Half Moon Bay Planning Commission Meeting – April 9, 2024
On April 9, 2024, the Half Moon Bay Planning Commission held a continued public hearing on a Coastal Development Permit (PDP-23-084) for Caltrans' State Route 1 Multi-Asset Roadway Rehabilitation Project. The meeting ran from 7:00 PM to approximately 11:15 PM (extended by vote). Commissioners considered the $34 million, 7.3‑mile project that includes repaving, class II bike lanes, drainage rehabilitation, ADA upgrades, and intersection improvements. After extensive public testimony and deliberation, the Commission approved the permit with several conditions.
Public Comments & Testimony
- James Benjamin (resident) urged the Commission to ensure conditions are precise, noting only two widening areas should be approved. He questioned the noise model (linear vs. point source) and requested pre‑ and post‑construction monitoring of culvert scour. He also recommended pedestrian‑scale lighting consistent with the Local Coastal Program.
- Paul Nagengast (community member) stressed that safety improvements should be locked in now, not deferred to future plans. He supported nighttime construction with a public web page for updates, and questioned the sudden safety justification for removing informal parking at Surfers Beach.
- Len Erickson (community member) presented photographic evidence showing extensive informal parking (he counted ~47 cars on the east side). He noted that the 2012 Safety and Mobility Study and the 2022 Connect the Coastside Plan had called for parking studies and multimodal trails, but neither was done. He argued the Surfers Beach area would lose about 54 spaces within city jurisdiction.
- Mike Ferrara (via Zoom) pointed out the lack of coordination with Surfrider and emphasized that the Coastal Commission will likely require mitigation for lost coastal parking. He questioned the safety claims and noted a bypass route exists.
- James Cornelium (Coastside Bikes) advocated for removing the "pork chop" islands at Kelly Avenue, adding a north‑side crosswalk at Poplar Street, and extending bike lanes south to the city limit. He said these are critical for students walking to school.
- Carleen Foldenauer (Cabrillo USD Safe Routes coordinator) highlighted three unsafe areas: Kelly Avenue (pork chop island), Poplar Street (missing north crosswalk), and Highway 1 between 92 and Kelly (no sidewalk). She expressed strong support for improvements.
Discussion Items
- Project Overview: City Planner Doug Garrison and Public Works Director Maz Bozu Kinia presented background. Caltrans project manager Kelly Ma, with engineers Dylan Lennebacker, Song Kim, Kai Liang, and Greg Curry, detailed the scope: repaving, 14.6 miles of new class II bike lanes (6‑ft lane + 2‑ft buffer), replacement of 12 guardrails, three culvert replacements, four biofiltration strips, intersection upgrades, and new traffic signals.
- Key Technical Issues:
- Noise and Light: Caltrans explained nighttime construction noise (86 dB at 50 ft) and committed to directional lighting with shielding to limit trespass.
- Widening: Only two locations (total 0.03 acres) will be sliver‑widened to accommodate bike lanes; runoff increase would be negligible (<0.1%).
- Drainage: Culverts will be replaced in‑kind; the design uses a 10‑year storm standard. Commissioners and public raised concerns about downstream erosion once culverts are cleared.
- Bike Lane / Parking Conflict: The project would convert informal shoulder parking at Surfers Beach into a continuous bike lane. Caltrans stated the shoulder is not designated parking and called the informal use a safety hazard. The city did not have an official parking inventory. The Commission debated whether removing ~54 spaces (as estimated by Commissioner Joanes) requires mitigation under the Coastal Act.
- Other Intersections: Commissioners considered the Kelly Avenue "pork chop" island (a safety hazard for pedestrians and cyclists) and the need for a north‑side crosswalk at Poplar Street. Caltrans initially said removing the pork chop was outside the project’s funding scope but later offered to add accessible push buttons.
Key Outcomes
The Planning Commission voted 3‑0 to approve the Coastal Development Permit with the following conditions:
- Widening: The two identified locations (north of Ferry Bay Street and south of Mirada Road) are the only areas where pavement will be widened within the city.
- Culvert Monitoring: Caltrans will conduct pre‑ and post‑construction monitoring of the three replaced culverts for erosion or scour and take corrective actions if needed.
- Street Lighting: Lighting at Kelly Avenue and Rousseau Francian shall be designed to minimize light pollution and comply with the city’s dark skies policy (Caltrans will work with staff on fixture selection).
- Kelly Avenue / Highway 1 Intersection: Caltrans shall install ADA‑accessible pedestrian push buttons on both the northeast and southeast curbs. The pork chop islands shall be removed (no reconstruction).
- Poplar Street Crosswalk: A marked crosswalk shall be added on the north side of the Poplar/Highway 1 intersection.
- Surfers Beach Bike Lane: The class II bike lanes from Capistrano Road to Coronado Road are approved, but the condition includes a provision that if the California Coastal Commission, in its review of the parallel county appeal, determines that replacement parking is required, Caltrans must return to the city for a plan to mitigate the loss of informal coastal parking.
The meeting was adjourned at approximately 11:15 PM.
Meeting Transcript
Good evening. Welcome to the City of Half Moon Bay Planning Commission meeting of April 9th, 2024. Good evening again. Just a brief um etiquette during the meeting. Um, we are broadcasting this live on Channel Twenty Seven and on the PCT's website. We do have Spanish interpretation. And we are um allowing public comment for general items that are not listed on the agenda as well as on the agenda. Um be given a time, and that can be determined by the chair. Um we did have some public comment come in this afternoon, and it has been published on the website as well as it was emailed to the commissioners. Um I think that sums it up. Thank you. And we will start with the Pledge of Allegiance. Okay, and so we could start with roll call. Um, Commissioner Ruddick and Commissioner Gordon are absent this evening. Um Commissioner Johannes? I'm here. Commissioner Hernandez. I am present. And Chair Gossett. Here. Oh funny, or all three are present. And at this point, I'll invite anyone from the public to speak out about anything that is not on the agenda. Um it's just that I submitted comments uh on my personal capacity in my personal capacity at the last meeting because I wasn't I wanted to attend, but I was unable because at the place where I was at didn't have um ADA access for the public, so I participated as a public member, and I have not made up my mind about the project, and we'll proceed to hear the evidence presented to the commission with an open mind. Um that wish would wish to speak on anything that's not on the agenda. Okay, with that, I will close the public comment section and we will move on to item one A. Which is a continuation of our meeting from March twenty-sixth. And the project description is the coastal development permit for the Caltrans State Route One multi-asset roadway rehabilitation project. And I believe Doug will be giving a presentation along with Caltrans as soon as they have access to the technology. Ready? Okay. So a little bit of background. This project was here at the last meeting, March twenty-sixth. At that time, there were a lot of questions, some of them pretty technical in nature. So the planning commission continued that hearing to a date certain till tonight. And one other piece of information, as we discussed before, part of this project is in the San Mateo County jurisdiction, part of it's in the city jurisdiction. The county did approve their coastal development permit, which was then right after our last meeting. It was appealed to the Coastal Commission on April 2nd for largely the same reasons that came up here concerning the the stretch of the highway between Surfers Beach and Sam's Chowder House, and uh what's been historically used as informal coastal parking there. Uh there was one question about where the jurisdiction line was, and uh I was surprised to find out it's in the center of the highway right there, because most of our maps show it on the west side of the right of way. We got this from uh LAFCO from county recorder's office, and it does show the center line for the section, the city section is in the center of the highway for that short little stretch. Um if you go a little bit south, a little bit north, it's all county jurisdiction on both sides. So some of the issues uh that came up last time. Um people were trying to figure out where the road was going to be widened, how much we had some questions about construction noise and light. I'd raise the question of sort of balancing quality of life issues that it would probably make sense for some night construction to avoid peak traffic periods when they're gonna have to close down at least half of the highway for a period of time. Um there were some questions as to sort of in layman's terms, what is 66 decibels, that sort of thing, and Caltrans has provided some of that. Um there were a lot of comments about Kelly Avenue and Highway 1 intersection, potential improvements. Um of these uh Caltrans does have a presentation for tonight, and I'm not going to explain or attempt to explain a lot of the more technical details of what they're proposing. I think they can do that better. Um there were questions about other intersections, Poplar, Redondo Beach Road. Um at this point, I think the answer is still they're not part of within the scope of work for this project. Uh Maas, our public works director does have some information to provide about uh city initiative to start looking at that stretch of the highway.