The North Kingstown Planning Commission met on Tuesday, March 5, 2024, at 7:00 PM at Town Hall, 80 Boston Neck Rd. The commission addressed a master plan extension request for a major subdivision, approved a development plan for outdoor pickleball courts with conditions, and discussed ongoing zoning ordinance amendments.
Town Planning Commission. I guess we'll go right into it. Our first agenda item is uh an extension request, master plan decision for uh WDIC L L C a 78 lot major subdivision located off Sea Winds Drive and Taylor Place, also known as AP as uh assessors plot 109, lot two zoned post roads good evening. Um the applicant is requesting an additional extension, so they've already received the two basic mandatory extensions that you're required to um give them. They're asking for another year. We have been working with them, they've been working on um obtaining sewers and some of their other approvals, so they it's not as if they have been quiet and silent, they have been working with this. So from a uh department perspective, this is not an unreasonable request. So is there is there a specific uh cause of the delay? Or um if Eric wants to or Bob wants to give any information on what they believe would be the reason for it, that would be fine. Uh good evening for the record, Eric Preebee, P R I V E. Um a uh registered professional engineer with Depreet Engineering. Uh yeah, the uh thanks for having us. The um so the extension is requested as mentioned it is outside of the state statute uh allowable one and then you have to come back and give a reason. Uh a couple of the reasons are we have um obviously we're connecting to Reynolds farm, uh phase two D. That road wasn't even in for a little while, and it's actually just starting to come online now. Um we're working through the wetlands permitting with DEM wetlands program as well. Um we didn't want to start that too too early right after because that has a four-year life as well when we get that wetlands permit, it's a four-year life. So if we get that right off and there's not even a road to attach to, so there was a little bit on that while we worked on some of the other items. Uh one of the uh really important things we were working on as well was working with uh Kwanza QDC. One of the discussions that we had with the planning commission at the master plan also was uh trying to maximize some of the separation uh from the industrial uses of QDC and Quanzett. So we've looked at and we've worked with qua with QDC to uh move some of those units even further down. Um and with that we had to kind of restructure the stormwater that comes with it. So we've been working through DEM. We actually got submitted to DEM for the freshwater wetlands permit since August of 2022 as well. So we've been working through it along the way with QDC uh as well, kind of going through and working through the stormwater measures as well. So um I did want to note as well, none of the regulations have changed between that time, so there was no zoning changes, there's no subdivision regulation changes, so it's not like there's anything that would be different if we came back to you with a master plan. Um so we're not we're not looking for anything from that regard. But you come back with us with the preliminary plan. Correct, yeah. And then we do as I mentioned, we've been with DEM wetlands. Um probably looking to wrap up in the next two months. I think we'll have our permit, and then we'd be looking to come back in for the preliminary plan with the town. So we're close, but we're it was close enough with the May deadline to obviously it's only March right now, but it's close enough with the May that we wanted to make sure we we thought it was going to be a little too close to to get in and be certified complete in advance of that time. So we're just requesting the one year extension. Okay. So probably the real driver would be just the progress on which I can you know I've seen by observation to see how things are progressing there. Yeah, we've as much. I mean, we haven't been sitting on our hands, we've been moving right along, and it is the the intent of the developer to to move this as quickly as we can. And I mean they want to would like to get moving on it too. So I believe we do need to make a finding of fact in in support of a waiver. You should we have any discussion from good I'm okay? Because I I I think the uh the um a finding of fact would be that we should uh grant the waiver due to the fact that the uh the current project depends on um on the progress of Reynolds Farm and Reynolds Farm's progress uh has not been as fast as as was originally expected, something to that effect. Um is this would we uh is this one where we'd vote tonight or just take the consent vote tonight? Okay. Uh you have a motion on the I'll make a motion that we approve the extension. Is there a second? Second. depends on um on the progress of Reynolds farm and Reynolds farms progress uh has not been as fast as as that was originally expected something to that effect um so is this would we uh is this one where we vote tonight or just take the consent vote tonight okay uh we have a motion on I'll make a motion that we approve the extension all in favor hold on AI can we just identify that it will be uh based on the date of the decision to May 13th of 2025 correct that until May of 25 it wasn't it was a second by second yep all in favor say aye aye any opposed thank you take them out to dinner Bob next uh next item up is development plan review application request by Lil Roadie pickleball for proposed outdoor commercial pickleball courts to be located south of 6615 post road cessors plat 157 lot 143 zone post road and located in the groundwater recharge area we'll start out with a brief from the I'll just give a little little overview um I'm sure everyone's pretty familiar with the complex I'm not sure if you had a chance to um go to the site but as Pat mentioned it's for 6650 and post road it's a um commercial plaza now where the um current TJ Maxx and tractor supply is located um it is zoned post road which you know is a mixed use area and it's also in our groundwater um recharge area which is the reason why it's before you tonight because any change of use or improvements in groundwater um need development plan approval by the planning commission it's not an administrative approval um they don't need any relief at all um from the zoning board so what the applicant is proposing is two outdoor pickleball courts so currently they're operating um inside the building right next to TJ Maxx where I think the Sears um used to be in the building and now they're looking to expand um to the outside with those two courts it would be um off the southern portion of the building and um they are proposing to have a six foot high green vinyl coated fence and um that's important to note just because it is in the post road corridor and we do have design standards so they are proposing at least a vinyl coated fence to help um mitigate some of the impacts of just a regular kind of gray or steel looking fence. That's about you know the only thing that would really be subject to any design standards besides signage for this proposed use. The flow of water away from the building um and fix some of the potholes that are existing as you know uh the truck traffic travels in and around the building um right next to where the proposed uh pickleball courts are going to be the um I'm not sure if it was in your staff report but the fire marshal did meet on site with the applicant they took a ladder truck out to the site um to ensure that it would have clearance over the six foot fence which it did the applicant actually responded um by amending the plans as you see them tonight you can tell the two corners on the southeast and southwest um have been kind of angled the corners have been cut off so there's a little more turning radius available there.