0:29I gotta stand that tall up in my office if you exit yet.
0:38Okay, then never mind.
0:41Um you should have two sheets um I named them so a little easier to follow this time.
0:47So you have parks bond option, the grants option, and then the last page is the tier two list that I narrowed down a little bit because I took off some of the other projects that moved on to tier one, Atlanta Street, and Orange Street, some of those, I took some of those off.
1:08Um, some of the smaller sidewalk projects because I think we can get those done uh individual council members approval for whatever board those in and using going.
1:24Um funding or doing small things like that, and listed on tier two, I think we still accomplish things if individual council members are okay, so that's reason.
1:35Some of those are all um so I'm narrowed also after the discussion on Monday night.
1:43This is kind of finalizing the list as it would look on that would go forward to the county, so I'll take a little descriptions now, project descriptions, and I will those down a little bit, so it's not as descriptive as it was Monday night.
1:57Water asking some of the questions about that, so I'm narrowing some of those down.
2:01So we've got both options before you didn't answer any questions.
2:12So we have a question about the trucks being the house.
2:22So you're applying for a park on it.
2:29If it's on the projects called needs to be an approval.
2:35The parks bond option would be uh maybe just discussions with the mayor uh talking about possibly doing a parts on so that was removing all of the parts uh items that we had on there except for the city hall reservations.
2:53So that took all of them off of the list and doing some other rebalancing uh some of the project accounts in order to do the overall budget balance, okay.
3:03Left everything else on there except maybe just the minor adjustments to some project transportation project account.
3:10Everything else in his balance.
3:13And grant options green station.
3:23So whatever reason we don't pick the green thing, but it's a project with their green money.
3:31If if yeah, if we do not get the grants or we don't get the full grant funding, then that would be brought back before this body to return how you would like to move forward if we have extra funding available, and that'll have to be a decision.
3:44This body that we have to make to allocate that extra funding.
3:51Wouldn't we try to get the grants no matter which option we choose?
3:56We always find it very much.
3:58We always always want to grants it.
4:02So there's not really a grant.
4:06Golsen got a seat like no stuff.
4:15I think I'm just making sure it's gonna see that.
4:17I think that would leave the parks projects on the list.
4:31The parks the grants from set.
4:34It's not saying that if we choose the grants for not doing the parks bond, it's just it provides the options that send if we don't choose the parks bond and have the projects on the list.
4:44If we do the parks bond and something happens, it happens because the project's on this parks bond and passes makes it be declared economically feasible with the funding source and those are the parts to be getting a grants option.
4:58Just provide more options.
5:04And it provides us a backstop just to my question in this.
5:27And we decided it would be no county money.
5:33What happened to Ireland?
5:37That's one of those sidewalk projects.
5:38I think we're going to do that.
5:53So we can't do the funding first.
5:57Also, it's still Washington.
6:01It's just the point of the north.
6:07Then you go all the way down to Rosemary Street.
6:12I don't need any important things.
6:20I don't want any of this.
6:22We have the all the way down to it.
6:33I don't have any extremes above Roswell.
6:37I know the longer Austin A meeting described all of those the old parts.
7:14I mean aspect I think for a pocket park full for a few different types of part.
7:20And then for that different personal different year board as well, just kind of looking at very much different pocket parts there and then take the books in the places.
7:36So we think feel pretty confident about 1.75 million for that new park once up with where it is with the question about where the numbers came from.
7:52So when it looked at the itemized list, or those numbers based on today's dollars based on when it five year from now dollar, like where are the numbers come from?
8:01Well those numbers are based on the future.
8:10So if we bond the projects, the bond is lost projects, then it's likely we could come in under actually from what is on here and possibly get it or done or in the tier two.
8:21That's what it's going to be.
8:31Any idea how much that would free up possibly?
8:51Um these are conservative numbers.
8:53I mean, we uh the question is that we brought in more revenue just lost at the spinning in every single time.
9:03So in the independent we over performing under those dollars that you look at no fund.
9:09Yeah, what uh uh what you would do.
9:12Um haven't had that opportunity yet on the current splash, but uh we come forward using the notes here and uh we do reallocation.
9:22So you'll look and see um sheet that shows you here's how much extra we brought in already.
9:28Um here's the areas that we would like to recommend uh budget for different ones if you know the costs are going up.
9:35Uh, an example would be the uh the trail project that we're doing right now.
9:44So we had to go back and cut a lot of the budget on order there as far as the uh but we also put additional money into it.
9:53So um that's what you would do first is look at the tier one project, figure out which ones needed additional money in order to want to be completed.
10:01And uh any additional money you have is supposed to go to tier two.
10:07So we don't usually get to tier two because the uh costs of the projects are usually uh pretty excessive, and so uh it just gets reallocated to tier one project.
10:18And we're prohibited by law from putting it in the general.
10:23So it's that's why we list the projects and we only can do those projects unless they are either because of that happening, or they're uh possibly called works.
10:45We can't you know, a lot of people hear that and go, well, there's nothing given project in general from it's gotta be right to the list.
10:59Primarily the two recent we can name project invasion, either engineering related or internal rare thing that means the contributor feasibility.
11:09Engineering in feasibility, we have had a couple that we are council has named in feasible.
11:15Um traffic studies updating says, you know, it doesn't make seems to do this way, and you need to do something else off top of things.
11:24So it is rare uh that you meet the project one in fifth.
11:29There are a couple of counts that we've got that are up on the top of this list that uh definitely you know you're able to put additional money in like street resurfacing, trails, sidewalks, that type of stuff.
11:43Uh then you could, you know, if we're going along if we see additional areas we can just work in, we can up to that project if you have additional money coming in, but um you really can't do a project that is totally new until we just all the names, and then you have to go to the tier two, and you'd have to knock that tier tier.
12:04You get to pick which ones you want from tier two, a week payment to what we can have on T 12 trying to understand what we could take off on street from to Washington.
12:21If uh if it's on the list and we have whether that we could do it, for some reason we can't get it uh with the way we're explaining that we're just what we know.
12:39Tier two has a lot more floods building more tier one as tier one.
12:44Right, okay, that's what you have to do.
12:48Technically and legally, we only have to list tier two projects.
12:52We typically do put at least a list of projects out there, so people know that we have some fallback if we do reach the access funds.
13:01We know kind of what we're gonna be looking at.
13:03But if you do have the flexibility to add two tier two projects, if you get to that point, but Mr.
13:10Burton says we've never gotten to that point how to deal with that, so uh that's part of the reason that some of these smaller scale projects such as sidewalks, this time, especially learning from the past.
13:24It's easier for me to pull those off because I do leave them on there without going through a big boat.
13:30Uh it's easier for me to have a flexibility to say as long as individual council person is okay with it, uh finding grants for the reason then I can I can go look forward to those projects.
13:44So the city would start wolves and trail construction.
13:55We we don't we we keep a small as uh otherwise as told maintenance and repairs, but we do keep a smaller list of projects list.
14:12Um right below uh the SP and top part of intersection permit strings getting through some project interests and it's uh one, two, three, four, five, six, seven four down, one tier two.
14:35That's what I'll get to price back.
14:40I don't want to do that.
14:49We didn't think that things probably project again when you should replace those of the project, but it's uh I think it's not a public hearing type of this.
15:00I think it's not a public character for this.
15:12Um aviation road improvements.
15:15That's your way to say it anywhere else.
15:25South Maryana and Rossworth.
15:27Uh we were looking at improvement stormwater and wide for the CCT buses that run through there as well as adding potential bike lines.
15:45That'd make the number right.
16:12And then we're going to discuss this at the next committee meeting.
16:16But we have silent railroad cross for downtown.
16:24Is that all the railroad crossings?
16:26Because the one that crosses was Dixie down the land is board one.
16:33That was just in the downtown core.
16:38Um that was not enough money to do all I mean six crossings that we have to do, but yes.
16:46I just finished the agenda items next to me's discussion.
16:49So we will have a very in-depth and very first discussion based on the topic.
16:54So it would be East Dixie, uh East DC way relief.
17:02I can't remember that name.
17:11But not anything further.
17:21But I'm wondering why we've already had a long R and we actually do it.
17:25If if you do silent crossings the way the federal regulations are written, um you do one, you gotta do them all.
17:34If they're within a certain distance, we have another.
17:36And all hours are within that distance requirement.
17:39So it might be already long or it is, but it doesn't still meet the requirements that for quiet times.
17:47So we would still have to upgrade that crossing.
17:50Maybe it's off is 7500,000.
17:54Uh that one might not be the full million that we would be anticipating per crossing, but no better yet.
18:02That one that one might be about 700,000, but the rest of them are going to be about a million per crossing.
18:13It was a little much lower amount.
18:15Now it's a large that's that's just the dollar amount that I is not considering the time that it takes.
18:22So look at the council were to commit to the dollar to move forward.
18:29Um that is about a seven to nine year process.
18:42Better get it going, I'll cost twenty million about that.
18:45You shouldn't go down road to McDonald's.
18:58Do you have to do that?
19:03Which is the same thing.
19:30So we'll be able to think that's more important than that than we like to have to do that on that board.
19:45I like to have them.
19:47I mean, every little bit's gonna happen.
19:52I mean, it's just between between the dollar amount and the time commitment.
20:00Um the longest part of the time commitment is dealing with the railroad, obviously.
20:03You have to use their engineers to do the design work.
20:06They have to approve everything.
20:09You have to use our contractors to do the instruction.
20:12So by the time you go through all of their processes, that's the reason that seven to nine year window.
20:22And that's not counting the maintenance and liability responsibility after you put them in.
20:28Because then the railroad walks away from it and says your crossings, we are no longer liable for anything that happens on those crossings.
20:35The city is now fully responsible for anything that happens on the crossings.
20:40And then we contract with the railroad to fix the crossings because we don't have the people fixing the crossings.
20:46So then we have the higher third party come fix them to the railroad standards, and then like I said, then we have to maintain all the ability for anything that happens on those crossings.
21:12We came on, we looked at it, we just said I think wise it's squared down there in bindings.
21:31And to the current numbers, what they're seeing too much now is about shares.
21:42On that uh on that one, if I remember correctly, and it used to be, I think, down to 400,000, but I think that's what we've done in prior line dialogue on council.
21:50And back when there was possible some tiger grants to help out.
21:53Or I think it was called tiger grants back then.
21:56Um to help out with the cost of I think that particular portion that program is called and again specifically more about what now, but um the one misconception is people think when you got clocked crossings, you'll never hear the horns.
22:14Um it's up to the discretion of locomotive engineer whether or not he bows any horn.
22:21So he feels like there is a need for him to blow the horn, he's still going to blow a horn.
22:26And it doesn't matter what time of day or night it is.
22:29So the piece is just basically getting late as they come through.
22:34So he's doing more still makes it.
23:00I mean, as you go down Dallas Highway most of the people, people won't really afford to have any up properly in here, but our personal change.
23:18From public works and staff perspective, this is a very good swatch list, both well rounded parks and rack public safety.
23:30You have to have to change your project round.
23:33Money in there for maintenance, uh for all room maintenance activities, not just so this is a very broad, well rounded project basically just probably basically the text with lock having any improvements.
23:50Um probably a lot of calls about having a safe we can provide some a little more context on specifically what we'll talk about.
23:57Like it's safe some hardware and something that is the new signal or we prefer merely for potential new signal and dialogue circle and woodwalk.
24:09Um plus we got a couple other maintenance things on woodwalk that we won't need to check into.
24:15Right past from Hope Street Extension, and you notice there's a real rough spot right there.
24:20We need to dig that up and do some investigation there and fix that.
24:24So we we got some I hated to call it maintenance and improvement, so I just called it improvements.
24:29Uh so we got a couple of things or woodlocked.
24:39Intersection improvement and a couple maintenance items are all good.
24:43No, totally get the just a little bit more text and further as long as without without picking calls.
24:51Yeah, I mean that that's because I kinda like to general, but uh, I'm happy to add interception maintenance that we would like.
25:00Maintenance people like otherwise it'd just be a conversation.
25:11I don't think it'll be bad thing back.
25:13So for me, just two questions, one current victory intersectional movement.
25:18I thought we already working that we're working the pedestrian crossing, but this is any potential roundabout to improve that all weekends.
25:26So that that's in tier two.
25:28And then just say you know the other one is that would call out of all these sidewalk windows and uh quarry on the waterman sidewalk to get some more fire projects.
25:42North side of water.
25:44I won't make that take all the way over to Lake with the north side of the water.
25:56I've just given him all of this.
26:02I don't think I'm trying to change that's been like this for one point three million dollars in three years, just I think everybody gets maybe either because they are data.
27:08So what is the process now tonight?
27:13Um council will choose one of these options and hope to approve that at this meeting or uh here this meeting.
27:24What will happen, and this will be the list that I will give to the council or to the county.
27:29Um our first town hall meeting, public input meeting in March.
27:35We'll have another one uh I think end of May, end of March, I'm sorry, and in the middle of April together public input on this on this list of projects.
27:46You will have another or bite of this apple at the May council meeting, which will be a public hearing.
27:54Um incorporate any or what percent immediately comments, or suggestions from public input meetings at the April committee meetings the lab opportunity might be tweaks you would like.
28:10Vote only to get at the May meeting.
28:12We'll have another week hearing and vote at the June council meeting along with the intergovernmental agreement that'll incorporate everything that'll be the final final list and vote at that meeting.
28:26That'll go to the county.
28:32You've got a few more opportunities to tweak me.
28:48But I'll suggest that we move forward with the grants option.
28:53That's kind of where we're leaving.
29:03Okay, I'll make that a motion.
29:14So the mean we're not gonna find more part one.
29:24It means we still can't.
29:53Just because we do the random park spot, it doesn't mean we can't do that later, do you think?
30:00And if we do the bugs projects, that means it just threw it out in the spawns instead.
30:05And why make the reallocation?
30:08But I'll see one of those exceptions as I mentioned about infeasibility.
30:12That would meet the definition of economic infeasibility due to the fact you had another funding source.
30:17So those projects are going to be pulled off of the squash, and you can reallocate those amounts to existing tier one projects, but then you could reset out a tier two and pull up other projects to fund at that time when the parked one you would have an opportunity to rebuild something.
30:46Um very good one is the thing that we got.
31:08If you guys remember 2001, uh part of where I can apply for that one 10 or grant or get my applies for 27, I think.
31:23So that they're planning on going back to that again, so they get that funding when that way.
31:41How much of that is grant?
31:53Three points there's maybe rent.
32:08And that's a conservative estimate to this number of HP, and we're here for like possible possible.
32:31Um obviously uh final design will come back in council if you'd have that an option.
32:39It would be our recommendation that's been table for name and whatever the final version would be, but council would have that opportunity to look at that and say, yeah, we like them, no, we don't like them.
32:50Whatever, but you had that option to be late.
32:58That's that's crazy.
32:59It would be our recommendation that we stay with that option to the same.
33:12Yeah, rest uh remains the trust through price ADA.
33:17Yeah, I'll be okay with changing that language and be a little more flexible.
33:26Um, replacements we can go ADA and other I would I would just if if we're going to change I just like call remote and drop the investing that gives you flexibility because where we're exploring what we're gonna see individually bathrooms but we uh have had other issues in the past with building so that would allow us flexibility's obviously for gives you some flexibility.
33:57But then we if you have the ADA on there helps because nobody wants to spend money on administrative building.
34:06And if we uh I don't think we should be him then to have it to do ADA, but if we have it on there, then at least we know people know that there's a reason, and people understand ADA compliance.
34:16People don't understand spending money on a government building.
34:36Are you right as a point?
34:39No, it's a good thing.
35:02I don't think it's what they like to say.
35:08We've got a lot of things out there.
35:10What's your grant money?
35:14We don't get the grant money.
35:17Because they're on the list.
35:19We can use supplies of money that is over what's anticipated.
35:31So we do have, but by having it on the list that we said, this is a project.
35:36Well, everyone is here just how we should fund it.
35:40So I whether we get the grants or actual cost of construction coming way above such as our rotten wood three.
35:50Um you would have that opportunity to reallocate extra parts for that, or sources, whether that's capital.
36:02Whatever else would be winning for this room, but that would have to be a proof of the are there individual grants for the projects or one grant for that several projects for the green rates that each one of these uh depending on the project has a possibility to use the different grains.
36:23They're all not usually the same.
36:28So some of the stuff I'd plan for public safety is not source versus sanctification in different parts.
37:36We have the six percent scale state sales things that we have just the two penny ones that we spost.
37:41Education's loss and our splits, we don't have the purpose of eight percent at this point.
37:47So very well in there, so I guess the wheel never got to correct.
38:04All the money that is in here for um the replacement of current head repair of those things or uh streets and store water just keep everything I got for the spot.
38:36Like the called equation, all over favorite, but you carry six levels.
39:28Every time I see the grade, I say grand study to work is a job when we got that same goal and different grants that I've seen you don't see about the content.
40:05If we're limited down to one of them, that it wouldn't be it.
40:09Uh I wanted to say something to me last night.
40:12I had a municipal association meeting.
40:16Um one of the things that they're looking at at the chamber was at the chamber.
40:22You spoke on displacement a few other things.
40:25They are looking at putting together an advocacy group.
40:30I mean whether it's a positive or an eight event looking at putting together an advocacy group and actually looking for um civilian group but resident and on that and some resident survey on that advocacy group.
40:48So I'm sure we'll hear more about that with you know, at least that's one of the things that they interfere with the government.
41:16Well, we have to go to your own cool working later, right?
41:20They're still there.
41:35After our final vote after the currents, I think we are limited to just education.
41:40We can't advocate for or against the slot because the smallest thing is a bot as a city body.
41:46At that point, it is in the hands of the residents who eventually vote on it.
41:54Of course, the one of the operations every time is advocacy.
41:58So are they city explaining why they would be wrong?
42:19Uh I don't know exactly what they're doing with their information sessions, but that's the purpose of these meetings now is to explain all the projects they have all the stuff now.
42:54I don't know, they've got a told us though.
43:21We're given a tour of the building uh as part of their trying to explain why they need more space and while they need different space um sound to be like the whole operation too.
44:20Well, the first one's gonna be on the fifth march.
44:26That's the end of the thing.
44:27Uh that will be on the one over instead of side joined person.
44:35Um, and then we'll uh log with their meetings that will be just the same.
44:43Uh that we'll work with y'all on as far as getting the dates to do that.
44:47Um we'll do those probably here.
44:52And both will be all the 20s for 201.
45:04I know we're gonna die to have to find out.
45:15Projects to just discuss while I think you can commit such license to have folks there, you can have a county folks there.
45:35Just be able to hear what we can.
46:13So I'll do uh bring up the um trains.
46:23Uh the notification is blocking the track.
46:29So now we'd be able to get a notification before you attract to the four times going.
46:36Well, but there would be uh some board.
46:42Uh what do you want to say?
46:47But also we're looking at the word people's phone to file fixes.
47:00I know uh there's a city sets of real round table to do it to different conferences, which one is because of that.
47:30I think that should be out anyway.
48:02We're gonna like open opinion.
48:11But we're really talking with whatever you want to do, and that helps.
48:22Yeah, but the decide and whether not there was a property right.
48:30License permit or whatever.
48:57Yeah, I can't right now.
48:59Is there a motion for such a yeah that's the key circuit?
49:09Is this uh for that particular one?
49:11Is that one that falls under the exact fee?
49:15Accept exemption tonight.
49:20Yeah, for the foreign executive session.
49:27You have an option at the three o'clock that's the exact session at the end of the day as well.
49:32You have one now before you.
49:37Well, I can't tell if there would be some time for the exact decision between six and seven.
49:42And I would think that's two weight to it then if normal force of business is that we're gonna session means to your council is very profitable.