DEKALB 2050 UNIFIED PLAN
COMPREHENSIVE TRANSPORTATION PLAN
⬚ figure
NOVEMBER 2022
DEKALB 2050 UNIFIED PLAN
⬚ figure
NOVEMBER 2022
(blank page)
⬚ figure
| Chief Executive Officer | DEPARTMENT OF PLANNING & SUSTAINABILITY | Director |
|---|---|---|
| Michael Thurmond | Andrew A. Baker, AICP |
November 14, 2022
To Members of the DeKalb County Community:
Often as planners, we ask ourselves the question: does transportation investment pave the way for new growth and development, or does new development spur the need for additional transportation infrastructure? While the connection between land use and transportation is often apparent; in reality, the answer to the question above is that both can come first or second. However, as planners, we must be open to a "balanced" approach. This document seeks to identify the land use growth pattern and align timely transportation improvements along with the identified growth pattern.
Recently, DeKalb County—in partnership with the Atlanta Regional Commission (ARC)—saw an opportunity to better coordinate and align its comprehensive transportation plan (CTP) with its comprehensive land use plan to create a more holistic and coordinated plan for the County’s future. I am excited to present to you the DeKalb County 2050 Unified Plan, which includes three documents:
The comprehensive land use plan includes the traditional elements such as a revised future land use map with refined character areas (particularly activity centers and residential areas) as well as a Community Work Program. Other policy elements in the plan include: (1) recommendations on housing and economic development, and (2) guidance on sustainability, retail, broadband, transit-oriented development, health and wellness, and arts and culture.
The transportation element of the plan includes the traditional components of ARC’s CTP program including a funding and financial strategy for transportation investments. Also included are the following key elements: (1) a financially feasible list of roadway, bicycle, and pedestrian projects for the first ten years of the plan, (2) policy recommendations that supplement projects, and (3) a short-range action plan to assist the County with moving forward to implementation.
Please note that while this plan discusses transportation, it does not go into detail on the preferred alignment and form of “transit”. At this time, there are several unknowns that need to be discussed and consensus built before the future of transit (light/heavy) can be adopted. Therefore, this document references the County’s Transit Master Plan, which serves as the guide for specific recommendations and open policy questions related to future funding, projects, and timing.
All effective planning processes must include a robust stakeholder and community engagement effort. This is particularly true for a countywide effort that looks 30 years into the future. Our goal has been to provide a variety of opportunities for engagement: (1) virtual public meetings throughout the pandemic, (2) participation at County outdoor festivals or park events to safely meet people where they are, (3) focus groups with a variety of stakeholders, and gatherings with the County’s diverse, multicultural, and English-learning communities.
In total, more than 80 meetings occurred from the start of the plan in Spring 2021 through its conclusion at the end of 2022. We appreciate the time invested by members of the community and our governing bodies to provide guidance and direction to the planning team. We look forward to the coming years and advancing the recommendations contained within the plan toward implementation.
Sincerely,
⬚ figure
Andrew Baker, AICP Director – DeKalb County Planning & Sustainability
⬚ figure
CHAPTER 01 Introduction ................................................................................................................... 1
CHAPTER 02 Priorities and Engagement........................................................................................ 7
CHAPTER 03 Existing Conditions and Needs Assessment Summary...................................15
CHAPTER 04 Project Development and Evaluation ................................................................. 21
CHAPTER 05 Transportation Funding and Financial Framework.......................................... 25
CHAPTER 06 Surface Transportation Policy Recommendations...........................................31
CHAPTER 07 Transit Recommendations........................................................................................ 61
CHAPTER 08 Priority Projects for Unincorporated DeKalb County......................................... 71
CHAPTER 09 Priority Projects for DeKalb Cities ......................................................................... 91
CHAPTER 10 Five-Year Action Plan and Performance Monitoring......................................131
⬚ figure
The DeKalb 2050 Unified Plan combines two of the County’s long-range strategic documents into one:
An update to the County’s 2014 Comprehensive Transportation Plan (CTP) that identifies priority transportation projects and policy recommendations
A Comprehensive Land Use Plan (CLUP) that establishes the framework for future growth and development
The DeKalb County CTP analyzes transportation priorities and needs to help facilitate County growth over the next 30 years, identifies key transportation projects in the short-term and long-term, and recommends key transportation policies that can be created to facilitate implementation. In combination with the CLUP, the CTP will help establish the framework for smart growth strategies in DeKalb County across many different contexts. As shown below, the CTP includes many types of roadway, bicycle/pedestrian, and transit elements as well as freight movements, smart corridors, and funding options.
Located in the center of the Atlanta Region, DeKalb County is the fourth largest county in Georgia and is a dynamic home to more than 764,000 residents and more than 287,000 jobs. It is bordered by Fulton County to the north and west, Gwinnett County to the northeast, Rockdale County to the east, and Clayton and Henry Counties to the south. The City of Atlanta itself is split between Fulton and DeKalb Counties, with approximately ten percent of the city located on the DeKalb side. With this in mind, DeKalb is a long-established population and employment center for the Atlanta Region, home to thirteen incorporated cities alongside fourteen major employment centers, including the areas around Decatur, Emory University, North Druid Hills, Northlake, and Perimeter Center. It includes many high-density areas within and adjacent to the I-285 Perimeter, less dense suburban areas in Central and South DeKalb, and low-density rural and environmental preservation areas dotted mostly along its eastern flank. DeKalb’s population has grown steadily by about 1 percent each year, while its jobs have grown by about 1.3 percent each year since 2010. These growth trends are anticipated to continue in the same direction, though at gradually slower rates, over the next thirty years.
COMPREHENSIVE TRANSPORTATION PLAN
⬚ figure
01 – INTRODUCTION
The CTP was developed over a period of eighteen months and includes four major phases:
| 2021 | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | |
| Project Tasks | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | |
| General Public Engagement | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure | ⬚ figure |
Vision, Goals, Needs, and Opportunities: This phase established a baseline of understanding where the County’s transportation network is today and where it is envisioned to be over the next 30 years.
Transportation Nexus: The next phase chronicled all of the feedback and findings received in the previous phase to inform a dynamic system of qualitative and quantitative themes. The themes were designed to evaluate how future projects should be prioritized and to discover how they interlink with each other.
COMPREHENSIVE TRANSPORTATION PLAN
= Online Survey ..... Community Events ///// Public Meetings |||||||||| Focus Groups
| 2022 | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Dec | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct |
⬚ figure | ||||||||||
| Recommendations | ||||||||||
| Documentation, Review, and Adoption | ||||||||||
⬚ figure |
With the Transportation Nexus established, this phase identified, evaluated, and prioritized a wide range of transportation investments, policies, and actions that will help the County achieve its future short-term and long-term transportation vision.
The last phase documented the recommendations, feedback, and findings into the final CTP document for public digest and subsequent County adoption.
In every phase, extensive stakeholder and community engagement played a vital role in the visioning, development, and compilation of the CTP. A range of engagement exercises and venues were involved to ensure that broad and diverse swaths of the County were reached and engaged throughout the process, including dedicated public open houses, community event outreach, online surveys, and focus groups.
The DeKalb 2050 Unified Plan is structured with ten chapters that document the technical methodology, results, and concurrent engagement efforts that went into the Plan. Below is a summary of what is included in each chapter.
Chapter 2 describes the eleven transportation priorities that guide the DeKalb 2050 Unified Plan and documents the robust stakeholder and public engagement efforts conducted throughout its development.
Chapter 3 provides a summary of key themes and takeaways that were uncovered in the March 2022 Existing Conditions and Needs Assessment (ECNA) Report and development of the Transportation Nexus.
Chapter 4 discusses how the universe of projects was developed and the evaluation process used to assess each project for prioritization.
Chapter 5 recaps the funding mechanisms available at the local, state, and federal level to potentially leverage delivering the prioritized transportation projects.
Chapter 6 documents the proposed strategic policy recommendations of the DeKalb 2050 Unified Plan and explains how targeted policies can help advance DeKalb County's transportation priorities.
Chapter 7 focuses on the 2019 DeKalb County Transit Master Plan recommendations and provides recommended next steps to advance that plan.
Chapter 8 lists the County’s priority projects within the unincorporated areas (i.e., areas outside of city boundaries) based on project evaluation results and stakeholder and staff input.
Chapter 9 similarly chronicles priority projects of the 13 DeKalb cities based on project evaluation results and stakeholder and staff input.
Chapter 10 details a short-term action plan and approach to initiate the long-term 30-year Unified Plan.
The Appendix includes additional information regarding technology recommendations.
⬚ figure
The 11 transportation priorities (developed from the previous CTP and Transit Master Plan and vetted through key stakeholder input and public engagement efforts) impacted the direction of the Unified Plan at all stages of development. From identifying areas of analysis for the Existing Conditions and Needs Assessment (ECNA) Report to determining metrics for project evaluation and making final decisions regarding policy direction.
Improve travel for all users by increasing connections across roadway, transit, bicycle, and pedestrian modes.
Leverage transportation infrastructure to encourage an active lifestyle and overall improved quality of life.
Provide for safe travel by all users across all modes of travel.
Ensure the long-term care for existing infrastructure, including paving roads and repairing bridges and signal systems.
Prioritize improvements that increase transportation access to all parts of the County, especially in communities where a lack of transportation options create substantial barriers.
Pursue new local revenue sources that will allow the County to implement additional transportation projects.
Prioritize transportation investments that allow workers and students to have easier access to these key destinations.
Leverage transportation projects that help to encourage revitalization and new development throughout the County.
Implement transportation projects that improve mobility while taking into consideration local character and context.
Prioritize transportation projects that can be implemented in a reasonable timeframe and provide a strong return on investment.
Implement transportation projects that improve freight in the County either by truck or by rail.
⬚ figure
| STANDING COMMITTEES/ LEADERSHIP |
|---|
| CEO/Board of Commissioners* |
| Planning Commission* |
| Community Councils* |
| Public Works and Infrastructure Committee* |
| Planning, Economic Development, and Community Services Committee* |
| City Leaders |
*Includes Board of Commissioners Committees
DeKalb County Commissioners, various committees of the Commissioners, and city leaders provided the Unified Plan team with valuable insights into the issues and opportunities that are important to their communities. The team conducted multiple rounds of meetings with the Commissioners for input on draft project recommendations as well as policy direction for both transportation and land use topics.
| COMMITTEES | |
|---|---|
| Transportation Committee | Land Use Committee |
| Atlanta Regional Commission (ARC) (relevant departments) | ARC (relevant departments) |
| The ATL /State Road and Tollway Authority (SRTA)/Xpress | CIDs |
| Commissioner Appointees | Commissioner Appointees |
| Community Improvement Districts (CIDs)/ Transportation Management Association | Department of Community Affairs |
| Cities | DeKalb School System |
| DeKalb School System | Decide DeKalb/ Economic Development |
| Decide DeKalb/ Economic Development | MARTA |
| Georgia Department of Transportation (GDOT) | DeKalb County (relevant departments) |
| MARTA | |
| DeKalb County (relevant departments) |
The DeKalb Unified Plan created two committees of key stakeholders. The Land Use Committee was primarily relevant for the Comprehensive Plan and the Transportation Committee included 82 stakeholders vital to the success of the CTP. In addition to appointees from each of the Commissioners, the Transportation Committee included leaders, planners, and decision-makers from the state, region, County, and cities. The stakeholders in the Transportation Committee helped guide the planning process by actively engaging with the plan at the envisioning and draft recommendation stages. The combined knowledge that this Committee offered helped ensure that the Unified Plan meets DeKalb County’s needs and priorities.
| STAKEHOLDER GROUPS (2+ MEETINGS) |
|---|
| Advocacy and Environmental |
| Civic/Business Associations |
| Higher Education and Medical |
| Transit (early coordination efforts) |
To supplement the Committees, smaller groups of stakeholders were organized to advise the plan in key policy areas. Stakeholder groups helped the project team better understand the specific interests of different groups and communities in DeKalb County, including the higher education and medical community and representatives from civic and business associations.
⬚ figure
| FOCUS GROUPS (1 MEETING) |
|---|
| Housing |
| Arts and Culture |
| Public Safety |
| Multicultural/BIPOC Groups |
| Bike/Pedestrian/Trails |
| Resiliency/Sustainability |
| Retail |
| Health and Wellness |
Focus groups allowed the project team to meet with a small group of community members to talk about a specific topic area in more detail. Each focus group obtained feedback from a unique group representing different interests in the DeKalb County community. Focus groups were held for various policy areas as well as several multicultural and Black, Indigenous, and People of Color (BIPOC) groups in DeKalb County.
Public outreach is a key component in developing any successful transportation plan. The DeKalb County Unified Plan conducted two rounds of diverse public outreach efforts that included both online and in-person components. Engagement efforts were developed to be consistent across formats—public meetings and community intercepts asked some of the same questions as the online survey to gather the same types of information from different groups. The goal of these outreach efforts was to gather public input from across the County through direct engagement and the input of community proxies. Providing such a wide array of opportunities for public participation ensures that the Unified Plan reflects the values and priorities of DeKalb County as accurately as possible.
⬚ figure
13 community intercepts
to meet residents where they are at community events
12 public meetings:
6 virtual meetings 5 community charettes by district 1 super district commissioner town hall with over 100 attendees
2 rounds of online survey with 1,515 participants
⬚ figure
Eight virtual meetings were held with the five stakeholder groups between July 2021 and April 2022, as explained in the previous section.
Nineteen virtual meetings were held with the focus groups between July 2021 and January 2022, as explained in the previous section.
Twenty-six total meetings were held with DeKalb County Commissioners between April 2021 and April 2022. These meetings included one-on-one meetings with each Commissioner and their staff as well as committee meetings like the Committee of the Whole (COW), Public Works and Infrastructure (PWI) Committee, and Planning, Economic Development, and Community Services (PECS) Committee. The purpose of the first round of Commissioner meetings was to review the existing conditions, needs assessment, round one engagement efforts, and early project considerations. The purpose of the second round of Commissioner meetings was to discuss draft recommendations for projects and some policies.
Two community council meetings were held in August 2021 and April 2022. These meetings primarily discussed land use.
The 12 total public meetings hosted by the project team provided the greatest depth of information regarding the plan and offered the public the opportunity to provide feedback. The first round of public meetings included three virtual public meetings in May 2021 to discuss project overview, schedule, engagement efforts, existing conditions, and needs assessment. Attendees were also given the opportunity to provide input on transportation priorities, needs, and opportunities. Five community charettes (generally divided by district) were also held to discuss existing conditions and allow communities to provide input on issues and opportunities in their area. The second round of public meetings included three virtual public meetings in May 2022 and a Super District Commissioner town hall in June 2022 to discuss draft recommendations for projects and some policies. Every meeting gave DeKalb County residents the chance to meet the project team and provide input throughout the planning process. The feedback from the public meetings helped to guide the project team in identifying vision, priorities, and recommendations.
⬚ figure
In an effort to meet people where they are, 13 total community intercepts were held across two rounds. The intercepts were pop-up events at festivals, parks, MARTA stations, and other events intended to gather public input on transportation issues, opportunities, and priorities. The first round of intercepts included seven events between May and June 2021 where participants were asked to identify transportation issues, opportunities, and priorities. The second round of intercepts included six events in May 2022 where participants were asked to identify priority policy areas and projects and provide input on some draft plans.
⬚ figure
Whenever possible, the DeKalb 2050 Unified Plan team spoke with the community to spread the word about the plan. These presentations took place between August 2021 and April 2022 at events including police precinct community meetings, pastor leadership meetings, and community groups meetings. Community presentations generally provided an overview of the Plan and informed attendees of opportunities for public engagement.
Two JotForm online surveys were conducted in tandem with both rounds of public engagement. The first round of the survey allowed respondents to provide input on the needs and vision of the project. The second round of the survey allowed respondents to provide input on specific project and policy recommendations. The second round of the survey also included an interactive map that allowed respondents to “like” and leave comments on specific projects. The first and second rounds of the survey and the interactive map generated a total of 1,515 participants. The online survey provided people with an easy way to engage with the Plan from the comfort of their home or office, ensuring that public engagement efforts reached as many users of the DeKalb County transportation system as possible.
For the duration of the Plan, the project website (dekalb2050unifiedplan.com) was maintained as a repository of relevant information. The website advertised upcoming engagement opportunities and shared links to the online surveys and interactive maps. It also hosted valuable information, including project documents, schedule, recordings of previous public meetings, and contact information.
The DeKalb 2050 Unified Plan leveraged DeKalb County’s social media presence on Facebook and Twitter to advertise the plan’s major events. Updates were posted on both platforms using the #ItsInDeKalb and #UnifiedDeKalb hashtags.
The Existing Conditions and Needs Assessment (ECNA) Report analyzes and assesses the many interworking characteristics of DeKalb County, including demographics, economic development, land use patterns, environmental features, and transportation infrastructure to create an in-depth understanding of the County’s transportation needs and opportunities. In addition to the review of some 60 previous plans and programs documented in the Report, some key themes uncovered in the Report are highlighted here.
Understanding the people that make up DeKalb County is integral to a well-rounded CTP and includes both general population and specific demographic measures. Notable demographic measures documented, include Seniors, Race/Ethnicity, Limited English Proficiency, Persons with Disabilities, Zero-Vehicle Households, and Level of Educational Attainment. These measures are especially important in informing equitable transportation decisions as well as guiding targeted community outreach approaches. DeKalb’s diverse majority-minority population, robust population growth, and medium- to high-density present unique opportunities and challenges for its transportation future.
A central tenant of the DeKalb 2050 Unified Plan is that existing and future land use patterns across the County directly impact the need for transportation investments, and vice versa. How and when communities in DeKalb County have developed informs a deeper understanding of the overall character of each community and its need for transportation improvements. In addition, proximity to a range of public amenities (e.g., parks, grocery stores, and schools) directly correlates to residents’ quality-of-life. While DeKalb is highly developed, certain pockets, particularly in the south and east, have limited access to some of these amenities.
⬚ figure
⬚ figure
COMPREHENSIVE TRANSPORTATION PLAN
Understanding historical crash data across the County plays a pivotal role in identifying transportation improvements that both mitigate areas with high crash rates and alleviate traffic congestion often caused by those crashes. While the highest crash densities in the county tended to occur on I-285 and other high-volume freeways, many hot spots were common on the County’s arterials, including Peachtree Industrial Boulevard, Buford Highway, Covington Highway, and North Druid Hills Road. Intersections with high crash rates were found at Henrico Road at West Side Place in South DeKalb and a heavy concentration of intersections along Peachtree Road and Peachtree Boulevard in the City of Chamblee.
Transit, pedestrian, and bicycle infrastructure incentivize greater use of alternative modes of transportation as opposed to driving, alleviates traffic congestion on the County’s roads, and contributes to a greater quality-of-life. The lack of sidewalks within a mile of activity centers and lack of bicycle facilities within two miles of activity centers were found to significantly limit their use as alternatives to driving. Crashes involving bicycles and pedestrians most often occur in higher-density areas of the County, near bus stops, and at MARTA rail stations. Enhanced transportation investments must be leveraged to improve these alternative modes.
Capacity-based traffic congestion often limits a person’s mobility in DeKalb County whether they choose to drive or take transit. The ARC Travel Demand Model and other sources were used to identify corridors and intersections with high rates of congestion and delay. This congestion is almost always expected to increase along DeKalb’s roadways as traffic volumes grow over the next 30 years. Making strategic transportation investments is necessary on this front to combat traffic congestion, mitigate bottlenecks, and rethink the movement of people and goods to achieve efficiencies for both.
⬚ figure
⬚ figure
⬚ figure
The central goal of the DeKalb 2050 Unified Plan is to combine the transportation and land use visions for the County into a single unified, actionable plan. Transportation and land use elements have direct and intrinsically interlinked relationships with each other.
The Transportation Nexus (center of page) explores those interlinked relationships in detail. A product of substantial public and community engagement, the Transportation Nexus was developed to convey the top line issues that the project team gathered in parallel through the engagement and technical analysis processes, mapping them to better understand the themes and connections between them.
Based on these efforts, the project team uncovered a total of seven top line issues pertinent to DeKalb’s transportation and land use future:
Housing: Providing enough quality affordable housing and a variety of housing options to meet demands and needs of DeKalb County resident to slow down rises in housing prices
Activity Centers: Establishing and maintaining dynamic activity centers throughout the County tailored to residents’ needs and promoting higher population and/or jobs densities in these areas
Economic Development: Promoting and incentivizing new population and job opportunities and celebrating the County’s diversity as an asset
Freight/Industrial: Focusing on the County’s well-established freight and industrial sector and continuing to encourage further development opportunities for jobs and skillsets it can generate
Roadway/Vehicular: Investing in improvements to the County’s vast roadway network to mitigate congestion, contribute to efficiencies in the movement of both people and goods, achieve a state-of-good-repair, and enhance safety and mobility
Transit: Leveraging, expanding, and enhancing the County’s existing transit network in strategic ways to increase regional mobility, connect residents to jobs, and provide an equitable balance of transportation options
Active Transportation: Enhancing and expanding the County’s vast sidewalk and bicycle infrastructure to enhance quality-of-life, increase local connectivity, and promote the well-being of all County residents
⬚ figure
⬚ figure
⬚ figure
Clustered around these top line issues are a series of word clouds that were uncovered as themes around each top line issue. These themes are rarely in isolation; rather, they are almost always shared elements. As illustrated, these themes often transcend multiple top line issues identified, shedding light on the underlying relationships that connect them. These relationships are represented by connecting arrows and as shown in the legend can be either complimentary connections or in some cases potentially conflicting connections.
On a higher level, four overarching guiding principles of Equity, Funding Availability, and Agency and Inter-Agency Coordination tended to transcend every issue, theme, and stakeholder conversation. They are shown prominently around the periphery of the Transportation Nexus. Balancing all of these guiding principles helps to anchor the decision-making of all transportation and land use investments as projects are evaluated and prioritized.
(blank page)
⬚ figure
After hearing from the community and evaluating the County’s existing conditions and needs, the DeKalb 2050 Unified Plan team identified a Universe of Projects to assist with the development of a recommended project list. The Universe of Projects contains numerous projects for the County to consider that address transportation needs. If funding were unlimited, the County could theoretically implement the entire Universe of Projects; however, just like in a household budget, there is always a gap between needs and the funding available to implement the projects. Performance-based planning is essential to identifying the most impactful projects.
The Plan included a technical process to identify high-scoring projects based on evaluation metrics that focused on project performance. The project evaluation was not limited to technical analysis, public input also played an important role. The data-driven baseline process allowed for the highest performing projects to rise to the top for conversations with communities and elected leaders.
This chapter describes the creation of the Universe of Projects, the development of evaluation criteria, and the evaluation of the projects.
The Unified Plan team developed the Universe of Projects in a layered approach using four different sources consisting of previous plans done by others, technical analysis, public input, and input from agencies, stakeholders, and elected leaders. Each of these sources played an important role in ensuring the Unified Plan had a comprehensive list of projects before beginning evaluation.
More than 40 planning studies were reviewed to develop the Universe of Projects, including the ARC’s Regional Transportation Plan (RTP), DeKalb County 2014 Transportation Plan, city transportation plans, and small area studies (e.g., Livable Centers Initiatives [LCI] and CID plans). Regionally significant projects from these resources were included in the Universe of Projects, shown below:
The results of various analyses done in the ECNA were used to identify additional surface transportation projects that were not mentioned in previous plans. Results from analyses, including historical traffic volumes, bottleneck congestion data, historical crash rates, and Level-of-Service were used to identify roadway operational and capacity projects. Similarly, results from analyses including gaps in the existing active transportation network and level of traffic stress were used to identify multimodal projects.
After compiling previous projects done by others and supplementing with projects from the technical analysis, the project team reviewed project ideas gathered from public engagement efforts, including the Social Pinpoint web platform, community intercepts, and charrettes. In Social Pinpoint, responders were able to place points throughout the County, specify a desired project type (i.e., Bicycle, Pedestrian, Safety, Traffic, or Transit), and like or dislike previously made comments. In some instances, the results of the public's feedback helped validate an idea that was already present in the Universe of Projects and in other instances the feedback helped identify a new project.
Agency and stakeholder input were essential for developing and refining the Universe of Projects. In previous months, the Unified Plan team conducted the following efforts in coordination with agency staff, elected leaders, and stakeholders:
The project evaluation criteria developed for the Universe of Projects builds on the transportation priorities identified at the onset of the Unified Plan to ensure that the project prioritization reflects the goals of the community. Projects were coded in a Geographic Information System (GIS) environment and categorized as multiuse trails, small-scale roadway, or large-scale roadway projects. Note that sidewalk and bridge projects were not evaluated as these are included under set-aside funding mechanisms. Additionally, transit projects were not evaluated as the County is considering transit improvements separately. The evaluation criteria are shown in the table below.
| Evaluation Criterion | Definition | Transportation Priorities | |
|---|---|---|---|
| A | Access to Existing/ Planned Transit Facilities | The project proposes improvements near existing and planned transit facilities | Provide Transportation Options through Connectivity across Modes |
| B | Access to Community Resources | The project improves access to community resources (e.g., parks, libraries, K-12 schools) and improves mobility in areas of no or low vehicle ownership | Enable Healthy Communities and Improve Quality of Life |
| C | Safety Improvement | Evaluates safety concerns near the project area using historical crash data, crash severity, and ARC Risk Assessment Score data | Improve Safety |
| D | Equitable Access | The project improves mobility in areas of traditionally underserved communities | Promote Equity |
| E | Employment and Educational Impact | Measures the project's impact on employment and higher educational opportunities | Increase Access to Jobs and Education |
| F | Economic Development Impact | Measures the project's impact on economic development based on proximity to CID, Tax Allocation District, Regional/Town Center/ Neighborhood Activity Centers, Federal/State Opportunity Zone | Encourage Economic Development |
| G | Mobility Improvement | Measures the reduction in travel time and vehicular congestion, proximity to built or funded trails, and project scale | Practice Fiscal Responsibility in Transportation Investments |
| H | Freight Movement Improvement | Measures the project's impact on freight movement based on proximity to regional truck routes, rail crossings, and if the project is in a freight cluster or industrial area | Better Accommodate Movement of Goods |
| I | Previous Plan Support | Recognizes if the project is included in a previous plan | N/A |
| J | Public Support | Recognizes if the project has received public support | N/A |
Projects scoring highly in the evaluation process were prioritized for conversations with staff and elected leaders and for possible inclusion in higher tiers.
⬚ figure
The Unified Plan considers multiple funding sources, including local, state, and federal levels. The image on the following page depicts the different types of funding sources considered during the planning process.
Local sources of funds must be generated within DeKalb County. If marked with an asterisk (*), they are currently in use by the County.
Federal and state funds have two basic forms—formula funds and discretionary funds. Formula funds are allocated to the state and region based on population size, whereas discretionary funds are awarded through competitive federal grant applications and are not guaranteed to the state or region. Federal funds for all transportation projects now fall under the new transportation bill, the Infrastructure Investment and Jobs Act (IIJA), also known as the Bipartisan Infrastructure Law (BIL). Under the IIJA/BIL, funding for transportation infrastructure has increased substantially and can be seen in both formula and discretionary funding programs.
Formula funds (administered by ARC and GDOT): Formula funds for surface transportation projects allocated to the Atlanta region are administered to local governments through the ARC’s Regional Transportation Planning process (also includes GDOT). Local funds generated within DeKalb can be used as match funds for federal dollars awarded by ARC or other state funds from GDOT for pavement management, bridges, etc.
Formula funds (administered by MARTA and the Atlanta Transit Link Authority [ATL]): Formula funds for transit are distributed by the FTA to designated recipients. In the Atlanta Region, the designated recipient for Section 5307, 5337, and 5339 funds is the ATL. The ATL is responsible for outlining the program of projects that detail specific projects that funds will be applied towards.
Discretionary/competitive grant programs: Several competitive grant programs exist through both the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA). Examples include the following: USDOT Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Grant Program (formerly known as the Better Utilizing Investments to Leverage Development [BUILD] and Transportation Investment Generating Economic Recovery [TIGER]), USDOT Infrastructure for Rebuilding America (INFRA) Grant Program, FTA Capital Investment Grant (CIG) Program, FTA Bus and Bus Facilities Grant Program, and FTA Low or No Emissions Bus Grant Program.
⬚ figure
Planning for transportation and mobility includes more than just building new projects. It also includes having resources to maintain infrastructure (e.g., paving roads, repairing bridges and signal systems, etc.), preparing for future technology, and establishing support systems to oversee the implementation of future capital projects. In order to properly prepare for these financial needs, it is critical to develop a strong financial framework.
The DeKalb framework is based around the assumption of constraining expenditures based on local funding with a check to help ensure reasonable state and federal funding matches. Additional local funding sources could be considered; however, the primary source assumed in the development of this financial framework is a renewal of the countywide SPLOST program. While recent returns have been coming in above projections, the plan assumes a more conservative baseline of the early projections of approximately $106 million per year with a 1% per year growth in the tax base.
The cities in DeKalb are allocated a percentage of collected SPLOST revenues based on population and can use the funding to support a variety of needs beyond transportation. The City allocations total approximately 39% of the annual revenues under the current SPLOST program. Additionally, the percent of remaining unincorporated DeKalb County funding assumed to fund transportation needs remains the same as the current program, resulting in a total of 38% of total annual revenues.
If actual revenues exceed projections or the allocation to transportation exceeds current proportions, the Unified Plan team recommends the funds be allocated to two specific categories described later in the chapter.
⬚ figure
The table below displays the overall financial framework for unincorporated DeKalb County. The timeframe is broken into three tiers: Tier 1 represents the first 6 years (short-range), Tier 2 represents the next 6 years (mid-range), and Tier 3 represents the final 15 years (long-range). Rows are broken into two major groups, set-aside funding categories and a project funding category. Total anticipated applicable revenues from the SPLOST are shown in the last row.
Set-aside funding categories include programmatic funds instead of individual projects. These funds provide an allocation of money for a larger program (such as repaving)—the Unified Plan does not recommend specific roads for paving; however, it does allocate the funding needed to conduct the work. There are several key elements to note regarding the funding categories, including:
If revenues from the SPLOST (or the transportation allocation) are higher than estimates below, the Unified Plan team recommends that additional funds are first allocated to asset management and then to pedestrian improvements.
The project category located at the bottom of the table includes funding for specific projects. An overview by project type follows, and more information on the individual projects can be found in Chapter 8.
| Tier 1 6 Years | Tier 2 6 Years | Tier 3 15 Years | |
|---|---|---|---|
| Set-aside Funding Categories | $179,000,000 | $162,000,000 | $371,000,000 |
| Asset Management (Resurfacing*, Bridge) | $127,500,000 | $107,000,000 | $206,000,000 |
| Transportation Project Management (5% of Program) | $12,500,000 | $13,000,000 | $37,000,000 |
| Commission District Projects ($1 million/District) | $7,000,000 | $7,000,000 | $17,000,000 |
| Technology/Smart Corridor Investments | $6,000,000 | $9,000,000 | $30,000,000 |
| Pedestrian Improvements (Sidewalks, Crossings) | $24,000,000 | $24,000,000 | $75,000,000 |
| Discretionary (Planning, etc.) | $2,000,000 | $2,000,000 | $6,000,000 |
| Project Funding | $71,000,000 | $103,000,000 | $363,000,000 |
| Total Transportation Funding | $250,000,000 | $265,000,000 | $734,000,000 |
05 – TRANSPORTATION FUNDING AND FINANCIAL FRAMEWORK
Three overarching categories of projects are included in the list: multiuse trails, small-scale roadway projects, and large-scale roadway projects. Multiuse trail projects may include off-road trails that run along their own right-of-way, streams, or utility easements as well as side paths running along the side of a road. Small scale roadway improvements include intersection projects and safety projects anticipated to cost less than $4 million. Large scale roadway projects may include a combination of several project types, such as capacity or widening projects, operational projects with a series of intersection or access management elements, or multimodal projects that include roadway and trail projects.
The allocation of funds across the different project types and different tiers are shown in the chart below. Tier 3 has a substantially larger funding assumption due to its longer timeframe (15 years compared with 6 years) and smaller allocation to asset management in later years.
⬚ figure
Asset management includes all the activities of an organization that balance the cost, risk, and performance of assets to deliver service to customers. Managing assets is an organizational strategy that focuses on data-driven and fact-based decisions. In asset management, the focus is on the asset life cycle and can include planning and design, operating and maintaining, and rehabilitating.
Asset management is one of the most critical, yet often overlooked parts of a transportation system particularly when not enough funds are available to adequately maintain the system. Relative to transportation infrastructure, assets to manage can include roadways and assets within the right-of-way (e.g., signals, crosswalks, striping, sidewalks, curb and gutter, and curb ramps), bridges, and bike and pedestrian right-of-way or trails. In DeKalb County, with many established assets, the focus can be on maintaining an accurate inventory of assets and rehabilitating these assets in cost-effective ways. This may include repaving and reconstructing roadways, repairing and replacing bridges (including those with structural or functional issues), maintaining trails and paths for bicycles and pedestrians, and keeping signal systems operational and up to date. For a well-developed county like DeKalb County, asset management should be a substantial portion of the financial portfolio in order to properly maintain assets in a safe and functional way for community use. Implementing asset management can be achieved through a stepwise process over time that may add both steps to the management process as well as more assets to the program. The goal is to move from awareness of an asset management need and into competence in executing a program. Ultimately, proactively managing assets will save money in the long-term by applying the right maintenance and rehabilitation at the right time in the asset's life cycle.
DeKalb County has nearly 2,300 miles of roadway. Addition and deletion of roads from the DeKalb County system can be managed through tracking inventory data using a database or software tool. The inventory of roads should be inspected on a routine basis to determine the current condition score, which can be used to determine both the timing of and level of resurfacing or reconstruction needed. At the conclusion of the 2014 CTP, DeKalb County had approximately $175 million of paving backlog without a clear funding stream in sight. With the establishment of the SPLOST program in 2017, the County had substantial revenues to reduce this backlog and reach a better overall road condition. The current SPLOST program allocates $151 million over six years specifically for resurfacing.
Continued focus on asset management, and particularly rehabilitation of the road network, will be of critical importance
to DeKalb County moving forward. The Unified Plan includes the following recommended activities for road resurfacing:
The County should invest resources (approximately an average of $200,000 per year) to complete a full inventory of the system every three years, including the addition or removal of roadways in the system and updating the network for any construction or maintenance that has been conducted. As a part of developing a proactive pavement management plan, conduct “what-if” budget scenarios that show the impact of spending on the road network condition and the implications of different investment levels and philosophies on management. Ultimately, creating a three-year plan that includes both maintenance and reconstruction work for the County to manage closely until the time when an acceptable overall roadway condition is reached (and beyond) into routine management.
Bridge maintenance is critical for ensuring the safety of the traveling public. Routine inspections by GDOT allow organizations to prioritize where and when the investments need to be made. Approximately eight bridges were flagged as fair or worse considering structural components and nine additional non-GDOT bridges have weight limit restrictions. Some of these bridges already have funding identified for repair, while others will need to be upgraded or monitored over the coming years.
Funding within the asset management set-aside is included for bridge repair. However, large and critical bridge failures can come quickly and require more funding than originally allocated and including contingencies for these types of situations can be valuable.
DeKalb County operates and maintains 47% of traffic signals across both unincorporated DeKalb County roadways and in the cities of Avondale Estates, Clarkston, Decatur, Doraville, Pine Lake, Lithonia, Stonecrest, and Stone Mountain. More than 100 miles of fiber are used to connect DeKalb County traffic signals to GDOT-coordinated relays. DeKalb County’s annual expenditure for the operations and maintenance of ITS and traffic signals is approximately $0.75 million to $1 million.
As a part of the overall technology recommendations, it will be important for DeKalb County to first ensure that the basic programs, software systems, and infrastructure are well inventoried and maintained before advanced technology (I.e., Safety, Mobility, Automated, Real-time Traffic Management [SMART] corridors) can be implemented and leveraged to its greatest extent. In Tiers 1 and 2, set asides for technology should be prioritized for upgrading and maintaining software and infrastructure, and then future investments in Tiers 2 and 3 can focus more on advanced technology elements. A more detailed list of project recommendations for technology is included in the appendix.
The Unified Plan recommends the following investment levels for asset management (specifically roadway resurfacing and bridge repair) over the life of the plan:
The amounts noted above are exclusively local funds through the SPLOST program and are in addition to state funding received through GDOT and Local Maintenance Improvement Grants (LMIG). The first tier assumes the largest annual investment due to the need to reach a state of good condition. In future tiers, fewer dollars are allocated to asset management, consistent with more of a maintenance level of investment. These amounts include not only the funds for repaving but also for the purchase and use of an asset management software system and the creation of a pavement
management plan on a rotating three-year cycle. Also included in this amount is funding for capital bridge repair beyond traditional routine bridge maintenance. Funding for signal maintenance is included in the technology budgets discussed later in this chapter.
Recognizing that more funding in Tier 1 would be beneficial to reach a state of good condition sooner, the Unified Plan team recommends that surplus revenues from the SPLOST above and beyond the original projections from this plan should be allocated to asset management first to continue to reduce the County's resurfacing backlog. Beyond that, additional revenues could be reallocated to sidewalks and crossings as well as other areas of focus.
Functional classification systems categorize roadways based on character and operational features. While the individual categories can vary between classification systems, they generally include arterials, collectors, and local roads. The key factors that determine a roadway's functional classification are mobility and access. Roads with higher mobility allow traffic to travel quicker over longer distances, while roads with better access offer vehicles with greater ability to enter and exit adjacent land uses through driveways and connecting roadways. Roadways cannot typically offer both high mobility and high access—there is always a trade-off. For example, arterials operate at higher speeds, offering high mobility but poor access to adjacent land uses. Conversely, local roads have low speeds and reduced mobility but offer greater access to adjacent destinations with more driveways and intersections.
The FHWA states that it is important to develop access standards that achieve a balance between property access and functional integrity of the road system in areas of varied land uses. Designating roadway facility hierarchy through functional classification promotes multimodal access. Proper functional classification designations ensure adequate property access, functional integrity of the roadway system, and non-vehicular travel.
Agencies define roadway classification for roads under their jurisdiction to apply more consistent design standards and policies. DeKalb’s roadway functional classification helps determine planning design elements that will influence many elements of access management, including right-of-way dedication, active transportation, number of access points, driveway spacing, emergency vehicle access, deceleration lane specifications, and interparcel access. DeKalb County Code of Ordinances, Section 14-200 defines access management specifications based on functional classification and land use characteristics. These access management specifications are applicable unless a more restrictive standard is required by GDOT.
Furthermore, functional classification drives design decisions for DeKalb County’s traffic calming program. The traffic calming program leverages the County’s functional classifications to determine eligibility. In this case, only local roads can currently participate in the program. DeKalb also determines sidewalk improvement eligibility using functional classification, as the County provides funding for sidewalks on non-local roads.
Because functional classification has such important and varied implications, the Unified Plan team coordinated with DeKalb County’s cities and neighboring jurisdictions to confirm functional classifications are consistent across borders. Within DeKalb, this coordination also meant that the recommended functional classifications met the needs of cities.
The CTP includes recommendations that the DeKalb County Code of Ordinances be reviewed for any mentions of functional classification and be updated according to the recommended functional classification map. This includes updating land use and development policies that are dependent upon functional classification and roadways to use the same roadway categories that are used in the recommended map. The CTP also includes recommendations that are consistent in functional classification, particularly across municipal boundaries, be assessed on a recurring basis.
⬚ figure
| — | Freeway |
| — | Major Arterial |
| — | Minor Arterial |
| -------- | Collector |
| — | Local |
The FHWA states that the primary purpose of traffic calming is to support the livability and vitality of residential and commercial areas through improvements in non-motorist safety, mobility, and comfort. These goals can be achieved by reducing vehicular speeds or volumes along roadways. Traffic calming measures include non-physical (e.g., enforcement and education for speeding) and physical treatments. Physical treatments calm traffic through horizontal deflection, vertical deflection, street width reduction, and traffic rerouting or restrictions.
DeKalb County developed a Traffic Calming Program (adopted in 1995 and revised in 2001) to address concerns from citizens for speeding along residential street. The full Residential Traffic Calming Code is found in Chapter 17, Article 3, Division 3 of the DeKalb County Code of Ordinances.
The following is a summary of the current criteria, evaluation, and implementation process for traffic calming treatments in DeKalb County.
The following are some examples of traffic calming treatments considered by DeKalb for the Traffic Calming Program.
| Treatment | Treatment Typology |
|---|---|
| Splitter Island | Horizontal Deflection |
| Center Island | Horizontal Deflection |
| Speed Table | Vertical Deflection |
| Bike Lanes | Street Width Reduction |
DeKalb is currently evaluating expanding the Traffic Calming Program to include treatments and measures for roadways with functional classifications other than local residential. The County should continue to collaborate with local emergency services agencies and other stakeholders to ensure that the identified physical treatments are effective and adequate for all vehicle types.
The findings of the ECNA analyses indicate that, like nationwide and state trends, crashes involving fatalities and serious injuries in DeKalb increased between 2015 and 2019. Transportation safety should continue to be a central focus for DeKalb through developing policies that support the national movement and GDOT’s focus of moving towards zero deaths and serious injuries for all road users. DeKalb County and its neighboring agencies should strive to align regional efforts with the emphasis areas presented in the state’s Strategic Highway Safety Plan (2022-2024 SHSP), published by the governor’s Office of Highway Safety (GOHS) in 2021. The 2022-2024 SHSP identified the following emphasis areas to be the top contributing factors to fatal and serious injury crashes in Georgia:
While some crashes can be mitigated through roadway and intersection improvements, many crashes result from driver behavior and cannot be solved through engineering. Therefore, the 2022-2024 SHSP highlights the “4 Safety Es”: Engineering, Education, Enforcement, and Emergency Medical Services.
The following is a summary of policy recommendations that can help DeKalb County continue to improve safety for all road users:
| Engineering Countermeasures (Source: 2022-2024 SHSP) |
|---|
| Intersection geometry improvements |
| Enhanced signing and pavement marking enhancements |
| Intersection lighting improvements |
| Signal backplates |
| Leading pedestrian intervals (LPI)—a signal timing treatment that improves safety for pedestrians |
| High visibility crosswalks and upgrade pedestrian signals |
| Flashing yellow arrows |
| Protected only left turn |
The efficient movement of goods through the freight network is vital to the economic health of DeKalb County. DeKalb County’s local economy includes several industries (i.e., manufacturing, logistics, and distribution) that rely on freight movements to deliver or distribute material goods to and from the County. In addition to industry, the growth in e-commerce catalyzed during the COVID-19 pandemic has increased reliance of everyday families on freight deliveries. It is important for the DeKalb Unified Plan to account for transportation needs derived from freight demands and understand its effects on the larger transportation network.
⬚ figure
Source: Atlanta Regional Freight Mobility Plan Update (2016)
Freight trucking plays a significant role in driving industries that contribute to DeKalb County’s economy. The ARC’s Atlanta Regional Freight Mobility Plan Update (2016) identified the I-85/Peachtree Industrial Boulevard/Jimmy Carter Boulevard area in DeKalb County as one of Metro Atlanta’s major freight activity clusters. Since the County is home to a lot of freight activity, it is especially important that its roadway network can accommodate large volumes of heavy vehicle traffic, where appropriate.
Chapter 17 of the DeKalb County Code of Ordinances designates truck routes where heavy vehicles can legally operate for the purpose of the general travel throughout the County. GDOT specifies that all state routes must be truck routes. Beyond state routes, the Unified Plan includes other roadways that should be designated as truck routes to effectively facilitate the movement of goods throughout the County. The truck route network also includes sanitation routes used by the DeKalb Sanitation Division. The DeKalb County Code of Ordinances also states that trucks may use roadways not designated as truck routes to make specific deliveries, within reason. I-285 is used by trucks traveling through metro Atlanta as truck traffic is not allowed along I-75 and I-85 unless they are making specific deliveries.
Continuous travel across jurisdictional boundaries is an important characteristic for operators to efficiently move goods throughout metro Atlanta. This goes beyond intra-county travel among unincorporated areas and incorporated cities as it includes roadways that cross jurisdictional boundaries between DeKalb County and adjacent communities. The Unified Plan team coordinated with adjacent communities to ensure truck route continuity and prevent costly miscommunications in the future. Many municipalities within DeKalb have adopted the County’s truck route network within their own jurisdictions and some municipalities maintain their own lists building upon the County’s (i.e., Atlanta, Avondale, Brookhaven, Doraville, Dunwoody, and Stonecrest). Some municipalities restrict truck travel along certain roadways based on specified truck sizes and weight classes. For example, Chamblee specifies truck restrictions along certain roads for trucks larger than 30 feet or 18 tons. The following figure illustrates the recommended truck routes network, transfer stations, and the Seminole Landfill. Transfer stations are used by the County’s commercial customers to process solid wasted material, and residents may use the Seminole Landfill to dispose of yard trimmings and solid waste.
The Unified Plan includes the following proposed modifications be made to the County’s code of ordinances for truck route restrictions as identified in coordination with adjacent communities:
and Gwinnett County designation
Roadway projects that are along designated truck routes should consider the safe accommodation of heavy vehicles in their designs. The ARC’s Strategic Regional Thoroughfare Plan identifies important considerations for the design of truck-friendly roadways, including lane and shoulder widths, speed limits, turning radii at intersections, bridge conditions, signal timing, and more. On roadways where heavy vehicles operate alongside bicycle and pedestrian traffic, design considerations must be even more carefully considered. Elements such as on-street parking, designated bicycle lanes, and green space buffer can protect pedestrians by providing auxiliary space in which heavy vehicles can turn with sufficient clearance. The ARC is beginning an update to the regional freight plan that will include further guidance for design standards within different contextual settings. Findings from the new plan can inform future roadway and multimodal designs within DeKalb County.
⬚ figure
The demand for truck freight activity continues to increase nationwide, far outpacing the supply of available public and parking facilities. The FHWA states that commercial truck drivers need access to safe, secure, and accessible truck parking. A lack of adequate truck parking can result in drowsy truck drivers continuing to drive or choosing to park in unsafe locations (e.g., shoulder of the road, exit ramps, or vacant lots). DeKalb County and partner agencies also should ensure that designated parking facilities are located in areas buffered from residential. The Federal Motor Carrier Safety Administration (FMCSA) establishes national hours-of-service regulations for truck activity, including driving limits (i.e., 11 hours of driving are allowed after 10 consecutive hours of rest) and 30-minute breaks after eight cumulative hours of driving. Regulations like these ensure that truck drivers stay alert but require the presence of strategic parking facilities along truck traffic corridors.
The ARC conducted the Atlanta Regional Truck Parking Assessment Study (2018) comprising the 20-county Metro Atlanta region and key adjacent counties. The study concluded that there is not enough designated truck parking in DeKalb County despite the County being a hub for freight activity in the region. The study identified 10 truck traffic corridors impacting the region of which five traverse DeKalb County (i.e., I-20, I-85, I-285 North/East, I-285 South, and I-675).
Truck parking facilities in DeKalb should be developed with design considerations that consider parking supply, location and quality of life, safety, and technology. The following is a summary of strategies and policy recommendations based on findings from ARC's Atlanta Regional Truck Parking Assessment Study (2018) and industry best practices. DeKalb should consider these strategies and policy recommendations for existing and planned designated truck parking facilities.
by parked trucks. Previous studies suggest the use of electric hookups at all spaces decreases noise by up to 30% compared to a site where trucks idle
Rail freight is equally influential to DeKalb's transportation system. Two Class I (i.e., defined by an operating revenue of $250 million or more) railroads operate in Metro Atlanta and traverse DeKalb County—CSX Transportation (CSXT) and Norfolk Southern (NS). The ARC's Atlanta Regional Freight Mobility Plan Update (2016) states that more than 25% of the freight tonnage in Metro Atlanta occurs by rail. Furthermore, global market trends such as the Panama Canal expansion will result in increased freight flows from the port of Savannah to Metro Atlanta on truck and rail.
DeKalb County has over 120 at-grade railroad crossings which can add to roadway delay and introduce conflict points between rail vehicles and other roadway users. The County should periodically (e.g., annually) evaluate rail crossings to identify locations that may pose a high risk and would benefit from capital improvements. A comprehensive safety evaluation of rail crossings should include the following information:
The FRA and the FHWA developed the Rail Crossing Handbook, Third Edition (2019) which provides guidance and best practices for engineering treatments to improve rail crossing safety and mobility. The following is a summary of engineering treatments DeKalb may consider for future improvements at and near rail crossings:
Passive Crossing Treatments include warning and regulatory traffic control devices such as pavement markings and signage. Implementing clear signage and pavement markings at rail crossing locations can have a positive impact (i.e., reduction) in the number of vehicles stopping on the tracks or their influence area.
Special emphasis pavement markings and signage that go beyond the typical installations can be further effective for congested areas where queuing on the tracks is of concern due to limited available storage downstream of the crossing. Dynamic envelope zone pavement marking is an example of special emphasis passive crossing treatment. White connecting Xs visually highlight to motorists the influence area they should avoid. The Florida DOT (FDOT) observed that vehicles stopping on or too close to rail crossings was reduced by 15% with the installation of dynamic envelope pavement markings based on a study conducted from 2014 to 2017.
⬚ figure
Source: FDOT, Operation STRIDE (2020)
Active Crossing Treatments inform users of the approach or presence of rail traffic. These include flashing lights (i.e., both mast-mounted or cantilevered), bells, and automated gates. Four-quadrant gate systems consist of flashing lights and gates which extend across all lanes of travel of the roadway. Four-quadrant gates further inhibit drivers from crossing after the gates have lowered.
Rail Preemption should be enabled for traffic signals near rail crossings (i.e., within 200 feet). Rail preemption consists of a sequence in the traffic signal phasing and timing to allow traffic to clear from the track area prior to the arrival of a train.
The County should investigate using a tool like Texas DOT’s (TxDOT) Guide for Determining Time Requirements for Traffic Signal Pre-Emption at Highway Rail Grade Crossings (Form 2304). Tools such as this can aid traffic signal maintaining agencies to optimize and refine rail preemption parameters.
Queue Management Strategies include traffic signal equipment and systems beyond rail preemption to help keep vehicle queues from extending over the tracks. Chapter 2 of the Rail Crossing Handbook, Third Edition (2019) provides guidance for evaluating which queue management strategies are most applicable for rail crossing locations.
Clear Storage Distance and Minimum Track Clearance Distance are measurements for rail crossings that are used to evaluate suitable queue management strategies.
⬚ figure
Source: FRA
Pre-Signals are used where the clear storage distance is not enough to store one or more vehicles. They control traffic approaching a grade crossing concurrently with the traffic signal beyond the tracks. Pre-Signals should be considered where the Clear Storage Distance is 50-75 feet to 200-250 feet.
⬚ figure
Queue-Cutter Signals operate independent of nearby traffic signals. They prevent vehicles queuing across tracks at crossings and are activated by the detection of a queue getting too close to the crossing. These signals are located just upstream of a rail crossing where traffic often queues across the crossing due to a downstream condition. Queue-Cutter Signals should be considered where the Clear Storage Distance is 450-500 feet.
⬚ figure
Source: FRA
Crossing Closure should be considered where a rail crossing is redundant with nearby locations. Rail crossing locations may be eligible for elimination grant opportunities.
Grade Separation should be considered where posted highway speeds exceed 55 mph, traffic levels exceed 30,000 AADT, or where train activity is significantly great (i.e., 30 or more trains per day, high train speeds).
DeKalb should investigate if crossing or grade separation are suitable strategies for key rail crossing locations in the County using FRA’s GradeDec.net rail crossing investment online application.
DeKalb-Peachtree Airport (PDK) is in the City of Chamblee and is generally bounded by Chamblee Tucker Road to the north, Dresden Drive to the south, US 23/Buford Highway NE to the east, and Clairmont Road to the west. PDK is classified as a general aviation reliever airport for Metro Atlanta. On average, PDK services 230,000 operations-takeoffs and landings per year and is considered the second-busiest airport in Georgia, second to Hartsfield-Jackson International Airport. The airport supports over 760 aviation-related jobs and is home to four aviation service companies, seven flight schools, and two helicopter operations.
DeKalb should continue to coordinate with PDK and partner agencies (i.e., Chamblee) on transportation projects that improve multimodal access to the airport as identified in previous plans, such as One Chamblee Comprehensive Plan, Chamblee Mobility Plan, and DeKalb Peachtree Airport’s Airport Master Plan Update.
DeKalb County can improve freight operations by focusing on the following key aspects of freight travel in coordination with partner agencies and organizations (e.g., adjacent jurisdictions and CIDs):
As discussed earlier, a tension exists between providing mobility and providing access along a roadway. A traditional approach to dealing with issues of congestion is often to widen the roadway to increase its capacity. While this may add incremental value by reducing congestion, it also results in other negatives such as property impacts, more challenging environments for walking, cycling, and transit service, and more impervious surfaces and aesthetic impacts. In more developed communities, like much of DeKalb County, widening may not even be feasible.
An alternative approach to reducing congestion is access management. Access management preserves existing roadway corridors while improving access to nearby destinations, allowing corridors to maintain mobility without physically expanding. When done successfully, access management can improve safety and efficiency while decreasing commute times, fuel consumption and emissions, and cut-through traffic in residential areas.
There are three main strategies for successful access management:
Various techniques can be employed to accomplish these strategies. This section of the CTP will provide a brief overview of those techniques as well as final recommendations for access management in the DeKalb County Code of Ordinances.
The strategic placement and design of driveways along roadways can help to control access, reduce vehicular conflict points, and avoid traffic spillback onto the roadway. When driveways are placed close together or located across from each other, they can create driver confusion and cause potential turning movements to overlap. Concentrating turning movements to a few well-spaced, defined driveways reduce conflict points and allow drivers to better predict the movements of other vehicles. Additionally, designing driveways to have longer transition sections between the roadway and
⬚ figure
onsite intersections improves mobility and gives drivers more time to make decisions, reducing the likelihood that the driveway will cause traffic to spill out onto the roadway. Reducing the number of driveways also creates predictability for pedestrians so they can be alert to the locations of potential conflict.
Implementing medians and improving traffic signal coordination can improve traffic flow, reduce congestion, and lower crash rates. Medians, especially raised or depressed medians, primarily yield benefits through the management of left-turn and U-turn movements along a corridor. Depending on the volume of turning movements, median openings can allow left turns along both the major and minor streets as well as U-turns from the major street, or they can only allow turning movements from the major street. Creating a series of appropriately spaced medians creates a hierarchy of decision points that allows for smoother traffic movements. Improving traffic signal coordination can yield similar benefits to medians. Providing adequate spacing between traffic signals and optimizing their timing can improve travel times and safety via the synchronization of signals along a corridor.
Some land use policies can also aid in successful access management. Land development regulations and zoning policies along a corridor have an impact on the mobility and safety of the roadway,
so they should be designed to encourage or require the interconnectivity of parcels and local roadways. Numerous roadways within DeKalb County are designated as major arterials while also having many closely spaced driveways to commercial properties: North Druid Hills Road, Clairmont Road, and Scott Boulevard, to name a few. Promoting inter-parcel access and local road connectivity (at a minimum for new developments) relieves pressure on major roadways also tasked with facilitating cross-county travel.
The CTP recommends that the DeKalb County Code of Ordinances be reviewed for existing access management requirements. Moving these requirements into one access management ordinance will consolidate access management requirements, reducing overlapping and confusing requirements. If any specific areas (i.e., overlay areas) have specific access management requirements, their relevant zoning section should have a standard access management subsection. Existing access management policies should be reviewed and updated based on the strategies and techniques laid out in this section as well as GDOT access management standards and FHWA access management guidance. Additionally, existing access management requirements that are informed by functional classifications should be updated to match the functional classification map provided in this plan.
⬚ figure
Source: FHWA
ITS leverage advanced technology and communications to monitor and manage the movement of people and goods across a transportation system. ITS infrastructure provides real-time data and information related to system performance to enable an agency to quickly respond to issues. Deployment of ITS technologies is one of many strategies that should be part of a successful Transportation System Management and Operations (TSMO) program. When compared with traditional roadway infrastructure projects, ITS can be an extremely cost-effective solution to enhance safety and mobility. Implementing ITS technologies and strategies could provide DeKalb County with a range of benefits, including enhanced traffic flow, reduced congestion, and more efficient and sustainable use of County resources.
The majority of the County’s existing ITS capabilities are located on state routes managed by GDOT as part of their statewide traffic signal operations (SigOps) program. Signalized intersections along state routes fall within GDOT District 7 and management is split between the SigOps Central Metro and SigOps Eastern Metro regions. GDOT traffic signals typically run time-of-day operational plans with traffic responsive (TR) plans implemented along Memorial Drive and several other corridors currently under consideration. TR operations are designed to implement preprogrammed traffic signal timing plans based on real-time traffic conditions. Many of the state routes maintained by GDOT are equipped with fiber optic communications and have closed-circuit television (CCTV) camera coverage.
DeKalb County manages almost 400 traffic signals located in incorporated and unincorporated areas of the County. These traffic signals are located outside of the jurisdiction of the cities of Atlanta, Brookhaven, Chamblee, and Dunwoody. All County managed traffic signals run time-of-day operations. DeKalb County has a small fiber optic communications network that connects several corridors to the County’s Traffic Control Center (TCC) and the GDOT communications network. The TCC performs some limited active traffic management activities for connected traffic signals, but a majority of the County’s traffic signals do not have the required technology or network communications needed to support remote management using GDOT’s MaxView software.
There are a limited number of connected vehicle (CV) deployments in the County. GDOT has deployed roadside units (RSUs) at several traffic signals within the County and has a multi-year plan to deploy RSUs at all GDOT managed signals. Additionally, GDOT and the County have deployed transit signal priority (TSP) along several corridors, including Memorial Drive and Candler Road. Many of the DeKalb County managed traffic signals do not currently have the infrastructure (technology or communications) required to support more advanced technologies. Upgrading County traffic signal controllers and installing a robust communications network will allow the County to take advantage of more advanced transportation technologies to improve operations throughout the transportation system.
⬚ figure
To better manage the County’s transportation network and leverage the benefits of ITS technologies, the CTP includes a number of project recommendations, each of which has been assigned to one of four project categories: Programmatic, Infrastructure, Operations, and Advanced Functionality. Programmatic projects are those projects that are more institutional in nature and should be implemented first as they will provide the County with the framework on which all future CTP projects will be implemented. Once Programmatic project elements are implemented, the County will need to build out the transportation system through a series of infrastructure projects focused on traffic signal technology, ITS, and communications. Once the required technology and communications are in place, the County can begin to implement Operational projects designed to improve safety and mobility across the transportation system. The last project category, Advanced Functionality, should be implemented only after the other projects are successfully implemented. The following sections
provide a brief overview of each project category and outline some of the projects included in each. The appendix has a full list of all transportation technology project recommendations included in the CTP.
Programmatic projects are those projects that are focused on the development of strategies, processes, and procedures to be implemented by the County prior to beginning any large scale ITS or technology deployment projects. These projects will provide the foundation on which a robust transportation system and traffic management program will be built and will be integral to the success of future infrastructure, operations, and advanced functionality projects. With a strong Programmatic framework in place, the County could implement future projects in a strategic and consistent manner and is able to maximize the benefits obtained from each project.
Near-term Programmatic projects identified in the CTP include the development of active asset management plans for all ITS and traffic signal equipment, a transportation data management plan, and an operations and maintenance plan. Master plans for the deployment of traffic signal infrastructure, ITS assets, and a communications network were also included as near-term projects as they could be vital to the successful deployment of these assets. In the mid-term, the County can work to implement each of the various plans developed and could consider procurement, deployment, and integration of asset management system (AMS) software to effectively manage County assets. Long-term Programmatic projects will focus on reviewing and updating each of the plans developed and the automation of AMS processes and procedures.
Infrastructure projects are those projects focused on buildout of the transportation system, specifically from a technology and communications standpoint. Deployment of advanced traffic signal controller and ITS assets will be a significant component of these projects. When fully deployed, the Infrastructure projects will provide the foundational and technological capabilities required to better manage the transportation system, including the ability to remotely monitor and manage field assets, and operational strategies required for effective traffic management. Infrastructure projects should also allow the County to implement the Operational and Advanced Functionality projects outlined in the CTP.
Near-term Infrastructure projects include upgrades to and/or replacement of existing end-of-life, malfunctioning, or non-functioning traffic signal and ITS infrastructure, including traffic signal cabinets, controllers, and vehicle detection. Buildout of a fiber-optic communications network and deployment of ITS technology could be part of both near-and mid-term projects. The County could focus on buildout of critical, high-volume corridors first and gradually expand to less critical, lower volume corridors. Where fiber-optic communications to remote traffic signals is not practical or cost effective, cellular communications can be utilized. Long-term infrastructure projects consist of reevaluating existing traffic signal, ITS technology, and communications network infrastructure to determine its suitability for future use, identification of upgrades and/or additional improvement projects, and an evaluation of potential impacts of more advanced technologies including CV, automated vehicles (AV), and SMART corridors.
Operations projects are those projects that are primarily focused on implementing operational improvements designed to improve safety and mobility throughout the County transportation system. These projects should focus on implementing strategies that are possible because of the technology and communications infrastructure deployed as part of the Infrastructure projects identified in the CTP. Operational projects also could include the deployment of or upgrades to central software systems that could allow the County to remotely manage ITS assets deployed in the field.
Near-term Operations projects included in the CTP (to be completed by the County) include modifications to existing traffic signal timing plans to improve safety, including implementing flashing-yellow arrow (FYA) and protected left turn phasing, where none is currently present. Operational projects also include corridor retiming to improve vehicle progression. Another near-term project that could extend to mid-term projects is further integration of traffic signals into GDOT's MaxView ATMS software and open-source Automated Traffic Signal Performance Measures (ATSPM) and SigOps
Metrics software. Integration of traffic signals into these software applications will allow the County to remotely manage traffic signals and analyze operations at the individual intersection, corridor, and systemwide level. TR operational plans could also be implemented on higher volume corridors as part of mid-term projects. Long-term Operational projects could focus on improvements in response to changing traffic patterns that occur over the near- and mid-term.
Advanced Functionality projects included in the CTP are those projects that either cannot or should not be initiated until other foundational elements of the transportation system have been implemented. Advanced Functionality projects include projects that incorporate complex operational strategies that may require additional software or technology as well as significant inter-agency coordination to implement. The benefits that can be achieved through these projects can be significant, but they are often difficult to realize without proper planning and coordination.
The CTP does not identify any near-term Advanced Functionality projects as these projects could require buildout of traffic signal and ITS infrastructure and the County communications network before they can be implemented. Mid-term and long-term projects include deployment of more advanced traffic management strategies, including adaptive traffic signal operations, vehicle preemption (i.e., emergency vehicles and rail), TSP, and enhanced work zone management. Advanced Functionality projects also include County deployment of CV and AV projects as these technologies rapidly progresses and are deployed more broadly in the coming years.
A major component of the mid-term and long-term advanced functionality projects could be developing and implementing SMART corridors in the County. While there is no single definition for a SMART corridor, the term generally refers to a corridor that leverages technology and communications to integrate multiple systems and real-time data to enhance safety and improve mobility along the corridor. SMART corridors generally have higher traffic volumes, significant multimodal activity, are located near activity centers or major businesses, and provide opportunities to address equity in the community.
The CTP project team performed a technical analysis of DeKalb County's roadway network to determine which roadway corridors would be good candidates for future SMART corridor projects. The base unit for the technical analysis was the ARC's travel demand model line segments. Segments were assigned scores based on seven equally weighted criteria:
The technical analysis identified ten corridors with the highest composite scores as potential candidates for a SMART corridor. The project team worked with County staff and analyzed other ongoing or planned future projects within the County to identify two final SMART corridor project candidates. The actual limits of each SMART corridor project can be determined as part of future discussions with the County staff and a more detailed analysis of existing corridor conditions.
⬚ figure
Complete Streets are streets designed to be and feel safe for all users of the transportation system, regardless of mode, age, or ability. Design solutions are expected to be collaborative and take into consideration the access of all users, the context of local built and natural environments, and the appearance of the roadway corridor. While DeKalb County has been pursuing the expansion of its bicycle, pedestrian, and transit networks over the past several years, the CTP has included an updated Complete Streets Policy to formalize these efforts.
The CTP recommends that DeKalb County to continue using the most current complete streets guidelines and design best practices. Existing design manuals, guidance, and publications from organizations such as the FHWA, American Association of State Highway and Transportation Officials (AASHTO), GDOT, ARC, and ITE should be used whenever possible. It is the continued intent of DeKalb County to pursue a complete streets policy that is aligned with USDOT and GDOT complete streets policies. The following bullets are the polices:
DeKalb County should also consider guidance published by the National Complete Streets Coalition (NCSC). The components established by the NCSC include:
While the County should consider the safety and mobility of all road users across all modes on every County-maintained roadway, certain types of urban
thoroughfares should be given especially intense consideration. The ITE/CNU manual, Designing Walkable Urban Thoroughfares: A Context Sensitive Approach, defines different types of urban thoroughfares and their relation to functional classifications. Of the identified thoroughfare types, boulevards, avenues, and streets should receive the highest level of context sensitive considerations for complete street design.
The DeKalb County CTP team recommends that County incorporate Complete Streets principles into appropriate plans, projects, and programs and specify how the County can continue to support complete streets application on streets owned by DeKalb County. The County, at a minimum, should recommend that all roadway projects, including new construction and renovation, consider and document decisions regarding installation of facilities that safely accommodate for bicycle, pedestrian, and transit users. For roadways that are not directly owned by the County, DeKalb County should coordinate with partner agencies and departments. DeKalb County should also work to develop a community engagement plan in the project selection, design, and implementation process that includes and prioritizes vulnerable communities. There are certain roadway corridors that can serve as exceptions from the complete streets policy. Where exceptions might exist, the County should work to document the decision-making processes regarding the corridors. Exceptions may exist for:
To further the value of the CTP's Complete Streets recommendation, the County should consider revising the Code of Ordinances to include improved design guidance and proactive land use planning that is context sensitive.
| Throughfare Type | Description | Associated Functional Classes |
|---|---|---|
| Boulevard | Walkable, medium-speed divided urban thoroughfare<br>Through and local traffic, pedestrians, and bicyclists<br>Primary goods movement and emergency response route<br>Serves longer trips and provides pedestrian access to land<br>Typically a longer corridor with four or more lanes | Major Arterial, Minor Arterial |
| Avenue | Walkable, low-to-medium speed urban thoroughfare<br>Primary pedestrian and bicycle route<br>Shorter than boulevards and no larger than four lanes<br>Goods movement limited to local routes and deliveries<br>Access to land is a primary function<br>May serve commercial or mixed-use sectors | Major Arterial, Minor Arterial, Collector |
| Street | Walkable, low-speed urban thoroughfare<br>Primarily serves adjacent property<br>Connects neighborhoods with each other and commercial/other districts<br>Connects local roads with arterials<br>Often the main street of a commercial or mixed-use sector<br>Goods movement restricted to local deliveries only | Major Arterial, Minor Arterial, Collector, Local |
Adapted from tables 4.2 and 4.3 of Designing Walkable Urban Thoroughfares: A Context Sensitive Approach
The ability of individuals to travel the County includes more than just those driving their vehicles. It also includes users of the transit system as well as those walking and riding bicycles. In a county as developed and diverse as DeKalb, providing meaningful connection for all user groups is tremendously important, however also challenging. The plan includes two different types of bicycle and pedestrian recommendations in this policy chapter. The first references a policy priority network for on-road facilities; the second includes a shortlist of possible recommended steps the County can take to make incremental progress in advancing safety and mobility for those walking and biking.
The Bicycle and Pedestrian Priority Roadway Network is meant to identify facilities that are good candidates for bicycle and pedestrian travel within the unincorporated part of DeKalb County – particularly focused on roadway facilities and areas within the adjacent public right-of-way. Not included on this map are completely off-road trail projects that run along stream buffers, utility easements, within parks, etc. Because DeKalb County is preparing a countywide trail master plan, decisions around the priority trail policy network will be determined through that planning process.
The creation of the Bicycle and Pedestrian Priority Network included consideration for the following items:
As future transportation projects are proposed along the corridors and new developments/redevelopments having a front along the corridors are built, the priority map should be considered a tool for facilitation of bicycle and pedestrian infrastructure investment.
06 – SURFACE TRANSPORTATION POLICY RECOMMENDATIONS
⬚ figure
| Strategy | Action |
|---|---|
| Identify which DeKalb County department should lead trail planning efforts and identify an individual to lead trail planning within the County. | Currently, DeKalb County trail planning and implementation takes place in three different departments: Recreation, Parks, and Cultural Affairs; Public Works, Transportation Division; and Planning and Sustainability. Having a clearly identified lead within the County could allow for a more cohesive and targeted investment in trails moving forward. In addition to identifying a county department lead, an individual should be appointed to lead trail planning. They can engage other liaisons from partner departments to ensure coordination. |
| Update the DeKalb County Trails Master Plan. | DeKalb County is currently procuring for the DeKalb County Trails Master Plan. This action is underway. |
| Conduct a sidewalk inventory and condition assessment for sidewalks in unincorporated DeKalb County. | In order to best prioritize sidewalk investments, it is first important to have a clear understanding of current assets and where gaps exist. The inventory and assessment can help to identify where sidewalk currently exists today as well as the condition of the existing facilities. Following the completion of the sidewalk plan, the funding set aside in the Unified Plan can be prioritized for high-priority investments. |
| Consider an update of DeKalb County's Complete Streets Policy. | DeKalb County's current complete streets policy was last formalized through the 2014[^] DeKalb County Transportation Plan. This policy recommended that all roadway projects include bicycle, pedestrian, and transit facilities. National best practices were updated since the 2014[^] update. The National Complete Streets Coalition publishes a set of essential elements that should be included in complete streets policies to ensure they are effective, implementable, and equitable. This document and other guiding documents listed in the Complete Streets section of this chapter should be referenced. |
| Review bicycle and pedestrian-related collisions, collision rates, and frequencies annually, and identify and implement safety strategies. | DeKalb County should analyze bicycle and pedestrian-involved collisions per facility type to identify trends, behaviors, and engineering solutions. DeKalb County should also work to develop a list of spot improvement projects—which can be included in annual capital improvement programs, SPLOST programs, or for the next CTP update. |
| Coordinate with law enforcement to locate hot spots of where cycling and pedestrian collisions are occurring. | As a part of the annual review of collisions that include cyclists and pedestrians, DeKalb County should regularly coordinate with law enforcement if there are patterns regarding specific vehicular movements or locations in the County. The National Highway Traffic Safety Administration (NHTSA) has guidelines which encourage training of law enforcement on bicycle safety and developed training materials for this purpose. |
| Coordinate the development of more robust parking and amenities for bicycling. | The DeKalb County Code contains regulations requiring new development to provide bicycle parking. However, the requirements are limited to specifying the number of parking spaces and where the parking should be placed. DeKalb County should work on tracking the locations of bicycle parking within the County to understand if amenities align with where current facilities exist and future facilities are planned. |
| Strategy | Action |
|---|---|
| Consider varying funding approaches to implement bicycling and pedestrian projects. | DeKalb County should continue to research and pursue grants that are available to make the most out of current SPLOST dollars. One such example is leveraging FTA funding opportunities to improve pedestrian facilities that increase and improve access to bus stops and shelters. |
| Consider e-mobility policy adoption for activity centers. | DeKalb County should consider the increase in demand for e-mobility devices in metro Atlanta, particularly regarding first- and last-mile connections. Although e-mobility devices will not likely affect the entire County, DeKalb should work with cities, agencies (e.g. MARTA), and local businesses to understand where e-mobility is occurring today and consider adopting a countywide policy in the future. The focus for DeKalb County should be given to regulation regarding how the devices can be operated and parked. |
| Support economic development through bicycle-related activities. | DeKalb County should consider promoting at least one bicycle-friendly event or campaign per year to encourage biking as a form of transportation. This can be conducted in a variety of ways, such as through partnering with local businesses or organizations to identify “bicycle friendly business districts” that offer discounts or incentives for those who visit via bicycle. Another more local example for metro Atlanta is “Atlanta Streets Alive” where a roadway is temporarily closed to automobile traffic and community members encouraged to walk, bike, and roll for a day while visiting local businesses and attractions. |
Transportation Demand Management (TDM) (sometimes referred to as Travel Demand Management) is a transportation industry term referring to a body of actions that seek to manage the demand for travel by drive-alone private car, rather than catering for that demand or managing the road system. In simple terms, TDM provides people with a variety of mobility options (other than driving alone) to reduce vehicle miles traveled (VMT) and gain environmental, conservation, and sustainability benefits—generally without large infrastructure investments. Measures are directed at increasing vehicle occupancy, shifting travel mode or time of travel, or reducing the need for travel. Much of the time, the focus is to reduce vehicular demand during peak morning and afternoon commute periods, but TDM measures have benefits that extend to off-peak and special event travel times as well.
⬚ figure
Source: FHWA
The benefits of reducing travel demand and dependence on the automobile are extensive, not only to an organization but also for the larger community. The benefits of TDM fall into five major categories: Transportation System Benefits, Social Benefits, Environmental Benefits, Health and Safety Benefits, and Economic and Financial Benefits. These categories are better defined below:
Transportation System Benefits ▶Reduced traffic congestion resulting in time savings ▶Enhanced overall access, convenience, and mobility equity
Social Benefits ▶Improved quality of life in communities with transportation options (walkable and bikeable) ▶Allows for social interactions and community connectedness ▶Reduced fragmentation and safety issues caused by wide, high-speed roads ▶Enables aging population to retain independence in the community
Environmental Benefits ▶Reduced dependence on fossil fuels and greenhouse gas emissions ▶Reduced congestion and energy consumption ▶Improved air and water quality (reduced emissions and fluid leaks) ▶Reduced heat dome effect (reduced need for paved surfaces)
Health and Safety Benefits ▶Improved health through active transportation (biking and walking) ▶Improved air quality ▶Reduced stress levels
Economic and Financial Benefits ▶Reduced car ownership, maintenance, and parking costs ▶Reduced need for expensive regional vehicular infrastructure yielding lower return on investment than transit ▶Reduced cost of healthcare (over the long-term) ▶Attracts individuals that value a multimodal environment (representing much of today's work force)
The largest TDM program in the metro Atlanta region is Georgia Commute Options (GCO). Managed by the ARC, GCO helps commuters and employers find better ways to get around, reducing traffic congestion and improving air quality. GCO helps employer partners develop and implement commuter programs and worksites around metro-Atlanta and surrounding areas. It's Telework and Flexwork Programs help employers reduce costs, provide better planning options, and identify tax savings—all while improving air quality and helping employees save time and money. GCO provides the following services for employers:
GCO provides the following services for commuters:
Transportation Management Associations (TMA) are organizations that provide TDM programming and help to manage transportation within a specific geographic area. TMA's typically are organized through CIDs. Existing Transportation Management Associations in the metro Atlanta region include Perimeter Connects, Midtown Transportation, Central Atlanta Progress (CAP), Clifton Corridor Transportation Management Association, and Livable Buckhead. Information regarding the TMAs in DeKalb County include:
to navigating projects and construction in Perimeter for a better commute. www.perimeterconnects.com
Traditional TDM strategies include programs and subsidies that seek to manage the demand for travel by drive-alone private car and provide greater mobility options with environmental, conservation, and sustainability benefits. Oftentimes, TDM strategies are facilitated through a local community organization or CID in partnership with GCO.
Organizations in DeKalb County with the opportunity to implement TDM strategies include, but are not limited to, the following local municipalities: DeKalb County Government, Cities of Decatur, Doraville, Chamblee, and Brookhaven, and the CIDs. Each organization should look at various TDM strategies and identify the ones that would best meet the goals of a TDM program. Many of these strategies may be implemented by leveraging a partnership with GCO or by learning about best practices from existing TMAs. The goal of the DeKalb Unified Plan is to highlight potential County-led program/policies.
As a developed, central County that is well served by transit and multimodal networks, DeKalb County has the opportunity to leverage TDM. This is not true for the entire expanse of the County, therefore, many of these recommendations are for DeKalb County to consider as internal policy and/or for the DeKalb Unified Plan defined activity centers, specifically the regional centers and town centers.
Policy recommendations are an important element of any transportation planning document because they provide an opportunity to improve transportation systems beyond the sole construction of infrastructure projects. Policy changes, in combination with the infrastructure projects, provide an opportunity to shape the way the County grows and serves its traveling public.
To implement the policy recommendations included in this chapter, it will require additional attention and work beyond this document to further refine the specifics of some of the topic areas. While not every policy may be advanced by County leadership and staff, the advancement of even some of the policies can help to change and advance the mobility for all users of the DeKalb County transportation system.
TRANSIT RECOMMENDATIONS
In 2019, DeKalb County completed and adopted a comprehensive long-range transit plan, known as the DeKalb County Transit Master Plan (DTMP). The DTMP provides a 30-year vision for future transit investments within DeKalb County and its municipalities. The plan’s recommendations include major new transit investments, as well as enhancements to existing transit services. The DTMP’s goals were to enhance countywide mobility and access, promote economic development, and improve residents’ overall quality-of-life.
The DTMP was developed through a transparent and collaborative partnership between the ARC, MARTA, DeKalb County Government, the 12 municipalities within the County, and agency partners (GDOT and the ATL). The DTMP was developed through a 13-month planning process, beginning in July 2018 and concluding in August 2019. Since the County has recently completed and adopted a comprehensive long-range transit master plan, the approach of the 2050 Unified Plan was to incorporate the recommendations of the DTMP and serve as a vehicle to further the goals of the plan.
⬚ figure
The DTMP featured a comprehensive technical planning process and robust community engagement process. At key project milestones, public and stakeholder feedback was solicited to help ensure the plan was guided by the community's input and vision. Early plan milestones included developing a future transit vision and goals, conducting an inventory of existing transit service, and identifying unmet rider needs as well as economic development visioning and concentrated public and stakeholder meetings. Later milestones included planning charrettes and interactive public workshops as well as defining transit investment scenarios and identifying financial constraints. The final phase of the plan was spent refining four potential transit scenarios for consideration and their financial constraints.
The transit scenarios primarily focused on major new transit expansion projects. Recommended improvements to the existing transit system were identified in a separate process, which was focused on the unmet needs of riders. These needs were mapped in an accompanying figure entitled 'Current Unmet Rider Needs' and include areas where local bus, paratransit, and on-demand service expansion is desired. Improvements to high-ridership local bus routes, bus-to-rail transfers, and first-mile/last-mile connections were also identified. The need for mobility hub facilities that would accommodate bus-to-bus transfers and additional multimodal connections also were included. Improvements to existing services are largely assumed to be funded through DeKalb County's current MARTA sales tax and several projects have already advanced since the plan's adoption.
The DTMP concluded by advancing five major recommendations for the County's consideration moving forward. These recommendations are summarized below:
Recommendation 1: Advance Four Transit Scenarios for Further Consideration and Additional Public Input and Education. It is recommended that four potential transit scenarios are advanced forward for additional public and stakeholder input and education. These scenarios include the Existing MARTA Penny Scenario, Half-Penny Scenario, Full-Penny Scenario, and Previously Adopted Scenario. The public and stakeholder education and input process should be designed to increase the public's understanding of the travel benefits and the costs and impacts of the scenarios. The four scenarios are described in detail in the following section.
Recommendation 2: More Public/Stakeholder and Input on Project Delivery and Innovative Financing Opportunities. Additional public and stakeholder education is recommended on funding opportunities outside of the HB 9301 sales tax option. This includes public-private-partnerships, value capture financing, and federal CIGs for transit.
Recommendation 3: Collaborate with MARTA on Current Unmet Needs. Increased coordination between DeKalb County and MARTA is recommended to help ensure that transit investments address current unmet needs and are delivered using funds from the existing MARTA sales tax. These needs include paratransit expansion in south and east DeKalb, mobility hubs, bus-to-rail transfer improvements, last-mile/first-mile connectivity projects, expanded local bus coverage, community circulators, and mobility on-demand services.
HB 930 refers to the Georgia House Bill 930, which established the Atlanta-region Transit Link Authority (The ATL). ↩
⬚ figure
⬚ figure
⬚ figure
Recommendation 4: Collaborate with MARTA and Agency Partners on the Advancement of Expansion Projects Consistent with DTMP. DeKalb County should continue to coordinate with agency partners like MARTA, GDOT, and the ATL as well as other agencies to advance the definition (i.e., planning and design concept) of key projects included in the DTMP scenarios. This includes coordination with GDOT on the I-285 managed lanes project to accommodate bus rapid transit (BRT) design solutions. Coordination with GDOT is also recommended to re-evaluate I-20 East high-capacity transit to Stonecrest and the I-285 Top End Express Lanes. Finally, coordination with MARTA is recommended on high-capacity transit projects along Clifton Corridor, Buford Highway, and Candler Road as well as an arterial rapid transit (ART) network.
Recommendation 5: Align Land Use, Development Codes, and Transit Efforts. In order to be more competitive in receiving FTA grants for major transit investments, it is recommended that DeKalb County and the 13 cities within the County undertake efforts to better align land use and development policies to support transit investments. This includes encouraging transit supportive land use which promotes transit usage, walkability, and compact development forms at station areas and transit corridors. It is recommended that land use plans in the County direct growth into the high-capacity transit corridors identified in the DTMP.
The four transit scenarios advanced in DTMP were developed based upon different funding assumptions. These include the Existing MARTA Penny Scenario, Half-Penny Scenario, Full-Penny Scenario, and Previously Adopted Scenario, described below.
The Existing MARTA Penny Scenario assumes a continuation of the one-penny MARTA sales tax with no additional funding. The revenue in this scenario will support the maintenance and sustaining capital and operations of the existing system without new transit services. This scenario assumes existing revenues will be available to fund current unmet rider needs. Examples of this include MARTA station upgrades and the South DeKalb and Stonecrest Mobility Hubs.
⬚ figure
The Half-Penny Scenario presumes the extension of the one-penny MARTA tax and includes an additional half-penny sales tax under the provisions of HB 930. Funding assumes the maintenance and operations of the existing system and a transit system expansion of 15 projects. The projects include 1 light rail transit (LRT), 5 BRT, and 9 ART projects for a total of 139 project miles. This scenario leverages investments in managed lanes for BRT on I-285 and I-20 East.
⬚ figure
The Full-Penny Scenario presumes the extension of the one-penny MARTA tax and an additional one-penny sales tax under the provisions of HB 930. Funding assumes the maintenance and operations of the existing system and a transit system expansion of 16 projects. The projects include 4 LRT, 4 BRT, and 8 ART projects for a total of 180 project miles. This scenario also leverages investments in managed lanes for BRT on I-285 and I-20 East.
⬚ figure
The previously adopted scenario assumes the continuation of the existing one-penny MARTA sales tax to support maintenance and sustaining capital and operations of the existing system. It also assumes an unidentified funding source that can generate more revenue than an additional one-penny sales tax under HB 930 to fund a transit system of three projects. This includes 1 heavy rail transit (HRT), 1 LRT, and 1 BRT project and 37 project miles. This scenario features the MARTA Board plans for the I-20 East and Clifton Corridors adopted in 2012.
⬚ figure
The Unified Plan’s approach to transit planning has been to advance the recommendations of the DTMP and to continue facilitating important conversations related to transit needs and potential investments within the County. This Unified Plan’s transit planning activities can be summarized in the following key areas:
⬚ figure
The recommendations of the DTMP were based upon an inventory of existing transit conditions in 2017 and 2018. The Unified Plan updated the DTMP’s baseline transit data with more recent data available from 2019. Given the significant and temporary impacts of the COVID-19 pandemic on transit usage, 2019 data was selected to establish a new baseline (as opposed to 2020 data). Data has been updated related to bus and rail ridership, on-time-performance, transit safety, and demographic transit propensity. An updated baseline is provided in the Unified Plan’s ECNA Report. This report also includes an inventory of recent developments to transit planning efforts since 2019.
⬚ figure
The Unified Plan featured a robust community engagement process, which provided numerous opportunities to facilitate a dialog on transit and collect public and stakeholder input on transit needs. This included a multitude of public meetings, targeted stakeholder meetings, focus groups, community events, online surveys, and in-person intercept surveys. These engagement activities involved educating the community on the recommendations of the DTMP and provided an opportunity to solicit feedback. Public and stakeholder meetings included facilitated break-out group discussions on transit and interactive polling exercises. The feedback collected generally confirmed the continued need for projects identified in the DTMP and indicated a general willingness to support additional funding streams for transit.
⬚ figure
Another important activity of the Unified Plan was to provide additional education to stakeholders, community leaders, and the public on potential transit options and solutions. Educational efforts focused on providing information on transit mode options and potential funding mechanisms the County may choose to pursue. Education was provided to the DeKalb County PWI Committee related to the differences between transit modes recommended in the DTMP, both in terms of costs and operating characteristics. Education was also provided to DeKalb County leadership related to the process of pursuing a transit TSPLOST to fund major transit investments, should the County decide to pursue this option.
⬚ figure
A key recommendation of the DTMP was to better align land use and development policies to support transit investments. This included the recommendation for land use plans to direct growth into high-capacity transit corridors identified within the DTMP and promote transit-oriented development (TOD). The Unified Plan’s Comprehensive Land Use Plan has proactively coordinated the recommendations of both plans in the following ways:
Multimodal Development: Reduce vehicle miles traveled by promoting new development and redevelopment at or near activity centers, developing quality bicycle and pedestrian facilities, and providing better transit access.
Development Intensity: Focus new and higher density development in existing developed areas, particularly in locations with existing services, facilities, and infrastructure with capacity to support additional development.
The Character Area Map, which serves as a future land use guide, takes the approach of directing higher-density and transit-supportive development into areas with an Activity Center designation. Activity Center locations are consistent with the planned high-capacity transit corridors and station areas identified in the DTMP.
The Character Area Map also includes a Commercial Redevelopment Corridor designation, which coincides with several planned high-capacity transit corridors in the DTMP (Candler Road and Covington Highway are two examples). Within these corridors there is the potential for transit investments to catalyze the redevelopment of declining or underutilized commercial areas with transit-supportive multi-family and mixed-use development. The economic development goals of both plans dovetail and support each other in these corridors.
A special Policy Spotlight is included in the land use plan promoting TOD at potential high-capacity transit stations in the DTMP. This Policy Spotlight includes maps of proposed transit corridors and station areas for each of the four transit scenarios. Recommendations include developing station-area plans and implementing strategies to promote TOD at potential station locations.
⬚ figure
Through the Unified Plan’s community engagement efforts, the public was polled on their support and priorities for transit. Input was collected via an online survey and through community intercept surveys. Polling included the public’s support for an additional transit sales tax and desired funding level. Feedback was also collected on transit investment strategies and priority corridors for improved transit service. The polling results are shown below and indicate that more than half of respondents were supportive of an additional sales tax for transit with diversity seen in the desired level of tax increment. A slight preference was seen for a geographically dispersed investment strategy over a targeted corridor approach. All potential transit corridors received some support as priorities with Buford Highway standing out as the top priority and LaVista Road as the lowest amongst the group.
⬚ figure
46% Make large investments in a few priority corridors
54% Spread investments geographically throughout the County
⬚ figure
58% Yes
25% No
17% Unsure
Would you support a transit sales tax?
⬚ figure
49% Full Penny
30% Half Penny
15% Quarter Penny
6% Three-Quarter Penny
What is the maximum tax you would consider for funding transit projects?
⬚ figure
To advance the DTMP’s efforts after the Unified Plan has concluded, a series of recommended next steps have been identified and are summarized below.
The planning environment is never static and significant changes have occurred to transit planning efforts since the DTMP was adopted in 2019. Several projects identified in the DTMP have been advancing through the planning process, these include the Top-End BRT, South DeKalb Transit Hub, Stonecrest Transit Hub, and Candler Road ART. The preferred transit mode for projects along Buford Highway, the Clifton Corridor, and I-20 East have changed or have the potential to change. The DTMP should be updated to reflect the current status of project definitions, modes, and costs. Updated project information will be required should the County decide to move forward with implementation.
There is the need for additional education involving the public, stakeholders, and decision-makers to explore all transit financing options available. This includes federal, state, local, and private sources. A special focus should be placed on value capture strategies that include, but are not limited to, tax allocation districts (TAD), ground lease revenue from TOD and joint development opportunities, CID contributions, Special Service Districts, millage rates, and other strategies that optimize the benefits for both the public and private sectors.
County leaders should consider reaching a consensus on a funding approach and level to invest in additional transit infrastructure. This may include a full-penny or half-penny sales tax revenue under authorities provided to DeKalb County in HB 930 (Ga. Code § 50-39-1 through § 50-39-61) in combination with value-capture strategies. Consensus should also be reached on a community outreach and education program and a strategy to develop a project list, costs, benefits, performance, priorities, and funding plan.
Should the County decide to pursue a transit TSPLOST (HB 930), it is important to consider the necessary steps and approximate timeline of 15 months to help ensure a successful referendum.
Chapter 4 outlined the development and evaluation of a Universe of Projects for consideration throughout the County. Chapter 5 outlined the financial framework encompassing revenue streams and assumptions for transportation funding through the year 2050. Chapter 8 includes the final list of prioritized projects over the three tiers of the plan.
Three categories of project types are included—each consists of different subtypes that are reflected in the map legends on the following pages:
The CTP considers short-range projects as projects that are planned to be implemented in the first six years following the adoption of the plan and the beginning of a new SPLOST program. Projects in Tier 1 were included from the results of CTP analyses, DeKalb SPLOST Planning, Covington Highway Corridor Master Active Living Plan, Metro South CID, PATH Foundation, ARC RTP, and DeKalb County 2014 Transportation Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
A total of $71 million is assumed for DeKalb County’s contribution toward implementation of these projects, with additional funds for new sidewalk and crossing investments ($24 million) and technology investments ($6 million). Project funding per year is lowest in Tier 1 due to the substantial investment in asset management (specifically resurfacing) needed to continue the work of the current SPLOST and improve the overall road conditions in the County.
Levels of investment across project types are similar with Multiuse Trails having the largest funding amount and Large Scale Roadway Improvements having the smallest. Many of the larger roadway projects include early concept and preliminary engineering work as a part of Tier 1 with funding for right-of-way and construction phases happening in later tiers.
| Tier 1 | ||||
|---|---|---|---|---|
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
| Interchange—New or Improvements | ||||
| R_1069 | I-285 EB ramp at Moreland Avenue Interchange Improvement | Moreland Avenue | $712,000 | |
| R_709 | I-285 WB ramp at Moreland Avenue Interchange Improvement | Moreland Avenue | $315,000 | |
| Multimodal | ||||
| M_043_PE | Chamblee Tucker Road Multimodal Improvement (Design Only) | I-285 | Tucker Norcross Road | $1,032,000 |
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
|---|---|---|---|---|
| M_045_PE | Church Street Multimodal Improvement (Design Only) | N Decatur Road | Medlock Road | $552,000 |
| M_2000_PE | Clifton Springs Road Road Diet (Design Only) | Panthersville Road | Flat Shoals Parkway | $500,000 |
| M_2016 | Glenwood Road Multimodal Improvement | Columbia Drive | Covington Highway | $4,329,000 |
| M_013_PE | Heritage Corridor Study (Design Only) | Stone Mountain | Lithonia | $300,000 |
| M_024_PE | N Decatur Road Multimodal Improvement (Design Only) | Clairmont Road | Church Street | $343,000 |
| X_010 | N Druid Hills Road at Spring Creek Road Bridge Improvement (Bridge ID: 089-0175-0) | Approximately 1,400 feet east of Spring Creek Road | $12,500,000 | |
| M_035bc_PE | N Druid Hills Road Multimodal Improvement (Design Only) | Briarcliff Road | Lawrenceville Highway | $2,290,000 |
| M_2017 | Pleasantdale Road Multimodal Improvement | Tucker/Norcross | I-85 | $3,000,000 |
| New Connection | ||||
| R_2005_PE | Clairmont Road Reliever Connection (Scoping Study) | I-85 Frontage Road | Briarcliff Road NE | $200,000 |
| Off-Road | ||||
| BP_022 | Deepdene Park Path Scoping Study (Design Only) | N Ponce De Leon Avenue | Parkwood Road | $750,000 |
| BP_1433 | Donzi Road Beltline Connector | Donzi Road | Southside BeltLine Trail (Fulton County) | $3,577,000 |
| BP_1446 | North Fork Peachtree Creek Trail Connector, Phase 1 | Fisher Trail Park | Peachwood Circle NE | $1,777,000 |
| BP_1502 | North Fork Peachtree Creek Trail Connector, Phase 2 | Shallowford Road | Chamblee Tucker Road | $6,376,000 |
| BP_1475 | Sagamore Trail | Alderbrook Road | Audobon Drive | $199,000 |
| BP_1476a | Sagamore Trail | Briarcliff Road NE | Peachtree Creek Greenway | $2,550,000 |
| BP_1477 | Sagamore Trail | S Peachtree Creek Trail/ N Druid Hills Road | Alderbrook Road | $3,707,000 |
| BP_1481 | South Peachtree Creek Trail, PATH, Phase 2 (Section 1) | Fulton County Line | Atlanta City Limits | $431,000 |
| BP_1482 | South Peachtree Creek Trail, PATH, Phase 2 (Section 2) | Briarcliff Road | Atlanta City Limits | $379,000 |
| BP_018 | South Peachtree Creek Trail, Phase 3 | Medlock Park | Farmers Market Trail and Zonolite Park | $1,951,000 |
| BP_037 | South River Multi-Use Trail Extension | Boulder Walk Drive | Crestdale Circle | $5,787,000 |
| BP_1464 | South River Trail Multiuse Trail Extension (Eastern End) | Waldrop Place | MLK High School | $7,090,000 |
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
|---|---|---|---|---|
| Operational-Corridor | ||||
| R_202 | Bouldercrest Road Operational Improvement | Constitution Road | Eastland Road | $3,490,000 |
| R_225 | Henderson Mill Road Operational Improvement | Henderson Road | Mercer University Drive | $2,300,000 |
| R_211 | Kensington MARTA Station Trail and Road Diets, Phase 1 | Covington Highway | Memorial Drive | $5,949,000 |
| R_1418 | North/South Hairston Drive Safety Study (Design Only) | Welsey Chapel Road | Ponce De Leon Avenue | $500,000 |
| R_405c | Redan Road Operational Improvement | Elder Lane | Allgood Road | $10,000,000 |
| R_2001 | SR 12/US 278 Operational Improvement | DeKalb Medical Parkway | Cragstone Court | $5,328,000 |
| Operational-Intersection | ||||
| R_161 | Bermuda Road at Stewart Mill Road Roundabout | Stewart Mill Road | $1,829,000 | |
| R_1414 | Briarcliff Road at Briarlake Road Intersection Turn Lane Improvement | Briarlake Road | $666,000 | |
| R_153 | Candler Road at H F Shepherd Drive Intersection Improvement | H F Shepherd Drive | $2,800,000 | |
| R_926 | Cedar Grove Road at Bouldercrest Road Intersection Improvement and Roundabout | Bouldercrest Road | $1,000,000 | |
| R_925 | Cedar Grove Road at E Conley Road Intersection Improvement and Roundabout | E Conley Road | $1,000,000 | |
| R_1064_PE | Cedar Grove Road/Thurman Road (SR 160)/Old McDonough Road Roundabout (Design Only) | Thurman Road | $438,000 | |
| R_159 | Crestline Drive at Chrysler Drive Intersection Improvement | Chrysler Drive | $1,300,000 | |
| R_813 | DeKalb Industrial Way at Milscott Drive Traffic Signal Improvement | Milscott Drive | $332,000 | |
| R_927 | E Rock Springs Road NE at Cumberland Road NE/Beech Valley Way NE Intersection Improvement and Roundabout | Beech Valley Way NE | $1,400,000 | |
| R_1402 | Indian Creek Elementary Signal Installation | Lakes at Indian Creek Apartments Driveway | $292,000 | |
| R_1405 | North Clarendon Road Signal and RR Crossing Improvement | Ponce de Leon Avenue | $520,000 |
| Tier 1 Continued | ||||
|---|---|---|---|---|
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
| R_1406 | North Decatur Road at Parkdale Road Intersection Improvement | Parkdale Road | $588,000 | |
| R_2000 | North DeKalb Mall Intersection Improvement | Birch Road | $1,000,000 | |
| R_157 | Redan Road at Lithonia Road Intersection Safety Evaluation | S Stone Mountain-Lithonia Road | $560,000 | |
| R_162 | Redwing Circle at Covington Highway or Nearby New Traffic Signal | Covington Highway | $328,000 | |
| R_145 | Stephenson Road at South Deshon Road Intersection Improvement | South Deshon Road | $2,800,000 | |
| R_112 | Wesley Chapel Road at Flat Shoals Parkway Intersection Improvement | Flat Shoals Parkway | $922,000 |
⬚ figure
The CTP considers mid-range projects as those that are planned to be implemented in the second six years of the plan (consistent with a second iteration of a countywide SPLOST). Projects in Tier 2 were included from the results of CTP analyses, DeKalb SPLOST Planning, Belvedere Master Active Living Plan, Covington Highway Corridor Master Active Living Plan, Metro South CID, PATH Foundation, and DeKalb County 2014 Transportation Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
A total of $103 million is assumed for DeKalb County’s contribution toward implementation of these projects, with additional funds for new sidewalk and crossing investments ($24 million) and technology investments ($9 million). Project funding per year increases over Tier 1 due to a small assumption in growth of the sales tax base as well as a reduced need to fund asset management. This allows more funding to go to the development of new projects.
In Tier 2, Large Scale Roadway Improvements have substantially more funding than in Tier 1, this is a result of Tier 1 designs advancing to construction in Tier 2 for multiple projects. Some of the Large Scale Roadway projects also include trails (specifically multimodal projects), helping to advance the larger bicycle/pedestrian network while also making vehicular improvements.
| Tier 2 | ||||
|---|---|---|---|---|
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
| Capacity-Widening | ||||
| R_1077_PE | Old McDonough Road Capacity Improvement (Design Only) | Lancaster Road | Mason Dixon Road | $86,000 |
| R_407 | Wesley Chapel Road Capacity Improvement | Boring Road | Flat Shoals Parkway | $20,141,000 |
| Freight and Rail Crossing | ||||
| R_904 | Constitution Drive SE at Old Constitution Road SE Rail Crossing Improvement (Norfolk Southern) | Old Constitution Road SE | $130,000 | |
| R_913 | Panola Road at Stone Mountain Lithonia Road Rail Crossing Improvement | Stone Mountain Lithonia Road | $1,000,000 | |
| Multimodal | ||||
| M_043 | Chamblee Tucker Road Multimodal Improvement | I-285 | Tucker Norcross Road | $6,907,000 |
| M_045 | Church Street Multimodal Improvement | N Decatur Road | Medlock Road | $3,692,000 |
| M_2000 | Clifton Springs Road from Panthersville Road to Flat Shoals Parkway Road Diet | Panthersville Road | Flat Shoals Parkway | $2,300,000 |
| M_2006 | Covington Trails and Kensington MARTA Station Road Diets, Phase 2 | Memorial Drive | MARTA Indian Creek Station | $5,579,000 |
| M_1063 | Jolly Avenue Multimodal Improvement | Rowland Street | Indian Creek Way | $1,700,000 |
| Tier 2 Continued | ||||
|---|---|---|---|---|
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
| BP_1447 | Lullwater Road NE Multimodal Improvement | Ponce De Leon Avenue NE | N Decatur Rd | $1,000,000 |
| M_035b | N Druid Hills Road Multimodal Improvement | Briarcliff Road | Clairmont Road | $19,461,000 |
| M_035c | N Druid Hills Road Multimodal Improvement | Clairmont Road | Lawrenceville Highway | $24,036,000 |
| Off-Road | ||||
| BP_1428 | Covington Trails, Phase 2 (South) | Covington Highway | Towers High School | $823,000 |
| BP_140 | DeKalb Industrial Way Greenway | Lawrenceville Highway | Jefferson Square Court | $2,000,000 |
| BP_015 | Farmers Market Trail | South Peachtree Creek Trail | Stone Mountain Trail in Avondale Estates | $3,851,000 |
| BP_1435 | Henderson Mill Creek Trail | Northlake Parkway | North Fork Peachtree Creek Trail | $2,484,000 |
| BP_1438 | Indian Creek MARTA Station Trails | Chemawa Drive | Elder Lane | $114,000 |
| BP_1439 | Indian Creek MARTA Station Trails | S Indian Creek Drive | Snapfiner Trail PATH | $2,696,000 |
| BP_1440 | Indian Creek MARTA Station Trails | S Indian Creek Drive | Rowland Road | $486,000 |
| BP_1441 | Indian Creek MARTA Station Trails | Elder Lane | Indian Creek MARTA | $468,000 |
| BP_040 | Multiuse Trail Connecting Delano-Line Park, White Oak Park, and Shoal Creek | White Oak Park | Shoal Creek I | $60,000 |
| BP_1445 | North Fork Peachtree Creek Trail Connector, Phase 2 Spur | Cravey Lane NE | Townley Circle | $3,679,000 |
| BP_1501 | North Fork Peachtree Creek Trail Connector, Phase 3 | Chamblee Tucker Road | Presidential Parkway | $2,627,000 |
| BP_1450 | Shoal Creek PATH Trail Connection 2 | Aspen Woods Apartments | Shoal Creek Crossing | $32,000 |
| BP_030 | Shoal Creek Trail | Candler Road | Flat Shoals Parkway | $3,534,000 |
| BP_1473 | South Fork Peachtree Trail Connection to Emory University | Emory University | Zonolite Park | $299,000 |
| BP_1480 | South River Trail-PATH, Phase 2 | Gresham Park | Sugar Creek Park | $4,931,000 |
| BP_1484 | South River Trail-PATH, Phase 2 | Constitution Lakes Park | Sugar Creek Park | $884,000 |
| Operational-Corridor | ||||
| R_400b_PE | Briarcliff Road Arterial Managed Lanes (Design Only) | Clifton Road | N Druid Hills Road | $4,500,000 |
COMPREHENSIVE TRANSPORTATION PLAN
| Tier 2 Continued | ||||
|---|---|---|---|---|
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
| R_1074 | Constitution Road Widening (within GTIB Grant), Phase 2 | Fayetteville Road | International Park Drive | $9,327,000 |
| R_222 | Covington Highway Operational Improvement | Glenwood Road | Young Road | $15,500,000 |
| R_224 | Frazier Road Operational Improvement | Lawrenceville Highway | LaVista Road | $676,000 |
| R_1078 | Henrico Road Operational Improvement | Moreland Avenue | Koppers Road | $7,984,000 |
| R_1417 | Lawrenceville Highway at North Druid Hills Road Operational Improvement | North Druid Hills Road | $338,000 | |
| R_1081 | Moreland Avenue Operational Improvement | Cedar Grove | Conley Road | $2,430,000 |
| R_1082 | Moreland Avenue Operational Improvement | Thurman Road | I-285 | $486,000 |
| R_234 | Raise Median along Covington Highway | Redan Road | Redwing Circle | $688,000 |
| R_405d | Redan Road Operational Improvement | Allgood Road | S Hairston Road | $10,000,000 |
| R_1422 | Rockbridge Road Traffic Engineering Study | Cobblestone Trail | Glen Cove Drive | $167,000 |
| R_1421 | South Rainbow Drive Corridor Safety Improvement Study | Fairlake Drive | Rainbow Drive | $146,000 |
| Operational-Intersection | ||||
| R_1068 | Cedar Grove at Moreland Intersection Improvement | Moreland Avenue | $1,880,000 | |
| R_1064 | Cedar Grove Road/ Thurman Road (SR 160)/ Old McDonough Road Roundabout | Thurman Road | $5,475,000 | |
| R_152 | Central Drive at Hambrick Road Intersection Improvement | Hambrick Road | $1,700,000 | |
| R_1410 | Evans Road at Evans Wood Drive Intersection Improvement Study | Evans Wood Drive | $63,000 | |
| R_1401 | Frazier Road at SR 8 Intersection Improvement | SR 8 | $676,000 | |
| R_116 | Gresham Road at Brannen Road Intersection Improvement | Brannen Road | $2,535,000 | |
| R_1067 | Henrico Road at Bonsal Road Intersection Improvement | Bonsal Road | $1,620,000 | |
| R_1071 | Henrico Road at CSX Crossing Cul-de-Sac | 500 feet before CSX crossing | $1,620,000 |
| Tier 2 Continued | ||||
|---|---|---|---|---|
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
| R_1070 | Henrico Road at Moreland Avenue Intersection Improvement | Moreland Avenue | $5,719,000 | |
| R_138 | Henrico Road/Westside Place at Moore Road Intersection Improvement | Moore Road | $720,000 | |
| R_1411 | Houston Mill Road at Lavista Road Intersection Improvement | Lavista Road | $406,000 | |
| R_1403 | Lavista Road at Clairmont Road Intersection Improvement | Clairmont Road | $229,000 | |
| R_1404 | Milscott Drive at Church Drive Intersection Improvement | Church Drive | $406,000 | |
| R_1062 | Moreland Avenue at Conley Road Intersection Improvement | Conley Road | $2,912,000 | |
| R_100 | N Clarendon Avenue at Rockbridge Road Intersection Improvement | Rockbridge Road | $497,000 | |
| R_160 | Rays Road at Norman Road Intersection Improvement Study | Norman Road | $52,000 | |
| R_166 | North Druid Hills Road at Lavista Road Intersection Improvement | Lavista Road | $958,000 | |
| R_1408 | Rainbow Drive at Cocklebur Road Intersection Improvement | Cocklebur Road | $510,000 | |
| R_172 | River Road at Lincrest Road Intersection Improvement | Lincrest Road | $100,000 | |
| R_148 | S Deshon Road at Alford Road Intersection Improvement | Alford Road | $800,000 | |
| R_151 | S Deshon Road at Rogers Lake Road Intersection Improvement | Rogers Lake Road | $2,000,000 | |
| R_170 | S Stone Mountain Lithonia Road at Shadow Rock Drive Intersection Improvement | Shadow Rock Drive | $340,000 | |
| R_143 | Wellborn Road at Dekalb Medical Parkway Intersection Improvement | DeKalb Medical Parkway | $1,450,000 | |
| R_149 | Wellborn Road at Marbut Road Intersection Improvement | Marbut Road | $800,000 |
⬚ figure
The CTP considers projects as long-range as those that are planned to be implemented in the final 15 years of the plan. Projects in Tier 3 were included from the results of CTP analyses, DeKalb SPLOST Planning, Belvedere Master Active Living Plan, Kensington LCI TOD, Medline LCI, Metro South CID, North Druid Hills LCI, and DeKalb County 2014 Transportation Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public. A total of $366 million is assumed for DeKalb County's contribution toward implementation of these projects, with additional funds for new sidewalk and crossing investments ($75 million) and technology investments ($30 million). Since this tier is much larger than the previous two, it includes far more funding in most categories, specifically Large Scale Roadway Improvements and Multiuse Trails. The focus of investment in the last tier is on larger scale investments in operational improvements and alternative modes (whether through multimodal roadway projects or independent trail projects). Many of the vehicular-focused projects improve mobility east-to-west, particularly in the central and eastern parts of the County.
| Tier 3 Active Transportation | ||||
|---|---|---|---|---|
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
| Off-Road | ||||
| BP_1424 | Arabia Mountain-Stone Mountain Connector Trail 2 | Stonecrest City Limits | Stone Mountain Park | $4,643,000 |
| BP_1426 | Bouldercrest Court Connection to S River Trail | Bouldercrest Court | S River Trail | $60,000 |
| BP_1431 | Covington Trails, Phase 2 (South) | Memorial Drive | Covington Highway | $1,048,000 |
| BP_1430 | Covington Trails, Phase 2 (South) | Covington Highway | Holcombe Road | $1,004,000 |
| BP_1429 | Covington Trails, Phase 2 (South) | W Austin Road | Towers Way | $798,000 |
| BP_1432 | Covington Trails, Phase 2 (South) | Covington Highway | Redan Road | $328,000 |
| BP_1434 | Gresham Park Connection to S River Trail | South River Trail | Gresham Park | $288,000 |
| BP_1500 | I-285 Top End Trail | Hammond Drive | Northlake Mall | $38,000,000 |
| BP_1437 | Indian Creek MARTA Station Trails | Tie-in to Snapfinger Trail PATH | $443,000 | |
| BP_1436 | Indian Creek MARTA Station Trails | S Indian Creek Drive | Snapfinger Trail PATH | $331,000 |
| BP_1442 | James B Rivers Memorial Drive Trail | Stone Mountain City Limits | Silver Hill Road | $1,439,000 |
| BP_1443 | James R Hallford Stadium to Snapfinger PATH Trail Connection | James R Hallford Stadium Parking Lot | Snapfinger Trail PATH | $30,000 |
| BP_144 | McConnell Drive Three Parks Connector-Multiuse Trail | South of Intown Community School | Toco Hills Shopping Center | $4,229,000 |
| BP_136 | Memorial Drive Trail | Kensington Road | I-285 | $1,251,000 |
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
|---|---|---|---|---|
| BP_041 | Multiuse Trail from Monterey Drive to Shoal Creek I Parallel to Capastrana Place | Monterey Drive | Shoal Creek I | $79,000 |
| BP_1448 | Shoal Creek PATH Trail, Connection 1 | Elkhorn Drive | Shoal Creek PATH Trail | $66,000 |
| BP_1449 | Shoal Creek PATH Trail, Phase 2 Connection 2 | Thomas Road | Shoal Creek PATH Trail | $81,000 |
| BP_1454 | Shoal Creek PATH, Phase 2 Connection Trail | Shoal Creek PATH Trail | Glendale Court | $91,000 |
| BP_1451 | Shoal Creek Trail PATH, Phase 1 (Section 1) | S River Trail | S Columbia Drive/ Thomas Road | $8,873,000 |
| BP_1453 | Shoal Creek Trail PATH, Phase 2 | Candler Road | Flat Shoals Parkway | $4,064,000 |
| BP_1425 | Snapfinger Creek PATH Trail Connection | Red Cedar Trail | Snapfinger Creek Trail | $55,000 |
| BP_1455 | Snapfinger PATH Trail Connection 1 | Ramblewood Circle | Snapfinger Trail | $191,000 |
| BP_1456 | Snapfinger Trail PATH | Indian Creek Trail | Indian Creek MARTA | $357,000 |
| BP_010a | Snapfinger Trail PATH | Snapfinger Road | I-20 | $4,948,000 |
| BP_1457 | Snapfinger Trail PATH, Section 1 | S River Trail | Snapfinger Road | $4,133,000 |
| BP_1458 | Snapfinger Trail PATH, Section 2 | Stonecrest City Limits | Stoneview Park | $17,552,000 |
| BP_1459 | South Peachtree Creek Trail PATH, Phase 1 | Atlanta City Limits | Toco Hills Shopping Center | $1,739,000 |
| BP_1479 | South River Connector Trail | Panthersville Road | Smithfield Avenue | $6,052,000 |
| BP_1462 | South River Trail Extension | River Run Trail | South River Trail Extension | $91,000 |
| BP_1463 | South River Trail Extension, Connection 3 | Sage Place | South River Trail Extension | $53,000 |
| BP_1465 | South River Trail, Connection 2 | Waldrop Trail Cul-de-sac | South River Trail | $198,000 |
| BP_1460 | South River Trail, Connection 4 | English Valley Drive | South River Trail | $157,000 |
| BP_1461 | South River Trail, Connection 5 | River Edge Court | South River Trail | $35,000 |
| BP_1478 | Stone Mountain Creek Trail | Stone Mountain Park Lake | Yellow River at SE DeKalb County Line | $16,238,000 |
| BP_1466 | Stone Mountain Creek Trail Connection | Deer Trail Lane | Stone Mountain Creek Trail | $68,000 |
| BP_1467 | Stone Mountain Creek Trail Connection to Rockbridge Road | Stone Mountain Creek/ Yellow River | SE DeKalb County Line | $718,000 |
| BP_138 | Wellness Multiuse Path | Medlock Road | Church Street | $384,000 |
| BP_1468 | Zonolite Park Trail Extension | Zonolite Park | Dalon Road NE | $149,000 |
| B_211 | Sycamore Drive Resurfacing and Bike Lanes | Church Street | Grove Street | $206,000 |
⬚ figure
PROJECT TYPES
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
|---|---|---|---|---|
| Capacity-Widening | ||||
| R_401 | Covington Highway Capacity Improvement | Evans Mill Road | SR 124 (Turner Hill Road) | $12,168,000 |
| R_1080 | Old McDonough Road Capacity Improvement | Thurman Road | Lancaster Road | $1,754,000 |
| R_1077 | Old McDonough Road Capacity Improvement | Lancaster Road | Mason Dixon Road | $1,067,000 |
| Freight and Rail Crossing | ||||
| R_909 | Rockbridge Road SW at Stone Mountain Lithonia Road Rail Crossing Improvement | Stone Mountain Lithonia Road | $470,000 | |
| R_914 | Stone Mountain Lithonia Road at Redan Road Rail Crossing Improvement | Redan Road | $340,000 | |
| Interchange-New or Improvements | ||||
| R_710 | I-85 SB Ramp at Pleasantdale Road Interchange Improvement | Pleasantdale Road | $50,000,000 | |
| R_700 | Shallowford Road at I-85 Rail Interchange Improvement | I-85 | $2,216,000 | |
| Intelligent Transportation System (ITS) Improvements | ||||
| R_809 | Briarcliff Road ITS Improvement | Johnson Road | N Decatur Road | $44,000 |
| R_800 | Briarcliff Road ITS Improvement | Johnson Road | Sheridan Road | $77,000 |
| R_808 | Flat Shoals Parkway/Flakes Mill Road/ Snapfinger Road/Wesley Chapel Road ITS Improvement | Boring Road at Flat Shoals | Covington Highway at Wesley Chapel Road | $278,000 |
| R_814 | New DeKalb County Traffic Control Center | $2,053,000 | ||
| R_811 | Pleasantdale Road ITS Improvement | Best Friend Road | Pleasantdale Crossing | $370,000 |
| R_807 | Rock Chapel Road/Rockbridge Road ITS Improvement | S Rockbridge Road/ Pembleton Court | Union Grove Road | $215,000 |
| R_806 | Turner Hill Road/Mall Parkway ITS Improvement | Klondike Road | Rock Chapel Road/ Union Grove Road | $146,000 |
| Multimodal | ||||
| M_022a | Clairmont Road Multimodal Improvement | Lavista Road | N Decatur Road | $2,000,000 |
| M_028 | Covington Highway Multimodal Improvement | S Hairston Road | Klondike Road | $46,067,000 |
| M_2007 | Covington Trails and Kensington MARTA Station Road Diets, Phase 3 | Durham Park Road | Sagehill Drive | $920,000 |
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
|---|---|---|---|---|
| M_034 | Executive Park Ring Road New Alignment | Buford Highway | Briarcliff Road | $24,785,000 |
| M_042 | Gresham Road/Clifton Church Road Multimodal Improvement | Flat Shoals Road | Clifton Church Road | $10,538,000 |
| M_013 | Heritage Corridor Multimodal Improvement (Multiuse Path and Operational Improvements) | Stone Mountain | Lithonia | $25,400,000 |
| M_014 | Lavista Road Multimodal Improvement | N Druid Hills Road | Harobi Drive | $43,110,000 |
| M_025 | N Decatur Road Multimodal Improvement | Church Street | E Ponce De Leon Avenue | $21,295,000 |
| M_024 | N Decatur Road Multimodal Improvement | Clairmont Road | Church Street | $16,560,000 |
| M_023 | N Decatur Road Multimodal Improvement | Clifton Road | Clairmont Road | $14,849,000 |
| M_029 | N Druid Hills Road/I-85 Access Road Multimodal Improvement | I-85 Frontage Road underpass at Cliff Valley Way/ Executive Park S | Mount Mariah Road/ Briarwood Road | $10,777,000 |
| M_010 | Scott Boulevard Multimodal Improvement and Grade Separation | Eastland Drive | Hollywood Drive | $56,000,000 |
| M_035d | Valley Brook Road Multimodal Improvement | Lawrenceville Highway | Ponce De Leon Avenue | $15,310,000 |
| New Connection | ||||
| R_2005 | Clairmont Road Reliever Connection | I-85 Frontage Road | Briarcliff Road NE | $10,000,000 |
| R_621 | McConnell Drive Extension | Clairmont Road | North Jamestown Road | $6,159,000 |
| R_612 | New Street A | Camp Circle | New Road | $712,000 |
| R_613 | New Street B | Camp Way | Camp Circle | $521,000 |
| R_614 | New Street C | Camp Street | New Street A | $664,000 |
| R_615 | New Street D | New Street A | Kensington Road | $432,000 |
| R_616 | New Street E | Camp Circle | Kensington Road | $267,000 |
| R_617 | New Street F | New Street C | Kensington Road | $904,000 |
| R_619 | New Street H | Northern Avenue | Mountain Drive | $1,307,000 |
| R_620 | New Street I | Kensington Road | Durham Park Road | $1,109,000 |
| Operational-Corridor | ||||
| R_400b | Briarcliff Road Arterial Managed Lanes | Clifton Road | N Druid Hills Road | $40,500,000 |
| R_400a | Briarcliff Road Operational Improvement | Clifton Road | N Druid Hills Road | $29,040,000 |
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
|---|---|---|---|---|
| R_220 | Candler/Flat Shoals Road Operational Improvement | I-20 Ramps | I-285 Ramps | $8,000,000 |
| R_1079 | Continental Way Operational Improvement | Bouldercrest Road | International Park Drive | $3,100,000 |
| R_235 | County Jail Driveway Operational Improvement | Camp Road | Memorial Drive | $740,000 |
| R_223 | Ponce De Leon Avenue Operational Improvement | Brockett Road | Rays Road | $3,500,000 |
| R_219 | Rainbow Drive Operational Improvement | Candler Road | Wesley Chapel Road | $4,200,000 |
| R_405b | Redan Road Operational Improvement | S Hairston Road | Panola Road | $12,900,000 |
| R_423a | Redan Road Operational Improvement | Panola Road | S Deshon Road | $16,000,000 |
| R_422d | Rockbridge Road Operational Improvement | S Stone Mountain-Lithonia Road | Deshon Road | $27,200,000 |
| R_422a | Rockbridge Road Operational Improvement | Memorial Drive | Allgood Road | $12,000,000 |
| R_422b | Rockbridge Road Operational Improvement | Rowland Road | Orchard Drive | $17,600,000 |
| R_237 | Shallowford Road Operational Improvement | I-85 | Briarcliff Road | $6,400,000 |
| R_233 | Stephenson Road Operational Improvement | Rockbridge Road | SR 124 | $6,600,000 |
| Operational-Intersection | ||||
| R_119 | Briarcliff Road at Clifton Road Intersection Improvement | Clifton Road | $11,005,000 | |
| R_117 | Flat Shoals Road at Brannen Road Intersection Improvement | Brannen Road | $2,535,000 | |
| R_115 | Flat Shoals Road at Cook Road Intersection Improvement | Cook Road | $2,535,000 | |
| R_905 | Frazier Road at Wilson Road Rail Intersection Improvement | Wilson Road | $3,600,000 | |
| R_114 | Gresham Road at Cook Road Intersection Improvement | Cook Road | $2,535,000 | |
| R_146 | Lloyd Road at Flat Shoals Road Intersection Improvement | Flat Shoals Road | $2,350,000 | |
| R_111 | Memorial Drive at N Hairston Road Intersection Improvement | N Hairston Road | $452,000 | |
| R_1497 | Moreland Avenue/Moreland Industrial Boulevard Intersection Improvement | Moreland Industrial Boulevard | $3,176,000 |
| Tier 3 Roadway Continued | ||||
|---|---|---|---|---|
| Project ID | Project Name | Extent From | Extent To | 2022 Total Cost |
| R_158 | Scott Boulevard at Decatur Road Intersection Safety Evaluation | N Decatur Road | $6,500,000 | |
| R_1409 | South Hairston Drive at Statler Drive Intersection Improvement | Statler Drive | $281,000 | |
| R_134 | Turner Hill Road at Covington Highway Intersection Improvement | Covington Highway | $3,500,000 | |
| R_144 | Village Square Lane at Hambrick Road Intersection Improvement | Hambrick Road | $850,000 | |
| R_1065 | Westside Place-Constitution Road-International Park Drive Roundabout | Constitution Road | $3,694,000 |
COMPREHENSIVE TRANSPORTATION PLAN
⬚ figure
PAGE LEFT INTENTIONALLY BLANK
PRIORITY PROJECTS FOR DEKALB CITIES
The CTP team reviewed major projects located within DeKalb’s cities. Projects identified in this section were identified as priorities by one or more of DeKalb’s municipalities, either through conversations with city staff and elected officials or through previous transportation plans.
It is important to note that a number of projects are priorities for multiple cities and for unincorporated DeKalb County. Because of this, some projects in this section are included in multiple cities and/or are also included in the list of projects for unincorporated DeKalb.
⬚ figure
Projects in the City of Atlanta were included from the Atlanta Transportation Plan, Cycle Atlanta Phase 2.0 Study, ARC Regional Transportation Plan, DeKalb County 2014 Transportation Plan, and DeKalb SPLOST Planning. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| M_2011 | Multimodal | Arizona Avenue/Clifton Street Multimodal Improvements | N/A |
| M_2012 | Multimodal | Caroline Street/La France Street Multimodal Improvements | N/A |
| M_016 | Multimodal | DeKalb Avenue Multimodal Improvements and Protected Bike Lane | $15,000,000 |
| M_2015 | Multimodal | McLendon Avenue/Euclid Terrace Multimodal Improvements (Enhanced Shared Roadway) | N/A |
| BP_1507 | Off-Road | La France Street Bike and Pedestrian Improvements | $200,000 |
| M_2014 | On-Road | Euclid Avenue Uphill Bike Lanes-Downhill Shared Lane Markings | N/A |
| B_204 | On-Road | Hosea L Williams Drive Bicycle Lanes | $746,000 |
| B_200 | On-Road | Oakdale Road Bicycle Lanes | $4,311,000 |
| B_205 | On-Road | Oakview Drive Bicycle Lanes | $42,000 |
| B_206 | On-Road | Whitefoord Avenue Bicycle Lanes | $2,129,000 |
| R_923 | Operational-Corridor | Euclid Avenue Safe Street and Little 5 Points Streetscape | $3,000,000 |
| Tier 2 | |||
| M_2009 | Multimodal | McLendon Avenue Multimodal Improvements | N/A |
| M_2010 | Multimodal | Moreland Avenue Streetscape Improvements | N/A |
| Tier 3 | |||
| R_705 | Interchange New or Improvements | I-20 East at US 23 (Moreland Avenue) Interchange Improvement | $9,084,000 |
| R_819 | ITS Improvements | Areawide Signal Upgrades on Briarcliff Road/ Clairmont Road/Church Street | $6,859,000 |
| R_809 | ITS Improvements | Briarcliff Road ITS Improvement | $44,000 |
| R_805 | ITS Improvements | Maynard Terrace ITS Improvement | $63,000 |
| R_816 | ITS Improvements | N Druid Hills Road ITS Improvement | $102,000 |
| R_804 | ITS Improvements | Panola Road/Redan Road ITS Improvement | $39,000 |
| R_817 | ITS Improvements | Ponce De Leon Avenue ITS Improvement | $2,026,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| M_021 | Multimodal | Clifton Road/Haygood Road Multimodal Improvement | $6,843,000 |
| M_001 | Multimodal | Howard Circle/DeKalb Place Multimodal Improvement | $69,000 |
| BP_1447 | Multimodal | Lullwater Road NE Multimodal Improvement | $1,000,000 |
| M_044 | Multimodal | Moreland Avenue Multimodal Improvement | $10,730,000 |
| M_003 | Multimodal | New Peachtree Road Multimodal Improvement | $6,179,000 |
| M_2013 | Multimodal | Rogers Street/College Avenue Multimodal Improvements | N/A |
| BP_019 | Off-Road | 2nd Avenue Trail | $5,317,000 |
| BP_079 | Off-Road | Briarcliff Road NE Multiuse Path | $4,815,000 |
| BP_099 | Off-Road | Flat Shoals Road Multiuse Path | $2,079,000 |
| BP_118 | Off-Road | Glenwood Avenue SE Multiuse Path | $3,075,000 |
| BP_066 | Off-Road | Glenwood Road Multiuse Path | $9,987,000 |
| BP_083 | Off-Road | Memorial Drive Multiuse Path | $4,242,000 |
| BP_082 | Off-Road | Memorial Drive SE Multiuse Path | $6,817,000 |
| BP_117 | Off-Road | S Howard Street SE Multiuse Path | $1,702,000 |
| BP_116 | Off-Road | S Howard Street SE Neighborhood Greenway | $288,000 |
| BP_1473 | Off-Road | South Fork Peachtree Trail Connection to Emory University | $299,000 |
| BP_1482 | Off-Road | South Peachtree Creek Trail-PATH, Phase 2 (Section 2) | $379,000 |
| BP_1508 | Off-Road | Stone Mountain Trail-Ponce Spur and Bicycle/Pedestrian Bridge | N/A |
| B_202 | On-Road | Ponce De Leon Avenue Bicycle Lanes | $1,301,000 |
| B_208 | On-Road | S Candler Street Bicycle Lanes | $2,738,000 |
| R_202 | Operational-Corridor | Boldercrest Road Operational Improvements | $3,490,000 |
| R_207 | Operational-Corridor | SR 154 (Memorial Drive) Operational Improvements | $2,772,000 |
| R_208 | Operational-Corridor | SR 260 (Glenwood Avenue) at US 23 (Moreland Avenue) Operational Improvements | $3,582,000 |
| R_120 | Operational-Intersection | Clifton Road at Houston Mill Road Intersection Improvement | $1,416,000 |
| R_127 | Operational-Intersection | DeKalb County Signal Upgrades | $9,366,000 |
| R_118 | Operational-Intersection | Moreland Avenue at North Avenue Intersection Improvement | $2,000 |
| R_173 | Operational-Intersection | S Howard Street at Memorial Drive Intersection Improvement | $30,000 |
| R_302 | Operational-Realignment | Realign Skyhaven Road with Moreland Avenue | $3,291,000 |
⬚ figure
| ◯ | Freight and Rail Crossing |
| ◯ | Interchange - New or Improvements |
| ◯ | Capacity - Widening |
| ◯ | ITS Improvements |
| ◯ | Multimodal |
| ◯ | New Connection |
| ◯ | On-Road/Off-Road Trail Projects |
| ◯ | Operational - Corridor |
| ◯ | Operational - Intersection |
Projects in the City of Avondale Estates were included from the Avondale Estates Downtown Master Plan, ARC Regional Transportation Plan, and DeKalb County 2014 Transportation Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| R_108 | Operational-Intersection | Intersection Improvement at Laredo Drive and N Clarendon Avenue | $1,396,000 |
| R_600 | New Connection | Downtown Avondale Street Grid | $5,165,000 |
| R_214 | Operational-Corridor | US 278 Improvements | $5,949,000 |
| BP_1106 | On-Road | Laredo Drive Bicycle Lanes | $971,000 |
| M_017 | Multimodal | W College Avenue/E College Avenue/ N Avondale Road/Covington Road Multimodal Improvement | $35,474,000 |
| Tier 2 | |||
| BP_001 | Off-Road | N Clarendon Avenue Trail | $83,000 |
| R_211 | Operational-Corridor | Kensington MARTA Station Trail and Road Diets, Phase 1 | $5,949,000 |
| BP_1105 | On-Road | N Clarendon Avenue Bicycle Lanes | $878,000 |
| BP_086 | Off-Road | Clarendon Avenue Multiuse Path | $604,000 |
| Tier 3 | |||
| R_915 | Freight and Rail Crossing | Avondale Plaza at Clarendon Avenue Rail Crossing Improvement | $150,000 |
⬚ figure
Projects in the City of Brookhaven were included from the Brookhaven 2020 CTP Update, Chamblee Mobility Multimodal Transportation Plan, Dunwoody CTP Update, North Druid Hills LCI, One Chamblee Comprehensive Plan Update, ARC Regional Transportation Plan, DeKalb County 2014 Transportation Plan, and DeKalb Greenways Plan. The project team also created projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| M_027 | Multimodal | Dresden Drive Multimodal Improvement | $8,308,000 |
| BP_033 | Off-Road | Peachtree Creek Greenway Trail, Phase II | $7,864,000 |
| BP_035 | Off-Road | Peachtree Creek Greenway Trail, Phase III | $26,760,000 |
| BP_014 | Off-Road | Perimeter Trail | $1,346,000 |
| R_1004 | Operational-Corridor | Johnson Ferry Road Corridor Study | $163,000 |
| R_213 | Operational-Intersection | Ashford Dunwoody Road at Windsor Parkway Intersection Improvement | $2,488,000 |
| Tier 2 | |||
| R_712 | Interchange-New or Improvements | I-85 Interchange Improvement | $9,580,000 |
| P_1006 | Off-Road | Pedestrian Flyover Bridge Over I-85 into Executive Park | N/A |
| P_1007 | Off-Road | Pedestrian Flyover Bridge Over N Druid Hills Road | N/A |
| BP_124 | Off-Road | Perimeter Trail | $17,479,000 |
| B_201 | On-Road | Peachtree Road/North Peachtree Road Bicycle Lanes | $13,371,000 |
| Tier 3 | |||
| R_411 | Capacity-Widening | North Druid Hills Road Widening | $16,224,000 |
| R_711 | Interchange-New or Improvements | Executive Park Interchange Access | $1,506,000 |
| M_051 | Multimodal | Briarcliff Bicycle Lanes and Sidewalks | $8,622,000 |
| M_009 | Multimodal | Buford Highway Multimodal Improvement | $29,206,000 |
| M_026 | Multimodal | E Roxboro Road Multimodal Improvement | $5,666,000 |
| M_034 | Multimodal | Executive Park Ring Road New Alignment | $24,785,000 |
| M_035a | Multimodal | N Druid Hills Road from Buford Highway to Briarcliff Road Multimodal Improvement | $19,461,000 |
| M_035b | Multimodal | N Druid Hills Road from Briarcliff Road to Clairmont Road Multimodal Improvement | $2,290,000 |
| M_035bc_PE | Multimodal | N Druid Hills Road from Briarcliff Road to Lawrenceville Highway Multimodal Improvement (Design Only) | $8,997,000 |
| M_002 | Multimodal | N Druid Hills Road from Peachtree Road to Colonial Drive Multimodal Improvement | $3,597,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| M_029 | Multimodal | N Druid Hills Road/I-85 Access Road Multimodal Improvement | $10,777,000 |
| R_1309 | New Connection | Buford Highway to Clairmont Road Connector | $788,000 |
| BP_032 | Off-Road | Clairmont Road Trail | $4,773,000 |
| BP_1306 | Off-Road | Dresden Drive Multiuse Trail | $5,962,000 |
| BP_009 | Off-Road | Perimeter Trail | $12,167,000 |
| BP_126 | Off-Road | Skyland Trail | $4,968,000 |
| BP_1104 | On-Road | Ashford Dunwoody Road Path | $16,805,000 |
| R_400b | Operational-Corridor | Briarcliff Road Arterial Managed Lanes | $40,500,000 |
| R_400b_PE | Operational-Corridor | Briarcliff Road Arterial Managed Lanes (Design Only) | $4,500,000 |
| R_400a | Operational-Corridor | Briarcliff Road Operational Improvement | $29,040,000 |
| R_216 | Operational-Corridor | Clairmont Road South Corridor Enhancements | $2,813,000 |
09 – PRIORITY PROJECTS FOR DEKALB CITIES
⬚ figure
| PROJECT TYPES | |
|---|---|
| ◯ | Freight and Rail Crossing |
| ◯ | Interchange - New or Improvements |
| ◯ | Capacity - Widening |
| ◯ | ITS Improvements |
| ◯ | Multimodal |
| ◯ | New Connection |
| ◯ | On-Road/Off-Road Trail Projects |
| ◯ | Operational - Corridor |
| ◯ | Operational - Intersection |
(blank page)
Projects in the City of Chamblee were included from the One Chamblee Comprehensive Plan Update, Chamblee Mobility Multimodal Transportation Plan, North Fork Peachtree Creek Greenway Comprehensive Study, ARC Regional Transportation Plan, and DeKalb County 2014 Transportation Plan. The project team also created projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| R_2003 | New Connection | Parsons Drive/Deacon Lane New Connection | N/A |
| BP_003 | Off-Road | Chamblee Rail Trail Multiuse Greenway Phase 3 | $4,554,000 |
| BP_048 | Off-Road | Chamblee Tucker Multiuse Path | $3,915,000 |
| BP_044 | Off-Road | Huntley Hills Park Trail Connector | $2,700,000 |
| BP_042 | Off-Road | Nancy Creek Trail | $799,000 |
| BP_047 | Off-Road | Savoy Park Trail | $642,000 |
| R_215 | Operational-Corridor | Johnson Road realignment | $8,977,000 |
| R_231 | Operational-Corridor | Peachtree Boulevard Operational Improvements | $7,600,000 |
| R_132 | Operational-Intersection | Buford/Dresden/Plaster Intersection Improvements | $1,800,000 |
| R_128 | Operational-Intersection | Sexton Woods-Malone Drive Intersection Alignment | $2,790,000 |
| R_129 | Operational-Intersection | Shallowford Operations at I-85 Interchange | $8,977,000 |
| R_2002 | Operational-Realignment | Chamblee International Logistics Center Catalina Drive Realignment | N/A |
| R_1310 | Operational-Realignment | Dresden Drive/Buford Highway/Plaster Road Safety and Operational Improvement | $1,125,000 |
| Tier 2 | |||
| R_1309 | New Connection | Buford Highway to Clairmont Road Connector | $788,000 |
| R_1319 | New Connection | Clyde Drive Extension | $394,000 |
| R_1318 | New Connection | Green Industrial Way to Clyde Drive Connection | $822,000 |
| R_1320 | New Connection | John Glenn Drive Extension | $3,120,000 |
| R_1311 | New Connection | Johnson Circle-Deacon Lane/ Parsons Drive Connector | $1,688,000 |
| R_610 | New Connection | Johnson Road South Extension | N/A |
| R_1312 | New Connection | Shallowford Road at I-85 New Street, Connection 1 | $1,463,000 |
| R_1313 | New Connection | Shallowford Road at I-85 New Street, Connection 2 | $2,025,000 |
| BP_1317 | Off-Road | Broad Street Extension and Bicycle Facility | $563,000 |
| BP_1305 | Off-Road | BRT Station Connector Trail | $4,000,000 |
| BP_1302 | Off-Road | Buford Highway Multiuse Trail | $5,737,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| BP_1301 | Off-Road | Carroll Circle Multiuse Trail | $563,000 |
| BP_1300 | Off-Road | Chamblee Dunwoody Road Multiuse Trail | $2,925,000 |
| BP_1304 | Off-Road | Chamblee Plaza Redevelopment Multiuse Trail South | $1,125,000 |
| B_209 | Off-Road | Chamblee Dunwoody Road Protected Facility | N/A |
| BP_1306 | Off-Road | Dresden Drive Multiuse Trail | $5,962,000 |
| BP_049 | Off-Road | Dresden East Utility Corridor Trail and Beverly Hills-Dresden East Connector | $1,452,000 |
| BP_050 | Off-Road | Keswick Park Trails | N/A |
| X_1308 | Off-Road | Peachtree Creek Greenway Connector Bridge South | N/A |
| BP_043 | Off-Road | Peachtree Creek Greenway Dresden East Connector | $4,500,000 |
| BP_1315 | Off-Road | Pedestrian Rail Crossing-West Chamblee | $383,000 |
| R_218 | Operational-Corridor | Johnson Ferry Road Median | N/A |
| R_217 | Operational-Corridor | Keswick Drive Improvements | $68,000 |
| R_1326 | Operational-Intersection | Chamblee Dunwoody Road/ Carroll Circle Roundabout | N/A |
| R_1325 | Operational-Intersection | Chamblee Tucker Road/Carroll Circle Roundabout | N/A |
| R_1324 | Operational-Intersection | Chamblee Tucker Road/Shallowford Road Roundabout | N/A |
| R_1327 | Operational-Intersection | Johnson Circle Roundabout | N/A |
| R_131 | Operational-Intersection | N Shallowford Road/E Johnson Circle Roundabout | N/A |
| R_2004 | Operational-Intersection | Peachtree Road/Peachtree Boulevard Intersection Realignment | $3,744,000 |
| R_1322 | Operational-Intersection | Plaster Road/Woodacres Road/ Dresden Roundabout | N/A |
| R_1323 | Operational-Intersection | Shallowford Road/Dresden Drive Roundabout | N/A |
| Tier 3 | |||
| M_009 | Multimodal | Buford Highway Multimodal Improvement | $29,206,000 |
| M_015 | Multimodal | Chamblee Dunwoody Road from Harts Mill Road to Cumberland Drive Multimodal Improvement | $3,373,000 |
| M_018 | Multimodal | Chamblee Tucker Road from Peachtree Boulevard to New Peachtree Road Multimodal Improvement | $3,189,000 |
| M_1039 | Multimodal | New Peachtree-Shallowford Road Complete Street, Phase 2 | $3,959,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| M_019 | Multimodal | Peachtree Road Multimodal Improvement | $5,063,000 |
| R_603 | New Connection | New Connection from Peachtree Boulevard to Buford Highway | $74,664,000 |
| R_1042 | New Connection | Park Avenue Extension and Covered Street | $13,183,000 |
| BP_002 | Off-Road | Chamblee Rail Trail Multiuse Greenway, Phase 2 | $1,756,000 |
| BP_032 | Off-Road | Clairmont Road Trail | $4,773,000 |
| BP_1506 | Off-Road | North Fork Peachtree Creek Trail Clairmont Road to Fisher Trail Park, Segment 1 | $5,917,000 |
| BP_014 | Off-Road | Perimeter Trail | $1,346,000 |
| BP_124 | Off-Road | Perimeter Trail | $17,479,000 |
| BP_126 | Off-Road | Skyland Trail | $4,968,000 |
| B_201 | On-Road | Peachtree Road/North Peachtree Road Bicycle Lanes | $13,371,000 |
| R_1004 | Operational-Corridor | Johnson Ferry Road Corridor Study | $163,000 |
| R_200 | Operational-Corridor | Malone Drive Operational Improvements | $1,041,000 |
| R_1057 | Operational-Intersection | Chamblee Tucker Road/Shallowford Road NE Intersection Realignment | $2,828,000 |
⬚ figure
Projects in the City of Clarkston were included from the Tucker-Northlake LCI Study, Clarkston City Plan, and DeKalb County 2014 Transportation Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| M_1486 | Multimodal | North Indian Creek/Montreal Road Diet | $9,200,000 |
| BP_1485 | Off-Road | Clarkston Greenway | $9,100,000 |
| R_1488 | Operational-Intersection | Glendale at Church Street Operational Improvements | $5,000,000 |
| R_1487 | Operational-Intersection | Mell Avenue Multi-Leg Crossing Intersection Safety and Operational Improvements | $2,200,000 |
| Tier 2 | |||
| M_1063 | Multimodal | Jolly Avenue Multimodal Improvement | $1,700,000 |
| Tier 3 | |||
| M_1497 | Multimodal | Brockett Road Complete Streets | $1,414,000 |
| BP_060 | Off-Road | N Indian Creek Drive Multiuse Path | $3,941,000 |
| BP_010b | Off-Road | Snapfinger Trail-PATH | $1,979,000 |
| R_109 | Operational-Intersection | Church Street/Ponce de Leon at N Indian Creek Road Underpass Intersection Improvement | $1,765,000 |
⬚ figure
Projects in the City of Decatur were included from the City of Decatur Community Transportation Plan Update, Medline LCI, Belvedere Master Active Living Plan, ARC Regional Transportation Plan, and DeKalb County 2014 Transportation Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| R_820 | ITS Improvements | Signal Upgrades in/around Downtown Decatur | $9,228,000 |
| M_047 | Multimodal | Clairemont Avenue, Commerce Drive, and Church Street Bicycle/ Pedestrian Improvements | $6,338,000 |
| M_024 | Multimodal | N Decatur Road from Clairmont Road to Church Street Multimodal Improvement | $16,902,000 |
| M_2008 | Multimodal | Sams Crossing Bridge Multimodal Improvements | $3,034,000 |
| M_017 | Multimodal | W College Avenue/E College Avenue/ N Avondale Road/Covington Road Multimodal Improvement | $35,474,000 |
| BP_005 | Off-Road | S Columbia Drive Trail | $2,738,000 |
| R_1018 | Operational-Intersection | E College Avenue at Sams Crossing Intersection Improvement | $1,404,000 |
| R_922 | Operational-Intersection | E Lake Road NE at Parkwood Road Operational Improvements | $385,000 |
| R_1022 | Operational-Intersection | E Ponce de Leon Avenue at N Acadia Avenue Intersection Improvements | $1,638,000 |
| R_169 | Operational-Intersection | N Decatur Road at Superior Avenue | $1,638,000 |
| R_920 | Operational-Intersection | Scott Boulevard at Clairmont Avenue Operational Improvements | $1,693,000 |
| R_921 | Operational-Intersection | Winn Way at N Arcadia Avenue Signal and Operational Improvements | N/A |
| Tier 2 | |||
| R_1020 | Operational-Intersection | East Lake Drive at 2nd Avenue Intersection Improvements | $1,287,000 |
| R_1021 | Operational-Intersection | Huron Street at Champlain Street Intersection Improvements | $468,000 |
| R_1019 | Operational-Intersection | W Ponce de Leon Avenue at Northern Avenue Intersection Improvements | $1,989,000 |
| Tier 3 | |||
| M_045 | Multimodal | Church Street Multimodal Improvement | $3,692,000 |
| M_045_PE | Multimodal | Church Street Multimodal Improvement (Design Only) | $552,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| BP_019 | Off-Road | 2nd Avenue Trail | $5,317,000 |
| BP_021 | Off-Road | Coventry Road Trail | $3,155,000 |
| BP_039 | Off-Road | Multiuse Trail North of Memorial Drive to Dearborn Park | $35,000 |
| B_208 | On-Road | S Candler Street Bicycle Lanes | $2,738,000 |
| B_211 | On-Road | Sycamore Drive Resurfacing and Bike Lanes | $206,000 |
| B_212 | On-Road | Winn Way Resurfacing and Bike Lanes | $411,000 |
| R_206 | Operational-Corridor | Commerce Drive (East) Operational Improvements | $5,475,000 |
| R_214 | Operational-Corridor | US 278 Improvements | $5,949,000 |
⬚ figure
| PROJECT TYPES | |
|---|---|
| ◯ | Freight and Rail Crossing |
| ◯ | Interchange - New or Improvements |
| ◯ | Capacity - Widening |
| ◯ | ITS Improvements |
| ◯ | Multimodal |
| ◯ | New Connection |
| ◯ | On-Road/Off-Road Trail Projects |
| ◯ | Operational - Corridor |
| ◯ | Operational - Intersection |
(blank page)
Projects in the City of Doraville were included from the Doraville Mobility Plan, Doraville Peachtree Creek Greenway Study, Buford Highway Master Plan, One Chamblee Comprehensive Plan Update, Chamblee Doraville CID, and DeKalb County 2014 Transportation Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| M_009 | Multimodal | Buford Highway Multimodal Improvement | $29,206,000 |
| M_1039 | Multimodal | New Peachtree-Shallowford Road Complete Street, Phase 2 | $3,959,000 |
| R_605 | New Connection | Assembly Redevelopment Street Grid | N/A |
| R_603 | New Connection | New Connection from Peachtree Boulevard to Buford Highway | $74,664,000 |
| R_1042 | New Connection | Park Avenue Extension and Covered Street | $13,183,000 |
| BP_1035 | Off-Road | City Center Connector Trail | $1,371,000 |
| BP_1032 | Off-Road | Flowers Road Multiuse Path | $1,745,000 |
| BP_146 | Off-Road | Longmire Way Bike-Pedestrian Project | $1,947,000 |
| BP_1037 | Off-Road | New Peachtree Road Multiuse Path | $1,600,000 |
| BP_1038 | Off-Road | Peachtree Creek Greenway Connector, South Spur | $695,000 |
| BP_1503 | Off-Road | Peachtree Creek Greenway, Segment 1 | $3,762,000 |
| BP_1031 | Off-Road | Peachtree Creek Greenway, Segment 2, Western Loop | $3,681,000 |
| BP_1504 | Off-Road | Peachtree Creek Greenway, Segment 3, Eastern Loop | $8,113,000 |
| BP_1505 | Off-Road | Peachtree Creek Greenway, Segment 4 | $2,716,000 |
| R_1058 | Operational-Intersection | Longmire/New Peachtree Intersection Improvements | $252,000 |
| R_2004 | Operational-Intersection | Peachtree Road/Peachtree Boulevard Intersection Realignment | $3,744,000 |
| R_1056 | Operational-Intersection | Realignment of Chestnut at Buford Highway | $2,900,000 |
| Tier 2 | |||
| M_1040 | Multimodal | Chestnut Drive Complete Street and Traffic Calming | $1,348,000 |
| R_1041 | New Connection | New Street-McClave to Shallowford | $4,515,000 |
| R_1044 | New Connection | New Street-Pleasant Valley Extension | $2,266,000 |
| BP_1034 | Off-Road | Bicycle-Pedestrian Railroad Bridge | $3,726,000 |
| B_201 | On-Road | Peachtree Road/North Peachtree Road Bicycle Lanes | $13,371,000 |
| R_1059 | Operational-Intersection | Longmire/Flowers Intersection Improvements | $864,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 3 | |||
| R_703 | Interchange-New or Improvements | Peachtree Industrial Boulevard at I-285 Interchange Improvement | $4,517,000 |
| R_811 | ITS Improvements | Pleasantdale Road ITS Improvement | $370,000 |
| R_601 | New Connection | Flowers Road New Connection | $16,040,000 |
| R_1320 | New Connection | John Glenn Drive Extension | $3,120,000 |
| R_1043 | New Connection | New Street-Longmire to Ashlyn Pointe Connection | $1,729,000 |
| R_604 | New Connection | Oakmont Avenue Extension | $5,012,000 |
| R_602 | New Connection | Shallowford Road New Connection | $36,332,000 |
| BP_1500 | Off-Road | I-285 Top End Trail | $38,000,000 |
| B_300 | On-Road | Dunwoody Area Trailway | $2,000,000 |
| R_1324 | Operational-Intersection | Chamblee Tucker Road/Shallowford Road Roundabout | N/A |
| R_1057 | Operational-Intersection | Chamblee Tucker Road/Shallowford Road NE Intersection Realignment | $2,828,000 |
| R_300 | Operational-Realignment | Pinetree Plaza Realignment | $6,400,000 |
⬚ figure
PAGE INTENTIONALLY LEFT BLANK
Projects in the City of Dunwoody were included from the Dunwoody CTP Update and DeKalb County 2014 Transportation Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| R_1100 | Capacity-Widening | Hammond Drive Corridor Study | $34,644,000 |
| M_030 | Multimodal | Mount Vernon Road from Ashford Dunwoody Road to Mount Vernon Place Multimodal Improvement | $18,473,000 |
| B_301 | Off-Road | Georgia State University Multiuse Greenway | N/A |
| BP_1104 | On-Road | Ashford Dunwoody Road Path | $16,805,000 |
| B_300 | On-Road | Dunwoody Area Trailway | $2,000,000 |
| Tier 2 | |||
| R_701 | Interchange New or Improvements | I-285 North at Ashford Dunwoody Road Interchange Improvement | $43,105,000 |
| M_007 | Multimodal | Chamblee Dunwoody Road from Roberts Drive to Ashford Center Parkway Multimodal Improvement | $22,582,000 |
| R_1101 | New Connection | Westside Connector | $27,311,000 |
| BP_1305 | Off-Road | BRT Station Connector Trail | $4,000,000 |
| BP_1500 | Off-Road | I-285 Top End Trail | $38,000,000 |
| BP_1103 | On-Road | Cotillion Multimodal Improvements | $1,623,000 |
| R_103 | Operational-Intersection | Mount Vernon Road at Chamblee Dunwoody Road Intersection Improvement | $3,696,000 |
| Tier 3 | |||
| M_031 | Multimodal | Mount Vernon Road from Mount Vernon Place to Dunwoody Club Drive Multimodal Improvement | $11,085,000 |
| BP_124 | Off-Road | Perimeter Trail | $17,479,000 |
| B_201 | On-Road | Peachtree Road/North Peachtree Road Bicycle Lanes | $13,371,000 |
| R_106 | Operational-Intersection | Mount Vernon Road at Ashford Dunwoody Road Intersection Improvement | $1,416,000 |
⬚ figure
Projects in the City of Lithonia were included from the DeKalb County 2014 Transportation. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| R_401 | Capacity-Widening | Covington Highway Capacity Improvement | $12,168,000 |
| R_916 | Freight and Rail Crossing | Main Street at Max Cleland Boulevard Rail Crossing Improvement | $50,000 |
| M_032 | Multimodal | Stone Mountain Street Multimodal Improvement | $1,212,000 |
| BP_023 | Off-Road | Loop A Trail | $1,095,000 |
| BP_025 | Off-Road | Loop B Trail | $2,050,000 |
| BP_024 | Off-Road | Loop C Trail | $685,000 |
COMPREHENSIVE TRANSPORTATION PLAN
⬚ figure
A projects list was not identified for the City of Pine Lake since nearby projects do not traverse into the City. The operational-corridor projects (R_422a and R_422b) are proposed along Rockbridge Road.
Projects in the City of Stone Mountain were included from the Stone Mountain Village Forward Master Plan and DeKalb Greenways Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| BP_1001 | Off-Road | 2nd Street Side Path | $1,082,000 |
| BP_130 | Off-Road | James B Rivers Memorial Drive Multiuse Path | $1,823,000 |
| R_1002 | Operational-Intersection | Mimosa Drive at Poole Street Intersection Improvements | $541,000 |
| Tier 2 | |||
| R_139 | Operational-Intersection | E Mountain Road at 4th Street Intersection Improvement | $20,000 |
| R_156 | Operational-Intersection | Ponce De Leon/Main Street at James B Rivers Memorial Drive | $1,082,000 |
| Tier 3 | |||
| M_013 | Multimodal | Heritage Corridor Multimodal Improvement | $25,400,000 |
| M_013_PE | Multimodal | Heritage Corridor Study (Design Only) | $300,000 |
| BP_127 | Off-Road | Smoke Rise Trail | $14,131,000 |
| R_1003 | Operational-Corridor | Reestablish Mackin Street between S Main Street and 2nd Street | $541,000 |
⬚ figure
Projects in the City of Stonecrest were included from the Stonecrest Transportation Master Plan, ARC Regional Transportation Plan, DeKalb County 2014 Transportation Plan, and DeKalb Greenways Plan. The project team also identified projects through conversations with stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| R_402 | Capacity-Widening | Panola Road Widening | $22,835,000 |
| R_413 | Capacity-Widening | Thompson Mill Road Widening | $30,285,000 |
| R_1120 | New Connection | East Glen Road Upgrade and Extension | $3,570,000 |
| R_607 | New Connection | Hayden Quarry Road/Sigman Road Extension | $15,346,000 |
| BP_113 | Off-Road | Browns Mill Road Multiuse Path | $6,623,000 |
| BP_1130 | Off-Road | Farrington Parkway Path | $2,974,000 |
| BP_1129 | Off-Road | Joels Lake Path | $3,435,000 |
| BP_1155 | Off-Road | Joels Lake Path, Segment 2 | $2,196,000 |
| BP_108 | Off-Road | Panola Road Multiuse Path | $2,791,000 |
| BP_1128 | Off-Road | Pole Bridge Creek Path | $4,438,000 |
| BP_114 | Off-Road | Salem Road Multiuse Path | $5,068,000 |
| BP_1125 | On-Road | Brisbane Way/Fannin Drive Neighborhood Greenway | $941,000 |
| BP_1123 | On-Road | Ottawa Trail Neighborhood Greenway | $678,000 |
| BP_1126 | On-Road | Sheffield Woods Neighborhood Greenway | $1,728,000 |
| BP_1124 | On-Road | Woodrow Road Neighborhood Greenway | $1,295,000 |
| R_204 | Operational-Corridor | Covington Road at Lithonia Industrial Boulevard (LIB) Operational Improvements | $797,000 |
| R_1122 | Operational-Corridor | LIB Operational Improvements, Segment 1 | $8,653,000 |
| R_1121 | Operational-Corridor | LIB Operational Improvements, Segment 2 | $16,224,000 |
| R_1141 | Operational-Intersection | Evans Mill Road at Browns Mill Road Intersection Improvement | $1,190,000 |
| R_1137 | Operational-Intersection | Evans Mill Road at Covington Highway | $3,786,000 |
| R_1139 | Operational-Intersection | Klondike Road at Mall Parkway | $2,813,000 |
| R_1135 | Operational-Intersection | Klondike Road at SR 212-Browns Mill Road | $2,813,000 |
| R_1140 | Operational-Intersection | Mall Parkway at Evans Mill Road | $2,813,000 |
| R_1138 | Operational-Intersection | Mall Parkway at Tuner Hill Road | $4,327,000 |
| R_1143 | Operational-Intersection | Miller Road at Thompson Mill Road | $2,596,000 |
| R_1142 | Operational-Intersection | Panola Road at Browns Mill Road | $5,949,000 |
| R_1144 | Operational-Intersection | Panola Road at Covington Highway | $4,435,000 |
| R_1145 | Operational-Intersection | Salem Road at Evans Mill Road | $1,839,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 2/3 | |||
| R_401 | Capacity-Widening | Covington Highway Capacity Improvement | $12,168,000 |
| R_412 | Capacity-Widening | Evans Mill Road Widening | $69,223,000 |
| R_409 | Capacity-Widening | Panola Road from Browns Mill Road to Thompson Mill Road Capacity Improvement, Phase II | $26,522,000 |
| R_404 | Capacity-Widening | Panola Road from Thompson Mill Road to Fairington Road Capacity Improvement | $22,971,000 |
| R_420 | Capacity-Widening | Rock Springs Road Widening | $46,509,000 |
| R_414 | Capacity-Widening | Salem Road Widening | $30,285,000 |
| R_430 | Capacity-Widening | Snapfinger Road (SR 155) Capacity Improvement | $20,900,000 |
| R_406 | Capacity-Widening | Turner Hill Road Widening | $18,011,000 |
| R_910 | Freight and Rail Crossing | Deshon Road at Holt Road Rail Crossing Improvement | $470,000 |
| R_1149 | Interchange-New or Improvements | New I-20 East Express Lanes Access Point at Fairington Road | $16,765,000 |
| R_1148 | Interchange-New or Improvements | New I-20 East Express Lanes Access Point at Stonecrest Mall | $10,816,000 |
| R_1147 | Interchange-New or Improvements | Panola Road, Segment 3 Operations Improvements | $73,008,000 |
| R_803 | ITS Improvements | Panola Road/Fairington Road ITS Improvement | $44,000 |
| R_807 | ITS Improvements | Rock Chapel Road/Rockbridge Road ITS Improvement | $215,000 |
| R_806 | ITS Improvements | Turner Hill Road/Mall Parkway ITS Improvement | $146,000 |
| M_028 | Multimodal | Covington Highway from Hairston Road to Klondike Road Multimodal Improvement | $46,067,000 |
| M_038 | Multimodal | Panola Road Multimodal Improvement | $28,894,000 |
| R_203 | New Connection | LIB Extension, Phase IV | $6,843,000 |
| BP_1132 | Off-Road | Arabia Mountain High School/Murphey Candler Elementary School Safe Routes to School (SRTS) | $805,000 |
| BP_1133 | Off-Road | Arabia Mountain High School/ Murphey Candler Elementary SRTS | $855,000 |
| BP_028 | Off-Road | Arabia Mountain Trail | $9,060,000 |
| BP_029 | Off-Road | Arabia Mountain Trail | $3,651,000 |
| BP_119 | Off-Road | Arabia Mountain Trail | $11,258,000 |
| BP_1153 | Off-Road | Miller Grove High School Path | $3,627,000 |
| BP_1156 | Off-Road | Miller Grove Path, Phases 2 and 3 | $1,262,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| BP_073 | Off-Road | Phillips Road Multiuse Path | $5,258,000 |
| BP_010a | Off-Road | Snapfinger Trail-PATH | $4,948,000 |
| BP_1131 | On-Road | Bouie Theme Neighborhood Greenway | $818,000 |
| BP_1152 | On-Road | Chupp Road Path, Segments 1 and 2 | $2,288,000 |
| BP_1154 | On-Road | Fairington Parkway Path | $489,000 |
| BP_1151 | On-Road | Hillandale Drive Path-Segments 1, 2, and 3 | $6,085,000 |
| BP_1150 | On-Road | LIB Path, Segments 1, 2 and 3 | $6,286,000 |
| R_2001 | Operational-Corridor | SR 12/US 278 Operational Improvement | $5,328,000 |
| R_122 | Operational-Intersection | Covington Highway at Hillvale Road/ Wellington Circle Intersection Improvement | $2,172,000 |
| R_107 | Operational-Intersection | Snapfinger Road (SR 155) at Browns Mill Road Intersection Improvement | $359,000 |
| R_1146 | Operational-Intersection | Turner Hill Road at I-20 East | $7,788,000 |
| R_1136 | Operational-Intersection | US 278-Covington Highway at LIB | $3,570,000 |
⬚ figure
| ◯ | Freight and Rail Crossing |
| ◯ | Interchange - New or Improvements |
| ◯ | Capacity - Widening |
| ◯ | ITS Improvements |
| ◯ | Multimodal |
| ◯ | New Connection |
| ◯ | On-Road/Off-Road Trail Projects |
| ◯ | Operational - Corridor |
| ◯ | Operational - Intersection |
Projects in the City of Tucker were included from the Tucker Strategic Transportation Master Plan, 2020 Tucker-Northlake LCI, Tucker Summit CID-Freight Cluster Plan, ARC Regional Transportation Plan, and DeKalb County 2014 Transportation Plan. The project team also identified projects in coordination with City staff, stakeholders, elected officials, and members of the public.
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| Tier 1 | |||
| M_1497 | Multimodal | Brockett Road Complete Streets | $1,414,000 |
| M_043_PE | Multimodal | Chamblee Tucker Road from I-285 to Tucker Norcross Road Multimodal Improvement (Design Only) | $1,032,000 |
| M_041 | Multimodal | Chamblee Tucker Road from Tucker Norcross Road to Lavista Road Multimodal Improvement | $4,079,000 |
| M_1498 | Multimodal | Fellowship Road Complete Streets | $377,000 |
| M_1499 | Multimodal | Idlewood Road Complete Streets | $996,000 |
| R_415 | Operational-Corridor | Cooledge Road Operational Improvement | $2,500,000 |
| R_121 | Operational-Intersection | Chamblee Tucker Road/Lavista Road/ Fellowship Road Intersection Redesign | $1,681,000 |
| R_1110 | Operational-Intersection | E. Ponce de Leon Avenue at Rock Mountain Boulevard Intersection Improvement | $364,000 |
| R_1092 | Operational-Intersection | Fellowship Road at Idlewood Road Intersection Control Evaluation (ICE) | $57,000 |
| R_1087 | Operational-Intersection | Hugh Howell Road at Mountain Industrial Boulevard Intersection Improvement | $9,016,000 |
| R_1496 | Operational-Intersection | Lawrenceville Highway at Old Norcross Road Intersection Improvements | $1,442,000 |
| R_1089 | Operational-Intersection | Lynburn Drive at Lawrenceville Highway Intersection Improvement and Traffic Study | $1,772,000 |
| R_1116 | Operational-Intersection | Mountain Industrial Boulevard at Elmdale Drive/Roger Marten Way Intersection Improvement | $552,000 |
| R_1113 | Operational-Intersection | Mountain Industrial Boulevard at Greer Circle Intersection Improvements | $396,000 |
| R_1112 | Operational-Intersection | Mountain Industrial Boulevard at Hammermill Road (South) Intersection Improvements | $292,000 |
| R_1114 | Operational-Intersection | Mountain Industrial Boulevard at Lewis Road Intersection Improvements | $416,000 |
| R_1108 | Operational-Intersection | Mountain Industrial Boulevard at N Royal Atlanta Drive Intersection Improvement | $749,000 |
| R_1107 | Operational-Intersection | Mountain Industrial Boulevard at S Royal Atlanta Drive Intersection Improvement | $208,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| R_1111 | Operational-Intersection | Mountain Industrial Boulevard at Tuckerstone Parkway Intersection Improvements | $224,000 |
| R_2006 | Operational-Intersection | Northlake Parkway at Lawrenceville Highway Intersection Improvements | $2,500,000 |
| Tier 2 | |||
| R_906 | Freight and Rail Crossing | Brockett Road at Moon Street Rail Crossing Improvement | $470,000 |
| R_907 | Freight and Rail Crossing | Main Street at Railroad Avenue Rail Crossing Improvement | $400,000 |
| R_706 | Interchange New or Improvements | Mountain Industrial Boulevard at Stone Mountain Parkway Interchange Improvement | $377,000 |
| M_043 | Multimodal | Chamblee Tucker Road from I-285 to Tucker Norcross Road Multimodal Improvement | $6,907,000 |
| B_1495 | On-Road | Main Street Bicycle Improvements, Shared Lane | $23,000 |
| B_1493 | On-Road | Montreal Road Bicycle Improvements, Bike Lane | $4,223,000 |
| B_1494 | On-Road | Woodlawn Circle Bicycle Improvements, Shared Lane | $44,000 |
| R_2010 | Operational-Corridor | Downtown Alley Improvements | $1,500,000 |
| R_2008 | Operational-Corridor | Lavista Road Access Management and Safety Improvements | $3,000,000 |
| R_2007 | Operational-Corridor | Lawrenceville Highway Access Management and Safety Improvements | $6,500,000 |
| R_1418 | Operational-Corridor | North Hairston Drive Safety Study | $47,000 |
| R_917 | Operational-Intersection | Briarcliff Road at Henderson Mill Road Intersection Improvement | $50,000 |
| R_2011 | Operational-Intersection | Brockett Road at Cooledge Road Intersection Improvement | $3,800,000 |
| R_105 | Operational-Intersection | Hugh Howell Road at Lawrenceville Highway Intersection Improvement | $5,475,000 |
| R_1093 | Operational-Intersection | Lavista Road at Fellowship Road Intersection Improvements | $10,299,000 |
| R_1088 | Operational-Intersection | Lawrenceville Highway (US 29) at Fellowship Road Intersection Improvement | $7,553,000 |
| R_1115 | Operational-Intersection | Lawrenceville Highway (US 29/SR 8) at N Royal Atlanta Drive Improvements | $479,000 |
| R_1090 | Operational-Intersection | Lawrenceville Highway at Lavista Road Intersection Improvement | $3,720,000 |
| R_1109 | Operational-Intersection | Mountain Industrial and E Ponce De Leon Avenue Intersection Improvements | $1,363,000 |
| Project ID | Project Category | Project Name | Cost |
|---|---|---|---|
| R_1117 | Operational-Intersection | Tucker Industrial Road at Hugh Howell Road Improvements | $416,000 |
| Tier 3 | |||
| R_417 | Capacity-Widening | Mountain Industrial Road Widening | $43,264,000 |
| R_901 | Freight and Rail Crossing | Goldsmith Road at E Ponce De Leon Avenue Rail Crossing Improvement | $166,000 |
| R_1085 | Interchange New or Improvements | Mountain Industrial Boulevard at US-78 Interchange Improvement | $22,334,000 |
| M_014 | Multimodal | Lavista Road Multimodal Improvement | $43,110,000 |
| BP_051 | Off-Road | Pleasantdale Road Multiuse Path | $5,277,000 |
| R_113 | Operational-Corridor | Briarcliff Road Operational Improvement | $58,080,000 |
| R_210 | Operational-Corridor | E Ponce De Leon Avenue Operational Improvements | $8,937,000 |
| R_223 | Operational-Corridor | Ponce De Leon Avenue Operational Improvements | $3,500,000 |
| R_1091 | Operational-Intersection | Grade Separation of Montreal Road at Railroad Crossing | $7,301,000 |
COMPREHENSIVE TRANSPORTATION PLAN
⬚ figure
(blank page)
The overall CTP includes a multitude of recommendations over the nearly 30-year horizon. While all of the recommendations are important, it is most critical to think about the near-term action items that need to be undertaken to move the plan forward. The Five-Year Action Plan provides a framework for establishing metrics the County may use to track progress against implementation of projects and policy items. It focuses on general topic areas, surface transportation projects (particularly those in Tier 1), transit next steps, and multiple policy-level recommendations.
| General Recommendations | |||
|---|---|---|---|
| Category | Action Item | Local Champion | Coordinate With |
| Plan Adoption | Adopt the DeKalb 2050 Unified Plan, including transportation and land use plans. | DeKalb County | |
| Regional and Statewide Transportation Planning | Work with ARC and GDOT to advance projects for evaluation and possible inclusion in the RTP, TIP, and STIP. | DeKalb County, DeKalb cities | ARC, GDOT |
| Code of Ordinances | Amend the existing Code of Ordinances to reflect transportation policy recommendations from the DeKalb 2050 Unified Plan. | DeKalb County | |
| Performance Monitoring | Develop a project monitoring program to track progress with funding and implementation. | DeKalb County |
| Surface Transportation Project Recommendations | | :--- | :--- | :--- | :--- | | Category | Action Item | Local Champion | Coordinate With | | Unincorporated DeKalb County Tier 1 Project List | Advance select Tier 1 projects with current SPLOST funding, where possible, to begin engineering with current program revenues. Advance remaining Tier 1 projects from engineering through construction, as applicable, if successful adoption of a SPLOST renewal takes place. | DeKalb County | ARC, GDOT | | Unincorporated DeKalb Tier 2 and 3 Project List | If select Tier 1 projects are advanced during the current SPLOST, identify priority projects within Tier 2 to be pulled forward for Tier 1 funding. As new SPLOST funding and state/federal match funding becomes available, consider advancing relevant Tier 2 project design work. | DeKalb County | ARC, GDOT | | Grant Opportunities | Consider new federal discretionary grant programs and determine if any projects might qualify and be competitive. Prepare relevant information and monitor for Notice of Funding Opportunities (NOFOs). | DeKalb County | ARC, GDOT, Cities (as relevant) | | DeKalb Cities Project List | Facilitate periodic meetings with city staff to review progress of the high priority city projects and ensure coordination and collaboration between the County and its cities. | DeKalb County | Cities |
| Transit Recommendations | | :--- | :--- | :--- | :--- | | Category | Action Item | Local Champion | Coordinate With | | Staffing | Identify a transit lead within the County for internal planning efforts, public education and input, and coordination with MARTA. | DeKalb County | MARTA, Cities | | Plan Update | Update the DTMP with updated project definitions, costs, tax revenue estimates, and federal match opportunities, etc. to ensure a well developed baseline for renewed conversations. | DeKalb County | | | Public Education | Continue education on transit funding options, both local and federal. | DeKalb County | Cities, ATL | | Investment Strategy | Reach consensus on a transit infrastructure and service investment strategy, including local funding options like sales tax and value capture. | DeKalb County | Cities | | Referendum Opportunity | Consider and prepare for a successful Transit SPLOST referendum. | DeKalb County | Cities, ATL |
| Policy Recommendations | | :--- | :--- | :--- | :--- | | Category | Action Item | Local Champion | Coordinate With | | Asset Management: Pavement | Adopt a consistent roadway rating system based on the standardized ASTM, implement a software system to manage the pavement and overall program, and use automated data collection methods in addition to visual inspection. Conduct pavement inventory on a rotating three-year cycle. Develop a proactive pavement management plan. | DeKalb County | GDOT, Cities | | Asset Management: Bridges | Set aside sufficient funding for unanticipated larger scale bridge projects. Repair/rehabilitate and monitor bridges of concern. | DeKalb County | GDOT, Cities | | Asset Management: Signal Systems | Formalize a signal maintenance program that establishes standards and best practices for traffic signal equipment, communications, and central software. | DeKalb County | GDOT, Cities | | Functional Classification | Adopt the recommended functional classifications (accomplished with the adoption of the DeKalb 2050 Unified Plan). Review the County Code of Ordinances to ensure that any sections of the code that are reliant upon functional classification are consistent with the 2050 Unified Plan. | DeKalb County | | | Freight | Adopt the recommended truck route network into the Code of Ordinances. Coordinate with ARC and adjacent counties and cities to ensure that any updates made to their truck route networks are consistent with DeKalb County's. Identify criteria for truck parking facilities. Perform recurring evaluation of rail crossing locations and identify high-risk locations. | DeKalb County | ARC, GDOT, Adjacent Communities | | Access Management | Reviews and consolidates access management requirements in the DeKalb County Code of Ordinances. Update the code based on recommendations from the DeKalb 2050 Unified Plan, GDOT standards, and FHWA guidance. Additionally, update the access management requirements according to updated functional classifications. | DeKalb County | |
| Category | Action Item | Local Champion | Coordinate With |
|---|---|---|---|
| Technology | Begin implementing programmatic and infrastructure technology projects. Coordinate with local, regional, and state agencies to identify possible opportunities for collaboration. Coordinate with GDOT on implementing the identified pilot SMART Corridors: Memorial Drive and Candler Road. | DeKalb County | GDOT, ARC, Cities |
| Complete Streets | Adopt a Complete Streets policy and revise the Code of Ordinances to include improved design guidance/requirements. Establish official performance metrics to evaluate the effectiveness of the Complete Streets policy. Encourage local, regional, and state agencies to incorporate the Complete Streets policy on roadway projects not led by the County. | DeKalb County | GDOT, ARC, Cities |
| Bicycle and Pedestrian Recommendations | Adopt the recommended bicycle priority network (accomplished with the adoption of the DeKalb 2050 Unified Plan). Identify a lead department for trail planning and implementation, update the DeKalb County Trails Master Plan, and conduct a sidewalk inventory and condition assessment. Prioritize sidewalk investments following the completion of the inventory/ condition assessment. | DeKalb County | ARC, Cities |
| Transportation Demand Management | Create a position for Transportation Coordinator within the County who can work to establish programs such as rideshare matching for carpool, plan events to incentivize participation, etc. Consider the creation of new TMAs within regional centers and zoning revisions to support improved site design for multimodal accommodation. | DeKalb County | Georgia Commute Options (ARC), Cities |
Along with the Five-Year Action Plan, DeKalb County should work to monitor progress of the plan over time. This will allow the County to identify places where additional focus should be placed and will provide a baseline status for the beginning of the next CTP update.
APPENDIX
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1069 | Interchange- New or Improvements | Metro South CID | District 3, District 6 | I-285 EB ramp at Moreland Avenue Interchange Improvement | Moreland Avenue | Widen the channelized right turn and the left turn lanes (2) on SB Moreland Avenue to accommodate truck movement. Restripe the channelized right turn and the pavement markings on bridge to enhance driver awareness and maintain safety. Install pedestrian crosswalks across ramp terminals to connect with existing sidewalks on bridge and determine warrants for signalized crossings | Unincorporated | |
| R_709 | Interchange- New or Improvements | Metro South CID | District 3, District 6 | I-285 WB ramp at Moreland Avenue Interchange Improvement | Moreland Avenue | Widen the channelized right turn onto ramp from SB Moreland Avenue. Restripe the channelized right turn and the pavement markings on bridge to enhance driver awareness and maintain safety. Install pedestrian crosswalks and signals across ramp terminals to connect with existing sidewalks on bridge | Unincorporated | |
| M_043_PE | Multimodal | 2014 Transportation Plan | District 1, District 7 | Chamblee Tucker Road Multimodal Improvement (Design Only) | I-285 | Tucker Norcross Road | Road diet to include two through lanes and a center left-turn lane and bike lanes. Operational and pedestrian improvements will also be made at key locations along the corridor | Tucker, Unincorporated |
| M_045_PE | Multimodal | 2014 Transportation Plan | District 2, District 6 | Church Street Multimodal Improvement (Design Only) | N Decatur Road | Medlock Road | Add center turn lane and on-street parking along with bicycle lanes | Decatur, Unincorporated |
| M_2000_ PE | Multimodal | Consultant Team | District 3, District 6 | Clifton Springs Road Road Diet (Design Only) | Panthersville Road | Flat Shoals Parkway | Multimodal improvements. Add and infill sidewalks | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 1 | YES | $53,000 | $66,000 | $439,000 | $154,000 | $712,000 | $712,000 | $- | ||
| Tier 1 | YES | $24,000 | $30,000 | $194,000 | $68,000 | $315,000 | $315,000 | $- | ||
| Tier 1 | 2.10 | Tier 1 | NO | $1,032,000 | $- | $- | $- | $1,032,000 | $825,600 | $206,400 |
| Tier 3 | 0.48 | Tier 1 | NO | $552,000 | $- | $- | $- | $552,000 | $441,600 | $110,400 |
| 0.72 | Tier 1 | NO | $500,000 | $- | $- | $- | $500,000 | $- | $500,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| M_2016 | Multimodal | Consultant Team | District 3, District 5, District 7 | Glenwood Road Multimodal Improvement | Columbia Drive | Covington Highway | Install sidewalks and improve pedestrian crossings along this corridor. Project assumes approximately 2.0 miles of moderate grading | Unincorporated |
| M_013_PE | Multimodal | Consultant Team | District 4, District 5, District 7 | Heritage Corridor Study (Design Only) | Stone Mountain | Lithonia | Multimodal improvements connecting Stone Mountain and Lithonia downtowns. Sidewalk improvements and pedestrian crossings | Stone Mountain, Unincorporated |
| M_024_PE | Multimodal | 2014 Transportation Plan | District 2, District 6 | N Decatur Road Multimodal Improvement (Design Only) | Clairmont Road | Church Street | Four lane section will include a combination of bicycle and pedestrian improvements and will be consistent with Clifton Corridor transit design | Decatur, Unincorporated |
| X_010 | Multimodal | 2014 Transportation Plan | District 2, District 6 | N Druid Hills Road at Spring Creek Road Bridge Improvement (Bridge ID: 089-0175-0) | Approx. 1400 ft east of Spring Creek Road | In County's TIP for design; 2020 Evaluation is Fair; Bridge sufficiency rating is 50 or less and therefore meets the threshold for qualifying for bridge replacement funding. Bridge considerations should include the potential for future transit lines running below | Unincorporated | |
| M_035bc_ PE | Multimodal | Consultant Team | District 2, District 6 | N Druid Hills Road Multimodal Improvement (Design Only) | Briarcliff Road | Lawrenceville Highway | Multimodal improvements. Add and infill sidewalks; GDOT projects GOASIS ID 21-7050, GOASIS ID 22-7092 and, GOASIS ID 20-7083/PI 0018284 | Brookhaven, Unincorporated |
| M_2017 | Multimodal | Consultant Team | District 1, District 7 | Pleasantdale Road Multimodal Improvement | Tucker/ Norcross | I-85 | Improve pedestrian crossings along this corridor; Currently under review by County staff | Unincorporated |
| R_2005_ PE | New Connection | Consultant Team | District 2, District 6 | Clairmont Road Reliever Connection (Scoping Study) | I-85 Frontage Road | Briarcliff Road NE | New connection from I-85 Frontage Road to Briarcliff Road NE east of Clairmont Road | Unincorporated |
| BP_022 | Off-Road | 2014 Transportation Plan | District 2, District 6 | Deepdene Park Path Scoping Study (Design Only) | N Ponce De Leon Avenue | Parkwood Road | Complete linear park path connection from Deepdene Park to existing bicycle lanes starting at Parkwood Road | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| 2.03 | Tier 1 | NO | $- | $- | $4,329,000 | $- | $4,329,000 | $- | $4,329,000 | |
| Tier 3 | 11.69 | Tier 1 | NO | $- | $- | $- | $- | $300,000 | $162,963 | $137,037 |
| Tier 1 | 1.29 | Tier 1 | NO | $343,000 | $- | $- | $- | $343,000 | $161,210 | $181,790 |
| Tier 1 | NO | $900,000 | $2,000,000 | $9,300,000 | $300,000 | $12,500,000 | $8,000,000 | $4,500,000 | ||
| Tier 3 | 3.82 | Tier 1 | NO | $2,290,000 | $- | $- | $- | $2,290,000 | $1,832,000 | $458,000 |
| 1.98 | Tier 1 | NO | $- | $- | $- | $- | $3,000,000 | $600,000 | $2,400,000 | |
| 0.20 | Tier 1 | NO | $- | $- | $- | $- | $200,000 | $- | $200,000 | |
| 0.26 | Tier 1 | YES | $750,000 | $- | $- | $- | $750,000 | $- | $750,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| BP_1433 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | Donzi Road Beltline Connector | Donzi Road | Southside BeltLine Trail (Fulton County) | DeKalb County connection to Atlanta's Southside BeltLine rail via Custer Avenue westward to the City of Atlanta in Fulton County, through to Boulevard SE and northward to the BeltLine | Unincorporated |
| BP_1446 | Off-Road | DeKalb SPLOST Trails | District 1, District 2, District 6, District 7 | North Fork Peachtree Creek Trail Connector, Phase 1 | Fisher Trail Park | Peachwood Circle NE | Connects trail to neighborhood | Unincorporated |
| BP_1502 | Off-Road | PATH Foundation | District 1, District 7 | North Fork Peachtree Creek Trail Connector, Phase 2 | Shallowford Road | Chamblee Tucker Road | Connects trail to multiple residential and retail areas | Unincorporated |
| BP_1475 | Off-Road | DeKalb SPLOST Trails | District 2, District 6 | Sagamore Trail | Alderbrook Road | Audobon Drive | New trail facility to improve connectivity | Unincorporated |
| BP_1476a | Off-Road | DeKalb SPLOST Trails | District 2, District 6 | Sagamore Trail | Briarcliff Road NE | Peachtree Creek Greenway | New trail facility to improve connectivity | Unincorporated |
| BP_1477 | Off-Road | DeKalb SPLOST Trails | District 2, District 6 | Sagamore Trail | S Peachtree Creek Trail/ N Druid Hills Road | Alderbrook Road | New trail facility to improve connectivity | Unincorporated |
| BP_1481 | Off-Road | DeKalb SPLOST Trails | District 2, District 6 | South Peachtree Creek Trail - PATH, Phase 2 (Section 1) | Fulton County Line | Atlanta City Limits | New trail facility to improve connectivity | Unincorporated |
| BP_1482 | Off-Road | DeKalb SPLOST Trails | District 2, District 6 | South Peachtree Creek Trail - PATH, Phase 2 (Section 2) | Briarcliff Road | Atlanta City Limits | New trail facility to improve connectivity | Atlanta, Unincorporated |
| BP_018 | Off-Road | 2014 Transportation Plan | District 2, District 4, District 6 | South Peachtree Creek Trail - Phase 3 | Medlock Park | Farmers Market Trail and Zonolite Park | Expansion of the PATH Foundation trail system (South Peachtree Creek Trail). Multiuse path was assumed for the third phase (1.3 miles) of this three-phase 6.3-mile project, but a detailed corridor study is needed to determine recommended improvements | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| 2.05 | Tier 1 | NO | $312,000 | $156,000 | $3,111,000 | $- | $3,577,000 | $- | $3,577,000 | |
| 1.02 | Tier 1 | NO | $155,000 | $78,000 | $1,545,000 | $- | $1,777,000 | $- | $1,777,000 | |
| Tier 1 | NO | $555,000 | $278,000 | $5,545,000 | $- | $6,376,000 | $3,825,600 | $2,550,400 | ||
| 0.12 | Tier 1 | NO | $18,000 | $9,000 | $174,000 | $- | $199,000 | $- | $199,000 | |
| 1.70 | Tier 1 | NO | $- | $- | $- | $- | $2,550,000 | $- | $2,550,000 | |
| 1.59 | Tier 1 | NO | $323,000 | $162,000 | $3,224,000 | $- | $3,707,000 | $- | $3,707,000 | |
| 0.25 | Tier 1 | NO | $38,000 | $19,000 | $375,000 | $- | $431,000 | $40,247 | $390,753 | |
| Tier 3 | 0.22 | Tier 1 | YES | $33,000 | $17,000 | $329,000 | $- | $379,000 | $- | $379,000 |
| 1.30 | Tier 1 | NO | $98,000 | $683,000 | $1,171,000 | $- | $1,951,000 | $- | $1,951,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| BP_037 | Off-Road | ARC RTP | District 3, District 6 | South River Multiuse Trail Extension | Boulder Walk Drive | Crestdale Circle | Offers pedestrian and bicyclist accessibility along Intrenchment Creek from Boulder Walk Drive to Crestdale Circle. It is intended to provide safe connectivity between the Atlanta BeltLine Trail and the Arabia Mountain Trail through ADA compliant infrastructure including a wide shared use path, ramp connection, and high visibility crosswalks | Unincorporated |
| BP_1464 | Off-Road | DeKalb SPLOST Trails | District 3, District 5, District 7 | South River Trail Multiuse Trail Extension (Eastern End) | Waldrop Place | MLK High School | New connection trail to neighborhood. | Unincorporated |
| R_202 | Operational-Corridor | 2014 Transportation Plan | District 3, District 6 | Bouldercrest Road Operational Improvement | Constitution Road | Eastland Road | Operational improvements along with pedestrian and bicycle accommodations | Atlanta, Unincorporated |
| R_225 | Operational-Corridor | Consultant Team | District 1, District 7 | Henderson Mill Road Operational Improvement | Henderson Road | Mercer University Drive | Operational improvements to address failing LOS and bottlenecks along Henderson Mill Road; Extension of left turn lanes at Henderson, Evans and Mercer intersections | Unincorporated |
| R_211 | Operational-Corridor | ARC RTP | District 3, District 4, District 5, District 6, District 7 | Kensington MARTA Station Trail and Road Diets, Phase 1 | Covington Highway | Memorial Drive | Phase 1 will occur along SR 10/Mountain Drive, Kensington Road, SR 154/ Memorial Drive and US 278/Covington highway and will implement a road diets, a 12-foot multi-use trail, and improved pedestrian and bicycle facilities; GDOT PI Number 0018335 - Road Diet | Avondale Estates, Unincorporated |
| R_1418 | Operational-Corridor | DeKalb SPLOST | District 3, District 4, District 5, District 6, District 7 | North/South Hairston Drive Safety Study (Design Only) | Welsey Chapel Road | Ponce De Leon Avenue | Corridor Safety High Level Audit; High-level character transformation and safety review | Tucker, Unincorporated |
| R_405c | Operational-Corridor | Consultant Team | District 4, District 5, District 7 | Redan Road Operational Improvement | Elder Lane | Allgood Road | Operational improvements to address capacity needs | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.49 | Tier 1 | NO | $- | $- | $- | $- | $5,787,000 | $- | $5,787,000 | |
| 5.80 | Tier 1 | NO | $617,000 | $309,000 | $6,165,000 | $- | $7,090,000 | $4,254,000 | $2,836,000 | |
| Tier 3 | 2.49 | Tier 1 | NO | $175,000 | $1,222,000 | $2,094,000 | $- | $3,490,000 | $- | $3,490,000 |
| 0.54 | Tier 1 | NO | $400,000 | $200,000 | $1,500,000 | $200,000 | $2,300,000 | $- | $2,300,000 | |
| Tier 2 | 1.27 | Tier 1 | YES | $536,000 | $217,000 | $5,198,000 | $- | $5,949,000 | $4,759,200 | $1,189,800 |
| Tier 2 | 8.27 | Tier 1 | NO | $500,000 | $- | $- | $- | $500,000 | $- | $500,000 |
| 1.10 | Tier 1 | NO | $869,000 | $2,276,000 | $5,420,000 | $1,438,000 | $10,000,000 | $5,000,000 | $5,000,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_2001 | Operational- Corridor | GDOT | District 5, District 7 | SR 12/US 278 Operational Improvement | DeKalb Medical Parkway | Cragstone Court | Operational improvements to address capacity needs; Sidewalk infill improvements; GDOT PI Number 0008288 | Stonecrest, Unincorporated |
| R_161 | Operational- Intersection | Consultant Team | District 4, District 7 | Bermuda Road at Stewart Mill Road Roundabout | Stewart Mill Road | Install a roundabout at intersection | Unincorporated | |
| R_1414 | Operational- Intersection | DeKalb SPLOST | District 2, District 6 | Briarcliff Road at Briarlake Road Intersection Turn Lane Improvement | Briarlake Road | Traffic study to develop turn-lane and operational improvements | Unincorporated | |
| R_153 | Operational- Intersection | Consultant Team | District 3, District 6 | Candler Road at H F Shepherd Drive Intersection Improvement | H F Shepherd Drive | Part of RSA conducted in 2021; Recommend operational and pedestrian improvements to address safety and capacity needs; GDOT PI Number M006292 | Unincorporated | |
| R_926 | Operational- Intersection | Consultant Team | District 3, District 6 | Cedar Grove Road at Bouldercrest Road Intersection Improvement and Roundabout | Bouldercrest Road | Intersection improvements and new roundabout | Unincorporated | |
| R_925 | Operational- Intersection | Consultant Team | District 3, District 6 | Cedar Grove Road at E Conley Road Intersection Improvement and Roundabout | E Conley Road | Intersection improvements and new roundabout | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Road-way | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 2 | 0.85 | Tier 1 | YES | $603,000 | $1,258,000 | $3,467,000 | $- | $5,328,000 | $5,328,000 | $- |
| Tier 1 | NO | $217,000 | $52,000 | $1,560,000 | $- | $1,829,000 | $- | $1,829,000 | ||
| Tier 1 | NO | $42,000 | $208,000 | $416,000 | $- | $666,000 | $- | $666,000 | ||
| Tier 1 | YES | $500,000 | $400,000 | $1,500,000 | $400,000 | $2,800,000 | $1,960,000 | $840,000 | ||
| Tier 1 | NO | $- | $- | $- | $- | $1,000,000 | $- | $1,000,000 | ||
| Tier 1 | NO | $- | $- | $- | $- | $1,000,000 | $- | $1,000,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1064_ PE | Operational- Intersection | Metro South CID | District 3, District 6 | Cedar Grove Road/ Thurman Road (SR 160)/Old McDonough Road Roundabout (Design Only) | Thurman Road | A truck roundabout for this intersection with 13’ lanes and adequate turning radii. Reconstruct pavement and restripe Old McDonough Road and Cedar Grove Road to accommodate truck traffic and enhance delineation for driver awareness and safety. Improve roadway drainage infrastructure, including a maintenance schedule to ensure efficacy. Install a storage lane on Old McDonough to relieve truck queuing from truck wash facility. Resurface Cedar Grove Road and Thurman Road as part of roadway and drainage maintenance. Improve roadway drainage infrastructure | Unincorporated | |
| R_159 | Operational- Intersection | Consultant Team | District 2, District 6 | Crestline Drive at Chrysler Drive Intersection Improvement | Chrysler Drive | Intersection pedestrian safety improvements | Unincorporated | |
| R_813 | Operational- Intersection | 2014 Transportation Plan | District 4, District 6 | DeKalb Industrial Way at Milscott Drive Traffic Signal Improvement | Milscott Drive | New signal and pedestrian safety improvements | Unincorporated | |
| R_927 | Operational- Intersection | Consultant Team | District 2, District 6 | E Rock Springs Road NE at Cumberland Road NE/ Beech Valley Way NE Intersection Improvement and Roundabout | Beech Valley Way NE | Intersection improvements and new roundabout | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 1 | YES | $438,000 | $- | $- | $- | $438,000 | $359,160 | $78,840 | ||
| Tier 1 | NO | $- | $- | $- | $- | $1,300,000 | $- | $1,300,000 | ||
| Tier 1 | NO | $31,000 | $- | $302,000 | $- | $332,000 | $- | $332,000 | ||
| Tier 1 | NO | $- | $- | $- | $- | $1,400,000 | $392,000 | $1,008,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1402 | Operational-Intersection | DeKalb SPLOST | District 4, District 6 | Indian Creek Elementary Signal Installation | Lakes at Indian Creek Apts Driveway | Signal warrant study and potential signal installation; May require school coordination at the new school driveway; Signal mast arms if possible (preferred option for DeKalb County where applicable). | Unincorporated | |
| R_1405 | Operational-Intersection | DeKalb SPLOST | District 4, District 6 | North Clarendon Road Signal and RR Crossing Improvements | Ponce de Leon Avenue | Railroad crossing assessment and improvements; Does not currently have railroad preemption (priority project) | Unincorporated | |
| R_1406 | Operational-Intersection | DeKalb SPLOST | District 4, District 6 | North Decatur Road at Parkdale Road Intersection Improvement | Parkdale Road | Priority project for TE Study. Signal installation and pedestrian enhancements; Study to evaluate converting Gifford Dr into an RCUT to funnel left turn traffic to Parkdale | Unincorporated | |
| R_2000 | Operational-Intersection | Consultant Team | District 2, District 6 | North DeKalb Mall Intersection Improvement | Birch Road | Mall redevelopment set asides for transportation improvements including a left turn lane at the intersection of N Druid Hills Road at Birch Road | Unincorporated | |
| R_157 | Operational-Intersection | Consultant Team | District 5, District 7 | Redan Road at Lithonia Road Intersection Safety Evaluation | S Stone Mountain-Lithonia Road | Improvements to improve intersection geometry, install traffic signal, signal coordination w/ Young Road and Wellborn Road | Unincorporated | |
| R_162 | Operational-Intersection | Covington Highway Corridor Master Active Living Plan | District 3, District 7 | Redwing Circle at Covington Highway or Nearby New Traffic Signal | Covington Highway | New traffic signal; Safety Project High Level Crash Screening, Project ID: 22-7126 | Unincorporated | |
| R_145 | Operational-Intersection | Consultant Team | District 4, District 7 | Stephenson Road at South Deshon Road Intersection Improvement | South Deshon Road | Operational improvements to address capacity and safety needs; Potentially new roundabout and auxiliary lanes | Unincorporated | |
| R_112 | Operational-Intersection | 2014 Transportation Plan | District 3, District 7 | Wesley Chapel Road at Flat Shoals Parkway Intersection Improvement | Flat Shoals Parkway | Operational improvements to address capacity and safety needs; GDOT GOASIS Project ID: 22-7078 - TE Report/RSA | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 1 | NO | $32,000 | $- | $260,000 | $- | $292,000 | $- | $292,000 | ||
| Tier 1 | NO | $52,000 | $- | $468,000 | $- | $520,000 | $- | $520,000 | ||
| Tier 1 | NO | $42,000 | $26,000 | $520,000 | $- | $588,000 | $- | $588,000 | ||
| Tier 1 | NO | $- | $- | $- | $- | $1,000,000 | $- | $1,000,000 | ||
| Tier 1 | NO | $20,000 | $20,000 | $500,000 | $20,000 | $560,000 | $- | $560,000 | ||
| Tier 1 | YES | $43,000 | $- | $285,000 | $- | $328,000 | $229,600 | $98,400 | ||
| Tier 1 | NO | $400,000 | $300,000 | $1,800,000 | $300,000 | $2,800,000 | $- | $2,800,000 | ||
| Tier 1 | YES | $80,000 | $55,000 | $787,000 | $- | $922,000 | $645,400 | $276,600 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1077_ PE | Capacity- Widening | Metro South CID | District 3, District 6 | Old McDonough Road Capacity Improvement (Design Only) | Lancaster Road | Mason Dixon Road | Pave and widen existing dirt road to 12 ft. lanes with 3-5 ft. shoulders to accommodate truck traffic | Unincorporated |
| R_407 | Capacity- Widening | 2014 Transportation Plan | District 3, District 7 | Wesley Chapel Road Capacity Improvement | Boring Road | Flat Shoals Parkway | Widening from 2 to 4 lanes, including bike and pedestrian improvements; GDOT GOASIS Project ID: 21-7008 - TE Report | Unincorporated |
| R_904 | Freight and Rail Crossing | Consultant Team | District 3, District 6 | Constitution Drive SE at Old Constitution Road SE Rail Crossing Improvement (Norfolk Southern) | Old Constitution Road SE | At-grade crossing safety and operational improvements; Recent request for quiet zone; County evaluating closure of Old Constitution | Unincorporated | |
| R_913 | Freight and Rail Crossing | Consultant Team | District 5, District 7 | Panola Road at Stone Mountain Lithonia Road Rail Crossing Improvement | Stone Mountain Lithonia Road | At-grade crossing safety and operational improvements; Improve signage and pavement markings including reflectors; Evaluate Florida-T signalized intersection | Unincorporated | |
| M_043 | Multimodal | 2014 Transportation Plan | District 1, District 7 | Chamblee Tucker Road Multimodal Improvement | I-285 | Tucker Norcross Road | Road diet to include two through lanes and a center left-turn lane and bike lanes. Operational and pedestrian improvements at key locations along the corridor | Tucker, Unincorporated |
| M_045 | Multimodal | 2014 Transportation Plan | District 2, District 6 | Church Street Multimodal Improvement | N Decatur Road | Medlock Road | Add center turn lane, on-street parking, and bicycle lanes | Decatur, Unincorporated |
| M_2000 | Multimodal | Consultant Team | District 3, District 6 | Clifton Springs Road from Panthersville Road to Flat Shoals Parkway Road Diet | Panthersville Road | Flat Shoals Parkway | Currently 4 lanes with no room for SW; Consider a road diet | Unincorporated |
| M_2006 | Multimodal | Consultant Team | District 3, District 4, District 5, District 6, District 7 | Covington Trails and Kensington MARTA Station Road Diets, Phase 2 | Memorial Drive | MARTA Indian Creek Station | New trail facility to improve connectivity; GDOT Safety Project PI Number 0018335 - Road Diet | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 2 | YES | $86,000 | $- | $- | $- | $86,000 | $7,740 | $78,260 | ||
| 1.27 | Tier 2 | NO | $1,008,000 | $7,050,000 | $12,085,000 | $- | $20,141,000 | $7,854,990 | $12,286,010 | |
| Tier 2 | NO | $- | $- | $- | $- | $130,000 | $- | $130,000 | ||
| Tier 2 | NO | $- | $- | $- | $- | $1,000,000 | $- | $1,000,000 | ||
| Tier 2 | 2.10 | Tier 2 | NO | $- | $2,350,000 | $4,557,000 | $- | $6,907,000 | $5,525,600 | $1,381,400 |
| Tier 3 | 0.48 | Tier 2 | NO | $- | $1,256,000 | $2,436,000 | $- | $3,692,000 | $2,953,600 | $738,400 |
| 0.72 | Tier 2 | NO | $- | $100,000 | $2,100,000 | $100,000 | $2,300,000 | $- | $2,300,000 | |
| 1.26 | Tier 2 | NO | $- | $- | $- | $- | $5,579,000 | $4,463,200 | $1,115,800 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| M_1063 | Multimodal | Consultant Team | District 4, District 6 | Jolly Avenue Multimodal Improvement | Rowland Street | Indian Creek Way | Explore making Jolly Avenue a one-way neighborhood street with the potential for sidewalk, multimodal, and road diet improvements | Clarkston, Unincorporated |
| BP_1447 | Multimodal | Consultant Team | District 2, District 6 | Lullwater Road NE Multimodal Improvement | Ponce De Leon Avenue NE | N Decatur Rd | Multimodal and operational improvements. Add and infill sidewalks | Atlanta, Unincorporated |
| M_035b | Multimodal | Consultant Team | District 2, District 6 | N Druid Hills Road Multimodal Improvement | Briarcliff Road | Clairmont Road | Multimodal and operational improvements. Add and infill sidewalks | Brookhaven, Unincorporated |
| M_035c | Multimodal | Consultant Team | District 2, District 6 | N Druid Hills Road Multimodal Improvement | Clairmont Road | Lawrenceville Highway | Multimodal and operational improvements. Add and infill sidewalks | Unincorporated |
| BP_1428 | Off-Road | DeKalb SPLOST Trails | District 3, District 7 | Covington Trails, Phase 2 (South) | Covington Highway | Towers High School | New trail facility to improve connectivity | Unincorporated |
| BP_140 | Off-Road | Medline LCI | District 4, District 6 | DeKalb Industrial Way Greenway | Lawrenceville Highway | Jefferson Square Court | New Greenway facility | Unincorporated |
| BP_015 | Off-Road | 2014 Transportation Plan | District 2, District 4, District 6 | Farmers Market Trail | South Peachtree Creek Trail | Stone Mountain Trail in Avondale Estates | Expansion of the PATH Foundation trail system (Farmers’ Market Trail). Multiuse path was assumed for the entire 2.6-mile corridor, but a detailed corridor study is needed to determine recommended improvements | Unincorporated |
| BP_1435 | Off-Road | DeKalb SPLOST Trails | District 1, District 7 | Henderson Mill Creek Trail | Northlake Parkway | North Fork Peachtree Creek Trail | Trail connection between North Fork Peachtree Creek Trail and Tucker-Northlake Activity Center. Closely follows the Northlake Trail. | Unincorporated |
| BP_1438 | Off-Road | DeKalb SPLOST Trails | District 5, District 7 | Indian Creek MARTA Station Trails | Chemawa Drive | Elder Lane | New trail facility to improve connectivity | Unincorporated |
| BP_1439 | Off-Road | DeKalb SPLOST Trails | District 5, District 7 | Indian Creek MARTA Station Trails | S Indian Creek Drive | Snapfinger Trail PATH | Loop from Redan Road to Elder Lane to Durham Park Rd to S Indian Creek Drive | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 3 | 0.55 | Tier 2 | NO | $300,000 | $100,000 | $1,200,000 | $100,000 | $1,700,000 | $440,471 | $1,259,529 |
| Tier 3 | 1.30 | Tier 2 | NO | $- | $- | $- | $- | $1,000,000 | $- | $1,000,000 |
| Tier 3 | 1.71 | Tier 2 | NO | $- | $7,170,000 | $12,291,000 | $- | $19,461,000 | $7,979,010 | $11,481,990 |
| 2.11 | Tier 2 | NO | $- | $8,856,000 | $15,181,000 | $- | $24,036,000 | $7,931,880 | $16,104,120 | |
| 0.47 | Tier 2 | NO | $72,000 | $36,000 | $715,000 | $- | $823,000 | $- | $823,000 | |
| 0.71 | Tier 2 | NO | $- | $- | $- | $- | $2,000,000 | $- | $2,000,000 | |
| 2.55 | Tier 2 | NO | $193,000 | $1,348,000 | $2,311,000 | $- | $3,851,000 | $- | $3,851,000 | |
| 1.43 | Tier 2 | NO | $216,000 | $108,000 | $2,160,000 | $- | $2,484,000 | $- | $2,484,000 | |
| 0.07 | Tier 2 | NO | $10,000 | $5,000 | $99,000 | $- | $114,000 | $- | $114,000 | |
| 1.55 | Tier 2 | NO | $235,000 | $118,000 | $2,345,000 | $- | $2,696,000 | $- | $2,696,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| BP_1440 | Off-Road | DeKalb SPLOST Trails | District 4, District 5, District 7 | Indian Creek MARTA Station Trails | S Indian Creek Drive | Rowland Road | New trail facility to improve connectivity | Unincorporated |
| BP_1441 | Off-Road | DeKalb SPLOST Trails | District 5, District 7 | Indian Creek MARTA Station Trails | Elder Lane | Indian Creek MARTA | New trail facility to improve connectivity | Unincorporated |
| BP_040 | Off-Road | Belvedere Master Active Living Plan | District 3, District 7 | Multiuse Trail Connecting Delano-Line Park, White Oak Park, and Shoal Creek | White Oak Park | Shoal Creek I | Multiuse Trail connecting Delano-Line Park, White Oak Park, and Shoal Creek I from west to east | Unincorporated |
| BP_1445 | Off-Road | DeKalb SPLOST Trails | District 1, District 7 | North Fork Peachtree Creek Trail Connector, Phase 2 Spur | Cravey Lane NE | Townley Circle | New trail facility to improve connectivity | Unincorporated |
| BP_1501 | Off-Road | PATH Foundation | District 1, District 7 | North Fork Peachtree Creek Trail Connector, Phase 3 | Chamblee Tucker Road | Presidential Parkway | New trail facility to improve connectivity | Unincorporated |
| BP_1450 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | Shoal Creek PATH Trail Connection 2 | Aspen Woods Apartments | Shoal Creek Crossing | New trail facility to improve connectivity | Unincorporated |
| BP_030 | Off-Road | 2014 Transportation Plan | District 3, District 6, District 7 | Shoal Creek Trail | Candler Road | Flat Shoals Parkway | Shoal Creek Trail from Rainbow Drive to SR 155/ Flat Shoals Parkway at Warriors Path/county-owned "Hudson Park" (2 miles) | Unincorporated |
| BP_1473 | Off-Road | DeKalb SPLOST Trails | District 2, District 6 | South Fork Peachtree Trail Connection to Emory University | Emory University | Zonolite Park | New trail facility to improve connectivity to Emory University | Atlanta, Unincorporated |
| BP_1480 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | South River Trail - PATH, Phase 2 | Gresham Park | Sugar Creek Park | New trail facility to improve connectivity | Unincorporated |
| BP_1484 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | South River Trail - PATH, Phase 2 | Constitution Lakes Park | Sugar Creek Park | New trail facility to improve connectivity | Unincorporated |
| R_400b_PE | Operational-Corridor | Consultant Team | District 2, District 6 | Briarcliff Road Arterial Managed Lanes (Design Only) | Clifton Road | N Druid Hills Road | Study and design of arterial managed lanes; GDOT PI Number M005990 | Brookhaven, Unincorporated |
COMPREHENSIVE TRANSPORTATION PLAN
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.28 | Tier 2 | NO | $43,000 | $22,000 | $422,000 | $- | $486,000 | $- | $486,000 | |
| 0.27 | Tier 2 | NO | $41,000 | $21,000 | $407,000 | $- | $468,000 | $- | $468,000 | |
| 0.95 | Tier 2 | NO | $10,000 | $- | $50,000 | $- | $60,000 | $- | $60,000 | |
| 2.11 | Tier 2 | NO | $- | $- | $- | $- | $3,679,000 | $2,207,400 | $1,471,600 | |
| 1.51 | Tier 2 | NO | $229,000 | $115,000 | $2,284,000 | $- | $2,627,000 | $1,576,200 | $1,050,800 | |
| 0.02 | Tier 2 | NO | $3,000 | $2,000 | $28,000 | $- | $32,000 | $- | $32,000 | |
| 2.34 | Tier 2 | NO | $177,000 | $1,237,000 | $2,121,000 | $- | $3,534,000 | $- | $3,534,000 | |
| Tier 3 | 0.76 | Tier 2 | NO | $26,000 | $13,000 | $260,000 | $- | $299,000 | $244,985 | $54,015 |
| 2.83 | Tier 2 | NO | $429,000 | $215,000 | $4,288,000 | $- | $4,931,000 | $- | $4,931,000 | |
| 0.50 | Tier 2 | NO | $77,000 | $39,000 | $768,000 | $- | $884,000 | $- | $884,000 | |
| Tier 3 | 1.67 | Tier 2 | YES | $- | $- | $- | $- | $4,500,000 | $3,600,000 | $900,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1074 | Operational-Corridor | Metro South CID | District 3, District 6 | Constitution Road Widening (within GTIB Grant), Phase 2 | Fayetteville Road | International Park Drive | Constitution Road widening (within GTIB Grant) - Phase 2 | Unincorporated |
| R_222 | Operational-Corridor | Consultant Team | District 3, District 5, District 7 | Covington Highway Operational Improvement | Glenwood Road | Young Road | Access management improvements to address capacity and safety needs including 11'-lanes with 20-ft raised median, RCUTS and U-turns, other intersection improvements exclusive of S Hairston Road and Young Road; GDOT Project ID: 22-7126 | Unincorporated |
| R_224 | Operational-Corridor | Consultant Team | District 2, District 6, District 7 | Frazier Road Operational Improvement | Lawrenceville Highway | Lavista Road | Intersection improvements including widening from Tolbert Dr to Camden Walk to provide better storage for approaches to Lawrenceville Hwy and left turn lanes at Pangborn Rd and Tolbert Dr; Sidewalk improvements for both sides | Unincorporated |
| R_1078 | Operational-Corridor | Metro South CID | District 3, District 6 | Henrico Road Operational Improvement | Moreland Avenue | Koppers Road | Significant pavement drop-off on roadway shoulders. History of truck rollovers due to low shoulders. Shoulder and pavement widening and road re-construction to accommodate truck traffic | Unincorporated |
| R_1417 | Operational-Corridor | DeKalb SPLOST | District 2, District 4, District 6 | Lawrenceville Highway at North Druid Hills Road Operational Improvement | North Druid Hills Road | Extend the northbound left-turn lane on Lawrenceville Hwy (SR-8/ US-78) for left-turning vehicles onto North Druid Hills Rd. May require the median to close to extend left-turn lane. Possibly a Quick Response project with GDOT | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.77 | Tier 2 | NO | $967,000 | $325,000 | $7,106,000 | $930,000 | $9,327,000 | $7,554,870 | $1,772,130 | |
| 1.91 | Tier 2 | YES | $2,500,000 | $2,500,000 | $9,000,000 | $1,500,000 | $15,500,000 | $15,500,000 | $- | |
| 1.04 | Tier 2 | NO | $52,000 | $104,000 | $520,000 | $- | $676,000 | $- | $676,000 | |
| 1.38 | Tier 2 | NO | $559,000 | $740,000 | $6,686,000 | $- | $7,984,000 | $6,387,200 | $1,596,800 | |
| 0.08 | Tier 2 | YES | $26,000 | $- | $312,000 | $- | $338,000 | $338,000 | $- |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1081 | Operational-Corridor | Metro South CID | District 3, District 6 | Moreland Avenue Operational Improvement | Cedar Grove | Conley Road | Widen Moreland Avenue to include 1) a deceleration lane and travel lanes that are 12-ft wide southbound and 2) a deceleration lane, left turn lane, acceleration lane/U-turn loon that are 12-ft wide northbound. Modify opposing left-turn lanes on Moreland Avenue to be offset to provide better sight distance. Install advanced warning traffic signs and signals as appropriate, including 1) flashing sign for SB traffic to signal left turns from driveway and 2) signs along Moreland Avenue to signal an upcoming driveway with incoming/ turning traffic | Unincorporated |
| R_1082 | Operational-Corridor | Metro South CID | District 3, District 6 | Moreland Avenue Operational Improvement | Thurman Road | I-285 | Reconstruct the right turn from SB Moreland Avenue into the driveway to enlarge the turning radius to accommodate truck movements. Modify opposing left-turn lanes on Moreland Avenue to be offset to provide better intersection sight distance. Modify median end-treatments into a "bullet-nose" type to improve left turn movements for trucks. | Unincorporated |
| R_234 | Operational-Corridor | Covington Highway Corridor Master Active Living Plan | District 3, District 7 | Raise Median along Covington Highway | Redan Road | Redwing Circle | Raised median and operational improvements; GDOT Project ID: 22-7126 | Unincorporated |
| R_405d | Operational-Corridor | Consultant Team | District 4, District 5, District 7 | Redan Road Operational Improvement | Allgood Road | S Hairston Road | Raised median, access management, and intersection capacity and operational improvements | Unincorporated |
| R_1422 | Operational-Corridor | DeKalb SPLOST | District 4, District 6 | Rockbridge Road Traffic Engineering Study | Cobblestone Trail | Glen Cove Drive | Traffic Engineering study to identify safety improvements for curved portion | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.69 | Tier 2 | YES | $180,000 | $225,000 | $1,500,000 | $525,000 | $2,430,000 | $2,041,200 | $388,800 | |
| 0.51 | Tier 2 | YES | $36,000 | $45,000 | $300,000 | $105,000 | $486,000 | $408,240 | $77,760 | |
| 0.46 | Tier 2 | YES | $90,000 | $- | $598,000 | $- | $688,000 | $688,000 | $- | |
| 1.20 | Tier 2 | NO | $869,000 | $2,276,000 | $5,420,000 | $1,438,000 | $10,000,000 | $5,000,000 | $5,000,000 | |
| 0.14 | Tier 2 | NO | $11,000 | $- | $156,000 | $- | $167,000 | $- | $167,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1421 | Operational-Corridor | DeKalb SPLOST | District 3, District 7 | South Rainbow Drive Corridor Safety Improvement Study | Fairlake Drive | Rainbow Drive | Traffic Engineering study to identify safety improvements for curved portion | Unincorporated |
| R_1068 | Operational-Intersection | Metro South CID | District 3, District 6 | Cedar Grove at Moreland Intersection Improvement | Moreland Avenue | Widen right-turn lane from Cedar Grove Road onto Moreland Avenue. Reconstruct pavement of Cedar Grove Road to accommodate truck traffic and minimize load-related pavement deterioration. Install sidewalks to accompany the existing crosswalks and existing signals to improve pedestrian safety. Improve radius (east side) | Unincorporated | |
| R_1064 | Operational-Intersection | Metro South CID | District 3, District 6 | Cedar Grove Road/ Thurman Road (SR 160)/Old McDonough Road Roundabout | Thurman Road | A truck roundabout for this intersection with 13' lanes and adequate turning radii. Reconstruct pavement and restripe Old McDonough Road and Cedar Grove Road to accommodate truck traffic and enhance delineation for driver awareness and safety. Improve roadway drainage infrastructure, including a maintenance schedule to ensure efficacy. Install a storage lane on Old McDonough to relieve truck queuing from truck wash facility. Resurface Cedar Grove Road and Thurman Road as part of roadway and drainage maintenance. Improve roadway drainage infrastructure | Unincorporated | |
| R_152 | Operational-Intersection | Consultant Team | District 4, District 6 | Central Drive at Hambrick Road Intersection Improvement | Hambrick Road | Turn lane capacity and operational improvements | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.21 | Tier 2 | NO | $11,000 | $- | $136,000 | $- | $146,000 | $- | $146,000 | |
| Tier 2 | YES | $140,000 | $174,000 | $1,160,000 | $406,000 | $1,880,000 | $1,598,000 | $282,000 | ||
| Tier 2 | YES | $- | $548,000 | $3,650,000 | $1,278,000 | $5,475,000 | $4,489,500 | $985,500 | ||
| Tier 2 | NO | $300,000 | $200,000 | $1,000,000 | $200,000 | $1,700,000 | $- | $1,700,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1410 | Operational-Intersection | DeKalb SPLOST | District 1, District 7 | Evans Road at Evans Wood Drive Intersection Improvement Study | Evans Wood Drive | Traffic Engineering study to identify safety improvements | Unincorporated | |
| R_1401 | Operational-Intersection | DeKalb SPLOST | District 4, District 6 | Frazier Road at SR 8 Intersection Improvement | SR-8 | New eastbound right-turn lane from Frazier Road onto Lawrenceville Hwy (SR-8) | Unincorporated | |
| R_116 | Operational-Intersection | 2014 Transportation Plan | District 3, District 6 | Gresham Road at Brannen Road Intersection Improvement | Brannen Road | Feasibility study is needed to examine the appropriateness of a roundabout | Unincorporated | |
| R_1067 | Operational-Intersection | Metro South CID | District 3, District 6 | Henrico Road at Bonsal Road Intersection Improvement | Bonsal Road | Widen Henrico Road and Bonsal Road to include 12-ft travel lanes and dedicated turn lanes. Reconstruct pavement and restripe Henrico Road and Bonsal Road to accommodate the increased truck traffic due to Cedar Grove Road closures. Include paved shoulders on both roads and improvements to drainage infrastructure. Reconstruct intersection to include adequate turning radii from and onto Henrico Road. Perform operational analysis investigating possible improvements | Unincorporated | |
| R_1071 | Operational-Intersection | Metro South CID | District 3, District 6 | Henrico Road at CSX Crossing Cul-de-Sac | 500 feet before CSX crossing | Resiliency project to reduce impacts from NS train crossing blockage. Allow cars and trucks opportunity to bypass long waits at train crossing and find alternate routes to their destination. Construct on westside of crossing an eyebrow cul-de-sac that will accommodate truck turning movements. Law enforcement to enforce illegal truck parking | Unincorporated |
COMPREHENSIVE TRANSPORTATION PLAN
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Road-way | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 2 | NO | $63,000 | $- | $- | $- | $63,000 | $- | $63,000 | ||
| Tier 2 | YES | $52,000 | $104,000 | $520,000 | $- | $676,000 | $473,200 | $202,800 | ||
| Tier 2 | YES | $230,000 | $- | $2,305,000 | $- | $2,535,000 | $1,774,500 | $760,500 | ||
| Tier 2 | NO | $120,000 | $150,000 | $1,000,000 | $350,000 | $1,620,000 | $97,200 | $1,522,800 | ||
| Tier 2 | NO | $120,000 | $150,000 | $1,000,000 | $350,000 | $1,620,000 | $1,393,200 | $226,800 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1070 | Operational-Intersection | Metro South CID | District 3, District 6 | Henrico Road at Moreland Avenue Intersection Improvement | Moreland Avenue | Widening Moreland Avenue to include a dedicated right turn lane from NB Moreland Avenue onto Henrico Road. Reconstruct the channelized right turn on Henrico Road to NB Moreland Avenue to include a larger radius for turning trucks. Reconstruct pavement on Henrico Road and re-stripe to accommodate the increased truck traffic. Consider closing driveways that are close to the intersection, including 1) the Circle K entrance on Moreland Avenue, and 2) the Chevron entrance on Henrico Road | Unincorporated | |
| R_138 | Operational-Intersection | Consultant Team | District 3, District 6 | Henrico Road/ Westside Place at Moore Road Intersection Improvement | Moore Road | Geometric improvements to address skew | Unincorporated | |
| R_1411 | Operational-Intersection | DeKalb SPLOST | District 2, District 6 | Houston Mill Road at Lavista Road Intersection Improvement | Lavista Road | Northbound right-turn lane from Houston Mill Road onto Lavista Road. Currently it is a shared right-thru lane | Unincorporated | |
| R_1403 | Operational-Intersection | DeKalb SPLOST | District 2, District 6 | Lavista Road at Clairmont Road Intersection Improvement | Clairmont Road | GDOT proposes right-turn lane improvements within the existing ROW; GDOT PI 0015680 | Unincorporated | |
| R_1404 | Operational-Intersection | DeKalb SPLOST | District 4, District 6 | Milscott Drive at Church Drive Intersection Improvement | Church Drive | Traffic signal and pedestrian improvements | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 2 | YES | $424,000 | $530,000 | $3,530,000 | $1,236,000 | $5,719,000 | $4,689,580 | $1,029,420 | ||
| Tier 2 | NO | $150,000 | $20,000 | $500,000 | $50,000 | $720,000 | $- | $720,000 | ||
| Tier 2 | YES | $42,000 | $52,000 | $312,000 | $- | $406,000 | $284,200 | $121,800 | ||
| Tier 2 | YES | $21,000 | $- | $208,000 | $- | $229,000 | $229,000 | $- | ||
| Tier 2 | NO | $42,000 | $52,000 | $312,000 | $- | $406,000 | $- | $406,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1062 | Operational-Intersection | Metro South CID | District 3, District 6 | Moreland Avenue at Conley Road Intersection Improvement | Conley Road | Install a new actuated uncoordinated signal with a 100 second cycle length for both AM and PM peak hours, as suggested in Greater Conley CID Master Plan. Widening of Moreland Avenue to include: 1) Increase width of left turn lane on SB Moreland Avenue to 12-ft; 2) Dedicated right turn lane onto Bailey Street from NB Moreland Avenue; and Acceleration/Deceleration lane for the driveway on the East side with large turning radius. Install pedestrian crosswalk and determine warrant for pedestrian signal to cross Moreland Avenue at Bailey Street. Improve/ rehabilitate/reconstruct pavement along Moreland Avenue and Bailey Street | Unincorporated | |
| R_100 | Operational-Intersection | 2014 Transportation Plan | District 4, District 6 | N Clarendon Avenue at Rockbridge Road Intersection Improvements | Rockbridge Road | Intersection operational improvements as well as bicycle and pedestrian access improvements | Unincorporated | |
| R_160 | Operational-Intersection | DeKalb SPLOST | District 4, District 6 | Rays Road at Norman Road Intersection Improvement Study | Norman Road | Study to identify intersection improvements | Unincorporated | |
| R_166 | Operational-Intersection | North Druid Hills LCI | District 2, District 6 | North Druid Hills Road at Lavista Road Intersection Improvement | Lavista Road | Safety and operational intersection improvement including median along Lavista Road across from Toco Hill shopping center | Unincorporated | |
| R_1408 | Operational-Intersection | DeKalb SPLOST | District 3, District 7 | Rainbow Drive at Cocklebur Road Intersection Improvement | Cocklebur Road | Intersection capacity and operational improvements including dedicated left-turn lanes | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 2 | NO | $216,000 | $270,000 | $1,797,000 | $629,000 | $2,912,000 | $2,416,960 | $495,040 | ||
| Tier 2 | NO | $46,000 | $- | $452,000 | $- | $497,000 | $- | $497,000 | ||
| Tier 2 | NO | $52,000 | $- | $- | $- | $52,000 | $- | $52,000 | ||
| Tier 2 | YES | $- | $- | $- | $- | $958,000 | $670,600 | $287,400 | ||
| Tier 2 | NO | $42,000 | $52,000 | $416,000 | $- | $510,000 | $- | $510,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_172 | Operational-Intersection | Public Engagement | District 3, District 7 | River Road at Lincrest Road Intersection Improvement | Lincrest Road | Add channelized island and pavement for existing right-turn lane on Linecrest Rd | Unincorporated | |
| R_148 | Operational-Intersection | Consultant Team | District 5, District 7 | S Deshon Road at Alford Road Intersection Improvement | Alford Road | Intersection capacity and operational improvements including potential mini-roundabout | Unincorporated | |
| R_151 | Operational-Intersection | Consultant Team | District 5, District 7 | S Deshon Road at Rogers Lake Road Intersection Improvement | Rogers Lake Road | Intersection capacity and operational improvements including potential mini-roundabout | Unincorporated | |
| R_170 | Operational-Intersection | Public Engagement | District 5, District 7 | S Stone Mountain Lithonia Road at Shadow Rock Drive Intersection Improvement | Shadow Rock Drive | New traffic signal (if warranted), add turn lane on Shadow Rock, improve at-grade RR crossing and Shadow Rock profile | Unincorporated | |
| R_143 | Operational-Intersection | Consultant Team | District 5, District 7 | Wellborn Road at DeKalb Medical Parkway Intersection Improvement | DeKalb Medical Parkway | Intersection operational improvements including channelization and signal upgrades | Unincorporated | |
| R_149 | Operational-Intersection | Consultant Team | District 5, District 7 | Wellborn Road at Marbut Road Intersection Improvement | Marbut Road | Intersection capacity and operational improvements including potential mini-roundabout | Unincorporated | |
| R_401 | Capacity-Widening | 2014 Transportation Plan | District 5, District 7 | Covington Highway Capacity Improvement | Evans Mill Road | SR 124 (Turner Hill Road) | Widen roadway from 2 to 4 lanes including a center turn lane from Evans Mill Road to SR 124 (Turner Hill Road) as well as a median treatment with bicycle and pedestrian improvements | Lithonia, Stonecrest, Unincorporated |
| R_1080 | Capacity-Widening | Metro South CID | District 3, District 6 | Old McDonough Road Capacity Improvement | Thurman Road | Lancaster Road | Operational Improvements along Old McDonough Road from Thurman Road to Lancaster Road | Unincorporated |
| R_1077 | Capacity-Widening | Metro South CID | District 3, District 6 | Old McDonough Road Capacity Improvement | Lancaster Road | Mason Dixon Road | Pave and widen existing dirt road to 12 ft. lanes with 3-5 ft. shoulders. Pavement section to be designed for trucks | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 2 | NO | $20,000 | $- | $80,000 | $- | $100,000 | $- | $100,000 | ||
| Tier 2 | NO | $100,000 | $100,000 | $500,000 | $100,000 | $800,000 | $- | $800,000 | ||
| Tier 2 | NO | $300,000 | $300,000 | $1,200,000 | $200,000 | $2,000,000 | $- | $2,000,000 | ||
| Tier 2 | NO | $40,000 | $- | $300,000 | $- | $340,000 | $- | $340,000 | ||
| Tier 2 | NO | $250,000 | $100,000 | $1,000,000 | $100,000 | $1,450,000 | $- | $1,450,000 | ||
| Tier 2 | NO | $100,000 | $100,000 | $500,000 | $100,000 | $800,000 | $- | $800,000 | ||
| Tier 2 | 2.65 | Tier 3 | YES | $154,000 | $5,743,000 | $6,273,000 | $- | $12,168,000 | $2,372,399 | $9,795,601 |
| 0.92 | Tier 3 | YES | $130,000 | $163,000 | $1,083,000 | $379,000 | $1,754,000 | $105,240 | $1,648,760 | |
| 0.23 | Tier 3 | YES | $- | $107,000 | $711,000 | $249,000 | $1,067,000 | $96,030 | $970,970 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_909 | Freight and Rail Crossing | Consultant Team | District 4, District 7 | Rockbridge Road SW at Stone Mountain Lithonia Road Rail Crossing Improvement | Stone Mountain Lithonia Road | At-grade crossing safety and operational improvements; Evaluate queue management strategies such as a a pre-signal | Unincorporated | |
| R_914 | Freight and Rail Crossing | Consultant Team | District 5, District 7 | Stone Mountain Lithonia Road at Redan Road Rail Crossing Improvement | Redan Road | At-grade crossing safety and operational improvements; Evaluate rail crossing operational, safety, and queue management strategies | Unincorporated | |
| R_710 | Interchange- New or Improvements | Consultant Team | District 1, District 7 | I-85 SB Ramp at Pleasantdale Road Interchange Improvement | Pleasantdale Road | Interchange improvements; GDOT PI Number 0008582 | Unincorporated | |
| R_700 | Interchange- New or Improvements | 2014 Transportation Plan | District 1, District 7 | Shallowford Road at I-85 Rail Interchange Improvement | I-85 | Interchange upgrade to include ITS/ operational improvements as well as accommodations for bicycles and pedestrians | Unincorporated | |
| R_809 | ITS Improvements | 2014 Transportation Plan | District 2, District 6 | Briarcliff Road ITS Improvement | Johnson Road | N Decatur Road | Install fiber optic interconnect and convert signals to ethernet | Atlanta, Unincorporated |
| R_800 | ITS Improvements | 2014 Transportation Plan | District 2, District 6 | Briarcliff Road ITS Improvement | Johnson Road | Sheridan Road | Install switches and cameras to upgrade traffic operations | Unincorporated |
| R_808 | ITS Improvements | 2014 Transportation Plan | District 3, District 5, District 7 | Flat Shoals Parkway/ Flakes Mill Road/ Snapfinger Road/Wesley Chapel Road ITS Improvement | Boring Road at Flat Shoals | Covington Highway at Wesley Chapel Road | Convert from dial-up to ethernet-connect Wesley Chapel to Panola via fiber on I-20 (DeKalb 24 cable); Must be done concurrently or after completion of Panola Road/Fairington Road improvements; GDOT GOASIS Project ID: 22-7078 - Resurfacing striping plans | Unincorporated |
| R_814 | ITS Improvements | 2014 Transportation Plan | District 5, District 7 | New DeKalb County Traffic Control Center | New DeKalb County Traffic Control Center (TCC) facility | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 3 | NO | $- | $- | $- | $- | $470,000 | $- | $470,000 | ||
| Tier 3 | NO | $40,000 | $- | $300,000 | $- | $340,000 | $- | $340,000 | ||
| Tier 3 | YES | $8,000,000 | $4,000,000 | $34,000,000 | $4,000,000 | $50,000,000 | $50,000,000 | $- | ||
| Tier 3 | YES | $162,000 | $440,000 | $1,615,000 | $- | $2,216,000 | $2,216,000 | $- | ||
| Tier 3 | 0.99 | Tier 3 | YES | $14,000 | $- | $31,000 | $- | $44,000 | $- | $44,000 |
| 1.49 | Tier 3 | YES | $17,000 | $- | $60,000 | $- | $77,000 | $61,600 | $15,400 | |
| 8.08 | Tier 3 | YES | $35,000 | $- | $243,000 | $- | $278,000 | $222,400 | $55,600 | |
| Tier 3 | NO | $- | $- | $2,053,000 | $- | $2,053,000 | $- | $2,053,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_811 | ITS Improvements | 2014 Transportation Plan | District 1, District 7 | Pleasantdale Road ITS Improvement | Best Friend Road | Pleasantdale Crossing | Install fiber optic interconnect and convert signals to ethernet; This portion requires fiber along the interstate from Pleasantdale Road to Shallowford Road in order to tie into the TCC (not shown in project geometry) | Doraville, Unincorporated |
| R_807 | ITS Improvements | 2014 Transportation Plan | District 4, District 5, District 7 | Rock Chapel Road/ Rockbridge Road ITS Improvement | S Rockbridge Road/ Pembleton Court | Union Grove Road | Install fiber optic interconnect (no current connection to TCC or path to TCC); add Rockbridge at S Deshon, Registry Bluff, Wynbrook Parkway to connect with Five Station | Stonecrest, Unincorporated |
| R_806 | ITS Improvements | 2014 Transportation Plan | District 5, District 7 | Turner Hill Road/Mall Parkway ITS Improvement | Klondike Road | Rock Chapel Road/ Union Grove Road | Install fiber optic interconnect, convert signals to ethernet and install fiber optic link to library | Stonecrest, Unincorporated |
| M_022a | Multimodal | Consultant Team | District 2, District 6 | Clairmont Road Multimodal Improvement | Lavista Road | N Decatur Road | Corridor improvements to include a median (center turn lane or landscaped) as well as bike and pedestrian facilities and operational improvements at key intersections | Unincorporated |
| M_028 | Multimodal | 2014 Transportation Plan | District 5, District 7 | Covington Highway Multimodal Improvement | S Hairston Road | Klondike Road | Addition of a landscaped median to include pedestrian (sidewalk and crossing) and bicycle accommodations and operational improvements at key locations along the corridor; GDOT Safety Project High Level Crash Screening: Project ID: 22-7126 | Stonecrest, Unincorporated |
| M_2007 | Multimodal | Consultant Team | District 5, District 7 | Covington Trails and Kensington MARTA Station Road Diets, Phase 3 | Durham Park Road | Sagehill Drive | New trail facility to improve connectivity | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 3 | 1.00 | Tier 3 | NO | $42,000 | $- | $329,000 | $- | $370,000 | $121,891 | $248,109 |
| Tier 2 | 6.39 | Tier 3 | YES | $31,000 | $- | $185,000 | $- | $215,000 | $193,500 | $21,500 |
| Tier 2 | 3.55 | Tier 3 | YES | $28,000 | $- | $118,000 | $- | $146,000 | $131,400 | $14,600 |
| 2.23 | Tier 3 | YES | $- | $- | $- | $- | $2,000,000 | $1,600,000 | $400,000 | |
| Tier 2 | 5.08 | Tier 3 | YES | $2,573,000 | $10,087,000 | $33,407,000 | $- | $46,067,000 | $41,460,300 | $4,606,700 |
| 0.76 | Tier 3 | NO | $- | $- | $- | $- | $920,000 | $- | $920,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| M_034 | Multimodal | 2014 Transportation Plan | District 2, District 6 | Executive Park Ring Road New Alignment | Buford Highway | Briarcliff Road | New roadway connection across I-85 connecting Buford Highway with Sheridan Road and Briarcliff Road. New connection will include multimodal and transit accommodations | Brookhaven, Unincorporated |
| M_042 | Multimodal | 2014 Transportation Plan | District 3, District 6 | Gresham Road/Clifton Church Road Multimodal Improvement | Flat Shoals Road | Clifton Church Road | Roadway operational improvements and inclusion of bicycle lanes and sidewalks to connect with PATH trail connection at Clifton Church Road and Gresham Road | Unincorporated |
| M_013 | Multimodal | Consultant Team | District 4, District 5, District 7 | Heritage Corridor Multimodal Improvement | Stone Mountain | Lithonia | A multimodal corridor study will consider roadway, bike, and pedestrian improvements throughout and connecting Stone Mountain and Lithonia downtowns. Pedestrian improvements will be considered to improve pedestrian crossings along this corridor | Stone Mountain, Unincorporated |
| M_014 | Multimodal | 2014 Transportation Plan | District 2, District 4, District 6, District 7 | Lavista Road Multimodal Improvement | N Druid Hills Road | Harobi Drive | Corridor operational and bike improvements to include a center turn lane/ bike lanes; pedestrian improvements at key intersections especially between Cheshire Bridge Road/ N Druid Hills Road, and passive pedestrian ATMS between Sheffield Dr/Houston Mill Road | Tucker, Unincorporated |
| M_025 | Multimodal | 2014 Transportation Plan | District 2, District 4, District 6 | N Decatur Road Multimodal Improvement | Church Street | E Ponce De Leon Avenue | Four lane section will include a combination of bicycle and pedestrian improvements and will be consistent with corridor transit design | Unincorporated |
| M_024 | Multimodal | 2014 Transportation Plan | District 2, District 6 | N Decatur Road Multimodal Improvement | Clairmont Road | Church Street | Four lane section will include a combination of bicycle and pedestrian improvements and will be consistent with corridor transit design | Decatur, Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 3 | 0.93 | Tier 3 | NO | $2,309,000 | $11,085,000 | $11,392,000 | $- | $24,785,000 | $17,195,784 | $7,589,216 |
| 1.78 | Tier 3 | NO | $527,000 | $3,689,000 | $6,323,000 | $- | $10,538,000 | $- | $10,538,000 | |
| Tier 3 | 11.69 | Tier 3 | NO | $- | $- | $- | $- | $25,400,000 | $13,797,555 | $11,602,445 |
| Tier 3 | 5.92 | Tier 3 | YES | $1,958,000 | $15,862,000 | $25,292,000 | $- | $43,110,000 | $38,799,000 | $4,311,000 |
| 1.25 | Tier 3 | NO | $1,065,000 | $7,454,000 | $12,777,000 | $- | $21,295,000 | $- | $21,295,000 | |
| Tier 1 | 1.29 | Tier 3 | NO | $- | $6,624,000 | $9,936,000 | $- | $16,560,000 | $7,783,200 | $8,776,800 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| M_023 | Multimodal | 2014 Transportation Plan | District 2, District 6 | N Decatur Road Multimodal Improvement | Clifton Road | Clairmont Road | Four lane section will include bicycle and pedestrian improvements (particularly pedestrian crossings), and will be consistent with corridor transit design. N Decatur Road/Haygood Drive intersection to include improved striping, lighting and signage | Unincorporated |
| M_029 | Multimodal | 2014 Transportation Plan | District 2, District 6 | N Druid Hills Road/I-85 Access Road Multimodal Improvement | I-85 Frontage Road underpass at Cliff Valley Way/ Executive Park S | Mount Mariah Road/ Briarwood Road | I-85 North Druid Hills Connector and North Druid Hills/ I-85 - Access road modifications along corridor | Brookhaven, Unincorporated |
| M_010 | Multimodal | 2014 Transportation Plan | District 2, District 6 | Scott Boulevard Multimodal Improvement and Grade Separation | Eastland Drive | Hollywood Drive | Recommendations for the Scott Boulevard corridor throughout the Medline LCI area are anticipated but not yet known. This is a set-aside for future recommendations | Unincorporated |
| M_035d | Multimodal | Consultant Team | District 2, District 4, District 6 | Valley Brook Road Multimodal Improvements | Lawrenceville Highway | Ponce De Leon Avenue | Multimodal improvements including capacity and operational improvements at key intersections, access management measures, and sidewalk infill | Unincorporated |
| R_2005 | New Connection | Consultant Team | District 2, District 6 | Clairmont Road Reliever Connection | I-85 Frontage Road | Briarcliff Road NE | New connection from I-85 Frontage Road to Briarcliff Road NE east of Clairmont Road | Unincorporated |
| R_621 | New Connection | North Druid Hills LCI | District 2, District 6 | McConnell Drive Extension | Clairmont Road | North Jamestown Road | New connection | Unincorporated |
| R_612 | New Connection | Kensington LCI TOD | District 5, District 7 | New Street A | Camp Circle | New Road | New grid network for Kensington LCI | Unincorporated |
| R_613 | New Connection | Kensington LCI TOD | District 5, District 7 | New Street B | Camp Way | Camp Circle | New grid network for Kensington LCI | Unincorporated |
| R_614 | New Connection | Kensington LCI TOD | District 5, District 7 | New Street C | Camp Street | New Street A | New grid network for Kensington LCI | Unincorporated |
| R_615 | New Connection | Kensington LCI TOD | District 3, District 5, District 6, District 7 | New Street D | New Street A | Kensington Road | New grid network for Kensington LCI | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.93 | Tier 3 | NO | $743,000 | $5,198,000 | $8,910,000 | $- | $14,849,000 | $- | $14,849,000 | |
| Tier 3 | 1.54 | Tier 3 | YES | $1,078,000 | $5,081,000 | $4,619,000 | $- | $10,777,000 | $3,931,702 | $6,845,298 |
| 1.13 | Tier 3 | YES | $2,800,000 | $19,600,000 | $33,600,000 | $- | $56,000,000 | $56,000,000 | $- | |
| 1.28 | Tier 3 | NO | $766,000 | $5,359,000 | $9,186,000 | $- | $15,310,000 | $7,961,200 | $7,348,800 | |
| 0.20 | Tier 3 | NO | $- | $- | $- | $- | $10,000,000 | $- | $10,000,000 | |
| 0.22 | Tier 3 | NO | $- | $- | $- | $- | $6,159,000 | $- | $6,159,000 | |
| 0.42 | Tier 3 | NO | $- | $- | $- | $- | $712,000 | $- | $712,000 | |
| 0.27 | Tier 3 | NO | $- | $- | $- | $- | $521,000 | $- | $521,000 | |
| 0.34 | Tier 3 | NO | $- | $- | $- | $- | $664,000 | $- | $664,000 | |
| 0.20 | Tier 3 | NO | $- | $- | $- | $- | $432,000 | $- | $432,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_616 | New Connection | Kensington LCI TOD | District 5, District 7 | New Street E | Camp Circle | Kensington Road | New grid network for Kensington LCI | Unincorporated |
| R_617 | New Connection | Kensington LCI TOD | District 5, District 7 | New Street F | New Street C | Kensington Road | New grid network for Kensington LCI | Unincorporated |
| R_619 | New Connection | Kensington LCI TOD | District 4, District 6 | New Street H | Northern Avenue | Mountain Drive | New grid network for Kensington LCI | Unincorporated |
| R_620 | New Connection | Kensington LCI TOD | District 5, District 7 | New Street I | Kensington Road | Durham Park Road | New grid network for Kensington LCI | Unincorporated |
| BP_1424 | Off-Road | DeKalb SPLOST Trails | District 5, District 7 | Arabia Mountain - Stone Mountain Connector Trail 2 | Stonecrest City Limits | Stone Mountain Park | Trail/Path alignment alternative to connect Stone Mountain Park to Arabia Mountain Park within DeKalb County's jurisdiction | Unincorporated |
| BP_1426 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | Bouldercrest Court Connection to S River Trail | Bouldercrest Court | S River Trail | Connection from South River Trail to local neighborhood via Bouldercrest Court | Unincorporated |
| BP_1431 | Off-Road | DeKalb SPLOST Trails | District 3, District 7 | Covington Trails, Phase 2 (South) | Memorial Drive | Covington Highway | New trail facility to improve connectivity | Unincorporated |
| BP_1430 | Off-Road | DeKalb SPLOST Trails | District 3, District 7 | Covington Trails, Phase 2 (South) | Covington Highway | Holcombe Road | New trail facility to improve connectivity | Unincorporated |
| BP_1429 | Off-Road | DeKalb SPLOST Trails | District 3, District 5, District 7 | Covington Trails, Phase 2 (South) | W Austin Road | Towers Way | New trail facility to improve connectivity | Unincorporated |
| BP_1432 | Off-Road | DeKalb SPLOST Trails | District 3, District 5, District 7 | Covington Trails, Phase 2 (South) | Covington Highway | Redan Road | New trail facility to improve connectivity | Unincorporated |
| BP_1434 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | Gresham Park Connection to S River Trail | South River Trail | Gresham Park | Trail connection between South River Trail and Gresham Recreation Center Park | Unincorporated |
| BP_1500 | Off-Road | Consultant Team | District 1, District 6, District 7 | I-285 Top End Trail | Hammond Drive | Northlake Mall | Regional trail facility | Chamblee, Doraville, Dunwoody, Tucker, Unincorporated |
| BP_1437 | Off-Road | DeKalb SPLOST Trails | District 4, District 5, District 6, District 7 | Indian Creek MARTA Station Trails | Tie-in to Snapfinger Trail PATH | Indian Creek Station area walkability improvements | Unincorporated | |
| BP_1436 | Off-Road | DeKalb SPLOST Trails | District 4, District 5, District 6, District 7 | Indian Creek MARTA Station Trails | S Indian Creek Drive | Snapfinger Trail PATH | Indian Creek Station area walkability improvements | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.12 | Tier 3 | NO | $- | $- | $- | $- | $267,000 | $- | $267,000 | |
| 0.36 | Tier 3 | NO | $- | $- | $- | $- | $904,000 | $- | $904,000 | |
| 0.47 | Tier 3 | NO | $- | $- | $- | $- | $1,307,000 | $- | $1,307,000 | |
| 0.59 | Tier 3 | NO | $- | $- | $- | $- | $1,109,000 | $- | $1,109,000 | |
| 2.67 | Tier 3 | NO | $404,000 | $202,000 | $4,037,000 | $- | $4,643,000 | $- | $4,643,000 | |
| 0.05 | Tier 3 | NO | $6,000 | $3,000 | $52,000 | $- | $60,000 | $- | $60,000 | |
| 0.61 | Tier 3 | YES | $92,000 | $46,000 | $911,000 | $- | $1,048,000 | $- | $1,048,000 | |
| 0.45 | Tier 3 | NO | $88,000 | $44,000 | $873,000 | $- | $1,004,000 | $- | $1,004,000 | |
| 0.19 | Tier 3 | NO | $70,000 | $35,000 | $694,000 | $- | $798,000 | $- | $798,000 | |
| 0.58 | Tier 3 | NO | $29,000 | $15,000 | $285,000 | $- | $328,000 | $- | $328,000 | |
| 0.17 | Tier 3 | NO | $26,000 | $13,000 | $251,000 | $- | $288,000 | $- | $288,000 | |
| Tier 2 | 9.00 | Tier 3 | NO | $8,000,000 | $- | $30,000,000 | $- | $38,000,000 | $23,180,000 | $14,820,000 |
| 0.25 | Tier 3 | NO | $39,000 | $20,000 | $385,000 | $- | $443,000 | $- | $443,000 | |
| 0.19 | Tier 3 | NO | $29,000 | $15,000 | $288,000 | $- | $331,000 | $- | $331,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| BP_1442 | Off-Road | DeKalb SPLOST Trails | District 4, District 7 | James B Rivers Memorial Drive Trail | Stone Mountain City Limits | Silver Hill Road | New trail facility to improve connectivity | Unincorporated |
| BP_1443 | Off-Road | DeKalb SPLOST Trails | District 4, District 6 | James R Hallford Stadium to Snapfinger PATH Trail Connection | James R Hallford Stadium Parking Lot | Snapfinger Trail PATH | New trail facility to improve connectivity with Snapfinger Trail. | Unincorporated |
| BP_144 | Off-Road | North Druid Hills LCI | District 2, District 6 | McConnell Drive Three Parks Connector-Multiuse Trail | South of Intown Community School | Toco Hills Shopping Center | New trail facility to improve connectivity | Unincorporated |
| BP_136 | Off-Road | Kensington LCI TOD | District 3, District 4, District 5, District 6, District 7 | Memorial Drive Trail | Kensington Road | I-285 | New trail facility to improve connectivity | Unincorporated |
| BP_041 | Off-Road | Belvedere Master Active Living Plan | District 3, District 7 | Multiuse Trail from Monterey Drive to Shoal Creek I Parallel to Capastrana Place | Monterey Drive | Shoal Creek I | Multiuse trail connecting east from Columbia Drive to Midway Park and Recreation Center throughout park and Memorial Dr | Unincorporated |
| BP_1448 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | Shoal Creek PATH Trail, Connection 1 | Elkhorn Drive | Shoal Creek PATH Trail | New trail facility to improve connectivity | Unincorporated |
| BP_1449 | Off-Road | DeKalb SPLOST Trails | District 4, District 6 | Shoal Creek PATH Trail, Phase 2 Connection 2 | Thomas Road | Shoal Creek PATH Trail | New trail facility to improve connectivity | Unincorporated |
| BP_1454 | Off-Road | DeKalb SPLOST Trails | District 3, District 7 | Shoal Creek PATH, Phase 2 Connection Trail | Shoal Creek PATH Trail | Gelndale Court | New trail facility to improve connectivity | Unincorporated |
| BP_1451 | Off-Road | DeKalb SPLOST Trails | District 2, District 3, District 4, District 6, District 7 | Shoal Creek Trail-PATH, Phase 1 (Section 1) | S River Trail | S Columbia Drive/Thomas Road | New trail facility to improve connectivity | Unincorporated |
| BP_1453 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | Shoal Creek Trail-PATH, Phase 2 | Candler Road | Flat Shoals Parkway | New trail facility to improve connectivity | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.83 | Tier 3 | NO | $126,000 | $63,000 | $1,252,000 | $- | $1,439,000 | $- | $1,439,000 | |
| 0.02 | Tier 3 | NO | $3,000 | $2,000 | $26,000 | $- | $30,000 | $- | $30,000 | |
| 0.53 | Tier 3 | NO | $- | $- | $- | $- | $4,229,000 | $- | $4,229,000 | |
| 0.68 | Tier 3 | YES | $- | $- | $- | $- | $1,251,000 | $- | $1,251,000 | |
| 0.42 | Tier 3 | NO | $10,000 | $- | $70,000 | $- | $79,000 | $- | $79,000 | |
| 0.04 | Tier 3 | NO | $6,000 | $3,000 | $58,000 | $- | $66,000 | $- | $66,000 | |
| 0.05 | Tier 3 | NO | $8,000 | $4,000 | $71,000 | $- | $81,000 | $- | $81,000 | |
| 0.05 | Tier 3 | NO | $8,000 | $4,000 | $79,000 | $- | $91,000 | $- | $91,000 | |
| 5.09 | Tier 3 | NO | $772,000 | $386,000 | $7,715,000 | $- | $8,873,000 | $- | $8,873,000 | |
| 1.56 | Tier 3 | NO | $354,000 | $177,000 | $3,534,000 | $- | $4,064,000 | $- | $4,064,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| BP_1425 | Off-Road | DeKalb SPLOST Trails | District 5, District 7 | Snapfinger Creek PATH Trail Connection | Red Cedar Trail | Snapfinger Creek Trail | New trail facility to improve connectivity | Unincorporated |
| BP_1455 | Off-Road | DeKalb SPLOST Trails | District 5, District 7 | Snapfinger PATH Trail Connection 1 | Ramblewood Circle | Snapfinger Trail | New trail facility to improve connectivity | Unincorporated |
| BP_1456 | Off-Road | DeKalb SPLOST Trails | District 5, District 7 | Snapfinger Trail - PATH | Indian Creek Trail | Indian Creek MARTA | New trail facility to improve connectivity | Unincorporated |
| BP_010a | Off-Road | Consultant Team | District 5, District 7 | Snapfinger Trail - PATH | Snapfinger Road | I-20 | New trail facility to improve connectivity | Stonecrest |
| BP_1457 | Off-Road | DeKalb SPLOST Trails | District 5, District 7 | Snapfinger Trail - PATH, Section 1 | S River Trail | Snapfinger Road | New trail facility to improve connectivity | Unincorporated |
| BP_1458 | Off-Road | DeKalb SPLOST Trails | District 4, District 5, District 6, District 7 | Snapfinger Trail - PATH, Section 2 | Stonecrest City Limits | Stoneview Park | New trail facility to improve connectivity | Unincorporated |
| BP_1459 | Off-Road | DeKalb SPLOST Trails | District 2, District 6 | South Peachtree Creek Trail - PATH, Phase 1 | Atlanta City Limits | Toco Hills Shopping Center | New trail facility to improve connectivity | Unincorporated |
| BP_1479 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | South River Connector Trail | Panthersville Road | Smithfield Avenue | New trail facility to improve connectivity | Unincorporated |
| BP_1462 | Off-Road | DeKalb SPLOST Trails | District 3, District 7 | South River Trail Extension | River Run Trail | South River Trail Extension | New trail facility to improve connectivity | Unincorporated |
| BP_1463 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | South River Trail Extension, Connection 3 | Sage Place | South River Trail Extension | New trail facility to improve connectivity | Unincorporated |
| BP_1465 | Off-Road | DeKalb SPLOST Trails | District 3, District 6 | South River Trail, Connection 2 | Waldrop Trail Cul-de-sac | South River Trail | New trail facility to improve connectivity | Unincorporated |
| BP_1460 | Off-Road | DeKalb SPLOST Trails | District 3, District 5, District 7 | South River Trail, Connection 4 | English Valley Drive | South River Trail | New trail facility to improve connectivity | Unincorporated |
| BP_1461 | Off-Road | DeKalb SPLOST Trails | District 3, District 7 | South River Trail, Connection 5 | River Edge Court | South River Trail | New trail facility to improve connectivity | Unincorporated |
| BP_1478 | Off-Road | DeKalb SPLOST Trails | District 4, District 5, District 7 | Stone Mountain Creek Trail | Stone Mountain Park Lake | Yellow River at SE DeKalb County Line | New trail facility to improve connectivity | Unincorporated |
| BP_1466 | Off-Road | DeKalb SPLOST Trails | District 4, District 7 | Stone Mountain Creek Trail Connection | Deer Trail Lane | Stone Mountain Creek Trail | New trail facility to improve connectivity | Unincorporated |
COMPREHENSIVE TRANSPORTATION PLAN
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.03 | Tier 3 | NO | $5,000 | $3,000 | $48,000 | $- | $55,000 | $- | $55,000 | |
| 0.12 | Tier 3 | NO | $17,000 | $9,000 | $166,000 | $- | $191,000 | $- | $191,000 | |
| 0.20 | Tier 3 | NO | $32,000 | $16,000 | $311,000 | $- | $357,000 | $- | $357,000 | |
| Tier 2 | 2.31 | Tier 3 | NO | $- | $- | $- | $- | $4,948,000 | $2,474,000 | $2,474,000 |
| 2.37 | Tier 3 | NO | $360,000 | $180,000 | $3,594,000 | $- | $4,133,000 | $- | $4,133,000 | |
| 10.14 | Tier 3 | NO | $1,527,000 | $764,000 | $15,263,000 | $- | $17,552,000 | $- | $17,552,000 | |
| 1.00 | Tier 3 | NO | $152,000 | $76,000 | $1,512,000 | $- | $1,739,000 | $- | $1,739,000 | |
| 3.49 | Tier 3 | NO | $527,000 | $264,000 | $5,263,000 | $- | $6,052,000 | $- | $6,052,000 | |
| 0.07 | Tier 3 | NO | $8,000 | $4,000 | $79,000 | $- | $91,000 | $- | $91,000 | |
| 0.03 | Tier 3 | NO | $5,000 | $3,000 | $46,000 | $- | $53,000 | $- | $53,000 | |
| 0.12 | Tier 3 | NO | $18,000 | $9,000 | $172,000 | $- | $198,000 | $- | $198,000 | |
| 0.09 | Tier 3 | NO | $14,000 | $7,000 | $136,000 | $- | $157,000 | $- | $157,000 | |
| 0.02 | Tier 3 | NO | $4,000 | $2,000 | $31,000 | $- | $35,000 | $- | $35,000 | |
| 9.35 | Tier 3 | NO | $1,412,000 | $706,000 | $14,120,000 | $- | $16,238,000 | $- | $16,238,000 | |
| 0.04 | Tier 3 | NO | $6,000 | $3,000 | $59,000 | $- | $68,000 | $- | $68,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| BP_1467 | Off-Road | DeKalb SPLOST Trails | District 4, District 5, District 7 | Stone Mountain Creek Trail Connection to Rockbridge Road | Stone Mountain Creek/Yellow River | SE DeKalb County Line | New trail facility to improve connectivity | Unincorporated |
| BP_138 | Off-Road | Medline LCI | District 2, District 6 | Wellness Multiuse Path | Medlock Road | Church Street | Wellness Multiuse Path | Unincorporated |
| BP_1468 | Off-Road | DeKalb SPLOST Trails | District 2, District 6 | Zonolite Park Trail Extension | Zonolite Park | Dalon Road NE | New trail facility to improve connectivity | Unincorporated |
| B_211 | On-Road | Medline LCI | District 2, District 4, District 6 | Sycamore Drive Resurfacing and Bike Lanes | Church Street | Grove Street | Pavement resurfacing and bike lanes | Decatur, Unincorporated |
| R_400b | Operational-Corridor | Consultant Team | District 2, District 6 | Briarcliff Road Arterial Managed Lanes | Clifton Road | N Druid Hills Road | Arterial managed lanes and operational improvements; GDOT PI Number M005990 | Brookhaven, Unincorporated |
| R_400a | Operational-Corridor | Consultant Team | District 2, District 6 | Briarcliff Road Operational Improvement | Clifton Road | N Druid Hills Road | Operational improvements to address capacity and safety needs; GDOT GOASIS Project ID: 21-7008 - TE Report | Brookhaven, Unincorporated |
| R_220 | Operational-Corridor | Consultant Team | District 3, District 6, District 7 | Candler/Flat Shoals Road Operational Improvements | I-20 Ramps | I-285 Ramps | Widening at key locations to add raised median with left-turn bays; Pedestrian hybrid signal crossings at 2 locations; GDOT GOASIS Project ID: 22-7078 - Resurfacing striping plans | Unincorporated |
| R_1079 | Operational-Corridor | Metro South CID | District 3, District 6 | Continental Way Operational Improvements | Bouldercrest Road | International Park Drive | Reconstruct and widen to 13 ft. lanes – curb and gutter urban section. Re-align West Fayetteville Road 90 degrees at Constitution Road. Correct deficient drainage at West Fayetteville/Constitution intersection and correct geometrics. Install roadway lighting and sidewalks | Unincorporated |
| R_235 | Operational-Corridor | Kensington LCI TOD | District 5, District 7 | County Jail Driveway Operational Improvements | Camp Road | Memorial Drive | Convert County Jail driveway into a public street | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.41 | Tier 3 | NO | $63,000 | $32,000 | $624,000 | $- | $718,000 | $- | $718,000 | |
| 0.28 | Tier 3 | NO | $42,000 | $- | $343,000 | $- | $384,000 | $- | $384,000 | |
| 0.09 | Tier 3 | NO | $13,000 | $7,000 | $129,000 | $- | $149,000 | $- | $149,000 | |
| Tier 3 | 0.98 | Tier 3 | NO | $42,000 | $- | $165,000 | $- | $206,000 | $148,467 | $57,533 |
| Tier 3 | 1.67 | Tier 3 | YES | $- | $- | $- | $- | $40,500,000 | $32,400,000 | $8,100,000 |
| Tier 3 | 1.67 | Tier 3 | YES | $- | $- | $- | $- | $29,040,000 | $23,232,000 | $5,808,000 |
| 1.22 | Tier 3 | YES | $1,000,000 | $1,000,000 | $4,500,000 | $1,500,000 | $8,000,000 | $8,000,000 | $- | |
| 0.63 | Tier 3 | NO | $500,000 | $300,000 | $2,000,000 | $300,000 | $3,100,000 | $217,000 | $2,883,000 | |
| 0.25 | Tier 3 | NO | $- | $- | $- | $- | $740,000 | $- | $740,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_223 | Operational-Corridor | Consultant Team | District 4, District 6, District 7 | Ponce De Leon Avenue Operational Improvements | Brockett Road | Rays Road | Access management and operational improvements to address capacity and safety needs including a raised median and turn lane extensions | Tucker, Unincorporated |
| R_219 | Operational-Corridor | Consultant Team | District 3, District 6, District 7 | Rainbow Drive Operational Improvements | Candler Road | Wesley Chapel Road | Access management and operational improvements to address capacity and safety needs including center turn lane treatments and pedestrian crossings | Unincorporated |
| R_405b | Operational-Corridor | Consultant Team | District 5, District 7 | Redan Road Operational Improvements | S Hairston Road | Panola Road | Access management improvements to address capacity and safety needs | Unincorporated |
| R_423a | Operational-Corridor | Consultant Team | District 5, District 7 | Redan Road Operational Improvements | Panola Road | S Deshon Road | Widening at key intersections to address capacity needs | Unincorporated |
| R_422d | Operational-Corridor | Consultant Team | District 4, District 7 | Rockbridge Road Operational Improvement | S Stone Mountain-Lithonia Road | Deshon Road | Operational and safety improvements to address capacity and safety needs including widening at key locations, access management, and pedestrian improvements | Unincorporated |
| R_422a | Operational-Corridor | Consultant Team | District 4, District 6, District 7 | Rockbridge Road Operational Improvements | Memorial Drive | Allgood Road | Operational and safety improvements to address capacity and safety needs including widening at key locations, access management, and pedestrian improvements | Unincorporated |
| R_422b | Operational-Corridor | Consultant Team | District 4, District 7 | Rockbridge Road Operational Improvements | Rowland Road | Orchard Drive | Operational and safety improvements to address capacity and safety needs including widening at key locations, access management, and pedestrian improvements | Unincorporated |
| R_237 | Operational-Corridor | Public Engagement | District 1, District 2, District 6, District 7 | Shallowford Road Operational Improvements | I-85 | Briarcliff Road | Operational and safety improvements to address capacity and safety needs including widening at key locations, access management, and pedestrian improvements; Some retaining walls are required | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | "Preliminary 2022 Cost by Others" | "Preliminary 2022 County Cost" |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 3 | 0.79 | Tier 3 | NO | $500,000 | $400,000 | $2,000,000 | $600,000 | $3,500,000 | $2,297,423 | $1,202,577 |
| 3.17 | Tier 3 | NO | $700,000 | $300,000 | $3,000,000 | $200,000 | $4,200,000 | $- | $4,200,000 | |
| 1.94 | Tier 3 | NO | $1,800,000 | $3,100,000 | $6,800,000 | $1,200,000 | $12,900,000 | $- | $12,900,000 | |
| 2.11 | Tier 3 | NO | $1,900,000 | $4,200,000 | $8,400,000 | $1,500,000 | $16,000,000 | $- | $16,000,000 | |
| 3.62 | Tier 3 | NO | $3,300,000 | $6,900,000 | $14,500,000 | $2,500,000 | $27,200,000 | $- | $27,200,000 | |
| 1.47 | Tier 3 | NO | $1,400,000 | $3,100,000 | $6,300,000 | $1,200,000 | $12,000,000 | $- | $12,000,000 | |
| 2.29 | Tier 3 | NO | $2,100,000 | $4,600,000 | $9,200,000 | $1,700,000 | $17,600,000 | $7,920,000 | $9,680,000 | |
| 0.81 | Tier 3 | NO | $900,000 | $1,000,000 | $3,500,000 | $1,000,000 | $6,400,000 | $- | $6,400,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_233 | Operational- Corridor | Consultant Team | District 4, District 5, District 7 | Stephenson Road Operational Improvements | Rockbridge Road | SR 124 | Operational and safety improvements to address capacity and safety needs including widening at key locations, access management, and pedestrian improvements; Evaluate roundabout at intersection S Deshon Road | Unincorporated |
| R_119 | Operational- Intersection | 2014 Transportation Plan | District 2, District 6 | Briarcliff Road at Clifton Road Intersection Improvement | Clifton Road | Intersection improvements including turn lanes and signal timing to reduce vehicular delay (and possibly a realignment of the intersection from Briarcliff Road to Clifton Road) and pedestrian improvements as needed | Unincorporated | |
| R_117 | Operational- Intersection | 2014 Transportation Plan | District 3, District 6 | Flat Shoals Road at Brannen Road Intersection Improvement | Brannen Road | Feasibility study needed to examine the appropriateness of a roundabout | Unincorporated | |
| R_115 | Operational- Intersection | 2014 Transportation Plan | District 3, District 6 | Flat Shoals Road at Cook Road Intersection Improvement | Cook Road | Feasibility study needed to examine the appropriateness of a roundabout | Unincorporated | |
| R_905 | Operational- Intersection | Consultant Team | District 2, District 6 | Frazier Road at Wilson Road Rail Intersection Improvement | Wilson Road | At-grade crossing safety and operational improvements; Existing quiet zone; Sidewalk improvements | Unincorporated | |
| R_114 | Operational- Intersection | 2014 Transportation Plan | District 3, District 6 | Gresham Road at Cook Road Intersection Improvement | Cook Road | Feasibility study needed to examine the appropriateness of a roundabout | Unincorporated | |
| R_146 | Operational- Intersection | Consultant Team | District 3, District 6 | Lloyd Road at Flat Shoals Road Intersection Improvement | Flat Shoals Road | Feasibility study needed to examine the appropriateness of a roundabout | Unincorporated | |
| R_111 | Operational- Intersection | 2014 Transportation Plan | District 4, District 6 | Memorial Drive at N Hairston Road Intersection Improvement | N Hairston Road | Safety and operational intersection improvements | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| 3.50 | Tier 3 | NO | $1,000,000 | $800,000 | $4,000,000 | $800,000 | $6,600,000 | $- | $6,600,000 | |
| Tier 3 | YES | $923,000 | $867,000 | $9,218,000 | $- | $11,005,000 | $7,703,500 | $3,301,500 | ||
| Tier 3 | YES | $230,000 | $- | $2,305,000 | $- | $2,535,000 | $1,774,500 | $760,500 | ||
| Tier 3 | YES | $230,000 | $- | $2,305,000 | $- | $2,535,000 | $1,774,500 | $760,500 | ||
| Tier 3 | NO | $500,000 | $700,000 | $2,200,000 | $200,000 | $3,600,000 | $- | $3,600,000 | ||
| Tier 3 | YES | $230,000 | $- | $2,305,000 | $- | $2,535,000 | $1,774,500 | $760,500 | ||
| Tier 3 | NO | $350,000 | $300,000 | $1,500,000 | $200,000 | $2,350,000 | $- | $2,350,000 | ||
| Tier 3 | YES | $42,000 | $- | $411,000 | $- | $452,000 | $316,400 | $135,600 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_1497 | Operational-Intersection | Metro South CID | District 3, District 6 | Moreland Avenue/ Moreland Industrial Boulevard Intersection Improvements | Moreland Industrial Boulevard | Widening Moreland Avenue to include a 12-ft center turn lane and dedicated turn lanes on NB Moreland Avenue for Moreland Industrial Boulevard traffic. Install right turn lane with large turning radii on Moreland Industrial Boulevard to accommodate truck turning movements onto Moreland Avenue. Increase lateral offset on Moreland Industrial Boulevard. Determine warrants for pedestrian signals along Moreland Avenue at the intersecting roads. Install traffic signs and signals as appropriate, including flashing sign for SB traffic to signal left turns from Moreland Industrial Boulevard and advanced signage to signal an upcoming intersection with crossing traffic (along Moreland Avenue). | Unincorporated | |
| R_158 | Operational-Intersection | Consultant Team | District 2, District 6 | Scott Boulevard at Decatur Road Intersection Safety Evaluation | N Decatur Road | Access management and pedestrian crossing improvements to address safety needs; GDOT GOASIS Project ID: 21-7063 - Crash Screening Performed | Unincorporated | |
| R_1409 | Operational-Intersection | DeKalb SPLOST | District 5, District 7 | South Hairston Drive at Statler Drive Intersection Improvement | Statler Drive | Within limits of South Hairston study. R-Cut or other alternative options | Unincorporated | |
| R_134 | Operational-Intersection | Consultant Team | District 5, District 7 | Turner Hill Road at Covington Highway Intersection Improvement | Covington Highway | Traffic signal upgrade, extend turn lanes for queueing for RR crossing | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 3 | YES | $236,000 | $294,000 | $1,960,000 | $686,000 | $3,176,000 | $2,636,080 | $539,920 | ||
| Tier 3 | YES | $1,200,000 | $800,000 | $4,000,000 | $500,000 | $6,500,000 | $4,550,000 | $1,950,000 | ||
| Tier 3 | NO | $21,000 | $- | $260,000 | $- | $281,000 | $- | $281,000 | ||
| Tier 3 | YES | $600,000 | $400,000 | $2,000,000 | $500,000 | $3,500,000 | $2,450,000 | $1,050,000 |
| Draft ID | Project Category | Project Source | County Districts | Project Name | Extent From | Extent To | Project Description | Municipality |
|---|---|---|---|---|---|---|---|---|
| R_144 | Operational-Intersection | Consultant Team | District 4, District 6 | Village Square Lane at Hambrick Road Intersection Improvement | Hambrick Road | Potential RCUT at a few locations with some vegetation clearing for sight distance along 0.7 mile corridor | Unincorporated | |
| R_1065 | Operational-Intersection | Metro South CID | District 3, District 6 | Westside Place-Constitution Road-International Park Drive Roundabout | Constiution Road | A truck roundabout to correct side street offsets and improve truck flow | Unincorporated |
| Tier Assigned by City | Total Length (mi) | Tier Assigned by County | On GDOT Roadway | 2022 Eng. Cost | 2022 ROW Cost | 2022 Const. Cost | 2022 Other Cost | 2022 Total Cost | “Preliminary 2022 Cost by Others” | “Preliminary 2022 County Cost” |
|---|---|---|---|---|---|---|---|---|---|---|
| Tier 3 | NO | $150,000 | $50,000 | $600,000 | $50,000 | $850,000 | $- | $850,000 | ||
| Tier 3 | NO | $274,000 | $342,000 | $2,280,000 | $798,000 | $3,694,000 | $3,066,020 | $627,980 | ||
APPENDIX
| Category | Time Period | Category |
|---|---|---|
| Programmatic Projects | "Year 1-6 (Short Term)" | Develop an Asset Management Program that includes all traffic signal and transportation technology assets |
| Inventory all existing traffic signal and transportation technology assets | ||
| Develop a technology focused Lifecycle Replacement Plan | ||
| Develop a Communications Master Plan | ||
| Develop a transportation focused Data Management Plan | ||
| Develop and implement a Configuration and Change Management Plan | ||
| Begin implementing elements of the Asset Management Program | ||
| Planning and development of procurement documents for a transportation focused Asset Management System (AMS) | ||
| Total: | ||
| "Year 7-12 (Tier 2 Considerations)" | Complete implementing elements of the Asset Management Program | |
| Advertise, procure, deploy, and integrate a transportation focused AMS solution | ||
| Implement the transportation focused Data Management Plan | ||
| Update Configuration and Change Management Plan to incorporate new technologies and change management requirements | ||
| "Year 13+ (Tier 3 Considerations)" | Review/update individual elements of the Asset Management Program to account for current priorities and the evolution of technology | |
| Identify areas for collaboration and develop partnerships with agencies to streamline traffic operations across the transportation network | ||
| Identify areas for process improvement and implement automation where possible to streamline program operations |
| Budget | Year 1 & 2 | Year 3 & 4 | Year 5 & 6 |
|---|---|---|---|
| $100,000 | $100,000 | $- | $- |
| $100,000 | $- | $100,000 | $- |
| $50,000 | $- | $50,000 | $- |
| $100,000 | $100,000 | $- | $- |
| $50,000 | $- | $50,000 | $- |
| $50,000 | $50,000 | ||
| $50,000 | $- | $50,000 | |
| $100,000 | $- | $- | $100,000 |
| $600,000 | $200,000 | $300,000 | $100,000 |
Year 7-12
Year 13+
| Category | Time Period | Category |
|---|---|---|
| Infrastructure Projects | “Year 1-6 (Short Term)” | Traffic signal technology upgrades (e.g., cabinets, controllers, and vehicle detection) |
| Pedestrian traffic signal equipment upgrades | ||
| Communications network buildout (fiber and cellular) | ||
| Deployment of CCTV cameras at critical locations and intersections | ||
| Total: | ||
| “Year 7-12 (Mid Term Considerations)” | Traffic signal technology upgrades and life cycle replacements (e.g., cabinets, controllers, vehicle detection, pedestrian signals, and CCTV cameras) | |
| Communications network equipment upgrades and life cycle replacements | ||
| Planning for buildout of a new/upgraded Traffic Management Center (TMC) | ||
| Conduct a network bandwidth analysis to assess future needs associated with new technologies included connected and automated vehicles (CAV) | ||
| Assess maintenance needs associated with CAV infrastructure | ||
| “Year 13+ (Long Term Considerations)” | Traffic signal technology upgrades and life cycle replacements (e.g., cabinets, controllers, vehicle detection, pedestrian signals, and CCTV cameras) | |
| Communications network equipment upgrades and lifecycle replacements | ||
| Buildout of a new/upgraded TMC | ||
| Assess the impact of CAV technologies on traffic signal design standards and specifications and update as necessary | ||
| Assess network design requirements and updates to network standards based on changes in communications technologies |
| Budget | Year 1 & 2 | Year 3 & 4 | Year 5 & 6 |
|---|---|---|---|
| $500,000 | $100,000 | $200,000 | $200,000 |
| $200,000 | $100,000 | $100,000 | |
| $400,000 | $200,000 | $200,000 | |
| $100,000 | $50,000 | $50,000 | |
| $1,200,000 | $100,000 | $550,000 | $550,000 |
Year 7-12
Year 13+
| Category | Time Period | Category |
|---|---|---|
| Operations Projects | “Year 1-6 (Short Term)” | Develop/update traffic signal timing plans along critical corridors |
| Integrate traffic signals into GDOT arterial ATMS software | ||
| Integrate traffic signals into GDOT ATSPM and SigOps Metrics software | ||
| Develop and implement an arterial Performance Management Program to support data driven traffic operations | ||
| Identify and implement technology focused safety project(s) | ||
| Total: | ||
| “Year 7-12 (Mid Term Considerations)” | Continue to develop/update traffic signal timing plans on critical corridors | |
| Continue to Integrate traffic signals into GDOT arterial ATMS software | ||
| Continue to integrate traffic signals into GDOT ATSPM/SigOps Metrics software | ||
| Integrate CV technologies associated with smart sidewalks (i.e. complete streets, pedestrian/bicycle detection) | ||
| Consider the use and integration of CV data to provide performance data that can be used in the development of updated traffic signal timing plans | ||
| Assess the impacts of technology on traffic signal operations | ||
| “Year 13+ (Long Term Considerations)” | Develop complete street guidelines for “smart” streets with connected pedestrian/bicycle detection | |
| Develop guidelines for the inclusion of exclusive bike lanes with the design of dedicated AV lanes and facilities | ||
| Assess the opportunity for dedicated AV lanes on major arterials | ||
| Conduct an assessment on the impacts of CAV technologies on transit infrastructure such as stops and park-and-ride locations | ||
| Revise design requirements to accommodate more AV transit vehicles |
| Budget | Year 1 & 2 | Year 3 & 4 | Year 5 & 6 |
|---|---|---|---|
| $250,000 | $50,000 | $100,000 | $100,000 |
| $150,000 | $50,000 | $50,000 | $50,000 |
| $150,000 | $50,000 | $50,000 | $50,000 |
| $100,000 | $100,000 | ||
| $150,000 | $- | $50,000 | $100,000 |
| $800,000 | $150,000 | $350,000 | $300,000 |
Year 7-12
Year 13+
| Category | Time Period | Category |
|---|---|---|
| Advanced Functionality Projects | "Year 1-6 (Short Term)" | Identify and implement traffic responsive (TR) or adaptive traffic signal operations at critical intersections or along high-volume traffic corridors |
| Identify and implement transit signal priority (TSP) along critical transportation corridors | ||
| Develop a CAV Market and Opportunity Plan (evaluate current state of CAV, identify potential CAV project patterns, develop CAV deployment strategy) | ||
| Identify and implement CAV pilot deployment project (pedestrian safety, RR and EVP safety, or freight progression) | ||
| Planning for deployment for one or more Smart Corridor projects | ||
| Total: | ||
| "Year 7-12 (Mid Term Considerations)" | Consider additional projects to implement advanced operational strategies including TR, adaptive, and TSP along critical corridors | |
| Implement Smart Corridor Project(s) | ||
| Plan for dynamic transit routing and stops in response to real time or near-real time ridership needs | ||
| Consider opportunities with unconventional intersections and impacts to access management with mixed fleet of legacy, CV, and AV. | ||
| "Year 13+ (Long Term Considerations)" | Consider additional projects to implement advanced operational strategies including TR, adaptive, and TSP along critical corridors | |
| Implement additional Smart Corridor Project(s) | ||
| Consider impacts to roadway design as freight delivery shifts to leverage more AV technologies (long-haul or local distribution) | ||
| Consider impacts to parking demand based on the conversation of private transportation fleet to more AV |
| Budget | Year 1 & 2 | Year 3 & 4 | Year 5 & 6 |
|---|---|---|---|
| $200,000 | $- | $100,000 | $100,000 |
| $200,000 | $100,000 | $100,000 | |
| $100,000 | $- | $100,000 | |
| $150,000 | $- | $50,000 | $100,000 |
| $150,000 | $- | $50,000 | $100,000 |
| $800,000 | $- | $400,000 | $400,000 |
Year 7-12
Year 13+
Michael Thurmond, CEO Robert Patrick, District 1 Commissioner Jeff Rader, District 2 Commissioner Larry Johnson, District 3 Commissioner Steve Bradshaw, District 4 Commissioner Mereda Davis Johnson, District 5 Commissioner Edward “Ted” Terry, Super District 6 Commissioner Lorraine Cochran-Johnson, Super District 7 Commissioner
DeKalb County Department of Planning and Sustainability DeKalb County Department of Public Works, Transportation Division Atlanta Regional Commission
City of Atlanta; City of Avondale Estates; City of Brookhaven; City of Chamblee; City of Clarkston; City of Decatur; City of Doraville; City of Dunwoody; City of Lithonia; City of Pine Lake; City of Stone Mountain; City of Stonecrest; City of Tucker; Decide DeKalb; DeKalb Chamber of Commerce; DeKalb Chief Operating Officer’s Office; DeKalb County Department of Community Development; DeKalb County Department of Parks, Recreation, and Cultural Affairs; DeKalb County Department of Roads and Drainage; DeKalb County Department of Watershed Management; DeKalb County Department of Finance; DeKalb County Department of Geographic Information System; DeKalb Peachtree Airport; DeKalb County School District; Chamblee-Doraville Community Improvement District; East Metro Community Improvement District; Metro South Community Improvement District; Perimeter Community Improvement Districts; Tucker Northlake Community Improvement District; Tucker Summit Community Improvement District; Georgia Department of Transportation (GDOT); Atlanta-Region Transit Link Authority (ATL); Metropolitan Atlanta Rapid Transit Authority (MARTA)
Kimley-Horn The Collaborative Firm (TCF) Vanasse Hangen Brustlin (VHB) RDG Planning & Design Perez Planning + Design (PP+D) Sycamore Consulting Center for Pan Asian Community Services (CPACS)