City Council Meeting Summary for October 21, 2025

City Council MeetingsTuesday, October 21, 2025
BodyTuscaloosa, Alabama
SessionCity Council Meetings
DateTuesday, October 21, 2025
StatusFILED
Video Record

STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE

Transcript — Verbatim
0:00

To approve if you're ready.

0:04

Motion.

0:05

Second.

0:05

Motion and second.

0:06

All in favor say aye.

0:07

Aye.

0:08

Minutes are approved.

0:09

Item number one.

0:11

Authorization for the mayor to execute an agreement with Al Dot for fiber relocation at Campus Drive associated with the Woolsey Fennel Bridge replacement and approaches project.

0:20

Mr.

0:21

Garner, welcome.

0:22

Good afternoon, Council.

0:23

Good afternoon.

0:24

So the scope of the work is in that clouded region, and this is relocation of the city's fiber system that's in conflict with the proposed widening and improvements associated with the Woolsley Fennel project.

0:43

This is a 100% reimbursable agreement through OLDOT.

0:49

Duncan Coker is the selected engineer of record.

0:55

The agreement is a total of 260,523.

1:00

That includes the construction component as well.

1:06

Mike, what was it again?

1:08

I'm sorry.

1:09

The amount?

1:10

260,5219.

1:16

Based on the information that you have, which I understand the mayor gave a great answer that it was an OLDOT project.

1:26

Understanding it's an OLDOT project.

1:28

What is the estimated timeline for this project right now?

1:33

If you had to as much as we know, I know what do they say?

1:37

Because I know what I've heard, and I can't really remember the dates now because they've changed two or three times.

1:41

So what so Jason, have you heard anything lately?

1:45

I haven't heard anything from the updates lately.

1:48

So the few had to guess when would it start?

1:50

27 in 27.

1:54

It's a three-year project, correct?

1:56

Roughly some.

1:59

Yeah, there's a little there's some unknowns that we just we don't have a lot of detail on, counselor.

2:04

Um when will we have the details?

2:07

When they release it.

2:09

I mean that's a great answer.

2:13

Thank you for that answer.

2:14

That's an instant idea.

2:16

Okay, so the last word I think you expect it changes for for that to be announced next year, probably this summer.

2:23

This summer.

2:24

Yeah, coming up next year.

2:27

With timelines and all that, and just a lot of residents.

2:30

I mean, not just district three, but a lot of residents are asking about this, right?

2:35

Oh, yeah.

2:35

They're asking me about it a lot.

2:36

And I what I've said, which I mean again, this is don't take this as the gospel of all these people that are listening.

2:43

I've heard the start late 26, maybe early 27, could be up to three years.

2:49

I think the construction schedule really is they're anticipating three years to build the project.

2:55

That's a good hedge answer.

2:57

You didn't remember, but it is an L dot project.

2:58

We have to remind everybody of that.

3:00

I have to remind them all the time we don't control 82.

3:03

Do we here on McFarlane?

3:05

But they think we do.

3:06

Anyway, sorry.

3:07

Do I have any other discussion or your motion?

3:10

Some of them.

3:11

Okay.

3:11

Motion second.

3:12

All in favor say aye.

3:13

Aye.

3:14

Item one is approved.

3:15

Item number two is approval of a contract with skipper consulting to provide professional engineering and construction services for transportation services.

3:23

The total is 50,000 per year for two years.

3:26

Bill, welcome.

3:27

Thank you.

3:28

Good afternoon, council.

3:29

Good afternoon.

3:30

So this is a it is a new contract, but it is a replacement for a contract that we've had for the past two years.

3:35

It's specialized services, so uh transportation expertise gets a little deeper in events than what we have in house.

3:42

Uh helps us out with things like signal crossings, signal timings, and that's expertise specialty, and it would be for $50,000 uh two-year contract, and this is the OCE budget for this year and the outside services line item.

3:55

That would be up to, right?

3:57

Up to questions, committee.

4:00

Bill, you you've listed their contract operations, traffic signal timing, conceptual geometric design.

4:08

What once what's a couple two or three examples of how they were engaged on our behalf last year?

4:15

So uh except for last year looking into signal timing on university boulevards and the crossings on university boulevards.

4:21

We got some feedback that uh maybe a little quick and we wanted to look and make sure that we were within standards.

4:27

So that's a I was I was one of the ones providing that feedback that it might be a little quick.

4:32

Yes, sir.

4:33

So that that's that's the type of uh uh feedback that they would give us on something like that.

4:37

Another example we have some uh pedestrian crossings that we're looking into up in Mr.

4:43

Crow's district that we want to make sure we get the geometry right for that so we don't create challenging intersections for kids who are just trying to get the school safely.

4:50

Uh that's another example of the type of feedback that's so second move and segment all in favor say aye.

4:56

Aye, item two is approved.

5:00

Item three approval to award Socal Park North Lighting Project to Premier Service Company.

5:03

The total is three hundred ninety-nine thousand four sixty-eight twenty.

5:06

Zach, welcome.

5:08

Good afternoon, council.

5:09

Good afternoon.

5:12

Good news.

5:14

Okay.

5:15

Uh so yeah, this is for lighting in the Circle Park North area.

5:19

Um we got Premier was a little bitter at 399,468,000 468 dollars and 20 cents.

5:28

If you'll look on the screen, they are adding lights in the circled area, basically from the entry drive on watermelon to the roundabout, and then adding fiber conduits to all the existing parking lots for future camera connectivity.

5:45

This when you and I taught this was planned, wasn't it originally?

5:49

But we were kind of waiting to see where all these numbers came in in the in the whole project, scope of the bigger project, right?

5:54

Yes, I think there was a bigger project before this where they did the parking lots, and this was not included because they were concerned with budget at the time.

6:01

So it's needed to get special lights that whole area.

6:11

I know a friend whose wife had a pretty bad wreck there the other day, and a car flipped three times.

6:18

Luckily she was okay, but it was yeah, so anyway, but it's that that whole area's changed a lot over the last I guess year or two.

6:26

There's a lot of traffic coming down that road, y'all.

6:28

So Zach.

6:32

Motion second.

6:33

Motion second.

6:34

All in favor say aye.

6:35

Aye.

6:36

Item three is approved.

6:38

Item four is approval of a minor public works contract with night signed for the Maccabe bridge.

6:43

The total is forty-five thousand four hundred thirty-seven dollars temp.

6:47

Thank you.

6:47

Good afternoon.

6:48

Good afternoon.

6:50

So this is uh proposed uh brick pedestal as well as commemorative plaques to be placed along the walking trail near the McAbee Bridge on the nearly open McWright's Ferry Road extension.

7:02

Um this pedestal and plaque would commemorate the Leroy and Ruth Maccabe on the top, as well as the various um uh project team below.

7:14

Um be similar to the ones that you see.

7:17

Well, that example is from Snow Hitting, so it'll be like the brick pedestal at Snow Hinton Park.

7:24

So Tim, the the signage on the facing will be similar to what's used to illustrate there on the top.

7:33

That's some sort of bronze like yes, sir.

7:37

It's it yeah, that's correct.

7:38

It is they're all cast plaques.

7:41

Um the top plaque is for the Maccabees, and then that's our typical project plaque there in the center, and then uh we'll have a tick rick and a project team plaque there on the bottom.

7:52

Okay.

7:53

Motion second motion second, all in favor say aye.

7:56

Aye.

7:57

Item four is approved.

7:59

Item five is approval of a minor public works contract with building specialties for door hardware for multiple secured doors at City Hall total is 10, 450 10th.

8:09

Yes, sir.

8:10

So uh I believe council's aware we've been making a lot of uh access control improvements to City Hall and other city properties.

8:18

We've got a few doors that um need a significant amount of additional hardware as well as preparation for uh them to be able to receive uh some of the new access control, and so we we would like to have this contract with building specialties for them to perform some of this work for us.

8:38

And that money is where facility renewal motion second motion is second, all in favor say aye.

8:45

Aye.

8:46

Item number five is approved, item number six is approval of the minor public works contract, the building specialties for rekeying of the police athletic league gym, the Powell Gym 10,316.

8:58

Tim.

8:59

Yes, sir.

8:59

So this is the Powell Gymnasium, uh, which we are cutting the ribbing ribbon on the gym and the um outdoor courts this Friday.

9:07

Um this is to add access control as well as re-key the two primary double doors at the Powell Gymnasium.

9:16

Well, it's just not included in the the original.

9:23

I'm not entirely sure of that, Mr.

9:25

Busby.

9:25

I know that initially the project started um with improvement to the facility itself, and I don't think until near the end we were really looking at some of the security components.

9:36

We were looking at cameras and such, which were captured as part of the project, but I think the thought was with this facility being something we're starting to maintain, getting it onto our keyway and our access control uh was something we decided we felt like we needed to do as well.

9:53

Yeah, Sam uh Mayor, I want to say first thank you for I had an opportunity to go inside the PAL Gym last week.

10:00

Um amazing job, it looks amazing.

10:02

Um, and I do agree that this is well needed because there isn't currently any kind of access control um on those front doors.

10:12

Um we're gonna maintain it and we're gonna keep people safe, it's gonna be safe, is something that's definitely needed.

10:18

So I appreciate your work on it.

10:20

And I can report counselor evening was five and seven behind the three-point arm.

10:26

I I think you he like I'm not making that up either.

10:29

I mean literally um so this reason why y'all go in and create your great uh I can't wait for the public to see it.

10:36

I saw some video last week.

10:38

Someone sent uh Joe and Central Senior Central playing the four in the state playoffs.

10:47

It was bad.

10:49

How good he was.

10:54

Yeah, yes, like when they say C and C codes.

11:02

Controllable or time to fold.

11:04

So they can be on timers, yes, sir.

11:07

They can be on timers, of course.

11:08

They'll work off of badges, whomever has access.

11:11

Um I don't know if there is a plan to leave them unlocked for any period of time, or I don't really know what the scheduling would be, but they can be put onto schedules where they were open from let's just say, for example, 8 a.m.

11:22

to 5 p.m.

11:23

and then the doors would automatically lock after it.

11:25

Automatically locked.

11:25

That's good.

11:27

Any other questions or a motion to approve?

11:30

Motion second.

11:31

Move second, and all in favor say aye.

11:33

Aye.

11:34

Item six is approved, item seven is approval of minor public contract with Amos and Associates for door replacement at Parker Hond Park.

11:41

Total is $3200.

11:43

Tim.

11:43

Yes, sir.

11:44

So this word we have an incident of vandalism on the women's restroom uh at Parker Home Park, then the door needs to be replaced.

11:52

Um we have uh filed a claim with the insurance, our insurance to replace for reimbursement of these costs.

12:00

Um so this will replace the door as well as repaint the door.

12:04

Questions again.

12:06

I want to say thanks to Eric on this one.

12:08

I got a call from constituent that the door was broken on the women's restroom, and they were out there pretty quick and on it and fixing it.

12:16

So it's Eric, I appreciate that.

12:21

I'm busted in advance.

12:24

Motion.

12:26

Uh second.

12:27

The 3200 bucks is a door.

12:30

Yes, sir.

12:31

This is a commercial grade hall of the door frame.

12:33

Yes, sir.

12:33

The door and frame second.

12:35

Doors are motion is second.

12:36

All in favor say aye.

12:38

Aye.

12:38

Item seven is approved.

12:40

Item eight is approval of minor public works contract with Red Oak Paint Company for painting services.

12:46

Fire station number six, the total is fifteen thousand to twenty-five temp.

12:50

Yes, sir.

12:51

And this is funded by the fire station six account, and I believe this will round out all the work we were doing at the fire station.

12:59

Um the gymnasium uh which is being used by all of the fire department.

13:04

Um we've done a rubber floor and a portion where they've got their gym equipment, their weight equipment, I should say.

13:10

Um, this is for the rest of the gym floor, and this will be to install a hard curing enamel floor in that gym area.

13:20

Chief Delk, your men didn't want to paint that.

13:23

We want it done right professional jobs.

13:27

Well, some of that they can do it, but I don't know if they've actually got the experience to work with those products.

13:33

So motion motion second, all in favor say aye.

13:38

Aye.

13:38

Aye.

13:39

Item eight is approved.

13:41

Item nine is authorization.

13:42

Tim, what was that coming on the original?

13:44

I'm sorry.

13:45

Was that coming out of the original account for that?

13:48

Yes, sir.

13:49

Yes, sir.

13:49

Authorization for minor public works contract with Guthrie Landscape for as needed landscaping services at various city properties.

13:57

The total is not to exceed 100,000.

14:00

Eric, welcome.

14:02

Thank you, counselor.

14:02

So this is uh not to exceed this is was actually presented to the council when we did the capital projects uh presentation a few months ago.

14:11

So that's where the uh the hundred thousand is coming from.

14:14

Uh primarily we're looking at re-landscaping DuPont Plaza when they finish with the construction out there for the NX2 chiller replacement, and then we're expecting to have some left over.

14:23

Uh there's some areas around City Hall, government plaza, and some other areas that just have not had any attention and need some plants going back in to dress it back up.

14:31

It's not meeting our so we've talked and also worked on replanting some willow oak trees around the downtown historic district where they're falling.

14:43

Where does that where is that in the anticipated queue?

14:48

Uh so right now we have um proscapes.

14:53

Correct has turned in something we plan on trying to bring in next week.

14:56

Okay, thanks.

14:58

Motion second motion second, all in favor say aye.

15:01

Aye.

15:02

Item nine is approved.

15:03

Item 10 is authorization.

15:05

Terminate the current contract with Life South Community Blood Center and authorization of the new contract with Life South Community Blood Center not to exceed 49.99 a year, Chief Dell.

15:17

This moves uh life south to our reserve blood program.

15:21

Right now we're using Red Cross as the primary uh just for delivery options and the available availability of that, it works better for our program.

15:29

But life sale is still there if we were to have a shortage from Red Cross, we'd still like to leave this open so we've got that avenue.

15:37

So why are we terminating their old contract?

15:40

The old contract was a higher dollar amount, which takes us over the budgeted outside services amount.

15:46

So this basically reins it in to where we're within budget on our contracts.

15:51

How are y'all priced in terms of units?

15:55

It's based on unit, but but the way it's priced, if the the way the program works is if we we monitor the temperature, the regulation and everything that's done with it and rotate that through the hospitals.

16:07

We actually don't have to pay for that.

16:09

So as long as we keep all of those those safety measures and quality uh measures in place, we don't pay for it unless we actually use it on the patient.

16:19

Mr.

16:19

Faye.

16:21

Two weeks is what they try to what they try to cycle it through and get it back to the back to the hospital.

16:27

Two weeks on blood for for us to have it in the field, and then it can go back to the hospital to be used.

16:33

Yes.

16:34

We'll use it pretty quick.

16:35

Yes, ma'am.

16:36

Yes, they go through.

16:37

Um pretty quick.

16:40

Other questions motion second, all in favor say aye, aye.

16:44

Item 10 is approved, 11 item 11 is approval, professional services contract with Grow Marketing for professional service design services for fire rescue, Tuscassa River Market totals $8,000.

16:56

Welcome, Sarah.

16:57

How are y'all?

16:58

We are wonderful.

16:58

How are you doing?

16:59

Good.

17:00

So, yes, sir.

17:00

This is a professional services contract with Grow.

17:03

It's actually two projects, but because they're happening at the same time, we're presenting it as one contract.

17:07

So one project is a brand refresh for Tuscaloosa fire rescue.

17:12

It's been a while, things have gotten a little scattered.

17:14

We just need to tighten things up and make sure they're crisp and representing the the fire department at a high level.

17:20

Um that one is for $3,500 with Grow.

17:23

Um, the other one is for the River Market, which has actually never had a brand.

17:28

They have a logo that used to be a stamp that the river market manager found in a drawer when she took over.

17:33

So they need a little bit more help.

17:35

Um, so their their brand package grow is estimating to be 4,500.

17:42

Any comments on the stamp and the drawer?

17:44

No, you got dial me in on some house just some marketing freshen up and crisp and more.

17:52

Yeah, it's just taking all of the elements that Tuscaloosa Fire Rescue has and modernizing them a little bit.

17:59

We're not gonna like completely change the patch, but we may bring the colors into you know an area that feels a little bit more modern, um, and then making sure all of the pieces are cohesive and work together.

18:10

Um, a lot of it has been kind of added as add-ons across the years.

18:14

So this is primarily graphics retooling, yes, y'all are there, no orange, right?

18:21

So you got feedback on that.

18:24

A lot of what we've got is a lot of t-shirts and things like that.

18:26

That's what he don't match because the logos have been done different ways, so they're not useful.

18:31

And that's what this will get us back to.

18:32

He can't actually uniform.

18:35

I like that.

18:35

Thank you.

18:36

Neither one of them can we got a motion and second.

18:44

All in favor say aye.

18:46

Aye.

18:46

Item 11 is approved.

18:48

Item 12 is authorization to enter into professional services.

18:51

Contract with Lamar Advertising Company for access to digital billboards.

18:56

Big number.

18:57

Yes, $31,300.

18:59

We don't usually deal in hundreds of thousands of people.

19:02

Yes, sir.

19:03

So back in the spring of this year, y'all signed the or authorized the original execution of this contract.

19:11

Prior to that, we had been purchasing access to digital billboards on a project-by-project basis.

19:17

Um, and so this was kind of a trial run to see if it streamlined things for us and if we were able to use those digital billboards more effectively if we purchase them as a bulk using funding from all of the sources that have marketing dollars where we would traditionally purchase billboards.

19:35

Um, so that was a five-month contract.

19:38

In that trial, we also included um static billboards, so there were digital billboards and static billboards in that contract.

19:45

What we found during that trial period was that the digital billboards are a lot more useful to us than the static billboards because we're able to be very nimble with the digital billboards.

19:55

We literally have a login system where we can log in, we can schedule what time of day they come up, we can schedule what time of day they come down.

20:01

Um if there's an emergency and we need to run an emergency message, we can take down everything else we have running and just run the emergency message.

20:09

Um so we have found that access to that to be very beneficial.

20:13

Um so this version of the contract is very similar to what you saw before, except taking those um static billboards out and just moving forward with the digital billboards.

20:24

And the money is being allocated back in the budget to the different departments that have this.

20:30

I know it's a big number, but it's really made up of multiple departments paying for this, right?

20:34

That's correct.

20:35

So within my budget from the public education line item, from the recruitment line item, and from the marketing line item, um then there's also two budgets that are outside of mine that have marketing dollars included.

20:48

One of those is for road construction project communications, so similar to what we did with with Nick Wright's Ferry Road, we want to do when Jack Warner Parkway MLK Phase 3 starts, um, and then the water has a marketing line in their budget as well.

21:01

By the way, that the way that we handled Nick Wright's ferry road was really good.

21:09

Thank you.

21:10

I appreciate that.

21:11

And y'all did a great job.

21:12

And I know part of that was kind of a new, we were stepping into something new, Mr.

21:16

Mayor, when we decided this path.

21:19

But I you know, I think the project went a lot smoother.

21:23

I think contract did contract did a good job.

21:25

Our group did a great job, Mike.

21:27

But I think the one of the biggest issues was there was no confusion with the public.

21:32

Everybody knew what was happening, everybody knew the down time, and I think that will translate into will help for the uh the next extension with uh Jack Warner and and MLK because it's as long as the people know, I think it makes a huge difference.

21:49

So you get text, you get emails, you know, you have we had the the board that was up or whatever, you know.

21:55

We're I don't think I mean I didn't get a lot of calls because of that.

22:00

Right, because the information absolutely, so I appreciate y'all doing that, and that's a that's very much worth of good the investment that it is that's great for the city, in my opinion, because I think it pays divided in dividends communications great.

22:13

Sorry.

22:13

One other thing to note about this contract.

22:15

So the last one that you signed was for five months.

22:17

Again, it was kind of a trial period, it was May until September.

22:20

This one is 11 months, so skipping October because we're trying to get this through, and then it will go um from November until next September.

22:29

So the by cutting the digital bill by cutting the static billboards, we did cut the cost from about $24,000 a month to about $18,000 a month.

22:38

Question.

22:39

So, sir, the the seven billboards that you're buying access to upload to are you buying X hours per billboard, or are you buying a mass a mass package that then is broken down amongst seven billboards later at different times of day or how do you structure it on the firm?

23:03

So the contract gives the city access to add content to any or all of these billboards at any time.

23:10

At any time, yes, sir.

23:11

For how long?

23:12

For as long as we want that content.

23:14

So you got seven digital billboards any time and all the time.

23:19

Yes, sir.

23:20

For 11 watts.

23:21

Yes, sir.

23:21

And that's a pretty good idea.

23:23

If you've ever purchased the billboard, it's not a good idea.

23:26

Yeah, he's able to give us a significant discount on the digital billboards for per billboard when we do it as a bulk.

23:32

I can I ask him a dumb question.

23:35

Yes, actually.

23:39

But are we do we utilize that at some point every day?

23:45

Yes.

23:46

So we're every day on these set, we're doing something.

23:50

Something, yes.

23:51

Okay.

23:51

We don't have to, but we are.

23:53

We don't have to, but we do, yes.

23:54

And you could do more on the on tomorrow if you than today if you need to.

23:58

I could, yes.

23:59

Okay.

24:00

But I see a lot on our billboards are really with the amphitheater, the least department.

24:04

Yeah, just about everything we do.

24:06

So I I like so you begin moving in this room.

24:11

It's really nice.

24:12

As you begin moving down the road on this, do the dividing lines currently in your budget, right?

24:21

37.5 is public education, 56 and change is recruitment, and then 11 is marketing.

24:32

Yes, sir.

24:33

Do those dividing dividers between those functional uses melt away, or are they still earmarked for only that?

24:46

They it's not ear, it's not earmarked in the sense that we can't shift things around, but it's estimated based on how we use them in the last period.

24:57

Okay, okay.

24:59

That's good.

25:00

Right.

25:00

Thanks.

25:01

Any other questions?

25:02

Would entertain a motion?

25:03

So moved.

25:04

Second.

25:05

Oh my gosh.

25:05

All in favor say aye.

25:07

Aye.

25:08

Item 12 is approved.

25:11

Our next public projects committee meeting will be next Tuesday, October 28th.

25:17

Is there any new business to be brought before this committee today?

25:23

You know, I could have gavbled you down.

25:26

I should.

25:26

I thought about it.

25:27

You got gavbled down.

25:28

ADI mailing.

25:29

Commander both must say dunker, but currently I like commander, but commander up.

25:34

Don't matter what you like.

25:35

I know.

25:38

That's right.

25:38

Don't you forget?

25:39

It doesn't matter what you see?

25:40

Now see you you want to gamble me down.

25:42

Are you during this meeting?

25:43

Are we just do I have a motion to journal second?

Discussion Breakdown — Share of Meeting
Facility Management█████████████████████████████29%
Arts And Culture████████████████████20%
Engineering And Infrastructure███████████████████19%
Procedural████████████████16%
Transportation Safety██████████10%
Public Safety██████6%
Summary of Proceedings

City Council Meeting Summary for October 21, 2025

The Tuscaloosa City Council convened on October 21, 2025, to approve a series of public works and professional services contracts, including fiber relocation, emergency equipment upgrades, and marketing initiatives. The meeting featured routine discussions regarding project timelines, budget allocations, and safety improvements, with Council members and staff emphasizing the necessity of these expenditures for community safety and operational efficiency. All twelve agenda items were approved unanimously via voice vote.

Consent Calendar

  • Minutes: The minutes from the previous meeting were approved.
  • Item 1: Approval of an agreement with ALDOT for the authorization to execute fiber relocation at Campus Drive associated with the Woolsey Fennel Bridge replacement. The total agreement amount is $260,523 (estimated start late 2026, roughly a three-year duration).
  • Item 2: Approval of a two-year contract with Skipper Consulting at $50,000 per year for specialized transportation engineering services, specifically for traffic signal timing and geometric design.
  • Item 3: Approval to award the Circle Park North Lighting Project to Premier Service Company for $399,468.20, including lighting installation and fiber conduits for future camera connectivity.
  • Item 4: Approval of a minor public works contract with Night Signed for $45,437 for brick pedestals and commemorative bronze plaques for the McAbee Bridge.
  • Item 5: Approval of a minor public works contract with Building Specialties for $10,450 to install door hardware and access control preparation for multiple secured doors at City Hall.
  • Item 6: Approval of a minor public works contract with Building Specialties for $10,316 to rekey doors and install access control at the Powell Gymnasium (PAL Gym).
  • Item 7: Approval of a minor public works contract with Amos and Associates for $3,200 to replace a vandalized commercial-grade door and frame at Parker Hood Park.
  • Item 8: Approval of a minor public works contract with Red Oak Paint Company for $15,000 for painting services and installing a hard-curing enamel floor at Fire Station No. 6.
  • Item 9: Authorization for a minor public works contract with Guthrie Landscape for "as needed" landscaping services at various city properties, not to exceed $100,000.
  • Item 10: Termination of the current contract with Life South Community Blood Center and authorization of a new contract not to exceed $0.99 per unit annually to switch the primary blood service provider to the Red Cross while maintaining Life South as a reserve option.
  • Item 11: Approval of a professional services contract with Grover Marketing for $8,000 to provide branding and design services for Tuscumbia Fire Rescue and the Tuscaloosa River Market.
  • Item 12: Authorization to enter into a professional services contract with Lamar Advertising Company for $31,300 to secure access to digital billboards for an 11-month period to streamline city communications.

Public Comments & Testimony

  • Council Member Comments:
    • A Council member expressed gratitude to Mayor and staff for the improved condition of the Powell Gymnasium, noting the lack of prior access control and the necessity of the new security measures.
    • A Council member praised the communication strategy regarding the Nick Wright's Ferry Road extension, stating that the clear public information about downtime resulted in fewer constituent complaints and served as a model for future road construction projects.
    • A Council member complimented Fire and Rescue Chief Delk for the efficient response to the vandalism incident at Parker Hood Park.
  • Speaker Positions:
    • Council members expressed full support for the safety upgrades at the Powell Gymnasium, highlighting the need to keep the facility secure.
    • Council members expressed strong support for the digital billboard initiative, citing the flexibility to manage emergency messages and the effectiveness of the previous trial in maintaining public awareness.

Discussion Items

  • Woolsey Fennel Bridge Project (Item 1): Council members discussed the uncertain timeline for the ALDOT fiber relocation. While some members recalled estimates of late 2026 or early 2027, staff acknowledged the lack of definitive dates and confirmed the project is externally funded and controlled by ALDOT. The Council noted the high volume of resident inquiries regarding the project's start date.
  • Skipper Consulting (Item 2): Staff provided examples of the firm's recent engagement, including reviewing signal timing on University Boulevard based on feedback that previous timings were "a little quick," and ensuring safe geometric design for pedestrian crossings near a school.
  • Circle Park North Lighting (Item 3): A Council member cited a recent serious car accident (flipping three times) in the area to emphasize the urgent need for improved lighting, noting the area's increased traffic volume.
  • Digital Billboards (Item 12): The Council discussed the shift from a bundled contract (digital and static) to a digital-only contract, noting a cost reduction from approximately $24,000 to $18,000 per month. Staff clarified that the city has access to all seven billboards for all 11 months, allowing for dynamic content scheduling and emergency messaging. Funding is drawn from public education, recruitment, marketing, and specific road construction communication budgets.

Key Outcomes

  • Unanimous Approval: All 12 items on the agenda were approved via voice vote (motion, second, all in favor say aye).
  • Budget Realignment: Item 10 confirms the switch of the primary blood supplier to Red Cross to stay within budget, with Life South retained as a backup at a reduced unit cost ($0.99).
  • Strategic Shifts:
    • Approval of contracts focusing on safety (lighting at Circle Park North, access control at City Hall and PAL Gym, door replacement at Parker Hood Park).
    • Adoption of a 11-month digital marketing strategy to replace the previous 5-month trial, utilizing bulk purchasing power for digital billboards.
  • Next Steps: The next public works committee meeting is scheduled for Tuesday, October 28, 2025.

Meeting Transcript

To approve if you're ready. Motion. Second. Motion and second. All in favor say aye. Aye. Minutes are approved. Item number one. Authorization for the mayor to execute an agreement with Al Dot for fiber relocation at Campus Drive associated with the Woolsey Fennel Bridge replacement and approaches project. Mr. Garner, welcome. Good afternoon, Council. Good afternoon. So the scope of the work is in that clouded region, and this is relocation of the city's fiber system that's in conflict with the proposed widening and improvements associated with the Woolsley Fennel project. This is a 100% reimbursable agreement through OLDOT. Duncan Coker is the selected engineer of record. The agreement is a total of 260,523. That includes the construction component as well. Mike, what was it again? I'm sorry. The amount? 260,5219. Based on the information that you have, which I understand the mayor gave a great answer that it was an OLDOT project. Understanding it's an OLDOT project. What is the estimated timeline for this project right now? If you had to as much as we know, I know what do they say? Because I know what I've heard, and I can't really remember the dates now because they've changed two or three times. So what so Jason, have you heard anything lately? I haven't heard anything from the updates lately. So the few had to guess when would it start? 27 in 27. It's a three-year project, correct? Roughly some. Yeah, there's a little there's some unknowns that we just we don't have a lot of detail on, counselor. Um when will we have the details? When they release it. I mean that's a great answer. Thank you for that answer. That's an instant idea. Okay, so the last word I think you expect it changes for for that to be announced next year, probably this summer. This summer. Yeah, coming up next year. With timelines and all that, and just a lot of residents. I mean, not just district three, but a lot of residents are asking about this, right? Oh, yeah. They're asking me about it a lot. And I what I've said, which I mean again, this is don't take this as the gospel of all these people that are listening. I've heard the start late 26, maybe early 27, could be up to three years. I think the construction schedule really is they're anticipating three years to build the project. That's a good hedge answer.