Metropolitan Area Planning Commission Meeting - September 9, 2025
STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE
Metropolitan Area Planning Commission Meeting - September 9, 2025
The Metropolitan Area Planning Commission (MAPC) met on Tuesday, September 9, 2025, at 5:30 PM at the Municipal Center in Jonesboro, Arkansas. The meeting included approval of previous minutes, a site plan for a U Storage facility, a withdrawn preliminary plat, a preliminary plat for Southern Oaks Phase II, and staff introductions of new planners.
Approval of Minutes
- The minutes from the August 26, 2025 MAPC meeting were approved unanimously. (Note: The transcript erroneously referenced an 'August 2026 meeting'; the correct date per the agenda is August 26, 2025.)
Discussion Items
-
SP-25-05 Site Plan: U Storage Facility, Elmhurst Drive – Bear Davidson of Davidson Engineering presented on behalf of the applicant. He described changes made since previous meetings: the building footprint was reduced from over 100,000 to 60,000 square feet; all overhead doors were removed from exterior walls (now interior-loaded, climate-controlled units); landscaping was added on all perimeters; and a sidewalk was added around the entire building. Davidson noted the project now falls below the 75,000 sq ft threshold for large-scale development but was voluntarily brought before the commission to address prior concerns. Commissioner Ford raised safety concerns about left turns from Elmhurst Drive onto Parker Road, suggesting traffic be directed to use the new street and Harrisburg Road. Staff noted that a traffic study for the subdivision did not require improvements. It was mentioned that Parker Road is state-controlled and has a no-left-turn sign from Parker onto Elmhurst, but the concern was turning left out of Elmhurst onto Parker. Staff agreed to bring the suggestion for a no-left-turn restriction to the Traffic Control Committee meeting on Friday, September 12. The motion to approve the site plan carried unanimously.
-
PP-25-08 Final Plat: Cook Minor Plat at Richardson Dr. and Limestone Dr. – This item was withdrawn prior to the meeting.
-
PP-25-09 Preliminary Plat: Southern Oaks Subdivision Phase II – Sam Doss of Fisher Arnold presented the request, which originally included two lots (north and south sections). The main issue is a 658-foot stretch along Southern Frontier Drive requiring a traffic calming device. The developer plans to revise plans with either a necked-down curb or a raised intersection. City staff confirmed the plat meets subdivision ordinance requirements and recommended approval. Commissioners requested that the traffic calming plan be included on the final plat. The motion to approve the preliminary plat passed unanimously.
Staff Comments
- City planner Michael Smith introduced two new planners: Charity (taking over the commissioner's role) and Anek (senior planner handling BZA, land bank, and addressing requirements).
Key Outcomes
- Approved: SP-25-05 Site Plan for U Storage Facility (unanimous).
- Withdrawn: PP-25-08 Final Plat for Cook Minor Plat.
- Approved: PP-25-09 Preliminary Plat for Southern Oaks Phase II (unanimous), with the condition that a traffic calming device plan be included on the final submission.
Meeting Transcript
Good evening, everyone. Welcome to the Metropolitan Area Planning Commission meeting for the for Tuesday, September 9th, 2025. I'll take row now. If you're here, press your I button. You ready? No, I'm here. We do have a quorum. We'll proceed. I'll open up for the discussion of the minutes from the August 2026 meeting. Are there any changes to be made? Submitted. Motion to hear a second. That motion and a second. Everybody pressure. Everybody in favor, press aye. Now minutes are approved. First item we have on the agenda. This is the uh site plan consideration for use storage facility at Elmhurst Drive. So this item, if you want to come up, yes, sir. State your name for the record and give us a little history about what we're doing. Yes, sir. Bear Davidson with Davidson Engine with Davidson Engineering. I'm here on behalf of the applicant. This is a project you all are familiar with. Uh we've been before you a number of times, first with the conditional use and then with the large scale submittal most recently. Um at that last iteration, there were a number of comments from you all. Um there are a few I'd like to address directly, and then I'll be quiet and let you ask questions. Um as you know, this building was uh much larger the last time you saw it, uh closer to or over a hundred thousand square feet, so we reduced that footprint to sixty thousand square feet. Uh concerns that were voiced at the last meeting were the exterior overhead doors. Um Mr. Smith, I believe has in your packet and may be able to pull up some renderings that will show and reflect the new floor plan, which has no exterior doors on any of the exterior walls. So all of these units are interior loaded climate controlled units. Um that picture in the top left of this plan sheet, you can see has a retail look for the front of the building. Um visibility of the northern wall from a future roadway was discussed at that last meeting, and as you can see in our submittal that northern perimeter and all of the perimeters are heavily landscaped. Question was also brought up about an exterior sidewalk around the entirety of the perimeter of the building. In this most recent submittal, uh, you'll see that's the case. We've added a sidewalk on all four sides of the structure. So I believe we we've our goal has been to address all comments that have come up. I believe we've done so. Um also would like to mention we we now actually fall under the threshold for a large scale development. Uh we're not over 75,000 square feet, but because this had been before you before and in good faith, we wanted to submit it to you all for consideration, even though we're under the threshold that would be required to come before you as a large scale development. Now why'd you add that part? Just curious. Uh well, just to show that our goal and my developer, my client's goal from the get-go has been to uh present this in a manner that the city would feel confident and comfortable in that it'll be a good development. And so I just wanted to point out that if that wasn't their MO, if they were just in it to try to ram through whatever they could, they would have we we would have submitted this differently, but in an effort to work closely with Mr. Smith and his team and the staff, we submitted it. And we requested to see it again. I think that's the case. Right. We did.