Leesburg Board of Architectural Review Work Session - March 2, 2026
Leesburg Board of Architectural Review Work Session - March 2, 2026
The Leesburg Board of Architectural Review (BAR) held a work session on Monday, March 2, 2026, at 7:00 PM in Council Chambers. The board addressed two deferred cases: rooftop mechanical equipment screening at 208 South King Street and the proposed Greenway Manor Theatre addition (Building C) at 1221 South King Street.
Consent Calendar
- Adoption of the meeting agenda was approved by a vote of 6-0-1 (one absence, Tom O'Neill).
- BAR member Rick Brown recused himself from TLHPBR2025-0061 (208 South King Street) due to a prior conversation with the applicant.
Public Comments & Testimony
- Robert Whiteman (resident of Greenway Farms, 312 Loftard Drive) expressed support for the design improvements but raised concerns about: (1) the lack of elevation views from the townhouse side, (2) potential noise issues from the theater affecting the established neighborhood (comparing to Wolf Trap), (3) whether the building includes appropriate sound abatement, and (4) the meaning of “appropriate” design changes and the scope creep (30%) from the original town council approval. He asked that the neighborhood be treated with the same consideration as the historic district. Staff noted that the square footage transfer from building D to building C was approved administratively by the Land Development Official; the appeal process would be researched.
Discussion Items
TLHPBR2025-0061 – 208 South King Street, Mechanical Equipment Screening
- Staff presented a proposal to screen rooftop mechanical equipment with black metal planter boxes matching existing ones on the hotel roof, each containing three arborvitae trees. The boxes would be located approximately two feet from the equipment.
- Staff found the solution acceptable per guidelines allowing plantings for screening. No public comment was offered.
- The board discussed and approved the plan, noting that the specific tree type need not be approved, only the concept.
TLHPBR2025-0081 – 1221 South King Street, Greenway Manor Theatre – Building C
- Staff and the applicant (Equip Studio architects Maddie Duncan and Tanner Sharp) presented revised designs for a 30,000-square-foot theater addition (up to 330 seats) to the historic bank barn.
- Key revisions from the January 21, 2026 submission included: reducing roof height from ~52 feet to ~49 feet; reducing square footage from ~28,700 to 28,200; simplifying roof sections from five to three; changing gable dormers to shed dormers; removing the wraparound porch and balcony; adding windows to break up mass; separating the addition from the existing barn’s southern wing; and screening mechanical equipment and loading dock on the west elevation.
- Staff analysis indicated that the revised design better meets historic district guidelines for massing, scale, and agrarian character. The east elevation was identified as the most sensitive, and the west elevation (facing the neighborhood) saw the most improvement.
- Board members commented elevation by elevation (east, north, south, west), generally praising the simplification and agrarian feel. Some minor concerns were raised: the chimney placement (Rick Brown suggested aligning it differently; Don Scheuerman noted functional flashing reasons), fenestration symmetry (Judd Futo noted a double-door/window mismatch on the north elevation), and the need for a cross-section to justify the roof height (requested by Julie Pastor and JP Andrew).
- The board reviewed applicable guidelines (deference, design, placement, orientation, size/subordination, fenestration, etc.) and reached consensus that massing and context are acceptable pending further detail.
- Outstanding items for the next submission include: window schedule and material cut sheets, a cross-section of the theater, fenestration symmetry study, information on the east wall restoration (structural study), and details on gutters, downspouts, and other cornice details.
Key Outcomes
- TLHPBR2025-0061 – Approved. Motion to approve the installation of planter boxes to screen rooftop mechanical equipment at 208 South King Street passed 5-0 (Rick Brown recused, Tom O'Neill absent).
- TLHPBR2025-0081 – Deferred to May 4, 2026 Work Session. The board voted 6-0 to defer the application and extend the critical action date to May 4, 2026. The applicant agreed to provide additional materials (window schedule, cross-section, material samples, east wall update) by the April 17, 2026 submission deadline.
- The public hearing for the theater case remains open until the next appearance.
- Staff announced upcoming events: Abingdon Preservation Day (save the date), Flower and Garden Show (April 18-19, booth pending approval), and the Boards and Commissions Networking Event (April 30 at Ida Lee).
Meeting Transcript
The meeting is called to order this evening. We have everyone here except for Tom. So you all know I'm Helen Aikman. I'm the chair this year. Julie Pasteur is our parliamentarian. We also have Rick Brown, Don Scheuerman, JP Andrew, and Judd Futo here this evening. Anyone have any comments about the agenda? And if not, could we have a motion to adopt the agenda, please? So moved. Okay. Any comments? No comments. All in favor? Aye. Aye. Aye. Opposed. The agenda is adopted by a vote of six to one. Six to zero to one, one absence being Tom O'Neill. Do we have any BAR member disclosures this evening? Okay. Go ahead, Rick. I will recuse myself from TLHPBR 2025-0061, as I have had a conversation with the applicant about a potential project. Thank you. No one else? Good. Um we have uh the agenda item for petitioners and presentations. This is an opportunity for anyone who's here to speak to the board about something that's not on the agenda. Umward and speak at this time. Is there anyone in that classification? No. Okay, thank you. Um we move on to discussion of deferred cases. The first item on the agenda this evening in that category is TLHPBR 2025-0061, 208 South King Street. Mechanical equipment screening. Okay. Thank you, Madam Chairman. I have very quickly tonight. Applicant was not able to be here, but um, I believe we have solved this issue after multiple uh postponements and discussions with our zoning staff. The applicant is proposing to screen the uh rooftop equipment with large planter boxes similar to the ones seen here that are already in use on the hotel rooftop. They would be approximately two feet from the edge of the mechanical equipment. Uh the applicant believes that each box will have three arborvite trees, which are like the ones seen in the top photo, although those look kind of dead and these will not be dead. Um we don't really need to approve the specific. Dead yet. Um we don't really need to approve the specific type of tree, just the concept of screening the mechanical equipment with greenery. And our guidelines do support the idea that plantings can be used for mechanical equipment screening. They don't typically anticipate that those would be on a building quite as large as this or on the rooftop, but they do mention that uh plantings are acceptable. Staff believes it's an acceptable solution, and if the BAR agrees, I have one brief finding and a motion for you there. Excellent. Um I believe that the public hearing is still open on this.