Transcript — Verbatim
0:00

Yeah.

0:04

Well, I'll speak to that later, but um but the main change that's gone over the different iterations is that connection through for Burkmar to Woodburn.

0:12

Yeah, that's correct.

0:12

There is a connection between I have it.

0:15

Right here.

0:15

This is the first proposal that came before the PC in June 2024.

0:20

Um there's the inner parcel connection or the internal travel way connection on the right side here where my cursor is.

0:28

Um and there's just a greater impervious area and less um green space, and the applicant requested a deferral from the PC to make revisions to the plan.

0:37

And this is the new one that they provided, which removed that inner parcel internal travel way connection and then enhanced added enhanced green space areas to the plan.

0:49

Well, my kids got me the as a joke at my last birthday, super memory boost.

1:01

Um help me understand.

1:04

So I normally like to make a point every time one of these comes before us of the fact that we are um that our zoning map is under zone based on what we're saying in our own comprehensive plan, we want.

5:00

From reading it, um, from my respective.

10:09

They wanted something else.

10:26

Clear on this.

12:56

There's actually so far.

13:07

So that's the first one.

14:47

These designations came up.

15:24

But Birkmar Over currently under construction, piece with a residential right here.

15:36

And then Birkmar Flats is kind of nestled right in between those.

15:39

So we kind of have this 3.6 acre plus a little two-acre next door pocket of land that's designated currently in the comp plan as flex light industrial, but it really kind of makes sense to lay out as residential given development patterns in recent years.

15:59

I will also note in, I can come back to these, but in the future in the AC44 plan that is currently under review, this property is designated as urban density residential.

16:11

And so that has that designation has been reviewed in this area throughout this kind of AC44 process.

16:19

And so we are directly consistent with what it looks like where we're moving to for a designation on this property.

16:37

And so I definitely want to ensure that I have time to address those.

16:41

So I'm going to start with Swede Street.

16:51

This is Swede Street.

16:52

So it stubs out directly to our property.

16:54

So that's a public road, stubs out directly to our property.

16:58

The ideal scenario is that we pull from that public road and uh, you know, continue interparsel connectivity.

17:06

Um we take advantage of the public road system.

17:08

However, that road, how it was constructed, and what I'm calling out here is the profile of the road and the profile of an RWSA water main that runs along the shared property boundary.

17:23

So that's a that's a Ribana Water Suite Authority main, um, large pipe coming directly from the reservoir.

17:30

And that water pipe elevation, if we were to continue Swede Street, which is shown here in purple.

17:38

So this is the existing Swede Street, the purple dots are showing how we would continue that profile to construct that public road would actually be below the waterline.

17:49

So this blue dot is showing the waterline.

17:52

So we looked at that, we had many conversations with VDAT, we had many conversations with the county, many conversations with RWSA.

17:59

That wasn't gonna work.

18:00

So that was not an option for interconnectivity for us.

18:04

Um a few other items that I wanted to bring up with our prior concept, so that connected that had a full interparcel connection from uh Woodburn to Berkmarr.

18:21

What I'm calling out here is our kind of required slopes in these areas to meet uh parking requirements.

18:30

So when we're we're coming in off of either Woodburn or Berkmar, we have to establish a landing with less than four percent slopes to establish a commercial entrance that's compliant with VDOT regulations.

18:42

So we can't immediately start ramping the road up.

18:45

Uh I will from from the lowest point to the highest point on this site.

18:49

I think we have a 42-foot grade drop.

18:52

Um yeah, so from entrance to entrance is 36, from the lowest point here to the highest point here, I think we're at 42.

18:58

So we're dealing with quite a significant grade.

19:01

Um to get from one road to the other and to establish the required parking, there was a significant amount of grading involved with this concept.

19:09

And so we're basically having to flatten out all these areas to establish our parking lots less than 5% slope.

19:17

So this during our conversation with the planning commission back in June, um, you know, they really tasked us, we talked about the the interparsel connectivity, but then they really tasked us with just coming up with a better design, respecting terrain, uh having more uh green space.

19:34

And so that's the what you see before you tonight.

19:37

And this is another helpful cross-section that kind of shows the um proposed design compared to the previous.

19:45

And what we're looking at here with the um the orange hatch is the amount of cut that was required to establish each development.

20:00

So you can see in the previous concept, we had a significant amount of earthwork that we were taking on, um, which, you know, in in the Piedmont region, sometimes you have to take on a significant amount of earthwork on many sites, but this was exclusively so that we could establish a full interparcel connection.

20:14

We were having to do that much earthwork.

20:16

And so by just splitting up that connection, keeping the portion of the site that is accessed from Woodburn high and keeping the portion of the site that's accessed from Berkmar low, we were able to significantly reduce our amount of grading um on the property and increase our green space.

20:33

Um I will also note that in our um in our proffer statement, we have uh committed to a 20 percent increase in recreational area over the requirement.

20:44

Um and so that's a that's a proffered condition of this development.

20:47

You know, that typically we'd be looking um at you know five percent of the area, so we increase that by 20 percent.

20:54

I think it increases the requirement by about two to three thousand square feet, um so which would be typically for per um county zoning regulations and the size of an additional required top lot, something like that.

Discussion Breakdown — Share of Meeting
Zoning And Land Use███████████████████████████27%
Public Hearing██████████████████████22%
Engineering And Infrastructure█████████████████17%
Procedural█████████████13%
Community Well-being██████6%
Public Transportation█████5%
Animal Welfare████4%
Transportation Safety███3%
Affordable Housing1%
Summary of Proceedings

Albemarle County Board of Supervisors Meeting – April 16, 2025

The Albemarle County Board of Supervisors met on April 16, 2025, to consider two major items: a residential development proposal on the Berkmar/Woodburn tract and a special use permit for a canine hotel in the rural area. Both items were approved after public hearings and board deliberation.

Discussion Items

  • Residential Development (Berkmar/Woodburn Tract): The applicant presented a revised plan for a 3.6-acre parcel, removing an internal vehicle connection to reduce grading and increase green space. The design includes a 20% increase in recreational area over requirements, with a 42-foot grade change across the site. The board discussed pedestrian connectivity, parking logistics, and the removal of the car cut-through. Supervisor Galloway expressed strong support for the pedestrian-oriented design, noting walkability to shops, schools, and transit. The board adopted the ordinance attached to the staff report.

Public Comments & Testimony

  • Canine Hotel (SP 2024-4 & SE 2024-4):
    • Applicants (Cody and Nikki Markham): Proposed a 1,200-square-foot soundproofed building with 12 kennels, a 7-foot privacy fence, and landscaping. They emphasized the business would support their family and meet a community need. They addressed opposition claims, stating the building could be repurposed for agricultural use and that noise mitigation measures were included.
    • Opposition (Attorney Addison Barnhart on behalf of the Blankenship family): Argued against the outdoor run, citing a commissioned sound study that predicted noise ordinance violations at the property line. They requested denial of the outdoor run or a remand to the planning commission.
    • Supporters (Donna McDaniel, Emily White, Scott Cunningham, Bree Hunley, Dave Norford): Spoke in favor, citing the applicants’ community roots, the need for local boarding services, and confidence in responsible operation. Some questioned the validity of the sound study, noting it used different terrain.

Key Outcomes

  • Residential Development: Approved unanimously (motion by Supervisor Galloway, second by Supervisor McKeel; roll call: all yes).
  • Canine Hotel – Special Use Permit: Approved with an amendment to increase the maximum number of kennels from 12 to 20 (motion by Supervisor Lapisto Kurdley, second by Supervisor Malik; roll call: all yes). The board cited the need for business flexibility and consistent noise mitigation requirements.
  • Canine Hotel – Special Exception: Approved to reduce the setback for soundproof confinements from 200 feet to 75 feet from property lines (motion by Supervisor Lapisto Kurdley, second by Supervisor Malik; roll call: all yes).
  • Adjournment: The meeting adjourned to April 23, 2025, at 6 p.m. in Lane Auditorium.

Meeting Transcript

Yeah. Well, I'll speak to that later, but um but the main change that's gone over the different iterations is that connection through for Burkmar to Woodburn. Yeah, that's correct. There is a connection between I have it. Right here. This is the first proposal that came before the PC in June 2024. Um there's the inner parcel connection or the internal travel way connection on the right side here where my cursor is. Um and there's just a greater impervious area and less um green space, and the applicant requested a deferral from the PC to make revisions to the plan. And this is the new one that they provided, which removed that inner parcel internal travel way connection and then enhanced added enhanced green space areas to the plan. Well, my kids got me the as a joke at my last birthday, super memory boost. Um help me understand. So I normally like to make a point every time one of these comes before us of the fact that we are um that our zoning map is under zone based on what we're saying in our own comprehensive plan, we want. From reading it, um, from my respective. They wanted something else. Clear on this. There's actually so far. So that's the first one. These designations came up. But Birkmar Over currently under construction, piece with a residential right here. And then Birkmar Flats is kind of nestled right in between those. So we kind of have this 3.6 acre plus a little two-acre next door pocket of land that's designated currently in the comp plan as flex light industrial, but it really kind of makes sense to lay out as residential given development patterns in recent years. I will also note in, I can come back to these, but in the future in the AC44 plan that is currently under review, this property is designated as urban density residential. And so that has that designation has been reviewed in this area throughout this kind of AC44 process. And so we are directly consistent with what it looks like where we're moving to for a designation on this property. And so I definitely want to ensure that I have time to address those. So I'm going to start with Swede Street. This is Swede Street. So it stubs out directly to our property. So that's a public road, stubs out directly to our property. The ideal scenario is that we pull from that public road and uh, you know, continue interparsel connectivity. Um we take advantage of the public road system. However, that road, how it was constructed, and what I'm calling out here is the profile of the road and the profile of an RWSA water main that runs along the shared property boundary. So that's a that's a Ribana Water Suite Authority main, um, large pipe coming directly from the reservoir. And that water pipe elevation, if we were to continue Swede Street, which is shown here in purple. So this is the existing Swede Street, the purple dots are showing how we would continue that profile to construct that public road would actually be below the waterline. So this blue dot is showing the waterline. So we looked at that, we had many conversations with VDAT, we had many conversations with the county, many conversations with RWSA. That wasn't gonna work. So that was not an option for interconnectivity for us. Um a few other items that I wanted to bring up with our prior concept, so that connected that had a full interparcel connection from uh Woodburn to Berkmarr. What I'm calling out here is our kind of required slopes in these areas to meet uh parking requirements. So when we're we're coming in off of either Woodburn or Berkmar, we have to establish a landing with less than four percent slopes to establish a commercial entrance that's compliant with VDOT regulations. So we can't immediately start ramping the road up. Uh I will from from the lowest point to the highest point on this site. I think we have a 42-foot grade drop. Um yeah, so from entrance to entrance is 36, from the lowest point here to the highest point here, I think we're at 42. So we're dealing with quite a significant grade. Um to get from one road to the other and to establish the required parking, there was a significant amount of grading involved with this concept. And so we're basically having to flatten out all these areas to establish our parking lots less than 5% slope. So this during our conversation with the planning commission back in June, um, you know, they really tasked us, we talked about the the interparsel connectivity, but then they really tasked us with just coming up with a better design, respecting terrain, uh having more uh green space.