The Peekskill Planning Commission met on January 13, 2026, to consider four major items: a recommendation to the Common Council for a multi-tenant industrial facility, a continued public hearing for a cannabis manufacturing facility, a public hearing for an amended site plan at a condominium complex, and a renewal of approvals for an office-to-apartment conversion. The Commission also handled a referral to the Zoning Board of Appeals and deferred a parking waiver issue.
One of our members won't be here, and the other one we think should be here shortly. The first item on our agenda is a recommendation to common council and a secret review for the proposed change in use and intensity from a single manufacturing occupancy to a multi-tenant mixed-use commercial facility with outdoor storage on properties located within the M2B Design Industrial District. The proposal uh the applicant is um Westchester Industrial Complex, Charles Cartolamy from Albany Post Road, and owners the same. Uh we they were before us last month, if you recall, um the site will mostly be used for outdoor storage and um parking. Um we did discuss the last time, I think a number of um there's case, okay. So um we asked for some updated information from the applicant from engineering standpoint and some soil um testing. Um so uh we will um I can turn it over to do you have anything to add, Carol? No, I thought they were gonna look uh no, go ahead. Yeah, okay. All right, so um if the applicant would like to update us on anything from last time. Uh hi, uh sure. Uh Jim Acarico with Corona and Engineering. Um we did provide uh answers to uh a bunch of questions uh that Gene uh had uh circulated to us. I believe many of them were probably or some of them at least were were part of the uh were the questions that were uh asked by the uh planning commission as well. Um Jean did incorporate that into her staff report I see uh back to you. Um one one I think one of the uh more important questions was how close uh would the retaining wall on the west side of our uh property be to the uh railroad track. Um and I looked into that. It may seem a little strange. Uh if you look at page three of the staff report, um it does show you know a dotted yellow line that you know is pretty much uh consistent with the shape of the of the property. However, the property line, the west property line does not go all the way up to the train tracks. Uh the closest point is about a hundred feet from the tracks themselves. Um so on if you're looking at that where where the where the yellow line goes behind the building uh on the south end of the property. Uh those you see there's some uh concrete areas uh behind the building between the building and the train tracks. Uh that's actually not our property, and that's our property ends on the east side of that uh what's shown there. So you can drive behind the building. There's about 10 to 12 feet behind the building from the fence there. Metro North has put up a fence there behind the building. Um and we can't we do have access behind the building, uh, you know, for safety per you know, fire safety purposes. Um, but that that is actually where the property line ends uh before. All the way across, or does it jog back up? Uh it jogs back up a little bit as you get to uh the area uh to the north of the property. Um but like I said, closest point from where the retaining wall would be proposed to the uh train tracks themselves is about a hundred feet. Uh and it's actually a a bit greater in in other areas in most of the other areas. So uh one of the questions was also I think you know, like how would we um how would we build the wall? We would likely build the wall from our side of the property and and not need to access uh Metro North's property. Um that uh you know I I would show that in in plans that would be submitted to your board in the future. Um we'll be we'll be subbing that out to the uh wall man, you know, the uh retaining wall manufacturer um and we'll provide you with uh you know a full detailed um construction sequence and details for that. Um we did get uh you know the application was referred to Metro North. Uh we got a few comments from them. I don't know if you've seen them, but I don't believe anything are shattering. Um you know, like I said, we'll provide them with uh everything that we provide you and uh we'll go from there. Okay. Um the other thing I forgot that we also need to do is declare a self-seleed agency tonight too. But um we did get was it just on this project? We just got a letter from the county too, right? Right. Or did I just put it now? Um county raised a couple interesting points. Um about the they they brought up this idea that um so there's a waterfront South Technical Assistance panel that's been in going on and that ideas to keep Louisa Street, a good buffer on Waza Street side. Right, between um this project, you know.