0:04Good evening everyone.
0:05Welcome to the July 8th meeting of the City of New Rochelle Department of Development Historical Landmark Review Board.
0:13We have a somewhat shortened agenda because we have some uh adjourned uh items.
0:18Uh but uh tonight uh we uh have a couple of items beforehand.
0:24Um I think is probably first.
0:28Um Rose Bofamante here.
0:31Lucia Elliott is out.
0:35Leanne Merchant here.
0:36Belkis Rees CUNY here.
0:38Don Richards is out, and staff members with us today, Soraya Bahabib, deputy building official, Kevin Kane, Director of Planning Sustainability, and myself, Benito Sahas, senior project manager.
0:52Uh that means we do have a form a quorum tonight.
0:56Uh so we can uh vote if necessary.
1:00Uh we're gonna just gonna jump into the uh approval of minutes.
1:05We have none tonight, so we can go right over item one, one point one nine.
1:11Uh then we'll go into the public hearings.
1:13I'll read out the adjourned ones just so they're they're on the uh television record.
1:18Uh public hearing item number two, public hearing 2.1 application HLRB 4-2026 by Mario Canteros for a certificate of appropriateness to legalize existing improvements, including a porch enclosure pool, outdoor kitchen detached open porch, fire pit, pizza oven generator, HVAC unit for foot IPE driveway gates, and a four-foot cable rail fence along the side yard, as well as to construct a new garage, install pavers, and add new front steps and a walkway at nine the court block eight two eight, lot fourteen in an R1 Historic Zone District.
2:00We are adjourned to the September meeting.
2:03Uh we can jump to 2.2 HLRB 5-2026 by Nishelle Arjuni for a certificate of appropriateness to construct a raised patio and detached garage in the front yard for an existing one family dwelling at 14 the boulevard, block 827, lot 42, and in R1 Historic Zone District adjourned until further notice.
2:29Uh and uh 2.3 application HLRB 7-2026 by Josh Lucina Picardo for a certificate of appropriateness to legalize a wooden enclosed fence at the side and rear yard at 40 Earl Place, block 879, lot 35, and in R1 Historic Zone District adjourned to the September meeting.
2:52Uh those are all adjourned, so we can go right to 2.4.
2:56Uh anybody's here for it.
2:58Okay, let me just read it.
2:59Uh application HLRB 909-2026 by Cameron Christensen, Momentum Solar for a certificate of appropriateness to install solar panels at 250 the Boulevard East, block 878, lot 45, and in R1 Historic Zones District.
3:28My name is Kate Weisberg.
3:30I'll be presenting the project for 250 Boulevard E.
3:38This is my first time attending one of your historic meetings, so I'll just navigate us through the plans.
3:43So we'll approximately have four rays.
3:46An array is a panel set.
3:49We have three arrays in the front, one large in the back.
3:53Sorry, didn't mean to go so fast.
3:56That's a front of the house.
4:03Up so I'm doing the house.
4:16This is what the view looks like.
4:19And um this will also show the distance where the houses approximately 50 feet away from the sidewalk.
4:33The back of the yard.
4:37This is what the street view looks like.
4:41And the surrounding properties.
4:47And then we also have what it would look like if we removed um the front.
4:55We have three rays in the back, uh, the one large one in the front.
4:58Um this would be this is what would happen.
5:00The production would basically cut in half if we uh get rid of the array in the front.
5:05But this is what it these are the two hypotheticals.
5:12It would be it would decrease by like 56.76%.
5:20What was the reduction?
5:21Oh, the reduction, 56.76%.
5:23If we get rid of uh the front panels.
5:25Yeah, I think I mean I can tell why we may just want to point out I see the north arrow there.
5:29So the the exposure and I think it's pretty obvious, but for anyone hasn't seen it.
5:37You know, the southern facing is on the front, right?
5:39So that's why you gotta put the panels in.
5:41No, we we try to make sure it's as aesthetic as possible.
5:45And we do try to make sure if panels can go solely in the back, we do aim for that.
5:50But unfortunately, with this system and the amount of power they use, this is um what was designed.
6:03Okay, can you go back to the the the roof picture with both both roofs?
6:07Yeah, yes, here you go.
6:09Um obviously that's what they want and what you would recommend as getting the power that you want.
6:16Yes, it would meet it would meet their production.
6:18Um it best suit um their utility usage.
6:21In New York State, you can't go over 110% of their of your annual usage.
6:27So it's also nothing egregious of like it's not like they're they're putting panels on so they can get a bunch of money on the grid.
6:36Okay, and and can we see the front elevation again?
6:44Oh, no, no, just go one more actual photo.
6:49Oh, the actual photo, okay.
7:00Um it's one of those houses with the uh lower pitched upper roof because of the gable.
7:09And we've looked at them before.
7:13Uh and I think I think what we've decided, I mean that's what I remember is that the lower pitch takes the uh channels out of your view a little bit better than a steep pitched roof.
7:28Uh and that that's what I would relate it to past approvals like that.
7:33Um it's symmetrical about that roof that we we see right there.
7:39Is that uh on the plan?
7:42I can go back to the plan if you'd like.
7:44And yeah, if you can, I you know, just uh Yeah.
7:49So you see right from the corner of the hip valley, I should say.
7:55Uh and um since it is that length uh I um what I'm aiming at was is it related to the just the window arrangement below?
8:06I don't think it is, but it's just a straightforward uh required walkway and then open.
8:11Yeah, those are the fire access points just in case God forbid um any fire there there's fire access points.
8:19Any comments from the board no uh can I open it up to the field here?
8:32Anybody have any comments on the proposal?
8:34Any neighbors or anybody here?
8:37Uh if that's the case and no with that.
8:41Uh would someone like to make a motion that it be approved or denied.
8:47I'll make a motion uh because of its similarity to uh other uh low-pitched roofs and the distance from the street, which is pretty good for front yards.
8:58Um I would say that we uh uh uh may I may I make the motion that we approve this one as presented.
9:05Do we have the second I'll second it?
9:09Just one quick question.
9:11Oh uh it's it it's black, right?
9:15Okay, I'll second on black.
9:28Thank you so much, guys.
9:28Have a very good evening.
9:43Okay, uh our uh 2.5 application, HLRB 10 uh-2026 by Trinity Episcopal Church for a certificate of appropriateness for installation of clear glass panel in front of the exterior side of existing glass clear story windows at 311 Nugenot Street block 417, lot 24, and a DB zone district, although it is a historic building, it's here.
10:11So hello board, my name is Thomas Monarski, architect for the church.
10:19So we're proposing to uh replace deteriorated clear story window units and glazing above the nave.
10:30Um the existing wood frames and glazing are damaged deteriorated and no longer performing.
10:37Um the proposed replacement will improve the weather resilience durability and energy performance of uh the church, and we hope um we'll address some of the concerns from uh our last presentation about the um uh cathedral glass.
10:59So uh the scope of the work is to uh uh install clear glazing on the clear story of the the nave and uh install the existing cathedral glass behind the new glazing um thereby improving the energy performance of the building.
11:25So this is uh some of the existing windows.
11:29Uh and our intent here just so um while I have these pictures up is to uh to maintain the existing profiles of uh uh of this facade.
11:44Um the plane at which the cathedral glass is that would be the plane where the new clear glass would go, and the cathedral glass would then sit back about an inch and a half behind that clear glazing.
12:01Uh this is the plan and again the elevation showing the two bands that we intend to work on, and a um schematic detail showing how we intend to do this.
12:16So the um the existing windows, uh the frames will be rebuilt uh completely because they're too deteriorated to reuse.
12:27We would uh insert that new clear glazing at that plane of the existing cathedral glass, and then the um the cathedral glass would sit behind there, and there'd be like uh uh a double rabbit on the frame so that the cathedral glass uh can be installed from the back.
12:52And this is important because one of our one of the things uh I asked the board is that uh we get some kind of accommodation for how long this is gonna take.
13:05We would like to um install the clear glazing um and we can install at least partially some of the cathedral glass, but uh the church is not financially able to restore all the cathedral glass at this time to at you know to to what it needs to be.
13:27Um a lot of the um I would say half of the uh work that is being done is being funded by NYCERTA as part of uh clean energy incentives that we're we're getting uh because the church did um transition off of uh I think it was either gas or oil and is now completely electric.
13:50So that's important to note, I think, just um and um so the all the the new window units will be custom fabricated wood, uh all the exterior profiles are gonna match.
14:07Uh we will maintain the the same um glass size and everything.
14:15Um intend to match the exterior at exactly paint and everything.
14:26Um and just a quick note on the um the glazing units we intend to use, so they'll be uh uh point thirty two to point thirty six uh U value um and uh uh let's see sorry.
14:49Yeah and solar uh heat gain um value as well.
15:00Um just a summary um okay, additionally a summary of the the window performance and um our ask is um to allow us to continue with the work.
15:21All right, um just to just to clarify it, uh your detail, you have the the new window and then the the uh vintage, so to speak windows.
15:30How what's the distance between that?
15:32It didn't look like it was great, but um it's gonna be about an inch to an inch and a half.
15:39Um it looks like it's it's a large gap there, but that's um just the scale you're drawing at.
15:51So what what we're saying is the existing stained glass is remaining.
15:56Um being reinstalled.
16:00But as you can see, the the existing cathedral glasses in in really bad shape.
16:07But I just want to know the scope of this project, all the stained glass that's there now, the intent is eventually for it all to do.
16:15The intent is eventually for it.
16:17Slightly moved back.
16:20Yeah, so so you could actually, I'm I'm sure you could see it with the uh new glazing in front of it.
16:26Uh yes, that's the intent.
16:27And then on the person on the inside will get the effect of the old uh, yeah, on the inside, yes.
16:33And then uh also on the outside, I think um uh you see a lot of churches installed.
16:41I've seen this happen before where the uh insulating piece goes on the outside to protect specifically to protect the the um the leaded glass.
16:50But it also has the benefits you see.
16:52Now just just in one thing you mentioned because you mentioned it, um the uh the energy code, the building department will look at that.
16:59But uh and whatever qualifications you have to do to meet the uh the glazing, as you know.
17:05Uh just I just wanted to because you mentioned it, I thought I'd just bring it on the HLRB table that way.
17:11Um then uh the other question I have is uh uh you you mentioned timing, which obviously is an important aspect with your with your finances, the church's finances.
17:25Uh I think probably because uh sometimes projects uh I'm just anecdotals projects can drift on into years and then everybody forgets what's supposed to happen.
17:38Uh I'm sh I'm hoping the church would be amenable to some kind of agreement in the permit if that's legally possible uh or or a condition.
17:48I think that the permit would not be closed out.
17:51Okay, there's some mechanism to make sure that the the project keeps going on, especially with putting the old glass back in, which is the most important part of the proposal.
18:01Um so that I just want to bring that up.
18:04It's gonna be under a permit, so they're gonna be watching it.
18:09I think uh that's reasonable.
18:12I just want to say one thing about the permit on the microphone, sorry.
18:15Like people leave their permit open for 30 years, you know.
18:20So that's what I think.
18:22That's not really an enforcement of a condition if you want the condition.
18:26Uh however, it can happen, that's all I'm saying.
18:29And Kevin brought up a good point.
18:30It's under a permit.
18:31So it's under a permit, right?
18:34Doesn't force them to finish the work.
18:37Um just quick, so in relation to what Zaria said and and the fact that we know a permit will be open.
18:44Is there any way that we can um stipulate like a timeline?
18:49I'm not saying three months, but you know a year, and then we re-evaluate to see where they're at.
18:55Yeah, yeah, time check.
18:57So okay, that's what I'd like to do.
19:01Yeah, we're happy to come back and in front of the board.
19:04I would imagine when the the first phase of the project is done, at least some of these would be uh installed as a mock-up for the board to look at uh because I'm sure at least some of them we haven't been able to really get up there properly without scaffolding, but um uh we should be able to reuse at least some of them.
19:29Um you know, I I definitely appreciate the fact that that you're taking um this step versus initially I believe it was just removing removing them all.
19:40So we definitely appreciate maintaining the historic aspects of the church.
19:44Um so in re-evaluating, let's just say in a year's time, like the status, how it's going.
19:50The only other thing that I would ask is if for some reason if you find that any of the current stained glass is not it cannot be put back, that you let us know or contact um uh the department so that we can evaluate what's what's happening, you know, before the year's time, you know, as you go along.
20:08Yeah, I I I think that's good.
20:10I think that should be noted.
20:12And however, in fairness, I think to the applicant, and then following what you know we typically do, like say with the planning board, um, you know, usually you have a year to pull the building permit to to do the work.
20:24Um, and then from that point you have a year uh to finalize the work.
20:28So I think I think maybe we should just keep that in mind that um they haven't been this prep.
20:37They haven't been given the permit yet.
20:39We're deciding, and then they would get the permit.
20:41So let's just say they got the permit in September.
20:44So what I was suggesting, and I don't exactly know exactly how the planning board, you know, what you're saying.
20:49So if they get it in September, I'm looking to see them to come back to us next September and let us know where how they're doing.
20:57So one year from the issuance of building permit.
21:01What happens with the rotted wood that's exposed now?
21:04What are you taking care of that?
21:06Uh I it's fair to say that all of the rotted wood that is uh comprising the existing window frames is too far gone to use.
21:16So we would replace that in kind.
21:19The um uh the soffit trim, that big ground piece, that's still not determined exactly what we can do.
21:26Uh we want to see if we can use consolidants to stabilize that and possibly keep it in place and refinish it, but that might need to be replaced as well.
21:36We don't quite know how badly uh deteriorated it is.
21:40Because the church in general also needs a new roof.
21:42That's kind of like the next thing down the road.
21:46Um but is it copper towards the bottom there?
21:50Or just yes, I think uh a lot of it is copper, some of it seems like it was yeah, it's all copper.
21:58I'm trying to see if maybe some of it was replaced with uh aluminum along the years, but probably not.
22:06But anyway, we would come back with copper.
22:08Anything that goes back, we'd go back with copper.
22:11Can I ask a question?
22:12Um, just for clarification.
22:14So we're saying on that picture you've got the plywood, that's actually in place of where the stain.
22:21So there's some stained glasses.
22:23Yeah, some of it just fell out, yeah.
22:25So in that case, I know you're going to repair the um the lead and the existing stain, or will those be re is there gonna be a replic replica of the uh yeah, uh uh eventually if when these get uh um I guess uh uh restored, because you'd have to restore the panels of leaded glass before you put them in.
22:54Um you can um fabricate a new piece.
22:59Uh that will be very similar to what they are around.
23:03That that this type of glass um we we've done it on a previous project, and surprisingly enough, it's fairly easy for them to get good matches with what you see there, this kind of um, you know.
23:20I I don't know how you describe that ocean colored glass or something.
23:27Uh well described and uh uh I I think it's a good solution because I've I've seen similar things like that done.
23:36And I'm so glad that you're keeping that stained glass in there in proximity to the other glass so you can see it.
23:43Uh with this whole thing.
23:45Um I love the way it looks all beat up like that, except for the damaged piece, but it's uh I'm glad you're doing it the way you are personally.
23:55Uh any comments from the board further.
24:03Any comments from the audience.
24:07We just want our roof there.
24:16I think they'd like to see it done.
24:19Uh anybody want to make a a motion on this one?
24:23Uh we close the uh public hearing and and uh make a motion.
24:26Jim, before we do that, I think we started to craft a couple.
24:32I think it's a since your mention.
24:38My name is uh the Reverend Eliza Davies have the priest uh uh at Trinity Church.
24:45We've been going back and forth on this for a very long time.
24:49And we have a small fund raised for this, and we uh uh trying to hold on to the fund that we may lose if we don't proceed with this uh as soon as possible.
25:06And we really appreciate if you could look into this uh a little bit more uh in our favor.
25:15Not only that, because if this thing is is if it's left alone, it will go worse than it is.
25:24So thank you very much.
25:25Yeah, I think we're we're there as quickly as we can tonight.
25:30So let's see if we can go even faster.
25:35Uh everyone wanted to say something.
25:40Uh yeah, I think we had a couple conditions.
25:43Um maybe I'll kind of go through what I have and then uh Benito can correct me and keep me correct.
25:50Um year from the issuance of a building permit, the applicant shall return to the board for a review of the timing of completion of the project as necessary.
26:00The applicant shall request an extension subsequent to any extensions that may be granted.
26:05If the scope of work is not complete, the applicant shall be in violation of this approval.
26:12Uh updates on any issues uh with the removal and storage of windows during the course of the work shall be provided to the board as necessary.
26:21That speaks to the comment earlier that if there's any issues with the removal, any damage, any any issues that come up.
26:28Um you need to update the board so it's not uh uh given to us you know last minute.
26:34Um that's all I had, Benito.
26:37Do you have anything else?
26:39So we are drafting those conditions, they may be modified a little bit, but are those acceptable to you?
26:51Are we back to do we have a motion?
26:56I'd like to uh move that we uh approve the Trinity Episcopal Church for certificate of appropriateness for the installation of the clear glass panel in the front of the exterior side of the existing clear story uh glass clear story windows at 311 Huguenot Street, and then subject to the timeline specifications that we will Do we have a second?
27:23Any opposed motion passes.
27:26Thank you very much.
27:28Thanks for bringing it back.
27:36We have no other business this evening.
27:38Unless there's anything else, is there a motion to adjourn?
27:42I motion to council.
27:49Thank you, everyone.