Amended 12/16/23, Ordinance 5514
Please refer to Notes 1, 2, and 3 on page i
There have also been a variety of in-fill commercial and industrial structures such as the Barrow Construction Company administrative offices, a pet hotel, a furniture store and a construction supplies warehouse. (See Map 4.)
Other development in the Taylor Run/Duke Street area includes two townhouse office complexes: the 2-story, 44,000 square foot Alexandria Medical and Professional Plaza, at Duke Street and Longview Drive and the 2-story 25,000 square foot Quaker Professional Plaza, at the northeast corner of Duke Street and North Quaker Lane.
The largest project in the study area is the redevelopment of the former Cameron Valley Homes, which is a mixed use residential, commercial and office development involving 300 dwelling units; 147,500 gross square feet of commercial space to consist of convenience stores, apparel stores, a junior department store and a Hechinger's; and 17,000 gross square feet of office space. Currently under construction, the project is slated for completion late in 1990.
Potential Development and Redevelopment Sites
Taylor Run/Duke Street is largely built up, and the majority of developable sites are small, in-fill lots. The most significant site subject to major development or redevelopment is the Fruit Growers Express Company property at the southern edge of the study area.
Fruit Growers Express Company Site
Consisting of 30.34 acres, or 1,321,671 square feet, the Fruit Growers Express Company property is by far the largest developable parcel in the study area. It is currently zoned I-2, which permits intense industrial or commercial use, at an F.A.R. of 3.0.
Access to the site is by way of Roth Street, a short street with a steep slope, which intersects with Duke Street. The site is abutted by Colvin Street and Longview Drive. Both of these streets have low scale industrial and service firms along them.
Although zoned for high density, potential development of the site is constrained by its limited access. Cut off from the south by the railroad tracks, the Fruit Growers Express site is totally dependent upon Duke Street for its access via Colvin, South Quaker Lane, Sweeley, Roth and S. Longview Drive. These latter four streets are narrow, short and unconnected with any north/south arterials which could provide good accessibility to the site.
Another constraint to high density redevelopment is that the site lacks frontage and visibility along Duke Street. This condition is exacerbated by the steep slope off of Duke Street to Colvin leading into the Cameron Run Valley.
The redevelopment potential of the site is also hindered by the railroad trackage and by the proximity of the Metro Service and Inspection Yard and trackage bordering the site to the south.
Overall, the Fruit Growers Express site is isolated and locked in by all of these factors which suggest that uses which generate a low level of peak hour traffic and which are not dependent upon high street visibility may be the most feasible uses for redevelopment of this site.
Other Potential Sites
The aforementioned site is the largest and most likely candidate for redevelopment. Another underutilized portion of the study area is the roughly eight acres along Dove Street which could be redeveloped if warranted by market conditions. This area is characterized by low scale warehouse and auto oriented uses. Low scale, medium density uses, such as limited office buildings or a motel, might be feasible given