Speaker numbers apply only to this recording.
The Lee Planning Board held a special permit hearing on June 22, 2026, to consider an application to demolish the existing Pilgrim Inn (a 24-room motel) and construct a new 74–75 room Fairfield by Marriott hotel on a 3.1-acre split-zoned lot at 165 Pusatonic Street. The applicant requested multiple special permits including site plan approval in the CBC (Commercial Business District) zone, a permit to place parking in the R20 residential zone, a 50-foot extension of the CBC district, allowance for a four-story (50-foot) structure, and reconstruction of a non-conforming use. The hearing included extensive board questioning and public testimony. The board continued the hearing to July 13, 2026, to allow the applicant to respond to written questions and provide updated plans.
At this point, I'd like to open the special permit hearing for 165 Pusatonic Street. I'd like to let everyone know the format we'll be going with tonight. The applicants will give their presentation. The board will have we'll go through their questions, and we have written questions that we're going to submit to the applicants to take back and come back with answers. And after the board is done, it'll will be open to the public. Okay. All right, gentlemen, you're up. Thank you. Members of the board, my name is Jeff Lynch. I'm from Lynch Scrimo Attorneys. I represent the applicant. With me is Brian Sider from Foresight Engineering Services, who has put together the site plan and design paperwork for everyone's review. We are here to address 165 who's atonic street, the current location of the Pilgrim Inn. It's assessors map zero lot four. The applicant is proposing to remove the existing structures on the building and build a new hotel. The existing site is approximately three and a half acres. With the development as it sits right now, it is non-conforming. It's not conforming as to its use as a hotel and also in terms of the dimensional requirements. Because it's a split zone. Yeah. And the spec of the hotel is in our district. Correct. Correct. And thank you for pointing that out. This is a split zone. The majority of the lot is the CBC commercial business district zone, where the rear of the lot is the R20. And we'll be addressing that as one of our special permit requests also today. We're actually becoming more compliant with the zoning requirements of the town of Lee. The proposed new hotel will be constructed solely within the CBC district, with the uh parking area only impacting the residential zone. For uh setbacks, front, rear, and side setbacks. Um, we will also meet the height requirements and the lot coverage. Um, I want to start with the lot coverage requirement or allowance in the town of lee lot coverage of the board is aware is the amount of development that can impact the size of the lot. It is set at 35% of the required lot size. Once built, our hotel will only be 7. Uh 74% of the allowed area on this lot. Um, so arguably the town through its zoning ordinance would allow much or many more structures or a larger structure to occupy the space on the lot. Uh so we're well below that. Um, another thing to point out is that the lot is part of served by two curb cuts. We're proposing to eliminate one of the curb cuts that's consistent with one of the purposes and goals of your zoning ordinance, which is to uh minimize the entrances and exits onto who's atonic street. Um so we also feel that that is a benefit of for conventional district line. Okay, realign that sorry. I tracked that, but so we will still have the two, but um, but in any event, it's currently served by the two curve cuts. It will be realigned um with full traffic analysis being done uh by DMT because this is state highway also. So they'll have some jurisdictional input um onto safety and any additional requirements that they may want to impose relative to site line and traffic patterns, entrance entering and exiting the site. Uh