21:36These are some of the rules and procedures for form-based code.
21:38If you plan to speak, you must be sworn in.
21:40If you speak, you must sign in at the podium.
21:43When you begin to speak, say your name, address, and interest in the project.
21:48Use the laser pointer provided.
21:50You may leave after your case is heard.
21:53When you leave, please refrain from speaking until you have fully exited the conference room and you're beyond the blue the wood doors.
22:00If you defer your case, you will need to notify staff.
22:03Major modification permits shall be issued within a week of the meeting through the online application portal.
22:12This meeting is being recorded.
22:15We'll start with staff presentations for the case.
22:17The applicant can present their case as well.
22:20Then there's a community comment section, and then the applicant gets to respond to any community comments.
22:28After that, uh goes to our committee discussion and then a motion and a vote.
24:01Maximize opportunities for redevelopment, provide a diversity of housing, promote development that will support transit commercial services, protect established single family residential areas, protect the integrity of established historic districts, balance development opportunity and conservation along the riverfront by promoting development scale form that maintains public accessibility to the river.
25:00If is the responsibility responsibility of the applicant to meet the burden of clearly demonstrating the reason for the request code exception, and to provide sufficient documentation to illustrate how the modification is relevant to the site constraint and or how the modification would equal or exceed the existing standard in terms of achieving the principles stated above.
25:21The FBC committee's role is to review requests for major modifications to the FPC that do not qualify for staff approval and to review appeals to staff decisions or interpretations.
25:36Has everyone on the committee had uh time to review the meetings from the minutes from the last meeting.
25:43Do I have a vote motion to approve?
25:50I have a motion and a second.
26:01We're hearing today's case at VCH26 has its address at 207 major avenues, A, but someone is urban edge out front.
26:15They're requesting to increase the intensity for their reposed use to allow up to 10 employees in our Chismal category.
26:25And in these technicians, uh facility for small scale production with two or five employees to require system.
26:39And this is um just proposed.
26:45They haven't submitted any permits to this is some of the developments.
26:50And again, the request is to increase the use of that state.
26:56They want to allow up to 10 employees in an artist long use.
27:00And again, in the use table, this category of RTM allowed and ESH, but um like light industrial cat to sell to the IS.
27:15So image, context consistent, loaded me, intensity, essential, commercial areas, gestions, license combinated.
27:29It requires top round floors with large transparent policing to support.
27:34And the new artist tenant currently has five employees, and they're requesting time office deliveries to uh go out to tenant place to support the production application passing.
27:47And I'd love to invite gap tents on two.
27:53I appreciate you uh let me come up here and uh talk to you about this.
28:01Uh, the address for this particular location is 207 Frazier Avenue.
28:12Um I've got is uh can you bring back up the overhead?
28:18That one, uh that that one right there.
28:22Um I'll give you a little bit of back history, which will just kind of a long way to get into our request.
28:30Uh, but we moved over to uh this site of town about a year ago.
28:36Uh and I'm from out of town originally.
28:38We moved to Chattanooga maybe six years ago, six and a half years ago.
28:42Uh we've been in this is our third house we moved to, and uh I was decided I want to kind of settle down, get some roots.
28:50Set here in Chattanooga, and I got two dollars that moved here.
28:53And so I decided uh I'm retired that I would invest some money in commercial buildings, give me something to do, try and improve the areas around me just to make things nicer.
29:02I ended up purchasing uh what you see is 201 and 207 Frasier Avenue, and 207 is the one we're talking about.
29:10I also purchase across the street 202 Fraser Avenue.
29:13And I'm doing this uh to give myself a project.
29:16I'm also wanting to improve the area.
29:18I look at Frasier Avenue as uh a unique location in Chattanooga that has some really good potential.
29:25Uh, but in my personal opinion, I may be wrong, but my personal opinion it maybe needs stepped up quality-wise a little bit to attract uh maybe some nicer restaurants, uh nicer retail stores, that type of stuff.
29:39And I purchased these properties because they're right at the end of the Walnut Street Bridge, which is the walking bridge.
29:44And I know it's under repair right now.
29:46Uh, they're gonna be done the end of September.
29:48But I thought it was a very unique location in that it uh those locations can serve both local community as well as tourist.
30:00And uh that led me into wanting to get the particular uh potential retail operation into one of these buildings.
30:08Uh when I moved to Chattanooga about maybe four years ago, I got in touch with Chattanooga Leather Company, which is a very small business.
30:15They're in your uh incubator building.
30:18I can't remember the name of it, but it's right down the road.
30:21The P uh PDC, what's the building called?
30:24BDC Business Development Center.
30:28And that's where he's been operating for three years.
30:31Uh, I had a hobby that I uh was doing that I used his services for.
30:36He manufactures uh leather goods for uh things like uh tomahawks, knives, she's sword shees, and other stuff that people would typically use leather for.
30:48And uh he started doing a project for me, which had to do with uh the golf industry.
30:52He had always told me he wanted to be involved in retail, but you know, he's small and was trying to develop and get into the retail end of the market so he could do both his manufacturing and retail.
31:03Well, it turns out that they're getting the city's getting ready to close the uh BDC building.
31:09And uh he was looking for retail, and I told him that look, I'm I'm purchasing these properties, these older buildings at 201 and 207 Frasier Avenue, and I'm gonna remodel them, make them as nice as I can.
31:20And I knew he wanted to do retail.
31:22I said, Well, I got an unusual building, this 201 Fraser Avenue or 207 Frasier Avenue, which has got a weird layout, weird floor plan for a normal retail operation, but for something like he's doing would actually be a really great fit.
31:36And uh I showed him the building, he said he was very interested.
31:39He wanted to, this would be the first time that he did retail.
31:42And it is an artisanal building or artisanal business.
31:46He's got five employees right now, two of them he says are part-time.
31:50Uh, but then if he moved into this building, he'd obviously need somebody to be able to operate the retail end of it.
31:56So that'd be another one or two people.
31:58And if he grew at all, they'd add another one or two people on top of that.
32:01So I picked out the number 10.
32:03I thought, well, that would be enough that if you got to the point where you got 10 people working there, and it means you're successful from the retail operation as well as as well as your manufacturing part that you could probably break off your manufacturing and put it in a different building at that time, and then either stay in this building selling your retail or maybe move somewhere else.
32:22But I thought maybe two to five years, he'd still be able to stay under that 10 employee part.
32:29And I thought, well, that'd be good enough to find out whether it's really going to work for him and uh whether that works for that particular area.
32:36I really like this uh leather craft company.
32:40It's kind of my definition of artisanal type of business.
32:43You know, it's kind of like glass blowing, you got blacksmithing, leather working is a little bit more mainstream.
32:50But it's uh people who are crafting products.
32:54And it I thought it lended itself very well to be both a local uh type business provider as well as a uh tourist type business provider, in that the stuff that they make could attract tourists to come into it.
33:13And that was my main interest was I want to get retail, I want to get a restaurant, I want to get that type of stuff in 2020 and 207.
33:22But I want them to be unique.
33:23I don't want them to be just your trinkets and bobbles and you know, just the basic kind of tourist stuff, t-shirts, that kind of junk.
33:31I don't want that in these buildings.
33:33I'm I'm trying to step it up to as high a grade or as high level as I can, specifically around where that bridge is, because I think you do get a lot of tourists as well as a lot of locals.
33:44I personally thought that the uh leather crafting was a great fit because as tourists go by there, that's something unique that you don't always run into when you're visiting other cities, trying to figure out what are we gonna look at, you know, what are we gonna see?
33:59And he cross the bridge and others Chattanooga Leatherworks company here that makes some cool leather stuff.
34:04Let's go check them out.
34:05So I looked at it as a as an attraction center for my buildings.
34:11Uh so I I have some personal interest in this that I uh been working with this guy for about four years, and uh I actually had some products I developed for the golf industry that I have him make and would let him sell there.
34:27Uh so it would be a combination of the stuff he's doing now, uh, which is kind of in the you know, the guns and the knives and the swords and some of this uh uh I can't remember what you call, but you know, people uh do the dress up and that kind of stuff.
34:42They need a lot of armor and that kind of stuff, but also the golf industry.
34:46So I thought it spread itself out wide enough that it wasn't just some kind of niche type of thing that he'd be going after, but it spread it out maybe over like three different markets, those three different markets.
35:00So I thought it would be a great fit for this building, uh a great fit for me as somebody who's trying to develop this area into something nice that it would be a great attraction getter, something that somebody would want to go in and take a look at.
35:11And that helps me then draw uh nicer higher end stuff to the 201 and the 202 Fraser Avenue.
35:18So uh I would like to be able to uh to get that number up high enough to where he can uh over the next couple of years know that it's gonna work and get it working, or if it's gonna grow too much, then he can move his manufacturing away and just do the retail, or if it's not gonna work at all three years from now, then he's not gonna be there and somebody else will be there.
35:38So I, you know, the number was the metric that was spelled out in the code, and so that's the number I have to look at and say, okay, well, so it's less than five.
35:48Give me a number up to 10 and include 10.
35:50I think that would uh at least give him the opportunity to try this thing out, give me the opportunity as a developer to get it to work for him.
35:58Um if it doesn't work, then obviously it's not gonna work for him.
36:02But if it does work and it grows big enough that you know that you've got the ceiling of 10 employees, and if it's gonna get bigger than that, then he's gonna have to do something different.
36:10And I would suspect it'd take at least three years for him to get to there.
36:14So that's what I'm asking for.
36:16That's what I'm looking for.
36:25Um Brad Northcutt with Tinker Ma Architects address 714 Cherry Street.
36:36Um to remediate um very briefly what Ken said, uh, we think that this is a very good opportunity to help uh promote local businesses and um especially on that Frasier Avenue area.
36:50Um as those businesses help reinforce the riverfront development and both um how pedestrians and either local or tourists are able to experience um that riverfront retail and um you know keep it to something that is uh locally produced and um you know benefit to the community.
37:11And we are uh approaching this project as Ken mentioned, uh, with um the overall 201 and 202 improvements uh other than the employee count for 207 um after having presubental meetings, both with the um FBC and land development office.
37:33Um everything else we're potentially looking at um should be within guidelines.
37:38And um it's primarily for cosmetic improvements, maintenance improvements, um, sustainable building material and by sustainable, I mean um just having uh the building materials uh be something that can last longer with a bit less maintenance.
37:55The storefronts are kind of rotted out now, and some of the accesses into the shops aren't great.
38:00Um the access into the rear of the building uh is also not great.
38:05So making some of those improvements to where that building overall is of um better use and available to uh more folks in the community.
38:14So um that's that's what we're looking at today.
38:19Is there anybody from uh Canadian comment?
38:31My name is Katie Campassi.
38:33I live in Hamilton County District Six in the North Shore neighborhood.
38:36So I am a resident of this community uh that they are considering uh changing with this retail.
38:43And sorry, Stoppy, did you swear in at the beginning?
38:49Uh so I came to attend the public hearing to see what type of use this building would be.
38:54If this was something that was going to be rent residential apartments, condos, things like that, considering this is already like a very congested area.
39:02That was something I was concerned about.
39:03I'm glad to hear from the developers that it is uh gonna continue to be a retail area and love the idea of leather work, handcrafted goods as someone who has been a resident of downtown for about 12 years and also been a um resident of the North Shore now for about eight to nine years.
39:21I think that that really fits in with the current vibe of the retail and then other offerings that that area has.
39:29Uh I just wanted to comment to the developers and to the committee that this is a very congested area.
39:36The picture that was shown is an old picture before they redid the roads, where you can see that there's two lanes going each way.
39:45Uh that has obviously changed uh with the horrific accident that did occur a few years ago.
39:49The trial is currently ongoing.
39:52And the roads have since been changed.
40:00And so it is one lane going each way with pedestrians and with bicycles and with planters and with parking along the sides of the road.
40:06It is very congested.
40:07As a member of the neighborhood, that is something that I drive and walk every single day.
40:13And so that's something I see on a regular basis.
40:15And so I would just like for the developers and the community to keep that in mind as they go forward with these renovations and as there's going to be construction trucks and cement trucks and a lot of workers and potential road closures that it is already heavily congested.
40:34And there is a lot of construction on houses happening in the North Shore neighborhood and over on Tremont.
40:42Uh there's things that are in development.
40:44There's things that are coming before different committees to be developed, new housing, new condos, new apartments, etc.
40:51Really all within on that same street and also within several blocks.
40:57So I would just like for there to be a level of accountability and responsibility moving forward as the residents will have to drive those areas and walk those areas and bike those areas.
41:09And I want that to continue to be uh safe, and I would like for that to be thought about as this project moves forward and taken into account.
41:47I'll respond two ways.
41:48One is uh I agree with that section of Fraser Avenue.
41:51I'll even throw this out.
41:52I wouldn't mind the speed limit being up to 15 miles an hour there, but that has nothing to do with what we're doing.
41:56Uh for the property that uh I'm referring to the 207 Frasier Avenue.
42:01Uh I own all the parking back behind there as well.
42:04So there's a large space to the north of 207 Frasier Avenue, which is where all the staging would take place as far as contractors, that type of stuff.
42:13I I can't say that you'll never see anything on was it Delmont is the one to the east.
42:18So that's right in between Forest and Delmont.
42:22So uh I own all the property from Frasier.
42:28I can't remember the street is to the north and then Delmont.
42:30So everything within that section I own, and there's 12 to 14 parking spots that are on that property.
42:39So I expect all the contractors, everybody working on my projects would be parking back there to the north and it would stay off of Delmont.
42:47Uh definitely would not want them to be on uh Fraser.
42:51I can't tell you whether or not they'd be on force uh because that side of the building has to be improved as well.
42:57So there may be something along there as far as uh uh maybe when they're rebricking the side of that building.
43:03There's a lot of places on that building that have some fake brick put on the side, it's just particle board made it look like brick.
43:08I'm gonna replace all that, have brick all put into that.
43:12Well, there's a Boeing section or a bulging section of brick I gotta fix.
43:16So there will be some uh maybe some scaffolding or whatever they would need, a lift or something that would be used on forest uh to fix that side of that building, the 201, but it is part of my whole development.
43:32Uh I wouldn't expect that to take too long, and then painting the whole building would be another thing.
43:36Other than that, I'm pretty sure everything would be to the north in the parking lot where everybody'd be staged.
43:47Uh again, uh the major modification request is just to increase the intensity and allow to the center choice to use and um again there are small facility on crack rushes.
44:06Um first I wanted to to speak to the issues that were brought up by community.
44:11Um the developer will have to get a right of view, uh a right-of-way permit to do any set up any equipment on the sidewalks or whatnot as part of the permitting process.
44:23Um, if any member from the community sees something blocked or there's not an alternative route, um the best thing to do is to take a picture of it and email it to 311 services, transportation in the city, they take all that very seriously.
44:39Um, and there is a process.
44:41I think the process the problem is a lot of people just don't know the process.
44:45So there is a way to make sure everyone stays safe throughout the process of this building.
44:54Is anyone from the committee have comments about the specific request?
45:02I had a question about the employees.
45:06Uh assume the original co-limited to five.
45:10Well, it says fewer than five, which in five.
45:13So we're actually doubling going from five to ten, basically.
45:19Well, the only other alternative would be they would have to rezone and go into uh the EIM, which allows like industrial, but generally the RP is not gonna just rezone like one spot if an entire block is ESH3.
45:38So this seemed like the better alternative with to just get a modification to increase that intensity up to and this is zoned.
45:52Shopfront mixed use zone.
45:54So if a restaurant wanted to be in there same space and have 20 employees, it would not be an issue.
46:02It's only because this is a use of the building.
46:05Yeah, it's only because they use provisions provided.
46:09I'm assuming that they want to keep that type of industrial use limited to small scale so that it is compatible, say the restaurant being adjacent to it where it's something more intense, like something you might not want in a shop.
46:24Are there any clear definitions of what constitute an industrial use versus the use provisions?
46:31Leather works, it's not specifically called out, but from the descriptions when we have our pre-consulting meeting, it seems like it could fall into how much is all my industrial.
46:43It's definitely not a heavy industrial.
46:45And as he said, it's meant to be a combination of the craft business along with retail.
46:51So that was the reason why it's a proper to say for the lowest intensity of industrial place.
47:00Can anyone think of another business downtown that's similar?
47:03I mean artisanal cupcakes, artisanal the glassmaker hot chocolate.
47:13At least the glassmaker, you know it, but I just don't know how many employees they have.
47:16And it would have to keep four employees on on-premise.
47:22Which is really small.
47:24I mean, you can you could have a five thousand square foot building, but you're only allowed to have four employees.
47:30This feels very reasonable to me.
47:33I mean, considering it to your point, if this is a restaurant, you could have 20 employees in the same space, no problem.
47:40How many employees are expected to be on business at a time, up to 10?
47:46Well, right now he's he has five employees, two of them are part-time.
47:51And they would be typically, you know, uh full-time.
47:54Well, I mean, other than the part times, it'd be whatever their hours are, eight hours in a day.
47:59And they're there and they produce product.
48:02Uh, you know, it's a lot of pan type stuff.
48:06Uh I just pull, you know, he said, well, maybe he can get away with eight.
48:10And I said, well, let me try for 10 because I don't want you in there a year and a half, and the retail side is doing real good.
48:16You know, you still got your five people in the manufacturing, but now you got three people in retail, five and three, and you is nine people.
48:24Now you've exceeded your employee count.
48:27I I wanted to give him a buffer so if it started working out and working out well for him, he could still stay there for let's say up to like a three-year time period before we would have to move, let's call it his manufacturing part of the uh business to a different location.
48:43So I wanted to give him at least three years, and I thought three years and ten employees should be a high enough ceiling that it's either gonna work or it's not gonna work.
48:52And we'll know by that time period, and then it's either you move out or do something different.
48:58So I I didn't want him to he's having to move out of that uh business development center, and I've moved businesses in the four, and that's a really big pain, even though it's a small business, it's still a really big pain to move your equipment, your employees, and you know, set up your electrical, your lighting, everything you need.
49:15That's a big hassle.
49:16So I thought, well, if if I could get the number 10, I felt comfortable that if he was to double his business and have the retail part of it, he could work that with 10 employees and anything bigger than that, then it kind of exceeds what you're looking for, which is an artisanal type of business.
49:33Well, it may be artisanal, but it's got too big where you need to have your retail separate from your manufacturer.
49:38Right now, he's such a small business, he can't do that.
49:41He can't have a retail operation and a manufacturing process.
49:44He just had to make that kind of money and have that much business.
49:49So I thought this was just that sweet spot, you know, it was 10 a magic number, not just from my experience, a number I thought put a high enough ceiling on it to keep him happy, but a low enough ceiling that it would keep the city happy.
50:02Does anyone else know from the business center that's closing how many businesses are operating in there now that are gonna be displaced by the county?
50:13There's quite a few.
50:14I know a lot of them are looking for places to move to.
50:17I've actually been looking for M1M2 zone property to uh develop because I have a son-in-law who moved here in town, he's a manufacturer, and we had an extraordinarily difficult time finding that sweet, you know, spot 5,000 to 10,000 square feet in M1 or M2 zoning, it's just doesn't exist.
50:36You just can't find it.
50:38And uh there's a lot of the people in that building that need that type of zoning, and I think they're having difficulty finding it.
50:45But I uh I know at least three that are him and two others that are doing fairly well uh that are looking for that type of zoning.
50:54The reason I was asking was if we're setting this precedent and there are others looking for the exact same situation where the only space they can find is zone shop front like this because it is a local localized commercial area.
51:09Um is this a positive precedent we're doing um to help them in the future?
51:16But do we need to consider any other conditions so it doesn't become uh a rolling thing where you can have you know 40 employees in a shop front?
51:27Yeah, my comment on that was this was I would consider it an artisanal business leather crafting.
51:35Um it's not like they're making uh robots or they're making uh door panels or something like that.
51:40They're making something, at least from my perspective, as somebody who wants to have retail stores there.
51:46I want to attract tourists and I want to attract local people, there's two combinations.
51:51Uh clothing stores, you got coffee shop, you know.
51:54What else do you have?
51:54Well, here's this company that's making leather goods that uh some of it is being sold into industry, some of it's being sold to other local manufacturers who make tomahawks and knives and all that kind of gun and knife industry, and then doing some stuff for me and the stuff I'm doing is in the golf industry.
52:13You know, I thought you could with the name Chattanooga, leather works underneath it on everything from keychains to maybe purses to wax cotton clothes and bags.
52:25That's something that attracts tourists when I go in there.
52:27It's got chat the word chattanooga on it.
52:30That's a leather thing, it's something unusual.
52:32I can't buy that anywhere else here.
52:34I'll buy a bag, or I'll buy a keychain, or I'll buy something that's got that on it, a powder cover, whatever this guy makes.
52:41I looked at his operation as an artisanal leather company as something that would attract tourists to that building, and that's what I was looking for for you look at some of the other systemal woodworking.
52:55There it's just I think that the scale of difference to measures the only is just the size of this.
53:02So we want to avoid large-scale traditional businesses, but again, it sounds like business is still very small, but they're adding some more of a retail side.
53:10Yeah, and I think uh speak other than sorry.
53:17I've got uh another question.
53:19Once you increase the 10, anybody can come in that space that fits under that use, and you did say wood crafting.
53:29Yeah, like yeah, well, I mean, yeah.
53:32Wood shops can get very heavy use with the llama cutting and all the dust and all that stuff.
53:39So, you know, that would not really fit in that retail use.
53:44I think we'd have to have a condition that this is specifically for this business.
53:50This leather, but they're artisanal businesses spelled out in the code, are like cabinet maker, blacksmith, glass blowing, and I thought leatherworks what seems a similar, even though it wasn't specifically spelled out as leather working.
54:04I thought, well, that's kind of similar to those other types of operations.
54:08Uh it's like you say, it's the intensity aspect of it.
54:12And uh that's I just kind of pulled the number 10 out of the hat.
54:15There's eight less intense than 10, yeah, but you know, where is that ceiling?
54:19Where do you draw the line on?
54:21Now it's an intense business.
54:22This isn't what we want in this area, and so I'm just throwing up the number of 10 would give me enough flexibility with him with his business that I think I give at least three years there.
54:33Uh, anything more than that from your standpoint, I would probably look at and say, eh, you're pushing the boundaries.
54:39So yeah, um, I'd like to add it's there's not a lot of square footage there.
54:44Um, and we are still a held to the um IBC standards for life safety and occupancy and egress and and all of those things.
55:00I think you're you're pretty limited in what could be um occupied with any sort of heavy equipment because you'd run out of space pretty quickly um there's I think getting larger scale material in and out of that space would be really challenging and not ideal.
55:17So I think there are some practical constraints just with the size that makes it fit with this smaller scale use and smaller scale production and smaller scale material production um that fits here um but understand um representative rough's um concern with uh some some other type of artisanal uses that might not be as um desirable that uh I would say that we did uh Ignos glass glowing with my family a few weeks ago and I'd say that's pretty large scale and kind of heavy and it was a lot of fun you know but uh that's I think that's all I think another key part of this is that like a public facing retail component and I think I don't know if that would be an appropriate condition but for any other future artisan production I think up to 10 you can still provide that if we're thinking about it from a continuing to maintain grade or an active ground score front that's that's really I think a differentiator in your inviting customers the public that it's not a closed off um production facility um even if it does maintain artisan use it kind of reminds you a little bit of the actual arts district where you kind of have the engagement of the pot like at all but it would be the condition yeah it's still it's gotta be open to the public and it's in a retail component um so then it's not a closed off like your industrial factory area.
56:59But yeah I I'm okay with it as long as that's a condition.
57:03Yeah well one of the aspects of this is where they want to do it's where you got the retail section and they want to build kind of a plexiglass type of wall so there's certain parts of the operation a retail customer can come in and see them doing you know whether it's sewing or or burnishing the edges or something to where they can actually see some of the operation to make it interesting to where it's not just you're walking in a store and here's 30 different leather products.
57:27It's like walk in well there's 30 different leather products but they're manufacturing it right there they're sewing it right in front of me.
57:34That's the part of it that I liked as well.
57:37And I think that brings a very unique local attraction as well as a tourist attraction.
57:44And that's why I thought that uh I would really like to have it in that building that particular building is also a tough one uh none of you have been in it but it's got some other issues with it that doesn't lend itself to many other type of operations there's a high likelihood if we can't get this 10 employees or can't get him moved in there for whatever then I got like also gonna be a coffee shop or as what uh tanker mall suggested maybe I just tear the whole building down and do something different.
58:14And um I thought before I do that I wanted to try and give this leather guy an opportunity to try and see if it can work for him if we can get this set up get the employee count up give him that however many years it takes and if you can make it work then great it's a win-win but if it doesn't work then at least I gave him an opportunity and uh we'd have to move on from there zoom more craft or motion with the conditions with conditions.
58:53Finally help crafting has conditions we covered we'd say we would craft conditioning before making motion that was I would say no conditions would be the all operation operations are physical to the phone maybe not all of them at all but standpoint operations are accessible visible.
59:30And that the space maintains a um retail component retail component and truly quality artisanal leather specific auto specific so then we're really not creating a precedent unless we just happen to have a run of leather workers it would be what's your time uh for when he may be moving in uh well I've uh I got tank them all working on the uh the demo and the remodel aspect of it
1:00:16What is your time on?
1:00:19Uh for when he may be moving in.
1:00:22Uh well, I've uh I got tinkamall working on the uh the demo and the remodel aspect of it.
1:00:30Uh if this 10 thing passes, then I would go to him and say, look, you it passed, you're going to be able to move in.
1:00:37You gotta start figuring out what you need me to do to this building.
1:00:41I mean, uh from the developer standpoint, I'm just gonna clean it up and make it safe, put it in new HVAC lighting, and give him a for lack of a better word, a box.
1:00:50Uh, but I think he's gonna need some help on doing some of the retail type design, and I've uh actually one of my daughters does that.
1:00:57And so them and tinker mall I'll piece it together for him.
1:01:00Just I'm kind of doing this obviously because I want that type of business in there, but also uh I want to kind of do him a favor.
1:01:08He did me a favor when it came to uh the hobby side of things that I was working on, and I thought, well, I'll give him an opportunity here.
1:01:16So we've got our points.
1:01:48With the following conditions that operations are visible to the public.
1:01:52This space maintains a retail component and uh maintains leather works as it's artist artisanal use.
1:02:01Did you say approved now I just wrote uh approved use intensity?
1:02:12All the operation has to be visible.
1:02:14Uh I'm not sure how you reported it.
1:02:16No, I think to just say it's a public of the extra.
1:02:19Okay, I just want to make sure component because this is a like a split level type of operation and the back part of it you wouldn't be able to see from the front.
1:02:32So we had a motion and motion to agree all in favor.
1:02:37I try against motion carries.
1:02:45Thank you very much.
1:02:47We almost see your operation.
1:02:51Thank you, everybody.
1:02:55Final information, announcements next meeting.
1:03:10And for additional questions and staff.
1:03:15I have a motion to adjourn.