0:31Okay, we're gonna call this meeting of the airport commission to order.
0:37It is April 7th, 2026 at 2 p.m.
0:41And uh we have a quorum.
0:46We do it, I guess we can do the um open comment period, but no one is here.
0:51Uh doors are open, but we don't have anyone here to comment.
0:55So we'll uh just move along.
0:59Uh do we need to do we don't need to do a roll call because everybody's here in person.
1:05And uh we do need to uh approve the consent agenda.
1:12So more so it's moved and seconded to approve the consent agenda, which consists of the minutes of the airport commission meeting on March 3rd.
1:21Any questions or corrections anyone has seeing none, all those in favor say aye.
1:31We're gonna go on through reports, and so we're gonna have 5A is airport financials, followed by 5B, which will be the airport operational and marketing data.
1:39And who's gonna do those first?
1:41Hi, I'm Kyle Gaffney.
1:43Um we're pretty early in the year, so numbers are still coming in.
1:49Um income is in line with where it should be for the year at this time, landing fees, our rent, things like that.
1:56Um two areas that are a little bit uh different than last year.
1:59One is uh maintenance expense.
2:01We've had a little bit more snow this time this year than we did last year.
2:05Uh so those expenses are a little bit higher, and then the under the administration category, the investments attributed to the airport or our share of the city's investments.
2:18Previous year we had some good gains.
2:20This year we had some losses the first couple months, so it's creating a little shift in our overall uh budget.
2:26Um, but nothing to be concerned with this time.
2:30Uh any questions on the financials.
2:34All right, moving on to the statistics.
2:37Uh the employments are uh a fun one to look at right now because they're they're pretty high.
2:42Uh pretty dramatic increase over last year.
2:45Um looking at our organizational objectives again.
2:49I'm interested in updating these.
2:51Uh Mary and I have started that conversation uh to come up with some different um um benchmarks here that we can review.
3:03Um I do expect the departing flight options per day to increase once United uh comes into until then they'll remain pretty steady uh compared to last year.
3:15Our passenger numbers are up a pretty good amount this year.
3:18Uh Delta's up 22 percent, Americans up 31 percent.
3:23Um that's you know a 27% increase for the year, uh, which is great.
3:30And that in turn creates um increases in our other revenues such as uh parking lot uh fees and things like that.
3:46What is that attributed to?
3:48Um simply smaller numbers.
3:52Um it was 362 so far this year.
3:55Well I see I see four was higher.
4:00And that'll be like the sun country flights um to um Laughlin.
4:07Um but fly out of RSD.
4:11All right, our uh load factors, uh we're up to 76 percent for Delta and 70 5% for American.
4:22Um that's what we want to see.
4:24Over 80 would be ideal, um, but we're we're going in the right direction.
4:31As I mentioned, other revenues increase such as the parking rent or sorry, the rental car activity, uh the parking lot transactions with the increased passengers.
4:42We have increased revenues there as well.
4:45I just ask um compared to pre-pandemic, are we you know we're we're tracking and improving over the last two years?
4:52Do we are we still way down because the flights are so far down yet?
5:00Um, yes, you know, uh, we're hoping to get there with United, you know, closer to uh comparables, um, but it's still um a pretty significant uh difference.
5:10Um else do you have yeah, for international passengers just slightly down from previous years at this time of year.
5:17Uh we didn't have the February data for those numbers yet, either.
5:21Um our cargo um is up a little bit.
5:25But this is only January, correct?
5:28February numbers hadn't come in yet for that report.
5:31Well, that could be low too, given what was happening in the state at the time.
5:35But we're seeing now back.
5:40Yeah, the uh international situation may decrease that and ground transportation, that's pretty straightforward.
5:53Those are the Ubers and the Lyfts, and uh they're increasing too over previous years.
5:59And that's it for uh statistics.
6:04Do we have some marketing?
6:05So yeah, and you know, the information that we're sharing in the marketing report has February um demand represented.
6:13So we did see it soften, um, likely because of some of the activities that were happening.
6:19Um we also shifted some of our budget to a different type of destination marketing campaign, um, focusing on some of the destinations that you could connect through Chicago uh to on the United Service, and we pushed some inspirational destinations that didn't perform as well.
6:36So you know, all of this is sort of listening to what works and what doesn't and figuring it out.
6:41It also was really early for us to be promoting United Flights, um, which I learned after the fact.
6:47Um all this new new to me, new service, um getting excited and trying to ramp up, but um looking at more of a closer in window would have been more realistic based on some of the conversations I've been having with United Marketing.
7:02Um so all that is to say, we launched it, we started it, we're seeing some of the numbers, the web users and traffic and the interest was lower than we'd like.
7:11So we've shifted that.
7:12Um we also at the beginning of the year in January, actually, we launched the um inbound uh patient focused uh marketing campaign featuring um a young uh up and coming national artist.
7:27Um that's still performing really, really well.
7:29So it hasn't fatigued.
7:30We've um dripped it so that it'll pace out throughout this entire year.
7:35So hopefully we continue to see that um show up in some of our top content, not only on organic, but also on the next page in our paid social side, um, because that is what we're using to drive interest and awareness that uh if you're traveling for nail clinic to Rochester, we have an airport, and here's the effects or the experience that you could have should you choose that.
7:57So it's it's our way of getting in front of those patient passengers.
8:01Um and then also we had a really um fun top performing mean um sort of positioning us against MSP, which we love to do.
8:10Um so that one is there's the disappointed cat.
8:14Oh, that's what I thought.
8:17Yeah, kind of fun on TikTok if you saw that.
8:20But um, our paid media, uh, we saw some really high-level searches happening for Fort Myers, which is not surprising knowing that we have a lot of second one ownership there.
8:31Um, but we haven't seen since I've used um Fly My Airport, our booking widget, we haven't seen this high of a volume of searches for Fort Myers.
8:40So for us, it you know, we just doubled down and started promoting Ford Myers even more then.
8:45Um, hoping that people would find the fares that they're looking for.
8:49Um but we overall saw a decrease in activity traffic and just February numbers all together.
8:56Um just a lot of conditions happening around that, but we've since seen that rebound.
9:01That's not in this report.
9:02Um, but March is looking a lot better.
9:06Um any questions that you have any questions, anyone?
9:15All right, well, we'll file the reports and bold business.
9:20We don't have any of, but we do have some new business today.
9:25Item 7A on your agenda is a grant acceptance and contract award to Mathawitz construction company for the RST ASR11 fiber optic relocation project out of the airport.
9:39Is there someone that was liking to take a look at the I'll take this and then I'll I'll have removal and I'll maybe defer to Matt or some specifics too.
9:46But so this uh this work was originally part of the uh phase four uh runway 0321 project.
9:52Um we didn't get good information from the FA on how this Asville Duck Bank actually looked.
10:00So the contractor wanted to offer a change order for that, and that was they offered it at 2.6 million.
10:04So we decided to pull that work out and um with the FAA's blessing, and then came back and this is a successful bidder at 1 million 75,000.
10:13So we save really roughly a million and a half over by rebidding that and actually pulling it out of phase four work.
10:19So it's at a nine 95% federal and a five percent state bonding to uh Mathewood's construction.
10:28Um we had three bidders on the open bids last Tuesday, March 31st.
10:33Um Matholis was low at uh just over one million dollars.
10:37So um the recommendation is to go ahead and award that to Matthew's instruction.
10:42Um they've got a lot of the work on the north side of the airfield this summer.
10:47Um, so that'll fit in nicely with them coordinating that north end work.
10:53Does anybody have questions?
10:56So the random um yes.
10:59Um so the fiber work they're doing is is it contained to from the explains it kind of where on the airport campus yeah, it's the primary communication line that runs from the air traffic control tower.
11:18It runs across the airfield under both runways to the radar site, which is located at the southwest quadrant of the airfield.
11:28Um, so it's a concrete encased duct bank, it's buried about four feet deep.
11:33Um it has a series of manholes for access along the way.
11:36And as Kurt mentioned, uh, we didn't have the as built from FA to know that that was encased in concrete or had a series of duct banks.
11:44So um changing the grade approximately 20 feet, we couldn't lower that.
11:48That's what is a big mound of material outground grade currently.
11:53So, what's the lifespan of this?
11:57Um, it should exceed, I think, the facilities themselves, the tower and the uh the radar site.
12:05Yeah, we're we're just replacing it because the old infrastructure is in the way of the line of sight correctly.
12:10And the FA wants us to replace the cable on it or moving it.
12:14Basically, I see they kind of have all the cards in the on the deck.
12:22If not, would someone like to move acceptance of 7A?
12:29It's been moved and seconded.
12:31All those in favor, say goodbye by saying aye.
12:387A passes, and we uh go on to 7B, which is professional services agreement to provide preliminary design and programming services for the reconstruction of the airport terminal parking lot at the Rochester International Airport.
12:53I'll take this as well, and then when we get to the beaten hunt part, I'll defer to Scott.
12:57So Scott Van Goppel's a new uh new to us, team member from Meet and Hunt that's going to be working with us on several projects.
13:03So this the parking lot's kind of his.
13:06So but I'll I'll run through this quick.
13:07So, you know, obviously the parking lot's kind of been a topic of discussion over the last several years, improvements that are necessary out there.
13:13Payments given us everything it's had.
13:15So we're trying to make improvements and and we've been striving to get federal and state funding and haven't been very successful in that realm.
13:23Um, still working on the state funding, still kind of an outlier there potentially.
13:28But um, the goal of of this initial work is kind of to give us the 30% design and hopefully putting this group and and city council in a spot where we can make a good informed decision as to kind of what that scope looks like, where we want to start and stop with the work in the in the parking lot and how much money do we want to expend, basically, because it's going to be essentially 100% local unless we're successful with uh with outside funding sources, which today we haven't been.
13:53So with that, I'll introduce uh Scott.
13:58Thank you very much.
14:00Um yeah, as Kurt mentioned, I will be um leading the project on uh for the meat and hunt side for the team on the parking lot.
14:08And the this initial study is to give us kind of a roadmap for the next couple years of what those projects could look like and what the costs could be associated with that.
14:16The parking lot was originally constructed in the 1960s.
14:20Um we've gotten a couple of rehab projects over the last uh 60 plus years.
14:26And uh it's it's time we heard about the increased passenger service as well as uh new opportunities for revenue.
14:32So it's time to take a look at the parking lot and see what we can do to improve that facility for the airport.
14:37Um the scope, as I mentioned, will be the preliminary design, but it does include full geotech technical investigation services as well as survey, uh, which will give us kind of a head start on uh whatever packages we're gonna design that will go out to bid uh once we go through this programming piece.
14:54So the initial programming will focus on the efficiency of the parking lot.
14:58We'll uh we have about 900 spaces out there.
15:01We do know that service is growing, so we'll look at opportunities if we need to expand services, um parking surfaces, I should say.
15:08Uh, we do anticipate reconstruction, so that will come with uh evaluation of stormwater drainage systems and some of the landscaping around the airport to make sure we're compliant with stormwater um regulation.
15:23Uh we'll also look at uh opportunities for um, as I mentioned, maximizing the parking efficiency.
15:28We'll look at covered parking as well as covered walkways to and from uh the airport terminal, and uh we'll we'll develop concept budgets for that to see uh if the airport wants to move forward with that work, and then also include would be wayfinding as well as information signage for passengers coming to the terminal area.
15:49There's a new digital entrance sign that will be installed off of uh Heldritsen Drive to greet passengers and people as they're arriving at the airport and provide them some information that'll be included in um some of the budgeting and the 25% design for the parking area.
16:09Uh other things just uh sorry, uh, but other things is just ADA parking and accessibility, uh potential ED charging stations, things like that.
16:17We'll look at all the options, what's on the table, we'll put dollars to it, and then we'll uh determine um what projects make sense and when to uh move forward with the um redevelopment projects.
16:33I I like the idea of the cover parking getting into the terminal.
16:36Um, I think you know, given our weather and how far out our parking lot is, which leads me to a question I think I know the answer already, which is probably it costs too much.
16:45Um given that we have kind of uh bad weather a good part of the year, and our parking lot is quite deep.
16:54Was there ever a thought given to creating a two-story or so parking garage and have it closer to the airport terminal?
17:04Yeah, I I think this came up during the master plan.
17:06Yeah, it's pretty involved for spot.
17:08That's what I wonder this all cost.
17:10Like north of 25,000 per spot or something like that.
17:13Yeah, it was it was expensive.
17:14We did look at that in the master plan and decided against it at this time, but in the future with expansion, maybe that's an option.
17:22I think we're projecting like more like 45 to 50,000 a spot right now.
17:26I think almost double that for some other entities that are building parking right now.
17:31Yeah, I know it's expensive.
17:33Just having people closer to the terminal is makes it for a more pleasant experience as opposed to having to walk from way back in that parking lot.
17:42But if we guess if we've got some coverage in a you know center place where they can go to the cover and then walk straight in, that that would be nice.
17:53That did materialize for the no.
17:56And I will just say that I don't think that was anything about the project.
18:00That was about the dysfunction and the lack of bonding from the legislature.
18:04So you know, I about I would not say give up on that if and you know, continue trying.
18:10I don't think it's that they didn't want to do it.
18:12I just they just aren't doing much on bonding.
18:15Yeah, I think our goal is whatever we do to be still open to that concept that can still occur.
18:20Yeah, I think that'd be great.
18:22Can I ask a question?
18:24Um, so the 40 to 50,000 per stall is that including the cover covered yeah, for some project.
18:34Oh, that's for a function.
18:35I think that's out, yeah.
18:36Another project you really have another.
18:38I mean, I think in your current day dollars, you would not be at 25,000.
18:42Yeah, that would be ordered 25,000.
18:48Okay, so with uh with the the design that you're going to be doing, are you going to what's the process as far as uh then we're gonna get options?
19:01We'll get the coverage option.
19:04What does that come back to this committee and then to the city council again for comes back to this group, right?
19:12To make a decision as to what they would recommend proceeding with.
19:15Yeah, dollar-wise, scope-wise, and then according to the dollars that would be and what so when will we see that?
19:22When is the when will they put design?
19:27One of our goals, I think, was to try to do something yet this year.
19:30So I think we're gonna be moving pretty quickly.
19:34Yeah, well, we're gonna hit the ground running and hopefully um we'll be able to come back um mid-summer and show what we have for recommendation.
19:43And one final question.
19:45So, what is save uh a parking ramp?
19:49What is the estimate that we're kind of the ballpark that we're probably looking at with covered and non-covered?
20:00Do you have any guess on that, Scott?
20:03I'm gonna defer to Matt.
20:04Uh Matt, we put an estimate together a while back.
20:07And I if you want to go through that.
20:10Yeah, I I think we were at five million, and I don't recall how much of that was covered parking.
20:17We'll have to look off look back at that estimate.
20:19But we had given a range from two to five.
20:22Um, if we could do overlays versus complete reconstruction with drainage updates.
20:28Um, and we had other amenities in there too, like a message board, um, the covered parking, concrete walkways, other improvements like that.
20:36So I think we're looking at two-tiered parking as well, right?
20:39So, like a potentially like a premium and uh whatever.
20:48And that I would assume unless we were doing well, even if we were doing everything.
20:54So there's some staging that has to look for the sequencing of this because we've got to keep parking going.
20:58And the good news is we don't have a full lot.
21:02Most of the time, right?
21:04That's no, but but someone's gonna while we're doing work, somebody's gonna be moving parking in the roof bar.
21:12And that's why the programming piece will um, I think during peak times we heard we have about a hundred spots available.
21:18So um, there is a small piece of undeveloped land on the southeast of that loop area.
21:25So uh we'll look at um kind of moving things around and figuring out where to best spend the money on that first project, and we'll have to stage around all that work.
21:38Other questions I don't see any.
21:41Someone would like to move this item.
21:43That would be great.
21:49Second, okay, second by listen.
21:52All those in favor, signify by saying hi.
21:57Be nice to have that parking lot fixed.
21:59So good luck on the planning, and hopefully the prices of something will come down.
22:09Uh 7C is our last item on the action of action items.
22:16And it's a change order number one with Oshkosh Airport Products LLC for firefighting equipment relating to the purchase of an aircraft rescue and firefighting ARF vehicle at the airport.
22:32Okay, so I'll take that um kind of high level two and I'll defer to Matt.
22:37So if you recall, we opened bids on a fire truck back in September.
22:42Um part of that process because it involves federal funding, is we use the advisor circle.
22:47The FAA has out of the time, which I think the current one dated that we use had data back to 2011.
22:53So when you go through the process, do you pick and choose the different components that you need on the fire truck?
22:57Then the I the FAA requires you use this advisory circler through that process.
23:02Well, actually, once we got through that process and we opened bids in uh or in June, they actually came out with a new advisory circuit right after we were done that was updated as of today.
23:13So a lot of the technology and that old advisory circuit circular doesn't offer us the equipment that we completely pick from once we talk to Oshkosh, or like all these items are FA eligible, but they're not on the FAA checklist.
23:26So these are things that we've kind of gone through and added um as part of the uh as part of the process.
23:33The FA is concurrent with every these changes that we've made.
23:37Um we also anticipate state funding for this change order, and they have given us a verbal commitment, but not a written commitment as of yet.
23:45So we're still waiting for that.
23:46And I would suggest that we don't, if this goes through, we don't take it, we don't take it to council until we have that that station along with the federal commitments.
23:55So but just an example of some of the things that weren't on there, like for instance, one of the things that you can get now that's FA eligible is you can get a foam testing unit built into the truck.
24:06So you can test the truck's ability to put out the correct amount of foam within the truck instead of having to do an outside source, which is something the FA wants you to have, but wasn't on that checklist that we used to order the truck that we're required to use for the truck.
24:19So now we can use that it's an FA eligible item.
24:23So that's some of the changes that we're discussing today.
24:26Okay, so if I'm understanding correctly, we we accepted we or you went out.
24:31I suppose you got a approval, but you went out for bids, turned them all down because the new regulations had come out.
24:38No, we just had to use the FA's older now antiquated documentation to actually spec spec out the truck.
24:46So once we order the truck under that old spec, now there's new things available to us that we can pick from that the FA will fund.
24:53So they're gonna be added to the truck that you've always already purchased.
25:00So Oshgash came to us as a vendor and said these are other things you can purchase that the FA will participate in.
25:03I didn't explain that probably the best, but that's okay.
25:06But you bought the truck already.
25:08You can upgrade it, and the FAA is not helping much.
25:12Well, we moved move some money around, and they're yeah.
25:15Then the state's gonna take the rest of it.
25:16And the state's taking it.
25:18The local is the $28.
25:19So that's that's what it's anything.
25:23No, I think there were there were some subtractions, and those are shown in there as the detailed sheet with the change order.
25:31Um the bracketed items are deducts that were federally eligible.
25:36So those offset the costs of the yellow highlighted federally eligible items.
25:41So I had a summary at the bottom there.
25:43Um there's a net increase of 4836 dollars of federally eligible items, which like Kurt mentioned, um, they agreed to support um at 95% two and a half, two and a half.
25:55Um, you know, between state and local, and then um $99,000, um, excuse me, $95,116.
26:04We're at the state local match 730.
26:07So that's the additional amount that Kurt was mentioning.
26:10We've kind of got the verbal agreement from the state, but they don't have the paperwork done yet.
26:14Um officially accepting that.
26:17So we are accepting this pending receipt of the receipt of the written statement from by the state.
26:25And when you get that, we're basically going to be giving you approval today to take that final document to the city council.
26:34So it may not even happen by the next council meeting, perhaps if the state kind of works on their time frame.
26:43Anyone else have questions?
26:52We're we're looking to we're um yeah, we're looking to place the order.
26:56They're they're the lowest bidder.
26:57We're looking to place the order with these changes.
27:01I thought that you said it.
27:05Good to have it on there.
27:08So if someone would like to move this item.
27:19All those in favor, signify by saying aye.
27:25So that is the those are the action items.
27:28We don't have anything listed under other business.
27:31Um, although I will pause here and see if folks have things to say, and it looks like someone does.
27:38I just thought I would update the airport commission on the latest Jazz B proceedings.
27:42Uh, we had our third meeting last Wednesday night on April 1st, and I think we had a really good meeting.
27:48We had all 10 members of the Jazz be there.
27:50Um, and uh Evan Verrett with Meet and Hunt gave a presentation.
27:55Uh, we had uh representation from the city of Stewartville, the uh the mayor was there, the city administrator was there.
28:01Uh we also had representation from High Forest Township, uh the township supervisor was there.
28:07Uh, and all of those individuals took an opportunity to speak during the public hearing and provide the Jazby with their thoughts and comments.
28:14And uh ultimately um with the unanimous decision, the JASB uh voted to adopt zoning ordinance number seven, uh, which is the the proposed model ordinance.
28:25Um next steps in the process will be for us to forward that to MINDAT for their final review and approval.
28:33I would note that we did two sort of two rounds of uh review by MINDAT before the meeting.
28:39So we're fairly confident that there isn't gonna be any big changes.
28:42Um so that process looks like it's gonna be concluding um within uh so essentially once MINDAT approves it, then I will circulate the ordinance for signature amongst all 10 Jazby members, and uh that process will be complete for now.
28:56Thank you for that update.
29:01Well, I one I want to come in Brent for his guidance on getting us through the process.
29:09I think it was new to all of us, uh, where whether we came from Rochester or one of the other comp one of the counties.
29:17And so I I think it was an amazing group, and then uh the Evan did an amazing job of really walking us through the process and and in the end at our last meeting, as Brent said, we had how many uh speakers during the open the public count?
29:37I think there were five officially five five individuals, but each with an average of five questions, and he went through every single question that came up.
29:49Very specific questions about people's properties and the height limits, and and so and I think uh everybody from the public and the uh members were very um pleased and went came out of the room uh happy with what we accomplished.
30:00And so and I think uh everybody from the public and the uh members were very um pleased and went came out of the room uh happy with what we accomplished.
30:11Thank you for that update.
30:12I was intending to go and got distracted and didn't get to the meeting, so that's I got a pen from uh the mayor of Stewart, which I meant to use to sign with document yesterday, but I couldn't find it by okay.
30:32All right, anything else for any anything else for the good of the order here today?
30:38If not, we will adjourn at 2 30.
30:45We are you do we want to vote on one?
30:49Let's do a motion a second just to make sure that we're I'll move that we adjourned.
30:53Okay, all those in favor signify by saying aye.
31:02Thank you, everybody.