0:02And welcome to the September Public Works meeting.
0:05I am Chairperson, Barbara Burke, and I would ask for the City Clerk to please call the roll.
0:15Chairperson, Councilmember Burke.
0:19Vice Chair, Councilmember Andrew Bowen.
0:24Councilmember Taylor.
0:27We have seven consent items, and I would ask council members, are there any items that you would like to have pulled?
0:35Three and four, Madam Chair.
0:39Is there a motion to approve the remainder of the consent items?
0:48A motion has been made and it has been second.
0:53We'll have a voice vote.
0:55All in favor, let us know by uh saying aye.
1:02City clerk, would you re please read consent item three?
1:07Item C three resolution monodernizing the Winston Salem Transit Authority's fair policy to establish a fair cap.
1:19Councilmember Clark, you ask for this item to be pulled.
1:23My question is how does the system know that you bought a ticket that morning and therefore is not going to charge you in the afternoon?
1:30So great question, Councilmember Clark.
1:33Madam Chair, members of the committee.
1:34Catherine McClellan, answer your question.
1:36With the launch of the new mobile platform, this is going to be a really an enabler for this type of treatment.
1:41And in fact, the item really talks about how the ease of transaction with the mobile technology allows users to establish that fair cap or allows us to establish a fair cap.
1:50Basically, the profile identifies when they load the bus by the tapping of the reader on the bus and identifies how many times that they have assigned that profile to credential on the bus as they has they passed through.
2:01So essentially, no more than two times or two dollars.
2:04Well any any any access on the bus past that will know that it's a free trip.
2:09So every rider's got to have a card.
2:13That that's the that's the uh moving towards this.
2:15This is a the uh a tool to to incentivize that that mobile technology as we move towards a uh a fair list or a cashless uh trip.
2:24Just curious, I would would have guessed most of your transactions are currently cash.
2:30Well, right now, by and large, we don't we don't really accept anything but cash on the bus outside of the ticket that you get from the kiosk or at the transit center.
2:38That's why we have a lot of benefit into this technology when we move toward the mobile technology will allow us to establish that with the profile of the user.
2:46It just incentivize them to download the application.
2:53I was gonna make a motion if you want to.
2:54I have another question.
2:55Oh, there are other questions.
2:57Councilmember Andrew Bowen.
2:59Thank you, Madam Chair.
3:00Uh so um you've already answered that when this will begin when when when we have the new uh UMO app, correct?
3:07Um so but the the another question I have is is so when how will this costs pass the two dollars?
3:14How will that be covered in our budget?
3:15So that's a great question, Councilmember.
3:17So right now, you know, at a $30 million budget, our fair revenue is about $900,000 to a million dollars, right?
3:23And so one of the issues we have with current projections is to figure out how much of that we can expect year over year.
3:28One of the challenges to that, council member, is the fact we have a free transfer policy.
3:33Right now, that complicates issues with the Hub and Spoke model where you could have two or three transfers for a single origin and destination trip, right?
3:41So it's really, really hard to quantify that loss of revenue.
3:45What we've committed to is rolling this out and doing some benchmarking of kind of what the current uh you know, fair we call it fair recovery, how much actually we take in this year and then benchmarking that next year.
3:55So we're gonna have to make some budget projections of on the revenue side to get this right.
3:59But what we do think actually is that on the revenue side this will increase because we have such a blatant abuse of the transfer policy.
4:06Folks are really abusing that transfer policy whether they don't communicate clearly with the operator, or we don't have great tracking of when they're transferring.
4:13There's a lot of logistic logistical requirements about understanding that transfer policy uh with the operator and the folks that are entering and exiting the bus.
4:21Because this does away with that, we do expect actually to see a little bit of increase in revenue while also incentivizing folks to ride the bus more frequently once they meet that two-dollar cap.
4:40Um, I used to ride the bus and correct me how this changes everything.
4:47I used to get a monthly pass, I think for 30 rides or something.
4:53Um, how does how is this more convenient than that?
5:00Yeah, so right now, I think the biggest opportunity here is folks, because right now our monthly passes are $30, which that $30 upfront initial cost is a large barrier for a number of our ridership base.
5:09This opportunity here bypasses that where they know riders at $2, they can ride that bus all day long for whatever their needs are.
5:16If they need to go to the to the maybe the grocery store after work before going home, and those what used to be maybe multiple trips are capped at $2.
5:24I think the biggest advent you know the biggest advantage here is that we eliminate that $30-day, $30 upfront upfront deal.
5:33Well, you know, for those that could afford that, that may still be your best financial choice if you could choose to do that.
5:39But this does let uh I guess you know remove that upfront barrier.
5:44Is it an opportunity for people to preload so much on the Absolutely?
5:49You can load your UMO account and then ride to the extent the system is sophisticated enough to know that once you meet that two dollar cap, essentially you're gonna have free anyway, even though you may have $15 on your account.
6:02Councilmember Andrew Bowen.
6:04Thank you, Madam Chair.
6:06So um in the um the report, you you referenced uh three different uh um other transit authorities that utilize this, how they be able to show success in this and and ease of use and improvement of of transfers and all those things.
6:21I appreciate you bringing that up because we spent a lot of time benchmarking these peer agencies, and we we we're happy to show that the fair cap policy they have.
6:27The biggest thing that we've seen and takeaway from this is the fact that the UMO platform enabled this to be a a fair policy for them.
6:34So we're excited to bring UMO to our city to allow us to introduce this kind of fair cap ability just to further incentivize folks that may have I've got two bucks, I can go there and I come back.
6:43Maybe you can go there, go somewhere else, and then come back and just add that.
6:46So those are the kind of the success stories.
6:48Now we don't have granular data from these other other you know providers.
6:52What we do know is that the UMO platform which they utilize um enables this as as a benefit to their ridership base.
7:02Can I get a motion to approve C3?
7:07Okay, it's been uh approved.
7:10We made a motion, we approved it.
7:12Uh let us uh all vote by on our iPads.
7:24City Clerk, would you please read C4?
7:29Item C4 resolution authorizing a supplemental agreement with American lighting and signalization of North Carolina LLC for installation of a traffic signal at Meadowlark Drive and Meadowlark Knoll Crossing.
7:44Yeah, I started reading this and it seemed to go all over the place.
7:48We're suddenly talking about Reynolds Boulevard at Shorefield Drive.
7:53So what exactly are we doing here?
7:56So thank you, Councilmember.
7:58So right now this the item before you is to is to approve a change order that would allow allow the funds to be administratively moved to to fund the installation of the traffic signal there at Metal Arc Metal Arc Noll.
8:09And so this is the programmatic element where essentially the the contract that we've already let with ALS, which is a provider that does a lot of work for our city, um, they're currently under contract to build the traffic signal at Shorefare and Rentals.
8:20So this is uh advantageous knowing that we needed to identify the issues before school and uh get this built before school, that was the the metric we chose to pursue uh to allow this this work to be done.
8:31So they're the contractor doing the rentals signal that that's why you see it in the item.
8:40Can we get a motion to approve C4?
8:45It has uh a motion has been made.
8:47It has been seconded.
8:49We can vote on our IPads.
8:59City Clerk, would you please read G1?
9:05Item G1, resolution approving a change order to the street resurfacing contract with APAC Atlantic Inc.
9:12Tom Thompson Arthur Division.
9:18If you would please uh share information about C1 G1.
9:23Good afternoon, Madam Chairman, members of the committee.
9:27The item you have before you is consideration of a change order with APAC Thompson Arthur, who is our current contractor for resurfacing.
9:35Uh this is a change order to add additional streets to their current contract.
9:40Uh as you may be aware, they council approved their parent contract last June, basically in the amount of nine million in change.
9:49They have performed satisfactorily in the job.
9:52They've exceeded the MWBE goals, and most importantly, they have been the only contractor that has been our bid our resurfacing projects in recent history.
10:03So for the last half decade plus, they've been the only contractor to bid our jobs.
10:09So to advance our interest in improving our our street network, basically staff reached out to them to consider a change order.
10:18They were interested in that.
10:20So basically, we gave them a list of the worst disfirst streets for our pavement condition study.
10:27Basically, they came back with a unit cost price of $5.2 million approximately.
10:34But considering the nature of those streets, how degraded they are, staff thought it was appropriate to add a 20% contingency on that because these might not be just mill and fill streets, these could be total rehabilitation streets with the pavement scores that we're seeing there.
10:50So basically what you have before you is a consideration of a change order in the amount of six million three hundred and twenty-six thousand five hundred and seven dollars and five cents for APAC Thompson Arthur to continue on those resurfacing efforts.
11:05Be happy to answer any questions.
11:08Any questions for Mr.
11:10Councilmember Scipio?
11:13How does this change the timetable?
11:15Or what is the timetable for this this set of research?
11:20So we have segregated the time frames for the initial parent contract, and then what we're gonna see with the uh change order, assuming is approved.
11:29Basically, APAC has until October, the end of October of this year, 25 to complete the parent order streets list, and then they will have until October of 26 to complete these change order streets.
11:44So it's compartmentalized as such.
11:47Any other questions?
11:49Can I get a motion to approve G1?
11:56The motion has been made and a s and a second, so we'll vote on our IPAS.
12:07City Clerk, would you please read item G2?
12:11Item G2, request by the Town of Lewisville to reinstate its expired annexation agreement with the City of Winston-Salem.
12:21You're gonna give us uh an update on this.
12:28Good afternoon, Council members, Madam Chair.
12:32So this annexation agreement is similar to the item that you saw last month for uh the village of Clemens.
12:39This uh one stems from interest from the uh town of Lewisville to also reinstate their annexation agreement.
12:46So just a really quick refresh, these types of agreements were very commonplace uh until around the 2010s when the state eliminated municipalities' rights to involuntarily annex uh unincorporated places.
13:01Uh this is the same chart from last month showing our research into all of the past annexation agreements.
13:07What you will see is that everything in red, these agreements have all lapsed or expire expired except for the town of Midway.
13:15However, that agreement does not affect for Scythe County.
13:20This map shows all of the different municipalities, the areas red hatched.
13:26Those are areas where historically uh the city of Winston-Salem agreed not to annex.
13:31All of the other different colors are areas where the different municipalities had also agreed not to annex.
13:38Which basically condenses down to this image.
13:41So everything in green, that was historically where Winston-Salem was allowed to annex, should uh the property owner file and initiate the petition, whereas the areas in red were agreed that they would not fix.
13:55So in the current status, we have no active agreements except for the town of Midway.
14:01Uh the town of Lewisville has expressed that they want to update uh their agreement as they have in the past.
14:10And this is the zoomed in uh area around Lewisville.
14:15So everywhere that you can see this was the uh agreement that expired in 2023.
14:21Everything in red, uh the city would not be able to annex, whereas everything in green would be available to the city of Winston-Salem.
14:32So uh just just in summary, uh they have shown interest and perhaps renewing their agreement as well.
14:39Uh the petitions will still have to be initiated by the individual property owners.
14:45So if no green agreement was in place, it would just give the individual property owner, they would have more of a choice, whereas the agreement sort of delineates these specific areas.
14:56At this time, we do not have a formal uh boundary that the uh town of Louisville is looking at.
15:03However, should they go with the previous boundary staff does not expect any issues.
15:08And are there any questions?
15:12Any questions, Councilmembers?
15:14Okay, this is not an item that we're voting on.
15:17This is an item that we need to uh provide some direction on uh if we have interest uh councilmember Clark.
15:27I I would certainly recommend that we continue uh and I would suggest we could maybe we already are continue negotiations with the other towns, uh Walkertown, um we've got here rural hall, tobacco bill, et cetera.
15:44Are we in agreement, Council members?
15:48City Clerk, would you please read G3?
15:51Item G3, stormwater infrastructure update.
15:56Huff is back to give us an update.
16:00Good afternoon again, Madam Chairman, members of the committee and council.
16:03This is a brief update on basically our stormwater infrastructure.
16:08And as I was putting this presentation together, I was thinking about the timing with the the anniversary of Katrina and all the named weather.
16:16But it's interesting that we can't size stormwater devices and pipes for named storm events that are in the 500,000 year level.
16:25It's the afternoon thr thunderstorms and things like that that we got Saturday afternoon that really tax our system.
16:33So basically with this presentation, we want to kind of focus in on what those stressors are to our drainage infrastructure.
16:40And then what does the city own and what do we not own as far as what we budget for, what we handle, and then kind of give uh the committee an update on some emergency drainage projects that uh staff has been addressing as of late, and then some process items that uh we're looking at moving forward.
17:01So as everybody knows, we have received record rainfall amounts in the past years, and the 10-year storm used to happen every 10 years, but now it happens multiple times every year.
17:15Well, we're seeing this recurrence interval, which is a 10 percent probability storm, and it occurs multiple times every year.
17:22It's commonplace almost.
17:24And and that is a storm event that will really will overwhelm our drainage systems.
17:30What you see at the top right-hand corner of the slide is a NOAA stage storage diagram, and basically it tells how many inches of rainfall you get in a duration.
17:43And that 10-year storm, again, it used to be more spaced out, like 10 years apart, but now we're seeing that regularly during the year.
17:53So point being is our storms are changing as we go forward, and we are receiving more intense storm events on a more frequent basis.
18:05And to our infrastructure that was designed in the 40s and 50s, and everything has a hydraulic lifetime.
18:12All pipes, basins, et cetera, are going to carry through through the end of their lifespan at some point in time.
18:21And being constructed in the 40s and 50s, we're seeing a lot of failures right now.
18:25And basically some of those systems show very little warning before they fail.
18:30And you just see a hole in the road one day, and you have to close it and react.
18:37So now we have over 30 major repair projects throughout the city.
18:42Every ward is dealing with this in some capacity, and these priority capital projects are over 30 million right now and growing.
18:50And with current resources, they will take over 20 years to complete.
18:54And this is only pipes.
18:56This is not bridges, this is not any of those pieces of infrastructure.
19:00On you only your drainage pipes.
19:03And basically, like we talked about, it it affects roads, it affects other utilities, water, sewer, gas, all of your other infrastructure components that are riding in that roadbid.
19:16So what does the city own?
19:19This this is a common misconception to the public that they think that the city owns all the drainage networks in somebody's backyard.
19:27But in fact, we own, operate, and maintain only what's in the public right-of-way and on city properties.
19:35There are certain prescripted easements that deviate from that, but generally speaking, we own, operate, and maintain what's in the public right-of-way.
19:43And that sums to over 24,000 structures.
19:48Manholes, catch basins, hooded grate and frame, pipes, and ditches.
19:53And basically, our our folks, we we maintain that.
19:56Uh you see the maintenance of those systems, jet vaccines, whatnot.
20:01And we also own stormwater control measures like Bloom Park, that constructed wetland.
20:06The city owns, operates, and maintains that.
20:09And some of the things we do are street sweeping activities to keep those those activities or the catch basins and whatnot in check and keep them from getting clogged with uh debris, organic matter, et cetera.
20:24This is a picture of Bloom Park right here, part of those city-owned facilities, stormwater control measures, if you will.
20:32Uh those require significant maintenance to keep on doing what they're doing.
20:36Um right now we are working on the IQ pond, corner of 52 and 40.
20:42That's going over a major renovation right now.
20:46But uh city-owned uh properties, we've had uh uh Lochland Park, Spring Park, Washington Park, all of those uh uh city parks have had infrastructure failures and significant cost as you see as far as three million dollars in repairs.
21:05And we also keep our our the city's NPDS phase one permit in in checked as well as far as uh listed discharges and what's going into this system.
21:17So moving on to private property drainage, what what is the popular misconception with the public?
21:23Staff deals with over 350 private drainage calls per year.
21:28And right now, we do not have a program to address those private property concerns.
21:35What we used to have commonly referred as the 7030 is in legislative moratorium because basically this local government does not have the authority to uh utilize public money on private property.
21:50But these are the the slide the top right hand uh picture.
21:54That's what uh uh a private property owner experienced where they had a sinkhole uh due to an improperly installed pipe, and uh woke up to a 20-foot deep sinkhole next to their house.
22:08Uh some people might recognize this as food line on Hawthorne and Oldwood.
22:14Councilmember Andre Bowen in his backyard.
22:17A lot of attention to this where the piping system that ran under the bakery of food line failed, and they had to enact very quickly.
22:27This was something that the city got a lot of calls on this thinking that we owned the pipe, when in fact it was on private property, and the owner of the parcel actually was the responsible party for that.
22:41So moving on some of the to the right-of-way emergency projects that we're we're dealing with right now, and uh this these slides are to give you some scope and breadth of the type of things that you would see in an emergency project.
22:55This is Canal Drive, basically bordering Peters Creek, basically Peters Creek during storm events, came up and basically destroyed the uh embankment and the road network.
23:08The road was literally impassable due to the erosion.
23:12And uh we had to do an emergency declaration, get some funding in place, approximate cost on this one was $90,000, and uh basically restored the embankment and the road network.
23:25So that project is complete and the roadway is currently open.
23:31Another one that's currently under uh construction right now is Hawthorne Road, first in Hawthorne.
23:37Basically, this was a uh situation where the main box culvert had settled over time and uh it was pulling away and and basically was in jeopardizing uh Hawthorne Road proper.
23:51So where they're at right now on this is the eastern portion of the culvert system has been uh upgraded.
23:59Now they last week basically they moved traffic control, and now they're working on the western side.
24:05This is a three million dollar culvert replacement project, so pretty large scale right here.
24:11But uh very very sensitive location with a hospital and all the traffic going through there.
24:19Next one, um recent one, Ronolda Road near Buna Vista.
24:23Basically, uh there's a pipe system you see in red there that crosses all four lanes of Rinolda.
24:30That pipe system had failed.
24:32It was a 24-inch clay pipe, and basically we had to do an emergency replacement of that system there.
24:40Uh it was done at nighttime.
24:42Approximate cost of this one 220,000.
24:45Again, you see the various range of these things, but none of them are cheap.
24:49None of them are inexpensive repairs when you're doing these fixes.
24:53Is this one finished?
24:55This is finished all except for sidewalk and curb.
25:00So the main pipe system is installed and it is functioning.
25:03Next one is button wood.
25:05This one is unique because this was the sole ingress egress for these property owners.
25:10You can see the stream channel in blue crossing.
25:14And if this pipe had completely failed, these people would not have any access in and out of their homes.
25:22So this was a jack and boar replacement of the pipe, and we had to basically stabilize the embankment structures and replace the pipe.
25:32So this one is complete, $800,000 project cost here, currently under warranty.
25:38But had this not been caught and dealt with in a timely fashion, those citizens would not have access to their homes.
25:49Is that on private private property?
25:52Of course was public, but Buttonwood is owned by the city.
25:55So we we had full responsibility, Councilmember Scipio.
26:00Let me add because that's in my word.
26:01What would you have done if it because it came close to failing the what would you do?
26:07Uh sweat first, uh, but we would have to basically build another access, and and Councilmember Clark, you've seen that.
26:17It's it's in a ravine.
26:19So it would have been very difficult.
26:21You could have put a couple of bypass pipes in there and rebuilt the shoulder.
26:26It could it would have been very expensive to do anything other than what we did.
26:30I'm talking to the tune of millions, so it was expensive enough anyway.
26:34Yeah, very expensive to even touch these things.
26:37But uh that one was what in a very sensitive location.
26:41It was so one of the last ones, this one is actually in service, been in service for several months now.
26:48Bathabra Road, we had to shut this road down because of the old metal arch.
26:53It was literally falling off of the concrete footings that it was situated on.
26:58Uh this this road carries a 24 and a 12-inch water main, speaking to the infrastructure that is in these road embankments.
27:06But uh this is since been completed, new culvert installed, all the utilities are in service, and the road is open to uh the public and has been for a couple of months.
27:18So just to give the committee a cross section of what we're seeing with these with these drainage repairs and these issues coming from these aging pieces of infrastructure.
27:29So some processes moving forward to kind of get out in front of things better than we have been.
27:35Uh we've commissioned the study of several classes of pipes around the city.
27:40Uh Alpha and Omega, we're working with them to do inspections of these piping systems and to give a priority ranking, like you would rate a bridge on the condition of the pipe, the serviceability, and then what we can do as the city to make repairs if need be.
27:58So we've got a lot of these inspection reports in from Alpha and Omega, and the goal is to prioritize them and let them guide our CIP process.
28:08And when it comes to actually boots on the ground repairing them, what we would like to do is get an on-call contractor.
28:16We've got some assistance in a master service agreement for design phase.
28:22We want to get a contractor on board or contractors, I should say.
28:27So when we have these issues, we can choose from that list, negotiate pricing, and move forward.
28:34And it's not something where you're reaching out to one contractor in an emergency situation.
28:39So that said, those are some things that we're moving forward with and be happy to entertain any questions.
28:45Councilmember Andrew Bowen.
28:48Thank you, Madam Chair.
28:49Uh first uh thank you for uh that presentation and second uh as someone who rides through the Hawthorne to First Street Street uh almost multiple times a day.
29:00Uh appreciate the quick work that everyone is making and the the notifications of of the moving of that.
29:06So thank you for that.
29:07Um thankfully there's been uh minimal grumblings from the public about that, but they they appreciate the work and the the openness about the process.
29:15Um you mentioned the Alpha and Omega group.
29:18Uh is there a timeline of when they expect for that process of the studies to be done?
29:23Yes, so we expect all of those reports in in the next month or so, then we'll start compiling them, reviewing them, and then making that priority ranking list.
29:33Beautiful, thank you, sir.
29:34Councilmember Clark.
29:37Yeah, just answer the question.
29:38Uh because how soon before Hawthorne is finished?
29:42Hawthorne's got a little ways to go, and it's very weather dependent.
29:46Um if they get good weather, it might be a December time frame, late December, is what we're thinking.
29:54But that the progress on the east side was severely hampered by the weather that we have had during the summer months.
30:02So if they can get a break with the weather, late December is an anticipated deadline or finished.
30:13Councilmember Scipio.
30:22When I drive around, I see uh landscaping companies uh cutting grass and blowing leaves into the street.
30:32Um they don't pick those leaves up typically or the grass.
30:40Um I am certain that that is having an impact on our system.
30:48Do we have any recourse with these landscape companies?
30:53Do they know that they're not supposed to do this, or what can we do to make sure that they are complying with what we would like for them to do to help keep our systems going?
31:08Yes, ma'am, good question.
31:09This is hitting the water quality vein of of the discussion.
31:13What we've been talking about before is the quantity, how much water.
31:17You're talking about how clean the water is.
31:19And the answer to your question is yes, we do have recourse.
31:23We have actually had trainings with the landscaping groups.
31:27We do point of purchase like Lowe's.
31:30Uh we put information cards out, and we do have a section chapter 75 of the city code that speaks to illicit discharges, but you've got to catch them in the act, uh, which makes things difficult.
31:43But we do try to educate that service group.
31:46We do try to work with them, but yes, uh, do we get them all?
31:53Do we educate them all?
31:56Well, there's another issue too, is homeowners um when they put their leaves out for pickup, they oftentimes put them in the street, and when it rains, it clogs up the system, and we have flooding on the street.
32:15So uh be interesting if we could have some thinking about how do we make sure that our residents are also helping to maintain our our drainage system because it floods on the streets when those leaves are right there blocking.
32:35Any other questions?
32:37Huff, we really thank you for coming today to provide this update on our infrastructure, stormwater infrastructure, and we thank you for all that you do.
32:48City clerk, would you please call item G4?
32:52Item G4, Winston Salem Transit Authority Microtransit Overview.
32:59Fancler, you're back to give us an overview.
33:02Well, I'm going to introduce this item and then turn to folks much more than me to to cover the the item.
33:08But I appreciate uh Madam Chair, members of the committee opportunity, just to you know, it feels it feels like every month there's some cadence of wisdom items, and I appreciate your appetite for that.
33:15Uh that's a welcome change, and we're we're grateful for that.
33:18But you all have been well aware that you know we've recently adopted the what we call the WIST division network, where it kind of gives us some uh some benchmarking and some kind of goal setting to to where we aspire to be with our WIST of service, and in doing so, we've had some additional cadence of of approvals like the UMO mobile application, like some identifying some security needs that we funded and addressing those things moving forward.
33:41All of those things are really modernizing and really bringing our system into where we think it should go and need to be to inform kind of best practice to inform better decision making and overall better performance of our network, right?
33:54And so in doing so, thinking about where we're trying to go, there's been a lot of conversation about microtransit.
33:59Some of those those that type of service you've seen in the news nationwide, you've seen the news here in North Carolina, and there's been some interest uh in our community about how can microtransit be uh available or could it potentially be an option at some point for the WISTA network?
34:15And I I pause there to say, you know, I think that that's a that's that's a good question.
34:19And I I think our staff has spent some time with uh consultants with in-house expertise with looking at our system to figure out how microtransit could be utilized in our network.
34:29So what I'd like to do is turn the floor over to my assistant director, uh Rockstar in our transit world, Kelly Garvin, to allow us to uh to go through kind of what is microtransit, but I think more so keep in mind I challenge you to just think about that WISP division where we want to go, and then maybe how microtransit could one day uh obviously subject to future funding, but allow um that that potential in our city.
34:51So without further ado, uh Madam Chair, I'd introduce Kelly Garvin.
35:03Didn't want to put it in the middle.
35:05Yeah, you're matching.
35:11Good afternoon, uh, Madam Chair Woman.
35:16Um, as mentioned, I'm Kelly Garvin, Assistant Director of Transportation, and uh with specific oversight over the uh transit authority.
35:25And I would like to talk to you a little bit today about microtransit.
35:29Um Jamie's helping me um pull up the the item.
35:36Tell them something else good about WISTA, Kelly.
35:38Oh, well, um, while we're pulling it up, um, some good news I heard today, not necessarily related to microtransit, is that uh September second and third this month since school has been back, we have seen seen an increase in ridership that is above what pre uh pandemic level were.
35:58Yes, since school has been back in session.
36:00Um since we did the changes in March, we have been tracking ridership since those changes, and we've seen some of those routes where we've made changes start to slowly increase, and then since school came back in session, we saw a boost those first two days of the of the of the month.
36:17So we're tracking, we're hoping we're excited.
36:20Um that it's just an encouragement to staff.
36:22And additional news that I heard from Jeff earlier, we added a stop at HM at an HM health facility.
36:29Um not far from uh Waterworks.
36:33And um we we were receiving encouraging picture from staff there about people using that stuff, that stop daily fa families using that stop all day.
36:44And that again is a testament to um our our ability, uh flexibility, um, and the the the way in which we listen to the residents.
36:53And so that's exciting news.
36:58Can we ask y'all to take a five-minute recess while they uh see if we can get this presentation loaded?
37:04At this time, we'll take a five-minute recess.
37:13I can't do anything.
40:28No, that's not right.
40:34I go, my border is Miller Street and 40.
40:38So I've got town campaign public.
40:49Okay, we're ready to bring the meeting back to order.
40:54Thank you so much for your patience.
40:57As I was mentioning earlier, the item before you as an information item just talking a little bit about microtransit.
41:04And so we we're gonna talk through what microtransit is, um, what it's not, some of the use cases that we've seen, and sort of how it could be applied uh to us here in New England Salem within our transit network.
41:20So microtransit, what is it?
41:23Um it's a uh public transportation system, as you can as you can tell, it's it's a shared ride, um, and it's usually picks up multiple passengers and takes them to multiple destinations.
41:35Um it's flexible routing as opposed to our current fixed route network.
41:40It's on-demand service and it's usually re requires uh a technology of some sort, an app to be able to request the ride and uh communicate with the operator.
41:52Um and it's often uh operating in a zone, and so the zone can be either just part of the system the system or the entire network.
42:01Uh, but it's all all often operating in a zone, and it can be procured in several different ways, but the probably the most uh advisable way for our system, just because that's where we currently procure our transit services, it would be mobility as a service, which is where the contractor brings the app with them, the operators, and we provide the fleet and the facilities, sort of for the model that we're currently using for our for our transit system.
42:27So it will be about the same as that.
42:30Um just some key differences between what microtransit and paratransit, those terms can be a little uh uh interchangeable and and confusing.
42:39So I wanted to bring to your attention just two key differences about the two.
42:43Paratransit, that's our trans aid, right?
42:45It's uh it both of them are are zone defined.
42:49The only difference in the zone is that paratransit is uh an FTA required zone.
42:55So FTA says if you're gonna operate fixed route, you need to have it's accompanied ADA service within at least three quarter miles of that fixed route.
43:05And for us, that's the entire city of Winston-Salem.
43:08Um, as opposed to microtransit, where we get to define the zone ourselves.
43:13There's no requirements attached.
43:15And then the time frame zone, another difference on the paratransit side, we usually request require um the rider to book its their ride 24 hours before at a minimum, and you can book up to seven days ahead of your of your scheduled time as opposed to uh microtransit, where it's a same-day booking on demand type situation.
43:37And and oftentimes your ride may get there within 20, 30 minutes of your of your booking.
43:42So that's those are the two uh you know, s significant differences between microtransit and paratransit.
43:48Oftentimes you can use the same vehicle for both because even though you be you might be running uh microtransit service, you still want to have ADA accommodation on those vehicles.
44:00And so it is uh very likely that you can use we can use either vehicles to do to do either tasks.
44:08So I'm gonna talk through some use cases.
44:11One that we probably all knew about is the Wilson uh scenario where they switched from their full uh uh fixed route service to a a full microtransit service for the entire their entire system.
44:25Um what's interesting about that, I'll go into the details of the data for a little bit here.
44:30Uh it's their their service area is 31 square mile just for context, um, as opposed to uh what our service area is, and um which ours is 311 square miles.
44:41So that's for context where they are in reference to us.
44:45Um the data you see, the 2020 data is specifically their fixed route numbers.
44:49So when we talk about their ridership, their cost per passenger, their operating costs, and then the passenger per revenue hour.
44:56When we talk about passenger per revenue hour, the revenue hour is any time the vehicle is in service.
45:01That's that's what we quantify as a revenue hour.
45:04In 2023, that's data that is both their microtransit and their paratransit together because it's reported together.
45:13So you see a big jump there, but we just have to keep in mind that it has to do with the fact that there's also paratransit included in that number as opposed to the 2020 number.
45:23Um but overall, we've we've had and we've had conversations with uh with with Wilson.
45:28We've had the chance to meet them and and discuss about their services and how things are going.
45:33Ridership has increased.
45:34That is just the fact ridership has increased, their cost per passenger has gone down.
45:40Um, but in contrast, the operating cost has also gone up, and the passenger per revenue hour has gone down.
45:46And that's usually has to do with the fact that when you are um uh using microtransit uh vehicles, you the vehicles are usually smaller, so you will carry fewer passenger per hour because of the size of the vehicle.
45:59So that's that usually also explains that that metric.
46:02Um the passenger per revenue hour is one that we use to usually think about productivity of the route.
46:08How productive, how efficient am I with servicing uh the my residents?
46:13So that's those are some key things about the data on that on that slide.
46:19The next slide is a uh newer service, that's microCats.
46:24Um you may have heard that Charlotte launched their first microtransit zone in February of this year.
46:29And so there's just very early preliminary data that we could uh get from them.
46:34We again staff had the opportunity to meet with them and discuss um in detail about how their service is currently running.
46:41Um they launched again, like I said, in February of 2025.
46:44They replaced four of their routes in the northern part of uh north of Charlotte in uh Huntersville, and they they kept their express routes.
46:53Those are usually routes that have very little stops, they go from one point straight to the downtown, usually to the core uh uh of where they're you know trying to take people to, but they they replaced their their fixed route with a microtransit solution.
47:08Um from what we've gleaned from them, the they report an increase in ridership.
47:15Um they also report, of course, an increase in operating cost, but a decrease in cost per passenger is also what they report.
47:24We don't have any actionable data because again, this just started.
47:27But this is part of a conversation we we had we had the opportunity to have with with their staff.
47:34So I want to bring us back a little bit to the WISTA route vision.
47:38If if if we remember, uh council recently approved uh a vision uh for WISTA route.
47:43And I want to talk about where we were, which is you know, 31 routes before the March switch over, and most of our routes being 60 minute headways, that's how long between the bus, right, and uh just a few of them having some 30 minutes uh headway for part of the day.
48:00And what council adopted was a vision where we are reducing the number of routes and we're increasing the frequency of the headways because one of the the found the the things that we talked about a lot during that route study was how can we get people to jobs faster and thereby help them help our community uh uh move up economically mobility uh uh wise.
48:24And so that's that's what we that's what this study did.
48:27That's what this this proposal was about, and that council approved.
48:31But you know, when we remove and we reduce routes, we also create some in some gaps in the system that we have to try to figure out how to meet the needs of the community members that will be affected by those gaps.
48:44And so that's where we we we think that microtransit might be a solution.
48:48That might be an option.
48:49And so staff looked initially very preliminary at some areas that might benefit from uh a microtransit solution.
48:57Now we've got to remember microtransit, in in our scenario, the goal is to bring somebody to the route.
49:03Um, and so the the routes that we we are proposing, that the the sections that we looked at, the intention would be to bring the the people that would not benefit from any routes within their area where we would remove routes to take them closer to a new route that would be hopefully faster than what they had before.
49:22And so that's what you have before there on on that map.
49:28So we we talk a lot about faster.
49:31How do we get people to move faster in our cities using using WISTA?
49:36Um and we so we talked about time, what what does time on the bus really mean?
49:40And this is a slide we've we've shown before.
49:42It has to do with the time when the riders are on the bus.
49:45That's that's that's the transit time, and then the time when the rider may get off the bus and transfer to another uh uh bus for a different route.
49:53And so those are both ways that we can tweak to help um uh our system work uh a little bit faster and in a more efficient way.
50:00And so those are both ways that we can tweak to help um uh our system work uh a little bit faster and in a more efficient way so the time on the bus that's that's making more direct routes which means you're pulling routes out of the neighborhoods more on the main streets to help them go faster um time waiting to transfer that's usually shortened by um making uh adding more buses to your route so you increase in your your headway if you if a if a if one bus makes an hour you add two bus that's your 30 minute headway so that's adding more buses to the route and then the final one is you time that can be saved by creating routes that do not go to the downtown because downtown while downtown used to be uh where you know you found most of your you know jobs the the system the the network has changed the way in which people travel has changed and where jobs are located have changed and so in responding to that we have to account for routes that maybe uh be able to go cross town without necessarily going downtown and so how does microtransit help us get there and so when we create I said when we generate service cuts whether we're making a route straighter or whether we are re uh removing a route altogether making geography changes we we try to think about ways in which we can compensate or help those that are going to be the most impacted by that change.
51:16And so we part of our service standard is we analyze our network we look at our data every day I have somebody looking at our ridership every month reports to see what route is functioning and how is it functioning and then we implement some cuts we look at okay well this route is not really working well so what can we do to tweak this network this route to make sure that we are getting the best out of it and then we adjust the geography we might straighten the route we might say this route is still not responding we'll take it out of the system and then we address the gap so because when we take something out of the system we're again impacting somebody so we address the the gap and the recommendation might be we might decide okay microtransit would be something that might work very well in in this neighborhood and so what to consider when we talk about microtransit pilot what are some of the things that we want to think about we should think about the fact that the the service does the zone should bring the riders to a fixed route service that's that's the ultimate goal we want to bring them to a fixed route service um we want the zone to cover the areas where fixed routes have been removed or did not exist before um and and so we we're we're feeling backfilling that gap in our system and then we want the buy the pilot we want to start small we don't want to buy it off more than we can chew.
52:30So we want to pick a zone that's small enough that we can manage the data and see how it's going and then over time analyze and determine if we need to adjust the geography or maybe even invest in another zone because this one is working so well um and then we want to prioritize two things our lowest ridership routes and then uh routes that are in neighborhoods or in in areas of our communities where there's low income population because most of the time those are going to be your zero car household people and so when you remove a uh a route from a low income neighborhood you want to try to see can how can I make them whole how can I still you know help them get to the transit center.
53:09So those are to the to the to the network.
53:10So those are the things that you would consider the lowest ridership route along with low income population would be sort of the metrics that you would you would utilize to determine where to start your pilot.
53:20And then the microtransit you know we have to keep in mind it might perform worse on the per hour basis as you saw from the slides earlier the the revenue the the the ridership per revenue hour is usually worse just because it's a smaller vehicle so that number shouldn't frighten us when we see that number go down but we can we we can certainly anticipate or or at least hope that the ridership will increase because not only are we making whole the existing user of that route that we moved but now we're creating oh somebody that might not see that as an opportunity might view microtransit as a new opportunity to now utilize the system because we made it easier we've made it more convenient and we made it faster um and so that's those are some of the things that we might want to think about.
54:05And then like I said it will attract hopefully some new customers.
54:10So with that being being said I'll leave you to ask any questions that you may have.
54:16Scarve and any questions Councilmember Clark is this something you would experiment with in certain parts of town yes.
54:24And when do you anticipate we would try that I think with this is a discussion for city council to tell us so I'll add on to that council clerk I think the information item that that Kelly just presented to you today is really to serve a couple purposes we've heard requests from council members to have a little bit more information on this so that is the purpose one of just kind of getting microtransit on the table.
55:00Staff feels like microtransit is a tool that we should have in our toolbox to help reshape the WISTA network.
55:04And I guess this is an opportunity to get some feedback from the public works committee.
55:08And is this something you want to see staff continue working on?
55:10So that's some direction we're looking for from the committee.
55:15Councilmember Clark, any more questions?
55:18Councilmember Andrew Bowen.
55:20Thank you, Madam Chair.
55:21Um, so uh to um see as a city manager King's question.
55:26Uh I personally would love to see this move forward.
55:28This is something that I'm a huge advocate for.
55:31Um I think one one thing that I think Councilmember Clark and I agree on is um seeing buses come through uh that are are nowhere near filled and the the amount of uh money that we put forward to this.
55:44So I think putting something in place in those places um makes sense for me.
55:50And um we were talking about um the the cost of those things.
55:55Um uh someone remind me how much should we we approve last Monday for nine new buses?
56:01Seven million the the nine new buses that how much was that?
56:07So uh thinking about that moving forward, the how long it takes to get those new buses.
56:13Um we we had a conversation around the the sustainable energy around those buses.
56:18Um again, uh Councilmember Clark looked at the the miles per gallon that these buses get, these these microtransit will get more uh miles per gallon, thus being a little bit more sustainable in in those things.
56:30Um and so this is something that I personally would love to see move forward um again, based on the the approval and the agreements of the people here, but um it makes sense to me to move forward and I'm very excited that I heard that you guys are hoping to get things out of downtown because that's the the usually the number one complaint that I hear about our public transport session is why do we have to go through downtown?
56:50So I look forward to that happening.
56:53Mayor Pro Tim Adams.
56:55Yes, good afternoon, everyone.
56:57Um Councilmember Clark, Councilmember Taylor know how long I've been talking about and Kelly and uh Aaron and those that have been around for a while with the transportation and everything that I always felt like why do we have to conform to these big buses?
57:14If the big buses are half empty or empty, why wouldn't we just purchase going forward?
57:20And we're talking 14, 15 years ago, smaller buses to transport people.
57:26I always reckon it to the idea that when we realized our city was growing so fast, and we had one police station, and that was the one downtown, Councilmember Taylor, the public safety building, getting it.
57:42And we knew that our police all had to go just like a hub to the the big house to get to whatever they were needed, which was downtime, costing lives, costing money.
57:55You know, our employees as police not being able to do their job.
57:59Same thing that with fire stations, you have to put stations wherever the people are.
58:05And we even discussed, because I was on public works early when I got on the council, that you gotta put the transportation with the jobs and the people, that's the connection.
58:17You know, so I am all for this.
58:20Um they've heard me talk about it numerous times.
58:23I'm like, well, let's go.
58:24I told them we all we needed ever when you bring a new idea is a prototype launch.
58:30You don't need to roll it out full steam.
58:33You just need to start somewhere, get the data, who you expect in the impact.
58:37And Councilmember Taylor and I and others decided we were going to do three police substations, and we let the data lead us to where the first station would be.
58:48And it was very much warrant and very much accepted by the citizens of the community.
58:53So I am all for this.
58:57Thank you, Mayor Pro Tim.
58:59Councilmember Taylor.
59:01Thank you, Madam Chair.
59:03Garvin, appreciate the presentation.
59:05I guess I support the concept in theory.
59:07I I guess I just have one question around the cost.
59:09The 175,000 dollar maximum for the proposed year one of the program, would that be for all five of these zones, or will we have to kind of pick and choose which zones make the most sense?
59:21Um so we don't actually have a a this is those are the cost estimates that Wilson incurred when they did their launch.
59:28Ours will certainly be different.
59:30But one of the things that we intend to employ is if we're removing a service, a route, can we recycle those revenue service hours with our current contractor and provide that service?
59:42We're hoping to get to a budget neutral change.
59:45So we already have the fleet.
59:47So we're hoping to use the current fleet and the current contractor and see if we can get to an about revenue uh budget neutral change.
59:56There's again, there's I don't have any figures quite yet, but we're working on those things.
1:00:01If I may make one comment too, Councilmember Taylor.
1:00:03Obviously, budget neutral is a is a big term.
1:00:05Basically, to do that, you know, there will be some hard decisions to made about how much service we have to take away to make that because there are elements that could be more expensive with microtransit, and so to do so, we'll have to make some hard decisions about how much service we have to remove to get to that point.
1:00:18Should council say that no, we don't want to we don't want to provide any more funds to the WIST of fund to support this effort.
1:00:24So there'll be some hard decisions if we're able to get to that point.
1:00:27And Madam Chair, as long as we're talking about pilot programs, I think this makes sense.
1:00:31But in the future, if we roll this out into a full program, I'd just be cognizant and sensitive about how it looks to the downtown community as we make these adjustments.
1:00:41So in theory, it makes a lot of sense, and I'm happy to support it.
1:00:44Councilmember Scipio.
1:00:47Thank you, madam chair.
1:00:50Garvin, I think this is great.
1:00:52I'm glad you are working on considering this idea.
1:00:58Um I have one question.
1:01:01I was wondering what happened in Wilson that led to the increase in ridership, other than just the microtransit change, were there other things going on, were there new employers that and people needed to get to work or were roads closed, just to understand that dramatic increase in ridership.
1:01:25Um the other thing I was curious about is what I heard you say that the zones would just connect people to an existing route.
1:01:39Um I wasn't seeing how that having that zone was going to make transportation better if and I guess my concept was okay.
1:01:52You pick me up in zone A and you take me downtown to the transit center.
1:01:57But I don't that's not what you're saying.
1:02:00Okay, so explain that a little bit.
1:02:02So I'll I'll do question two first.
1:02:04So uh the the idea of the zone is we would connect uh community members riders to a route that is faster, right?
1:02:13So because we're we're adjusting our geography, so in theory, our bus are moving faster on the surface transportation network because we're not going into the neighborhoods anymore.
1:02:21We're taking people from the neighborhood to the main road where the bus will take them downtown.
1:02:27Or if they're taking a crosstown in our future vision network, they don't have to go downtown.
1:02:32They can catch the line in that microtransit zone that takes them, you know, wherever they would like to go along the fixed route.
1:02:41Because we would not be put in zone initially in different places.
1:02:44We would, you know, hopefully pick a one specific area to try first.
1:02:49And we would want to target a small enough area that the the passenger per hour is not so low because we're taking people all the way down to the TC and back.
1:03:01And and and I it the way that it would work is if you connect somebody, if I take I'm at my house, I call the the microtransit folks, they pick me up, they take me to the bus.
1:03:13I've already calculated my route.
1:03:14I know my bus will be there at 10 o'clock.
1:03:17So when I book my ride, I get to the bus station to the to the bus stop, I get on the bus, and I keep going.
1:03:24So would it be that within a zone?
1:03:27I I my concept was that within a zone, let's say zone two is West Winston, and I'm using the microtransit there, and my where I'm going was would be within that zone.
1:03:44In theory, you could go anywhere with it.
1:03:46That so you could pick the the microtransit if there's a food line within that zone, they could drop you off there.
1:03:52But if I needed to go somewhere else, you would connect me to uh faster fixed route line line.
1:04:00And then to your other question about Wilson, if I may, um, we didn't necessarily have the discussion about the the economic changes, but uh from my understanding with our conversation with them, it had to do with the fact that their ridership level was very low.
1:04:14She saw their productivity number, they were they were having six passengers per per revenue hour.
1:04:20That's our lowest route today is six passenger per revenue hour on a big bus.
1:04:25And so it just made economical sense for them to switch.
1:04:29And then the why the number is so big is because as I was trying to say, say the the first number on that line was the just the fixed route, but the 2023 number is the fixed route and the paratransit number.
1:04:43That's the huge delta.
1:04:45But even on top of that, there's an additional increase because now new people are using the service as well.
1:04:54I have a couple of questions, and uh you probably already answered them, but please bear with me.
1:05:00Um thinking about just going back to the microtransit uh concept, how much advanced notice would uh a rider have to provide in order to uh be able to take advantage?
1:05:15So I have heard from both Cats and uh Wilson that it's on average 20 minutes that by the time they order the you know put their ask for the service to get the the vehicle is on average 20 minutes both for both of them.
1:05:29I'm not sure about all the other, but I think the target is to be below 30.
1:05:35Uh thinking about the question that council member Scipio asked, if you are in a zone and you request transportation to another location, you're not just stuck there.
1:05:49If you decide to go somewhere else, you'll make the request, and the request could take as long as 20 minutes.
1:05:56Depending on on, of course, the service level during that time, yes.
1:06:00And you had said something earlier in your presentation about microtransit versus para.
1:06:08And you said something about uh microtransit.
1:06:12Uh there's a difference when it comes to ADA compliance.
1:06:16Can you explain that?
1:06:18Yeah, so uh paratransit the FTA requires us to provide paratransit because it's it's an AD year requirement for operating a fixed route service that you have paratransit.
1:06:30Microtransit, you also need to have an ADA-friendly vehicle.
1:06:35In other words, I should be able to, as a uh this differently abled person, tell on the app when I order my ride, oh, I also I have a wheelchair, and so we would then deploy a vehicle that would be wheelchair accessible, for example.
1:06:49So there will be assurance that we'll be able to accommodate our ADA compliant citizens.
1:06:57Any other questions?
1:07:00Scarvin, thank you so much for this information.
1:07:05King said, um, today we have to decide whether or not this is uh we have an interest for them to move forward for staff to move forward, and it looks like we do.
1:07:16We're all in agreement.
1:07:20Yeah, Councilor Burkala, thank you for the direction on that.
1:07:22I think that's what staff was looking for there.
1:07:24I'll just also throw out while we're on the topic of WISTA.
1:07:27Um we've talked a little bit internally with the manager about um last year leading up to the um retreat, we gave council the tour city facilities to help give you a little visual of kind of what's going on in some of our facilities.
1:07:41And one thing we were not able to cover at that time was some of the WISTA facilities, the transportation center downtown and the Hampton Have facility.
1:07:48So we will probably be reaching out to get a feeler from council to see if there's interest in doing uh a smaller tour, probably sometime this fall, maybe a couple hours to give you a little flavor of some of the issues and things that are going on at those facilities just to help you see what's happening there.
1:08:02So you may see an email coming out shortly to try to set something up there.
1:08:07We'll look for that email.
1:08:09Uh council members, any other uh questions, discussion?
1:08:14Finance committee will begin at four o'clock.
1:08:17Thank you, Council Clark.
1:08:19Well, that concludes our uh agenda for public works.
1:08:23This meeting is adjourned.