The Milwaukee Historic Preservation Commission met on Monday, September 14, 2026, at 3:00 PM in City Hall, Room 301-B, and adjourned at 4:57 PM. Chair Jordan Morales led the meeting. Present were Ann Pieper Eisenbrown, Matt Jarosz, Patricia Keating Kahn, Sally Peltz, Nicholas Hans Robinson, and Jordan Morales; Ald. Robert Bauman was excused. Commissioner Jarosz left at 4:50 PM, so votes on later agenda items were 5-0.
To order, Miss Carmen, can you take the roll, please? Yes, okay. Member Ann Piper. Yeah. Sally Pelt here. Nicolas Robinson. Excused. Mark Jerose. Matt's Girls. Robert Bauman, he also has to be excused. He'll be excused. Patricia Keaton? Here. And Jordan Morales. Here. Okay. Starting with item number one on the docket here, two six zero six two resolution relating to a certificate of appropriateness for installation of a playground, various recreational facilities and alterations to the comfort station all along Minaky Avenue at seven five zero East North Avenue. Kilborne Reservoir Park, an individually designated historic property for Milwaukee Waterworks. They have to be widened to be accessible doorways. It will add a water fountain and buttons for accessible access and push buttons for accessible access. This is the main front. This is where the potential concession stand will go. They're going to operate that via Dutch door. So that door will be changed. And here is the building in its new context. Comfort station is not being moved. Picnic shelters will be added next to it at a one-foot distance, so there won't be splash back from the roof on onto the half timbering of the original. And extensive playground equipment will go in. So on the guidelines for the comfort station, retain existing windows and doors. Respect the building stylistic period. And if replacements are necessary, replacement should duplicate the appearance and design and material of the original window or sash or door. What we have proposed right now are slab doors. They are going to have to come up with a better plan than that, but given the uh given the location and use, steel or similarly sturdy doors are appropriate in this case. There's also no details on what is planned for the windows. Additions, technically, it's not an addition. The sheds are just adjoining, although they will be very close. A lower roof pitch might be desirable to leave more of the half timbering up visible from outside rather than under the picnic shelter, but that's really a judgment call of the commission. And then we will get into the playground. Paths are almost all untouched, except for this kind of the northwest corner between the purple play area and the enchanted forest where they're putting that round feature. Otherwise, the main change is the switchback trail up to the top. Enlargement of the basketball courts. Going up the slope with the uh sensory areas and switch back trail. One of the reading nooks. Play areas. And the grading plan. If you can see the dotted line kind of along the path on the right edge. That is the extent of all modifications except for one flower bed on the hillside. That appears to be integrated into the current slope. So staff is recommending full approval of the changes to the comfort station and this concept for the playground. That is it for us, and I am sure you will have questions for the proponents.