Rockport City Council Workshop on Austin Street Redesign - September 22, 2026

City Council — Tuesday, September 22, 2026
BodyRockport, Texas
SessionCity Council
DateTuesday, September 22, 2026
StatusFILED
Video Record
0:00 / 29:29

Original source
Transcript — VerbatimClick a timed line to jump · ⧉ to share it

Speaker numbers apply only to this recording. Names come from transcript evidence. “Possibly” marks uncertain attribution.

Speaker 1

0:00

On the agenda's presentation discussion on the proposed Austin Street redesign concept plan by Amanda Torres, Director of Building and Development, and Ryan Picarazzi, Director of Public Works.

Speaker 2

0:13

Hello, Mayor and Council.

0:15

Today we have a draft of the 30% concept plan for the Austin Street redesign project.

0:23

As you know, we've been having public engagement events across the past few weeks.

0:30

So this is the culmination of all those comments that we've gotten from the public.

0:34

We do have our consultant here, House Associate, Thomas Everett and Dear Adbyer.

0:40

And they will be presenting the concept to you today.

0:43

So you'll have an opportunity to look at it and comment on it, and then there's also going to be a cost breakdown associated with it as well.

0:53

There should be some handouts of the latest iteration of that that are should be at your desk, or if we need to pass those out, we can do that as

Unassigned speaker

1:01

well.

Speaker 2

1:02

But I'm going to introduce you to Thomas Everett.

1:05

He's the project manager over here.

Speaker 3

1:12

Hello, everybody.

1:13

Good afternoon.

1:14

Good afternoon, Thomas Everett.

1:16

And here with my coworker David.

1:18

We're excited to present this to y'all today.

1:23

Right now is going to be handing out some executive summary documents.

1:29

At the very back, there is the cost related information.

1:33

I know that is a very important item, so I can go into detail on that cost when we get to that.

1:41

And also I do have breakdowns of those cost figures if we need to go into anything specific.

1:48

But I'm gonna ask that uh Miss Shelley go ahead and upload to okay.

1:56

We got it right there.

1:57

Is it gonna stay that size

Speaker 4

1:59

roughly?

Unassigned speaker

2:00

Do you need it bigger?

Speaker 3

2:01

If it can, if not, we can work off this.

Unassigned speaker

2:04

So the TV's up here

Speaker 3

2:06

are larger.

2:06

Oh, okay.

Speaker 5

2:08

And they have a

Speaker 3

2:09

large photo

Unassigned speaker

2:12

station.

Speaker 3

2:12

Okay, that'll work.

2:14

Thank you, ma'am.

2:16

All right, so the Austin Street Improvements Project.

2:19

Uh some of you know uh previously my company have provided a um master plan for this area some years ago.

2:29

Now at this point, we've resurrected that, and we have hosted two public input meetings here at this facility.

2:37

We've gathered input and we have come up with this concept plan here that you see today.

2:44

You'll notice that the limits are from Market Street all the way to State Highway 35,

David Beyer · Speaker 6Inferred

2:48

and they go

Speaker 3

2:50

uh as far if you're looking at the screen, top of the screen to Magnolia, and then on the bottom, you'll see Water Street, and then not all the streets go that far down,

Unassigned speaker

3:02

but in

Speaker 1

3:03

a nutshell, that's

Speaker 3

3:04

the visual that's from last week.

3:06

Thank you, sir.

3:10

All right.

3:12

Next slide, please.

3:16

Okay, so what are we changing to Austin Street?

3:21

That's gonna be on this slide here.

3:24

It is currently we have a median with the light poles there.

3:30

We understand this is a maintenance issue for the city, so our primary objective was to move the lights outside of the median, put them on the sides, get rid of the median, and have more of an open space for vehicles to travel through.

3:46

In addition to that, we'd be introducing some landscaping options.

3:51

Now, when we met with the public, it was made very clear to us what they wanted more parking for sure.

3:57

So we did look at providing more parking that is in our concept.

4:02

We didn't want to completely eliminate the landscape aspect though.

4:06

So you'll notice that there is still a landscape component.

4:10

In addition to that, there are streetscape elements such as ballards.

4:15

There is benches, things of that nature that will be in

Unassigned speaker

4:20

that

Discussion Breakdown — Share of Meeting
Engineering And Infrastructure█████████████████████████████████████████████70%
Public Engagement█████████████████27%
Procedural██3%
Summary of Proceedings

Rockport City Council Workshop on Austin Street Redesign - September 22, 2026

A workshop meeting of the Rockport City Council was held on September 22, 2026, at 4:00 PM in the City Hall Council Chambers to discuss the proposed Austin Street Re-Design concept plan. City staff and consultants presented a 30% concept plan developed from public input, including design features, cost estimates, and phasing options. Council members provided feedback and directed staff to proceed with finalizing the design, with budget decisions deferred to the next fiscal year.

Discussion Items

  • Presentation of 30% Concept Plan – Amanda Torres (Director of Building & Development) and Ryan Picarazzi (Director of Public Works) introduced the plan, which was developed by HAF consultants Thomas Everett (project manager) and David Beyer (landscape architect) following two public input meetings. Key design elements include:

    • Removal of the existing median and relocation of streetlights to the sides to reduce maintenance issues (lights frequently damaged by boat trailers).
    • Widened sidewalks for pedestrians.
    • Angled parking similar to current configuration, with an estimated gain of approximately 30 parking spaces (total parking not reduced, as strongly requested by the public).
    • Landscaping with native, salt-tolerant, low-water plants and site furnishings (benches, bike racks, bollards) chosen for durability and modular repairability.
    • Intersection accents celebrating Rockport’s identity (e.g., redfish, waves, oak trees), potentially using stamped concrete or colored asphalt.
    • Asphalt roadway with concrete intersections.
  • Cost Estimates and Phasing Options – The consultant presented three options:

    • Option 1: Full construction all at once (no phasing). Cost shown in handout but not explicitly stated in transcript.
    • Option 2: Major phasing – Phase 1: roadway and lighting improvements; Phase 2: streetscape, pedestrian, water quality, and drainage adjustments; Phase 3: side streets full improvements.
    • Option 3: Finer phasing – Phase 1: lighting and median removal (immediate fix); Phase 2: roadway; Phase 3: streetscape with temporary landscaping; Phase 4: permanent landscaping and water quality; Phase 5: side streets. Each phase assumed at 5-year intervals with 3% annual inflation, making the total project span up to 25 years (e.g., phase 5 completed 20 years after phase 1). The consultant noted that phasing is more expensive overall due to inflation but provides a more feasible start.
    • A 30% contingency was included in all estimates.
  • Council Comments and Questions –

    • Councilmember Brad Brundrett questioned the 20–25 year timeline if using 5-year phasing, suggesting a shorter interval (e.g., 3 years) to make the project more realistic.
    • Councilmember Matt Anderson asked about modularity of site furnishings to allow for easier replacement of parts; the consultant confirmed they would specify products with long-term availability.
    • Brundrett also raised concern for the businesses along Austin Street during construction and inquired about plans to minimize disruption. The consultant noted a line item in the cost breakdown for nighttime sidewalk work adjacent to businesses to avoid daytime closures.
    • A councilmember (likely Mayor Jayroe) expressed appreciation that the plan incorporates public input and maintains the “Rockport feel.”

Key Outcomes

  • Council reached consensus (no formal vote recorded) to direct the consultants and staff to proceed with final design, with the understanding that a decision on phasing would be made during the next budget cycle (starting February 2027).
  • The consultants will deliver a final design (potentially up to 60% drawings) for future council consideration.
  • The workshop adjourned at approximately 5:00 PM to be followed by a regular council meeting.

Meeting Transcript

On the agenda's presentation discussion on the proposed Austin Street redesign concept plan by Amanda Torres, Director of Building and Development, and Ryan Picarazzi, Director of Public Works. Hello, Mayor and Council. Today we have a draft of the 30% concept plan for the Austin Street redesign project. As you know, we've been having public engagement events across the past few weeks. So this is the culmination of all those comments that we've gotten from the public. We do have our consultant here, House Associate, Thomas Everett and Dear Adbyer. And they will be presenting the concept to you today. So you'll have an opportunity to look at it and comment on it, and then there's also going to be a cost breakdown associated with it as well. There should be some handouts of the latest iteration of that that are should be at your desk, or if we need to pass those out, we can do that as well. But I'm going to introduce you to Thomas Everett. He's the project manager over here. Hello, everybody. Good afternoon. Good afternoon, Thomas Everett. And here with my coworker David. We're excited to present this to y'all today. Right now is going to be handing out some executive summary documents. At the very back, there is the cost related information. I know that is a very important item, so I can go into detail on that cost when we get to that. And also I do have breakdowns of those cost figures if we need to go into anything specific. But I'm gonna ask that uh Miss Shelley go ahead and upload to okay. We got it right there. Is it gonna stay that size roughly? Do you need it bigger? If it can, if not, we can work off this. So the TV's up here are larger. Oh, okay. And they have a large photo station. Okay, that'll work. Thank you, ma'am. All right, so the Austin Street Improvements Project. Uh some of you know uh previously my company have provided a um master plan for this area some years ago. Now at this point, we've resurrected that, and we have hosted two public input meetings here at this facility. We've gathered input and we have come up with this concept plan here that you see today. You'll notice that the limits are from Market Street all the way to State Highway 35, and they go uh as far if you're looking at the screen, top of the screen to Magnolia, and then on the bottom, you'll see Water Street, and then not all the streets go that far down, but in a nutshell, that's the visual that's from last week. Thank you, sir. All right. Next slide, please. Okay, so what are we changing to Austin Street? That's gonna be on this slide here.