10:00Beneath that we have the liabilities at 96 million.
10:04Most of that is again the bonds that were issued.
10:08I would like to make note of the 2.5 million in retainage.
10:11That amount will fluctuate as the construction continues and nears its completion.
10:16That should dwindle over time.
10:19Beneath that we have the income statement and expenses.
10:23Again, most notably is the 3.6 almost 3.7 million of interest earns from the bonds.
10:31And then finally, below all that is the income statement in debt, which again shows the TIFF payment we received last year, as well as the debt interest payments on the bonds that were received.
10:44Are there any questions over the balance sheet and income statements?
10:50If not, we can move on to the next page, which shows I'm sorry.
10:55I'll just I just want to um thank you for the revised presentation.
11:01It's much more understandable.
11:04Um the income statement and the income debt.
11:12I I I guess I'm a little confused with the name when it says income statement.
11:17Does that mean we've collected for more than we brought in?
11:21Where is that coming from?
11:23Or is it just money in and money out?
11:25It's sort of cash in and cash out.
11:28Yes, that's to show the cash that was received that was brought in, and then some of the expenses that were uh expensed out.
11:36But we just wanted to also break out beneath that the income statement showing some of the debt from the interest payments as well as the TIFF income.
11:46We just wanted to kind of break that out so that it was a little easier to parse and read.
11:52Well, thank you so much for the clarification.
11:54Yeah, it was just more of a highlight.
11:58And that that's because you have money coming in from the industrial development board on the TIFFs here into this funding for the I guess the sports authority financial report, correct?
12:10So the 10 million, or actually, I'm sorry.
12:14Yeah, no, I'm sorry.
12:15That's that's the because of the IDB TIFF, correct?
12:23Looking at the very bottom, the TIFF, yes, that's correct.
12:26So it's coming from another uh entity here that would be coming in because of the tax increment financing.
12:32Yeah, that's correct.
12:33Okay, I guess since you brought that, I kind of what it doesn't show is the excess or the surplus of ins versus out.
12:45Unless I add them all up.
12:48And we'll eat the presentation or reading that net difference is what I would look for.
12:56We can we can include that next time as well.
12:59All right, but again, thank you very much.
13:01This is much, much better.
13:06Uh if we can move on to the next page, then shows more of the budget presentation of um the first column above is the stadium budget of 115 million.
13:19To the right of that shows the encumbrances and actuals.
13:23Uh again, this is as of January 2026.
13:26Uh, there may be a typo I showed January 2025.
13:30Uh but the far right, we show that uh of from the amount remaining, 77% of the budget is complete.
13:41Beneath that is the public infrastructure, which again is the West 26th Street.
13:46Uh the budget for that was 10 million, and as you can see at the far right, 64 percent of that is complete.
13:53Are there any questions regarding that statement?
13:58That that's not showing on our screen, so we were just it should be the next page.
14:07The hard copy works, no problem.
14:10Okay, as long as that network.
14:16Well, in total for the whole project, it's 76% complete, according to the budgeted amount.
14:24Are there any other questions?
14:28We're not behind anything at this point that's 76% complete, and completion is estimated to be sometime uh this spring.
14:38Well, I believe uh Clay may be able to answer that more uh in detail, but yes on the numbers.
14:45So we think we'll be within budget when it's completed.
14:48Again, I think Clay may be able to answer that more in detail.
14:53Yeah, okay, all right.
14:55All right, thank you.
14:56Well, thank you so much.
15:02Um, we'll move on to presentation of February progress support by public works.
15:16Hey, uh, so I'm Clay Oliver.
15:18I work with Chattanooga Public Works.
15:19I'm filling in for Bill Payne today.
15:21Uh, here to present our February progress report.
15:26Uh, first the construction update.
15:28Uh, we've been working through the field installation.
15:31We've got our base of sand down.
15:33We actually started putting sod down, I believe, yesterday.
15:36Uh, we've also finished the ribbon board installation along the powerhouse, the pattern shop, the third base building, and since I've made this along the left field wall as well.
15:46That's your video boards that show the score and everything else, tell you when to cheater.
15:51Um, we've switched over from temporary to permanent power, and we've also started the team store installation in the shed building that is progressing pretty well.
16:03Um plate and powerhouse buildings.
16:09We've finished the elevator in the pattern shop, uh, working through team offices and the pattern shop.
16:16We've actually completed those, moved furniture in and gotten a temporary certificate of occupancy for team use, so they're actually in there in their offices working now.
16:27Uh on the public infrastructure side, the river walk concrete and the rubble gardens are being installed.
16:33Uh, West 26th Street and Pipe Way both have curb and binder.
16:38Uh, the storm water, all the sewer that needs to go in for this is has been installed, and we are uh waiting to pave everything till closer to opening day since we're still using it for construction traffic.
16:52Brings us to our budget tracking update.
16:56Uh, as has been the case for most of the project, we're tracking very close to our cash flow estimate from the beginning of the project.
17:04Uh, to answer your your question, we're feeling pretty optimistic that we'll bring it in within budget and uh opening day.
17:11First pitch is April 14th.
17:16West 26th Street and site preparation update.
17:19Uh as you can see, we've spent out all of our stormwater and wastewater funds.
17:24Uh we're what is that a hair under 40 percent through the West 26th Street General Fund.
17:31Uh, that includes all of the work for the river walk, uh, the the paving, the actual construction of the the surface road.
17:39Uh and then as far as site preparation goes, we are at 7.15 million out of the 10 million.
17:48The team supplied items.
17:50Uh the team has supplied request notices for a total of about 15.3 million dollars.
17:58They've submitted draws for about 5.1 million of those dollars.
18:04Uh so they have about 3.6 million dollars remaining in their budget to to write contracts and finish this thing out.
18:11They have a lot of the the end of project thing that all the furniture, the weight room, that kind of stuff that can't go in until the project's mostly done.
18:19So that's why they still have some outstanding budget left.
18:25And that's all I got for today.
18:29So financially, you're about 76% complete.
18:34Um construction-wise, because it doesn't necessarily correlate with the dollars.
18:39Are you following along or those two be about the same?
18:43So this is construction.
18:44I believe Paul's number probably includes soft costs to the architect and everybody else.
18:48So you would say you are about 80%, 75%.
18:53It sounds about right.
18:59Can't wait to throw the first pitch.
19:02Rich isn't here today, but I'll talk to him about it.
19:05Well, I assume we'll be operational by April 14th, but will there be ongoing construction going on?
19:12Yeah, so we'll be going through punch list for a little while, uh, going through cleaning stuff up that got damaged, say during construction.
19:19Um, and we're also starting to kind of look at things that may not need to be done day one.
19:26You know, maybe we don't have to paint that utility closet.
19:29Let's go face a paint a client-facing area, that kind of thing.
19:33So, yeah, we'll we'll be out there for a little bit after opening day.
19:46Appreciate the update.
20:00Okay, item six a resolution authorizing the city engineer to direct payments of the remaining unencumbered stadium budget amount of 307,486.33 cents for final stadium expenditures to the appropriate vendors, including existing consultants and contractors to the sports authority, or to reimburse pipe properties LC foundry developer LLC or shadow professional baseball LC for reimbursement of eligible stadium costs in accordance with all financing documents previously approved by this authority and directing the city engineer to report on the distribution of these of these remaining unencumbered funds at a future meeting of the authority after project closeout acceptance of infrastructure and the approval of a certificate of occupancy by the city.
20:42Come back just in case you have any questions.
20:45Explain uh so that 307,000 was it 4683, I believe, um is the outstanding is the remaining balance of the 86 million dollar budget.
21:00We've only gone out and written 85.7 million dollars worth of contracts.
21:06So this 307,000 dollars is just gonna give us some flexibility at the end of the project to um if we need to pick anything else up that we don't know about, you guys don't meet again until after well week before the first pitch, I think.
21:20Um so we were just gonna go ahead and ask for this money so that we can write contracts and we'll come back and tell you exactly how we spend it down to the penny.
21:26So it's basically to allow to spin this without the usual purchase and process.
21:35Yeah, just because you guys don't meet that often.
21:38And this is also what the city engineer has been looking over this whole project, and and you and and Bill have been monitoring, correct?
21:48And you're not gonna spend some unless it needs to be spent, correct?
21:55And if they bring it back to us and don't approve it, Bill has guaranteed that it'd be covered out of his personal account.
22:04I'll talk to him about that one.
22:07No, um for a contract is large, 80 plus million 300,000 cleanup.
22:14Um, it's not unreasonable, but we do have purchasing rules to follow, so we appreciate you bringing it forward.
22:23Is there a motion to approve that?
22:25This resolution to approve.
22:37The resolution is approved.
22:39Move on to item seven.
22:41Presentation update on the public art process.
22:44Projects underway in future projects planned for the South Broad Erlinger Stadium.
22:54Um, I'm Kate Kearney, manager of Public Art Chattanooga with the city's Office of Arts, Culture, and Creative Economy.
23:02Um, I'm new to the city as of um this past August, but I am returning.
23:07So happy to be back overseeing public art with the city of Chattanooga.
23:13Um, just wanted to give you all uh a brief overview about um the process that we've gone through with the public art capital dollars that have been allocated to the stadium in the South Broad district.
23:26Um we're very excited that this has been thought of um as integral to this project, but we were up against a tight timeline um with the stadium's construction schedule.
23:38So we've been we've been creative, um, but we also have some future opportunities that we've identified.
23:45Um just um so you all are aware we do um have a public art commission that is authorized to review and recommend um expenditures of public art capital dollars.
23:58Um, and that is authorized through city code section 9-1.
24:02So our our board is a combination of art and design professionals, but we also have um an engineer, we have local artists, we have um local arts organizations represented, um, landscape architects and urban designers.
24:19And this is our team.
24:20We have a small um team, um just two with a focus on public art, and then um Carmen Davis is our director of arts, culture, and creative economy, and Monica Kenzie oversees our efforts under parks and outdoors, um, arts, culture, and special events.
24:37Our mission is presenting a wide variety of public art.
24:41So our goal is to see um small, large um monuments, memorials, uh, murals, all sorts of things integrated into the public environment.
24:52But we do that in in collaboration with the community to enhance a civic environment and enrich the lives of all our our visitors and residents to Chattanooga.
25:02So with that, our guiding principles, this came out of our 2019 strategic planning process.
25:08Chattanoogans believe that public art builds an authentic city.
25:12So as we pursue development projects and build new structures, our hope is that we really reflect an authentic Chattanooga and we can do that through the arts.
25:22We're also working to preserve the character of our neighborhoods, so making sure all our neighborhoods have access to the arts and creative expression through public displays.
25:32Collaborating to create vibrant public spaces.
25:34So again, working alongside public works, our Chattanooga Design Studio, our RPA, to really make sure that our public spaces have character and vibran.
25:45And then public art is a great way to provide equal access to the arts because it's out in public, it's free.
25:51Anyone walking by from all walks of life get to enjoy this and have exposure to the arts and inspiration.
25:59And we also value the artists in the creative process.
26:03So with that, our timelines and schedules might be tight, but we also have to give the artists the ability to have time for their process.
26:13And we we love to bring the community into that process when we're able when we when time allows.
26:19So throughout the city, we have 99 outdoor artworks, permanent artworks that are part of the city's collection.
26:25This has been growing since 1992 through various partnerships and collaborations, but we are now a full-fledged city department with policies and procedures and overseeing over 5.4 million dollars of city-owned assets.
26:42And this work can be found in 26 neighborhoods throughout the city.
26:46So we're not just downtown.
26:48And through our art and neighborhoods program, we've managed to get art out into a number of neighborhoods.
26:54So here's a little scatter shot view of all the the artwork in our city, and we continue to expand this year by year.
27:12Okay, so for the stadium and for fiscal year 26, um, Mayor Kelly and the City Council approved a designation for public art and capital funds of 344, just over 344,000 dollars.
27:31So we have pulled together a committee that would oversee how these funds are designated and used in the district, and that it goes on to be recommendations to our board, and they have the formal oversight of the approving that.
28:08We we use we followed our standard process, but I will say we did have to expedite this process uh somewhat to make sure we could get art into the construction phase.
28:18So step one, as I mentioned, is that design team coordination, identifying what the opportunities are within the the building site.
28:27Step two is community engagement.
28:29That selection panel is a piece of our community engagement, so we're making sure we have some broad representation there, but we are also typically asking ourselves what are the other opportunities to engage the community.
28:40Has there been an engagement process already for this project?
28:44Do we have time to do some more engagement activity?
28:48And is there a specific community interest or goal for public art to address?
28:55We move on from that to to bring together the selection panel and create a call to artist to just to go into detail on this opportunity.
29:05So this is our standard call to artist that we've developed alongside city procurement to source artists for projects.
29:15We used an invitational approach for this call for the stadium gates, um, sourcing 12 local artists to submit.
29:26From there, we go to a concept design, so we get visuals of the ideas presented, and then we present that to the panel and the board for for a final approval on the the approach to the project.
29:41From there, we move into a final design.
29:44Um if there's some feedback that needs to be incorporated, um, any tweaks, and then if needed, depending on the project, we'd move into a technical drawing and permitting phase for the project.
30:00And then the artist has time to create either in their studio on site, prepare the site, and install.
30:06So our first project that's been identified, and again, this was a an art or no art conversation, basically.
30:16So we we really had to move quickly to see that there could be art.
30:21So in October, we invited 12 local artists to apply for this.
30:26The panel selected two finalists.
30:29We saw concept designs by those two finalists, and in November, the Public Art Commission approved that initial design.
30:40The artists produced an at scale mock-up.
30:43And we had a final design approved by the Public Art Commission and the selection panel.
30:49Our local artist is Tommy Bronx, and he is a visual artist, a muralist, but he has a very strong design practice, digital design practice, which was an essential component for this project because the artist would be working with Thoroughbelt, the contractor for the stadium gates, the fabricator, to design a cut file.
31:12So we were able to expedite the creation process because we had an existing subcontractor, and we just needed to source the artist that could design and produce a file to be cut by a laser router.
31:28So we have core core tin steel panels cut by laser but designed by an artist.
31:36And with that, we were able to again leverage the budget for the fencing and gates, pay for the artist's design, pay for some sketches, and then we do have a fabrication allowance, knowing that that design might be more complicated than a standard fence or gate panel to cut.
31:56So these are the locations of our main entrance gates that we have artist designs for.
35:01So that's you you'll maybe seeing that come before your agenda as as a um agreement that we need to complete just for future future reference.
35:13The second project that's been identified, and this um is first scene is happening post-complion because it's a surface element.
35:21Looking at this back wall of the stadium, we know that this is um highly visible from the highway, and um is an opportunity to sort of welcome uh travelers and visitors coming to into Chattanooga.
35:35Um so we are setting aside most of the pretty much the remaining budget that had been set aside for public art for this because it is a it's a actually the the wall itself is over 8,000 square feet, um, but we're looking at sort of the the higher visible portion uh which is just over 6,000 square feet, and so pricing that at what we like to standard is standard for artists is based on a square footage uh price, and we're looking at $35 a square foot for this process.
36:09We feel like we have a little more time to do more community engagement around this.
36:13We'd love to do um a more public presentation of three potential design proposals from different artists and and really get the community's input on which is the preferred approach.
36:27So we've also set aside um funds for for lighting for this.
36:33Um I was just talking with Clay, if there's um to think through the electrical situations on the wall there so that we can make sure this artwork is lit up at night.
36:43But this would be a very iconic um opportunity, sort of a gateway to the city that we can um take advantage of with artistic um creativity and enhancement.
36:57Uh there's a couple other projects that were identified by the the art selection panel and the commission as potential opportunities, but we do not have funding currently.
37:07So if these are opportunities that the lookouts want to pursue, or um the sports authority or developers, um, you know, these have been identified as potential, but we're not pursuing them.
37:19But I wanted to make you all aware.
37:21Um the tradition that Chattanooga has had is is really bringing integrating art and gateways to the Riverwalk.
37:31Um, and so I knowing that there will be a new actual access to both the the South Broad Stadium District, but also the Riverwalk entry point, um, there could be an opportunity for a gateway sculpture.
37:44And um the idea had been pot passed around that this could be you could take some of the salvaged material, industrial materials or metals on the site and have artists creating um pieces with this.
37:58This is an example of what that could look like.
38:00Um, or if you wanted to go the approach of just having industrial materials, maybe not reclaimed, but um, you know, something of this nature that has um aluminum or steel incorporated could be an interesting um moment.
38:18But the again that was not identified as something we pursue at this time.
38:22Um we did we have put in a request, an additional request for public art capital funds for this coming year, um, which may or may not be approved for that project.
38:36Um this other opportunity we feel like it would be uh a low-hanging fruit, maybe not as expensive, is a mural on the powerhouse um building, um, the elevator shaft, the sort of three-sided um structure there with about 45,000.
38:55You could implement a um a tribute to baseball legends in in whatever way is identified by um the community or lookouts that they want to honor.
39:08Um, so this could be an interesting opportunity to have a more uh baseball themed telling of history or recognizing of significant um players.
39:26Is that my last slide?
39:29Are there any questions about the upcoming projects?
39:40Uh it's not about the upcoming, but um right before you end it.
39:45Before you started talking about the funding needed, maybe go back to prior slide.
39:52No, it was right before you started talking about needed funded for the project.
40:00I the the picture there that shows Chattanooga.
40:03Is that just a sample or something?
40:05That was from the architectural renderings.
40:07So that's not intended to be what's painted by any means.
40:11No, we think we'd do something much more creative than just the words and solid colors.
40:18It would be, I mean, I think the opportunity is um uh you're you're dealing with a matter of seconds, you know, cars driving.
40:28So it you know, we we couldn't do sort of like a full historical narrative mural, um, but we'd want to reflect Chattanooga's identity as much as possible and and sort of a quick passing um glance.
40:45Well that just comment that public art, the public art department has been around a long time trying.
40:50They're in a struggling department, so I am I encouraged that uh things are happening that allows you guys to be able to, you know, enhance the city through public art, but there were times I recall when there were funding below public art was definitely a low priority for public issues, so I'm glad to see it move up on that on the ladder for you.
41:16We're really glad there's been some investment for the stadium.
41:20So one last thing, sorry.
41:24So we need 300,000 more to do uh powerhouse baseball legends murals, 300,000 to do a gateway sculpture, it would be closer to 45,000 to do the the mural, the powerhouse mural.
41:46So I see on the uh page 47 and 4849.
41:56Um we have African Americans represented.
42:01Um that's in this uh the Great Eight.
42:09I'm assuming that's is that the Negro League.
42:13These are project comps.
42:15So these are this is examples of artworks done in other cities.
42:21So we would need to identify who and and you know what what individuals, who we what stories, what history we wanted to tell, but this is just sort of an example of what's been done in other cities.
42:35I would just for the record, I would like to see more emphasis or some emphasis installed in this stadium uh around it inside, however, to represent that as an originally African American community, and I think this is and I've talked with um Jim Irwin about this, and he's in concert with it too.
43:01Uh so I I didn't see a lot in these gates.
43:07I mean, you can't tell, you know, race in these gates, uh, which is which is good.
43:14I mean, they're very well done.
43:16I don't I think they're nice, but I I think it's important uh because this neighborhood goes back and and has gone through redlining and being cut off from uh major society in Chattanooga, and so I want to see, and I've personally been a part of revitalization on South Borough, so that's that's why I have that interest is uh I learned some things, but there isn't not a lot of history on the African American community down there because white people wrote it or didn't write it.
43:57They wrote the history and some things were left out.
44:00So I think this is an opportunity to bring these things to light.
44:05Right, I agree, and you know that the um the black the black artist who's created these works, you know, really I think he he liked designing these without race um as a factor that he could even present, but we will I think have some interpretive opportunities with this because I think that there's you know these players we can tell the history that's represented in these panels through some signage um and as well as um the reference to the Southern Negro League, the stars that will appear and the gates are are intentional, and so we can we can call that out and and tell that story.
45:00Um but yeah, I think this the mural, the smaller mural is actually a better opportunity to tell a more uh a colorful narrative uh and get really more specific on representation and the history.
45:09And I think if you if you interview, interview African American people, there are a lot of folks that grew up down there from that area or have family in that area.
45:22I mean, somebody that knows the history.
45:24This white woman does not.
45:26I want to make sure it can it comes from the people that grew up there or family there.
45:33Reverend, there are the teams also working on a lot of that stuff too.
45:36So there's the public art component of it, and the team themselves have taken that upon to have storyboards and sort of tell that history of the Negro Weeks here and other things.
45:45So this is just one component of many facets, too.
45:48So it's not the only thing.
45:49Yeah, so we we shake it.
45:52We need to make sure we tell that story.
45:53Um we had a really fun one the other week.
45:55We we toured the Bedwood board, and the carto bus driver that came down.
45:59Uh, he we jumped on the bus and he pulls around the back of the stadium, and he's like, Wow, I haven't been here since I worked here.
46:06I said, How long did you work here for?
46:07And he said, 12 years.
46:08And I was like, any chance you can park the bus?
46:11And so he went on the tour, and it was so neat standing there and hearing from someone who spent 12 years of their life four different jobs and loved working at uh he actually worked at U.S.
46:22Um, but those stories do need to be told.
46:25And uh, you know, and that's something that the team is working actively on to make sure we do tell, you know, what this what this area is.
46:31Yeah, and we want everybody to come, and everybody means everybody.
46:36So if we tell their story, they'll come.
46:40And and that's c that collaboration is really important because the public art, if if that falls all on one artist and one artwork, it's a it's a really big task to portray visually, right?
46:52There's only so much that can be captured and and what you can gather walking past something.
46:59So, yeah, again, those those interpretive um opportunities for signage and history in throughout the stadium will be um really important.
47:09Um, so and you know, we would we're doing our best with the projects that we have.
47:14Um, but again, I do think um, I don't know if um I've talked with Rich and the Lookouts, you know, if that's an opportunity to do something on that wall with the historic more historical context, um, that would be great.
47:34I um and thank you, Ann, for bringing that forward.
47:38I was actually in totally total agreement.
47:41Um I I'm in my mind though, wondering how and what's the process to make that happen.
47:47Um the the teen individuals they how I mean what mechanism is there to ensure that that history is known and brought forward.
47:58And I quite honestly was mistakenly in my assumption that it was a major part, maybe I'm not in seeing the murals and uh representative of African American.
48:12I thought it was I I I kind of thought it was already part of your major, and it probably is, but that emphasis is I'm in total agreement, so I appreciate it.
48:21But I I I would like to know how how we're gonna make it happen.
48:26How do we get that history?
48:28Because our reverence says that she didn't have it, I don't have it, but I have talked with some people, uh African Americans that know some history, and but it's you have to find the matriarchs and the patriarchs that are around African Americans that know that history and can guide you to okay, you need to go here and over there talk to this person, yeah, that person.
48:59It's a process, but it's rewarding.
49:03You learn something all along the way.
49:07Well, and I think our for this next larger mural project, our engagement process will be much more robust, and I'd also like to have a broader representation on that artwork selection panel.
49:20Um, so whether that's having a community organization or residents, or yeah, people from the community who have that history and knowledge, so because there's a direct communication with that panel and the artist, and so the information that's provided can be passed through that.
49:40So if we can we'll we'll do some some research and try to find um representatives that could be providing that input for the next projects, because we will have more time.
49:56Thank you for separating these works.
50:00Well uh uh Kate, I know you work for the city, right?
50:02Yes, and uh the question I guess I've got, and this is the sports authority for the city and the county here that we have in this entity, and this entity has just engaged in over a hundred million dollars worth of bonds, but the money that we're talking about here is actually going to be coming from a city source, or where is the money coming from?
50:22So I I see that at least quarter two of 2026 for the gates, at least that's already in the budget here for this year to have the gates to go up for the stadium whenever the stadium opens, correct?
50:35Okay, and then the other budget for the uh the outside of the structure here uh that will show people when they're coming into the city of Chattanooga has yet to be decided in the budget for 2027, correct?
50:48We have the funds for that.
50:50Okay, so you have the funds already.
50:52So the only additional funds that the city will have to come up with then is the other aspects of the city and the uh the entity that is running the the stadium here, uh the stuff for inside the facility.
51:06Um yes, so that's where you know the that mural opportunity to to showcase the baseball legends is inside the facility.
51:17Right, and so again, that's sort of where we the commission has focused our efforts on sort of the more sort of broader Chattanooga facing public art um opportunities, and um that gateway again, not knowing exactly whose property that would be on, who's building that access point to the riverwalk would determine again sort of our office's involvement and um contracting process is focused on the city's city sites typically.
51:52Yeah, just trying to make sure because there are bond issuance here that this body is involved in.
51:58That's not the city of Chattanooga, that is this entity here that is responsible for that bond issuance, and then what responsibility for future construction would be the responsibility of this body versus the city of Chattanooga or the entity that has a long-term lease.
52:16Okay, so there's all three folks that need to be involved, right?
52:23Hopefully, that does not negate our desire to want to see the history.
52:29Okay, just trying to figure out how it's gonna get paid for.
52:32Well, and that's where I'm kind of saying we have our two projects that we are implementing, those other two projects, funding source, and who's who they fall to to implement is a is a question mark based on yeah, who's who's owning the funds and the project.
52:50So you're saying who owns the funds, direct how the project is spent.
52:55So therefore, our concern is may not be something that we can direct or we can always be quick.
53:08Yeah, the you know, from the development standpoint, you know, we're committed to the public art and to working, you know, it's been part of our thing, right?
53:15You know, creating the district, creating the foundries district, the whole purpose of it is to tell these histories and tell these stories.
53:21So us and the team collectively will work to tell that story and to create these public arts.
53:27So that's part of our as part of what we're trying to create here with the district.
53:31So you know it's it takes time to be thoughtful and to do it right, and that's what you know that's what's happening.
53:36These are the first bits of a lot more to come.
53:39So but we are committed to that.
53:46I had a non-related question if I could ask.
53:49Um the city used to own the Chattanooga.
53:52Chattanooga did a lot of public had a lot of public art that we left there that the city owned that the approach.
54:01Do we still own that art?
54:02We have the art, yeah.
54:05We took the art out, they got their own new the new hotel, yeah, got their own art.
54:10None of that could be used to hear, so it's all interior paintings and things.