Tampa Bay Water Regular Board Meeting - July 27, 2026
STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE
Good morning, everyone, and welcome to the July 20th, 2026 regular board meeting of Tampa Bay Water.
This meeting was noticed in the Florida Administrative Register and on the Tampa Bay Water website.
The meeting is available for viewing through live stream, and a recording of the meeting will be posted on the agency's website.
Today we are going to begin using a new feature that allows board members to request to speak and to make motions and seconds using their tablets rather than speaking out.
We expect the change to improve accuracy and clarity as it will be difficult as difficult sometimes to hear across the dais.
So, board members, as we move through the meeting, please use your tablets for these functions.
We appreciate everyone's patience.
I'm sure it's gonna take a little bit to get adjusted to, but I believe that you will see the ability to make the motion come up when the time is right.
Okay.
And with that being said, um, our vice chair is out today, and so Commissioner Cohen was going to lead us in the Pledge of Allegiance.
Commissioner Collins.
I pledge allegiance to the flag of the United States of America and to the Republic for which it stands.
One nation under Godissi with liberty and justice for all.
Thank you.
Clerk, you please read the names of the board members to determine if there is a quorum.
Commissioner Cohen?
Here.
Mayor Davis.
Here.
Commissioner Eggers.
Here.
Councilman Miranda.
Here.
Commissioner Oakley?
Here.
Commissioner Peters.
Commissioner Wistol.
Here.
Vice Chair Waitemann.
Chair Hanowitz.
Here.
Madam Quormus Present.
Thank you so much, Clerk.
Okay, now we open up our regular meeting.
Are there any changes to the agenda?
Yes, uh, good morning, Madam Chair, members of the board.
Um we're requesting to defer agenda item C1.
Um, this is the eminent domain settlement with Fishhawk Ranch CDD 4 for the South Hillsborough Pipeline Project.
While the primary terms of the settlement, i.e.
the um the amount is not affected at all.
Uh we did receive wordly yesterday that several of the conditions for these easements um have been modified in the final settlement, and they're different from what was presented in the agenda packet.
So we intend to bring this back at a you know upcoming meeting, but we're in defer for today, so you have the accurate information in front of you.
Okay, well, thank you.
This moment we move on to public comment.
Each speaker will have three minutes to speak.
I have a card for David Geddes Jr.
Hi, good morning.
David Ballard Geddes Jr.
I live on Georgia Avenue in Palm Harbor.
Let's say, for instance, that I went door to door in every neighborhood in the county, and I deceived all the residents into signing the reclaimed water variants application, which in effect grants me development rights throughout the residents' entire parcel of property.
It permits me the right to replumb the residential homes with reclaimed water for laundry and toilet use.
The variance quarters the consent of the homeowner into forfeiting their Third Amendment rights, allowing me the right to enter the homeowner's property day or night, as based on Pinellis County Resolution 95286, section 3K, and to levy an annual indoor water inspection charge against the residents for water use privileges as written in Chapter 1, Section 13 of Maloney's Water Code, published in 1972.
The variance affirms my reasoning to take hold of civilian Fourth Amendment rights in my doing of things in statute 15320 and allows my seizure of civilian-owned property claiming eminent domain of the residents, taking all their personal and real property in statute 15303 section five, tapping title to the residential homes in Pinellas County Ordinance 97103, Section 126509, taking hold of their religion to as based on the variants in my development rights, as I have contrived and as I have invoked.
And let's say I want to take these reclaimed water variants and the development rights that go along with it and sell it to a third party developer transferring such development rights to a third party in order to limit my liability and legislation and the judges were all in on the scam using third party mercenaries as written in the Declaration of Independence using bashuas as written in Federalist Paper 30.
And now you have created a holy war based on the 14th Amendment and attorneys like Joe Morrissey over there.
He lit the fuse.
Well, thank you.
We get to consent agenda.
Is there anyone that wants to pull something from consent?
I see no hands.
Move consent.
Second.
Clerk, you want to try that?
Let's try the machine.
So there's a motion.
Button.
Mr.
Commissioner Cohen, you can press them.
Oh, we have the mover.
Oh, I see.
I'll second that.
There you go.
And it makes it much, and it makes it much easier for the clerk.
So we just push the button.
Yeah, and you can make the motion.
And that that way the clerk has the name and doesn't have to figure out who said it.
So we have a motion and the second.
I mean, board members, please enter your votes.
Motion passes unanimously.
Thank you.
Okay.
Now we move to the general agenda, and our general manager is gonna provide us with his report.
V1.
Well, good morning, Madam Chair and members of the board.
Before I get started on my report, I just wanted to take a moment to recognize the passing of uh former Senator Jack Latvala.
As you know, he was very instrumental in the creation of Tampa Bay Water and helped pass the enabling legislation that created us.
His role was featured in our documentary Lightning in a Bottle that can be found on our website for any of you wanting to see more about his impact on the water supply uh authority here.
The state uh why drought continues as the summer rains have not been uh consistent in our area as of yet.
We uh we were off to a good start Friday and um didn't get as much as I was hoping for over the weekend, but uh we're showing some signs and uh we'll uh have Warren approach the podium, he'll go into some more of the details.
We are still in the phase three water restriction uh from the water management district through October 1st.
Warren Morning, Madam Chair, members of the board.
Uh just a few slides to give you a current snapshot of where we are for our water supplies.
I'll start with rainfall or the lack of it.
Our drought has not been very long, but it's been very severe.
We started in September of last year when we received only about two inches instead of the seven or eight that we normally expect.
So since then, we had an average December rainfall, and fortunately, we got a pretty good bump in the month of May.
But otherwise, we've had very little for our region.
The month of June averaged just over three inches instead of the normal eight.
And as a result of this, primarily we see water use go up, but we also see diminished river flow, which especially in the summer is our predominant source type, and it's how we uh refill our reservoir every year.
The flow in the Hillsborough River this July is the fourth lowest that we've seen in the last 50 years.
So that kind of punctuates the severity of the drought situation that we're in and how important it is for us to continue with enforcement of those restrictions.
For our region, we delivered an average of 207.9 million gallons a day so far for the water year.
It's about eight MGD or 4% more water than we delivered for the same period last year.
And for the month of June, our regional water delivery was about 6.2 million gallons a day, higher than we had planned.
But we're still balancing our sources to make sure we meet demands 24-7.
As we look for regular rains to begin, unfortunately, we have a tropical system on our doorstep, and it's going to go away from us.
So we did get some beneficial rains, as uh Mr.
Carden mentioned started Friday.
Uh we did get good flow in the Alli Fire River based on that Friday night rainfall.
Uh happy to report a little good news.
Today is the first day that we will put meaningful water into the reservoir.
The last time we did that was October mid-October of 2025.
Uh and at that point we were close to 15 billion gallons.
Uh we will harvest about 47 million gallons a day from the Alifire River today, and that's 30 for the region actual use, and another 17 that we'll be able to send back to the reservoir.
If we can get into our summer rainy pattern, we will be able to harvest water off the alifaya, now at 19 percent of flow instead of 10, and we'll be able to harvest from the Tampa Bypass Canal for the region.
Um for the Allafa, I mentioned the 19 percent of flow.
We increased our permit one year ago.
We went up to 19 percent of flow and a maximum of 75 million a day.
Just that one change in percentage and the amount we can capture has resulted in uh about 2.5 billion gallons of additional water.
So it's it has been a substantial change for us.
We just need it to flow.
From the back, can I get some help changing slides, please?
There we go.
The consolidated water use permit running average was 103.27 million gallons a day at the end of June.
And with the high demands and the constrained supplies that we've had so far for July, that's likely to increase.
We are averaging presently about 120 million gallons per day from these well fields, which if we stay at that rate, it would bring the running average up slightly, perhaps to 105-106.
Hopefully, we get rains that make the rivers flow, and at that point we can begin reducing our take from the well fields.
Probably the most critical thing for us to do since it's already mid-summer is to refill the regional reservoir.
Uh, once the rivers flow like they should in the summertime, we can harvest and store about a billion gallons a week in the reservoir.
We just need that sustained rainfall and sustained flow.
The South Central Hillsboro regional well field running average was 26.3 million gallons a day at the end of June.
It's about a half a million gallons a day below its permit limit.
And speaking of the reservoir, once we got into the drought, we were already in it in September, so as we get began planning for the rest of the year that we're currently in, we did forecast to be at a very low level, about 2.1 billion gallons for the months of June and July, which is where we find ourselves now.
We're currently at 2.12 billion, which is about 13 and a half percent of our full storage capacity.
With that, I'd be happy to answer questions of me, or I'll turn it back over to Mr.
Gardin.
I don't see any questions or comments.
Yes.
Um Commissioner Eggers, you did it right.
I tried to punch the talk to me a little bit about our D cell plant, how's that doing?
The D cell plant is up and running.
Uh yesterday it delivered 12.8 million gallons a day for the region.
We did have a little bit of an outage last week as TICO was doing some planned maintenance that happened a little faster than expected, but I believe the facility was offline for less than one week.
So it is back up and running now.
And they're aware of the impact that their downtime creates.
Yes, we have regular communication with them.
They understand the criticality of that facility for us and their impact on us when they're down.
There are times when they have to be down for maintenance or planned construction work, but they have worked with us in the past year to minimize the outages and time them as best we can so that there's a minimal impact on our system.
Commissioner, come on.
Yeah, I just wanted to go back to the reservoir for a minute.
You you mentioned that you you thought uh we would shortly be able to start harvesting water again for the reservoir.
Is there enough rain coming down now?
Um that that's that that's the case.
You you mentioned that you you thought uh we would shortly be able to start harvesting water again for the reservoir bait is there enough rain coming down now that that's that that's the case today we'll be able to harvest enough to send continue to send 30 million a day to our surface water plant and store 17 in the reservoir that's purely from the Allifire River and the flow has already crested if we don't get sustained rain and this is really from Lithia into Polk County is the the catchment area that we need if we don't get the rains by later this week in that area to sustain the flow we'll be back to no water stored in the reservoir.
It's really the area from Lithia into Polk County for the Allifire River is where we need that rain and the new Tampa to Zephyr Hills area to refill the Hillsborough River basin.
When do you need to start filling the reservoir in order to be comfortable that you're going to be up at 15 billion gallons by the end of the rainy season if we get the sustained rainfall and flows we should be full or relatively close to full by the time those flows diminish.
If we get good summer rains the rivers will flow well into October so we can continue to harvest we may not hit 15 right at the end of the fiscal year end of September but we can typically harvest through much of October to try to top that off the longer range climate forecast is still for a strong El Niño climate event which for us means typically cooler and wetter winter months it depends on where that river of moisture sets up.
If it's over us it will be a very soggy late winter and early spring.
If it's north or south hopefully we'll get average rainfall which will help us to perhaps store a little more water for the coming season.
Yes Commissioner to give you a little context we are putting um 17 in the reservoir today and that's the first time since the last October there's 47 available from the river but when we're up and running and we expect hopefully real soon we usually push more than 200 into the reservoir so just to give you comparison we're very happy about getting some water but um we can do 205 probably is one of our our bigger bigger days so I'm hoping to get up to 200 a day going forward and we have a new permit limit that's almost double from the the past so we think that's going to be a big help to getting full once the rains start by October ish.
People should be watching between Lithia and Polk County that's really where you need it.
That's where we need it for that river.
New Tampa to Zephyr Hills for the Hillsboro.
Okay thank you.
Thank you.
Commissioner Wastel thank you first I would say that this highlights the importance of us continuing to research a secondary reservoir so that I know that this is one of the worst droughts that we've had in a very long time but I think that this would help prevent us from having to thread the needle I was talking to staff my staff in development services and I asked in these situations this is the first drought that I've experienced while I'm legislating do we restrict certificates of occupancy to new users on our water supply?
And the response that I received was that no there is currently no mechanism in Hillsborough County are are you aware of any other jurisdictions even in the Tampa Bay water area or throughout the state where when we're experiencing severe drought that we restrict new certificates of occupancy towards new users on our water supply I'm not aware of that.
That doesn't mean it doesn't exist but I'm not aware of it in our area or other places.
Wouldn't that make sense though is that that's something that we at least look at as a possible scenario that if we're already restrained that we don't add new users onto it I know that you know a small amount of users isn't what caused the drought to happen but wouldn't wouldn't that seem to be common sense that that's a practice it is a tool that could be used by a local jurisdiction it could help curtail water use from growing as developments come in even before a certificate of occupancy is issued for a residence the builder may have already installed the landscape and with new sod they would likely water every day for 15 to 30 days so whether there's a a certificate of occupancy or not that landscape may be there and using the water.
Good point.
So it's it's a difficult time and question but certainly any technique would be good for discussion.
Okay.
Commissioner Eggers.
Yeah, just uh following up on the on the D cell comment.
Um we have expansion capability there still, I think.
Um when you were talking about taking the water off the river.
Um we're using some of it.
We can't send it to the um to the reservoir.
We have to pass some through our surface water plant.
Um with that extra water coming in, could we then divert more to the reservoir from the river?
Um just trying to get you know balance all of our different it's all being used for the region.
Uh we're still 30 is about the minimum that we can run out of the surface water treatment plant, or we have to take it offline completely.
So the the 12.8 from DSL is coming up to blend with that 30, but it is being consumed through the rest of the region everywhere from the South Hillsborough service area around to the St.
Pete beaches, it becomes part of that regional mix.
Uh we are currently working to install the sixth and seventh racks, which should give us additional water once those are complete to give us the best flexibility in our system for the next dry season.
Thank you.
Commissioner Cole.
I just wanted to comment on um Commissioner Wastel's uh remarks because I think it was right before you were on the board, but it was the catalyst for the events that led to the South County pipeline project was people in in South Hillsboro County were were complaining because they would turn on their their shower and and it would be no water would be coming out or just drips would be coming out.
And while uh I don't think it was a a moratorium on COs, there was a period where Hillsburg County did hold up the building permits because of the water shortage in South County, and it was only after the interim measures were taken by Tampa Bay Water and Hillsburg County that sort of bumped up the uh the supply that they that they relaxed that.
But there was like a nine to twelve month period where things in in uh everything south of Big Bend Road sort of came to a halt because of that that uh supply that actual supply issue.
So for what it's worth um and just on that, this is a question that has been coming up, and I've mentioned this to Chuck, and I know we're having discussions at our city data centers.
And I'm just curious, you know, a lot of people are not familiar with what's happening, what's the regulation, who are the bodies that are regulating this, whether it's large or smaller uh data centers.
And I just was wondering in terms of Swift MUD and their role, maybe you could just give us and I know you're putting it on a spot.
If if if you can't, that's fine.
Um, but if you can just give us uh something in terms of what's happening with that, because it goes again in terms of data in terms of water supply.
And I'm getting residents, oh, okay.
Well, you're putting restrictions on us and what they're building data centers, and so that is kind of a concern that I'm hearing.
The water management district did put a policy in place about probably less than a year ago.
I think it was late 2025, that said any data center must come before the board as a permit.
If it served through a municipality, they will review that municipality's water use permit.
And if data center was not already permitted as a part of it, they will have to go through a justification as a city or county that helds a water use permit.
And the district has the right to open that back up and make modifications to allow it or disallow it or put more restrictions on it.
So the water management district is taking a very close look at every data center that needs water in our area, potable water, making sure that it doesn't impact the environment or the existing drinking water systems.
Right.
Okay, thank you.
Commissioner Eggers, are you are you ahead of you?
Thank you.
Okay, thank you, Warren.
I'm gonna finish up.
Uh I wanted to announce that uh Hillsbrook County uh has hired a new water resources director.
His name is Chris Jones.
I don't know if he's in the audience today, but um I want to welcome Chris.
Uh he has been on a few meetings with us and he's met some of the other uh staffs above the member governments.
I did want to give an update real quick on the East Pasco Well Field uh feasibility study.
The last board meeting we held, uh there was an item approved to allow additional drilling uh of the for the test well up to 3,000 feet.
And so I believe we finally are there at 2,850 feet.
Uh and so the uh work can be completed on that on the well, and then they will be putting uh uh doing a modeling test, water uh withdrawal test to see if there's any uh what the yield is for a potential new well field uh uh East Pasco.
Legislatively, uh we did secure $500,000 in state funding for a SCADA project that we we had, so that was great news.
And also on a federal level, uh the Water Resource Development Act.
Uh we've been released from the committee, and it includes a hundred million dollar authorization for water projects within the Tampa Bay region.
Uh and in addition to that, we had uh there's three community project funding requests still out there.
Uh $700,000 for the surface water treatment plant expansion, $756,000 for the South Hillsborough Well Field Project, and an additional $700,000 for the South Hillsborough Well Field, so about a million five for that one project.
Um collectively, all three of those projects are about uh 2.1 million dollars.
Tampa Bay Waters Procurement Team has been awarded the 2026 Achievement of Excellence in Procurement Award from the National Procurement Institute.
Uh that's the second consecutive year they've won that.
So congratulations, Christina, and your staff.
Speaking of the procurement team, uh they did participate in a uh reverse trade show.
So that's where the event allows uh our staff to engage directly with businesses, uh helping the vendors understand uh how to do business with Tampa Bay Water.
Uh we also participated at the Keep Pinellas uh Beautiful's High School uh Environmental Leadership Workshop.
And so uh Warren was there uh along with our continuous improvement director Shane Johnson, and they were evaluators for the uh workshop.
I believe we also had a uh one of our hydr hydrogeologists, Aaron Hayes, there to uh explain uh how uh the aquifers work using our edible aquifer uh project.
And Warren's been pretty busy.
He's here at the Forest Hills Neighborhood Association meeting along with uh the city of uh Tampa's water director Rory Jones, and so they participated in a meeting uh uh explaining some of the things we're doing here and helping the citizens out.
And again, Warren was at the um uh Carewood HOA meeting.
Uh they were wanting to talk to us about their water levels in Lake Carroll.
Uh this is uh some photos of our grant dollars at work.
Uh we were educating students in Tampa Bay through the water conservation protection grant.
Uh these students uh were paddled through the local waterways during Tampa Bay Water Keepers Colors of the Bay Kayak Tour Series.
And through our water conservation and protection grant as well, the Girl Scouts of uh West Central Florida uh have water conservation education activities worked into their summer camp curriculum.
And uh I think the middle picture is a picture of the edible aquifer.
It was a very big hit with everybody, so that's all I have.
If I'd be happy to take any any additional questions.
Well, Warren and Chuck, thank you for that update.
Um and to our legislative team, thank you for all your hard work in getting some more dollars uh to make our projects happen.
Every dollar helps, just like every drop of water helps.
So thank you.
Commissioner Igers.
Yeah, I was gonna say that about the legislative team, so thank you for that.
The the other thing is I just wanted to put an exclamation mark on Commissioner Wastel's comment about you know the investigation of our second um reservoir.
Um, and maybe just the uh kind of a lay of groundwork for some of that conversation, just high-level kind of targeting areas and working with our different members and start to really hone in on what that really means as far as the needs, uh the land needs, the infrastructure needs, the dollar needs, all of that.
But um, yeah, I just think that needs to be wherever it is in our system, needs to be kind of punctuated a little bit.
Thank you.
Yeah, there's currently uh three projects in our feasibility study that I believe will be in front of the board uh probably by next year, mid next year.
Uh so there's three reservoir projects, including a surface water treatment plant next to them.
Uh, that is uh at the current site, so there would be an additional uh sighting of a smaller reservoir next to the existing one.
Then off of Lake Tarpin, we're looking at taking some water off Lake Tarpon and putting it in a reservoir, and also uh down near the border uh with Manatee County off the Little Manatee River.
We're also looking at an area there to put one as well.
So it is a uh an extraordinary project, the one we have now, uh except that it is needing uh Mother Nature to help it sometimes, and so uh an additional one I agree would be a big help for our system.
Okay, thank you.
Well, we've deferred item C1, and so the next item up is C2, and that is gonna be presented by Maribel Medina from our planning projects uh planning and projects director.
Good morning.
Hey, good morning, madam chair and members of the board.
Um, agenda item C2 is an action item requesting your approval for the South Hillswater Well Field Land Exchange and East MENS Agreement with Hillswater County.
I will begin with a brief overview of the agreement and the requested board actions.
The South Hillswater well field is a new regional water supply project, which was approved by you last October.
At full built out, the well field will include eight production wells with one well already constructed.
The site has demonstrated excellent groundwater quality, requiring only ozone treatment for hydrogen sulfide removal.
The project will also include about four miles of collector main, a connection to Hillswater County's water supply system, and associated meeting metering facilities.
Once completed, the well field is expected to provide an important new source of regional water supply.
This map shows the South Hillswater well field site in the Balm area of southern Hillswater County.
The western portion is located within the Stacy R.
White Nature Preserve, where wells one through four will be constructed.
Well five is our existing well, which is shown in the upper left portion of the map.
The eastern portion is located in Hillswater County's water resources property and will include wells six through eight and the water treatment facilities.
These facilities will be co-located with Hillswater County's future drinking water facilities and adjacent to the ballm point of connection for the southern for the South Hillswater Pipeline project.
Today's request pertains to the western site for wells one through four and associated collector main and access easements.
Construction of this well field requires property rights from multiple stakeholders.
This slide provides an overview of those property interests required for this project.
We will request approval for additional property rights next year.
The agreement presented to you today exchanges Tampa Bay Waters water supply development rights at the former Cone Ranch property, which is now known as the Lower Green Swamp Preserve for about five acres of eastments needed within the Stacey R.
White Nature Preserve.
The map shows the lower green swamp preserve in northeastern Hillswater County.
This exchange both supports long-term conservation of the preserve and provides the property rights needed for this new well field.
In this slide, you can see the property rights included in the interlocal agreement before you today.
Tampa Bay Water will receive about five acres of east within the Stacy R.
White Nature Preserve at no cost as part of the land exchange.
We will also acquire about 4.7 acres of east within the water resources utility corridor, which is shown in pink to support the collector main access to the to the well sites and monitoring facilities.
The cost for those utility corridor eastments and associated closing costs is about $66,000.
Together, these property rights provide the access to key project infrastructure needed to construct and operate this new well field.
And with that, staff requests your approval for the South Hillswater Well Field Interlocal Agreement with Hillswater County.
Hillswater County staff is expected to present the agreement to their board of county commissioners for approval in August.
And the requests at this moment are the items listed in the slide.
And Madam Chair, this concludes my brief presentation.
I will be happy to address any questions you may have.
Thank you.
At this time, I see no requests for speakers.
If someone wants to press the motion button to approve it or not.
I have a motion by Commissioner Eggers and seconded by Wastel.
Clerk, if you can open the machine for voting.
Board members, please enter your votes.
Motion passes unanimously.
Thank you so much, Clerk.
Okay.
Thank you, Mayor Bell.
Next up, we have C3.
And this is gonna be presented by Christina Sacket, our chief financial officer.
Good morning, Christina.
Good morning, Chair, members of the board.
Agenda item C3 is requesting approval of the supplemental bond resolution 2026 002.
As I mentioned in April and in May, the agency needs to issue new debt for the capital improvement projects in fiscal years 27 and 28.
And we are issuing refunding debt on part of the 2016 A bonds.
This presentation will provide an overview of the bond issuance and the parameters of the bond resolution.
I would like to start off by introducing Jay Glover and Nick Roca with PFM financial advisors to present an update on the 2026 A and B financing.
Yes, good morning, Madam Chair, members of the board.
I'm Nick Rocka with PFM Financial Advisors.
Um and we'll be giving you a brief presentation on the upcoming Series 26A and B bonds.
First, I want to start out with a graphic detailing the authorities' current debt service schedule.
Uh combination of the brown and green bars you see here represent the annual debt service payments related to the outstanding bonds, with the green bars specifically detailing the series 2016A bonds that we're looking to refund for savings.
All combined, the outstanding bonds uh result in a maximum annual debt service, also known as MADS of approximately 82.1 million dollars, and that occurs there in fiscal year 2027.
Uh additionally, we show the 10.2 million dollars of the member of the annual acquisition credits provided to the member governments, uh and those go on through fiscal year 2028.
With the 2026 A bonds, we're looking to fund 292 million of authorities' capital improvement plan with these debt proceeds.
Due to the authorities' current debt service payment structure, we believe is beneficial to wrap the new 2026 A bonds debt service around the existing debt, and this will help minimize the annual debt service, which directly impacts the uniform rate.
The 2026 A bonds will be structured over an approximately 30-year term, utilized capitalized interest to cover the first year of interest payments, and is expected to make use of a surety to cover the related increase in the debt service reserve fund requirement instead of placing just cash in there.
The 2026 B bonds will be issued to refund the outstanding 2020 sixtea A bonds, which are eligible to be refinanced starting on October 1st, 2026.
And the 2026 B bonds will feature the same maturity date of the refunded bonds, so there will be no extension of that debt, and they'll also be structured to result in debt service savings each year through fiscal year 2038.
The 2026 A bonds will partially fund 29 different projects of authorities' capital improvement plan, including the South Hillsboro well field, surface water treatment plant, water quality improvements, supervisory control and data acquisition system upgrades related to the surface water treatment plant, water quality improvements for the El Ridge Wild Field, wild well field, and improvements to the Cypress Creek well field.
The 2016 A bonds will have 72 million 80,000 of principal maturity in fiscal years 2033 through 2038.
And of that, those are eligible to be refunded prior to maturity without any penalty and are expected to result in significant positive savings for Tampa Bay Water.
At current market rates, we anticipate the refunding to produce approximately 7.8 million dollars in net present value savings due to the low coupon rate on the fiscal year 2039 maturity of the 2016 bonds is not in anticipated right now in the current market uh environment to produce any savings if it were refunded.
So we expect to leave that one maturity of the 2016 A bonds outstanding, but we are gonna are looking to refund the vast majority of that financing.
And the table on the right details the principal amounts of the 2016A bonds, maturing each year that we're looking to refund.
And we anticipate the refunding will result in debt service savings each year, ranging from uh right now we're expecting about 195,000 to current kind of that first year, that short year, fiscal year 2027, uh, up to almost two and a half million dollars in fiscal year 2038.
Then here on slide six, we show the estimated aggregate annual debt service of authority following the issuance of both these series, uh 26A and B bonds.
And here, the brown bars once again that represents the outstanding bonds, less the 2016 A bonds uh we highlighted on the earlier slide.
Uh, since uh those will be refunded through, as I mentioned previously, through fiscal year 2038.
And then the green bars on this one that shows the debt service resulting from the 2026 B bonds that will be refunding those 2016 A bonds.
And the orange bars there at the top, those show the impact from the 2026 A bonds that will be funding the 292 million dollars of additional capital improvements.
So the net result of all this is an increase in the maximum annual debt service to approximately 90.3 million dollars in fiscal years 2029 through 2032.
That's roughly 8.2 million dollar increase.
Uh, we have also added a red dotted line to this graph, and that represents the current debt profile compared to our projections after the issuance of the 2026 A and B bonds.
So you can kind of see a comparison there.
And you might notice kind of there's a little gap there between the red dead dotted line and the green bars, and that's essentially the savings you're getting there from that refunding.
So it looks kind of small on the on this graph, but it's quite significant.
Uh on our final slide here, we just lay out the preliminary financing schedule for the upcoming issuance.
Today we are requesting the Tampa Bay Water Board of Directors to approve the bond resolution, allowing the issuance of the 2026 bonds based on certain parameters, uh, which will be further detailed by bond council following my presentation.
During the week of August 3rd, we currently expect to price the 2026 bonds.
And if priced during that first week in August, we expect to close the financing on August 27th.
And then we just highlight here October 1st.
That's the first allowed call date of the 2016 A bond.
So this is when they'll actually be refunded and redeemed.
Uh this concludes my portion of the presentation, and I'll pass it back to Christina at this time.
Thank you, Nick.
With that, I would like to introduce Michael Brochart with our bond council, neighbors uh Gibbon and Nickerson, and he will go over the parameters of the bond resolution.
Morning, Madam Chair and members of the board.
I'm Mike Rochart from Neighbors Gibble and Nickerson.
We serve as the authorities bond council.
So before you today, we have resolution 2026 002.
And what this resolution will do, it is establish the maximum principal amounts of each series of bonds, which I'll discuss in the next couple slides.
It'll set the purpose of the issuance.
It'll authorize a negotiated sale of these bonds by a series of underwriters selected pursuant to this resolution.
It'll set out the financial parameters of the bonds, which again I'll talk about on the next couple slides.
It'll give some delegation authority to the general manager to allow for the sale of the bonds on the day that um that we enter into the bond purchase contract.
It approves the form of the purchase contract and the escrow deposit agreement related to the bonds, as well as the preliminary official statement and the official statement for the bonds.
It'll establish a 2026 construction fund, which is a bit of a um a technical requirement under the authorities master bond resolution.
It'll set out how the bond proceeds are to be allocated, and it will allow for the purchase of a surety bond for should the underwriter underwriting team and staff and financial advisor uh decide that appropriate at the time of sale.
So for the first series of bonds, the um the new bundle new money bonds of series 2026A.
The resolution will set out the following financial parameters.
The bonds will not be issued in a par amount greater than 325 million.
These bonds will be for issuing the capital or for financing the capital projects discussed previously.
The resolution sets a true interest cost of not more than 5.5%, and an underwriting discount not to exceed 0.4% of the par value, a final maturity date no later than um 10.1256, and the first call date no later than 101 2036.
The second series of bonds, the refunding bonds previously discussed, will have the following financial parameters pursuant to the resolution.
They won't be issued in a maximum par amount of more than 100 million.
They'll be to refinance all our portion of the series 2016A bonds.
We'll have a true interest cost of not more than 4.5% and an underwriting discount not to exceed 0.4% of the par value.
Also, the present value savings of the refunding will need to be equal to at least 3% of the par amount of the series 2016A bond re bonds that are being refunded.
And again, the final maturity date will be no later than 10.12038, and the first call day will be no later than 10.1 2036.
So with that, we ask that you approve resolution 2026 00-2, which will authorize the issuance of the refunding the revenue bond series 2026A and the refunding bond series 2026 B pursuant to the parameters set forth in such resolution.
Thank you.
Thank you.
Board, I don't see any speakers requesting.
Oh, Commissioner Eggers.
Yeah, um, because my you know, I'm not remembering all of the things that we've financed and refinanced and re-refinanced.
Um, I'm wanting to make sure I understand um the picture that's on page six that shows the new debt load that we have here.
This one.
Yeah.
What's included in that?
Is that is of all the major projects that are going on?
What's in that number?
Because I'm seeing obviously our our responsibilities going up significantly over the years above the red dotted line.
Yeah, what has caused the increase in the past few years?
Um, largely since 2024, uh, was the South Hillsboro Pipeline.
I mean, that's uh half a billion dollar project in and of itself.
Uh, the expansion of the surface water treatment plant, which is close to 200 million.
Um the new reef the new fundings that we're doing right now will include the South Hillsborough well field, uh, which is about um I think 160, and then it also includes the design phase for the PFAS treatment projects, which is another 35 million for for those.
Um those are the large projects, and then there's um we did the board did approve um coming up, but that would be in future bonds, you know, potentially the construction of the PFAS projects and the construction of or the design and construction of the water quality.
Um, but right now this includes just the design for the PFAS projects.
Okay, but it does include all the major projects that you just mentioned.
Um, and obviously things that we talked about today when I used the exclamation point on the expansion looks for a reservoir, that's a whole different set of of correct.
Yeah, correct.
Um, I think this is you know it's important, obviously.
We we started talking about having sources of uh funds that I guess I'm I'm just thinking about the the next the next phase if you will of expansion here and what it's going to result in, additional funding, uh whether it's the this DSAL plant or other items.
So just keeping a close eye on all of that is gonna be really important for us to kind of keep just keep our arms around it, I guess, more than anything.
Thank you.
And um, based on Commissioner Eggers' comments, um, and maybe you can comment.
Obviously, we have increased debt service and your future projects later on, and maybe uh Nick or Jay, you guys can talk about credit rating and where we are in terms of your debt load and the agency itself.
Madam Chair, board members Jay Glover, also with PF and Financial Advisors.
Obviously, a great question.
I mean, part of the credit quality of Tampa Bay water is because each of you member governments have very strong credit ratings, the majority of them in the triple A, AA, A plus range.
So, you know, and as you know, most of the fees paid to Tampa Bay water are operating expenses of each of your member government.
So all of that results in a very strong credit rating that Tampa Bay Water has.
Um we have actually uh heard that um one of the ratings has been affirmed already.
We're working on the other one.
We hope to have both of those ratings, you know, probably the next day or two.
But again, you know, we do look at credit ratings as any part of a financing discussion and how we structure the debt.
Um I think the rating industry is very comfortable with your debt structure.
Um you also maintain significant liquidity.
We fund that debt service reserve fund that was mentioned.
So all these things are done to make sure you maintain the credit ratings, which obviously lowers the borrowing cost and with significant CIP needs and significant debt funding really minimizes the impact on the you know the the rate as we move forward.
So those are all discussions we're having with your general manager and your CFO as we go through this financing process.
Great.
Well, thank you.
Jay, based on that, any other questions.
Uh Chuck, if you can provide that information once you get it from Jay to the board, that would be fantastic.
Um that if there is a motion and a second on this, I have a motion by Commissioner Wassel, second by Commissioner Cohen.
Clerk, if you can open the machine for voting, board members, please enter your votes.
Motion passes unanimously.
Thank you.
Well, thank you, Mike, Jay, and Nick for being here with us and joining us today.
Um and Christina, thank you so much for your work on this too.
Okay.
Next up, we have the one, we get to the presentations reports phase of our agenda.
We have a member government report from the city of Newport Ritchie, and we have Colin Eichenweer.
Yes, ma'am.
Okay.
Good morning.
Morning, madam chair, uh, board members.
So this morning, we're gonna do a brief rundown of the city of Newport Ritchie Public Works uh utilities for an update from our member of government.
Uh I am Colin Eichemular, the Public Works Director for the City of Newport Richie.
I want to run through today.
We're gonna look over our potable water system, our sanitary sewer system as it pertains to our reclaim water system, and how that bolsters our distribution and our current and future utility projects.
We have our made them water treatment plant, which averages 5.6 MGD per day, and 3.63 of that goes to our city customers and is also distributed through uh the city of Port Ritchie, and then 1.97 MGD to the regional system that's pushed back through our Tampa Bay water connection.
We have 154.87 miles of potable water mains, and that's uh 70,975 active service connections.
We're currently seeing an increase in those connections with the development of the Newport Corners district, and that will be an additional 331 connections, which is completing its arriving at completion now.
So those are going in as we speak.
Uh to go over our sanitary sewer system, and again, this is as it pertains to the uh production of reclaim water.
Our wastewater treatment plant averages about 5.5 MGD.
Uh we have a total of 76 lift stations, 29.82 miles of sanitary force mains, uh 87.46 miles of gravity sewer lines, and it's a just shy of uh 15,000 connections with the again our current increases of 331 connections, and that will be with that Newport Corners development.
Our reclamation facility again is housed there at our wastewater treatment plant, and it averages about five to five point five million gallons of reclaim per day.
That's 21 miles of reclaim transmission lines and 17.5 miles of reclaim distribution lines with a hundred with 516 service connections.
The Newport Corners district there is going to be master metered.
Uh, that was installed in September of 2025, and so they're currently up and running.
To go over some of our current utility projects with the city of Newport Ritchie.
We have our West Grand neighborhood.
Uh, that project was out the bid, has been awarded, and we'll be kicking off here shortly.
And that will be updating some of our utility lines, six inch, eight inch, and increasing our fire protection in those areas.
We have our potable and reclaim extensions, something that we wanted to really look at in the upcoming years, and we've been uh going over this current year is a needs assessment on our reclaim production and distribution to better disperse throughout the rest of the city of Newport Richie and see because of the water conservation efforts, kind of review with our our city members and our our residents what they are looking for as far as reclaim and if there's an increase in demand for that.
We have our smart meter replacement project.
Um this year we completed the inch and a half and two inch meters.
We'll be going into the three inch and four inch meters in the future years as well.
And then we completed our uh PASCO County Interconnect upgrades.
We have our sewer utility system improvement that'll be conducting uh that's out for design right now, and we'll be going out to bid sometime in 2627.
The sewer extension projects, those are kind of our continuous uh efforts to ensure that as we expand our utility, we do it in a way that is intelligent, and we aim for the septic to sewer conversions.
We have our manhole lining project, which is closing out this year, and we're also gonna be looking at our conducting a water loss audit.
We've engaged with a few different um disciplines to take a look at that to see where we can better utilize our efforts in identifying not only where our water loss is, but essentially where there might be a connection that might be unknown or something to that degree.
We really want to hone in on that and make sure that what we're we're sending out of our plan is at our best efficacy.
So looking forward, our uh upcoming projects would be the high service pump at our elevated storage tank.
Again, looking to expand our reclaim system throughout the city of Newport Ritchie and further.
Uh our China Country Leisure Lane Sewer Extension.
Again, that that would be focused on the septic to sewer conversion out there.
The we will continue to update our potable water within our district, and the water utility system improvements as well.
The sewer utility improvements, we do those, those are a part of our annual rotation.
So we'll do our water project one year, we'll do our sewer projects the following year.
So we're always out to design and always looking to upgrade our system.
And again, their sewer main and uh manhole lining project.
Some key projects that I really wanted to focus in on uh would be out of our wastewater treatment plan.
Again, this is really to focus in on our reclaim production as it pertains to both water conservation efforts and just providing those services to our residents and our utility customers.
So the Schreiber tank conversion, the Schreiber tank is is a clarifier aerator all in one unit.
Um it's a heavily uh maintenance required unit, and as such, we have chosen to look into converting that into just a direct aerator that would help with our nitrogen reduction, reduce our total maintenance, and is expected to take about 12 to 18 months in total.
Currently, our wastewater treatment plant is due for an upgrade and some refurbishment.
It's hit that lifespan on most of its mechanisms as far as the aerations go.
So, right now we're conducting our aeration tank seals and coating.
Those will be conducted every two years for our four aerators, and then we'll have our clarifier gearbox replacement projects as well.
That concludes this presentation.
Um I appreciate your time and I'm here for any questions.
Thank you.
Well, thank you for the presentation.
I'm curious, in terms of the um your reclaim water system.
You said um you have a future utility project, right?
An extension is that for more to reach more customers, and if so, what are you looking at in terms of extending the size of it?
You have 21.7 miles at this point.
So, how much more are you looking to expand?
So, to answer the first question, what we would like to do is really we've done this in the past, and we kind of looked at a needs assessment and looked over what our residents were looking for and what our utility customers were looking for, and if if there was a need there, if there was a desire to have a distribution line in that area.
So that's what we're looking at first, and that would drive that expansion.
So if we see that there's a demand for it in certain areas in certain neighborhoods, then it would be looking at those identified neighborhoods and saying, okay, we still haven't expanded into this.
We haven't put a distribution main down that that particular street or within that district.
So let's go ahead and start moving forward with that, and that would be a part of that design element.
So it's first identifying where our highest needs are, where folks really want it, and then going out to design on that specific area.
Okay.
Thank you.
I don't see any requests to speak.
Well, thank you so much for your presentation and for letting us know what's happening in the city of Newport Ritchie.
Thank you.
Next item up is D2, and this is going to be presented by Eliana Lara, our senior professional engineer.
Good morning, Eliana.
Good morning.
Good morning, Madam Chair and members of the government of the board.
As you mentioned, my name is Eliana Lara.
I'm your senior professional engineer and project manager at Tampa Bay Water Presenting Agenda item D2.
This is a presentation for the 2045 system hydraulic and emergency scenario analysis.
No action is required from the board at this time.
The purpose of this presentation is to outline the key findings and recommendations based on the analysis of the regional system's performance through the year 2045 by confirming hydraulic capacity and ability to meet future member government demands, identifying reliability and resiliency improvements, and addressing emergency hydraulic and power outages services scenarios.
In collaboration with our six member governments, we aim to prioritize these improvements recommendations to support long-term capital planning, investment decisions, and routine operations and emergency events, considering efficiency and cost.
The Tampa Bay Water completes a comprehensive evaluation of its regional water transmission system every 10 years to proactively identify system capacity and reliability improvements needed over a 20-year planning horizon.
The 2045 analysis is the third iteration of this report.
We started this with the 2035 analysis and updated it with input from each member government.
We also had a lot of meetings with the utilities directors, their engineers, water plant operators, maintenance, you name it, all the key players.
As a matter of fact, I see a couple here present today.
Thank you for attending.
They collaborated, reviewed and approved the report we're presenting to you today.
In five years, we will be verifying that the projections are in line, and in 10 years, the full the next full 2055 analysis.
In this analysis, hydraulic capacity, reliability, and resilience were considered.
The analysis incorporated member government demand projections growth through 2045 and confirmed the need for targeted transmission system improvements.
Our consultants utilized software models to simulate historical data and what-ifs scenarios, identifying bottlenecks and key challenges in the system.
The models also identified eight new hydraulic capacity improvement concepts to help mitigate system constraints that would otherwise pose challenges in meeting demand during drought years.
Of the eight system capacity reliability and resilience improvement concepts, the analysis recommends implementation of the Cypress Creek Repump mode to provide energy efficiency in the system, upgrading booster pumps and motors at the Morris Bridge Pump Station, and adding pumps at the Lake Bridge Booster Pump Station.
The construction of a potential Pinellas Booster Pump Station, parallel transmission mains, loops, and all other lower value alternative concepts are recommended to be deferred.
The good news is that the agency has already begun identifying projects for the implementation within the capital improvements program.
In addition to the hydraulic capacity, reliability and resilience, we also consider unexpected hydraulic emergencies such as pipe breaks or facility outages.
This part of the assessment addresses critical hydraulic challenges and provides recommendations to ensure a reliable and resilient system.
As shown on the figure to the right, over 20 emergency scenarios were analyzed.
Of these, eight outages were identified as critical emergencies that could prevent Tampa Bay water from supplying water or the member governments from receiving it.
The hydraulic emergencies assessment recommends taking proactive steps to address these scenarios by developing emergency operating procedures and memorandum of understandings so that Tampa Bay water can rely on the abilities and functionalities of the member government's systems.
Lastly, it recommends improved system interconnections with member governments.
Finally, the analysis consider as well unforeseen power outages, providing recommendations to ensure a reliable and resilient system.
Though the agency is required to meet the annual daily demand with backup power, the analysis showed a deficit for the year 2045.
Lessons learned from recent hurricane seasons also help identify additional backup power gaps in the system.
Based on the power outage emergency assessment, the recommended improvements are remote access, monitoring and control of backup power systems, increased generator capacity at key facilities, change of generator ownership and operation, and enhanced coordination with electric utility providers.
One more time, the good news is that the agency has begun identifying projects for implementation within our capital improvements programs.
So, with all that said, here's a quick summary of the recommendations discussed.
It will be crucial to monitor member demands to ensure a timely implementation of solutions.
Therefore, in five years, we will be verifying that the projections are in line, and in 10 years, the next full 2055 analysis.
And this concludes my presentation.
I will be happy to answer any questions that you may have.
Thank you, Eliana.
Commissioner Wastel.
Thank you.
Could you pull back up slide five real quick?
Sure.
That recommendation from Morris Bridge down to Cosmi.
Is that recommendation?
That's not an existing line, right?
They're recommending a full new line.
So this is this is part of the um uh low value alternative concepts that were recommended to be deferred when you're talking about loops, parallel pipes, transmission mains.
So it does not exist.
But we did take a look at if it would be a benefit.
Okay.
All right, thank you.
No problem.
I see no more questions.
Okay, thank you so much, Eliana, for the presentation.
Okay, thank you.
Next up, we have the three, and this will be presented by Danielle Kercy, the senior project manager.
Hi.
Morning.
Good morning.
Madam Chairs and members of the board.
Agenda item D3 provides a construction status update on the South Hillsborough Pipeline and Surface Water Treatment Plant Expansion Projects.
First up is the South Hillsborough Pipeline.
The map shown illustrates the 26-mile pipeline route from Brandon to Lithia and Balm.
This pipeline is designed to deliver up to 65 million gallons per day of water, and it includes 17 tunneling locations, which are represented by the orange diamonds on the screen.
These tunneling locations are strategically planned to minimize traffic disruptions and reduce environmental impacts during construction.
The diamonds circled in red show where tunneling work has already been completed.
In addition to the pipeline, the project also includes the construction of a new alkalinity adjustment facility as well as key points of connection with Hillsborough County.
This accounts for 90% of the pipeline construction.
And we're happy to report that this weekend the 48-inch HTP pipe was successfully pulled into the tunnel shaft beneath Little Fush Fish Hot Creek.
What you see on the screen is them preparing.
We meet monthly as a team to co to go over construction progress and discuss the upcoming schedule.
Hillsborough County and the district regularly attend those meetings as well.
The project team also regularly meets and coordinates with other utility providers such as TICO, Spectrum, Frontier, and more.
We did recently host a week-long utility coordination meeting block where we offered to meet with individual utilities at their convenience throughout the week.
We also work hard to keep residents and businesses informed with frequent construction and detour updates.
As you can see on this slide, we use a variety of tools to reach residents, including direct mail, email updates, social media, and HOA meetings and more.
And residents and businesses can reach us on the project hotline and email.
Our public engagement team is also coordinating with key stakeholders on a regular basis.
We have ongoing communications with Hillsborough County public schools, transportation, and administration departments.
Any time a new traffic plan is put in place.
And we meet regularly with individual schools before and during active construction activities near those facilities.
Overall, this project is progressing well and remains on track.
Construction is about 5% complete based on linear feet of pipe installed.
And spending is aligned at 20% of the total 478.4 million construction budget.
At this stage, no corrective actions for budget and schedule are required, and the project is performing as expected.
Now for an update on the surface water treatment plant expansion project.
This project expands the existing surface water treatment plant capacity by up to 12.5 million gallons per day.
It includes a fifth train along with supporting systems, which are labeled A through E on the screen.
The new treatment train will mirror the existing treatment processes currently in operation.
Area A represents the fifth train.
Area B shows the belt filter press replacement.
Area C identifies the location of three new filters.
Area D shows the location of chemical buildings, and area E includes the expand and solids drying bits.
In area A, crews have finished utility relocations and the installation of a new 24-inch return pipe under the north axis road, which is shown at the top of the screen, along with ground reinforcement work.
The excavation of the 24-inch recycle return piping as pictured at the bottom of the screen is in progress.
Three of the belt filter presses have been delivered and set at the site.
The crew also completed forming the pedestals for belt filter presses five through seven, along with the concrete encasement of the 10-inch drain line.
In areas C and D, crews have completed installation of the 4848-inch ductile iron pipe at filters 16 through 18, as well as the encasement of the T's and piping.
The installation of the 54-inch waste backwasher piping is also complete.
Overall, the surface water treatment plan expansion project is progressing well and remains on track.
Construction is currently at 6% complete, and spending is aligned at 17% of the total 167 million dollar budget.
As construction activities increase, our continued focus will be on maintaining alignment between progress spending and schedule performance.
At this stage, no corrective actions for budget and schedule are required, and the project is performing as expected.
With that, I'd be happy to take any questions.
I see no request for speakers.
It's time.
Commissioner Eggers.
Thank you.
How are we monitoring complaints from residents?
Um I'm sure we're going to get them from businesses and residents and how we email.
Oh, no, thank you.
You don't need to answer.
I guess WASP is getting all the we're getting planning in my office too.
Okay.
Hi, good morning.
I'm Michelle Robinson with Dialogue Public Relations.
We are tracking everything in a stakeholder database called Simply Stakeholders.
So right now we have thousands of stakeholders in there.
Anytime someone calls, it's logged and followed up on, and we can track it on a daily basis.
So all of his complaints are kind of filtering through that system too.
They get to us eventually.
Sometimes they're an email from Katrine or from Michelle, but they do get to us and we log it, we respond to everyone.
We try to do it the same day.
Sometimes it might take 24 or 48 hours to chase down the answer and respond.
Thank you.
Hey, Commissioner Wastel.
Hold on.
Oh, I'm sorry.
One other comment.
So one of the thoughts that I was thinking about earlier when we were talking about the eight well fields, and it's not for you, I'm sorry.
Um was more about you know how do we how do we minimize the cost going forward?
And I know this probably goes to somebody else.
I'm sorry if if I'm if I'm hitting the wrong person, but the importance of those eight well fields, the importance of additional credits that we're getting in the area, or where I know we're hoping for the 23 water supply project being non-existent.
At least that's my hope and prayer, because of the amount of cost that we're bearing on all of this other stuff going forward.
So just a comment maybe on that uh water supply accumulation that we're kind of doing along the way instead of a 23 water supply project.
Mayor Bell Warren is probably the he's been our designee.
Um describe him with uh with a basket and he walks around and uh collects water uh permits.
No, it's true, it's been great.
So he's you he's used to that.
Well, I'm going to requisition a bigger bucket.
Um we have acquired about 3.72 million gallons a day, transfer them to what will be the South Hillsborough Well Field.
We plan to bring another two acquisitions and transfer three permits.
Probably we'll have that to the October board meeting for approval.
That should hopefully take us above four, and we are still actively talking with property owners in South Hillsboro to see if there's other quantities that we can acquire as those properties transition from agriculture to either residence or industrial uses.
We believe there's more, and we'll continue to squeeze every rock to get all that we can.
So he's just described Hillsborough County.
He's also met with the Pasco County staff, they've identified potential, and so he's going to be working the Pasco County areas.
Uh in addition, we have a uh feasibility study of increasing the 90 million gallons a day, uh, and that should be ready by next year.
So we are working very hard on that end, as you suggest, uh Commissioner.
Yeah, thank you.
Thank you, Warren.
And uh one last question on the six percent and seventeen percent.
I'm assuming that's a lot of pre-paid stuff that they're that they're get they're buying ahead of time.
Is that kind of the idea why we're so far ahead on the cost expenditure versus the yes?
We did do early procurement of materials and equipment.
Okay, thank you.
On budget and everything, no problems.
Okay, thank you.
Thank you.
Thank you.
Commissioner Wastel.
Thank you.
I wasn't cued, but um simply stakeholder, what is it called?
Oh, stay the system.
I it's simply stakeholders, it's a um kind of like a contact management application, and so we we've got every person who's ever emailed us or phoned us in that system.
Um, we're able to track tasks within it.
So if somebody says we would like business signage, for example, that task is put in there, it's assigned to a person, they've been given a date, and we check it multiple times a day to make sure that we're keeping up with inquiries and tasks and complaints.
Complaints get logged in there as well.
And you said you call the complaint people, even if you don't have an answer, you lose contacts.
Absolutely, absolutely.
I I don't know if I missed the memo on this organization, but all seven Hillsborough County Commissioners need this info to forward um the emails that we're getting for complaints of this, just so that we're not using um the general manager as a customer support support agent.
And and I know that I get a lot, so I don't know if your office had it, Harry, but we No, and we're we're sending them directly here.
Oh, yeah, just let's just all of the commissioners because they'll click the button that says contact all, and you might get duplicates this way, but the way that people can contact us in Sunshine Law, that way we can just forward them straight to her.
So we can we can provide the project team email.
That's where it's all coming, and that's how we track everything.
Okay.
Yeah, that would be very helpful to us.
Thank you.
Sounds like something very good came out of this for the commissioners over there in Hills Pearl.
Well, thank you so much for your work on this, Danielle, and for the presentation and the update, and thank you to everyone who's actually working with the stakeholders on this.
I know it's a lot of work, uh, but coordination is key.
Okay.
team email that's where it's all coming and that's how we track everything okay yeah that would be very helpful to us thank you sounds that something very good came out of this for the commissioners over there in Hills Pearl well thank you so much um for your work on this Danielle and for the presentation and the update and thank you to everyone who's actually working with the stakeholders on this I know it's a lot of work uh but coordination is key okay commissioner eggers it's raw okay um we have no other administrative manners any old business I don't see any receive and file okay if we can press the button there's a motion to receive and file mover Dave Edgers and secondary lost if you can board members please enter your votes motion passes unanimously thank you I'm just curious uh board members how do you like the system so far any suggestions uh it's different but it seems efficient yeah good comment no comment sometimes that's good okay that's rare so usually well thank you everyone um for a great board meeting our meeting is adjourned thank you
Tampa Bay Water Regular Board Meeting - July 27, 2026
Note: The meeting date is provided as July 27, 2026, though the transcript indicates July 20, 2026. This summary uses the provided date.
This regular board meeting of Tampa Bay Water covered drought conditions, water supply updates, approvals of a well field land exchange and a bond resolution, and presentations on member government projects, a 20-year system analysis, and construction progress. The meeting began with a deferral of an eminent domain settlement item due to last-minute condition changes.
Consent Calendar
- Agenda item C1 (eminent domain settlement with Fishhawk Ranch CDD 4 for the South Hillsborough Pipeline Project) was deferred because several conditions for the easements were modified after the agenda packet was published. The primary settlement amount was unaffected. The item will be brought back at a future meeting.
- The remaining consent agenda items were approved unanimously.
Public Comments & Testimony
- David Geddes Jr. spoke about alleged deceptive practices related to reclaimed water variances. He claimed that the variance grants development rights, permits entry onto properties, and infringes on constitutional rights. He referenced multiple statutes, ordinances, and historical documents. The speaker did not represent a specific organization.
Discussion Items
- General Manager's Report (V1): Chuck Carden and Warren provided a drought update. June rainfall averaged just over 3 inches (normal 8). The Hillsborough River flow in July is the fourth lowest in 50 years. The regional reservoir is at 2.12 billion gallons (13.5% capacity). For the first time since October 2025, water was being harvested into the reservoir at 47 million gallons per day from the Alifia River (17 million to reservoir). Water use is 207.9 million gallons per day, 4% higher than last year. Phase 3 water restrictions remain through October 1. The East Pasco Well Field test well reached 2,850 feet. Legislative updates: $500,000 state funding for SCADA; $100 million authorization in WRDA; three community project funding requests totaling ~$2.1 million. Commissioner Wastel discussed data center water use; Warren explained that the water management district now requires permitting for data centers. Commissioner Eggers emphasized the need for a second reservoir; three feasibility studies are underway (expansion at current site, Lake Tarpon, Little Manatee River).
- C2: South Hillsborough Well Field Land Exchange and Easement Agreement with Hillsborough County: Maribel Medina presented an interlocal agreement to exchange Tampa Bay Water's water supply development rights at the Lower Green Swamp Preserve for approximately 5 acres of easements within the Stacy R. White Nature Preserve at no cost, plus acquisition of 4.7 acres of utility corridor easements for $66,000. The well field will include eight production wells; one already exists. The agreement was approved unanimously.
- C3: Supplemental Bond Resolution 2026-002: Christina Sacket, with PFM Financial Advisors and bond counsel, presented the issuance of $292 million in new money bonds (2026A) to fund capital projects, and refunding of 2016A bonds (2026B) for savings. Parameters: 2026A up to $325 million, true interest cost ≤5.5%, final maturity 2056; 2026B up to $100 million, true interest cost ≤4.5%, present value savings ≥3% of refunded amount. The refunding is expected to produce ~$7.8 million in net present value savings. The resolution was approved unanimously.
- D1: Member Government Report from the City of New Port Richey: Colin Eichenmuller presented updates on the city's potable water (5.6 MGD avg), sanitary sewer (5.5 MGD), and reclaimed water systems (5-5.5 MGD). Key projects: West Grand neighborhood utility upgrades, smart meter replacement, reclaim system expansion needs assessment, and wastewater treatment plant improvements (Schreiber tank conversion, aeration refurbishment). No action required.
- D2: 2045 System Hydraulic and Emergency Scenario Analysis: Eliana Lara presented findings from a comprehensive evaluation. Eight hydraulic capacity improvement concepts were identified; recommended: Cypress Creek Repump mode, Morris Bridge pump station upgrades, adding pumps at Lake Bridge Booster Station. Other concepts were deferred. Emergency scenarios: 20 analyzed, 8 critical outages identified; recommendations include developing emergency operating procedures and improving interconnections. Power outage analysis showed backup power deficits for 2045; recommendations include remote monitoring, increased generator capacity, and coordination with electric utilities. No action required.
- D3: Construction Status Update on South Hillsborough Pipeline and Surface Water Treatment Plant Expansion: Danielle Kercy reported the pipeline is 5% complete (20% of budget spent), and the surface water plant expansion is 6% complete (17% of budget spent). A 48-inch pipe was successfully pulled under Little Fishhawk Creek. Complaints are tracked via a stakeholder database. Commissioner Wastel requested that the project team email be provided to all Hillsborough County commissioners for efficient complaint tracking.
Key Outcomes
- Agenda item C1 deferred to a future meeting.
- Consent agenda (excluding C1) approved unanimously.
- C2 (South Hillsborough Well Field Land Exchange) approved unanimously.
- C3 (Bond Resolution 2026-002) approved unanimously.
- Receive and file of administrative items approved unanimously.
- No other formal votes taken.
Meeting Transcript
Good morning, everyone, and welcome to the July 20th, 2026 regular board meeting of Tampa Bay Water. This meeting was noticed in the Florida Administrative Register and on the Tampa Bay Water website. The meeting is available for viewing through live stream, and a recording of the meeting will be posted on the agency's website. Today we are going to begin using a new feature that allows board members to request to speak and to make motions and seconds using their tablets rather than speaking out. We expect the change to improve accuracy and clarity as it will be difficult as difficult sometimes to hear across the dais. So, board members, as we move through the meeting, please use your tablets for these functions. We appreciate everyone's patience. I'm sure it's gonna take a little bit to get adjusted to, but I believe that you will see the ability to make the motion come up when the time is right. Okay. And with that being said, um, our vice chair is out today, and so Commissioner Cohen was going to lead us in the Pledge of Allegiance. Commissioner Collins. I pledge allegiance to the flag of the United States of America and to the Republic for which it stands. One nation under Godissi with liberty and justice for all. Thank you. Clerk, you please read the names of the board members to determine if there is a quorum. Commissioner Cohen? Here. Mayor Davis. Here. Commissioner Eggers. Here. Councilman Miranda. Here. Commissioner Oakley? Here. Commissioner Peters. Commissioner Wistol. Here. Vice Chair Waitemann. Chair Hanowitz. Here. Madam Quormus Present. Thank you so much, Clerk. Okay, now we open up our regular meeting. Are there any changes to the agenda? Yes, uh, good morning, Madam Chair, members of the board. Um we're requesting to defer agenda item C1. Um, this is the eminent domain settlement with Fishhawk Ranch CDD 4 for the South Hillsborough Pipeline Project. While the primary terms of the settlement, i.e. the um the amount is not affected at all. Uh we did receive wordly yesterday that several of the conditions for these easements um have been modified in the final settlement, and they're different from what was presented in the agenda packet. So we intend to bring this back at a you know upcoming meeting, but we're in defer for today, so you have the accurate information in front of you. Okay, well, thank you. This moment we move on to public comment. Each speaker will have three minutes to speak. I have a card for David Geddes Jr. Hi, good morning. David Ballard Geddes Jr. I live on Georgia Avenue in Palm Harbor. Let's say, for instance, that I went door to door in every neighborhood in the county, and I deceived all the residents into signing the reclaimed water variants application, which in effect grants me development rights throughout the residents' entire parcel of property.