrastructure Committee.

0:12

I'm joined in person today with our presiding officer and fellow commissioner Shakira Johnson representing District 4.

0:19

Joining us online is Commissioner Ted Terry, uh Super Six.

0:24

Super 6, thank you, everybody.

0:26

Uh Commissioner Terry, are you there?

0:28

Yes, I'm here.

0:29

Thank you, Terry.

0:30

Thank you for joining us.

0:31

It's much appreciated as always to have you with us.

0:34

We have a long agenda, I believe about 21 items, and um not a whole lot of time today, unfortunately.

0:41

We have the hard stop at 11 o'clock.

0:43

Uh so let's go ahead and get started.

0:45

We are going to begin with uh the minutes.

0:48

Agenda item 2026-1069.

0:50

This is for all commission districts.

0:52

Minutes of the June 18, 2026 Public Works and Infrastructure Committee meeting.

0:57

Commissioners move to approve.

1:00

Second.

1:00

Okay, proper motion, proper second.

1:02

All those in favor, raise your hand and say aye.

1:04

Aye.

1:04

Aye.

1:05

Uh moving on.

1:06

Uh items previously heard.

1:08

We have agenda item 2026-1022.

1:11

This is for commission districts four and super six to allocate $500,000 of category B3 bicycle paths, lanes, multi-use trails one.

1:21

Uh SPLOS 2 funding for the Laredo Drive bicycle facility.

1:25

Uh and who do we have?

1:27

Director Keeter, good to see you this morning.

1:38

Good morning, Commissioners.

1:39

How about that?

1:40

Good morning.

1:41

So, what can you tell about this item?

1:43

So, um, recently under um SPLOS resurfacing, Laredo Drive was resurfaced.

1:50

And instead of just putting back the traditional striping that was there previously, um, there was a plan that was um made with the bicycle master plan to do a uh connection or an um interim connection between the Atlanta Stow Mountain Trail and the UmCAP Farmers Market at East Potts in Loreto.

2:15

And so this uh agenda item would allow for um permission to use 500,000 dollars of that um of SPLOSS funding to uh to advance the Laredo Drive uh ped bike or bicycle facility plan while it's freshly resurfaced and we have a blank slate to work with.

2:37

Gotcha.

2:38

Makes sense.

2:39

Um this is uh both of my commissioners' uh districts, so I'll start with uh Commissioner Johnson.

2:44

No questions.

2:45

No questions.

2:45

Commissioner Terry, any questions, any comments?

2:49

Uh no, other than just say thank you.

2:52

Oh, we have a little bit of feedback, actually.

2:56

So I'll just keep my comments to no comments for now.

2:59

Okay, all right, Commissioner Terry.

3:02

Um, unless there's any objections, I'm gonna open the floor for a motion.

3:05

Move to approve item 1022.

3:08

Second.

3:09

Proper motion, proper second.

3:10

All those in favor, raise your hand and say aye.

3:12

Aye.

3:13

Okay.

3:14

Um, all right, we're gonna move on to agenda item 2026-0524.

3:18

This is for all commission districts.

3:20

RFQ request for qualifications number 25-085, RFQ design services for traffic signal operations and technology improvements in the DeCab County, uh, excuse me, DeCab County uh PI number 0019786 for use by public works transportation to obtain engineering design services for traffic signal operations and technology improvements in DeCab County.

3:46

Recommended award to the highest scoring proposer, KCI Technologies Incorporated, amount not to exceed 636,250 cents, excuse me, 250 dollars and 24 cents.

3:58

Director Keeter.

3:59

Yes, so this is more like a maintenance project where we've picked out a hundred, well, it's really 98 signals, um, to get flashing yellow arrow upgrades and uh any kind of detection upgrades.

4:13

Um now that Audible PEDs are required on new signals, we're gonna try to sneak that in as well as our budget allows.

4:22

Um, however, this is not a full signal upgrade.

4:25

I want to make that very clear.

4:27

This is slap it in there, knock it out, get it done, upgrade these minor but um impactful improvements.

4:36

So if any signal requires ride away or has some kind of significant issue, we will actually drop it from the project to advance the other 98 signals.

4:47

Gotcha.

4:48

Okay.

4:48

Uh Commissioner Johnson, any questions?

4:50

Yeah, I did have one question.

4:52

The sub has the amount being maybe $50,000 higher.

4:57

What's that difference?

5:00

out get it done upgrade these minor but um impactful improvements so if any signal requires ride away or has some kind of significant issue we will actually drop it from the project to advance the other you know 98 signals gotcha okay uh commissioner Johnson any questions yeah I did have one question the sub has the amount being maybe fifty thousand dollars higher what's that difference all right so that's a that's a good question so all of this is GDOT funded and when we go through the GDOT process which we are learning um th a new purchasing process it's been a hard labor I would say um the um the forms that they have it says total this amount well that's not the total it's total plus fixed fee so we've had on a multiple agenda items you're gonna see substitutes where we've had to go back in and add the fixed fee um so that's the difference understood thank you uh any other questions no sir uh commissioner terry any questions no questions thank you okay and uh just for clarity again as was stated this is a substitute I think believe everything is gonna be the same except for the dollar amount so recommend award to the highest scoring for prozer KCI technologies incorporated amount not to exceed six hundred ninety-three thousand nine hundred eighty three dollars and eighty cents and I'll open the floor for a motion move to approve the substitute for 0524 second all right uh proper motion proper second all those in favor raise your hand say aye aye aye aye perfect all right commissioners we're gonna uh we are hopping around although not that much so we're gonna go to the top of page two and we're gonna take the first one at the top agenda item 2026 0581 this is for districts one and super seven RFP excuse me RFQ request for qualification number 2025 045 RFQ uh rebid design services for CR 5182 Pleasantdale Road from I 85 to Tucker Norcross Road PI number 0019623 for use by public works transportation to obtain engineering design services for CR 5182 slash Pleasantdale Road recommend award to the highest scoring proposer Atkins Realist USA Incorporated amount not to exceed 2,29096 cents.

7:05

Director Keeter this is another one of our GDOT projects where we'll have a substitute to add that fixed um cost I I think that's been it it has been and let me since you just reminded me uh again this is recommend award to the highest scoring proposer Atkins Realis USA incorporated amount not to exceed 2,35314 and nine cents and this is for um full design through the plan development process of GDOT um I would that number is a large number and um it's it's going to be it's not a worse case but it's a higher case because they don't they don't have a concept yet so they don't know you know if there's bridges or walls or what so they had to uh you know assume make some assumptions based on a field visit.

8:06

And so I expect that we'll be assigning this by task order instead of just one big um uh assignment so that we can do it um get a concept and narrow that and hone that number in for the next task order so that's how we're we're planning on doing that some of these big design projects but I would as y'all talk about congressional funding and other federal opportunities anything that goes through GDOT has to follow the plan development process which takes multiple years at least three years of design right away and then construction and that's a very small project and the plan development process design costs are are going up to about two million for just an average size project and could go to three or four million for a longer project or a larger project so just keep that in mind as you make applications.

9:00

Okay all right thank you and I'll just say for Pleasantale Road uh there are several retaining walls along the area so I suspect there's gonna be some underground water flows that are are uh part of the concern so uh thank you for that information uh commissioner Johnson any questions any concerns no questions commissioner terry any questions any concerns uh no concern just one question is is the goal of this redesign to make it more um like multimodal or is it just um standard infrastructure oh it's absolutely to make it more multimodal um the the the vision I have is to narrow the lanes and shift the lanes to one side and have a multi-use path with um that supplements our existing pedestrian crossings um to uh help the corridor so the the narrower lanes would slow down the speeds and um there's a lot of pedestrians and bikes park school um so uh it to provide that multimodal um facility at least on one side of the street okay wonderful thank you yep and uh commissioner terry uh just for for information at 85 in Pleasantdale is the large uh warehouse distribution of UPS so they have several heavy vehicles that are coming through there

10:07

Um so uh to provide that multimodal um facility at least on one side of the street.

10:16

Okay, wonderful, thank you.

10:17

Yep.

10:18

And uh Commissioner Terry uh just for for information at 85 in Pleasendale is the large uh warehouse distribution of UPS.

10:26

So they have several heavy vehicles that are coming through there, and then as you get down to Tucker, uh Tucker, of course, did that road diet several years ago.

10:35

Um and uh I think it's fair to say traffic is a teetotal mess uh around rush hour uh in that interchange near the QT.

10:44

So um uh I appreciate staff looking into ways to sort of improve traffic over there.

10:49

Uh Commissioners, unless there's any questions or conversation, I'll open the floor for a motion.

10:53

Move to approve the substitute for 0581.

10:58

Second.

10:59

All right, we got a proper motion, proper second.

11:01

All those in favor, raise your hand say aye.

11:02

Aye.

11:03

All right, move.

11:04

Moving on to the next one, agenda item 2026-0821.

11:08

Uh this is for commission districts four, six, and seven.

11:11

Low bid invitation number 2025-108 ITB.

11:16

Stevenson Road and Valley Brook Road traffic signals, 180 days for use by public works transportation to obtain construction services to install two new traffic signals at the intersection of Valley Brook Road at Hollywood Drive.

11:29

Recommend award to the lowest responsive and responsible bidder, RJ Haney and Associates Incorporated, amount not to exceed 441,244.

11:41

Yes, so this uh is a straight up construction bid to build to build two traffic signals, one at Alford and Stevenson, one at Hollywood and Valley Brook.

11:53

Okay.

11:53

Uh Commissioner Johnson, uh this is no questions, just excited about the project though.

11:59

Okay.

11:59

Commissioner Terry, this is also your area.

12:01

Any questions?

12:03

No, no questions other just to say thank you, Director Keeter, for um getting these uh traffic signals installed at Valley Brook in Hollywood.

12:10

That's been a long time request, so excited um to see that move forward.

12:14

Thank you.

12:15

Yep, okay.

12:16

Commissioners, unless there's uh nothing else to say, open floor for a motion.

12:20

Motion to approve 0821.

12:24

Second.

12:24

All right, that proper motion, proper second.

12:26

All those in favor, raise your hand, say aye.

12:27

Aye.

12:28

Aye.

12:28

Aye.

12:29

All right.

12:30

Um next item is going to be uh 2026-0845.

12:36

This is for Commission Districts 34, 5, and 7.

12:40

Uh change order number one to contract number 2000 470, North Decatur Road at Parkdale Drive, signal pedestrian hybrid beacon, 270 days for use by public works transportation to obtain construction services for the installation of a new traffic signal, a pedestrian hybrid beacon, and ADA compliant concrete ramps, seeking term increase through December 31st of 2026, awarded to Readwick LLC, contract term extension only.

13:09

Director Keeter.

13:11

Yes, this is to just uh extend the time.

13:13

Um there were some delays in obtaining some traffic signal equipment um to get manufactured, so we wanted to give them some more time to finish.

13:21

Okay.

13:22

Uh Commissioner Johnson.

13:24

Um so what do we think the timeline will be?

13:28

How much longer do we think it'll be?

13:30

Um they are they're planning on being done by the end of the year.

13:34

So thank you.

13:37

All right.

13:37

Um Commissioner Territory, any questions?

13:40

No questions.

13:41

All right, open the floor for a motion.

13:43

Motion to approve 0845.

13:47

Second.

13:47

All right, proper motion, proper second.

13:49

All those in favor, raise your hand say aye.

13:51

Aye.

13:51

Aye.

13:51

Aye.

13:52

All right, moving on.

13:53

We're going to go to agenda item 2026-0951.

13:57

Uh, this is for Commission Districts 146 and 7.

14:01

RFQ request for qualifications.

14:03

2025-038 RFQ.

14:07

Design services for North Fork Creek Peach uh excuse me, North Fork Peace Creek Trail from Fisher Trail to Shambley Tucker Road for use by Public Works Transportation to obtain design services for North Fork Pea Street Creek Trail.

14:23

Recommend award to the highest scoring proposer, Thomas and Hutton Engineering Company, amount not to exceed 998,946.59 cents.

14:33

Director Keater.

14:34

Okay, this is another one where we're still preparing the substitute to add the fixed fee uh cost.

14:42

Okay.

14:45

Um I don't know.

14:46

Do we have that?

14:50

Commissioners, uh any questions?

14:53

Commissioner Johnson?

14:54

No questions.

14:55

Commissioner Terry.

14:58

No, everything looks good here.

15:00

I was just um uh curious.

15:03

I guess this is I guess like the next big step for this trail extension.

15:08

Is that right, Director Keater?

15:10

Right.

15:11

So we're um this will be to provide a uh G dot concept report and uh to get an alignment set and get public buy-in.

15:22

Um so this is really working on the concept and and getting um getting this finalized to go um on to design to full design.

15:36

Okay, wonderful.

15:38

Is there I was trying to see if there was a map.

15:42

Is that something you could send later on?

15:44

Absolutely.

15:44

We'll provide a map.

15:46

Okay, great, thank you.

15:48

No further questions.

15:49

Okay, Commissioner Terry, just uh just for general information.

15:52

Uh this is part of the Peach Tree Creek Greenway.

15:54

I guess is one of those segments that they have proposed going all the way up in the Gwinnett County.

15:58

Uh Director Keeter will get you the map that you're looking for for all of us.

16:02

Uh but I think generally speaking, that's the intention is to follow that that trail that has already been proposed.

16:10

Great, thank you.

16:11

Okay.

16:11

Uh and then uh is this urgent where we should we you would recommend we approve it a substitute and then it comes to us tomorrow, or do we have time and we can get this to uh 14th.

16:23

It would it would be much better if we went ahead um because we're up against some federal deadlines.

16:28

Understood.

16:29

Okay.

16:30

So an appropriate motion might be uh pending substitute.

16:34

Correct.

16:35

Move to approve 0951 with the pending substitute.

16:39

Second.

16:40

All right, proper motion, proper second.

16:42

All those in favor, raise your hand and say aye.

16:44

Aye.

16:44

Aye.

16:44

Aye.

16:45

All right, commissioners, thank you.

16:47

Uh on my notes here.

16:48

I have that uh 2026-0950 is over three million dollars, and so it's gonna be deferred.

16:55

So um we're just gonna keep that uh keep that in the queue.

16:59

I I would just add that that will have a substitute as well for the same reasons.

17:02

Okay.

17:04

Um we're fine deferring it for the time being because we're gonna be meeting tomorrow anyway.

17:12

Um again, it's up against some federal funding deadlines, so um we also have a vote meeting next Tuesday.

17:20

We do, yeah.

17:22

Okay.

17:23

We're with you, but we gotta we want to.

17:25

Right, I understand.

17:26

And there's a process.

17:27

Yes.

17:27

Yep.

17:28

Director, I appreciate you being here.

17:30

Thank you so much.

17:30

Thank you, sir.

17:31

Okay, uh, commissioners, we're gonna go to the top of page three, and we're gonna go to uh 2026-0676.

17:39

This is all commissioned districts.

17:41

This isn't uh, I guess an emergency right-of-way mowing and maintenance services for use by public works sanitation and beautification to obtain emergency right-of-way mowing and maintenance services.

17:52

Ratifying an emergency stopgap purchase awarded to Russell Landscape LLC, amount not to exceed 123,930.

18:01

Director McKinney, pleasure to see you here.

18:04

Good morning, Commissioners.

18:05

How are you all today?

18:06

Doing good.

18:08

Yes, this invitation is for uh uh maintenance and right-of-way mowing for our right-of-ways uh to control some excessive growth to make some hazards visible as we is our as part of our beautification efforts.

18:22

Uh looking through the agenda packet, I noticed I think there was about four pages of of specific streets or interchanges that you're talking about, and it looked fairly countywide.

18:31

So every district is being touched by this request here, it looks like yes, and is it just to add his work has already been completed.

18:37

Okay.

18:38

Uh Commissioner Johnson, any questions?

18:40

No questions, but I concur.

18:43

Definitely a lot happening in district four, so I appreciate that.

18:46

Understood.

18:47

Uh Commissioner Terry.

18:49

No questions, thank you.

18:50

No questions.

18:50

Okay.

18:51

Well, with that, I'll open the floor for a motion.

18:53

Move to approve item 0676.

18:56

Second.

18:57

Proper motion, proper second.

18:58

All those in favor, raise your hand and say aye.

19:00

Aye.

19:00

Aye.

19:01

Aye.

19:01

All right.

19:02

Uh thank you, Director.

19:04

Appreciate you being here.

19:04

Thank you.

19:05

Uh, we're gonna move on to public works fleet management.

19:08

We have agenda item 2026-0919.

19:12

This is for all commission districts.

19:14

Uh renewal of contracts, and there are about half a dozen contracts uh for filters, annual contract with two options to renew.

19:23

Exercising the first renewal option through September 30, 2027, awarded to O'Reilly Auto Parts Advanced Stores Company Incorporated, doing business as advanced auto parts.

19:34

Um Tide Water Fleet Supply LLC doing business as TNT Parts Incorporated and Parts Authority LLC and Cummings Incorporated.

19:44

Total amount not to exceed 450,000.

19:47

Good morning.

19:48

Good morning, Commissioner.

19:49

Good to see you this morning.

19:52

Oh, yeah, gotta hit the microphone button.

19:56

Okay.

19:57

Is that better?

19:58

Perfect.

19:58

Okay, good.

19:58

Thank you.

19:59

I'm sorry.

20:00

Um as as was read.

20:01

This is for um renewal, uh renewal contract for our filters.

20:05

It's filters is for all the vehicles and pieces of equipment.

20:08

Um we have um two options to renew, and we are just exercising our first option to renew the on annual contract.

20:15

Perfect.

20:16

Uh Commissioner Johnson, any questions?

20:19

No questions.

20:20

All right, Commissioner Terry.

20:22

No questions, thank you.

20:23

All right.

20:24

Uh I'll open the floor for a motion.

20:26

Move to approve 0919.

20:28

Second.

20:29

All right, we got a proper motion, proper second.

20:31

All those in favor, raise your hand and say aye.

20:33

Aye.

20:33

Aye.

20:33

Aye.

20:34

All right.

20:35

Uh moving on.

20:36

We have agenda item 2026-0838.

20:39

This is for all commission districts.

20:41

Renewal of contracts, and again, there's probably about a half a dozen uh for the purchase of tires, including recapping and repair.

20:48

Annual contract with two options to renew.

20:50

Exercising first renewal option through July 31st, 2027, awarded to Action Tire Company, Atlanta Commercial Tire, Best Drive Tire LLC, and JR Tire Incorporated.

21:02

Southern Tire Market LLC, and next tire commercial incorporated, total amount not to exceed $3,640.

21:12

And I believe I have that as something Mr.

21:14

Labwa Campbell had given us a report saying that the confirmed dollar amount, yeah.

21:19

The uh request was supported by audit.

21:23

Um add, Director?

21:26

Uh nothing other than you know, you pretty much read it.

21:29

It's is for the purchase of tires.

21:31

Tires.

21:31

They they roll and we need them to work, basically.

21:33

Right.

21:34

And it's an annual renewal.

21:36

Okay.

21:36

Uh Commissioner Johnson.

21:38

First dad joke of the day.

21:39

Hey.

21:40

No question.

21:41

And we're early, so they're gonna they're only gonna get worse.

21:45

Better.

21:46

Uh Commissioner Terry, any any questions from you?

21:50

No questions, or dad jokes.

21:51

Or man.

21:53

Okay.

21:53

We'll get you there, too.

21:54

Yes.

21:54

Later in the case.

21:55

They're coming.

21:56

I can fill them.

21:58

Uh with that said, uh, I'll open the floor for a motion.

22:02

Move to approve 0838.

22:05

Second.

22:06

All right.

22:06

Commissioners, we've got a proper motion, proper second.

22:09

All those in favor, raise your hand, say aye.

22:10

Aye.

22:10

Aye.

22:11

All right.

22:11

We got that one taken care of.

22:13

Next item, agenda item 2026-0863.

22:17

This is for all commission districts.

22:19

There are literally a truckload of agenda items.

22:21

Uh, but uh ultimately this is uh repair of equipment, all automobiles on on the road, off the road, vehicles, motorcycles, trucks, trailers, and motorized equipment.

22:31

Annual contract with two options to renew.

22:33

Exercising first renewal option through July 31st, 2027, awarded to 40 vendors.

22:39

The list is below.

22:40

Total amount not to exceed 705 uh 750,000.

22:45

Excuse me.

22:46

Thank you.

22:47

7,550,000.

22:50

Um, and I believe I have this on my list as things that uh director uh Campbell has approved through audit and said that it is supported that request.

23:00

Yes.

23:01

And so um commissioners, uh Commissioner Johnson, any questions, concerns?

23:06

Only concern was I did not acknowledge your second dad joke.

23:09

No other question.

23:11

Okay, thank you.

23:14

Ted, Ted, would you like to make it a little more awkward for me, please?

23:19

No, I'm good, thank you.

23:21

Thank you, Ted.

23:23

Um, commissioners, unless there's anything else to add, uh open the floor up for a motion.

23:27

Move to approve 0863.

23:30

Second.

23:31

All right, we got a proper motion, proper second.

23:33

All those in favor, raise your hand and say aye.

23:34

Aye all right.

23:36

Hi.

23:36

Uh Commissioners, we're gonna move on to public works, fleet management, and watershed management.

23:40

So that's gonna be the top of page four.

23:44

And uh the first item, top of the page is 2026-0922.

23:49

This is for all commission districts.

23:51

Renewal of contract numbers 2000, 2022, excuse me, 2000 four four-nine, and two zero two two four five zero.

24:02

Lubricants, annual contract with two options to renew.

24:06

Exercising first renewal option through September 30, 2027, awarded to Dilmar Oil Company, uh, the McPherson Companies and Lubricants Engineers Incorporated, total amount not to exceed 820,000 dollars.

24:20

Okay.

24:21

Okay, also this is uh another renewal contract.

24:23

Um, and this contract we do share it with uh Watershed.

24:26

We are the main primary user, but Watershed also uses this contract for uh the treatment plants.

24:33

Gotcha.

24:33

Okay.

24:34

Uh Commissioner Johnson, any questions?

24:36

No questions.

24:37

Commissioner Terry, any questions?

24:39

No questions, thank you.

24:40

Okay, you know I got a dad joke ready to go, but I'm not gonna draw it.

24:44

I'm not gonna drop it.

24:47

Uh I'll open the floor up for a motion.

24:50

Move to approve 0922.

24:55

Uh Commissioner's second, and just happy to keep things moving.

25:00

That's pretty slick.

25:01

That was also sick.

25:04

All right.

25:04

Uh proper motion, proper second.

25:06

All those in favor, raise your hand, say aye.

25:08

Okay.

25:09

We are the greatest show on earth, by the way.

25:11

That's that's how we're the reason.

25:13

All right, moving on.

25:14

Uh director, thank you very much for your time this morning.

25:16

Thank you.

25:17

Uh moving on to watershed management.

25:18

We have agenda item 2026-0874.

25:22

This is for commission districts three and seven.

25:24

Change order number seven to contract number one three-nine zero two six eight four.

25:30

Construction management services for Snapfinger advanced wastewater treatment plant.

25:35

Expansion, phase two for use by the Department of Watershed Management to obtain CM services.

25:40

Seeking increase in contract funds and term through December 31st, 2026, awarded to TetraTech Incorporated, amount not to exceed 654,004 dollars.

25:52

Morning, Director.

25:53

Good morning.

25:53

Good morning.

25:54

Thanks for you.

25:55

Allowing me to be here this morning.

25:58

Um this item is ultimately for close out of phase two of the Snapfinger.

26:06

Um advancement project.

26:09

Um it's been on the way for quite some time.

26:12

We're against the fact that I emphasize close out.

26:18

Okay.

26:19

So that's exactly what it is.

26:20

There's uh um a few key um administrative things that need to take place.

26:27

Um exchange of warranty information, operational manuals, and things that we need to ensure that we have due to the nature of the project, and that's exactly um what TetraTrack is providing for us.

26:42

Gotcha.

26:42

Okay.

26:43

Uh Commissioner Johnson, any questions?

26:45

No questions.

26:46

Commissioner Terry.

26:48

No questions, thank you.

26:48

No questions.

26:49

All right.

26:49

Well, Commissioners, uh I'll open the floor for a motion.

26:53

Move to approve 0874.

26:56

Second.

26:56

All right, we got a proper motion, proper second.

26:58

All those in favor, raise your hand and say aye.

27:00

Aye.

27:01

Aye.

27:01

Okay.

27:01

We're gonna skip uh the City of Atlanta payment for the time being, and we're gonna go to agenda item 2026-0799.

27:09

This is for all commission districts.

27:11

Change order number seven to contract number one one two four four zero three.

27:16

I'm sensing a substitute.

27:19

Um again, uh change order number seven to contract number one one two four four zero three.

27:25

Uh teledyne ISCO training and support equipment, software, and licenses, parts and related system components for sanitary sewer flow monitoring, sole source for use by the Department of Watershed Management to install and maintain equipment related to consent decree requirements.

27:43

Seeking increase in contract term through December 31st, 2026, and to ratify term increase awarded to Teledyne uh ISCO, a business unit of Teledyne Instruments Incorporated, contract term increase only.

27:57

Director?

27:58

Yes, sir.

27:59

So the need for the substitute, and I think they're going to be some additional tweaks, but ultimately because we're going to be rebidding, and hence we do have existing funds.

28:12

So we're just gonna um only go for uh contract time increase through the end of this year, so no need to add additional funds.

28:20

Okay.

28:21

Put another way, you'll be, as you said, you will be coming back to us before the end of the year or early next year.

28:26

Absolutely.

28:26

Absolutely before the end of the year.

28:27

Okay.

28:28

But later today, you guys will probably get all the details of this substitute.

28:33

Okay.

28:33

Okay.

28:34

Perfect.

28:34

But that's the meat of it.

28:36

Uh, is there anything you can tell us sort of in details as to what is the nature of the substitute?

28:41

Um just to remove the the uh three million dollars in um stick to uh term increase for six months to the end of this year.

28:52

Gotcha.

28:53

Um the contract is very central.

28:56

Um it's kind of like a sole source.

28:58

It's flow monitoring equipment that we must have for a whole host of reasons.

29:02

Yep.

29:03

Um and we just need to, it's been um a contract for I think a little over five years, and it's just time to rebuild, even uh rebid and ensure that we're um getting the best we can for the county.

29:19

Quite understood.

29:20

Okay.

29:21

Uh Commissioner Johnson, any questions or comments?

29:23

Um, comment.

29:24

We did get a report from uh Director Campbell this morning on this item, so this reflects what the audit was showing.

29:33

Yep.

29:33

Okay.

29:34

Uh Commissioner Terry.

29:37

No questions, thank you.

29:38

No questions.

29:38

Okay.

29:39

Uh that said, uh, I'll open the floor for a motion on the substitute.

29:43

Move to approve the substitute for 0799.

29:48

Second.

29:49

All right, we got a proper motion, proper second.

29:50

All those in favor, raise your hand, say aye.

29:52

Aye.

29:52

Aye.

29:53

All right.

29:53

All right, Commissioners.

29:54

We're gonna move on.

29:55

Uh next item is uh 2026-0822.

30:00

This is for all commission districts.

30:01

RFP request for proposal number 2025-154-RFP.

30:07

Construction management services for Snapfinger advanced advanced wastewater treatment facility.

30:13

Expansion phase three, a three C and three D projects, multi-year contract for use by the Department of Watershed Management to provide pre-construction services, construction inspection, and other field services.

30:26

Recommend award to the highest scoring proposer, Arcadis U.S.

30:29

Incorporated.

30:30

Total amount not to exceed 20 million five hundred eighty-three thousand forty-five dollars and one penny.

30:37

And I will note that this came back from Mr.

30:41

Campbell's uh audit review uh as supported.

30:44

So director, please tell us what you can.

30:46

Yes, so uh this item is ultimately to provide the same service as the previous item, but for our additional phases of the project, hence the three A 3C 3D versus the um phase two.

31:04

Um it will uh expand further capacity of the plant give us um more reliability and um modernization for the future and this is the um construction management services of that the actual contract um GC services were was presented, I want to say two committees back.

31:30

Um so this is actually what this item's for.

31:33

Okay.

31:34

Uh Commissioner Johnson, any questions?

31:36

Just one question, refresh my memory.

31:38

What's the timeline on this project?

31:40

When is it expected to be completed?

31:43

I think all three phases is projected through 2030.

31:51

23.

31:52

Um thereabout, or maybe 2032.

31:57

A lot of these um capacity expansions is aligning with consent decree.

32:04

Okay.

32:04

Um it requires some pretty um major changes to the list station, um the um influent pumps, you know, various treatment processes.

32:17

So I do believe it's 2030 or 2032 is the final completion.

32:23

Anticipated completion.

32:25

Thank you.

32:26

All right, thank you.

32:27

Uh Commissioner Terry.

32:29

No questions, thank you.

32:30

No questions, okay.

32:32

All right, uh Commissioners.

32:34

Um, and again, confirming there's no substitute that's been put forward with this.

32:41

Correct.

32:42

Okay.

32:42

Good.

32:43

Um I'll open the floor for a motion.

32:46

Move to approve 0822.

32:49

Second.

32:50

All right.

32:50

Uh we've got a proper motion, proper second.

32:52

All those in favor, raise your hand and say aye.

32:54

Aye.

32:55

Aye.

32:55

All right.

32:56

Commissioners, we're hopping over to page five.

32:58

Top of page five is uh I'll just uh read the title out agenda item 2026-0197.

33:07

And um that is five million dollars, and we're gonna go ahead and defer that as we're still waiting for it to come out of uh Mr.

33:12

Campbell's audit review.

33:14

So we're gonna hop on down to the next item.

33:16

Agenda item 2026-0644.

33:19

This is for all commission districts.

33:21

Change order number four to contract number one three zero one five two six on call water and sewer, multi-year contract with two options to renew for use by the Department of Watershed Management to obtain on-call services for the installation and repair of various sizes of water and sewer pipes seeking increase in contract funds and scope of work awarded to Ruby Collins Incorporated, total amount not to exceed 21, uh 23,442 dollars.

33:51

Director?

33:52

Yes.

33:53

Um this item is warranted to essentially can continue replacement of approximately a mile of 36-inch transmission main.

34:11

Um that actually was predicated by emergency failure that that that happened, and we notice additional deterioration when responding to that break and which necessitate uh this particular change order.

34:26

Okay, all right.

34:27

And I'll note that Mr.

34:29

Campbell has uh reviewed this item and it was supported uh through audit.

34:33

Uh Commissioner Johnson, any questions?

34:35

Can you tell that length again?

34:38

How long?

34:38

It's it's just shy of 5,000, so about a mile.

34:42

About a mile.

34:42

Okay.

34:43

Thank you.

34:44

Okay.

34:45

Uh Commissioner Terry, any questions, any comments?

34:49

No questions, thank you.

34:50

Okay.

34:51

Uh Commissioners, unless there's anything else to add, I'll open the floor for a motion.

34:55

Move to approve 0644.

34:58

Second.

35:00

We got a proper motion, proper second.

35:01

All those in favor, raise your hand and say aye.

35:03

Aye.

35:04

Aye.

35:04

Aye.

35:04

Okay.

35:05

We're going to defer the next two items.

35:06

I'll just uh call out the numbers so that that's on the record.

35:09

Uh the next item is 2026-0854.

35:13

Uh, this is a request of over 230 million dollars, and uh we're well obviously waiting for Mr.

35:18

Campbell on that one.

35:19

Um and then the next item is 2026-0861.

35:23

Again, all commission districts, and this is just over 18 million dollars, and we're waiting on Mr.

35:28

Campbell for uh for this one as well.

35:31

We're gonna go to the next item and the final one on the page, agenda item 2026-0888.

35:38

This is for commission districts one, three, six, and seven.

35:41

Change order number one to contract number two zero zero zero zero five seven.

35:46

Uh indefinite quantity construction services, statewide contract number that we can all read for use by the Department of Watershed Management to obtain rehabilitation and painting services for storage tanks, seeking increase in contract funds to repair and repaint three additional storage tank tanks awarded to Lichie Commercial Construction Incorporated, amount not to exceed two million nine hundred forty-seven thousand eight hundred ninety-four dollars and seventy-two cents.

36:13

Director?

36:14

Yes, sir.

36:15

Um, just as is stated, um, there's um a need to do um three additional of our um ground storage tanks.

36:26

I believe it's inclusive of our station at uh Lathonia.

36:34

Um, and then two additional tanks that are actually located at uh the Scott Candler plant.

36:42

Um a lot most you see the storage tanks that are outside of the plant, and what you can't see is the outside, you can tell that it needs to be maintained by discoloration of the paint.

36:55

However, internally, there's structural condition elements that you must drain and then inspect um preventatively to ensure that you don't allow the tank to go beyond repair, um, and that's what this item allow us to do.

37:11

Okay.

37:11

Uh Commissioner Johnson, any questions?

37:14

So just to make sure I understood.

37:15

So is this just the outside we're doing, but but are we also doing that inside inspection?

37:21

Okay.

37:21

Both.

37:22

Both.

37:22

Understood.

37:23

Yeah, we we yes.

37:25

Uh Commissioner Terry, any questions?

37:28

No questions, thank you.

37:30

Okay.

37:31

Um Director, I got uh, on behalf of the people of Dunbody, I have to ask when uh is there an expectation and what's the time frame for the water tank uh at Ashford Dunwoody and uh Mount Vernon?

37:43

So actually, thank you for that question.

37:47

That item is that particular tank is on the contract because of the increase in flow during summer.

37:57

And I think there was some additional work that was needed.

38:03

We couldn't take the tank out of service for the length of time to do that, so we pushed it to uh the colder months where demand reduced and we can actually normalize the system and take it out of service.

38:16

Okay.

38:17

So um I venture to say we'll get back at it um Septemberish, October-ish, once it starts um really get deep into fall.

38:29

Um we'll definitely be able to uh create um the um the logo, the the aesthetics that they've been sort of dyingly pressed for.

38:46

Yes.

38:47

So that's the most important part.

38:48

We are gonna be able to do that.

38:49

Okay, but it will be a um tank that's structurally sound and um understood.

38:56

As we need it to be.

38:57

Okay.

38:57

Well, thank you much for that.

38:58

I appreciate your attention on that one.

39:00

Um Commissioners, uh, unless there's any additional questions, uh I'll open the floor for a motion.

39:06

Move to approve 0888.

39:10

Second.

39:11

All right.

39:11

Uh we ought a proper motion, proper second.

39:14

Uh Commissioner or uh nope, okay.

39:16

Just on another item.

39:18

Okay.

39:18

Uh all those in favor, raise your hand and say aye.

39:21

Aye.

39:21

Aye.

39:21

Aye.

39:22

All right.

39:22

We got that taken care of.

39:24

Director?

39:25

If we had time since we're at the end of the agenda, if it's you guys will.

39:29

I do have staff there to discuss the um 233 dollar item, anticipating that it was gonna come out of item out of out of audit.

39:38

Okay.

39:38

But if the will is just to wait to afterwards, um I'm prepared either way.

39:44

We're prepared either way.

39:45

Okay.

39:46

I'll tell you what, uh, let's circle back to page four.

39:49

Just one.

39:50

Under watershed management, and let's hit agenda item 2026-0867.

39:56

Um, and I believe uh Mr.

40:00

Campbell has reviewed that and it's come out of audit as supported.

40:02

This item is for all commission districts, City of Atlanta CIP payment, various quarters from 2021 to 23, fourth quarter of 25.

40:11

Uh total cost 29,800, 874 dollars and eighty-seven cents.

40:17

Um how are we on this one?

40:20

We're we're ready to go, and actually there was a substitute, just uh matter of correction of time duration.

40:27

Uh it actually covers to uh first quarter of this year, 2026 um additional quarter where the initial agenda item says through fourth quarter.

40:39

Okay, I submitted the substitute.

40:42

Um not here just yet, I understand.

40:45

Yeah, the dollar amount does not change?

40:47

No, no, sir.

40:48

It doesn't.

40:48

It's just a correction of that time component you mentioned.

40:51

Okay.

40:51

Correct.

40:52

Uh can staff get us the substitute for tomorrow.

40:56

Yes.

40:56

Okay.

40:57

I'll rescind it.

40:58

Okay.

40:59

Um commissioners.

41:00

Uh we do have another meeting before we uh before we adjourn for for the summer.

41:06

Um if you're comfortable, would you want to take the motion now or do you want to wait for the substitute?

41:10

Sort of open to you guys.

41:12

I'm comfortable.

41:13

Okay.

41:13

Commissioner Terry.

41:15

Yeah, that's fine.

41:16

We can move forward.

41:16

We move forward.

41:17

Okay.

41:17

We'll open open up the floor for a motion.

41:20

Move to approve a substitute for 0867.

41:23

Second.

41:24

We got a proper motion, proper second.

41:26

All those in favor, raise your hand and say aye.

41:28

Aye.

41:28

Aye.

41:28

Okay, we got that taken care of.

41:30

Um and then director.

41:32

I don't think we've skipped over any of the other items.

41:36

So if you uh commissioners, we do have 18 minutes.

41:39

Do you want to hear the presentation on the 233 million dollar request?

41:46

And it's um for off Scott Candler plan, and it's about recruit increasing the reliance and capacity, so it's very important.

41:58

That's the only reason why I wanted to ask Miss Um Dora, our assistant director of compliance, and she uh continues to work on this project because she was the uh principal engineer for Scott Candler, um, and the most familiar in our engineering department.

42:16

So she does dual capacity only for Scott Candler.

42:19

Ms.

42:20

Dora.

42:20

All right, Assistant Director, what you got for us?

42:23

Good morning, Commissioners.

42:25

Good morning.

42:25

Good morning.

42:27

All right, let's let's talk about this project.

42:30

And uh is that something that'll be up on the screen or I thought we sent it ahead.

42:35

I apologize.

42:37

Um worries, is it gonna be on the screen?

42:40

Do we have an electronic copy?

42:41

I don't I can send that email.

42:44

Okay.

42:45

We were prepared to be at Sam this morning.

42:47

Yeah, I uh you know that happens.

42:49

Okay.

42:49

How about this?

42:50

Why don't we why don't we postpone it?

42:52

And uh we're gonna be meeting tomorrow anyway.

42:54

So why don't we just make time at the end of towards the end of that committee?

42:58

Uh and if y'all don't mind coming down, we'll be at Sam Street.

43:01

And uh if that works for you, that works for us.

43:04

Absolutely.

43:06

Okay.

43:07

Well, yeah.

43:08

And just so you know, we actually presented on this project in March.

43:13

Oh apologize.

43:17

I'm just excited about it.

43:21

So we did uh present actually, Ms.

43:23

Doral did um, I want to say March when we was given a look ahead on large dollar items on the uh CIP.

43:30

Yep, so it was actually a part of the presentation then.

43:35

I want to say about three or four slides at that time because we hadn't actually got the bids back.

43:41

We um only had an estimated calls thereabout, but we didn't have the exact cost.

43:47

So um so we have presented this.

43:50

This is not new, it's just really a refresher and because we have concrete hours.

43:55

Gotcha.

43:56

Just gonna say that.

43:56

Okay.

43:57

Well, we'll see you guys tomorrow in committee at 3 30 at the greatest show on earth.

44:02

Absolutely.

44:02

Thank you guys.

44:03

Yep, thank you.

44:04

Uh Zach, any other things that we need to cover?

44:07

We got it all.

44:08

Okay.

44:09

Very efficient.

44:11

You're welcome.

44:13

Only only a planner from UGA.

44:16

Just a little bit.

44:17

You know what, Commissioner, you just had a third in there.

44:20

Let me put my language back on well, uh, Commissioners, we're at the end of our agenda.

44:29

Uh I'll open the floor for a motion to adjourn.

44:32

Move to adjourn.

44:33

All right.

44:34

Thank you.

44:34

All right.

44:34

Thank you, Commissioner Terry, for the second.

44:36

Commit Commissioner Johnson, thank you for the first.

44:39

Thank you for representing the other great school in Georgia, Georgia Tech.

44:42

We're very grateful.

44:43

The best.

44:44

Go ahead.

44:44

Uh, all those in favor, say aye.

44:46

We're adjourned, everybody.

44:47

See all tomorrow.

44:49

Thank y'all.

Discussion Breakdown — Share of Meeting
Water And Wastewater Management████████████████████████████████████36%
Engineering And Infrastructure████████████████████20%
Public Works Maintenance██████████████14%
Procedural███████████11%
Technology and Innovation█████5%
Transportation Safety█████5%
Public Engagement█████5%
Active Transportation████4%
Summary of Proceedings

Public Works and Infrastructure Committee Meeting - July 6, 2026

The Public Works and Infrastructure Committee, chaired by Commissioner Shakira Johnson (District 4) and joined by Commissioner Ted Terry (Super District 6), met on July 6, 2026, to consider 21 agenda items. The meeting had a hard stop at 11:00 a.m. The committee approved numerous contracts, change orders, and renewals, and deferred several items pending audit review. All votes were unanimous.

Key Outcomes

  • Minutes Approved: The committee approved the minutes of the June 18, 2026 meeting (Item 2026-1069).
  • Laredo Drive Bicycle Facility (2026-1022): Approved allocation of $500,000 in SPLOST funds for an interim bicycle facility on Laredo Drive, connecting the Atlanta Stone Mountain Trail to the East Potts Farmers Market.
  • Traffic Signal Operations Design (2026-0524): Approved a substitute award to KCI Technologies for $693,983.80 for design services to upgrade 98 traffic signals with flashing yellow arrows and detection upgrades.
  • Pleasantdale Road Design (2026-0581): Approved a substitute award to Atkins Réalis for $2,353,314.09 for full design of CR 5182 (Pleasantdale Road) improvements, including multimodal features.
  • Stevenson Road/Valley Brook Road Traffic Signals (2026-0821): Approved award to RJ Haney and Associates for $441,244 to install two new traffic signals.
  • North Decatur Road Signal/Hybrid Beacon (2026-0845): Approved a contract term extension through December 31, 2026, for Readwick LLC (no additional funds).
  • North Fork Pea Creek Trail Design (2026-0951): Approved with a pending substitute, award to Thomas and Hutton Engineering for $998,946.59 for design services (GDOT concept report). The substitute was to be presented to the full commission.
  • Emergency Right-of-Way Mowing (2026-0676): Ratified an emergency purchase awarded to Russell Landscape, not to exceed $123,930.
  • Fleet Filters Renewal (2026-0919): Approved renewal of contracts for filters, not to exceed $450,000.
  • Fleet Tires Renewal (2026-0838): Approved renewal of contracts for tires/recapping/repair, not to exceed $3,640.
  • Fleet Equipment Repair Renewal (2026-0863): Approved renewal for repair of automobiles and equipment, not to exceed $7,550,000.
  • Lubricants Renewal (2026-0922): Approved renewal of contract for lubricants (shared with Watershed), not to exceed $820,000.
  • Snapfinger Phase 2 Closeout (2026-0874): Approved change order #7 for TetraTech, $654,004, to support closeout of the Snapfinger advanced wastewater treatment plant expansion phase 2.
  • Teledyne ISCO Flow Monitoring (2026-0799): Approved a substitute change order (term increase only through December 2026, no additional funds) for sole-source flow monitoring equipment, with a planned rebid.
  • Snapfinger Phase 3 CM Services (2026-0822): Approved award to Arcadis U.S. Inc. for construction management services for Snapfinger Phase 3 (3A, 3C, 3D), not to exceed $20,583,045.01.
  • Water/Sewer Pipe Repair (2026-0644): Approved change order #4 for Ruby Collins Inc., $23,442, to continue replacement of approximately one mile of 36-inch transmission main due to emergency failure.
  • Storage Tank Rehabilitation (2026-0888): Approved change order #1 for Lichie Commercial Construction, $2,947,894.72, to repair and repaint three additional ground storage tanks (including at Lathonia and Scott Candler plants).
  • City of Atlanta CIP Payment (2026-0867): Approved a substitute to correct time duration (through Q1 2026 instead of Q4 2025), amount unchanged at $29,800,874.87.
  • Items Deferred: The following items were deferred pending audit review or substitute preparation:
    • 2026-0950 (over $3M)
    • 2026-0197 ($5M)
    • 2026-0854 ($230M for Scott Candler plant expansion)
    • 2026-0861 ($18M)
  • Scott Candler Plant Presentation: The committee deferred a detailed presentation on the $233 million Scott Candler plant project to the next day's meeting (July 7, 2026) at 3:30 p.m.
  • Adjournment: The meeting adjourned with a motion approved.

Meeting Transcript

Good morning, everybody. Welcome to the Greatest Show on Earth, Public Works and Infrastructure Committee. I'm joined in person today with our presiding officer and fellow commissioner Shakira Johnson representing District 4. Joining us online is Commissioner Ted Terry, uh Super Six. Super 6, thank you, everybody. Uh Commissioner Terry, are you there? Yes, I'm here. Thank you, Terry. Thank you for joining us. It's much appreciated as always to have you with us. We have a long agenda, I believe about 21 items, and um not a whole lot of time today, unfortunately. We have the hard stop at 11 o'clock. Uh so let's go ahead and get started. We are going to begin with uh the minutes. Agenda item 2026-1069. This is for all commission districts. Minutes of the June 18, 2026 Public Works and Infrastructure Committee meeting. Commissioners move to approve. Second. Okay, proper motion, proper second. All those in favor, raise your hand and say aye. Aye. Aye. Uh moving on. Uh items previously heard. We have agenda item 2026-1022. This is for commission districts four and super six to allocate $500,000 of category B3 bicycle paths, lanes, multi-use trails one. Uh SPLOS 2 funding for the Laredo Drive bicycle facility. Uh and who do we have? Director Keeter, good to see you this morning. Good morning, Commissioners. How about that? Good morning. So, what can you tell about this item? So, um, recently under um SPLOS resurfacing, Laredo Drive was resurfaced. And instead of just putting back the traditional striping that was there previously, um, there was a plan that was um made with the bicycle master plan to do a uh connection or an um interim connection between the Atlanta Stow Mountain Trail and the UmCAP Farmers Market at East Potts in Loreto. And so this uh agenda item would allow for um permission to use 500,000 dollars of that um of SPLOSS funding to uh to advance the Laredo Drive uh ped bike or bicycle facility plan while it's freshly resurfaced and we have a blank slate to work with. Gotcha. Makes sense. Um this is uh both of my commissioners' uh districts, so I'll start with uh Commissioner Johnson. No questions. No questions. Commissioner Terry, any questions, any comments? Uh no, other than just say thank you. Oh, we have a little bit of feedback, actually. So I'll just keep my comments to no comments for now. Okay, all right, Commissioner Terry. Um, unless there's any objections, I'm gonna open the floor for a motion. Move to approve item 1022. Second.