OpenPublica

Accountability starts with access.

© 2026 · Filed for the public record

Use casesAboutAPIPrivacyTermsLinkedIn
Home/Gulfport, Florida/City Council
OPENPUBLICA · PUBLIC MEETING RECORD
Record of Proceedings

Gulfport City Council Meeting – November 18, 2025: Stormwater Study and Key Decisions

City Council — Tuesday, November 18, 2025
BodyGulfport, Florida
SessionCity Council
DateTuesday, November 18, 2025
StatusFILED
Video Record
Meeting Thumbnail
⇩ GET FROM SOURCE

STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE

Original source
Transcript — Verbatim

Speaker numbers apply only to this recording. Names come from transcript evidence. “Possibly” marks uncertain attribution.

Speaker 1

6:30

It's always so weird sitting here waiting until it hits exactly six o'clock.

6:34

If there's any chance that you haven't remembered to turn your phone off, please do it now.

6:39

We got another action packed meeting, so I prefer not to have phones ringing.

6:45

Um so welcome to the November 18th meeting.

6:49

Thanks for coming out.

6:50

I do like seeing that there's quite a few new faces in here today tonight, and I appreciate that.

6:56

So we're gonna go ahead and get started.

6:58

Um the invocation tonight will be given by Vice Mayor uh Thanos, and then it'll be followed by the Pledge of Allegiance.

7:06

So please stand if you

Unassigned speaker

7:07

will.

Speaker 2

7:10

I have to say I kind of had fun with this one.

7:13

But um so it was about thankfulness.

7:16

Let us rise up and be thankful.

7:18

For if we didn't learn a lot today, at least we learned a little.

7:22

If we didn't learn a little, at least we didn't get sick.

7:25

And if we didn't get sick, at least we didn't die.

7:29

And that's from Buddha.

7:32

And there was another one.

7:33

Gratitude is not only the greatest of virtues, but the parent of all the others, and that's from Cicero.

Speaker 1

8:01

All righty, roll call if you will.

8:06

Present.

Speaker 3

8:06

Council Member Jackson?

8:08

Here.

8:08

Council Member Early.

8:11

Here.

8:11

City Attorney Salzman.

8:12

Here.

8:13

City Manager O'Reilly.

8:14

Present.

8:14

City Clerk Keriko is present.

Speaker 1

8:17

Very good.

8:18

So I can only imagine that the faces that I don't recognize are here for the presentation tonight.

8:24

Um I know many of us have been waiting on this and we're very anxious to hear what you have to say.

8:29

So with that in mind, please, Mr.

8:31

Justin Keller.

Speaker 4

8:40

Justin Keller with Advanced Engineering.

8:42

Um I'm here with uh Rafkae with advanced engineering as well.

8:45

Um we are here to present on our findings for the watershed management plan.

Unassigned speaker

8:50

All right,

Speaker 4

8:50

I've told I was told to be very careful with this, so all right.

9:10

Uh we're gonna talk about our big picture findings, uh get into a little bit of the weeds and talk about uh nerd nerd out a bit and talk about the model.

9:17

Uh we're gonna share the results or the floodplains with you.

9:20

Uh discuss level service, more or less how do we determine success when it comes to stormwater management.

9:26

Uh we're gonna talk about our project recommendations, provide some program recommendations, then obviously, um whether it's at the end or intimidately, please feel free to ask questions.

9:34

I want to make sure everybody um, you know, I'm I'm not losing anybody as I talk.

9:39

Um so starting with kind of what is flooding.

9:42

Uh you know, a lot of times uh, you know, we have or you know, just not golf port specific, but you know, you see standing water in the road after after uh a rain event.

9:52

Um and maybe it's like some curb flooding.

9:54

Um that's not the kind of flooding we're talking about here.

Unassigned speaker

10:00

Or um, you know, if you have a uh, you know, if you have a structure that or a collection structure has a palm front in front of it, that's really not the type of flooding that we're talking about here.

Speaker 4

10:06

Uh today we're here to really hit on the um, you know, let's say your your stormwater infrastructure, which is your pipes, your ponds, um, you know, your ditches and your inlets, and talk about how they function uh during specific design storms and then where those inefficiencies are and how we can make them better.

10:23

Um, and then also too, um I I have a note here that also you know um golf port experiences tidal flooding.

10:31

Um this is a focus on stormwater as in rainfall-based flooding today, but there will be discussion about tidal flooding uh throughout the presentation.

10:40

So as far as big picture, what exactly goes into a watershed management plan um referred to as a WMP, so I'll be using that uh abbreviation moving forward.

10:49

Um the first part is an extensive records review.

10:52

Um I think we requested that uh Tom and his team uh go up in the attic about a couple times to look at the uh you know to get some sacred scrolls, smolder plans so we can get information, uh some more detailed information about what's out there.

11:04

Um also field and get an investigation.

11:07

Part of this effort was us going out in the field, uh, you know, put putting our head in structures, putting our eyes on things, and making sure that we had a lay of the land of what what's out there.

11:16

Um we also uh this is a um GIS-based um exercise that we performed.

11:22

So while we did not get funding through the Southwest Florida Water Management District, we followed all the protocols of that of that funding program or of their watershed management program.

Discussion Breakdown — Share of Meeting
Stormwater Management██████████████████████████████████34%
Flood Management██████████████████18%
Public Comment███████7%
Public Works██████6%
Procedural█████5%
Public Safety████4%
Community Events████4%
Public Engagement████4%
Senior Center Funding██2%
Summary of Proceedings

Gulfport City Council Meeting – November 18, 2025

The Gulfport City Council met on Tuesday, November 18, 2025, at 6:00 PM at City Hall. The meeting centered on a comprehensive presentation of the city's Watershed Management Plan by Advanced Engineering & Design, Inc., followed by public comments, council reports, and approvals of consent items and resolutions. A charter amendment ordinance was tabled for additional public review, and several workshops were scheduled.

Consent Calendar

  • Approved the meeting minutes from November 4, 2025.
  • Approved Resolution No. 2025-97 appointing Kimberley Hamilton to the Board of Adjustments.

Public Comments & Testimony

  • Robert Lewis (Beach Boulevard resident, environmental engineer) requested that computer modeling calculations be included in the public report and noted a culvert near the Senior Center that needs attention.
  • Peter Ford (59th Street South, near Wood Ibis) thanked staff for drainage improvements on 59th Street but expressed frustration that work stopped at the boundary of Pasadena Yacht and Country Club (PYCC) private property; he urged cooperation across public/private lines.
  • Jennifer Webb (resident) recommended the city learn from Safety Harbor's financing models, pursue joint projects with neighboring municipalities (St. Petersburg, South Pasadena), and look forward to council discussion after reviewing the presentation.
  • Donovan Nickel (Bicycle Pedestrian Action Committee, Gulfport representative) reported that Pinellas County ranks first in the state for e-bike injuries and advocated for safety measures (minimum age 16, helmet requirement, no sidewalk riding). He also thanked the city for installing pedestrian signs on Beach Boulevard.
  • Kathy Ford (59th Street South) requested that the presentation slides be made available on the city website or in printed form.
  • Bob Kang (Shore Boulevard) criticized the proposed nine-inch over-center-line flood tolerance, saying it effectively means 12 inches, and argued that leasing pumps from Godwin would be more cost‑effective than building permanent pump stations. He also noted the absence of check valves causing tidal backup and asked that engineers attend the upcoming workshop.
  • Carrie Schwartz (Delaware Avenue South) questioned whether drainage easements on private property allow the city to maintain ditches; she urged enforcement of existing easements.
  • Amy Costa (28th Avenue South) questioned whether flooding originates outside Gulfport and urged regional coordination with other municipalities.
  • Eileen Corning and Bill Griffin (Gulfport Senior Center Foundation) reported fundraising success, including a $87,000 bequest, and announced plans for a newsletter and expanded board.

Presentation

Stormwater Drainage Study – Watershed Management Plan

Justin Keller and Raf Kadai of Advanced Engineering & Design, Inc. presented the city's Watershed Management Plan (WMP). Key findings and proposals included:

  • The study used NOAA Atlas 14 rainfall data (100‑year 24‑hour storm: 13.7 inches; 25‑year: 9.61 inches) and incorporated sea‑level rise via a tailwater elevation of 1.78 feet NAVD88, consistent with the city's Comprehensive Plan.
  • The model covered 454 drainage catchments; a large portion of the city drains through PYCC.
  • Floodplain maps for the 25‑year and 100‑year storms highlighted hotspots: City Hall, Tomlinson Park, 59th & 20th Avenue, Wood Ibis/Shore Boulevard, Stetson area, and the Marina.
  • Level‑of‑service evaluation (using 6 inches for passenger vehicles, 9 inches for emergency vehicles over the crown) showed that 192 of 454 basins (43%) failed the 25‑year storm.
  • Six capital projects were proposed: (1) Police/Fire rapid response improvements ($18.1M); (2) PYCC bypass box culverts ($11.8M); (3) PYCC pond expansion with box culvert ($10.2M); (4) 58th & 30th overland flow reduction (benefits in concert with projects 1–3); (5) 15th Avenue conveyance improvements ($10.2M); (6) Marina tidal flooding pilot with smart outfalls and sensors ($1.5M).
  • Program recommendations included refining level‑of‑service definitions, updating sea‑level rise projections to 2050/2070, reducing allowable imperviousness in residential code (20% green space), reevaluating the stormwater utility fee, and considering non‑structural fill in low‑lying areas.
  • Council members asked about conservatism in rainfall data, the potential impact of ADUs on imperviousness, and the relationship with the pending Vulnerability Assessment (presentation scheduled for January 6, 2026). A workshop was scheduled for November 25 at 4:00 PM for deeper discussion.

Discussion Items

Ordinance 2025‑12: Charter Amendments (Second Reading)

The ordinance proposing multiple charter amendments was tabled to the next meeting to allow the public time to review the revised language. Council requested that the updated ordinance be posted on the city website.

Key Outcomes

  • Consent items approved unanimously (Resolution 2025‑97).
  • Ordinance 2025‑12 tabled to next meeting.
  • Resolution 2025‑98 (58th Street Roadway Improvements) approved. Authorized a contract with Keystone Excavators, Inc. for full‑depth reconstruction of 58th Street from 17th Avenue to Gulfport Boulevard at a cost of approximately $2.2 million (alternative B). An additional segment (15th to 17th Avenue) was omitted due to budget constraints. Project includes new sidewalk and limited drainage improvements.
  • Resolution 2025‑99 (Hurricane Helene/Milton budget amendment) approved. Accounts for $1.2 million in non‑reimbursable costs and a pending $2.9 million FEMA claim. Finance Director Chris Cadell and staff were commended.
  • E‑bike ordinance direction: Council directed the City Manager to draft an ordinance prohibiting e‑bikes in parks and on the beach (sand area) as permitted by statute.
  • Code enforcement updates: Of 192 flood‑related violation notices sent, 140 residents have responded. Council emphasized public outreach before initiating new enforcement campaigns (line‑of‑sight, RV storage).
  • State attorney meeting: An investigation (Invest) regarding potential charges related to code violations is scheduled for November 24, with City Clerk Keriko and a police detective attending.
  • Upcoming workshops: November 25 (stormwater study), January 8, 2026 (Lions Club property visioning, marina area), and February 5, 2026 (referendum question explanation).
  • Election qualifying: Opens December 1 for Ward 1 and Ward 3 seats in the March 10, 2026 election.
  • PYCC drainage: City Manager clarified that PYCC owns its stormwater system; any capital projects requiring work on PYCC property will need easements. The city will continue to explore coordination.

Meeting Transcript

It's always so weird sitting here waiting until it hits exactly six o'clock. If there's any chance that you haven't remembered to turn your phone off, please do it now. We got another action packed meeting, so I prefer not to have phones ringing. Um so welcome to the November 18th meeting. Thanks for coming out. I do like seeing that there's quite a few new faces in here today tonight, and I appreciate that. So we're gonna go ahead and get started. Um the invocation tonight will be given by Vice Mayor uh Thanos, and then it'll be followed by the Pledge of Allegiance. So please stand if you will. I have to say I kind of had fun with this one. But um so it was about thankfulness. Let us rise up and be thankful. For if we didn't learn a lot today, at least we learned a little. If we didn't learn a little, at least we didn't get sick. And if we didn't get sick, at least we didn't die. And that's from Buddha. And there was another one. Gratitude is not only the greatest of virtues, but the parent of all the others, and that's from Cicero. All righty, roll call if you will. Present. Council Member Jackson? Here. Council Member Early. Here. City Attorney Salzman. Here. City Manager O'Reilly. Present. City Clerk Keriko is present. Very good. So I can only imagine that the faces that I don't recognize are here for the presentation tonight. Um I know many of us have been waiting on this and we're very anxious to hear what you have to say. So with that in mind, please, Mr. Justin Keller. Justin Keller with Advanced Engineering. Um I'm here with uh Rafkae with advanced engineering as well. Um we are here to present on our findings for the watershed management plan. All right, I've told I was told to be very careful with this, so all right. Uh we're gonna talk about our big picture findings, uh get into a little bit of the weeds and talk about uh nerd nerd out a bit and talk about the model. Uh we're gonna share the results or the floodplains with you. Uh discuss level service, more or less how do we determine success when it comes to stormwater management. Uh we're gonna talk about our project recommendations, provide some program recommendations, then obviously, um whether it's at the end or intimidately, please feel free to ask questions. I want to make sure everybody um, you know, I'm I'm not losing anybody as I talk. Um so starting with kind of what is flooding. Uh you know, a lot of times uh, you know, we have or you know, just not golf port specific, but you know, you see standing water in the road after after uh a rain event. Um and maybe it's like some curb flooding. Um that's not the kind of flooding we're talking about here. Or um, you know, if you have a uh, you know, if you have a structure that or a collection structure has a palm front in front of it, that's really not the type of flooding that we're talking about here.

SUMMARIZED BY OPENPUBLICA AI
TRANSCRIPT VIA PUBLIC VIDEO
openpublica.com