All right, we will call committee of the whole to order.

0:07

First, I will move to approve the minutes of the February 9th Community of the Whole without necessity of reading.

0:13

Second.

0:14

Motion has been made and seconded.

0:15

Any discussion?

0:17

Hearing none.

0:18

All those in favor?

0:19

Aye.

0:19

Aye.

0:20

And that motion passes.

0:22

Okay.

0:22

So tonight, um, our main objectives uh for this evening, we have all of the uh bond notes legislation.

0:33

Um that you know the finance department in our bond council has um asked the uh whichever whatever we're adopting, then we get it done by the next full council meeting, which is uh our next meeting in March, which means we need to get it out of committee of the whole uh tonight.

0:50

So that's our main uh work tonight.

0:54

So on the docket we have all of the bond legislation.

0:57

Um and then we also uh will be getting a presentation um planning, obviously.

1:04

Uh so what I want to make sure we do is save some time.

1:09

Um director Boss, how long do you think your presentation is?

1:15

Uh I'm gonna try to keep it at like 10, 15 minutes or less.

1:19

Okay, that's great.

1:20

Okay, so that that'll give us time um deliberate about the ordinances as well as um if anyone has questions about any of the other bonds uh ordinances besides the city hall stuff.

1:33

Okay, so with that, I will turn it over, I'm assuming, to the director boss.

2:01

Madam President, members of the council, thank you again.

2:04

Allow me to come uh for you and walk you through what I've got and what you've got in front of you is really just um slides 13, 14, and 15.

2:15

Um that if it's okay, I'm just gonna jump to here.

2:33

So if you remember from last time we left off at this slide, this slide twelve.

2:38

It's just kind of the basic analysis of alternatives, eliminating status quo option one and option three with the community health center.

2:46

Um so it really leaves us down to uh option two and option three.

2:51

So what I wanted to do was hopefully just recap some things, provide some additional perspective, um, and then stop talking and let answer questions and and and further deliberate.

3:05

Um again, this is a broad, high-level scope kind of view at it, and it's really it's a view to what's the end?

3:12

What's the end state that we're shooting towards?

3:15

There are lots of ways that you can get here and we can talk about all those different ways of getting here, but ultimately what is the end state that that we're working towards?

3:25

Um slide 13.

3:30

And I'll just go kind of top to bottom down here.

3:33

Um I wanted to provide you the hard copies there because I know they can be hard to see on the screen.

3:40

Um so as we as we reviewed last week for priority one, which is providing the police and courts the increase of renovated space to meet their needs, both options work.

3:52

Um I think w one of the few uh the only change to the previous slides that I made was on the assumptions, and I added another assumption just based on our discussion last time and and uh further thought was that we talked about and I wanted to assume just in planning that the council offices currently on the first floor in that lobby, they they do need to move in order to create the space for that lobby.

4:18

Now they can stay in this building, they could move to another building.

4:21

That's all part of the plan, the planning process, but I I added that to an assumption.

4:25

Um but for priority two, looking at that, you know, while achieving party one consolidating and improving the functionality of the administrative departments.

4:35

I'll just walk down kind of through the criteria there from top to bottom.

4:39

Um so we talked about departmental location and functional space.

4:44

Um and I know that there's concern about the additional space in the Board of Ed building under option three versus the kind of flex space under option two.

4:54

Um that that additional space, that flexibility, I view that as an advantage of that option.

5:03

There are and there will be, regardless of the direction that you go, you know, the Weber Murphy Fox uh space study, it was a snapshot in time.

5:16

So any design effort, once you actually get into the detailed architectural design effort of trying to determine space requirements and things, you need that inherent flexibility and adaptability to go back through each department, talk to the new people.

5:32

Some departments have gotten bigger, like ours, some departments have stayed the same.

5:37

But it's going to be an another rebaseline of functional space requirements.

5:42

Now, in the assumption I provided kind of that minimum for the administration of just to allow us to kind of objectively look at each of these options.

5:51

So but that may be that may flex up, it may flex down.

5:55

I have a feeling it's going to flex up just when you start thinking about things.

5:59

And the other thing that was not included in that fit in any of those fit studies was storage space.

6:05

There was no IT space in the new, you know, in either new building.

6:09

Um then there's the uh there's the decision that has to be made about where is council offices and the auditorium going to be.

6:18

So in my view, looking at this, flex space is an advantage.

6:23

And having more space is an advantage.

6:27

When you look at option two, it is more limited because obviously if you want to include more space, you have to create a larger addition on the front of the building.

6:38

How large that is, I can't tell you.

6:42

I will show you a guesstimate here in a little bit of what uh just one kind of in terms of looking at cost, uh, a size that you know that might be within that range.

6:54

But just staying within the option two right now, you're locked into not a lot of adaptability with the administration all on the third floor, um, and any changes that you make to that to try to accommodate any design flexibility or things that come up in that design process is going to take away from police and further complicate that design effort of having the administration maybe not on the third floor, maybe it's on the third and the second floor.

Discussion Breakdown — Share of Meeting
Engineering And Infrastructure█████████████████████████████████████████████51%
Procedural███████████13%
Fiscal Sustainability███████████12%
Parking Management█████████10%
Budget Equity Analysis█████6%
Public Safety██2%
Accessibility██2%
Personnel Matters██2%
Public Engagement██2%
Summary of Proceedings

Lakewood Committee of the Whole Meeting – February 23, 2026

The Committee of the Whole met on Monday, February 23, 2026 at 6:00 p.m. in the City Hall Auditorium to discuss City Hall space options and multiple bond ordinances. The main focus was a presentation by Assistant Director Boss comparing two primary alternatives (Option 2 – renovate/add at current City Hall, and Option 3 – relocate administrative functions to the former Board of Education building at 1470 Warren Road). Following extensive deliberation, the committee advanced several bond ordinances to full council, but removed $16.5 million from Ordinance 07-2026 (facilities improvement notes) pending further direction on the City Hall relocation decision.

Discussion Items

  • City Hall Space Alternatives Analysis: Assistant Director Boss presented a high-level comparison of Option 2 (renovate current City Hall with a 5,400 sq. ft. addition; estimated $25.5–30.9 million) and Option 3 (renovate Warren Road building for administrative offices and convert existing City Hall into a Justice Center; estimated $31.8–39.7 million). A larger addition (Option 2A) was also roughly estimated at $32–39 million. Key criteria included parking, functional space, operational efficiency, and timeline (8 months design, 2–3 years construction).
  • Parking Concerns: Councilmember Evans and others raised concerns that allocating downtown parking lots to City Hall employees could conflict with retail/commercial parking needs. Option 3 was argued to have better area parking due to proximity to multiple city-owned lots within 1,000 feet.
  • Employee Feedback & Flexibility: Councilmember Strebig questioned whether the assumed administrative space (18,308 sq. ft. in Warren Road) is adequate. Assistant Director Boss noted that 17,000 sq. ft. of “flex space” would be available for storage, IT, and future growth, while Councilmember Baker questioned whether that much extra space is needed given trends toward reduced office footprints.
  • Phasing vs. Full Relocation: Councilmember Bullock and Baker advocated for studying phased renovations on the current campus before committing to the Warren Road option. Chief Story stated that the police renovation is the top priority, and that any design funds are needed urgently.
  • Bond Ordinances: Council considered nine bond ordinances (06-2026 through 14-2026). Ordinance 07-2026 originally included $18.3 million for facility improvements, of which $16.5 million was earmarked for City Hall/Warren Road renovations. Council substituted a version removing that $16.5 million, with the understanding that up to $4 million could be proposed later for immediate police/fire renovation design and construction.
  • Appropriations Ordinance (33-2025B): The committee amended the 2026 permanent appropriations to remove $16.5 million from the Capital Improvement Fund, and added whereas clauses consistent with prior resolution language.

Key Outcomes

  • Ordinance 07-2026 (City Facilities Improvements): Committee adopted a substitute removing the $16.5 million City Hall/Warren Road component. The amended ordinance was referred favorably to full council.
  • Other Bond Ordinances (06, 08, 09, 10, 11, 12, 13, 14) : All referred favorably to full council without change.
  • Ordinance 33-2025B (Permanent Appropriations): Amended to subtract $16.5 million from the Capital Improvement Fund and referred favorably to full council. The amendment included the possibility of adding up to $4 million for police/fire design and construction at the full council meeting.
  • Next Steps: Council will consider the legislation at the next full council meeting (likely March 2026). A working group may be formed to continue studying the long-term City Hall space plan, with design work for priority police renovations expected to begin as soon as funding is approved.

Meeting Transcript

All right, we will call committee of the whole to order. First, I will move to approve the minutes of the February 9th Community of the Whole without necessity of reading. Second. Motion has been made and seconded. Any discussion? Hearing none. All those in favor? Aye. Aye. And that motion passes. Okay. So tonight, um, our main objectives uh for this evening, we have all of the uh bond notes legislation. Um that you know the finance department in our bond council has um asked the uh whichever whatever we're adopting, then we get it done by the next full council meeting, which is uh our next meeting in March, which means we need to get it out of committee of the whole uh tonight. So that's our main uh work tonight. So on the docket we have all of the bond legislation. Um and then we also uh will be getting a presentation um planning, obviously. Uh so what I want to make sure we do is save some time. Um director Boss, how long do you think your presentation is? Uh I'm gonna try to keep it at like 10, 15 minutes or less. Okay, that's great. Okay, so that that'll give us time um deliberate about the ordinances as well as um if anyone has questions about any of the other bonds uh ordinances besides the city hall stuff. Okay, so with that, I will turn it over, I'm assuming, to the director boss. Madam President, members of the council, thank you again. Allow me to come uh for you and walk you through what I've got and what you've got in front of you is really just um slides 13, 14, and 15. Um that if it's okay, I'm just gonna jump to here. So if you remember from last time we left off at this slide, this slide twelve. It's just kind of the basic analysis of alternatives, eliminating status quo option one and option three with the community health center. Um so it really leaves us down to uh option two and option three. So what I wanted to do was hopefully just recap some things, provide some additional perspective, um, and then stop talking and let answer questions and and and further deliberate. Um again, this is a broad, high-level scope kind of view at it, and it's really it's a view to what's the end? What's the end state that we're shooting towards? There are lots of ways that you can get here and we can talk about all those different ways of getting here, but ultimately what is the end state that that we're working towards? Um slide 13. And I'll just go kind of top to bottom down here. Um I wanted to provide you the hard copies there because I know they can be hard to see on the screen. Um so as we as we reviewed last week for priority one, which is providing the police and courts the increase of renovated space to meet their needs, both options work. Um I think w one of the few uh the only change to the previous slides that I made was on the assumptions, and I added another assumption just based on our discussion last time and and uh further thought was that we talked about and I wanted to assume just in planning that the council offices currently on the first floor in that lobby, they they do need to move in order to create the space for that lobby. Now they can stay in this building, they could move to another building. That's all part of the plan, the planning process, but I I added that to an assumption. Um but for priority two, looking at that, you know, while achieving party one consolidating and improving the functionality of the administrative departments. I'll just walk down kind of through the criteria there from top to bottom. Um so we talked about departmental location and functional space. Um and I know that there's concern about the additional space in the Board of Ed building under option three versus the kind of flex space under option two. Um that that additional space, that flexibility, I view that as an advantage of that option. There are and there will be, regardless of the direction that you go, you know, the Weber Murphy Fox uh space study, it was a snapshot in time. So any design effort, once you actually get into the detailed architectural design effort of trying to determine space requirements and things, you need that inherent flexibility and adaptability to go back through each department, talk to the new people. Some departments have gotten bigger, like ours, some departments have stayed the same. But it's going to be an another rebaseline of functional space requirements. Now, in the assumption I provided kind of that minimum for the administration of just to allow us to kind of objectively look at each of these options. So but that may be that may flex up, it may flex down.