North Kingstown Planning Commission Meeting - November 15, 2022
STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE
North Kingstown Planning Commission Meeting - November 15, 2022
The North Kingstown Planning Commission met on November 15, 2022, to consider two major agenda items: a preliminary plan application for a two-lot conservation development at 155 Essex Road (Item 3B), and a development plan review for a 96 sq. ft. donation center shed at the Masonic Lodge property on Ten Rod Road (Item 3A). Both items were approved unanimously, along with the minutes from the November 1 meeting.
Discussion Items
Item 3B: Preliminary Plan – Steven Allen, 155 Essex Road (AP 158 Lot 14)
- Applicant Steven Allen proposes a two-lot conservation development in the Neighborhood Residential (NR) zone and Groundwater Recharge Area. The existing dwelling will remain; a second dwelling will be created by converting an existing barn.
- Staff (Becky) presented that the property's groundwater designation (new mapping) subjects the entire site to bedroom-based density: up to 9 bedrooms total (4 existing, 5 remaining). The applicant calculated land unsuitable to support that number.
- Discussion centered on allocating bedrooms between lots for enforcement. The commission recommended and the applicant agreed to allocate 5 bedrooms to the new lot (barn) and 4 to the existing house, though this is not mandated by ordinance.
- Access and utilities: A moratorium on cutting into the recently paved Essex Road prevents a new water line connection. The applicant will work with the Water Department on a shared water service from the existing line, with independent shutoff for each lot. The driveway will be shared, using the existing curb cut to avoid a sharp turn that concerned the fire marshal.
- Open space: The applicant will merge two open space lots (Lot C and Lot X) into one parcel of over 400,000 sq. ft., exceeding the 50% open space requirement.
- Conditions include: consolidation of open space, bedroom allocation, new on-site wastewater treatment systems (OWTS) replacing the existing cesspool, shared driveway with easements, and final plan submission with updated drawings.
Item 3A: Development Plan Review – Jennifer Chase, Masonic Lodge Property at 1515 Ten Rod Road
- A request to erect a 96 sq. ft. wooden donation center shed for clothing donations.
- Chair Grundy recused himself as a Masonic Lodge member but stated no conflict of interest and participated.
- The shed is similar to one previously approved at the Carriage Inn and has been operating for five weeks, collecting about 50 bags of clothing per week (571 pounds), which clothed 105 people per week worldwide.
- Staff and commissioners noted the wooden shed design discourages illegal dumping compared to metal bins; volunteers from the Lodge will monitor the site weekly.
- The commission found the proposal consistent with all applicable findings: no adverse impact on the neighborhood or groundwater, no traffic concerns, and compatibility with the scenic overlay district.
Key Outcomes
- Item 3B (155 Essex Road Preliminary Plan): Approved unanimously (5-0) with conditions, including bedroom allocation, shared driveway and water service, consolidation of open space, and OWTS upgrades.
- Item 3A (Masonic Lodge Donation Shed): Approved unanimously (5-0). Decision to be recorded; applicant will receive notice within 20 days.
- Minutes of November 1, 2022: Approved as amended after one wording correction on page 5.
Meeting Transcript
3A isn't here yet. So we're going to move on to item 3B and we'll circle back to her shortly. What we have item 3B is a preliminary plan application. Steve Allen for two lot conservation development proposed that assesses plat 158, lot 14, 155 Essex Road, located in a neighborhood residential zone in a groundwater recharge area. And we've seen this a few times over the last few years, and we did have a site visit out there. And uh I think the applicant's attorney knows the process better than I do because he did it longer than I have. Um I'm sorry, engineer. Uh not to look at this, but what we'll do is staff will walk us through first, and after questions, we'll let the uh applicant uh present anything that they have. And Becky, you're gonna I'm I'm all there is tonight. Is this not working? Can you hear me? I can hear very it is okay, all right, good. Um again, this is the application of Steve Allen uh plat 158 lot 14 on 155 Essex. Um it's located in the neighborhood residential zone and also the groundwater recharge area as well as the um oh actually this one is not in the scenic overlay, the first application was um there is an existing dwelling on the property, and then the remaining property is largely wooded. Um the applicant is proposing just to add one additional house lot and then some associated open space, which I'll get into a little bit later. Um they are proposing a conservation development, and as proposed, the development meets the lot area requirements. Typically NR is 40,000 square feet, um, but for conservation development, you only need 10,000 square feet, um, 20 feet of frontage and 25 feet in um depth, and the proposed lots do meet those requirements. Um the as you recall from earlier this year, the groundwater ordinance was um changed, and as part of that change, we adopted new mapping. Under the previous mapping, only a portion of the lot was in the groundwater, but with the new mapping, the entire lot is in the groundwater. And really the only difference that makes for this application is the way in which we determine density. It used to be that it was one dwelling unit per two acres of of land. Now it's four bedrooms per two acres. So we're taking the lands unsuitable, which the applicant calculated for us. Um and again it it it gets a little bit confusing because I think they're gonna be we're staff is proposing that they merge in the two open space lots, so it could have given them a little bit more land unsuitable, but as presented, we used the land unsuitable and then did the calculation for the number of bedrooms based on that. Um similar to what we would do with a typical subdivision, doing one, you know, two-acre, you know, the density based on two acres. And so they can have about nine bedrooms for the entire site based on the amount of land unsuitable. There's four bedrooms in the existing dwelling, and that leaves them five bedrooms for the rest of the property, and they can either apportion them, you know, one to the new house or all five to the I mean five to the new house, none to the existing, you know. However, you know, and we're gonna have to figure out at the staff level how we're gonna um monitor that because you know now it's not based on acres, you know. So once a lot is is divided, it's done. We're gonna have to somehow monitor over time that that number of bedroom, not just for this one, but for all applications, that that number of bedrooms is restricted to what was approved as part of the original um subdivision. So that's something we're working out as we're using the ordinance. Um let's see. I think I covered that. So um in a NR zone, the con and for conservation development, 50% of the land unsuitable um has to be for open space. And so they are meeting that requirement as presented with that lot C and not even including the lot X in the back. Um and I can jump right to that. We we found when we were reviewing the application that it was getting a little bit confusing to separate. We were uncertain as to why that lot in the back was kind of kept as a separate unbuildable lot. And I spoke with um the applicant in their engineer. I spoke with with our engineer and he spoke with with Steve that it probably made sense since he wasn't planning to build on that lot at any time anyway, just to merge it in with the lot C and make one big open space lot. Um so I think they're amenable to that, and staff definitely would support that. It it just makes it cleaner for review too, and then you only have one lot instead of um two separate open space lots. In terms of um traffic and access, there's an existing driveway to the existing dwelling, and they're proposing well the original plans that you have in your packet were was proposing a private per private pervious drive to access lot B. Um as you saw in your comments, it's related to a couple of different items at the TRC, the Department of Public Works, um, Deputy Director Allie Sparks let us know that the road was recently paved and there's a moratorium on cutting into the road at all for five years. So then that doesn't allow Mr. Allen to put a water line because it's on the opposite side of the road, so they have to cut up the road to put the water line in. Um if he had to do any kind of excavation the right way for the driveway, that would be limited too. I think the main concern was the water. So at the TRC, um Tim Cranston was there also, and I think there um he's open to having um a T or or something put in from the existing water service to the existing house at 155 and allowing water service to extend to the new house. And then in you know, in the future, when the five years is up, they could then go and get the water service to the house.
openpublica.com