0:14Welcome to the City of Joliet pre-council meeting for Monday, December 1st, 2025 by 530 in City Hall Council Chambers with the Mayor Terry Darcy presiding.
0:25We'll begin with roll call.
0:28Councilman McCartiness.
0:39First, we have a presentation, 2026 budget presentation by Kevin Singh, Director of Finance.
0:53So tonight we wanted to focus primarily on the capital portion of the uh fiscal year 2026 budget.
1:00I'll also recap a little bit more on the operations and the total budget as a whole.
1:04So capital funds are in various different funds within the uh city, ranging from motor fuel tax, vehicle replacements, government capital, parking, and then the sewer and water funds.
1:16So the funding sources for capital come from on the government side, uh casino gaming revenues.
1:22So a couple of years ago, we took our casino revenues and we allocated them to fund capital improvements.
1:27They also come from our local fuel tax for vehicle replacements.
1:30Uh we receive an allotment from the state of Illinois' fuel tax, and then we also seek uh and receive grants uh as they become available.
1:38For sewer and water, we collect funds from utility rates dedicated and use those for capital improvements.
1:44Once again, we also seek and receive grants, and then we use debt.
1:49So some highlights for the capital uh government capital for 2026, uh roads and sidewalks.
1:56So in the various funds, there's just shy of 23.5 million dollars for roads and sidewalks.
2:02Uh it's broken out about a little over five and a half million in the capital government capital fund, small amount in general fund, and then most of it is in motor fuel tax fund.
2:11And then the amounts that we have set aside is roughly or the equivalent of roughly 43 lane miles of roadways uh of new road work.
2:19We also have a public safety institute uh in partnership with JJC.
2:23Uh we've budgeted the use seven million, not sure exactly how much that will come, but that represents the amount we received from uh development fee from the compass business part, which is restricted for that type of use.
2:34We also have some specialty vehicles for the fire department, two pumper trucks totaling about two point four million, and then a uh technical response vehicle for uh 225,000.
2:46And then police, we have various equipments from uh ballistic shields, drone program, and then replacing gas masks that are aged uh quite a bit in the police department.
2:55Then we've also got 300,000 in a to continue our deployment of security cameras throughout the city to increase public safety.
3:04For sewer and water, we're continuing our water main replacement uh down a little bit for this year, represents roughly 18 miles of roadway.
3:12It's that uh we fund that through uh combination of loans, bonds, and low interest loans through the uh Illinois EPA.
3:20We also continue our late Michigan water program.
3:23Uh we've got almost 28 million programmed in the budget uh for our improvements to be able to accept Lake Michigan water, and then as part of uh Grand Prairie Water Commission, we've got about 38 million that we're on the uh have in our budget to go fund towards our contribution to that.
3:40Continuing the West Side uh wastewater treatment plan expansion uh design.
3:46Also have just under two and a half million on the sewer collection system, so that's a sanitary sewer.
3:51Uh just under six and a half million for water and four point seven million for sanitary sewer itself.
3:58Uh for vehicle replacements, uh this is funded by our local fuel tax.
4:07We're replacing 31 vehicles just shy of three and a half million dollars, uh 15 police vehicles for large dump trucks, uh street sweeper, seven roadways trucks, uh, an electrical service truck, and three inspectorslash admin vehicles for sewer and water looking to replace two dunk trucks.
4:26Moving into the total budget itself or comprehensive budget, uh shaping up to be just shy of $650 million.
4:34So the some of the highlights are what makes up that budget, uh $222 million is the general fund.
4:40We've got $38 million of employee slash retiree uh insurance, $28.6 million capital projects, $3.7 million in uh vehicle replacements, sewer and water operating is $95.7 million, sewer and water capital is $196 million, and then we've got some expenditures of tax increment financing district funds.
5:04Breaking up the general fund expenses, you've got $153 million in workforce pay and benefits, contract services the next largest at $24.1 million.
5:14Repairs and maintenance is $6.4, utilities at $4.3, and then fueled for our fleet of $1.7 million.
5:22Those are funded primarily through sales taxes, $81 million.
5:28Our share from the State of Illinois of our income tax, use tax, and personal property replacement tax is $33.6 million.
5:35We we bill for refuse at $17 million.
5:39The fire department bills out for ambulance service $14.5 million, and then building permits represent $5.2 million.
5:47Next steps through the budget is we're continuing one-on-one meetings.
6:04Public hearing is tomorrow.
6:06And just want to summarize the public hearing is required by statute to give the public the ability to comment on our budget.
6:12It can be changed after the public hearing, but it gives them the ability to be heard on that budget.
6:17And then potential adoption are looking for adoption on the 16th.
6:26Kevin, I sent you a message earlier, and um you know it's nice to uh sit up here and listen to the public and just from personal observation, you know, like tree replacement, uh the asphalt hot boxes, sidewalks and roadways, the free parking downtown, uh that's this downtown sweeper, which I believe is on the agenda, our entryways.
6:50Thank you, Mayor, for that.
6:51But um my thing is is the weeds.
6:54Is there anything set aside to tackle the the weeds and the entryways and the intersections?
7:02This is probably my fifth year, and I'm gonna I'm gonna hold everybody's feet to the fire.
7:05I want to clean up the city, and those are kind of things that uh I'd like to like have a priority on.
7:12And um, I didn't know if anything was set aside for that.
7:14Yeah, I you know, talking with Greg Ruddy, public works director, did uh allocate at least 200,000 for uh weed maintenance and landscape maintenance.
7:21Uh also there's some other landscape maintenance mixed throughout the budget.
7:24So there's at least 200,000 for that.
7:26Yeah, Greg, I'd love to really tackle that this spring.
7:30Like not in June, but I want to I want to get her like right out of the gate so we don't have these weeds uh three or four feet high.
7:36I appreciate any doing you guys did a great job with the snow.
7:40So uh let everybody know that.
7:41But um that's something I really want to want to tackle this year.
7:48Did you have a question?
7:52We definitely have to have a meeting, because $23 million for sidewalks and roads.
7:58Can I get that more broken down if we meet one-on-one?
8:01Because that seems like a lot of money.
8:03Yeah, there's there's a and I don't see that, but I mean you can explain it to me.
8:07Yeah, there's a lot that goes into that, I'd be happy to go through that.
8:10Yeah, that would be so fantastic.
8:12There's a number of projects in the okay, I'll reach out to you.
8:16Yeah, Kevin, you and I discussed it as far as dedicated uh funds for sidewalks.
8:20Right now, the way it runs the money we have for roadslash sidewalks, kind of discretion on how much can be spent.
8:28And you you you said you would look into it.
8:30I thought I thought that we should probably double the sidewalks because we're just not getting it done fast enough.
8:35I think you can tell me we spent 1.2 or 1.4 million on sidewalks last year.
8:39Then I don't remember.
8:40I'd have to defer to Greg on that one.
8:43And if we can commit money to sidewalks, double the what we spent this year to next year, because we need to sped up the sidewalks.
8:49Remember you and I talked about that.
8:50Yeah, I relayed that to public works director as well.
8:53No, but I'd like to see it as a budget item, making sure it's you know, I will say the way I've got the budget set up is you know the council this the city could spend up to five million in sidewalks if they wanted to.
9:05It gives you that ability to hit use those resources for roads or sidewalks.
9:10But it can spend as little as how much?
9:12As little as you guys approve.
9:14Right, you know, because it's not a set number.
9:17Sidewalks is not a set number, it's allowable under the umbrella of votes.
9:22I'd like to get a set number of double of whatever we've been doing the last couple of years.
9:26You know, just to refresh people's minds, there was a time we were doing about a quarter million a year, and we eventually got up to a million.
9:32I want to say either this year or last year we peaked at 1.2 or 1.4 million on sidewalks.
9:37We need to double that commitment.
9:40Um you could look into doing that.
9:49Any other comments or questions?
9:52Yeah, I just have one.
10:00Now that we've had a huge snowstorm, what I really want to know is I know we have four snow plows on reserve for because it takes a while to order them, so that we'll be getting in the next year.
10:09And you don't have to answer this now, like I want you guys to think about it and let the council know if you feel like even that's enough to not have to sub out, but actually have our own.
10:18Let me just tell you, I got no complaints from my district, and everyone was super, super happy.
10:24I got a couple of very off complaints from another district, not not a big deal at all.
10:29But I want to know, like I want us to be thinking way ahead to say is this really enough if we have a huge winter season, is it enough so we can think ahead for like the future years?
10:45Okay, next to citizens to be heard on agenda items.
10:48Is there anyone who would like to speak on an agenda item this evening?
10:54Okay, seeing none, we'll move on.
10:57We will have the city manager review tomorrow night's actionable items.
11:04Um tomorrow we will have an appointment to the Board of Police and Fire.
11:08We will hear from the land use and economic development committee and public service.
11:14Um under consent agenda, we have invoices to be paid.
11:18Moving on to council memo six three zero twenty-five, award of contract precision truck center for the engine rebuild of ladder truck fire department 779 in the amount of 28,454.54 cents.
11:35Um a replacement unit is unavailable, and we must rebuild this engine due to the age and style of the unit.
11:43So that's why we're doing it instead of getting a whole new one.
11:46Council Memo 63125, award of contract for the 2025 roadways resurfacing contract A to PTPR construction in the amount of 516, 142 dollars and 58 cents.
12:01Um I believe this is the Manningdale subdivision on the southeast side at Mills Road and Raoul Avenue.
12:08It's part of our annual roadway resurfacing um program.
12:12And I believe the township just recently resurfaced a lot a lot of their roads that are around there, and we took a look and thought probably be good if we do them around there too, so they're just taken care of.
12:25Council Memo 6325, approval purchase of one compact electric sweeper from the Brown Equipment Company in the amount of 342,523.
12:37Um this would be a sweeper that could help us downtown and in the parking deck.
12:43It qualifies for a hundred thousand dollar reimbursable grant and um was budgeted in 2025 for the year uh and funds are still available.
12:55Yeah, I'm I'm glad we're doing this.
12:57You know, I I think I brought it up a couple years ago.
13:00And um, you know, Larry Larry, we had a little we talked or you spoke about it, you know, is it gonna take care of the whole city or whatever, but might think it was you know, downtown, it's coming around as something nice to have to be able to keep keep it clean down there.
13:13And um I'm glad that we're we're moving forward with this, or at least at least the it's on the agenda.
13:18Yeah, it will be helpful because it's a smaller machine that can fit into the smaller spaces that we don't have right now.
13:33Award of contract for the district meter area chamber installation project to PT Faro Construction and the amount of 267,550.
13:44Um as part of the city's water loss program.
13:48A project was designed to install water meters at various locations throughout the city, so the water distribution system can be subdivided into smaller networks, which will help us find where water loss is occurring as well.
14:01The project to install the meter chamber vaults uh was designed and you approved that in July of 2025, um, which will add 23 meters, resulting in a total of 12 different zones that we'll have broken up into very specific zones that Allison's talked about before that can help us like narrow down where this loss is coming from.
14:22So we're just following protocols on you know how to best figure out um where this water loss is coming from, and and Alison's doing a great job with our team on that.
14:34Actually, I'll pile on there.
14:36In our public service committee meeting, Alison, it's pretty impressive.
14:40For us water geeks, right, Alison.
14:43Last month is the first time in God knows how long, if ever.
14:46Not in my tenure on this council, we only had two water main breaks in a month.
14:51So we're about 50% done with the water main projects, you know, uh replacements, and we're starting to see the return finally.
14:58I was about to ask it.
15:00She must have been reading my mind, because I was going to ask it at the end of our committee, but she she laid it out for us, said that we're at about 50%, right now Ellison, roughly.
15:08And uh two, and you know, normally what do we have?
15:11We we would have at least probably a dozen on any given month in the old.
15:14Yeah, right, 10 or 12, yeah.
15:16So that's even more of a good news on top of what you just said.
15:22Council Memo 63425, approval of amendment number one to the professional services agreement for engineering design services for the Des Plains River Tunnel Crossing Rehabilitation Project for the Water Main Replacement Program to Jacob's Associates doing business as Delve Underground in the amount of 266,630.
15:44Um this contract will be a detailed design of the tunnel rehabilitation and replacement of the water main in the tunnel.
15:53On June 4th, 2024, the mayor and city council approved the preliminary design, and so now we're doing a detailed design for this tunnel.
16:02And the scope of the project uh that we did before this detailed one was this structural assessment of the tunnel serving and soil bearing.
16:14So now we're getting more into the details of what that tunnel looks like under the water and what additional work we need to do.
16:26Council Memo 63525, approval of change order number one for the 2025 sanitary sewer cleaning and inspection program to Pipe View America in the amount of eighty-two thousand seven hundred and seventy-nine dollars and ninety-four cents.
16:41So this change order is a net increase in the amount of eighty-two thousand seven hundred and seventy-nine dollars and ninety four cents as a result of the following balancing of quantities, lateral locating for the 2025 waterman replacement projects, addition of televising the sanitary sewer of the Southeast Jewel Sanitary District, which um we will be reimbursed by the county.
17:09Is that right, Allison?
17:11For the Yes, so we're doing additional, we're doing sewer televising and cleaning in the Southeast Julius Sanitary District area, and then we'll get reimbursed by the county for that work.
17:23Okay, moving on to agenda items, Council Memo 63725 award of business continuity grant for the total amount of $63,733 and 50 cents to cut 158 incorporated.
17:37Um cut 158 is eligible for a total grant amount of $63,733 and 50 cents, which requires city council approval approval.
17:49Um I've also been through recently uh people had questions about the program.
17:55I don't know if there's any more questions now.
17:57I handed out like a fact sheet about when we pass this, how it's helping the downtown businesses.
18:03This is the last tranche because we've opened uh Chicago Street now.
18:10So um Bill's here if you have any questions for him, but we recommend adopting.
18:19Mayor Beth, anything to under 25,000 doesn't come from hope, so we don't review it.
18:25You're allowed to do that.
18:29Yeah, be happy to send that to you.
18:31I don't have it right on me right now.
18:33Yeah, that's no problem.
18:37Um I'm happy to provide that information if you want me to provide it.
18:40Right now, do you want to write now?
18:45So uh good evening, council members.
18:47For fiscal year 2025, the businesses that have received grants under 25,000 are Internode, Moose Greek Tavern, Juliet's Tavern, and Eur Nuna.
19:00We also have three other businesses that are in the pipeline to receive funding, um, including Ama Love, which is a boutique store on Chicago Street, and uh Kula's jewelry.
19:15So exhaustibly it would be seven businesses.
19:17Four already got it in twenty-five, and three are applying for it.
19:22How about in twenty-four?
19:26If you don't have it, Pauline, that's okay with that.
19:28Yeah, I didn't know.
19:28We can email them tomorrow.
19:31That's why I said email and then put nobody on the spot.
19:34Okay, so if you can get it.
19:35She's just prepared, but yeah.
19:38Could someone make a note of that?
19:54Where did I leave off?
19:58I just lost my place.
20:05Approval of change order number two for the Plainfield Road, Theodore Street to Black Street, Water Main Improvement Project to Austin Tyler Construction Inc.
20:13for a decreased amount of 1.735,000 $236.11 and pay estimate number 11 and final in the amount of $564,000 and $68 cents.
20:30Change order number two is a net decrease for the following work, time extension to contract milestones due to change field changes and staging for restoration, balancing of final qualities and quantity adjustments.
20:47Chain order number two also includes a time extension of 91 days due to delays from conditions and traffic realignments for restoration.
21:02Council Memo 640 25 public hearing for the 2026 fiscal year budget, which is the opportunity for all of our residents to come out and let us know what they think about the budget and um you know express themselves and give their feedback so we can take that into account before you pass it.
21:20So we encourage all residents who can come out to please do that tomorrow.
21:28Ordinances and resolutions, ordinances, council memo six forty-two twenty-five, ordinance for the levy and assessment of taxes for the fiscal year beginning January 1st, 2025 and ending December 31st, 2025 in and for the Joliet Public Library, Will and Kendall Counties in Illinois.
21:47Um questions on that?
21:50You want Kevin to go over it, or is everybody this is like routine that we do every year, but happy to reflect refresh recollections if needed.
22:02Council memo six forty-three twenty-five ordinance for the levy and assessment of taxes for the fiscal year beginning January 1st, 2025 and ending December 31st in and for the City of Joliet, Will and Kendall Counties, Illinois.
22:17Council Memo 64425, ordinance authorizing amendments to the rules and regulations of the Board of Fire and Police Commissioners of the City of Joliet.
22:26So this is there was a scrivener's error where a word is changed from of to or then Todd, do you want to um the other one was assert qualification?
22:38There's actually two other things.
22:39Uh military preference points.
22:41We made that consistent between uh fire and police and uh cleaned up the language so it's more clear.
22:47Um the main one, the main reason we brought this is preference points to allow cert.
22:52So the state law allows us to give five points for unique categories, so the the board rules will just reflect the state statute.
23:05Resolution, resolutions, council memo six forty-six twenty-five resolution approving the dedication of a portion of Maple Street as a public right-of-way.
23:18So uh the property lines right now extend to the middle of the street.
23:23Um that's where the right-of-way ends, and so we're fixing it by it'll come to the curb then instead instead of the middle of the street because we're obviously responsible for streets.
23:37Council Memo 64725 resolution for the surface transportation program local match commitment for the Theodore Street east of Brighton Lane to Illinois Route 59 roadway widening improvement project.
23:53Um so this uh is a grant application that will be for the construction portion of the project, which is estimated to be two million eight hundred and forty-four thousand dollars, eight hundred and forty-four thousand eight hundred dollars, eighty percent uh the federal government will pay, which is two million two hundred and seventy-five thousand eight hundred and forty dollars.
24:17And um this resolution is just stating that the city can cover twenty percent of the cost, so feds eighty, city twenty, um, and that we will have available through MFT funding $168,960 for the 20%.
24:38Council Memo 64825, resolution approving the easement agreement for water delivery structure structure by and between the City of Joliet and the Grand Prairie Water Commission.
24:48So the city owns property on which the Grand Prairie Water Commission will construct a water delivery structure, which will be the primary point of delivery of water from the commission to the city.
25:00The city and the commission have negotiated mutual acceptable terms of an easement agreement for water delivery structure for the primary point of delivery consistent with the water supply agreement.
25:12Council Memo 64925 resolution authorizing execution of an intergovernmental agreement between the City of Joliet and the state of Illinois for the city's use of the Joliet Correctional Center.
25:26So the City of Juliet into an intergovernmental agreement with the Illinois Department of Corrections and the Illinois Department of Central Management Services on December 27, 2017 for temporary possession and control of the old Joliet Prison for Stabilization, maintenance, and redevelopment purposes.
25:51It will include the same property lines that it did before.
25:56So this is what we we've been talking about that we've been negotiating with the state.
26:01We finally reached an agreement, and so we can get an additional three years on that.
26:06And the reason why we're not just the they would love the state would love to give us this property, but there's still a lot of work that needs to be done there.
26:13So getting a longer lease, you know, for now is better to see how much they can help us with funding on these properties and environmental things, etc.
26:25Our um our state um representatives and and senators um you know are supportive of that.
26:36Yeah, Beth, this does not have anything to do with the east side of the road property over there.
26:42This is just strictly the uh it is it includes it.
26:46There was um certain items.
26:47So the main difference between this agreement and what we've had prior is the state gets control over the activities that go on out there.
26:56So we the museum basically has to apply.
26:59There's certain items that they've already applied for and been approved, um, but going forward anything else we they need to apply for.
27:07So the property description that was in the last couple agreements is exactly the same as this.
27:17That concludes the agenda.
27:22Okay, next we have public comments.
27:23Is there anyone who would like to address the council this evening?
27:30Seeing none, I did receive a request for closed session.
27:33Is there a motion to go into closed session to discuss personnel, collective bargaining, land acquisition, or conveyance, pending or threaten litigation after which the meeting will adjourn?
27:42It's been motion and seconded to approve.
27:43Councilman Cardinals.
27:46Councilwoman of Barra.
27:50Councilwoman Quomen.
27:52Councilwoman Burden.