City Council Committee Meeting - October 14, 2025

City Council MeetingsTuesday, October 14, 2025
BodyTuscaloosa, Alabama
SessionCity Council Meetings
DateTuesday, October 14, 2025
StatusFILED
Video Record

STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE

Transcript — Verbatim
0:00

To approve.

0:00

So moved.

0:01

Second.

0:02

Moved and second.

0:02

And any discussion.

0:03

All in favor say aye.

0:05

Aye.

0:06

Item uh minutes are approved.

0:09

Item number one is approval of a right-of-way use permit for the Academy Drive Homeowners Association to add additional brick column, additional brick column to the end of the existing entrance sign wall.

0:20

Mike, welcome.

0:21

Good afternoon.

0:22

So very simply.

0:31

It's in the public right-of-way.

0:33

Probably been there 30 years, long before I think the city initiated, you know, right-of-way use permits.

0:42

So what they want to do is they want to modify the sign.

0:46

That is a image of the proposed look.

0:50

Today there's only one column.

0:55

So I can make this thing go backwards.

0:58

That's what's there today.

1:00

And that's what they wanted to end up looking like when they modify the monument sign.

1:06

We are you know getting a right-of-use permit for this so that there's just a clear understanding that car hits this.

1:13

The HOA is responsible for that's a reasonable question from committee members.

1:23

Can I get a motion?

1:25

Second.

1:26

All in favor say aye.

1:27

Aye.

1:28

Item one is approved.

1:29

Item two is approval of contract amendment number two with TTL for the University of Boulevard East Roadway Improvement Project.

1:36

Total is 35,000, 25 dollars.

1:38

Clint, welcome.

1:40

Hello, good afternoon.

1:41

Good afternoon.

1:42

Yes, sir.

1:43

So this amendment adds bid phase services and real allocates funds from services from that were either completed or like completed and didn't have to use the entire funds or just deemed unnecessary to those requiring additional designs and consulting.

1:56

So that's for this.

2:33

What is the amendment is uh contract amendment?

2:37

So uh gosh, sorry.

2:40

All right, y'all.

2:41

Sorry, we were having amber alerts.

2:43

It's not a flaws.

2:44

Everything's fine.

2:45

Okay.

2:47

See yes, sir.

2:47

The contract amendment.

2:48

Um there was uh several tasks that were not completely used up, and they were moved to the design phase, and then uh it's also moved to the bid phase.

2:57

So this is an additional 35,000 to supplement what was left over.

3:02

The bid phase and the re the there were several redesigns that occurred during this uh before the several tasks that were not used up, yes sir.

3:14

Like what?

3:14

Like what?

3:15

Yes, sir.

3:16

Uh the environmental uh there's a few environmental tasks that were not used.

3:20

Uh it was added in case FHWA needed uh us to supply more information regarding uh uh mitigations and uh a nationwide permitting.

3:32

Okay, and so what then?

3:34

All right, and so from we took some of the funds from that and supplied uh went toward bid phase and a few redesign phases uh uh for this project.

3:45

So basically this is my nice left over.

3:47

Yes, sir.

3:49

So uh before um redesigning, so there was a few things in this project that we needed redesign the northern uh shared use path.

3:59

The originally uh this contract had that that shared use path straight, a straight line, and then we had to uh wait.

4:07

We we redesigned it to weave around the transmission poles that will be uh uh there for this project.

4:15

Uh another designed it to weave around transmission, yes, sir.

4:19

That required regrading, it shifted a lot of things, so we had to take care of that.

4:23

Um that was the that was the major one uh working with uh uh property owners during right-of-way acquisition.

4:30

A few of them needed a few different things, wanted a few different things.

4:34

So working with them, uh we redesigned a few things like their driveway or relocating a sign or something like that.

4:43

Why would we redesign a driveway?

4:46

Just uh to make the relocation acquisition smoother.

4:50

Um I will say that originally the reload the right-of-way acquisition phase was thinking was going to take a year and a half long, and we shrunk it down to eight months.

5:00

We were on top of it.

5:01

We were meeting with property owners.

5:02

We were we were they uh TTL and Tom Bobbett, you know, they they the group they crushed it.

5:08

That's right-away driven, right?

5:10

To get more efficiency.

5:11

I don't have any other questions because it's perfect.

5:14

Cashes you wait.

5:17

Motion, second, any discussion.

5:19

All in favor, say aye.

5:20

Aye.

5:21

Thank you, Clem.

5:22

Item two is approved.

5:23

Item three is approval of a professional services agreement with Garber LLC for the Hilliard Fletcher phase three improvement project.

5:31

The total is 997,900.

5:34

Mr.

5:35

Gurney, welcome.

5:36

Thanks.

5:38

Um, so yes, this is uh offered request for authorization for engineering on the third phase of improvements at the WERF the exhibit that was in the packet and on the screen kind of shows um what we've done out there in the in the past couple years.

5:59

Um this project is the northern bold square.

6:06

That's the blower building.

6:08

So in this project, we've got three components, the return activated sludge pumps, those are housed in that that rectangle between the circles on the north side of the drawing.

6:19

So those are five pumps that recycle the activated sludge from the secondary clarifiers to the aeration basin.

6:29

So those need replacing, and then the aeration second component aeration blowers replacement.

6:37

So that's replacement of four 600 horsepower blowers, and which would include variable frequency drives.

6:46

Um, these are electric motors, so that helps dial in the speed and creates efficiency.

6:52

Um, so you're not using as much power.

6:54

Um, so those are in need of updating, and then the third component would be the septic receiving station rehab.

7:03

So that's replacement of existing valves, actuators, level transmitters.

7:10

Um there's there's bar racks, so I guess let me back up the septic receiving station is if you get your septic tank pumped out, there's vendors that do that and they come to the plant and discharge, and this is the receiving station which they do that.

7:23

So these improvements will help protect the the uh downstream process equipment.

7:30

So those are the three components.

7:34

Um the design is uh expected to take seven months conceptually our rough order of magnitude cost is 11 million dollars for construction.

7:48

Um the current budget uh we don't anticipate we'll be able to fund all that.

7:53

We expect to design it all, have a comprehensive design, do a short-term construction project to do what we can and then phase in the rest of it in the future.

8:04

Um I believe that's uh any questions.

8:07

So Mary, it's just one of the ones we talked about uh incrementally financing as it becomes uh evident what needs to be done there.

8:21

Well, yes, sir.

8:23

I'm sorry, I was reading a document here.

8:26

Yes, sir.

8:28

Is this one of the projects we talked about finding ways to finance incrementally as we move along or we I think that the one that you're thinking about might be um the improvements to the um it's it's not this one, it's to the acceptance dumping facility that we were talking about is how we would finance it over time, it's not this specific project.

8:57

Yeah, this this project does include short-term version of that, and then the long term we would figure out think that would be you know, in terms of specific discussions on the financing of the long-term part of this.

9:14

I don't know that we've had those.

9:16

I think our plan is we know we need to get something designed.

9:19

We know we need looking roughly a million to get it designed, right?

9:22

That's right.

9:22

That'll take seven months.

9:24

That's right.

9:25

And then what do you think the first thing might rough order of magnitude would be before we need to start looking elsewhere for sources of funds?

9:34

Well, we hit we'll have an additional one and a half million dollars in budget.

9:38

I think I think I'm anticipating we'll do most of the RAS pumps with that.

9:43

We also have a source of funding for the short-term septage uh improvements, so we should be able to do all that.

9:50

So, what that'll leave for future funding is whatever's left in the RAS pumps and the blowers.

9:56

So, and depending on how we work through the design, we'll continue to kind of understand the priorities.

10:02

Um that's the approval.

10:05

Meaning, meaning, like, well, maybe we can get a blower and not two ras pumps.

10:10

That's I think that's part of the the exercises we go through design.

10:16

Okay.

10:18

Tier RAS pumps.

10:20

Tier.

10:21

Is that what you're saying?

10:22

I was trying to say I don't know about tier.

10:26

I was saying ras pumps is I don't know what the first word would have been.

10:32

Okay.

10:37

You all know what that is.

10:38

Uh I'm dead.

10:38

And I know you do, Kip.

10:39

We've been here 40 years.

10:42

Okay.

10:42

Is it for me?

10:43

I don't have any other questions.

10:45

Okay, that's hey, hey Brian, bottom line though for me is you we will do this study, and the study will show us design.

10:53

The design, what's the design?

10:55

The priorities and and we'll where we see the whole thing, the whole picture, design it and see what how we've got to phase the symphony.

11:02

Yeah, it'll it'll get more granular on these systems.

11:04

We just backing up, we've done a study of the plant, processes, hydraulics.

11:10

These three things were identified as high priority already.

11:14

Okay.

11:15

So that's done.

11:16

Now we're in design.

11:18

Uh we're gonna you know, design prioritize more granularly, work with what we got and see you know what we need to pull out how then figure out how we fund it.

11:28

Correct.

11:29

Okay, any other questions?

11:30

I don't have anything else.

11:32

Can I entertain a motion?

11:34

Second motion second.

11:37

All in favor say aye.

11:39

Aye.

11:39

Aye.

11:40

Excuse me.

11:41

Item three is approved.

11:44

Item four is approval of change order number one with Mark Johnson construction for the Hillary Fletcher uh headworks improvement project, a deductive total of 3,799.

11:54

Brian.

11:54

Yes, sir.

11:55

So this is one of the projects at the plant at the work plant.

11:59

Um this is the bar screen project.

12:00

You can see pictures on the screen, the two vertical structures, those are new.

12:06

Um new pieces of equipment that were installed, and I know that from feedback from the operators that they're working much better than the previous version.

12:15

The the panel on the right side of the screen is new controls that was also installed in this project.

12:20

So anyways, this is the close out change order for the project.

12:24

Um questions.

12:28

Where would this go?

12:31

This is ARP funded, and so this the um the deductible go back to ARP, which is very small.

12:38

We we've really um obligated and spent all that.

12:42

We still are earning a little bit.

12:43

We've earned a little bit of interest in the last couple of years, and so there might be a some small change left over, and that would be about it.

12:51

Motion motion second, all in favor say aye.

12:54

Aye.

12:55

Item four is approved.

12:56

Item five, approval of a professional services agreement with Thornton, Mousso, and Bellaman.

13:02

So that right to provide services at various lift stations, the total is twenty-two thousand four hundred forty-five dollars and fifty cents, right?

13:10

Is there so uh this is a contract as needed with T and B to basically provide intermediate wastewater treatment, build like dose chemicals at certain listations where we need it to dial in pH and things like that?

13:27

Something we do every year.

13:29

Uh we do.

13:30

I don't think we've used them yet.

13:31

We're using them uh because we've had success with them on the water side, and so these chemical additives at certain spots of the work we do.

13:39

Yes, sir.

13:40

I don't have any other questions for a motion.

13:43

Motion second motion, second, all in favor say aye.

13:46

Aye.

13:47

Item five is approved, item six is approved of additive change order number one to the minor public works contract with civil works for additional shrub removal and grade inlet increasing compensation by two thousand dollars.

13:59

Tim afternoon.

14:01

After that uh so this is related to the work ongoing in DuPont Plaza out here.

14:07

Uh the additional shrub removal is along sixth street near the parking garage entrance.

14:12

Fifth street.

14:14

Fitz, yes, sir.

14:15

Thank you.

14:15

Fitz Street uh near the parking garage entrance.

14:18

We want to remove all the shrubbery right there and include that in our landscape.

14:25

Well, I don't have anything against rubbery, Mr.

14:28

Bay.

14:29

But we are going to relandscape everything in DuPont Plaza as well as in front of municipal court and want to want to tie it all in together and make it match.

14:36

And where's the money to this in y'all's this is coming from facility renewal or renewal account?

14:42

I don't think we need to modify one grade inlet where we remove the um previous fountain.

14:49

Yeah, any other questions or ask for a motion to approve.

14:53

So move the second, all in favor say aye.

14:55

Aye.

14:56

Item six is approved.

15:00

Item seven is approval of minor public works contract with civil works for sidewalk repairs at Evergreen Cemetery.

15:03

The total is three thousand two hundred dollars, Tim.

15:05

Yes, sir.

15:05

This account is the Evergreen Cemetery account.

15:08

This was an issue that was brought to us by Russell Lawrence.

15:11

He had observed there were multiple sections of the sidewalk along the south side of Evergreen Cemetery that were causing a trip hazard.

15:18

And we've gone ahead and had this work completed last week so that we don't have anyone.

15:25

We we he had he had observed several people tripping after game days, and so we wanted to eliminate that hazard as quickly as possible.

15:32

This is going to parallel the 12th Street.

15:35

Yes, sir.

15:36

I was about to say we're sure it was the sidewalk.

15:38

They didn't have anything we can say the sidewalk did need some uh adjustments.

15:46

It depends on the game.

15:52

Kind of motion and second.

15:53

All in favor say aye.

15:54

Aye.

15:55

Item seven is approved.

15:56

Item number eight is approval.

15:58

Minor public works contract with West Alabama Mechanical for purchase and installation of uh Globe Valve at fire station number six.

16:05

The total is three thousand four seventy-five, Tim.

16:08

So um I'm not gonna put Chief Brook on the spot, but if you ask me a question about a draft pit, I may have to.

16:15

Um at station six, as part of the construction project, we installed a draft pit, which is for uh testing of their pumper trucks as well as okay, primarily testing of their pumper trucks.

16:28

Um this draft pit is like it sounds it's a larger draft, it's a large pit that is um supplied by six-inch water main.

16:38

That line, when fully open, is causing some pressure issues in the fire station as well as some of the surrounding occupancies.

16:46

We want to install a pressure reducing glove valve so that we can lock that pressure at a set amount and eliminate the loss of pressure to the surrounding properties.

16:58

Fair enough.

16:59

That's moved.

17:01

Here a motion.

17:02

Motion second motion second.

17:04

All in favor say aye.

17:05

Aye.

17:06

Item eight is approved.

17:08

Item number nine is approval of minor public works contract, chip griffett construction company for improvements, fire station number six gym building, the total of 13,365.

17:19

Yes, sir.

17:19

So this is inside of the station six metal building, the existing gymnasium building that was on the property.

17:26

We have we have moved both the fire marshal's office as well as EMS prevention into that building.

17:32

There are 12 offices, 12 occupants in that building right now.

17:37

We are asking to install a 10-foot cabinet with drawers in a sink.

17:43

Questions?

17:44

And where's this money coming from?

17:46

This is coming from the fire station six account, the original construction account.

17:51

All right.

17:54

So move.

17:55

Second.

17:56

All in favor say aye.

17:57

Aye.

17:58

Item nine is approved.

17:59

Item 10 is approval of the minor public works contract with Red Oak Company for as needed painting services, the total not to exceed $45,000, Tim.

18:08

Yes, sir.

18:09

And as it says, this is for as needed painting.

18:12

Um, this is not specifically identified to one particular project, so we are requesting to fund this from our facilities maintenance outside services, and this would be our uh as needed painting contract for fiscal year 26.

18:26

Questions motion second motion second.

18:29

All in favor say aye.

18:30

Aye.

18:32

Item 10 is approved.

18:33

Item 11 is approval of change order number one with Hall Taylor construction for landscape improvements at JC Park.

18:40

The total is 39, 398 dollars 37 cents, Tim.

18:45

Yes, sir.

18:45

So this is change order number one related to the tenant center project, however, it is specifically for JC Park and the drainage along Kicker Road adjacent to JC Park.

18:57

Um we are wanting to add to the contractor scope some additional grading work inside JC Park as well as removing an existing corrugated pipe that runs along Kicker Road.

19:09

Uh, there was a utility entrance into JC Park that is being eliminated by the project itself.

19:16

Um we did not cover and design the removal of that underground pipe, um, but the amount of rainfall that we had in the spring identified that pipe as an issue for storm drainage, and we want to go ahead and get that out while we're working in the area.

19:31

Tim, what's the total size of the contract it's been added to?

19:35

It that that puts this contract just over 10 million.

19:42

I don't know that exact amount, but it we're just exceeding 10 million with this ad.

19:48

And how will this how will this be funded?

19:50

Is this in the contingency amount?

19:52

No, no, there's a corresponding budget revision on finance committee for elevate.

20:03

So how is this discovered after the original design was so there are two things happening here?

20:12

The the kicker road work.

20:15

Um we had uh I don't know, historic rainfall uh in the months of April, May, and June.

20:23

Um I believe OCE as well as public works received multiple complaints as far as storm drainage onto kicker road.

20:30

This it was certainly not something that was obvious, I don't believe, to any of us prior to the uh design work.

20:37

Um and so since we were already removing that entrance, that service entrance to the park, we felt like now is a good time to go ahead.

20:45

He doesn't like fun and include removing that underground pipe entirely.

20:49

So the service entrance that was removed is was coming off the kicker road side.

20:53

Yes, sir.

20:54

That's correct.

20:57

Okay, I'm sorry, Mr.

20:58

Standard.

20:59

You said it's coming from where elevate contingency.

21:02

I don't have any things that's awarded.

21:06

Do I hear a motion?

21:07

Motion, you can't please strike that in the right.

21:12

All right, now hold on a minute, I'll mess it up.

21:14

Do you motion?

21:15

Busby or I have a motion motion second.

21:19

Second.

21:20

Your your vote has been taken out.

21:22

I hope so.

21:23

Exactly.

21:23

All in favor say aye.

21:24

Aye.

21:25

Item 11 is approved.

21:27

Without Mr.

21:28

Tyner's vote.

21:30

Item 12 is authorization to enter into a professional services contract with Lance Holloway Productions.

21:35

Welcome, Brent and Sarah.

21:37

Good afternoon, Council.

21:39

So this item and the next item go together.

21:41

Um, what we are asking for is to enter into a professional service contract with Lance Holloway Productions to produce time-lapse uh photography and videography of the Sabin Center construction site.

21:53

So um the second piece of this is an MOU between the city and the Sabin Center Foundation so that we can share the cost of that item.

22:03

Questions motion?

22:06

We're splitting it, right?

22:08

We're splitting it, yes, sir.

22:11

Yes.

22:12

Who selects Savings Center or us?

22:15

Who selected Lance Holloway?

22:18

Uh saying he currently has the contract to kind of capture the life of this amount.

22:25

So this is part of the larger contract.

22:27

It's it's in it's not officially part of it, but he it would I would say it's it's cousin.

22:33

In form okay, it's informally motion.

22:38

Motion and a second, all in favor say aye.

22:42

All right.

22:42

Vote on the and then item 13 is a memorandum of understanding authorizing that between the city and saving foundation for joint funding of the professional services contract with Lance Holloway Productions, which is what you're talking about, correct?

22:55

Yes, sir.

22:56

Do I hear motion?

22:57

Motion and a second.

23:01

All in favor say aye.

23:02

Aye.

23:03

Thank you.

23:04

Item 13 is proved.

23:07

Our next committee meeting is next Tuesday, October the 21st.

23:12

Is there any other business to be brought before our committee today?

23:17

Hearing none, I would entertain a motion to adjourn.

23:20

So moved.

23:21

Moved and cash that you second.

23:23

Second.

23:24

Any discussion?

23:25

All in favor, so

Discussion Breakdown — Share of Meeting
Engineering And Infrastructure█████████████████████████████████████████████60%
Procedural█████████████████22%
Facility Management█████7%
Arts And Culture█████6%
Parks and Recreation████5%
Summary of Proceedings

City Council Committee Meeting - October 14, 2025

The City Council Committee met on October 14, 2025, at 7:39 PM to consider 13 agenda items related to public works, infrastructure, and facility improvements. All items were approved unanimously by voice vote.

Discussion Items

  1. Right-of-Way Use Permit for Academy Drive Homeowners Association – Approval to add a brick column to the existing entrance sign wall. The item was explained by staff member Mike, noting the sign has been in the right-of-way for 30 years and the HOA will be responsible for any damage. Approved.

  2. Contract Amendment #2 with TTL for University Boulevard East Roadway Improvement Project – Amendment totaling $35,025 to add bid phase services and reallocate funds from unused environmental tasks. Staff clarified redesign of the shared use path to avoid transmission poles and adjustments for property owners. Approved.

  3. Professional Services Agreement with Garber LLC for Hilliard Fletcher Phase Three Improvement – Agreement for $997,900 to design replacement of return activated sludge pumps, aeration blowers, and septic receiving station rehab. Construction estimated at $11 million; design will prioritize phasing due to budget constraints. Approved.

  4. Change Order #1 with Mark Johnson Construction for Headworks Improvement Project – Deductive change order totaling $3,799, returning funds to ARP. Approved.

  5. Professional Services Agreement with Thornton, Mousso, and Bellaman for Lift Station Services – Contract for $22,445.50 for as-needed wastewater treatment chemical dosing. Approved.

  6. Additive Change Order #1 with Civil Works for DuPont Plaza Shrub Removal and Grade Inlet – Increase of $2,000 for shrub removal along Sixth Street and grade inlet modification. Funded from facility renewal account. Approved.

  7. Minor Public Works Contract with Civil Works for Sidewalk Repairs at Evergreen Cemetery – Contract for $3,200 to repair trip hazards on sidewalk along 12th Street. Work completed prior to meeting. Approved.

  8. Minor Public Works Contract with West Alabama Mechanical for Globe Valve at Fire Station #6 – Contract for $3,475 to install pressure reducing valve on draft pit supply line to prevent pressure loss. Approved.

  9. Minor Public Works Contract with Chip Griffett Construction for Fire Station #6 Gym Building Improvements – Contract for $13,365 to install cabinet with drawers and sink in the relocated office building. Funded from fire station construction account. Approved.

  10. Minor Public Works Contract with Red Oak Company for As-Needed Painting Services – Contract not to exceed $45,000 for fiscal year 2026, funded from facilities maintenance outside services. Approved.

  11. Change Order #1 with Hall Taylor Construction for JC Park Landscape Improvements – Change order for $39,398.37 to add grading and remove corrugated pipe along Kicker Road, addressing storm drainage issues discovered after heavy rainfall. Funded from Elevate contingency. Approved.

  12. Professional Services Contract with Lance Holloway Productions for Time-Lapse Photography of Sabin Center Construction – Authorization to enter contract for capturing construction progress. Approved.

  13. Memorandum of Understanding with Sabin Center Foundation for Joint Funding of Time-Lapse Photography – MOU to share cost of the contract with Lance Holloway Productions. Approved.

Key Outcomes

All 13 items were approved by voice vote with no opposition. The next committee meeting was scheduled for October 21, 2025.

Meeting Transcript

To approve. So moved. Second. Moved and second. And any discussion. All in favor say aye. Aye. Item uh minutes are approved. Item number one is approval of a right-of-way use permit for the Academy Drive Homeowners Association to add additional brick column, additional brick column to the end of the existing entrance sign wall. Mike, welcome. Good afternoon. So very simply. It's in the public right-of-way. Probably been there 30 years, long before I think the city initiated, you know, right-of-way use permits. So what they want to do is they want to modify the sign. That is a image of the proposed look. Today there's only one column. So I can make this thing go backwards. That's what's there today. And that's what they wanted to end up looking like when they modify the monument sign. We are you know getting a right-of-use permit for this so that there's just a clear understanding that car hits this. The HOA is responsible for that's a reasonable question from committee members. Can I get a motion? Second. All in favor say aye. Aye. Item one is approved. Item two is approval of contract amendment number two with TTL for the University of Boulevard East Roadway Improvement Project. Total is 35,000, 25 dollars. Clint, welcome. Hello, good afternoon. Good afternoon. Yes, sir. So this amendment adds bid phase services and real allocates funds from services from that were either completed or like completed and didn't have to use the entire funds or just deemed unnecessary to those requiring additional designs and consulting. So that's for this. What is the amendment is uh contract amendment? So uh gosh, sorry. All right, y'all. Sorry, we were having amber alerts. It's not a flaws. Everything's fine. Okay. See yes, sir. The contract amendment. Um there was uh several tasks that were not completely used up, and they were moved to the design phase, and then uh it's also moved to the bid phase. So this is an additional 35,000 to supplement what was left over. The bid phase and the re the there were several redesigns that occurred during this uh before the several tasks that were not used up, yes sir. Like what? Like what? Yes, sir.