0:01Alright, well, good morning.
0:03Uh we'll get started.
0:04My name is Andrew Merkley.
0:05I'm the director of the Office of Public Health and Safety.
0:08Welcome to the March 4th, 2026 meeting of the Board of Public Health and Safety.
0:13Abby, can you please uh call the roll?
0:20Leave President Webster.
0:22All right, we have four.
0:24Has everyone had an opportunity to review the minutes from last from the last meeting?
0:29Any uh discussion changes that need to be made.
0:33Hearing none, I'll entertain a motion to adopt the minutes from last from the last meeting.
0:43Motion has been moved and seconded.
0:47Hearing none, the motion passes.
0:49We'll get started with the first item 030426A, which is MES service company LLC.
0:59Indianapolis Fire Department.
1:05Good morning, Lauren.
1:09I'm at the Indianapolis Fire Department.
1:10I'm the purchasing manager.
1:12And I brought our uh chief of our air management, Corey Jones.
1:26That's what I call them.
1:31So uh we are asking the board to um approve a con a um us the purchase equipment from a cooperative agreement through Sourcewell through MES uh for SCBA equipment.
1:45Um Corey can go more into what that equipment is used for.
1:49So good morning once again, everybody.
1:54Um V is currently um outfitted with Briam Scott X3 Pro SCBA Snapchange.
2:04Um this piece of equipment here is designed with uh intrinsic safety um in order to prevent electrical components from igniting in hazardous um environments.
2:15Um our SBA has four different components.
2:19We have our mask here, which everybody wears when it's on their face, which we test annually, all firefighters tested this annually for a perfect fit in their mask when they go into hazardous materials.
2:30I mean hazardous environments.
2:33Next is our regulator here.
2:36This is what actually delivers the air from the cylinder into the mask, and it creates positive pressure inside the mask, which prevents if the seal is broke in the mask, the positive pressure keeps the toxin air out of the mask.
2:53The component is the cylinder.
2:56We have a 5500 psi cylinder, um, which provides a little bit longer work time in those environments when we're inside.
3:04Um this cylinder here is a snap change, if you guys can see here at the bottom.
3:13And the snap change is for an easy change on the fire ground.
3:17Where we're on the fire ground.
3:19If we want to change the bottles, we just snap it out, put another bottle, and you go back into your work environment.
3:25Um the pack itself here, this is pretty much what we are paying for here as far as the pack.
3:33Um this pack right here has two pressure redundant um reducers.
3:39So this right here, which we call the pressure reducer, reduces this air down to enough to it gets to about 135 PSI when it gets to the cylinder, and about time you take your breath in there to activate that, it's less than one percent.
3:56I mean less than one PSI, probably about 0.036 in your mask, and that's what produces the positive pressure of the air package.
4:05So with that, all four components with the intrinsic safety on there that meets all NFPA and NIASH guidelines.
4:29Well, it's what they call um it's a it's a redundant pressure reducer.
4:35So the primary is when you first take your breath, you breathe this pack down to about one-third.
4:42Once you get to one third of 5500 PSI, the viber alarm goes off, and that lets you know you have one third left of that cylinder to egress to get out of that environment.
4:53So that's which which is it that you're you're purchasing like for example, you're not purchasing the air tickets, you're seeing that equipment piece, like the part you put on your back.
5:02Yes, so it's the whole it's the whole ensemble.
5:04So you need you need all pieces, if I'm understanding you correctly in order.
5:09This contract's just for the packs themselves, so right, the masks and the bottles are purchased separately in the regular.
5:17So the mask and the bottles are separate.
5:21So if you buy the SEBA pack itself, that comes with that comes with regulator.
5:30And 700,000 over two years will allow us to purchase how many of these devices.
5:41So this ensemble, so let's say that we're purchasing just the pack itself.
5:46The pack itself is roughly 11,000 for the pack.
5:51Um the regulator, which you know, we purchase sometimes individually, depending upon the situation.
5:58Um, if we have to replace a regulator that's damaged or does not meet the standards as far as testing standards, then the regulator is about $2,100 a month.
6:08Umce we buy the pack, usually we outfit everybody in the department with a single regulator.
6:14So at that point in time, this cost would go outside of the total purchase of the pack.
6:25We will buy masks and regulators.
6:28Let's say we have a recruit class, we have a recruit class going on right now.
6:31At the beginning of each recruit class, all recruits receive a mask and a regulator.
6:36We already have the pack ready for them to go, which we are repurchased.
6:40But let's say a pack goes down, let's say we have to purchase another pack, then each pack is about 11,000 to purchase per pack.
6:51Now, if we add the cylinder in there, we talk about another $2100 for said cylinder.
6:58How often you have to replace the packs?
7:00Our packs right here.
7:02We we have we have not replaced um our packs.
7:05Um as far as outside of just repairing the packs.
7:13I mean the packs NFPA recommends every 15 years, you know, for the replacement of the pack.
7:19Um, but depending upon the use that we have, I mean, that could be less, you know, than the 15 years, depending upon where the pack is located, depending upon how you know how much action, if you will, the pack has received within that lifetime.
7:36Any additional questions?
7:41Still kind of didn't get my question answered.
7:45How many of these do?
7:48So we got 700,000 over two years.
7:51That's $350,000 a year.
7:55How many people can be outfitted with $350,000 in one year with this with this equipment for this contract?
8:09Uh if I'm not mistaken, I think what what this contract buys is simply the packs, right?
8:17The bottles, the the masks and the and the regulators are are purchased separately.
8:24You need the fewest packs, you need probably next most, you need bottles, and then the most you need face pieces and regulators, so they don't come as one.
8:33I'm I'm clear on that.
8:34I'm just want to get to a $350,000 gets us how many pieces of equipment or I'm sorry.
8:44So with that, um, if we're just buying the pack itself, um, you know, that would be you know, based upon which packs go down, which packs that we need.
8:56So this is a as needed, like you're not gonna do that.
8:58This is the this is a as needed as we're going forward.
9:03We don't know what that would be.
9:05But you do know that you have a recruit class or drop down.
9:08We have a recruit class.
9:08And how many is in that recruit class?
9:10Uh we have about 65, 67 within there.
9:14You know, will that take up the 700?
9:16No, that would not take up the 700.
9:18With that, that's roughly 179,000 as of now.
9:23That price can be different next year.
9:25You know, as you go up.
9:27Two years would probably cover most of that cost.
9:29The rest of it is we don't we don't know going forward.
9:32That's all the 700 is more of like the actual cushion.
9:38Because I'm also gonna say I'm assuming next year, if you're taking a recruit class this year, you're probably not gonna take one next year.
9:44We have one next year as well, too.
9:46But then that it would also open up the next cat amount, I guess, so then you would still uh and uh I would assume over the course of any given year, sometimes a pack becomes unrepairable or has to be replaced.
10:00The merger the wine merger.
10:01The merger we are um as far as the Wayne Township merger is coming on, we will be um on boarding more equipment, um more um patch that we need to repair.
10:19Um that will cover that as well, too.
10:21If set pack goes down as of now, I mean if the merger happens, we don't know what the condition of air packs are, their equipment is going forward.
10:31We we just we just don't know that that part of it.
10:34So that makes perfect sense.
10:40All right, any further discussion?
10:44Hearing none, I'll entertain a motion to adopt 030426A.
10:49So moved item has been moved and seconded.
10:55Hearing none of the processes.
11:00All right, next item on the agenda 030426B.
11:06I'm staying up here for some right.
11:32Um, I have our chief of logistics, Mike Tiern in here to discuss our um purchasing of a chiller um at IFD headquarters uh through the again through the Source Well agreement with Johnson Controls and Incorporate it.
11:47Um sorry no, no, no, I don't know.
11:50Okay, so basically, when IFD changed headquarters uh to its current location at 955 Fort Wayne Avenue, um it was the old uh Red Cross building, and people who are a lot smarter than I am in the HVAC systems explained to me this way it's set up in a dual zone.
12:09One of the zones was updated, one of the zones is antiquated.
12:16Uh the antiquated and they run off of a computer system, and they explained it to me like the antiquated system is like run off like a MS DOS-based, and the updated one is like a Windows 13.
12:29So the issue is they only the people that service our HVAC system have one computer that hasn't been upgraded through the Windows Upgrade Systems that is able to talk to the control system to help regulate the HVAC system.
12:44So what we're asking is to kind of bring up our HVAC system to current standards because over the past since I've been in my position, we've had Johnson controls come out there and service it frequently.
12:57We're putting band-aids on an issue, uh, and no one wants to work in in Indianapolis in the summer without air conditioning.
13:04So that's basically where we're at now is we're just kicking the can down the road, and until we really address the situation of upgrading our HVAC system, um we're at the mercy of uh when when not if the equipment fails.
13:22Questions is this chiller the band aid or the stop and other kicking?
13:26This is this is uh bringing uh new chiller, um, which to me is an air conditioner, but bringing the the air conditioner up to current standards, as and when I say standards, uh I mean as far as like the operating system, and it also brings the controls up to I'll say like the Windows 11 version instead of the Windows 3 version.
13:48So it's not the right terminology, but that's how my mind can kind of understand exactly what's needed.
13:54I I have two questions.
13:56One, you said, for example, there's it's two sides.
13:58I understand you probably made improvements like before you guys acquired this base.
14:02So one is this um upgrade for the entire buildings, yeah.
14:05Both sides will receive the update.
14:08Two, is this a physical equipment upgrade and a computer upgrade?
14:11Like you're upgrading the ventilation systems and the uh obviously the chiller, right?
14:15I understand the physical chillers being required, but I mean are you up to or is it just the chiller and the computer system?
14:21So it's the chiller and the computer systems itself.
14:23So this past year we had our our ductwork cleaned because we anticipated um upgrading the equipment, knowing that well, let's let's get them cleaned.
14:33Maybe that'll help push the airflow a little bit better, get a a little bit more circulation.
14:38Uh again, band-aid but appropriate um for the time.
14:42So this would upgrade the physical air conditioner as well as the electronic controls for both zones.
14:54For the discussion, seems like a pretty reasonable number for such a substantial fix.
15:00I was actually expecting a higher number.
15:02Yeah, I would have expected much earlier than we did not go with the Cadillac, we went with what's going to work.
15:09So this is more the Chevy Avalanche version.
15:12Uh I would try, you know, we do try and be stewards with uh the people's money, not just all the bells and whistles.
15:18So gets the job done and it's gonna keep everyone happy.
15:23Will this get Harmon to stop complaining?
15:25No, it will absolutely not.
15:27How long will it take to actually install the new system?
15:31I don't have that information, but I can probably ask Dave.
15:35I'm guessing Johnson controls is they're pretty responsive.
15:38They're the ones that have worked on it before.
15:40So once once and if we get approval, um our goal is to get it started before the heat turns on.
15:48Um so I'm gonna say ball part figure, probably three weeks.
15:54Oh, that's wonderful.
16:01Any further discussion questions?
16:03Hearing none, uh I'll entertain the motion to adopt 030426b.
16:12Motion has been moved and seconded.
16:16Hearing none, the motion passes.
16:22Item number 030426C is next on the agenda.
16:27Hearing from Indianapolis Fire Department.
16:29Uh so we're we are asking the board to um to approve the uh NTE increase of the fire boots.
16:37Um sorry, fire gear.
16:38Uh we came to the board last January, I believe, um, to get the contracts in place, and I think in December of 2024, we were asked to put an NTE on it.
16:49We came back the second time in 25 to with that NTE, which is 150,000.
16:54Um, according to our quartermaster, um I'm not sure what the number was with the numbers there, but we needed more money than that on our fire contract.
17:04Um, so I have it here that if we're increasing it from 150,000 to 600,000, um, that should be able to get us through um the year the length of the contract.
17:20What is the budget contract?
17:21Um, it expires in 27.
17:26So roughly two million years.
17:29But one more year by increasing it 150 to 600, which is four times the amount.
17:36Have you already exceeded the initial one fifty then?
17:40It wasn't, I don't know.
17:42We were we're right at that threshold.
17:45So if we we'll say we doubled it uh for the up until the next, so we're looking at three to four hundred thousand.
17:52We just didn't want to be in the same predicament that we are now, and asking for smaller increases, and then knowing the unknown or the future of any sort of uh consolidation.
18:04Um we wanted to kind of forecast out what an uh anticipatory uh anticipation cost might be if there are any mergers.
18:16So that's that's kind of where we are.
18:19It's not to buy all the sets of gear, it's all the replacement parts which wear out uh much more frequently.
18:26Yeah, I I get the anticipation of the merger.
18:28Just to be clear, so the original almost 150, this is a two-year contract, right?
18:33We're already through the first year of the contract, we're still under 150 we're right.
18:38We're at the cusp of it.
18:40And so at this time, you anticipate it spending in the next 365 days, potentially 450,000 on equipment.
18:48What we don't want to do is ask for 300 and then spend 304,000 and get stuck.
18:54So even though we're not going to be able to do that.
18:57Even though we we don't want to budget, we we don't have 600,000 for our budget.
19:02We're asking for an inflated number so we don't even have to get to that threshold.
19:06And if we stay as we are with the members of IFD, we'll be well within that 600.
19:13And if we increase the membership, we'll still be well within that 600.
19:16So depending upon what happens in the next year, we would definitely be within the 600.
19:24Is it 600 uh feasible budget-wise for IFD?
19:29Understanding next year's budget, obviously has nothing.
19:33So if if you take into account what we spent uh last year with anticipated cost this year, uh 600 would be a stretch if we had to spend that much, but you know, ultimately, if we get some horrific events and the gear is unsolvable, then we still have to provide the gear.
19:52So this gives us a cushion uh to at least have the contract in place in case that emergency arises.
20:00Yes, personnel are added.
20:09Any other questions?
20:11Again, though, this is just as an as needed basis.
20:14So you you haven't sent a contractor this much money.
20:16You'll say, oh, if I need this part, this part, you pay them invoicing it as it goes along.
20:21Yes, but just like the SCPA, yes, ma'am.
20:34Do I knew okay I'm looking for the pricey, but I found it.
20:39Uh if there's no further discussion, um we'll I'll entertain a motion to adopt 030426C.
20:51Motion has been moved and seconded.
20:56Hearing none, the motion passes.
20:57Thank you very much.
21:02That is the aside from signing this document.
21:07That is the last item on our agenda.
21:09Um we are all in agreement.
21:13We can go ahead and pass this around for our signatures, and then we will adjourn after that.
21:18Abby, do you have a this is the weekend to clean up the line from last week to go?
21:27I was like, actually, that one's a little finicky right now.
21:29So if that one doesn't work, these are well.
21:33We have a lot of time in circulation right now.
21:35So the dying out of means are like I needed a breather, so I was hoping, but okay.
21:42We'll try the other one.
21:44I almost always have a run with me.
22:09I'll let you make that correction.
22:20I guess I should read for the record.
22:22Uh to get this on record, this is the resolution from our last meeting approving and authorizing the city of Indianapolis to grant a temporary easement and permanent right-of-way from the parcel of land located at 1715 East Washington Street to the Indianapolis Public Transportation Corporation doing business as indie go.
22:43Uh and so there were some technical corrections we were making to this resolution.
22:47All right, I corrected that.
22:58Yeah, that's a nice jacket.
23:10You got to guess 600,000.
23:14Sneak six jackets in there.
23:36All right, with all of your signatures, I think uh we we have no other items on the agenda, so we are okay to adjourn.
23:43All right, thank you.