Community Development Committee Meeting, July 29, 2025: 15 Resolutions Approved
STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE
Community Development Committee Meeting - July 29, 2025
On July 29, 2025, at 9:15 AM, the Grand Rapids Community Development Committee convened and approved 15 resolutions spanning infrastructure improvements, public museum expansion, brownfield plan amendments, and other routine matters. The meeting adjourned at 9:52 AM.
Public Comments & Testimony
- Dale Robertson (President & CEO, Grand Rapids Public Museum) spoke in support of the museum expansion (Item 7), highlighting the need for a new elevator, the ability to double student capacity from 35,000 to 70,000 annually, and the fiscal wisdom of completing work concurrent with ongoing construction.
- Celine (applicant for Item 14 rezoning) was recognized after the vote; the motion had already carried. She was informed of the public hearing date.
Discussion Items
- Item 1 – Fireworks Permit: Approved unanimously for JDL FX LLC at Belknap Park for Breakaway Music Festival 2025 (August 15–16). Fire Chief confirmed no issues.
- Item 2 – Sidewalk Improvements (Fulton Street): Approved with one abstention (Commissioner [not named] cited need to process prior discussion). Project installs 6-foot sidewalks on the north side of Fulton from Plymouth to Worchester (0.5 mile), filling a gap. Uses $474,000 federal TAP grant; local share $640,105 from Vital Streets Fund. Contractor chose spring 2026 construction.
- Item 3 – Collendale Lift Station Improvements: Approved. Contract awarded to K&R (low bid $442,310; total not to exceed $673,725). Redesigned after rejection of a higher bid in March. Funded from Sewer System Fund.
- Item 4 – Stephen Street Reconstruction: Approved. Contract to Diversico Construction (low bid $3,169,855; total not to exceed $4,997,407). Includes water main replacement, boring under Silver Creek drain, contaminated groundwater treatment. 2.9% MLBE participation. Funded from Water System and Vital Streets Funds.
- Item 5 – WRRF Ferris Pumps & Piping Replacement: Approved. Contract to Franklin Hourda Company (low bid $489,000; total not to exceed $776,520). Replaces aging pumps critical for NPDES compliance. Funded from Sewer System Fund.
- Item 6 – Traffic Signal Optimization (CMAC Grant Phase 18): Approved. Agreement with Kimley Horn for $300,000. Ongoing work across multiple intersections (incl. 44th Street). Discussion on definition of “urban core” per USDOT.
- Item 7 – Grand Rapids Public Museum Expansion Phase 1A: Approved. Increased scope with OAK (construction manager) by $4,152,828; total phases 1A & 1B now exceed $22.3 million. Funds from Capital Improvement Fund. New elevator tower will serve future expansion.
- Item 8 – Brio Porter Hills Village Construction Agreement: Approved. Private retirement community in Grand Rapids Township; relocation of fire hydrants and sanitary sewer work.
- Item 9 – Wildflower Townhomes Easement Release: Approved. 33-unit development in Kentwood; water main relocation required adjustments to utility easements.
- Item 10 – US 131/Wealthy Street Interchange Planning: Approved. Authorizes $7 million of a $10 million MEDC grant for design, environmental review, and community engagement. Project aims to reconnect the community divided by the highway (built 1960s). Current traffic: 120,000 vehicles/day; estimated bridge replacement ~$200 million.
- Item 11 – Noise Variance Public Hearing Scheduling (MLK Jr. Bridge): Approved. Public hearing set for August 12, 2025, to consider MDOT’s request for up to 45 nights of night work (March–November 2026) for bridge replacement east of US 131.
- Item 12 – Brownfield Plan Amendment (280 & Northwest): Public hearing scheduled for August 12, 2025. 44 residential units (studios, one-bedrooms) in new 4-story building. Eligible activities increased from ~$701k to ~$4.2 million due to new housing eligibility. Total project $11.7 million.
- Item 13 – Brownfield Plan Amendment (Breton Meadows): Public hearing scheduled for August 12, 2025. Demolish former grocery store and build 7 buildings with 168 apartments (1–2 bedrooms). Total construction $28 million; $14.8 million in eligible activities.
- Item 14 – Rezoning (1356 Kalamazoo Ave SE): Public hearing scheduled for August 12, 2025. Rezone eastern ~60 feet to TNTBA district to unify split zoning and facilitate mixed-use redevelopment.
- Item 15 – Nuisance Special Assessment Roll 8800: Approved. Authorizes assessor to spread $417,191.16 in delinquent charges (1,298 invoices, 30% less than previous roll). Includes standard appeal process.
Key Outcomes
- 15 resolutions approved (all carried, with one abstention on Item 2).
- Public hearings scheduled for August 12, 2025, on: noise variance (Item 11), three brownfield plan amendments (Items 12, 13), and one rezoning (Item 14).
- Funding authorized: Total local share commitments include $640,105 (sidewalks), $673,725 (lift station), $4,997,407 (street reconstruction), $776,520 (pump replacement), $300,000 (signal optimization), $4,152,828 (museum expansion), and $7,000,000 (US 131 interchange planning).
- Next steps: Contractor to begin sidewalk work in spring 2026; US 131 interchange design and environmental work to proceed; museum expansion phase 1A to include elevator tower.
Meeting Transcript
The time is now 9 15 and we'll go ahead and call this um community development committee to order as always. Tim has a lot of resolutions. No. Um so let's go ahead and get started. Uh first is a resolution approving a fireworks discharge permit for JDL FX LLC for outdoor special effects at the Belknap Park in connection with the breakaway music festival 2025 on August 15th and 16th, 2025. So moved support. Moved and supported. Do we have anybody from the fire department who's gonna speak on this item? Or okay. Wow, this is an expensive resolution. Thank you, Chief. Yes. Not a problem. Uh let's see. Yep, BellNAP Park uh breakaway uh music festival. We've reviewed the plans. Uh we'll have uh inspector on site and we have no issues with this. Okay. We have a lot of uh uh events in Bell Knapp Park. So yes, we do it. The other one, uh now it's evading me, but anyways, um so thank you for your work on this. And it's obviously been hot and not as much rain, so these are things to just be mindful of as well. Yes, thank you, Chief. Um, all those in favor? Aye. Any opposed? Motion carries. Thank you. Item uh number two is a resolution approving agreement with MDOT and authorizing expenditures and amount not to exceed 640,105 for their local share of costs for sidewalk improvements in Fulton Street from Plymouth Avenue to Wartrester Drive. Do you have a motion? To move. Support moved and supported, Mr. Berkman, is this yours? Yes, good morning, commissioners. So this project will install six-foot wide sidewalks on the north side of Fulton between those limits of Plymouth and Worcester, about a half mile stretch, uh, including ADA compliant curb ramps. Project funding utilizes federal transportation alternative program or TAP funds, and in the amount of 474,000 were obtained for this project, so it's being managed and administered through MDOT. MDOT received bids and ANLON provided that low bid of 776,288 dollars, which was below the engineer's estimate of uh 921,000. The project total uh expenditures are estimated to be 1,114,000. So after you deduct that federal grant that I referenced, it leaves 640,105 as our local share. So seeking your approval of this agreement with MDOT for the project and then authorizing that local share to come from the Vital Streets Fund. Uh we did give the contractor the option and the bidding um specs to complete complete the work this year or wait until next year. They've selected to do the work in spring of 2026, and it'll be wrapped up by uh this time next year, the end of July. Okay. Great. Colleagues, questions? I have a few questions. Um I guess I'm curious because there's so many areas in our in different places around elementary schools and things that I have been asking for sidewalks. What is the the reasoning and logic of putting the sidewalks here? Is a is a six-foot sidewalk wide enough for multiple kinds of use, including maybe bicycles or something like that. If or you know, kids are playing, or if there's uh, you know, Fulton's very busy and we don't have a bike lane necessarily there.