OPENPUBLICA · PUBLIC MEETING RECORD
Record of Proceedings

Marietta City Meeting - April 6, 2026: Sign and Facade Approvals

City Council Archive ViewMonday, April 6, 2026
BodyMarietta, Georgia
SessionCity Council Archive View
DateMonday, April 6, 2026
StatusFILED
Video Record

STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE

Transcript — Verbatim
1:28

Um our request today is to add a sign, like a hanging sign, like you see other businesses have on the street.

1:37

Um it is black white, and then the yellow is the same color as our door, which is the colonial yellow that's in the approved colors.

1:48

I know it shows different, but I promise it's the same.

1:51

Um that is our logo.

1:54

Um the sign is sixteen inches tall by twenty inches wide.

1:59

Um it is made of wood, it is treated so that it will not it will withstand the weather.

2:07

Um, and it'll just be hanging.

2:09

There are two existing hooks already um in the soffit that we will be hanging from, so we won't be doing anything to the building.

2:17

All right.

2:19

Shelby, does she need a variance or anything?

2:23

Hard to tell.

2:24

Do you guys have another sign?

2:26

Like a main sign.

2:29

This would be our only sign.

2:31

We don't have any signage on the building.

2:33

We have the awning, but that's all we have.

2:36

You have the door.

2:38

Well, okay, yeah, the door.

2:40

Um is this gonna hang from the yes, it will hang from the you can't see them, but there are two hooks that already exist.

2:50

Um I'm assuming previous businesses used.

3:00

So like when you're walking down the street, you will see it.

3:03

Yeah, you will face it.

3:05

So the bottom's gonna hang down, but but it's gonna be above the door.

3:08

Uh yeah, it'll come yes.

3:12

It's it'll like very little.

3:14

I know it this is a you know, proportionally is not exactly right, but I wanted you to be able to tell where the sign was gonna be.

3:21

Um but yeah, it will barely hang it maybe like an inch below the door height, honestly.

3:27

But yes, we made sure that we measured for like people height and walking and things like that.

3:36

Yeah.

4:08

All those in favor.

4:10

Thank you.

4:11

You're thinking that's uh one forty eight church street.

4:18

Oh, that's a good thing.

4:30

Um the agenda was he's there next on the addend.

4:37

Well, I'm not complaining, I'm just trying to find it.

4:39

No, because the agenda is an amend amended agenda that I left.

4:45

Yeah, it's on the amendment.

4:46

That has one forty-eight on there.

4:49

This is amended in red here.

4:54

I left it on your I left gave each one.

4:57

No, I'm not sure.

4:58

Got it?

5:00

All right, Don, go ahead.

5:02

Good evening.

5:02

My name is Don Dorsey.

5:04

I'm a member of First Baptist Church Marietta, and here this evening requesting your approval to make a couple or three changes to the exterior facade of the building that we refer to as our Family Life Center, which is located at the corner of Dobbs Street and Church Street, right across Dobb Street from our main building complex.

5:28

Stop Shelby at this one if you would for just a moment.

5:31

This is shown for reference only.

5:34

This is a photograph of the exterior facade of our main building complex.

5:40

Sharing these photographs to illustrate the colors that we would like to use to essentially recoat or paint the Family Life Center that exists directly across the street from our main building complex that you see here.

6:12

And the addition to the original chapel.

6:46

And then the balance of the building, the second and third floor, would uh be the color of the uh light colored portion of the building.

6:55

Shelby, if you could advance it.

6:57

Um these two photographs are of the Family Life Center, uh the facade that faces Church Street.

7:05

This is the main entrance to the building.

7:08

Uh the view at the top is almost directly east, looking from Church Street to the facade of the building.

7:16

While we're on this one, uh one other change that we would like to make that is both aesthetic as well as weather protecting is to add a canopy across the full width of the entrance there that you see.

7:30

It's about 25 feet.

7:32

Uh aesthetically, we feel like it'll be uh an improvement, uh, but it's more important in terms of protecting the entrance doors from the strong west rains that we frequently get that have a way of migrating water through the doors uh and windows.

7:51

I'll share that with you in just a moment in a future slide.

7:55

Uh the next uh picture down is the essentially the same facade, just looked at at a slightly different uh angle.

8:04

And what we're proposing to do right now, this is natural tan brick.

8:09

Uh we've had some weather problems with water migrating through the brick, so we would like to coat it with a uh lastomeric coating, which essentially is paint on steroids.

8:20

It helps seal the brick and the mortar joints so that uh water will not be absorbed.

8:26

And what we would like to do is to paint the main body of the brick with a very light colored uh paint that exists on the existing main building complex.

8:38

And then for this banding that you see here, as well as the cross and the surround around the main entrance.

8:48

We're considering two options.

8:50

I would have preferred only to bring one to you, but the church can't make up their mind which of two colors they would like to paint this banding and the cross.

9:01

Uh one option which is included in the color material is uh to paint the brick again, the very light or cream colored paint, and to slightly accent the horizontal band and the cross with a lighter, probably four shades lighter white, just to make a very subtle uh emphasis on the banding and the accent of the cross, and for the rest of the building, it would be the the very light cream colored brick, uh maintaining the dark bronze aluminum storefront framing that exists there now.

9:38

That would also be the color we're proposing for the canopy of the dark bronze.

9:44

Hey Shelby, if you want to go one more.

9:48

Uh this is a kind of an incidental improvement we would like to make.

9:51

Back when the building was built uh in the 90s, we only felt we needed some handrails in a few uh spaces.

10:00

Now we're realizing it would be beneficial uh to have additional handrails at the main entrance where you have to walk up about four or five steps.

10:08

So for the folks like me that are getting a little elderly, those handrails come in handy.

10:13

So the reason for showing this is that we intend to replicate the architectural theme of this handrail with new handrails on the the front steps.

10:23

Okay, Shelby.

10:27

Can you rotate this?

10:29

Okay.

10:32

Okay, good.

10:34

This is color scheme one.

10:36

Again, everything is the same for both color schemes, with the exception of the color to use in the banding, the surround around the entrance and the crosses.

10:49

Um again, the very light color for the brick, and then the white color for the cross and the banding in the surround.

10:57

And then the canopy, which I have a larger image of, I'll share with you shortly, is directly across the full 24-25 foot width of the front entrance.

11:10

Okay, Shelby, if you go one, go two more if you would.

11:16

And then it's it's maybe very modest to understand in these drawings, but again, the only difference is in option two, the color of the banding and the surrounding the cross would be the darker grayish brown color that we're using on the base of the building, again, replicating what's across the street at the uh Stone Mountain Granite ground floor of the building complex.

11:48

The awning or canopy and the storefront, all the colors of the trim, uh, as well as the roofing shingles remain the same.

12:01

Okay, Shelby.

12:03

A couple more.

12:04

This one.

12:05

Uh, this is just a larger image of what's proposed for the canopy.

12:10

It'll be a um a suspended hangar rod canopy, about three rods suspended from structural elements within the window framing itself.

12:22

Uh the height of this canopy is about two feet, which matches the finestration of the uh storefront, uh, full width again.

12:33

Uh, we would like to put the name of the church and the name of the building on the front face of the canopy.

12:40

It would extend out about six feet and maybe seven just to the edge of the steps.

12:46

And again, it's primarily for the purpose of providing weather protection for our front entrance, but we also feel like it'll be a uh uh reasonable um aesthetic enhancement to the building as well.

13:00

Hopefully, all that makes some sense.

13:02

Happy to try to answer any questions you might have.

13:05

I have a question.

13:06

The canopy is gonna be canvas or what it'll be metal.

13:10

Okay, form to metal.

13:12

Then I was a little bit confused.

13:14

You said that some other folks at the church had an opinion about the colors.

13:18

Which were the colors that were in question there.

13:22

Okay, Shelby, if you don't mind flipping back.

13:29

Um sorry, right flip one more forward.

13:35

And if you can rotate it.

13:41

This is a very bad representation from the copier.

13:44

I'm not sure you're gonna be able to discern it.

13:47

I think you were distributed copies, so maybe you if I I'll guide you on the on the slide, and maybe you can see uh the brick color, the light color, which looks like paper here, um, is included a real uh true color sample there.

14:04

Uh this is the color that we propose to use on the base of the building, uh, which is essentially just the ground floor, uh, and then the accent color, castone accent color, is a um uh a snow white almost color that'll just be a uh a very subtle accent to the cream colored body of the brick.

14:33

Now that's the only change between option one and watching option two.

14:38

Yeah, Shelby, if you go to the same paint color samples for option two, okay.

14:45

Here we go.

14:46

Again, the the same color brick, that's the base gray color, and then that same base color that's at the ground floor around the building, would be used as the accents for the horizontal band and the crosses and that surround that uh encompasses the main entrance.

15:00

And then that same base color that's at the ground floor around the building would be used as the accents for the horizontal band and the crosses and that surround that uh encompasses the main entrance.

15:11

Okay.

15:12

All right, thanks.

15:13

But you want us to approve both, right?

15:15

Then you guys will.

15:17

Yes, I'm sorry, but if you if you would, that would be ideal.

15:21

I mean, if you would like to make a recommendation, I'd be happy to pass it on.

15:25

But right now it's about 5050 among the congregation.

15:30

So I'm like we have a question, I'm sorry.

15:33

Chris has I was going to make a uh motion that we accept it with the uh option of the two colors and everything else as presented.

15:42

Did you have a question, Chris?

15:44

Okay, what's the question?

15:45

Oh sorry, I asked you if you had a question.

15:47

So my question deals with uh canopy and how again I know you said it one time, how it is affixed to the building and whether it is stationary and translucent, or is it opaque and somehow on connected to something that can move?

16:10

It does not move.

16:11

It is stationary and it is opaque.

16:13

It'll be a dark bronze, which is the same color as the framing for the storefront and glass there.

16:21

It is suspended from that storefront with hangar rods, but is totally permanent, fixed, and uh opaque.

16:33

Okay.

16:34

What came to my mind was what's been done at the airport, and was hoping that it would not be like the big canopy at the airport drive under the case.

16:45

I'm sorry, sounds like Brown, I'm not familiar with that.

16:50

Sounds a lot more reserved than that.

16:53

And I'll say I'm a neighbor from across the street at St.

16:57

James.

16:58

We have struggled and struggled over the years trying to waterproof whatever's over there.

17:02

So good luck.

17:03

I hope you're it's it's not easy.

17:07

Nice.

17:08

Any other questions?

17:10

That's all I think you want to restate your memory.

17:12

Yeah, I might I make a motion that we uh approve this as presented and included giving the church the option of the two colors that they uh have in motion.

17:24

Okay.

17:25

Any other discussion?

17:27

All those in favor.

17:30

Thank you, Don.

17:31

Thank you very much.

17:32

You should recruit Don to your church, and maybe he'll help you with your waterproofing issues.

17:40

After it gets up.

17:42

Okay.

17:44

36 Trammel Street, somebody here.

17:46

Yes, sir.

17:47

This is Jose Torres with uh PPR building design, and uh we are trying to get some stuff approved on a couple buildings.

17:55

Um it's replacement of the windows mainly, um, changing um some of the windows on building 30 to 35 and 45 for the PVC replacement windows, and on the historic one, which is built in 37, changing to wood, the the wood window sash replacements, lap setting replacement and decorative trim to repair on this building here.

18:19

So the the wood you're proposing is different from what's in your application, correct?

18:25

The what, sir?

18:25

The wood, the wood windows.

18:28

Yes, so the yeah, one of them is a wood windows and the other ones are the um PVC replacement.

18:33

Because I think we asked, and we were told they were all gonna be vinyl, but now you're saying they're wood.

18:38

Yeah, on building 37, it was yes, that one's a wood window slash replacement.

18:43

Oh, I'm sorry, yes, you're right.

18:45

They're all um PVC windows, you're correct.

18:48

Including 37?

18:49

Including 37 on one of the buildings, they've already approved it prior, so we're trying to get the approval on all the buildings as well.

19:05

If there are any other questions, or I'll explain the window issue.

19:09

But if somebody has some other question, but the issue is in our guidelines to have here somewhere.

19:39

Basically, it says that any windows visible from the public right-of-way, the exterior should be wood.

19:51

On on any of the buildings.

19:54

Well, if they're historic.

19:57

Because um, I think that the the historic one is 37.

20:01

And I like I said, on one of those buildings, we were priorly approved PVC window replacement prior.

20:08

So that's why we were trying to move forward on doing the same type of windows for all three buildings.

20:15

I mean that is correct.

20:17

Those some point the vinyl was approved.

20:22

Yes.

20:27

But we hear here I'll just read it real quick.

20:29

This is out of the guidelines 9.2.09.

20:32

Windows should be double hung slasher casement windows and finish on the exterior with wood.

20:43

And says um elevations that are seen from the public rights of way, in particular, the front elevation should always have windows that are finished on the exterior with wood.

20:53

Vinyl clad or one over one light double hung windows may be utilized on elevations that are not visible from public rights of way.

21:01

Example, the rear elevation.

21:06

So saying just the stuff that's not visible to the street to be plastic windows.

21:11

Yeah.

21:11

The rest would have to be wood.

21:12

Yeah.

21:13

Okay.

21:15

So we'll have to go back to the drawing board and talk to the uh the owner about getting that updated.

21:21

But if you want to come back in next month with a different plan, you can do that.

21:27

Okay, we can do that.

21:28

So I'll talk to them and we'll get this updated for you guys.

21:30

And do we need to resubmit anything else?

21:33

No, but before you go, let me look at the because you're also asking for siding.

21:39

Yes, sighting is lap setting replacement on building 37.

21:46

Yeah, you're gonna put like some kind of hardy product for the siding, right?

21:50

Yes, correct.

21:52

And then you had repaint the exterior, replace side staircase, install flyover roof.

21:59

Yeah, we showed the examples there, the colors and the sighting material as well.

22:05

So what we could do is approve everything except the windows, if that's the will of this group.

22:11

I don't know.

22:11

What if how is what is the staircase gonna be made with?

22:16

Is it just gonna be pressure treated wood?

22:18

Pressure treated wood, correct.

22:20

Leave it pressured exposed.

22:22

Yes, just like building number, I think uh 30 to 35 right there.

22:26

You can see where that uh um that staircase got redone at one point.

22:31

And some of these are apartments, right?

22:33

Yeah, yeah.

22:36

Or they're all apartments.

22:38

I I don't know.

22:39

Yeah, yeah, they're all apartments.

22:44

Well, that's why you have all these stairs, right?

22:46

So people can get to their unit.

22:48

Yeah.

22:55

So if you guys could approve that, you're saying come back with the proposal on doing the windows out of wood.

23:02

Just for the ones that are visible from the public right-of-way.

23:05

Okay.

23:06

But we can go ahead with everything else if that's agreeable.

23:12

Somebody wants to make a motion to approve everything except the windows if everyone's okay with that.

23:19

I'll make a motion to bike for light.

23:22

What's that?

23:23

Yeah, the the stairwell like for light.

23:26

Yeah, yeah.

23:27

Yeah.

23:28

I'll make the motion to approve all the items that he's requesting except for the windows.

23:34

Okay.

23:35

There are second.

23:37

And and just to make it clear, you're not denying the windows at this point.

23:40

They're going to come back next month with any other discussion?

23:47

All those in favor?

23:49

Thank you, guys.

23:50

So when you come back, remember just the ones that are visible from the public right-of-way.

23:55

Okay.

23:55

Sounds good.

23:55

Thank you guys so much.

23:56

Okay, thank you.

24:01

121 Church Street.

24:04

Mary.

24:10

Hello.

24:10

Uh Merritt Lancaster, Bridger Properties.

24:15

Um we are here for the front monument sign in front of Mary Station.

24:21

There she is.

24:22

Um I'm not exactly sure when that was built, but I think it was late 90s based on what we could figure out from the Google Earth images.

24:31

And so as we we're gonna redo the landscape in front, and what we're trying to do is paint that brick, which is obviously it's not the same brick that's in the old buildings, the same color is the wall that is adjacent to the parking lot.

24:44

Um side of seven tequila is there.

24:47

Uh we'll keep all the iron black and then redo the back of the signage to match the new awnings that were previously approved.

24:56

But it's just the sign, all right.

24:58

Just a sign.

25:01

The the uh church street name there is kind of white it out because of the white background.

25:07

Are you considering darkening that or yeah?

25:10

That was some AI.

25:11

We'll uh we will figure out maybe some different lettering that's more pronounced.

25:20

I move that we approve this.

25:23

Yeah, I'll say any other discussion.

25:27

I don't know.

25:27

Well, yeah, you said you'll change that because that's can't read the numbers or no, you can't see anything actually.

25:31

Now that I'm sitting here looking, that's kind of embarrassing.

25:33

Um I I think what we probably do is use the same.

25:37

Well, we would probably take we we'll redo those maybe with the same blue-green that's the the background of the signage that matches the uh the awnings on the Maria Station buildings.

25:47

But I thought the way your application is you're just gonna paint the um the sign and the railings.

25:56

You're not saying you don't say anything about the lettering.

25:59

We didn't, you're correct, we did not.

26:00

I think we but what color is the lettering now?

26:05

I believe it's currently white, which is why that looks like it does.

26:09

Bottom right currently okay, yeah, it is white.

26:14

So you're you would like to include painting the letters the same color?

26:17

Yes, sir.

26:18

So we can add that as a yeah, okay.

26:20

So what color do you want to paint the letter?

26:22

We use the same color as the background of the uh the signs, the upper myriad station, which all matches the awnings on the buildings.

26:31

So kind of that blue, correct.

26:33

Okay.

26:34

So who made the motion?

26:36

You want to I guess you want to resistate right?

26:40

I yes, I approve.

26:42

I uh propose that we approve this application contingent upon those letters being painted blue.

26:50

Okay.

26:52

You may want to you may want to tie the color.

26:54

I think on the application we actually got.

26:57

That's correct.

26:57

That's the exact color.

26:58

Yep.

26:59

Um, you may want to look at the I think it's the back page.

27:03

It's not if I'm following this correctly.

27:07

Yeah, right there.

27:08

Yeah, it's on the I can't read that bungle house.

27:11

Bungle house blue.

27:11

Bungle house blue house.

27:13

That's you want to say that.

27:14

I moved that we approve the colour.

27:19

Yes, sir.

27:19

I move that we have approve this application contingent upon the letters being painted bungle house blue.

27:28

Got it.

27:30

There's a second.

27:31

Sorry.

27:32

Any other discussion?

Discussion Breakdown — Share of Meeting
Historic Preservation█████████████████████████████████████████████83%
Permitting█████9%
Zoning and Land Use████8%
Summary of Proceedings

Marietta City Meeting - April 6, 2026

The meeting on April 6, 2026, was a regular session of a city board (likely the Historic Preservation Commission) considering several requests for exterior modifications to commercial and religious properties. The board approved a hanging sign for a business, approved a church's facade changes with two color options, deferred window replacements on historic apartments pending compliance with historic guidelines, and approved a sign repaint for a shopping center with a condition on lettering color.

Discussion Items

  • Hanging Sign at 148 Church Street – A business owner requested approval to add a hanging sign (16" x 20", wood, treated for weather) using existing hooks on the soffit. The sign would be black, white, and yellow (matching the door color). There was discussion about whether a variance was needed; the board confirmed no variance required as it would be the only sign. The board approved unanimously.

  • First Baptist Church Exterior Changes – Don Dorsey, representing First Baptist Church Marietta, requested approval to repaint the Family Life Center (corner of Dobbs and Church streets) with a light cream color to match the main building complex, add a dark bronze metal canopy (25 feet wide, opaque, stationary) for weather protection, install new handrails replicating existing architectural theme, and repaint the banding, cross, and entrance surround using one of two color options: Option 1 – very light cream with a white accent; Option 2 – darker grayish brown (matching the base of the building). The church was split 50/50 on the color. The board approved the entire proposal including both color options, giving the church the choice. The board also noted the metal canopy would not resemble the airport canopy.

  • Window and Siding Replacements at 36 Trammel Street – Jose Torres (PPR Building Design) sought approval to replace windows on buildings 30, 35, and 45 with PVC, and on building 37 (historic, built 1937) with wood window sash replacements, plus lap siding, repaint, replace a side staircase (pressure-treated wood), and install a flyover roof. Board members pointed out that historic guidelines (Section 9.2.09) require wood windows on elevations visible from public rights-of-way; PVC is only allowed on non-visible elevations. Since PVC had been approved for one building previously, Torres initially claimed all windows were PVC, but then corrected that building 37 would have wood. The board determined the window proposal did not comply and directed Torres to return next month with a revised plan for wood windows on visible elevations. However, the board approved all other requested items (siding, repaint, staircase, flyover roof) contingent on the window deferral. The motion passed.

  • Mary Station Front Monument Sign – Merritt Lancaster (Bridger Properties) requested approval to repaint the brick base of the monument sign at 121 Church Street to match an adjacent wall, redo the sign backing to match previously approved awnings, and paint the iron black. The lettering (currently white) was hard to read against the white background. After discussion, the applicant agreed to paint the letters the same color as the background of the signage (Bungle House Blue). The board approved the application contingent upon the letters being painted Bungle House Blue.

Key Outcomes

  • Hanging sign at 148 Church Street – Approved unanimously with no conditions.
  • First Baptist Church facade changes – Approved with both color options, allowing the church to choose.
  • 36 Trammel Street (windows, siding, etc.) – All items except windows approved; windows deferred and must come back next month with a proposal using wood windows on elevations visible from public rights-of-way.
  • Mary Station sign – Approved contingent on lettering being painted Bungle House Blue.

Meeting Transcript

Um our request today is to add a sign, like a hanging sign, like you see other businesses have on the street. Um it is black white, and then the yellow is the same color as our door, which is the colonial yellow that's in the approved colors. I know it shows different, but I promise it's the same. Um that is our logo. Um the sign is sixteen inches tall by twenty inches wide. Um it is made of wood, it is treated so that it will not it will withstand the weather. Um, and it'll just be hanging. There are two existing hooks already um in the soffit that we will be hanging from, so we won't be doing anything to the building. All right. Shelby, does she need a variance or anything? Hard to tell. Do you guys have another sign? Like a main sign. This would be our only sign. We don't have any signage on the building. We have the awning, but that's all we have. You have the door. Well, okay, yeah, the door. Um is this gonna hang from the yes, it will hang from the you can't see them, but there are two hooks that already exist. Um I'm assuming previous businesses used. So like when you're walking down the street, you will see it. Yeah, you will face it. So the bottom's gonna hang down, but but it's gonna be above the door. Uh yeah, it'll come yes. It's it'll like very little. I know it this is a you know, proportionally is not exactly right, but I wanted you to be able to tell where the sign was gonna be. Um but yeah, it will barely hang it maybe like an inch below the door height, honestly. But yes, we made sure that we measured for like people height and walking and things like that. Yeah. All those in favor. Thank you. You're thinking that's uh one forty eight church street. Oh, that's a good thing. Um the agenda was he's there next on the addend. Well, I'm not complaining, I'm just trying to find it. No, because the agenda is an amend amended agenda that I left. Yeah, it's on the amendment. That has one forty-eight on there. This is amended in red here. I left it on your I left gave each one. No, I'm not sure. Got it? All right, Don, go ahead. Good evening. My name is Don Dorsey. I'm a member of First Baptist Church Marietta, and here this evening requesting your approval to make a couple or three changes to the exterior facade of the building that we refer to as our Family Life Center, which is located at the corner of Dobbs Street and Church Street, right across Dobb Street from our main building complex. Stop Shelby at this one if you would for just a moment. This is shown for reference only. This is a photograph of the exterior facade of our main building complex. Sharing these photographs to illustrate the colors that we would like to use to essentially recoat or paint the Family Life Center that exists directly across the street from our main building complex that you see here.

SUMMARIZED BY OPENPUBLICA AI
TRANSCRIPT VIA PUBLIC VIDEO
openpublica.com