Loudoun County Facility Standards Manual Public Review Committee Meeting – October 9, 2026

Commissions & Advisory Boards — Friday, October 9, 2026
BodyLoudoun County, Virginia
SessionCommissions & Advisory Boards
DateFriday, October 9, 2026
StatusFILED
Video Record
0:00 / 1:38:17

Original source
Transcript — VerbatimClick a timed line to jump · ⧉ to share it

Speaker numbers apply only to this recording.

Speaker 1

0:01

That's it.

0:02

All right, everyone.

0:04

I'd like to call to order the October 1st, 2026 Facility Standards Manual Public Review Committee meeting.

0:10

No members are participating remotely, and committee members disclose that they are members of one or more affected groups in their respective declarations of interest are kept on file in the minutes of the facility standards annual public review committee.

0:25

We're not quite at a quorum.

0:30

I'd like to maybe kind of wade into this a little bit.

0:35

We've already had kind of an offline conversation about our minutes from the last meeting.

0:41

But if y'all could take a minute, just flash through them and see if there's anything else that you might uh feel needs to be edited.

0:51

I thought Laura did a great job capturing the content of the meeting.

1:00

Yeah, we there was a suggested edit to that fourth to last bullet point on stormwater pond treatment.

1:08

Yes, let

Speaker 2

1:08

me make that slightly bigger so we can actually

Speaker 3

1:12

see it.

Speaker 2

1:14

It said this one.

1:15

Um staff noted that the ponds are intended to provide water quality treatment, and additional treatment to protect the Gabian baskets would be difficult.

Unassigned speaker

1:24

Thanks.

Unassigned speaker

1:36

What

Speaker 1

1:36

do we need?

Unassigned speaker

1:37

Eight, eight,

Speaker 1

1:39

okay.

Unassigned speaker

1:41

All right.

Speaker 1

1:52

Recommendations.

Speaker 2

1:54

Yeah, I I I say we postpone that.

1:57

That was where you had asked us to go through the FSM and note all the different recommendations, but we haven't had a chance

Speaker 3

2:02

to discuss

Unassigned speaker

2:03

that.

Unassigned speaker

2:03

Okay.

Speaker 2

2:04

Um, but we do have the meeting calendar.

2:07

If you're prepared to discuss

Unassigned speaker

2:08

that.

Speaker 1

2:09

If you'd like,

Unassigned speaker

2:10

the

Speaker 1

2:10

time filler, I don't know that's necessary.

2:13

We're gonna meet again next year.

Speaker 2

2:17

On the same schedule, first and third Thursdays is what we're proposing from three to five.

Speaker 1

2:23

We'll go through and look at holidays and that type of thing, and obviously cancel out some meetings based on that.

2:29

Um I will go on record and say that my preference and recommendation is that we try to alternate months where we have two meetings in one month, hopefully, one meeting the following month, two meetings the following, uh, with the understanding if something comes up that's pressing, urgent, you know, state code, compliance, health and safety, whatever we'll we'll meet whenever we need to to address those things.

Unassigned speaker

2:56

Does

Speaker 1

2:57

that sound fair?

2:58

Betsy.

Speaker 3

2:59

Sure.

Unassigned speaker

3:03

Okay.

Speaker 4

3:04

We'll see how the workload goes, right?

3:07

Right now, I think we're in a good position for that, Kevin.

Speaker 3

3:11

Maybe we'll get to sidewalks someday.

3:13

How

Speaker 2

3:14

many months is that?

Speaker 1

3:15

Yeah, we yeah.

Speaker 2

3:18

So to that point, we are kind of waiting for a comprehensive plan amendment, I think.

3:23

I have to check in because remember the term NUX.

Speaker 3

3:27

I was

Unassigned speaker

3:28

was

Speaker 3

3:28

it the company, is it?

Speaker 2

3:31

Sounded we think it was oh, it was your right, it was a quick fix.

3:36

Which is now

Speaker 4

3:36

quick fix,

Speaker 2

3:37

you're

Speaker 4

3:38

right.

3:38

Spring summer of next year.

3:41

I

Discussion Breakdown — Share of Meeting
Cultural Resources██████████████████████████████30%
Stormwater Management███████████████████19%
Gabion Basket Maintenance███████████11%
Wetland Management███████7%
Procedural██████6%
Legislative Agenda██████6%
Data Center Development█████5%
Archaeological Survey████4%
Technical Memorandum████4%
Summary of Proceedings

Loudoun County Facility Standards Manual Public Review Committee Meeting – October 9, 2026

The Facility Standards Manual (FSM) Public Review Committee met on October 9, 2026, to review proposed cultural-resources text changes, discuss draft gabion-basket standards for stormwater facilities, and preview the FSM's transition into the ENCODE platform. The provided meeting timestamp is October 9, 2026, although the chair's opening words in the transcript say 'October 1st, 2026.' The committee was not quite at a quorum at the start; no remote members participated.

Administrative Items

  • The committee reviewed the draft minutes from the prior meeting and discussed one suggested edit to the fourth-to-last bullet on stormwater pond treatment. Formal approval was deferred to the next meeting.
  • Members discussed the 2027 meeting calendar and generally agreed to propose first and third Thursdays from 3:00 to 5:00 p.m., alternating months with two meetings and one meeting, with additional meetings if urgent items arise.
  • Staff noted the work plan is awaiting a comprehensive plan amendment related to the 'Quick Fix' items, with an update to the Board scheduled for the October 20 board meeting. Sidewalk/shared-path work was mentioned as a possible future topic.

Discussion: Cultural Resources and Archaeology Amendments

  • Staff walked through track changes intended to prepare for the October 27 Planning Commission public hearing. Edits were largely structural: an introductory sentence explaining that cultural resources include the phase one survey and reconnaissance survey described below; reorganized provisions for preliminary plats and record plats; and a change from 'structure plan' to 'sketch plan.' The requirement for phase one cultural-resources testing on residential lots two acres or less was retained. During discussion, a member noted the FSM uses the word 'recommend' about 26 times.
  • Members debated the existing statement that a phase one survey is 'recommended for the entire property.' Some members objected to using 'recommended' in a regulatory document, while staff explained it puts applicants on notice that additional testing may be needed if limits of disturbance change. The committee ultimately agreed to keep the original formulation with minor wording changes.
  • The committee agreed to add a 'digital submission' requirement in Chapter 7 for digital files—DWG, DXF, KML, KMZ, or shapefile—of the phase one and reconnaissance survey boundaries, provided with the initial submission. The equivalent digital-file language was removed from the preliminary-plat, CPAP, and site-plan sections in Chapter 8. Staff will continue to send approved survey boundaries and reports to the Virginia Department of Historic Resources and maintain the countywide GIS survey layer.
  • A footnote reference to 'section 7800 archaeology' will be updated to 'cultural resources.'

Discussion: Gabion Baskets in Stormwater Facilities

  • Stormwater staff Chris Stone and BMP reviewer Alex Morgan presented draft FSM text and discussed a study on gabion baskets in wet environments. The study estimated PVC-coated gabion baskets could last about 16 years before corrosion, while county maintenance representatives reported seeing some baskets corroding within about two years.
  • County maintenance representatives explained that Loudoun County, not homeowners associations, maintains wet ponds subject to easements and wet-pond agreements, so a landowner replacement/maintenance scheme would not fit the current structure. The idea of a replacement fund was discussed but not decided.
  • The original draft proposed allowing PVC-coated gabions in detention and extended-detention ponds while prohibiting them in retention ponds or completely submerged environments. Several members found the text too restrictive or confusing. Discussion moved toward a simpler rule: gabion baskets installed in stormwater facilities where any part is subject to inundation must be PVC-coated, and gabion baskets should not be used where they would be completely submerged in a permanent pool.
  • Staff are developing a riprap/stacked-stone alternative, likely with graded riprap on a roughly 2:1 slope, and will bring the gabion language back for further review.

Discussion: ENCODE Migration and DOAM Request

  • Staff reported that the FSM and LSD standards will be moved into ENCODE, with all 32 FSM figures recreated in AutoCAD-based, downloadable, searchable format and an AI search feature.
  • Because minor formatting changes require a DOAM, staff plan to ask the Board at the October 20 business meeting to authorize a non-substantive cleanup. Examples shown included bolding subsection labels, restructuring water-system definitions, placing chapter figures at the end with titles, updating cross-references, and correcting small figure and text inconsistencies.
  • Committee members indicated support for proceeding with the ENCODE formatting work, understanding that substantive FSM changes would come back separately.

Key Outcomes

  • Minutes approval was postponed to the next meeting.
  • The archaeology/cultural-resources edits were accepted for further drafting, with the digital-file requirement moved into Chapter 7 and removed from Chapter 8.
  • Gabion-basket language was not finalized; staff will continue work on a riprap/stacked-stone alternative and return with revised text.
  • The committee supported taking a DOAM to the October 20 Board meeting for minor ENCODE-related FSM formatting changes.
  • No formal counted votes were recorded; the committee was without a full quorum at the beginning of the meeting.

Meeting Transcript

That's it. All right, everyone. I'd like to call to order the October 1st, 2026 Facility Standards Manual Public Review Committee meeting. No members are participating remotely, and committee members disclose that they are members of one or more affected groups in their respective declarations of interest are kept on file in the minutes of the facility standards annual public review committee. We're not quite at a quorum. I'd like to maybe kind of wade into this a little bit. We've already had kind of an offline conversation about our minutes from the last meeting. But if y'all could take a minute, just flash through them and see if there's anything else that you might uh feel needs to be edited. I thought Laura did a great job capturing the content of the meeting. Yeah, we there was a suggested edit to that fourth to last bullet point on stormwater pond treatment. Yes, let me make that slightly bigger so we can actually see it. It said this one. Um staff noted that the ponds are intended to provide water quality treatment, and additional treatment to protect the Gabian baskets would be difficult. Thanks. What do we need? Eight, eight, okay. All right. Recommendations. Yeah, I I I say we postpone that. That was where you had asked us to go through the FSM and note all the different recommendations, but we haven't had a chance to discuss that. Okay. Um, but we do have the meeting calendar. If you're prepared to discuss that. If you'd like, the time filler, I don't know that's necessary. We're gonna meet again next year. On the same schedule, first and third Thursdays is what we're proposing from three to five. We'll go through and look at holidays and that type of thing, and obviously cancel out some meetings based on that. Um I will go on record and say that my preference and recommendation is that we try to alternate months where we have two meetings in one month, hopefully, one meeting the following month, two meetings the following, uh, with the understanding if something comes up that's pressing, urgent, you know, state code, compliance, health and safety, whatever we'll we'll meet whenever we need to to address those things. Does that sound fair? Betsy. Sure. Okay. We'll see how the workload goes, right? Right now, I think we're in a good position for that, Kevin. Maybe we'll get to sidewalks someday. How many months is that? Yeah, we yeah. So to that point, we are kind of waiting for a comprehensive plan amendment, I think. I have to check in because remember the term NUX.