The Clearwater Marine Advisory Board met on June 10, 2026, at 8:00 AM in the City Hall Council Chambers. The meeting covered updates on the Beach Marina reconstruction, Seminole Boat Ramp repairs and wave attenuator projects, kayak launch sites, a director's report on manatee zone designations, marina rate increases, and police/fire dock replacement. Public comments addressed enforcement at the Seminole Boat Ramp, and board members discussed parking improvements.
Stevenson's Creek Manatee Zone
Marina Rate Increases
Kiosk Rates
Police/Fire Dock Replacement
It is anything. Yeah. Okay. So I'm skipping four one and jumping uh probably right to you. Not yet. I have eight o'clock. Oh, we're good. I would like to call the June 10th, 2026 Clearwater Marine Advisory Board to order. We'll turn off our phones and thanks for the reminder. Yes. Oh dear. Everybody had a chance to look over the meetings from uh last uh March. Yes. Yes. And we have a motion to accept. So moved. I'll say that. And a second. All in favor? I the minutes from March 4 18th are approved. Are there any citizens to be heard today on things that are not on the agenda? No? Okay. As apparently everybody heard, we're gonna skip over 4.1 because our speaker is a little detained. Uh we'll go to 4.2, which is the Beach Marina Reconstruction Project Udate, which we're all totally excited to hear about. Good morning, members of the board. Um, my name is Kelly Petrich. I'm the engineering division manager in public works for the uh city of Clearwater. Um I'm happy to say that we are now 82% billed for the entire project, so we're finally coming to the end here. Um some of the activities currently going on. We have the um all the upland utility construction is progressing pretty well. We have the water and fire and stormwater work is all complete. Uh the electrical is actually 50% complete um with the in-ground with underground rough ends. Um and then the sidewalk paving and the shade structure foundations. Uh that will start within two weeks. Um actually both the A and B docks are actually the install is actually well underway. Um we're we're very happy we've been getting uh all of our manufacturers have been doing a great job. Um golden docks have supplied most of um the aluminum docks, and then we have Bellingham has supplying actually the precast docks, and they've been doing a great job getting getting everything on site, and um and O'Rion's doing a good job of uh placing them on the uh on site. Um right now the the B dock main section and the support pilings are complete. Um Ryan's actually installing the mooring piles um where they will wait for the last few sections of the aluminum uh finger sections actually to be produced. Um they will actually complete B dock installation the uh the last week in June. So as you see, we're we're progressing uh really well on everything. Um 250 uh degrees of the dock. Main sections are actually installed. Um and completion of the dock except um itself is actually expected to see mid-July. So you're actually going to see a lot of a lot of things happening in the next uh the next month here. Um the water and electrical rough ins on the boardwalk are almost complete. Uh those trades will actually be starting work on the B docs this week, and the B dock utilities are expected to take uh one to two weeks. And then focus will shift again to the A dock. One of the one of the neat parts of this project, I I know you guys already know is the actual fuel building.