Speaker numbers apply only to this recording. Names come from transcript evidence. “Possibly” marks uncertain attribution.
The Township of Edison Zoning Board of Adjustment held a regular meeting on October 13, 2026, to consider three applications: a bulk variance for a fire-damaged home reconstruction, a use variance and site plan for a PSE&G training campus expansion, and a settlement hearing for a proposed assisted living facility under federal court order. The board approved the first two applications unanimously and, after reconsideration, approved the third application with a charitable contribution condition.
Case Z 25-2026 – Patricia Sheeman (13 Short Street): Applicant sought bulk variances to rebuild a single-family dwelling destroyed by fire on May 15, 2025. Proposed variances included building coverage (31.58% vs. 23% allowed), minimum lot area (3,100 sq ft vs. 7,500 required), front yard setback (14.35 ft vs. 25 ft), and combined side yard setback (9.7 ft vs. 18 ft). The architect testified that the house would be slightly repositioned to improve side clearance and add a small front porch, with minimal increase in building coverage (26 sq ft) and lot coverage (320 sq ft for driveway/walk). No public comment. Board found the request de minimis and not detrimental.
Case Z 21-2026 – PSE&G (101 Silver Lake Road): Applicant sought preliminary and final site plan approval with a D1 use variance to construct a one-story modular classroom and mock residential training structures (training village) on an existing 88-acre utility training campus. Testimony from PSE&G’s training manager described the need for realistic hands-on training using simulated gas leaks (compressed air, not live gas) and electrical disconnects. Hours remain 7:30 a.m. to 3 p.m., no increase in trainees (max 30). The project engineer noted 13 trees to be removed, 17 new trees proposed, reduction in impervious coverage by ~11,000 sq ft, and stormwater management improvements. A board engineer confirmed the plan was competent with minor conditions. No public comment. Unanimous approval.
Case Z 46-2017 – Care One at Birchwood (1350 Inman Avenue) – Settlement Hearing: This was a Whispering Woods hearing on a revised settlement agreement following federal court ruling that Edison’s zoning code violated the Fair Housing Act by barring assisted living in residential zones. The proposed memory care facility (114 units, 122 beds) replaced an earlier denied application (2019) and a July 2026 settlement rejection. Key changes: building height reduced to two stories on the east side near Lewis Court; generator, trash enclosure, and loading moved to the west side between existing skilled nursing and proposed building; updated traffic study (August 2026 counts, adjusted for season and growth) showing negligible impact (one new trip every six minutes); acoustical study showing generator compliance with 65 dBA daytime standard; addition of an eight-foot fence and enhanced landscaping. The board attorney and township attorney confirmed collaborative settlement negotiations. Public opposition was extensive (see Public Comments). The applicant’s litigation counsel warned that rejection would likely lead to a $40 million damages verdict paid by the township (via insurance/taxes).
Township Edison Zoning Board of Adjustment regular meeting of October 13th, 2026 is now in session. Adequate notice of this meeting as required by the Open Public Meetings Act of 1975 has been revided by the annual notice published at the Home News and Tribune on December 4th, 2025, has been posted the main lobby of the municipal complex on December 4th, 2025. Please join me in the pledge allegiance to the flag. Pledge allegiance to the flag of the United States of America. To the Republic for which it stands. One nation under God, indivisible with liberty and justice for all. Madam Secretary, roll call, please. Mr. Carly. Mr. Kerr. Mr. Salmon. Here. Mr. Ayott? Here. Mr. Johnny. Here. Mr. Chabron. Here. Mr. Sarrito. Here. Mr. Schneider. Here. Mr. DeVay. Yeah. And Chairman Kemba. Here. Madam Secretary, minutes for consideration. Minutes of approval for September 29th, 2026 for approval. What's the board's pleasure? Motion to approve. Second. Motion made by Mr. Schneider. Second by Mr. Chabra. Roll call, please. Mr. Sarrito. Yes on the motion. Mr. Johnny.