Community Development Committee Meeting - September 9, 2025

Meeting PortalTuesday, September 9, 2025
BodyGrand Rapids, Michigan
SessionMeeting Portal
DateTuesday, September 9, 2025
StatusFILED
Video Record

STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE

Transcript — Verbatim
0:00

The time is now 9 15 and we're gonna go ahead and call our community development committee meeting to order.

0:05

Good morning, everyone.

0:07

Our first item today is a resolution approving a fireworks discharge permit for ATL Special FX for indoor special effects at the Van Andel Arena in conjunction with the John Party concert on September 18, 2025.

0:19

So moved support.

0:23

Yes, please go ahead.

0:24

But remind me of your last name.

0:25

Roy Lagrone.

0:27

Yes, thank you.

0:28

So we reviewed uh this Ted Jensen did Inspector Ted Jensen's so and he approves uh or recommends the approval of this uh this uh permit.

0:37

Okay.

0:37

I don't know who John Party is, and somebody will probably be mad about that, but um thank you for that update.

0:43

I didn't know who either.

0:44

Okay.

0:45

So um all those in favor?

0:48

Aye.

0:48

Any opposed?

0:49

Motion carries.

0:50

Thank you.

0:51

Thank you.

0:51

Item number two is a resolution awarding a contract with Rockford Construction Company for construction management services in connection with improvements to Sullivan Field phase two in the amount of two million eight hundred and thirty-five thousand six hundred and forty-six dollars, with the total amount not to exceed of three million four hundred and ninety thousand three hundred and sixty-two dollars.

1:11

So moved.

1:12

Moved and supported.

1:13

Great skipping.

1:15

Hi everyone, I'm Carrie Enriquez with the Parks Department.

1:18

So we are here today for the much anticipated and excited second phase and final phase for improvements to Sullivan Field.

1:25

This project started a handful of years ago with a partnership between the fans of Valley Field and the city of Grand Rapids.

1:32

We started the first phase uh a year ago in 2024, um, that really focused mainly on the grandstand improvements.

1:40

And when that project started, we peeled back all the siding, and there was a lot of um more intense structural concerns than we had anticipated.

1:48

So we had to put the project on hold to address all of those structural concerns, and that work was just completed by Rockford this past summer.

1:56

And in the meantime, while we're working on those structural issues, we also were doing the design work for the phase two, which is what I'm here for today.

2:04

So phase two focuses on some more aesthetic approvement improvements to the grandstand, but also really focusing on the site improvements.

2:11

So looking at a museum space that really celebrates the history of this park as well as new concession building, uh rehabilitated restroom facilities, and some field work as well.

2:23

Rockford construction was selected through uh competitive um construction management agreement back when we did the phase one.

2:30

So we're continuing with them for this phase two work.

2:33

Construction is anticipated to start here this fall and be complete by the end of 2026.

2:40

Okay.

2:41

Thank you for that timeline as well, Miss Enriquez.

2:43

Um questions.

2:46

Hearing none, all those in favor?

2:48

Aye.

2:48

Any opposed?

2:49

Motion carries.

2:50

Thank you.

2:51

Next is a uh resolution awarding a contract with Wyoming Excavators Inc.

2:55

for reconstruction to Oakley Place from Lion Street to Crescent Street and drainage improvements in Perkins Avenue from 400 feet south of Lamberton Creek Lane, which is private, to 100 feet north of Brookmoor Drive in the amount of 723,134 dollars with a total amount not to exceed 1,076,640.

3:16

So moved.

3:17

Support.

3:18

Mr.

3:18

McCall.

3:20

Uh good morning, Commissioners.

3:21

Uh Jeff McCaw filling in for Tim Berkman today, who's um out, his wife was having uh a procedure done that he wanted to attend.

3:29

Um this project was bid through two projects, Perkins and Oakley Place were bid together for both efficiencies because they're both kind of smaller projects.

3:38

Uh the contractor was given the option to build them either in 25 and/or 26.

3:43

They currently plan to build them both in 2026.

3:46

Um the work on Oakley Place includes water main replacement, um road reconstruction, new driveways, lead service line replacements, and the work in Perkins.

3:56

Um there's been some kind of ongoing erosion due to the hill of the sidewalks being undermined.

4:01

So this will install a ditch and a culvert under Perkins to alleviate that problem.

4:09

Okay, great.

4:10

Thank you.

4:10

Questions, colleagues.

4:12

Hearing none, all those in favor?

4:14

Aye.

4:15

Any opposed?

4:16

The motion carries.

4:17

Item number four is a resolution awarding a contract with HL Bulcama decorating for government center ramp signage and wayfinding painting and the amount of 125,970 dollars with a total amount not to exceed of 255,635 dollars.

4:33

So support.

4:36

Yeah.

4:36

Um this project's a little bit unusual.

4:39

It's kind of a specialized scope of work.

4:41

Um we advertised it for bids.

4:44

We did not receive any bids.

4:46

Um prior to the due date, we issued an addendum extending the bid period.

4:50

Still no bids were received.

4:52

Um so we did reach out to um HL Balcamo Decorating for a proposal.

5:00

Um they did provide a proposal for the work, which was um 125,970 dollars, which was significantly under the engineer's estimate of 448,000 dollars.

5:06

Um the work includes repainting stairwells the inside of the ramp and different wayfinding work around the government center ramp.

5:16

Um the reasons we got for no bids were it was a unique project and it required a specific skill set.

5:22

Um the project didn't fit into current workloads, and there was um kind of more attractive projects on the market.

5:28

So thank you for that update.

5:30

Uh colleagues' questions on this item.

5:33

Could you just clarify uh where this project how this project is being financed?

5:40

And I'm asking because it looks like in the package, um it looks like a draft version.

5:46

Um it'd be the parking services fund.

5:50

Okay.

5:51

Okay, great.

5:52

And then City Clerk, could you just make sure we have the updated one online?

5:55

This is what I'm seeing.

5:59

You see, oh, the draft one, okay.

6:06

Thank you, Commissioner.

6:07

Thank you.

6:09

Hearing no other questions, all those in favor?

6:11

Aye.

6:12

Aye.

6:12

Any opposed?

6:14

Item carries.

6:15

Item number five is a resolution approving an increase of $677,250 and 87 cents of the construction contract with Owen Ames Kimball and authorizing of a memorandum of understanding to add $963,362 and funding for a total not to exceed of $19,838,807 for the East Riverfront project.

6:39

So moved.

6:40

Moved and supported.

6:41

Hello.

6:42

Good morning.

6:44

My name is Mike Stahl.

6:45

Um in the engineering department.

6:47

Excuse me.

6:49

So when this the East Riverfront project was bid last winter, it came in much higher than what our engineers' estimate was.

6:57

So we worked with downtown Grand Rapids Inc.

7:00

and the designer to remove specific scopes of work out of that project in order to bring it forward for award.

7:08

Um since then, downtown Grand Rabbids Inc.

7:11

has really been working on finding additional sources of funding so we can add those scopes of work back into the project.

7:19

So in July, we came forward uh to add DDA funding to the project to add some catenary lights in.

7:27

And since then, DJRI has continued to work on adding funding.

7:31

They have now attained a wrap grant from MEDC through the right place in the amount of $963,362.

7:42

Um, and so the item before you today is to approve the memorandum of understanding with DGRI to take to get that grant funding added into this project, and then also it this item will amend the contract with the construction contractor OAK to add in pavers and swing benches into the contract as well.

8:06

So we're still on schedule uh of uh being complete in 2026.

8:12

Great.

8:13

Thank you, Mr.

8:13

Saul.

8:15

Questions hearing none, all those in favor?

8:19

Aye.

8:20

Any opposed?

8:20

Item carries, thank you.

8:22

Thank you.

8:22

Item number six is a resolution authorizing an increase to the professional services agreement with Williams Architects for the fire training facility at eight eight fifty Panel Street Northwest in the amount of eight hundred and sixty-five thousand dollars with a total amount not to exceed of twenty-seven million seven hundred and twenty seven hundred and twenty-one thousand eight hundred and ninety-two dollars.

8:42

Support moved and supported.

8:46

Um, this project uh well, the first bid package was awarded back in March of 2025.

8:51

That included um pre-engineered metal buildings, concrete, steel, site work, and earth work.

8:56

Um this project is only for the construction engineering services with Williams Architects.

9:01

Um the future bid packages are until they've actually already been bid, and we will be bringing a future item here later this fall to establish the guaranteed maximum price.

9:10

Um at this time we estimate that to be 46 million dollars for the overall project, and the project's anticipated to be completed in the spring of 2027.

9:19

Um the groundbreaking was just held um a couple weeks ago here.

9:23

Thank you.

9:25

Colleagues questions on this item.

9:28

Hearing none, all those in favor?

9:31

Aye.

9:31

Any opposed item carries.

9:33

Thank you.

9:34

Item number seven is a resolution accepting a sidewalk and utility easement at 1535 Adams Street Southeast and authorizing payment for $3,560 in conjunction with the water main and water main lining and Adam Street from Colorado Avenue to Sylvan Avenue and Roto Mill resurfacing of Adams Street from Al Allerton Avenue to Gladstone Drive project.

9:56

So moved.

9:58

Moved and supported.

10:00

This is a project that's currently in design.

10:01

It will be um installing a new water main and lining the transmission water main that's in Adams currently.

10:07

Um in the course of design, they discovered that the existing sidewalk, um, even though it's in line with the other sidewalks on the street, it's on private property, so um it's really just kind of cleaning up housekeeping item to um get an easement for that existing sidewalk.

10:22

Um some of the larger corners on the street will be kind of square squared up into more traditional um intersections versus the the large intersections that currently exist.

10:32

Okay, thank you, colleagues.

10:35

Questions on this item.

10:37

Hearing none, all those in favor?

10:39

Aye, any opposed item carries, thank you.

10:43

Item number eight is a resolution accepting the easement uh utility easement at 1700 28th Street for the nominal consideration of one dollar.

10:51

So moved.

10:52

Moved and supported.

10:54

Um yes, this is uh you um easement for a fire hydrant.

10:57

Um it's for the new Myer gas station being built at 28th and Kalamazoo.

11:01

Um there was previously a sidewalk easement.

11:05

Um accepted by commission.

11:07

Unfortunately, the Meyer did not want the sidewalk and utility language included in that.

11:12

So um had they done that, we wouldn't need to be here doing this action.

11:16

So yeah, so this is just to accept the utility easement for the hydrant.

11:21

Got it.

11:21

Okay, thank you for that clarification.

11:25

All those in favor?

11:26

Aye.

11:27

Aye.

11:27

Any opposed item carries.

11:29

Item number nine is a resolution scheduling a public hearing for September 23rd, 2025 to consider an amendment to the City of Grand Rapids Brownfield plan to include the 440 443 443.

11:42

Why can't I say this?

11:43

Sheldon Redevelopment Project located at 443 Sheldon Avenue Southeast.

11:48

Do you have a motion?

11:49

So move support.

11:50

Miss Renero.

11:51

Yes, thank you.

11:52

This is a Brownfield plan uh public hearing for property that's been vacant since 2000.

11:57

I was actually transferred to the State Land Bank in 21 and with the portfolio transferred from the state to the Grand Rapids Land Bank authority in February came to the city.

12:07

Um the option, the developers working on a purchase agreement to option that goes through March of next year, but in the meantime, we're also working to um partner on a brownfield plan uh for the project that includes 26 apartments across uh roughly 18,000 square foot building.

12:24

Um six of those units are anticipated to be sixty percent AMI, which is about which is twenty percent of the units, and the total eligible activities for the brownfield plan are considered uh roughly three point eight million, and this is a project that is in the DDA, so we're working with them.

12:44

I believe this project is on their agenda tomorrow uh for the pass-through in partnership with the DDA.

12:52

Happy to answer any questions.

12:53

Thank you, Miss Renero.

12:54

Questions regarding this project.

12:58

Hearing none, all those in favor?

13:00

Aye.

13:01

Any opposed?

13:02

Item carries.

13:03

Our last item today is a resolution scheduling a public hearing for September 23rd, 2025 to consider an amendment to the City of Grand Rapids Brownfield plan to include the Powers Place Redevelopment Project located at 764 and 800 Powers Avenue Northwest.

13:18

Support moved and supported.

13:20

Thank you.

13:21

Yes, this is the Brownfield plan for a public hearing involving a project in a neighborhood just south of Walker Avenue on Powers.

13:28

Uh will be two different buildings, uh, four units each for eight townhomes.

13:34

Uh roughly 2.7 million in construction costs, uh, with about 1.18 million in eligible activities for the Brownfield plan.

13:44

And I just want to call attention to the the really large site prep number on the second page of this memo being over 800,000 uh to really ready this site for housing uh because of the grade, because of a retaining wall, uh, and all that jazz.

13:58

Um it's important to note that because in order to uh accommodate the interim housing guidelines that require 20 percent of the units being affordable for either 10 years or the term of the Brownfield plan, which in this case would be 25 years, uh the staff uh staff are recommending a waiver to that policy and allowing one unit uh to remain affordable for the full 25 years uh to really help make the performance on this one.

14:27

Um so I just want to call some attention to that and that the Brownfield plan or the Brownfield Redevelopment Authority approved that at their last meeting in August.

14:36

Uh and that was the last thing I wanted to say.

14:42

Happy to answer any questions.

14:43

Thank you, Miss Renero.

14:44

And I I'm sorry, I don't remember.

14:45

Um, but this developer also received an emerging developer grant at a previous meeting.

14:51

Yes, okay.

14:52

Yes, thank you.

14:53

I'm sorry, at a previous meeting, but in this last year.

14:57

Earlier in the year, yes.

14:58

Thank you.

15:00

Um, colleagues, questions on this item?

15:02

Hearing none, all those in favor?

15:04

Aye.

15:05

Any opposed item carries.

15:08

And with that, we can go ahead and adjourn our community development committee at 9 30.

15:11

Thank you.

Discussion Breakdown — Share of Meeting
Engineering And Infrastructure█████████████████████████████████████████████67%
Affordable Housing██████████15%
Economic Development███████10%
Parks and Recreation█████8%
Summary of Proceedings

Community Development Committee Meeting - September 9, 2025

The Grand Rapids Community Development Committee met on September 9, 2025, at 9:15 AM to consider ten agenda items, all of which were approved unanimously. The meeting adjourned at 9:30 AM.

Consent Calendar

All items below were approved unanimously with no opposition.

  • Fireworks Permit: Approved a fireworks discharge permit for ATL Special FX for indoor special effects at Van Andel Arena in conjunction with the John Party concert on September 18, 2025. Inspector Ted Jensen recommended approval.
  • Sullivan Field Phase Two: Awarded a contract with Rockford Construction Company for construction management services for improvements to Sullivan Field Phase Two in the amount of $2,835,646, with total not to exceed $3,490,362. Work includes aesthetic grandstand improvements, museum space, new concession building, rehabilitated restrooms, and field work. Construction starts fall 2025, completion by end of 2026.
  • Oakley Place Reconstruction and Perkins Avenue Drainage: Awarded a contract with Wyoming Excavators Inc. for reconstruction of Oakley Place from Lyon Street to Crescent Street and drainage improvements on Perkins Avenue in the amount of $723,134, with total not to exceed $1,076,640. Work includes water main replacement, road reconstruction, new driveways, lead service line replacements (Oakley), and a ditch/culvert for erosion control (Perkins). Construction planned for 2026.
  • Government Center Ramp Signage: Awarded a contract with HL Bulcama Decorating for government center ramp signage and wayfinding painting in the amount of $125,970, with total not to exceed $255,635. No bids were received initially; the proposal was significantly under the engineer's estimate of $448,000. Funded by the parking services fund.
  • East Riverfront Project Amendment: Approved an increase of $677,250.87 to the construction contract with Owen Ames Kimball and authorized a memorandum of understanding with Downtown Grand Rapids Inc. to add $963,362 in grant funding from MEDC's wrap grant, for a total not to exceed $19,838,807. The additional scope includes pavers and swing benches. Project remains on schedule for 2026 completion.
  • Fire Training Facility Design Services: Authorized an increase to the professional services agreement with Williams Architects for the fire training facility at 8850 Panel Street NW in the amount of $865,000, with total not to exceed $27,721,892. The first bid package was awarded in March 2025. Future bid packages will establish a guaranteed maximum price estimated at $46 million. Project completion anticipated spring 2027.
  • Sidewalk and Utility Easement (1535 Adams St SE): Accepted a sidewalk and utility easement at 1535 Adams Street SE and authorized payment of $3,560 in conjunction with a water main project on Adams Street. This housekeeping item formalizes an existing sidewalk on private property.
  • Utility Easement (1700 28th St): Accepted a utility easement at 1700 28th Street for nominal consideration of $1 for a fire hydrant at the new Meyer gas station at 28th and Kalamazoo.
  • Brownfield Plan Amendment – 443 Sheldon Ave SE: Scheduled a public hearing for September 23, 2025, to consider an amendment to the City Brownfield plan for the 443 Sheldon Avenue SE redevelopment project. The property has been vacant since 2000, transferred to the State Land Bank and then to the Grand Rapids Land Bank Authority. The project includes 26 apartments in an 18,000 square foot building, with 6 units (20%) at 60% Area Median Income (AMI). Total eligible activities: approximately $3.8 million.
  • Brownfield Plan Amendment – Powers Place (764 & 800 Powers Ave NW): Scheduled a public hearing for September 23, 2025, to consider an amendment to the City Brownfield plan for the Powers Place Redevelopment Project. The project includes two buildings with four townhomes each (8 total). Construction costs approximately $2.7 million, with $1.18 million in eligible activities, including over $800,000 for site preparation. Staff recommended a waiver to interim housing guidelines to require one unit to remain affordable for 25 years, which was approved by the Brownfield Redevelopment Authority.

Discussion Items

Staff provided additional context for several items as summarized in the Consent Calendar. Key presentations included:

  • Sullivan Field Phase Two: Carrie Enriquez (Parks Department) described the partnership with fans of Valley Field, the structural issues encountered in Phase One, and the scope of Phase Two improvements.
  • Oakley Place and Perkins Avenue: Jeff McCaw (Engineering) explained the bid packaging for efficiency and the specific work at each location.
  • Government Center Ramp: Staff noted the unique scope led to a lack of bids; a direct proposal was obtained at a favorable price.
  • East Riverfront Project: Mike Stahl (Engineering) detailed the original bid overage, removal of scope, and subsequent addition of grant funding to restore features.
  • Fire Training Facility: Staff updated on the design services contract and anticipated future costs.
  • Utility Easements: Staff explained the housekeeping nature of the Adams Street easement and the correction for the Meyer gas station easement.
  • Brownfield Plans: Miss Renero presented both Brownfield items, highlighting affordability components, eligible activities, and the site preparation cost for Powers Place. A commissioner noted that the Powers Place developer also received an emerging developer grant earlier in the year.

Key Outcomes

  • All ten agenda items were approved unanimously by voice vote.
  • Public hearings for two Brownfield plan amendments were scheduled for September 23, 2025.
  • Construction contracts awarded for Sullivan Field Phase Two, Oakley Place/Perkins Avenue improvements, and government center ramp signage.
  • Contract amendments approved for the East Riverfront project and fire training facility design services.
  • Easements accepted for water utility projects.

Meeting Transcript

The time is now 9 15 and we're gonna go ahead and call our community development committee meeting to order. Good morning, everyone. Our first item today is a resolution approving a fireworks discharge permit for ATL Special FX for indoor special effects at the Van Andel Arena in conjunction with the John Party concert on September 18, 2025. So moved support. Yes, please go ahead. But remind me of your last name. Roy Lagrone. Yes, thank you. So we reviewed uh this Ted Jensen did Inspector Ted Jensen's so and he approves uh or recommends the approval of this uh this uh permit. Okay. I don't know who John Party is, and somebody will probably be mad about that, but um thank you for that update. I didn't know who either. Okay. So um all those in favor? Aye. Any opposed? Motion carries. Thank you. Thank you. Item number two is a resolution awarding a contract with Rockford Construction Company for construction management services in connection with improvements to Sullivan Field phase two in the amount of two million eight hundred and thirty-five thousand six hundred and forty-six dollars, with the total amount not to exceed of three million four hundred and ninety thousand three hundred and sixty-two dollars. So moved. Moved and supported. Great skipping. Hi everyone, I'm Carrie Enriquez with the Parks Department. So we are here today for the much anticipated and excited second phase and final phase for improvements to Sullivan Field. This project started a handful of years ago with a partnership between the fans of Valley Field and the city of Grand Rapids. We started the first phase uh a year ago in 2024, um, that really focused mainly on the grandstand improvements. And when that project started, we peeled back all the siding, and there was a lot of um more intense structural concerns than we had anticipated. So we had to put the project on hold to address all of those structural concerns, and that work was just completed by Rockford this past summer. And in the meantime, while we're working on those structural issues, we also were doing the design work for the phase two, which is what I'm here for today. So phase two focuses on some more aesthetic approvement improvements to the grandstand, but also really focusing on the site improvements. So looking at a museum space that really celebrates the history of this park as well as new concession building, uh rehabilitated restroom facilities, and some field work as well. Rockford construction was selected through uh competitive um construction management agreement back when we did the phase one. So we're continuing with them for this phase two work. Construction is anticipated to start here this fall and be complete by the end of 2026. Okay. Thank you for that timeline as well, Miss Enriquez. Um questions. Hearing none, all those in favor? Aye. Any opposed? Motion carries. Thank you. Next is a uh resolution awarding a contract with Wyoming Excavators Inc. for reconstruction to Oakley Place from Lion Street to Crescent Street and drainage improvements in Perkins Avenue from 400 feet south of Lamberton Creek Lane, which is private, to 100 feet north of Brookmoor Drive in the amount of 723,134 dollars with a total amount not to exceed 1,076,640. So moved. Support. Mr. McCall. Uh good morning, Commissioners.