Belgrade City Council Workshop Meeting Summary – January 12, 2026
STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE
Belgrade City Council Workshop Meeting – January 12, 2026
The Belgrade City Council convened a workshop meeting on January 12, 2026, at 7:00 PM to discuss two major water-related agenda items: the Preliminary Engineering Report (PER) for the water storage expansion project and the city's water rights change application with the Montana Department of Natural Resources and Conservation (DNRC). No public comments were received, and no formal votes were taken.
Discussion Items
-
Water Storage Expansion Project (PER Presentation)
- Camry Iulia, Director of Public Works, introduced the project. Jared Moran of HDR Engineering presented the PER, which has been submitted in draft form.
- The project uses a high growth rate of 4% for planning, selected over a medium rate, to avoid undersizing critical infrastructure. The storage requirement is based on average day demand plus fire flow plus 15% of max day demand for emergency storage.
- The project includes three components: (1) groundwater wells (Well 7A and Well 10) – Well 7A will be on the Mayfair Meadows Park site; (2) a 3-million-gallon ground storage tank (pre-stressed concrete, dome roof, ~121 ft diameter, ~35 ft tall, life expectancy 40–50 years) on the 42-acre property at Frontage Road and Bollinger; (3) a booster station and ~7,500 ft of transmission piping from the tank down Bollinger Road to Cruiser Lane.
- The total estimated construction cost is approximately $21 million (including 30% contingency at the Class 4 estimate level).
- Key operational points: The tank is designed to meet 20-year planning horizon (2045) demands for the central pressure zone. Equivalent storage from the aquifer (4.1 million gallons at 20-year horizon) is included. Water age was analyzed, and the single-tank option avoids stagnation issues. A chemical storage room is included for potential future chlorination.
- Council members asked about pressure zones, leaks (estimated ~30% loss), and the ability to serve future growth in the north and south zones. Staff noted the project solves central zone needs but doesn't address north/south zone storage requirements.
- Next steps: Begin well design in January 2026, tank design by end of January, bid by May 1, 2026, with construction starting in 2027. Booster station design will follow, with construction concurrent with the tank.
- Council expressed support for the project while noting the need for cost containment and aesthetic coordination with the parks department.
-
Water Rights Change Application Update
- Camry Iulia provided an update on the city's effort to update its water rights place of use and attach existing rights to new wells (Well 8 and Well 9). The application is required by DNRC and has been ongoing since early 2022.
- To date, the city has spent approximately $206,000 ($162,000 engineering, $44,000 legal) plus significant staff time. The pre-application is 98 pages with a 374-page guidance document, designed primarily for agricultural irrigators, not municipal systems.
- Two pre-applications have been submitted and both were deemed insufficient (most recently on December 29, 2025). DNRC comments focused on historic use data back to 1928 and minute details of pump operation (e.g., momentary peak flow during startup). Staff expressed frustration with the process, noting that the city holds senior, unmitigated water rights and is legally entitled to the water.
- The city now faces a 30-day waiting period before resubmitting. Once past pre-application, a technical analysis (45-day statutory timeline) will assess impacts on other users.
- City Manager Neil shared concerns about bureaucratic red tape, noting that the process has hindered development in northwest Belgrade and that many communities simply ignore the mapping requirements. The council discussed the need for legislative reform.
- Staff will continue working with DNRC and legal counsel to address the remaining five comments.
Key Outcomes
- No formal motions or votes were taken; the workshop was informational.
- Council directed staff to move forward with the water storage expansion project as presented, with design work starting immediately.
- Staff will continue to pursue the water rights change application and will provide updates as the process evolves.
- The city manager committed to working with Senator Vance and the Montana League of Cities and Towns to advocate for more municipal-friendly water rights processes in the next legislative session.
Public Comments
- No members of the public spoke during the public comment period.
Meeting Transcript
All right. I'll uh thank everybody for being here tonight. I'll call our Belgrade City Council workshop meeting uh to order. But uh first form of business, we'll put this in recess until our final council member arrives here. Should be about five minutes. All right, I'll call the meeting to order after our brief recess here. Uh so please stand and follow me in the pledge. I pledge allegiance to the flag of the United States of America and to the Republic for which it stands. One nation under God, indivisible with liberty and justice for all. Roll call, please. Jason Guppy. Here. Uh Matthew McGee. Late but here. Jim Simon. Here. Michael Meath. Here. Christine? Here. Aaron Bell. Here. Renee Manimo. Here. Thank you. All right. Our first item on the discussion agenda is discuss the preliminary engineering report for the Belgrade water storage expansion project. Good evening, Mayor and Council. I'm Camry Iulia, the director of public works. We're here tonight to uh uh present the findings of the preliminary engineering report for the water storage expansion project that's been in the works for uh the last several months. Um so uh I'm gonna hand it over to uh Jarrett Moran. Uh Jarrett is uh professional engineer with HDR. Um his team specializes in pipeline storage, uh pumping system, so really good fit for this project, and uh we're really excited uh for you guys to finally get to see what everybody's been working on. Let's see. Okay. Thank you, Mayor Cam Mayor and Council uh for the opportunity to give a presentation on the update for where the water storage expansion project currently sits. Um as Camry mentioned, I'm Jared Moran, uh project manager for the project for HDR and leading the team from the PER stage into the design, subsequent design phases. Um I guess we'll start off with kind of where things stand now. So as of today, um PER is in draft format, it was submitted last week uh to Camry and staff for review and and to you as well for review. So once we have all review comments uh incorporated and any um concerns addressed, we will incorporate those comments and concerns into a final revised version of the PER and um get that submitted to Camerie and her staff as well for uh kind of to document the end of the PER stage and then kind of set us up for transitioning into design. Umsequent to our development of the PER, um we have had subconsultant work occurring to try to keep some you know some concurrent work going that we'll need for a subsequent design. So two of our subconsultants, one is aspect, they're the hydrogeological subconsultant. Um they have been doing a preliminary well design uh tech memo that's gonna be incorporated in or that is incorporated into the PER. Um, but they're also ready at this point in time to start the well the permanent well design for the project for the two proposed wells that'll be a part of the project. Um we've also had Pioneer uh starting the end of last year do their preliminary field work from a geotechnical and survey standpoint. That information is gonna be lumped into design. So the fact that they're already doing that and they should be wrapped up by the end of this week. Um we'll be able to pull that in and incorporate that into the design as we start here in the next several weeks. So kind of shave a little bit of time off of the entire effort by having that occur while the PER was being developed. So for demands and storage volumes, this kind of sets the precedent for the entire project kind of from the base up.