0:16Again, good evening, ladies and gentlemen.
0:19Ignacio Nunez, and I serve as chair of the Planning and Zoning Commission of the City of Arlington.
0:24I hereby call to order this regularly noticed meeting of the City of Arlington's Planning and Zoning Commissioner regular session for September the 24th, 2025.
0:36At this time, I'll ask our administrator to read the speaker guidelines and general decorum.
0:43We ask that the citizens and other speakers in attendance assist in preserving the order and decorum of this meeting and to provide for attendance at and participation in the meeting without fear of intimidation, threats, or hostility.
0:56Any person making personal, profane, hostile, slanderous, or threatening remarks who uses vulgar obscene language, who engages in any other actions that disturb or are calculated to disturb the meeting, or who becomes disruptive while addressing the planning and zoning commissioners, or while attending the planning and zoning meeting, may be removed from this council chambers.
1:19All speakers shall address the commissioners and not the audience or city staff and shall not call out individually named members of city staff or the public.
1:29For speakers tonight, when your name is called, please come to the microphone at the podium and state your name and city of residence for the record.
1:37The applicant will be asked to speak first and will be given 10 minutes to make a presentation.
1:43Speakers in support or opposition of the item will be given five minutes each to make their statement.
1:50If there are many speakers for an item, each speaker will be given three minutes to make their statements.
2:27A copy of the corrected minutes of our August 20th, 2025 regular session meeting were sent to all the commissioners in advance.
2:36Were there any changes or corrections needed to those minutes?
2:40And do I have a motion to approve the August 20th minutes?
2:44I have a motion to approve by Commissioner Sumter.
2:47A second by Commissioner Blake.
3:11Seeing none, do I have a motion to approve the minutes?
3:14I have a motion to approve by Commissioner Winkles and a second by Commissioner Blake.
3:43So the vote's nine to nothing.
3:46All the commissioners were in favor.
3:51Next on the agenda, we have two zoning cases.
3:54The first case is zoning case Z03-56 P03-56R1, located at approximately 915 East Randall Mill Road.
4:11This is an application for approval of a revision to an approved development plan on approximately Kevin.
4:26The floor is yours, Kevin.
4:31Good evening, Commissioners for the record.
4:34Kevin Charles, Principal Planner, Planning and Development Services.
4:37This evening we'll be looking at ZO3-56, P03-56R1, also known as the Walmart Supercenter site.
4:47The site is approximately 16 acres, of which approximately 3.75 of it are developed with the Walmart Super Center.
4:56The address is 915 East Randall Mill Road.
5:11And the request, of course, is for a revised development plan.
5:15This is an aerial photograph of the site with the site highlighted in yellow.
5:20The applicant is requesting a revision to the approved development plan for zoning for this zoning case for the installation of a solar solar panel array on the roof of the existing structure.
6:04Of those community commercial, residential multifamily, and residential single family uh detached.
6:14Again, the development plan proposed to install downward oriented accent lighting and a solar energy array array in the shape of Walmart Spark logo on the roof of the existing Walmart building.
6:28The proposed way array will be installed to supplement the site with Clean Energy.
6:33As Walmart is currently working to reach uh zero emissions by 2040.
6:39The solar arrangement will not be visible from uh the ground level and will have no effect on the streets streetscape view of the site.
6:47Uh no other requests or affiliated with this proposal, and then speaking with the applicant prior to this meeting.
6:54Uh, this is the first uh project of this sort for Walmart in the DFW area.
7:02The applicant is Boyd and Lowry, LLP, Next Era Energy Resources LLC, owner Walmart Real Estate Business Trust.
7:13Staff did not receive any letters of opposition or uh any letters of support in reference to this particular project.
7:19I'm available for any questions or comments.
7:22Do any of the commissioners have any questions of staff at this time?
7:27Saying none, thank you, Kevin.
7:29Going to open up the public session at this time.
7:33Um with the applicant, I have several cards here uh and two speakers.
7:41Who's going to go first?
7:42Please, sir, come forward to the microphone.
7:45Remember to please state your name first and last in the city uh that you live in.
7:52Yes, uh, thank you, Chair Nunez, and members of the planning and zoning commission.
7:55My name is Ivan Jaime.
7:57I'm the director of government affairs for Walmart.
7:59I live in San Antonio at 16503.
8:03Um actually, that's my work address, 1650 Nakadoches Road in San Antonio.
8:08I just have a very, very brief presentation for y'all today, and and I think I'll be the only presenter, but uh, I did also want to introduce uh very quickly our store manager who manages this store, Mr.
8:20Um, and we're joined also by the uh next era who developed the project.
8:24Uh Chris Jardis, and I'm sure I butchered his last name, even though he coached me on how to say it.
8:30Matt Butler, uh, who's our uh land use counsel, and Ms.
8:34Deborah Meek on our communications.
8:35We just wanted to be here in case you have any questions.
8:37We wanted to make sure we could address them.
8:39Uh but this project really for us is about showing our pride in Arlington.
8:44Um we have we recognize the importance of this site.
8:48It is very unique in our footprint anywhere else in Texas for sure, and even in the country, being next to uh this cowboy stadium, and also recognizing that Arlington really is a major attraction in the world.
9:03We know that the World Cup is coming.
9:05Uh there have been several car races as well that we've worked on, Super Bowls, and so that makes this site different.
9:11And so when we were looking at where to bring um the solar uh project to in Texas, we decided to do it at the store, and we decided to do the pattern in a way that resembles our our pride, and that hopefully the community can be proud of as well.
9:26Uh just to tell you a little bit about our store.
9:28If you've been in it, you can see the the cowboys pride all over.
9:32Um if you just even Google the store, you'll see a lot of fans that come into town that will say, make sure that you stop at the Walmart.
9:39They have a lot of uh apparel and a lot of uh cowboys pride that you can visit.
9:44Uh, we employ over 400 associates, which is on the high side of what we employ in most stores.
9:51Most stores we have anywhere from the 320 to 370.
9:55Uh so this will show you that it's a very busy area.
10:00Uh we were actually this year awarded the uh North Texas Food Bank Retailer of the Year because of our donations to the food bank uh and our engagement with them and award we were very proud to receive.
10:09Um proud sponsors of the Arlington Um uh Veterans uh parade at last year was our first year.
10:16Uh we're doing it again uh this year.
10:18And then also uh a corporate sponsors of the um uh the National Medal of Honor Museum, which just opened, I believe earlier this year.
10:26So something that we take a lot of pride in.
10:28Again, we recognize that uh Arlington and general and in particular, this store is different.
10:32We got to treat it a little bit uh different to be commensurate with what uh the city has been uh able to attract to town.
10:40Uh it'll be visible from the uh from up top, but not visible from um down on the street level, as was mentioned it.
10:49Um and it's also in keeping with our uh smart energy goals.
10:54Kevin, I think I already covered most of this, and that's that's really all that we have.
10:58It's a fairly uh straightforward project.
11:01Again, my colleagues and I are available if you have any questions.
11:04Uh and we certainly appreciate the opportunity to bring this project before you today.
11:10Um I I kind of got confused.
11:18I didn't understand how pride was involved with it.
11:21So will it be a it's not a monument or anything, it's not going to be visible, but how how come y'all are proud of it or have pride in it?
11:28That's a good question.
11:29I didn't make that clear.
11:30Uh the shape of the spark.
11:31I apologize for that.
11:32It's this is our logo.
11:33Um so the yeah, I I apologize for that.
11:35I should have made that more clear.
11:37Uh so the way that we're arranging the panels isn't exactly how we arrange them in other areas.
11:41Uh it's on our rooftop.
11:42We're not doing that anywhere else uh here in this uh area or really in the state.
11:47Uh so yeah, that that that's where we're that's how we're showing our pride is by actually putting it in the logo, bringing this to this application uh of energy resilience to this uh location.
11:58So it's mainly the uh the people that would see it as the airplanes, the helicopters, the hotel rooms nearby.
12:04Our associates, our associates will know that it's that it's there.
12:07Um so it's it's all part of that.
12:10It'll make them feel good.
12:13What's the lifespan on these solar panels?
12:15I plan on supporting it.
12:16I'm just I just had some genuine questions about the what is the lifespan on these and what's the real advantage of them?
12:23I know a lot of people regret residential panels in my experience, but what's the advantage for Walmart to have them on their building and what's the lifespan of them?
12:34Uh Chris, do you want to take the?
12:37And you might want to say your place set your name and the city that you live, where you live.
12:41Uh hi, I'm Chris Georgiadis.
12:43I'm the development lead on this project.
12:45Um I work for Nextera Energy Resources, and I live in uh sunny Juneau Beach, Florida.
12:56But what's the lifespan on these panels?
12:58And uh and I and I do plan on supporting it, so I'm not dissenting.
13:01I'm just saying what is I just have a legitimate question of what's the lifespan on them and how does Walmart uh how do they consider themselves going green with it?
13:10What's and how long do they last and do they sure you know just general stuff like that?
13:16Well, you the panels have a warranty between 20 25 to 30 years.
13:20Sometimes it can extend to to 30, like I said, 35 years.
13:24Um I mean, you know, we've successfully built projects all across the United States.
13:29Um I think we're the largest developer uh solar projects in in the US.
13:35Um, and I can tell you that that they that they do work.
13:38Um there's a reason there's so many.
13:40Uh the purpose of the project is to offset Walmart's load.
13:45So during the day, you know, whenever the stores running bustling, um the in like a you know sunny day, for example, it's take a hot sunny summer day, right?
13:55When you know you're using like a lot of air conditioning.
13:58Well, that's a perfect example of when the solar project comes to best use because it helps offset the Walmart, you know, the their load there, and it also helps create left less of a strain on the surrounding grid.
14:11Um being it's such a you know tight-knit area, like there's obviously hard to develop like a lot of um energy assets.
14:20So having something like this helps, like I said, offset that load.
14:24So they are uh acting as a generator, these panels are powering up the air conditioners inside the buildings.
14:33That that's correct.
14:34Yes, it attached the system attaches behind Walmart's meter at the facility and it helps power the facility.
14:41Okay, so it's not the type where it's selling it back to the grid and then it's a swap out.
14:46No, it's the goal of it is non-export.
14:50Are there any other questions?
14:54Just wanted to say thank y'all for for kind of thinking ahead and being a model community partner.
15:06Just to build on uh Commissioner.
15:10Uh so I know you said this the goal is for this to offset.
15:15Uh you said you're not planning you're not planning on doing these anywhere else.
15:19Is this is this the only one in Texas that you expect to see it like this?
15:23Or are you planning?
15:24Will we start seeing Walmarts with uh uh you know grids put on top of the the roofs?
15:32That's that's uh another really good question.
15:34At this point, there's no immediate plans, uh, but there wasn't a plan for this one as recently as a couple years ago.
15:39So um it's it's a little bit of uh unclear.
15:43Here's what I can tell you.
15:44We are beginning to view our rooftops as an asset that is unused, and we're beginning to look to see how we can utilize those assets.
15:53We're also beginning to bring in a lot of technology into our stores.
15:58Um we're trying to see how do we power that technology without stressing city, municipal infrastructure, water services, electric services.
16:07So as of right now, we have no immediate plans.
16:09There's no other ones that I'm working on uh that we're working on that I have seen designs for.
16:13Uh I just did want to say, you know, I can't say ever.
16:16Um can't really predict more than a couple years in advance as as of this point.
16:20So we are looking at a rooftops, uh, but this is the only one that we're doing as of right now that we have identified that we have started to design, that we have approved a municipal permit, and the reason why we chose it is because of its proximity to Cowboy Stadium, because of what we know is coming, the World Cup and everything else.
16:35That's why that's why we selected Arlington.
16:37And then uh kind of a follow-up question to, and perhaps the other gentleman should answer this, but uh I I know you mentioned it it was an offset.
16:45Uh uh let's go back to that scenario where it's a bright sunny day and every everything's running great.
16:52Uh what do you anticipate offset wise?
16:55Is this something where the the grid pulls in 10% of the power you use or 90% of the power, or what what's what's the aspiration there?
17:04I don't know the exact percentages, but there probably will be some grid pull and then probably some solar support in some way, shape or form.
17:13And and I think the reason why I'm asking this question is because I I think we're all just kind of wondering you know, is this uh you know is is this creating electrical power is gonna be electrical power and secondary is hey, it also looks like our logo, or is it a sign that has our logo that maybe generates some power and we're saying it's a grid.
17:38So that's only the only reason why I'm asking this question.
17:41Yeah, so um we we will go through uh like a full you know building permit review process, and you'll see how the project is tied electrically into the Walmart facility.
17:54The panels will definitely be working, and we actually have an agreement with with Walmart to kind of all balance that.
18:02And Chris, I I've got a so we were thinking of all the questions that could come up today because it is it is a fairly uh like I said, it's a fairly new project.
18:10Um and so I did get here about 30 minutes um the answer, not in a percentage, but here's what I've got from our engineers.
18:18The system generates 438,000 kilowatt hours annually, which is the equivalent of powering 35 homes annually uh as of today.
18:29Um and it can remove up to 183 metric tons of CO2 per year.
18:34Um and then to answer your question if it's uh um an energy system that happens to be in a logo or a logo that happens to produce a little bit of energy, it's it's a little bit of both.
18:43Uh I think that whenever we look at the investment to justify the investment, if if this was strictly one or the other, like if it was just a logo, would it justify an investment?
18:54If it was just an energy system, would it have justified the investment?
18:58I don't know, I don't think so.
18:59But when you put the two together that you can offset some some grid power, make your building more resilient, and it can be in the shape of a logo in Arlington, Texas.
19:07That became a winner for us to the point that we're we were we decided to bring this project to your for your review.
19:14Thank you very much, and I appreciate the information.
19:16I know sometimes there's we we hope to anticipate the question.
19:20So when you get on to council, that those questions are already out there.
19:24So thank you so much.
19:25They're gonna answer that.
19:26Anybody else have any comments or questions?
19:29Thank you, gentlemen.
19:30Thank you all very much.
19:32Uh I'm gonna read the names of the people who are here in support.
19:36Ivan, you've spoken.
19:41Matthew's their attorney.
19:44Matthew Butter, you're you've you've been identified in your own support.
19:47Deborah Make here here in support.
19:52Uh I'm not gonna attract it.
19:54But you're you're and you're here in support.
19:57That was a great reason to ask him a question.
20:00That way you got his name pronounced correctly at the podium.
20:02Um is there anyone here in support?
20:08Is there anyone here that wants to speak in opposition no one?
20:15I believe we can close the public session at this time.
20:18Are there any comments or questions from the commissioners before we uh vote?
20:24Seeing none, I have a motion to approve by Commissioner Sumter, and I have a second from Commissioner Ware.
20:31Commissioner Sumter, would you please state your uh motion?
20:35Uh move to approve the zoning case Z03-56 slash P03-56R1 having an address in 915 East Randall Mill as presented.
20:47Commissioner Ware, is that your second yes it is.
20:52Cast your vote, please.
21:00We're a little slow.
21:08Motion passes nine to nothing.
21:11Gentlemen, thank you so much.
21:13We appreciate your business here in Arlington, and yes, that logo is gonna look pretty awesome from the air for you guys.
21:23Don't be surprised if the city asks you to put something else there, maybe.
21:29I'm just just throwing out an idea.
21:33Yeah, yeah, a little, yeah, a little because you know we're we're having to temporarily rename our stadium, Dallas Stadium for a little bit.
21:40And so, you know, the city council might uh look really kindly on you know, the Arlington store.
21:48You know, so I'm just throwing it out there for your good.
21:56That's actually not a bad idea at all.
21:59All right, very good.
22:01We're gonna move on now to zoning case PD 15-0 R1, uh located at approximately 5301 West Pioneer Parkway.
22:13This is an application for approval of a of a revision to an approved development plan on approximately 7.1 acres.
22:22This time I'll call on staff uh to present its report.
22:25Uh Kevin, the floor is yours.
22:30Um Kevin Charles, principal planner planning and development services.
22:34Uh this evening, uh second zoning case is PD 15-05 R01 Circuit Systems Company Incorporated.
22:45The site is approximately seven acres in size.
22:49Uh address at 5301 with Pioneer Parkway.
22:52The current zoning is a PD for LI with the development plan.
22:57Uh and the request is a revision to the approved development plan.
23:03This is the aerial photograph of the site highlighted in yellow.
23:07As you can see from the aerial photograph, the property to the north is currently zone industrial manufacturing.
23:13Uh the property uh to the south across West uh Pioneer Parkway is uh planned is a PD developed as Lake Arlington Golf Course.
23:25The property to the east is community commercial and is currently undeveloped, and the property to the west is uh planned development as well and developed with a pipe yard.
23:38These are photographs of the site.
23:41Uh the upper right and left-hand corners are photos of the site as it is currently configured with the uh photograph in the upper right-hand corner being uh view of the site from the main entrance.
23:53All of the other views are of the adjacent properties and the public right-of-way there, as well as the golf course across West Pioneer Parkway.
24:04The circuit systems company has been in operation for over 30 years.
24:08The company is one of a limited number of U.S.
24:11based producers of aerospace bonding jumper cables, bus bars, and grounding straps.
24:18Additionally, the company's products are used on commercial and military aircraft.
24:24The continual growth of the company has led to the need for expansion.
24:31The applicant is requesting an amendment to the approved development plan along with the existing 11,800 square foot structure that is currently constructed on the site as part as phase one of this development.
24:47The original PD approved an additional uh 9,788 square feet of space uh for phase two of this development as part of the originally approved PD in 20 uh 2015 for a total of 21,000 plus square feet.
25:07However, the applicant is now proposing an additional 2300 square foot square feet of space as a part of phase two to the existing 11,880 square foot structure for a total building area of 34,880 square feet.
25:27So this is the reason why we are here today.
25:33This shows these the area that is going to be added in color with the aerial photograph of the existing site as it is currently configured.
25:45This shows the elevations.
25:47The structure will incorporate similar architecture features and materials as currently found on the existing structure.
25:55The exterior materials will consist of painted concrete tilt walls, panels, and stone veneer.
26:02The structure will also include canopies and metal doors.
26:06It will be 25 approximately 25 feet in height with varied roof line line heights, matching that of the existing structure.
26:15The addition meets all of the minimum requirements of the unified development code.
26:21The entire site meets or exceeds all of the minimum unified development code landscaping requirements within the landscape buffer setback and proposed internal parking areas.
26:36The applicant is MMA represented by Miss Nikki Moore.
26:39The owner is Grady King and co LLC.
26:42Staff has not received any letters of opposition or support in reference to this particular project.
26:48I am available if there are any questions or comments.
26:54Are there any questions of staff at this time?
27:00We'll open up the public session at this time and ask for the applicant to come forward and make their presentation.
27:06Please remember to state your name and city of residence.
27:10Hello, Nikki Moore, Arlington, Texas.
27:14Nunez and the members of the commission.
27:16I'm here to present this amendment for PD 15 5 on behalf of Circuit Systems.
27:23Let them get this presentation up here.
27:26So just allow me to kind of reintroduce you to the site and business that was along Pioneer Parkway, just west of Greenoaks Boulevard, but near Oak Ridge School.
27:34Greedy King has owned and operated circuit system since 1983.
27:39He is one of the only handful of U.S.
27:41based uh first-tier contract manufacturers producing some of these different types of cables and bonding straps.
27:48Uh their products are used on commercial and military aircraft, including the F-22 and F-35 aircraft from Lockheed and the International Space Station.
27:59King purchased and moved to this building.
28:01Uh was an existing building, uh used to be a Big Daddy's liquor store way back in the day.
28:07Um he plans to expand the buildings and bring as his future business grew.
28:13And so with that original 2015 plan development, uh they had taken into consideration the existing building, some site constraints, um, and excluded some uses that would have typically been allowed by right in the light industrial zoning district.
28:26Uh circuit systems is a very clean business.
28:30Um, it does not produce a lot of chemicals, there's no contamination or noxious odors.
28:35Uh truck traffic is limited to UPS, FedEx, and trucks of similar size, which deliver a couple of times a month.
28:46The existing portion of the building is about 12,000 square feet.
28:49Uh the original PD had approved an expansion of about 9700 square feet since then.
28:56The business has flourished, um, and the applicant is requesting an additional 23,000 square feet and associated parking that would come along to that PD amendment.
29:05Uh the product continues to utilize the existing drive approaches off of Pioneer 303.
29:11Um, of that 23,000 square feet, they you know it will be used for office storage and the factory and manufacturing.
29:18So in some components, that will be what the additional space is used for.
29:23Um, of course, you know, the required landscaping and parking uh will be added for the expansion of the building as long as well as more of a fire lane and loading area so that there's complete building coverage all the way around for safety.
29:37The next few slides of show renderings of the new addition and how it will blend seamlessly with the existing building and architecture and finishes which meet the city's design criteria standards.
29:49We've um during our community outreach, we had conversations with the board at the Trinity Methodist Church, leaders of the Oak Ridge School and Arlington ISD.
30:00Um were had no um issues with the expansion.
30:02In fact, uh Oak Ridge School was really encouraged to hear that they have a couple of interns helping out at their manufacturing, and so maybe there will be some more opportunities being so close in proximity to one another.
30:17Um overall, you know, in our comprehensive plan, uh one of the target industries was aerospace products.
30:24Um I think this is just a really great example of how the city achieved this goal and creating a central hub for the region's growing aerospace industry.
30:31Um the proposed expansion has also the potential to create more jobs in this area.
30:36But in summary, circuit systems and Mr.
30:38King are really excited to continue to do business in Arlington and to expand.
30:42Um they've made good on the promise to come back and eventually adapt and reuse a vacant building, but also to continue to expand their operations in an ideal location for low intensive use of manufacturing.
30:55So I thank you for your time and attention, and I'm here to answer any questions that you may have.
31:01Thank you very much, Nikki.
31:02Um commissioners, do you have any questions, comments?
31:07We'll see any at this time.
31:09Thank you very much.
31:12Umbody change their mind.
31:24Uh then uh is there anyone else that would like to speak in support?
31:32Or is there anyone in opposition?
31:36Saying none, I'll understand a motion to approve.
31:39I have a motion to approve by Commissioner Blake and a second by Commissioner Winkles.
31:44Commissioner Blake, would you please state your motion?
31:46Like to make a motion to approve PD 15-05 R15301 West Pioneer Parkway as presented.
31:56Commissioner Winkles, is that your second?
32:02And in advance, because I don't know how this is going to turn out.
32:05Sir, thank you for being a wonderful uh business owner.
32:10We are so happy you're here in Arlington and we'll continue to be here, I hope, for a long time.
32:15Motion passes 8 to nothing.
32:21With that, let's see.
32:24Uh are there any reports from boards, commissions, or liaisons?
32:30Any additional reports from staff or any other announcements other than my softball team began playing again this last Friday.
32:37We uh will have some plats for you next week, but no zoning cases.
32:44Not next week, but on the next meeting.
32:48So I therefore I will remind everyone that our next regular session of the planning and zoning commission will be on Wednesday, October the 8th at uh 5.30 p.m.
32:58And we are officially adjourned.
33:00Thank you so much for all of your due diligence, ladies and gentlemen.