OPENPUBLICA · PUBLIC MEETING RECORD
Record of Proceedings

San Jose T&E Committee Meeting - February 9, 2026

City CouncilMonday, February 9, 2026
BodySan Jose, California
SessionCity Council
DateMonday, February 9, 2026
StatusFILED
Video Record

STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE

Transcript — Verbatim
0:00

A title card displays the City of San Jose logo with capital of Silicon Valley.

0:05

Text shows Transportation and Environment Committee in February 9th, 2026.

0:10

The graphic reads will begin shortly.

0:29

Today's the February 2026 meeting of the Transportation Environment Committee to order and start with roll call, please.

0:38

Tordillos.

0:40

Here.

0:40

Compos Absent.

0:42

Ortiz.

0:43

Present.

0:44

Vice Chair Foley.

0:45

Here.

0:45

And Chair Cohen.

0:46

Here.

0:47

You have a quorum.

0:48

Thank you.

0:49

All right.

0:50

We have one work plan review item.

0:55

That's a um an update of the Climate Advisory Commission work plan.

1:00

Um think we have any presentation on this or anything.

1:05

Is there any public comment?

1:07

No public comment.

1:09

Okay.

1:09

We I'll take a motion on this item.

1:12

So move.

1:15

Okay.

1:15

Let's go.

1:16

And then Tatan's currently down.

1:17

We'll take a verbal vote if that's okay.

1:19

All in favor say aye.

1:21

Aye.

1:21

Aye.

1:22

Thank you.

1:22

That passes unanimously.

1:24

Motion carries four zero.

1:25

Thank you.

1:26

And we have a consent calendar.

1:28

Oh, wait.

1:31

Oh, I'm sorry.

1:32

We were supposed to that was to add this item to the agenda so we could consider it in consent calendar.

1:37

Why is it listed twice?

1:39

One is to add it, one is two.

1:40

So that item was just to have it so we can now have it on the consent calendar.

1:43

So now we're on to consent calendar.

1:45

I assume there's still no public comment on this item.

1:47

No public.

1:48

And now we'll need a motion to adopt this.

1:51

All right.

1:51

All in favor say aye.

1:53

Aye.

1:54

Opposed.

1:55

All right.

1:56

Motion carries four zero.

1:57

That was item is adopted.

1:59

Thank you.

2:00

I thought I was going crazy for a minute there, trying to figure that one out.

2:04

All right.

2:04

Now we're on to our reports.

2:07

The first report is our large load energy customer development status report.

2:11

I think Erica, you're taking this one.

2:14

Good afternoon, committee members and members of the public.

2:17

Erica Grafo, assistant to the city manager, and large load energy customer development lead.

2:23

Today I'll be providing a status report on the city's large load energy customer development activities, including the implementation agreement with PGE and related electrical transmission and distribution infrastructure grid enhancement projects.

2:40

Reliable and timely access to electricity has become a defining constraint on San Jose's economic growth.

2:48

Over the past several years, economic significant economic drivers, including data centers, advanced manufacturing, and other large energy users have faced growing uncertainty and about electric capacity, delivery timelines, and accountability.

3:05

These customers are critical to the city's fiscal health.

3:08

They generate significant general fund revenue, create high quality construction and permanent jobs, and typically require fewer ongoing city services relative to the revenue that they produce.

3:20

Ensuring San Jose can attract and retain these customers is essential to maintaining long-term fiscal stability.

3:31

In response to these challenges, the city conducted an extensive evaluation of its options to secure reliable electric infrastructure.

4:00

At that meeting, the city council authorized the administration to pursue a formal implementation agreement with PGE while preserving the city's ability to revisit other options if performance expectations were not met.

4:15

Following that direction, the city and PGE negotiated and executed an implementation agreement.

4:21

Oh go back.

5:00

A slide about council direction and PGD agreement.

5:04

The city's work to improving electrical infrastructure directly supports the city council focus area growing our economy, particularly the goal of ensuring infrastructure readiness.

5:16

Within this focus area, there are three infrastructure readiness goals which guide the city's effort to attract and deliver large energy projects.

5:25

The first goal is to energize three large load projects by June of 2026.

5:31

So far, two have been energized on time, and the third is scheduled to be energized next quarter.

5:38

The second goal is to facilitate two projects entering the building plan review phase, and so far we've had three projects that have submitted building plan applications since July of last year.

5:51

The third goal is to facilitate five new projects entering the planning entitlement phase.

5:56

So far, we've had two projects that have submitted development applications.

6:00

Looking ahead, we have indication of a possible two additional applications coming in March, but we may not hit this goal by June of 2026.

6:10

Much of goal 2.3 is driven by the project's ability to secure power from PGE.

6:15

A slide shows progress tracking toward council focus area goals.

6:21

Since June of 2025, our focus has been on standing up the people, process, and technology needed to advance these goals.

6:29

We established a cross-departmental data center development team made up of staff from planning, building, fire, public works, energy, water supply, and the Office of Economic Development.

6:41

The team oversees all large energy projects in the city's development pipeline.

6:46

We also brought on a data center development facilitation officer in PBCE to assist with permitting.

6:53

The team tracks each project from early planning through construction and meets regularly with developers to ensure a coordinated citywide approach.

7:03

The primary objective of this team is to move projects through entitlement and permitting without unnecessary delays so that they are ready for PG ⁇ E energization on schedule.

7:13

A slide shows electrical infrastructure tracking.

7:17

Under the implementation agreement, city staff meet bi-weekly with PG ⁇ E to track substation upgrades, transmission planning, and project-specific energization timelines.

7:28

This coordination is intended to reduce uncertainty, surface risks earlier, and align city permitting and development timeline with PGE's capital planning and construction schedules.

7:41

This team also plays a key role in monitoring PGE's performance.

7:46

On a quarterly basis, projects are formally scored to confirm whether PGE is meeting the milestones established in the implementation agreement.

7:55

So far, the city has held two quarterly check-ins to score PGE's performance on meeting their obligated timelines for the 12 projects in the implementation agreement.

8:06

As of January 2026, I'm pleased to say that two of the projects have been energized and PGE is on schedule and or has a path to get back on schedule and energize the remaining 10 projects by the end of 2030.

8:19

A slide shows regional transmission projects and station locations.

8:24

The city is also coordinating with LS Power on the two high voltage transmission projects totaling 2,000 megawatts of capacity that traverse San Jose and are critical for increasing regional capacity.

8:37

These transmission investments are foundational to serving future large load demand and improving grid reliability citywide.

8:46

LS Powers utility permits are on track to be issued by June of 2026, and construction should not impact the remaining 2026 sporting events.

8:55

A slide displays fiscal benefits of data centers.

8:59

As the city continues to advance infrastructure readiness and attract large energy users, it is important to outline the benefits and concerns that data centers pose.

9:10

Starting first with the fiscal benefits to the city.

9:13

Large data centers represent a significant fiscal opportunity for San Jose, particularly through the utility user tax.

9:22

Because data centers consume large volumes of electricity continuously, they generate stable and predictable utility user tax revenue that directly supports the city's general fund.

9:36

For example, a 50 to 99 megawatt data center, once fully ramped up, could generate between three and seven million dollars in unrestricted annual revenue for city services.

9:50

Unlike many other forms of development, data centers do not add traffic, require limited public services once operational, and do not generate school or public safety demand at the scale of residential growth.

10:02

The city benefits from capturing economic activity that would otherwise be located in other states or regions.

10:09

Retaining these projects locally allows San Jose to share in the financial upside of the digital economy while leveraging existing infrastructure investments.

10:19

A slide shows data center environmental requirements.

10:23

Turning now to environmental impacts.

10:27

Across the country, residents have raised concerns about the environmental footprint of data centers, particularly related to water use, energy consumption, air pollution, and noise.

10:39

These concerns have prompted legislative hearings which highlight the need for careful siting, transparency, and regulatory oversight.

10:48

In San Jose, data center development is already subject to a comprehensive set of environmental requirements that significantly mitigate these impacts.

10:59

All large data centers projects undergo review under the California Environmental Quality Act, which evaluates air quality, greenhouse gas emissions, water use, noise, hazardous materials, and energy demand.

11:15

Projects that meet defined thresholds are classified as water demand projects and must demonstrate the availability of reliable water supply under both normal and dry year conditions.

11:27

These projects must also demonstrate that recycled water was evaluated and when reasonably available will be used in lieu of potable water supplies.

11:37

The city's general plan and municipal code also require the use of recycled water where feasible, contribution to a recycled water infrastructure, and protection of groundwater recharge areas.

11:49

From an energy standpoint, data centers in San Jose can receive between 65 and 100% renewable carbon-free elect carbon neutral electricity through San Jose Clean Energy and must incorporate energy efficient design and compliance with state and local air quality regulations governing backup generation.

12:09

Taken together, these requirements place San Jose among the most tightly regulated jurisdictions for data center development, addressing many of the environmental concerns being debated nationally.

12:22

The attachment accompanying this item's memo provides a more comprehensive list of the applicable environmental regulations.

12:33

In summary, the March 2025 City Council Action and the subsequent implementation agreement established a structured accountable framework for advancing electric infrastructure delivery in San Jose.

12:47

One designed to support large-scale development, protect the city's fiscal interests, and ensure accountability over PGE's performance.

12:56

This partnership is particularly important given San Jose's strategic position within the regional transmission grid network.

13:04

Large energy customers have the potential to generate strong revenues, and building data centers in San Jose means they are built and operated more cleanly than in other states.

13:16

In just the past eight months, tighter coordination has shifted San Jose from infrastructure constraints to infrastructure-driven growth.

13:25

Thank you.

13:28

All right, thank you, Erica, for the comprehensive presentation.

13:31

We'll start with public comment.

13:33

We have two speaker cards for Alina and Mashika.

13:36

Please make your way down to the podium.

13:37

We will each have two minutes to speak.

13:39

Thank you.

13:40

The scene returns to the city council chamber.

13:43

A title card reads public comment.

13:48

Thank you.

13:49

Hello, the Transportation and Environment Committee.

13:53

I'm a lifelong resident of San Jose, and the last time I spoke on this was on November 18th, and I had brought up the lack of study in public engagement on the public health impacts and our environment.

14:06

And I specifically remember Councilmember Cohen saying that this is California, what's happening across the nation is not going to happen here.

14:13

And as we've seen from the most recently powered facility of South Bay Great Oaks, the EIR clearly states that what's happening across the nation is also what's happening here.

14:26

And so the city staff report just says stated that you will use recycled water when possible.

14:33

In the EIR report, it says SV1 met with a great South Great Water Oaks company, and it was not feasible, so they're not going to be using any recycled water for their data center.

14:48

And so if it's like that for here, then how will we be treating all the other data centers that are happening?

14:54

Additionally, that data center has 36 diesel generators, and that's just for one data center.

15:00

And the Bay Area Quality Management District, in their report that was submitted in the EIR, also stated that there were data centers found in San Jose, Sunnyvale, and Santa Clara that operated some of their diesel generators for 400 hours outside of non-emergency and maintenance hours requirements.

15:20

And so when we think about the cumulative impact of San Jose saying that they want to be the center of AI revolution and we want to build out all of these data centers.

15:30

What is a cumulative health impact that the residents are going to be facing?

15:34

That is our burden to carry.

15:36

And if we weren't having these projects here, then we wouldn't be having this discussion.

15:41

But because we are, then that burden on legislator falls on the city of San Jose since the City of San Jose is the one bringing these projects to our doorsteps and to the residents here to deal with.

15:52

And the projected four to seven million dollars.

15:56

Next speaker.

16:02

Hello, my name is Michigan Allgood.

16:04

I am an AI ethicist and the founder of Ally Consulting LLC.

16:08

I'm also a South Bay resident.

16:10

I'm here today out of concern for the impacts that large scale data AI data center build out is having on the quality of our air and the scarcity of our water.

16:19

I read the memo that was provided to you for this agenda item and was deeply concerned by the message that was being conveyed by the attachment to that memo.

16:27

It's a list of environmental rules and regulations that seems to provide seems to have been provided an effort to assuage any concerns about the sufficiency of the environmental review process for these large load customers.

16:40

But that review process is not without flaws.

16:42

I provide extensive written comments addressing major concerns in the environmental review process performed on Equinix's recently open data center.

16:51

My main point in providing that information was to make it clear that city government cannot rely blindly on the efforts of others.

16:58

When things get missed in those processes, is the residents of San Jose who will pay for those errors.

17:04

So it is incumbent upon all of you to oversee these evaluations and ensure the people of San Jose are well protected.

17:10

The decisions this committee and this broader council will make now will determine the survivability of the entire Bay Area over the next 30 years.

17:20

I ask that you review my written comments and lean into your oversight authority.

17:24

Thank you.

17:26

Thank you, and back to the committee.

17:28

All right, thank you for the public comment.

17:30

And now we'll start with uh Casmara Ortiz.

17:34

Thank you, uh Chairman Cohen.

17:36

I want to thank staff for their presentation and the work that has gone into this report.

17:40

I also want to acknowledge the public comments submitted on this item and thank those who are advocating on this issue.

17:47

I continue to hear concerns uh daily in regards to the rapid expansion of data centers.

17:52

I know I've mentioned this in the past, um, especially as it may have impacts both environmentally and to rate payers.

18:01

And so I just had a few questions as we're talking about data center development in regards to our oversight structures.

18:09

So as we build uh more data centers, are we monitoring their intake uh of potable water and actively considering the implications that this may have on the availability of affordable water for our residents?

18:26

Uh thank you, Councilmember.

18:28

We're gonna ask environmental services.

18:29

Uh Jeff looks like it's walking over to uh kind of give that perspective.

18:32

Thank you.

18:43

Good afternoon, Jeff Provenzana, director of environmental services department.

18:47

Uh that's a great question.

18:48

Um yeah, we we're looking at um not only us as the San Jose Municipal Water System, but all the water retailers and the wholesalers are looking at data centers, how much water they're using, where it's gonna come from.

19:01

It is a big topic.

19:03

Um we do have water supply available, both potable water and recycled water, and we work closely with all these data centers, especially the larger ones on the right type of water supply mixture, what's available in order to both facilitate their development but make sure that we are providing them a reliable water supply that's available at uh minimal impact to our communities.

19:28

Great.

19:28

Um and so how do we determine if it may impact the affordability of water and do we have any safeguards for that?

19:36

Uh good question.

19:38

Um it actually is um almost uh net zero water usage is dropping, uh but our infrastructure here, and uh there's a cost to keep that infrastructure running by adding water usage is um efficient and smart water usage, even for data centers.

20:00

It'll help keep help keep their systems running and actually in the end may make our systems more affordable versus trying to keep these water infrastructure going with a declining revenue source.

20:09

So there is a there is a positive benefit for everybody by continuing to move water through our water systems for new development, including data centers.

20:19

Great.

20:20

Thank you.

20:20

Thank you so much.

20:22

I have another question.

20:23

What data does or will the city receive as it relates to on diesel generator runtime and emissions at the operating centers?

20:31

And has staff conducted or does it plan to conduct a study comparing a real world world generator generator use versus what was assumed during the environmental review?

20:44

Thank you.

20:45

And I don't know if uh if Chris will have anything to add to that, so he'll walk we'll walk towards uh towards the podium here.

20:51

I will note just kind of based on my experience with data centers, so the the runtime is um is part of their air permit that they have.

20:59

And typically runtime for generators is uh just what's needed to um make sure that they can maintain and operate the generators and they have a limited number of hours that they can uh run a year.

21:09

Of course, if there's an outage um those generators um will run during that those time periods.

21:16

But typically large data centers are actually fed from transmission lines, not distribution lines, which have a have a much higher rate of stability and they don't really have as many outages.

21:27

Um so in general, uh most data centers, large data centers that I work with in the past, their runtime is limited to what's needed as part of their permit to make sure they can operate and maintain those generators.

21:38

Um if there is an outage, they will run during that time period.

21:41

I'll add have Chris add anything else to that.

21:43

Yeah, I think that pretty much covers everything.

21:45

Sorry, Chris Bowden, director of planning building code enforcement.

21:48

Um, through the environmental process, we rely very heavily on the standards that the Bay Area Air Quality Management District has uh for diesel generators uh and any kind of emitting.

22:00

Um as a uh local agency, they actually have an enforcement capacity as well.

22:05

So um sorry, usage uh is actually continually monitored by them.

22:10

They'll send inspectors out in the field and they'll make sure that folks are either um you know staying consistent with uh their permit, and if they're not, sort of much like we would with code enforcement, they have uh procedures on the back end that they would follow up with the individual user.

22:25

Okay.

22:26

Thank you.

22:26

I appreciate that.

22:28

I wanted to ask in regards to electricity rates.

22:31

Um the memo notes that large load customers may ultimately help lower rates, but that outcome also depends on infrastructure, how infrastructure costs are allocated.

22:41

So, how are we working with the city?

22:43

Uh, how is the city working with PGE and state regulators to ensure that the new transmission and distribution investments driven by data centers aren't not are not shifting costs onto a residential and small business ratepayers?

22:56

Sure.

22:56

Um yeah, that's a that's obviously on the top of people's mind is making sure that the costs aren't going up.

23:02

Um of the um ways that costs are assigned um are through rules through the CPU C.

23:08

So that's the California Public Utilities Commission.

23:10

Um and right now there's an interim rule 30 that's working its way through.

23:15

The way that Rule 30 works is it assigns costs and who bears those costs for bringing on projects.

23:20

And these as rule 30 is particular to large load development.

23:24

Um and I'll I'll summarize it in layman's terms.

23:28

Essentially, most of the cost burden is on the developers for these data centers.

23:34

So the data center is required to um pay for uh and and or build out all of the infrastructure that's required to bring them up onto the grid.

23:43

Um to the extent that they wind up paying for substation upgrades or things that otherwise benefit other rate payers, there is a mechanism to pay them back for any costs that they you know ought to be paid back for, but that's only after they've been running.

23:58

So the idea is to really minimize any stranded infrastructure costs and make sure that um any of those costs are borne by the data centers themselves.

24:08

Thank you.

24:09

And so we won't necessarily see ourselves in a situation where our rate pairs will be impacted due to our scalability of these data centers.

24:17

I mean, I I think that's the intention of those rules.

24:20

Now, this is obviously something that's before the CPUC, so that's part of their uh that's part of their governance to look into that stuff.

24:27

Um but I will say one of the things that PG ⁇ E has put out there is that their infrastructure costs are spread over all rate payers.

24:36

And to a large extent, those infrastructure costs are kind of steady.

24:41

So the more load that they bring on, the more they can kind of spread out those costs.

24:47

And so while you see increasing amounts of energy usage, you actually see the per kilowatt hour rate go down because that infrastructure costs is spread across more.

25:00

Thank you.

25:01

I appreciate that.

25:09

But you know, not all articles are written equally.

25:13

I did, you know, request, and it wasn't a formal um motion, but I had asked if it was it would be possible to have a study session specifically on data centers and what the city is doing to prevent environmental impacts as well as impacts to rate pairs.

25:29

Has there been any consideration?

25:31

I don't know, Manuel, if you if you've had any thoughts about that, because I'm sure that other council members, you know, we want to support the data centers, but we we want to make sure that there isn't unintended consequences as well.

25:42

Yeah, I think certainly if there's an uh interest from the from the full council to have a study session that the administration can look at that.

25:48

We always offer, and I'm willing to offer for any council member who wants to get into any level of detail, spend as much time as possible to actually have those conversations as well.

25:56

I think I think the best part is not necessarily education to me, it's also education to the public.

26:01

And it's also on the record.

26:03

You know, uh individuals who come in and uh you know have those concerns, they don't get insight into our conversations in in my council office.

26:10

And so I heard you say um to the entire council if you'd like, I could submit a memo to rules, or if you guys want to move forward with it, that's fine.

26:18

Let me uh let me take that back and then I will communicate with you directly if there's a more formal process for the request, or if something the administration can just uh look at kind of availability on your um council council study session schedule.

26:30

Thank you so much.

26:32

Yeah, thank you for the good set of questions, council member.

26:35

There's you know, I'm I'm sitting in on a lot of forums around from around the country for for climate groups and others who are raising the alarm, who are concerned.

26:44

Um many jurisdictions are asking for moratoriums on this, and so it's important for us to understand the ramifications and what the implications are locally for our residents, but also globally in terms of the the overall good or bad that that comes from this expansion proliferation.

27:01

Remind me, because time I can't keep track of time, but we did have an agenda item recently, uh when recently meaning last six months, I don't know, um, on one of our council meetings where we did have a an uh item to to review and the whole council got to hear that.

27:14

Is that correct?

27:15

What when was that that we did that?

27:17

A few months ago we we had control lodges.

27:20

Well, it was not we had a sp we had a didn't we have a more general data session data center discussion at a council meeting?

27:26

I I I I remember I have recollection of what you're referring to.

27:28

We did have a conversation.

27:30

I think at that meeting we actually said we were coming back to T and E with a discharge of the Right.

27:34

I think I think this is the kind of topic that has enough public interest that probably an annual agenda item on a council meeting to hear.

27:42

It might not need a whole full study session of a few hours, but uh but an agenda item where the public has an opportunity to weigh in and hear how we are monitoring and you know, once some of these data centers come online, we get more data that we can share with the public about the effects that they're having.

27:56

So I might be a good standing annual report to council to do this discussion to to council member Ortiz's point.

28:04

So yeah, so I think what I'm hearing from the committee is uh either a formal uh council item that would come once a year or uh a study session at least to to kind of to begin the process.

28:15

So I'll take those both those back and see kind of what what works best and what works best for the council as well.

28:20

Okay.

28:21

I have some further questions, but I'll turn to council member Turtius first.

28:25

Thank you, Chair.

28:26

Yeah, just one quick question on my side.

28:28

Uh there was a note before about uh you know this requirement that projects use recycled water wherever feasible and cost effective.

28:34

There was mentioned during the public comments about previous data centers that have not moved forward with using recycled water.

28:39

Do we have a sense based on those previous examples of whether this was you know a geographic proximity issue, you know, too far from the existing recycled water system, or if it was a cost question or a technological question, if you could just provide some more context there.

28:54

Looks like uh Jeff if it's coming down as well.

28:56

So please come down.

28:57

I will note that we do have over a hundred miles of recycled water in San Jose, but not in every geographical location.

29:03

So I'll let Jeff expand on that.

29:05

Jeff Provinzano addresses the committee from the podium.

29:09

We work with the data center industry um every year.

29:12

We're meeting with uh different uh developers.

29:15

There's a strong interest uh in the industry to use recycled water, they want it.

29:20

They'll bring it in half a mile away.

29:24

Um need it if they're producing energy.

29:29

Uh there they're licensed there, they need to use recycled water.

29:32

So a lot of cost drivers, um, sp all in California, especially here locally, they are looking at uh using these resources, uh re recycled water as one.

29:42

Um lower energy usage, air cooling, loop system.

29:46

So they're trying to do everything they can to um to uh build uh these data centers as efficient um and resource conscious as possible.

29:56

Um we don't require recycled water, I think.

30:00

And the question was um what I think if I understood the question, it was what are they doing?

30:03

And yeah, they're they're looking at it.

30:05

We have some that um are bringing in uh recycled water from almost a mile away to bring it in.

30:11

So they they want to use it.

30:12

Um we don't our system isn't everywhere, like our potable water system.

30:16

So if it's nearby and cost feasible, there they have a strong interest in doing that investment.

30:22

Thank you.

30:22

And just for the record, how does the cost of recycled water compare to our potable water usage?

30:27

Uh you know, assuming that a project is close enough to the existing recycled water network, are there any other you know, factors that would uh impact the feasibility of using recycled water in some of these projects?

30:38

Well, the cost is uh w water overall is very cheap.

30:41

Um a cost of a gallon of potable water is about a penny.

30:45

Um so there isn't a lot of cost savings from one to the other, uh, just because all it's all cheap, unfortunately, from this perspective.

30:53

Um the but for each retailer uh our rates are a little bit different, but overall um recycled water is about 40% less expensive than potable water.

31:04

So there's a strong interest, it does matter for the big water users, they are gonna see some savings.

31:10

Um, but those savings don't necessarily cover the cost of the infrastructure, um, even over a 30 or 40 year period.

31:18

Um, but there is there is savings recycled to potable.

31:24

Thank you.

31:24

Uh if I could just add, um so data centers have a choice between how they cool their data centers.

31:31

Sometimes it's water cooled, sometimes it's air cooled.

31:34

So it's also possible that even if they're not using recycled water, they could be using air-cooled system, which would not have as great of an impact on the potable water supply.

31:44

Thank you for that additional context.

31:46

I would just say, uh, you know, obviously we are in a deficit year, you know, the city is looking for ways to increase revenue.

31:51

I continue to believe that data centers are an interesting idea here to generate, you know, reliable new revenue sources that don't come with significant additional service cost to the city.

32:00

Uh, but agree with the public commenters and some of my other colleagues uh that we need to be mindful of the environmental impacts.

32:05

So thank you.

32:07

Thank you.

32:07

And just to follow up on that first on the on the water and air cool question.

32:12

Um I've been you know, we I I appreciate the standards that we have that you published.

32:18

Um I was wondering whether we want to review those standards about what kind of cooling we want to require in the data centers that are here.

32:25

And I know that many of the ones I talk to now are doing air cooling and not water cooling.

32:29

For the air-cooled data centers, sometimes they're water use, they have to have a little bit of water still to for the heat exchangers, but the amount of water that they're using, and it's a close, it's often a closed loop, reuse the same water with a little bit of fresh water.

32:41

They're using about the same amount of water as maybe 10 houses.

32:44

It's not a you know a huge user.

32:46

But I think we ought to be very clear about what we want out of our users and and start with a starting point of um what our expectations are as we negotiate any any agreement that comes into the city that we want to start with what air cool then negotiate from there some kind of general basic standard.

33:07

Um back to the other question about proximity.

33:11

So all the data centers that are being proposed in my district, which is the preponderance of them, there they are within the location that they can use recycled water, and they will be required to use recycled water, at least that's my expectation, and I want to make sure that you know how we have that conversation.

33:26

Clearly, the one down in Great Oaks was too far from from a recycled water line for them to use it.

33:30

Is that is that a fair statement?

33:32

Um Great Oaks does not currently offer recycled water.

33:36

Right.

33:37

So that was the issue was the location of that data center.

33:40

Um I you know, that are these standards that are here that on this on this um attachment official, are they kind of our our guidance?

33:52

I mean, are they are they actual standards, are they requirements?

33:54

Like how are they being um presented?

33:57

Um this is it's a summary of of current regulations that apply.

34:01

You know, in some cases, um, these are taken from our general plan, in other cases it's taken from CEQA.

34:06

Um but the intent with this is trying to provide kind of a um an overview of what's currently on the books of what we would require.

34:15

Um, you know, but happy to go into any detail on any of the specifics.

34:19

Yeah, my my I I've raised this before.

34:22

I mean, my main thinking is that we ought to be very clear about what our expectations are.

34:28

Um and it's not not just for the discussions we have with the developers of data centers, but for our public to understand, because we get questions, and I get questions all the time from residents of my district when we say, hey, this new data center construction is starting, um, to make sure that um what people ask, you know, they're hearing stories from other parts of the country about the huge loads, about the cost of it, about things, but we do things a little differently.

35:00

Um, for example, just the idea that we're requiring the data cent the developer to build the infrastructure of their electricity means that we're not passing on costs that other parts of the country might be seeing.

35:06

And it but it's hard for us to explain what advantages we have and what what we're doing differently and what our standards are.

35:13

And so I'm this the summary is great, but I'm wondering if we can create a portal, a site, or something that we can point the public to to say here's what we are requiring, here's what our expectations are for people so that we can share it when we get these questions.

35:27

Yeah, I mean, certainly we'll we'll take a we'll take a look at doing that.

35:30

And uh, from our perspective, we this was kind of a starting point to have the conversation with the committee.

35:34

I think this can be further refined to be uh probably a document that's a little easier to read and follow.

35:40

In addition to that, we're also working with uh PGE to talk about Rule 30 and the different um requirements and who pays for what, and then easier to understand kind of the typical documents that you might be see that go to the CPUC so uh we can share with the community exactly who pays for what as part of the process.

35:57

So we're seeing this as a starting point, and we'll work to further refine to make sure we can make it available to the council and the public.

36:04

And we're and we're gonna have this conversation soon on a different item in front of about um our energy costs and things.

36:12

But you know, PGE does pass along these infrastructure costs to everyone, and but the more users there are the better that will be for that PCI or IA portion.

36:23

So there is a bad value to having some large um users added to the system as long as the infrastructure cost isn't passed along.

36:32

We have a different structure than Santa Clara, for example, which because it's a public utility, the costs do at some point fall to the city, but that's not true with PGE's infrastructure costs shouldn't be falling directly to the city.

36:46

Yeah, and and and um they the uh they do have a pretty clear direction as to kind of the infrastructure that's paid by the actual data centers that use it as well.

36:55

And most of it is paid by them.

36:56

There's some transmission upgrades that happen up the line that help the overall system, and that's funded a little separately.

37:02

So we'll strive to create a document that explains that in probably like a more simple way than the CPOC documentation does.

37:08

Uh we'll note since you brought up Santa Clara that uh it's a good example that when you have large customers, they use a lot of that do a lot of large load and large sales that sometimes can help rates.

37:17

Uh Santa Clara has I think over 60% of their load is data centers and they have the lowest rates of uh any utility with more than 10,000 customers in the state.

37:26

Right, that's right.

37:27

Um, and then as far as the backup generators, I think it's great, it would be great for us to have some data to say what how are they actually being used.

37:34

I know it's pretty inconsequential in some sense.

37:37

The the data center that the active data center uh in my district that I've toured ran their their generators for a total of 20 hours the entire year last year.

37:46

And the only reason they do that is because they have to once a month run them for 20 minutes or half an hour just to make sure they're working, but they're not running them.

37:52

There are very few outages.

37:54

Um, but I think it's important for us to be able to explain.

37:56

And it's also important for us to basic to to uh codify a requirement that they use the clean energy source of energy so that we're being um you know car requiring carbon-free sources of energy in there as they install.

38:13

Anyway, those just some input and feedback that I have.

38:16

Thank you.

38:17

Um I'll move approval of the item.

38:20

All right, we have a motion, a second.

38:23

All right, is the system working now for voting?

38:26

Okay, well, then let's uh vote to accept the item.

38:29

A title card displays transportation and environment committee.

38:34

Oh, is it all right?

38:37

It's not working.

38:38

All in all in favor, say aye.

38:40

Aye.

38:41

Thank you.

38:41

That motion polices unanimously.

38:42

All right, Cass is five zero, thank you.

38:44

The scene returns to the meeting room.

38:48

Sorry.

38:49

And that that does that brings us to our second item, which is our climate adaptation and resilience plan.

38:55

I see the team coming in the box.

38:57

Lori, you're gonna kick us off or Julie.

39:00

Yes, I'll I'll kick us off.

39:02

So, Lori Michelle, director of the energy department, and really pleased today to be joined by Julie Benavente, she's our deputy director of our climate smart and Jeff Pramazano, who's the director of ESD, as well as Michael Gonzalez, who is a program manager in the environmental services department.

39:21

This item is our climate adaptation and resilience plan.

39:26

And I'll just wait for the slides to load.

39:29

Looks like while we're waiting, I'll just introduce this.

39:40

So, in addition to our climate smart um plan that focuses on climate add uh climate mitigation.

39:48

Um, over the last couple of years, staff have looked at climate adaptation and resilience plan and developed this plan with the help of state funding.

39:57

So very appreciative of that.

40:00

Um here under Julie's leadership, Michael really has has done the heavy lifting here in developing this adaptation and resilience plan.

40:11

And so we're excited to present this to you today for your approval, and then it will be cross-referenced to the full city council later this spring.

40:21

I think we're almost there.

40:22

Julie Benavente walks down the aisle toward the central speaker's table.

40:32

There we go.

40:33

Perfect.

40:34

Thank you.

40:35

So just as a reminder about what we're going to talk to about today, we're going to talk about the background of this plan, which I just introduced.

40:42

Um, importantly, part of the plan did a vulnerability assessment of what we could expect in San Jose in terms of climate impacts.

40:51

And then it lays out a framework and measures that we should work on to reduce um impacts of climate change here in San Jose.

41:00

And then finally, we worked a lot on engagement with the public and getting their community impact.

41:06

Um, we'll talk a little bit about that and then next steps as well as our recommendation today.

41:11

And with that, I'm going to pass it over to Julie.

41:16

Thank you, Lori.

41:18

A lower third identifies Julie Benevente, Deputy Director, Environmental Services.

41:24

She looks toward the council.

41:26

This is not working right.

41:29

Is that still not good?

41:30

City staff walks up to the central speaker's table to assist with the presentation equipment.

41:41

Well, getting into our background for this project, um, Lori did uh key it up pretty well.

41:47

So um we actually, uh as you know, we have our climate smart plan, which was approved in 2018, which focuses on reducing greenhouse gas emissions.

41:57

And in um, as Laurie mentioned, in 2023, we were awarded a grant to be able to work on this climate adaptation resilience plan.

42:04

Some of the partners that we've had uh both for the application and during the process were the Santa Clara Valley Water District who provided technical review and input on the plan, as well as the San Francisco Bay Area Planning and Urban Research Association, better known as SPUR, who helped with a lot of the community engagement that we were doing.

42:27

There we go.

42:29

Um, and just to again kind of I think there's some confusion around what is this plan compared to other things that the city already has in place.

42:37

I already talked about climate smart as our uh reduction for greenhouse gases emissions, and so um the plan that's the plan that we're presenting today is focused on reducing the impact of climate change as we're seeing those already play out here and other places in the United States and the world.

42:54

Um and so this really helps us to identify how we can reduce those that impact on our community.

43:00

Um part of the process also included looking at other plans within the city, which included uh emergency planning, um, which is more uh, you know, on the ground when uh a response when um immediate hazards are happening versus thinking about how we can reduce those hazards uh going forward.

43:19

So here is our uh project timeline.

43:22

I won't go into detail on this, but you can see that there are a lot of steps that have happened since the the grant was provided to the city.

43:30

Um today uh and leading to today's meeting with you guys and future meeting with city council.

43:41

One of the important steps that we completed in order to develop the climate adaptation and resilience plan was this vulnerability assessment that was specific to San Jose.

43:51

So this uh we worked with our um technical consultant to Ramian Associates to be able to prepare this assessment, and it had a high-level analysis of how projected climate hazards can affect the city's populations, buildings, critical facilities, utility infrastructure, as well as transportation systems.

44:10

And this information was really important to be able to inform the prioritization and the development of the actual strategies and measures that are currently in the proposed uh plan.

44:25

Some of the hazards that were identified, um, I'm sure no surprise to you all, but um that are certainly things that we need to be aware of in San Jose are flooding, severe drought, wildfire smoke and events, sea level rise, and the frequent and extreme heat waves were the primary ones that were identified for San Jose.

44:48

And so those um some of the information that went into looking at some of the impacts and how we can reduce those, included a variety of data sources, some of those listed here, the other organizations, including the county and federal and also other state agencies have completed, so we made sure to try to look at those and align this uh plan with those as well.

45:05

So we made sure to try to look at those and align this plan with those as well.

45:10

Slides displayed with picture-in-picture view.

45:14

In terms of some of the key findings through the vulnerability assessment, uh, one was that flooding is the most impactful hazard to infrastructure, which includes our critical facilities, buildings, transportation assets, and utility infrastructure, and to populations in the city.

45:31

And that was followed by extreme heat and sea level rise.

45:40

Its greatest impact is on health and safety for our residents, particularly for our vulnerable populations.

45:46

Sea level rise and storm surge pose increasing long-term risks, but they also are geographically limited to northern portions of the city.

45:55

Wildfire risk is present within city limits, but also geographically limited.

46:01

And wildfire smoke from regional fire activity is a more impactful hazard for San Jose residents as it represents presents significant public health and service continuities concerns.

46:13

Vulnerable populations are disproportionately impacted by extreme heat, air quality, and flooding in terms of the resources that they have available to them.

46:22

And the assessment concluded that the adaptation plan strategies should focus on facility assessments, infrastructure upgrades, community engagement, and resilience measures tailored to vulnerable communities.

46:35

A slide shows vulnerability assessment findings.

46:38

Within the city, oh, I'm sorry, so uh part of the work also that was done was to look at kind of a framework for how we should structure the plan itself.

46:48

And we focused on measures that were within the city's direct control to implement, as well as integrate with related city plans and policies, measures that address infrastructural community and ecosystem impacts from climate-related hazards, and also address inequalities and reduce and reduce climate-related impacts to vulnerable communities.

47:11

And so though the measures themselves are structured within these four categories that are listed here, including knowledge, governance, and policy structural and communications.

47:21

A slide displays CARP measures categories.

47:25

The measures, um, this the next two slides do list the measures.

47:30

Um they don't list all of the 62 strategies.

47:33

Those are attached to the report, but um, just to kind of give an understanding of the types of things that were included as measures within the plan itself.

47:43

Umas um in each of those are supported by the implementation strategies, which are there's 62 of those.

47:52

Um, and so you can see here some of those items under the knowledge and governance and policy ones, and then as well under the structural and communications ones.

48:04

These things included um items like community engagement, they include additional studies to gain more knowledge and to then be able to strategize on direct steps forward and items like that.

48:19

There was quite extensive engagement that we conducted during the development throughout the entire process that included both an internal working group that held regular meetings to look at and provide input on all the items coming forward, as well as uh wide variety of community engagement, which included agency interviews, presentations, uh the a survey for the public, tabling events, a public comment period, and virtual open house, as well as some small group meetings with some of our community-based organizations to get more direct input.

48:55

A slide shows engagement timeline.

48:59

The climate ready working group, which I had mentioned for the internal coordination.

49:03

It also included Valley Water, and it included a variety of departments shown here to provide input based on their areas of knowledge and interests.

49:13

A slide displays next steps and recommendations.

49:18

So, as part of our next steps, and there are some current city activities that are supporting CARP measures already happening, most of those through grant funding, and those include a Roosevelt Community Center resiliency hub development, um, a sub-regional shoreline adaptation planning report that will is coming out of a grant led by the county, which the city and many other cities in the area are partner on, as well as reducing water demand and and/or increasing non-potable water sources.

49:49

It's happening through South Bay water recycling.

50:00

The Urban Land Institute Technical Assistance Program workshop that we will be hosting on March 18th through 19th this year in order to get some more input on best practices for community engagement around the CARP, as well as implementation efforts.

50:09

As well as that, we will continue to implement additional efforts over time as we acquire additional funding.

50:16

A slide shows council recommendations.

50:19

And our recommendation is that the council consider and take action to adopt the climate adaptation and resilience plan as well as approve incorporation of the climate adaptation and resilience plan into the annual climate smart updates and cross-reference this item to the March 3rd City Council meeting.

50:40

Open for questions.

50:44

Thank you for that report.

50:46

Do you have any public comment?

50:48

Yes, we have two speaker cards for Anne Ferris and Jordan Maldell.

50:52

Please make your way down to the podium.

50:53

You will each have two minutes to speak.

50:55

Thank you.

50:56

The scene returns to the chamber.

50:58

Anne Ferris arrives at the public comment podium and prepares to speak.

51:03

Thank you, Committee.

51:04

I'm Anne Ferris and I represent your bicycle and pedestrian advisory committee.

51:09

We express support for the City of San Jose's climate adaptation and resilience plan and urge the Transportation and Environment Committee to prioritize shaded infrastructure for pedestrians and flood control and climate resilient design along major bicycle pathways.

51:25

These elements are essential for protecting public health, maintaining mobility during extreme weather, and ensuring equitable access to active transportation as climate impacts intensify.

51:36

Extreme heat poses a growing risk to pedestrians, particularly seniors, children, outdoor workers, and residents without access to air conditioned vehicles.

51:46

Shaded sidewalks, trails, and public spaces through trees, shade structures, and climate appropriate landscaping can reduce surface and ambient temperatures.

51:55

These measures improve walkability, encourage moe shift away from car travel, and directly support public health and equity goals.

52:04

Bicycle infrastructure is most effective when it remains safe and usable year-round.

52:08

Flood-prone bike corridors can become impassable during storms, disrupting commutes, and discouraging cycling as a reliable transportation option.

52:17

They remain impassable after storm due to drainage issues.

52:21

Integrating flood control strategies such as improved drainage, permeable surfaces, green infrastructure, and setback design into major bicycle pathways will increase system resilience, protect investments, and support San Jose's climate and transportation objectives.

52:39

We respectfully urge the committee to affirm strong support for climate adaptation and resilience to ensure this shaded pedestrian infrastructure is a core consideration in transportation and streetscape projects and prioritize flood resilient design and green infrastructure along major bicycle corridors, especially those serving daily commuters and underdesurf communities.

53:03

Thank you.

53:05

Thank you.

53:05

Next speaker.

53:08

Hi, Jordan Moldale, District 3, speaking on behalf of myself.

53:12

Obviously, I support everything that was said in the letter from the BPAC that Ann just read.

53:18

And I want to emphasize again the strong need for shade and flood protection.

53:25

I also want to emphasize the strong need to fund this plan once it's adopted and to continue to fund and increase funding for the climate smart plan in general.

53:37

We just talked about data centers in the previous item.

53:41

Yesterday, we hosted the Super Bowl, and I just want to emphasize that if we have heat waves and we don't have any way to keep people cool, people aren't going to go out into the economy and spend money.

53:54

If the area around the data centers flood, people aren't going to want to build more of them.

53:59

So there's a strong economic incentive for us to implement this plan.

54:03

Furthermore, I think there's a strong economic incentive to make sure that the things we do going forwards are climate positive.

54:11

Again, going back to the data center item, making sure that the building that we're doing is climate positive.

54:17

Uh isn't just good for the environment, it's good for us because if it's climate negative, then we end up having to spend more money on these resilience plans.

54:25

So I'd like to just ask you to think about it in those perspectives as well as the environmental perspective on its own.

54:32

Thank you.

54:34

Thank you.

54:34

Back to the committee.

54:37

All right.

54:38

Um don't see any hands raised yet.

54:41

Um, but I want to thank you for the work.

54:43

I know that you've you've vetted this pretty heavily through the climate or what the climate commission, so they were involved a lot in in making sure and they've they were supportive of the plan as it's as it's been brought forward.

54:56

It's very important for all of us uh to be prepared for the effects of climate change, which are real and and uh happening now.

55:03

We know sea level rise is happening, and I know that in the district that I represent, North San Jose is very vulnerable to the effects of sea level rise as as true along all of our rivers, and we've seen flooding incidents in recent years that I know that we're going to continue to see them, so I appreciate this work to try to make sure that we're ready and and uh do as much as we can to to prevent impacts for our residents.

55:27

And I see that Councilmember Ortiz has raised his hand.

55:31

Just wanted to move item for approval.

55:35

Oh, cross-reference the city council.

55:37

All right, there's a motion and a second.

55:38

I don't oh, I see uh before we vote, Councilmember Tordia's has his hand up.

55:43

Thank you.

55:44

Just wanted to uh echo some of the public comments around kind of public realm improvements, increased shade near pedestrian and cycling infrastructure, uh but also highlighting some of the opportunities around resilient design standards for private development.

55:55

I think one of the things that I like about this one, if we look at things like increasing the thermal envelope requirements for new buildings, higher energy efficiency windows and insulation.

56:04

Uh it seems like the sort of thing where we can kind of have an impact on multiple fronts, both reducing greenhouse gas emissions by decreasing uh air uh heating and cooling needs, uh, but also providing that resilience and adaptation benefit uh in terms of making these buildings more resilient to things like wildfire smoke uh and also extreme heat with that active solar protection.

56:24

Uh sorry, like the strategies that allow us to kind of dip into both sides of the problem uh from multiple angles.

56:29

Thank you.

56:32

All right.

56:33

I think we're ready to vote.

56:38

Okay.

56:38

Items approved um 5-0, and we'll see it at council in a few weeks.

56:45

Our third item is transportation.

56:47

We're going to get our update on our citywide pavement conditions funding and maintenance program.

56:55

Go ahead, John.

56:58

Thank you, Chair and Committee.

56:59

John Risto, Director of Transportation.

57:02

We are here to present the pavement program report to the committee.

57:08

And with me today is Jennifer Sagan, our deputy director for infrastructure maintenance and division manager Frank Parshidi in charge of our pavement program.

57:17

I'm going to turn it over to Jennifer.

57:22

Good afternoon, committee.

57:23

Um's the clicker.

57:28

Thank you.

57:29

Thanks, John.

57:30

Um, so moving to our first slide here.

57:33

Um, I think all of you are aware, but just focusing in on this, the um at the bottom you see the combined um pavement condition index for the city after our 2025 paving season is 73.

57:47

And we've gone up a little bit on our local street network um from 73 to 74, and a little bit down on the major street network, 76 to 71, and that's because we've been prioritizing the local streets to get through paving all of them in our 10-year time horizon.

58:05

And moving to the next slide.

58:07

A slide shows pavement condition index overview with network data.

58:13

It's not moving.

58:14

A slide displays pavement needs and funding breakdown.

58:21

Okay.

58:23

I think it's working now.

58:24

There we go.

58:26

Okay, so the the key point of this slide is if we were in school and we were grading our streets, this is what we would see.

58:32

So with on the major street network, which is about 967 miles of streets, um, 75% of those are in the good to excellent condition.

58:43

Um in the at-risk to fare is about 21%, and we've taken down the port of failed to only 4%.

58:50

So we're gonna be addressing those as we move forward, of course, with the priority on the worst first.

58:55

Looking at local streets or uh 1,500 uh 1552 miles.

59:00

Um we're doing a little bit better there because again, the emphasis on local streets, we're at 79% of them are the good to excellent or A to B category, 12% at risk to fare, and the D to F is nine percent.

59:14

And again, we're gonna try and address those over the course of the next few years.

59:19

Now there's a lot on the slide to look at, but I'm gonna point you to the overall network box at the top near the top of the triangle.

59:27

And the key thing there is the 66.3 million dollar annual need.

59:32

So to keep our pavement at 70 PCI, which is our goal, um, we'd like to be at 70 or above.

59:40

Um we need approximately 66.3 in annual funding to stay at that goal.

59:46

And of course, each year, as um material cost changes and in labor and everything, that it's kind of a moving target, but that's where we are right now.

59:55

Um a portion of that is for the major street network, of course, a portion of that is for the local street network.

1:00:04

And this is just a graph over time showing where we have gone with the pavement condition index.

1:00:11

So 10 years ago, we were at 63 overall for the city, and we've been able to raise that 10 points to 73 in 10 years, which is pretty incredible for a network our size.

1:00:23

And I'm going to pass it on to Frank now to keep going.

1:00:29

Thank you, Jennifer.

1:00:30

Frank Far Shitty speaks from the staff table.

1:00:34

So this slide uh shows our 10-year funding status and uh what we are uh what where we're at right now and we're uh what we're projecting to have uh for for pavement maintenance.

1:00:48

A couple of important lines here to uh note is the green and the red that we have uh we're showing here.

1:00:55

So the red is our annual uh funding required to maintain 70 PCI as Jennifer mentioned.

1:01:02

And overall, if you add up all of the bar uh charts that you see for each fiscal year, we're gonna be at 66.1 million uh on average for the next 10 years.

1:01:13

So we're uh just a tiny bit uh lower than the than the funding needed to maintain that 70 PCI, and uh as uh some of you and uh all of you know that our uh uh that is because of the measure T sunset, right?

1:01:27

So it's uh it is a it is a 32 percent of our funding that will uh sunset in a in a couple of years that is gonna affect us.

1:01:36

Now to maintain our current PCI of 73, that's the green line.

1:01:40

So we need we need to uh have on average 74.9 million uh for over the next 10 years, and we're definitely uh gonna be below that mark.

1:01:49

So we anticipate that we're going to see that effect on our network as far as the PCI is concerned.

1:01:56

So a slide displays deferred maintenance backlog projection showing costs rising to 673 million dollars.

1:02:04

Uh deferred maintenance backlog is something that we have been communicating uh to the committee and the council over a few years now.

1:02:12

So the uh these two lines, uh the first one, the orange or the uh red one is back right before 20 uh 18 when we started the residential uh repayming and maintenance.

1:02:25

Uh we were projecting at that time over the next 10 years, if we didn't have any other new funding sources, we would be at 1.1 billion dollars as far as the maintenance backlog in 10 years from 2018.

1:02:38

Uh but since then uh a few favorable things have happened.

1:02:43

So we have now measure T funding and as well as uh BTA measure B and the SP1 that we have combined into our pavement maintenance dollars.

1:02:51

So the the blue line that is uh that is the more updated as you know, right after uh we started implementing measure T in 2020 and also VTA measure B starting in 2018 on residential trees.

1:03:06

So we have definitely uh decreased that uh deferred maintenance backlog.

1:03:12

So as you see in the few uh few years from now, and then also uh it is still uh going down, but we are still projecting it to go back up.

1:03:23

It's not going to happen uh right away, so it's a gradual increase, but we are projecting to uh to be at 673 million dollars of backlog uh 10 years from uh from 2026.

1:03:36

A slide shows pavement production and plan miles.

1:03:40

Now this next slide is uh kind of uh backwards and forward, so it's looking back, you know, uh what we have delivered and implemented on the pavement maintenance side and also projections for uh the next few years.

1:03:55

So as you as you can see, I mean we have since uh so the two milestones uh that kind of explain some of the spikes here are the passage of VTA measure B back in 2016, but it was held in the course for a couple of years.

1:04:09

We were able to start implementing in 2018.

1:04:11

So we are you know, we see the numbers and the productions that we uh were able to you know put those dollars into actual projects uh for the community right uh right after that.

1:04:23

And then all uh of course measure T that was uh started but that we started implementing in 2020.

1:04:30

Now uh on the dash lines, so those are all the planned miles that we are projecting to uh to implement and deliver based on the funding that we think we're going to have.

1:04:44

Obviously, you know, we can't tell what's gonna happen exactly in the future, but that's our projection if uh once measure T sunsets, we're going to definitely have less miles that we are able to uh maintain.

1:04:55

A slide displays the 2026 pipeline featuring 20 pavement projects.

1:05:01

So what does that all mean for this year 2026?

1:05:04

Our pipeline, we uh we are uh going to have a uh good size program still.

1:05:09

So we're gonna uh in total mileage, we're gonna have 201 miles.

1:05:13

This includes 60 miles that we uh that went into winter suspension last year, but still uh it's a solid program.

1:05:20

We're gonna have between our residential uh streets and major streets, 20 projects.

1:05:26

So we uh we're still using uh minor contracts and concrete uh preparation in advance of our big payment projects.

1:05:34

So uh we are uh going to have combination of both minor contracts and major project uh major contracts for delivery of our project.

1:05:44

A slide shows local and neighborhood streets maintenance zones.

1:05:48

Local and neighborhood streets project delivery is still going to be based on the pavement zones that we have been uh implementing uh for a few years now.

1:05:58

So uh the main the main points behind that uh project selection and planning is uh these zones are geographically contiguous.

1:06:09

It gives us flexibility to do projects in neighborhoods and finish one neighborhood and then move on to the next.

1:06:16

It's very efficient and effective in terms of delivery and it maximizes our work for these neighborhood areas.

1:06:23

We also consider equity priority communities, so we have that's a tool that we have developed for a few years and we're still uh monitoring.

1:06:33

Uh some pictures of the work that had uh has been happening uh on the ground, some before and uh uh before and after pictures.

1:06:43

So we use uh in big picture uh we we have two types of treatments.

1:06:48

Uh we use pavement preservation for uh extending the life of our uh good pavements.

1:06:55

So those are the pictures of sealing job uh from last year, and then we also uh use resurfacing uh terminology for for uh some of these uh larger rehabilitation projects that we implement uh on our network.

1:07:09

A slide displays 2026 local streets projects totaling 50 million dollars.

1:07:15

Again, uh going to uh focus on local and neighborhood streets or our residential streets.

1:07:20

Uh for this year, we have a total of eight major construction projects.

1:07:24

Three of them are preparation work, uh, two ceiling projects and three resurfacing projects.

1:07:31

Uh we're gonna also have four minor construction projects, those are all in the preparation category, and we will be maintaining about 156 uh miles, including the winter suspension ceiling streets from last year.

1:07:44

Total contracted amount uh adds up to 50 million on uh this local and neighborhood streets that we will be maintaining.

1:07:53

Now, just another statistical uh data here is approximately uh 1,234 miles are expected to be maintained uh from 2019 until 2026.

1:08:06

So that's roughly 80 percent of the network that we're gonna be uh completely done with on the residential streets.

1:08:13

A slide shows sustainable pavement innovations, including permeable concrete and cape CEO.

1:08:20

Sustainability and uh green infrastructure is something that we have uh been uh uh also uh focusing on to use in our project delivery because we uh do a lot of work on uh these projects.

1:08:34

We want to uh we want to be uh doing the right thing for the for the city and for the environment.

1:08:40

So a few uh few of these innovations that we have been successfully uh able to uh implement is uh low carbon concrete that we uh started uh piloting and actually now it's into our full program.

1:08:55

So uh by uh by using this technology, we're able to uh reduce uh 40 percent of our footprint from the baseline for for uh for all the ADA care ramp work that uses concrete materials since 2021.

1:09:10

Permeable interlocking concrete pavement, so that's another technology that we started looking into last year, and uh we uh implemented that as a pilot project on one of our local and neighborhood streets.

1:09:22

Uh we will be continuing.

1:09:24

So that project has been successfully delivered.

1:09:26

We uh we are going to continue monitoring this project for uh implementation in other locations where there is no existing in uh infrastructure for stormwater runoff collection.

1:09:38

And that was the case for our pilot project that we implemented NASA.

1:09:43

Uh this year for 2026, we are looking into a uh CAPE seal uh pavement treatment.

1:09:50

So uh this is a uh a different type of treatment that we haven't done in our uh CIP program.

1:10:00

Uh the city used to have an in-house uh chip seal that which is a little bit different than what we're going to do this year.

1:10:05

The uh the reason that we are looking into CapeSeal is in anticipation of our funding shortage that's coming uh after 2028 and uh and measure T sunsets.

1:10:17

We need to uh do more with less.

1:10:19

So we uh this uh treatment will uh give us a little bit more lifecycle cost uh and uh more bank wrap buck to to do uh hopefully more uh projects.

1:10:31

A slide displays public right-of-way accessibility guidelines and requirements.

1:10:36

Uh public right-of-way accessibility guidelines.

1:10:39

So this is uh we are we continue uh monitoring this to uh see how it gets developed, but this is not something that's uh that has changed our business model.

1:10:50

We uh we we have it on our radar.

1:10:53

Uh the requirements are not into effect yet.

1:10:56

So this uh because of the uh the political aspect of it, it's not into effect uh and into implementation, so we are not required.

1:11:05

We are still doing our diagonal ramps.

1:11:07

So there will be some changes uh in future that we're gonna continue and monitor, but uh we are uh monitoring that one.

1:11:18

Now uh I'm going to pass this back to Jennifer uh for uh the conclusion slide.

1:11:25

Oh, thank you, Frank.

1:11:29

Okay, so in conclusion, um we've made a lot of results.

1:11:34

You know, we we've gone from 63 to 73 over the 10-year period.

1:11:39

Um most of the major streets network and local streets network is rated at good or better.

1:11:44

Um we're gonna continue moving forward with um the plan and try and get those numbers uh to all the local streets.

1:11:54

Um future payment funding is expected to decrease decrease, and we're looking at options um and both for future funding and also uh different ways to deliver the product and our paving program so that we can be um as efficient as possible.

1:12:13

And then um as a result of that, with the pavement funding decreasing, we're expecting some of the uh the PCI numbers to decline, but hoping to keep it at 70.

1:12:24

And we are ready to deliver the pavement program this year and building capacity to move forward.

1:12:31

And with that, we'll take questions.

1:12:32

A council member appears on screen wearing a striped shirt.

1:12:38

Thank you.

1:12:38

I was just reading some of the notes.

1:12:40

Sorry.

1:12:40

Um, let's start with public comment on this item.

1:12:43

We have two speaker cards for Anne Ferris and Jordan Maldow.

1:12:46

Please make your way down.

1:12:47

You will each have two minutes to speak.

1:12:48

Thank you.

1:12:49

Anne Ferris stands at the podium and begins speaking into the microphone.

1:12:58

Thank you.

1:12:59

My name is Ian Ferris, and I'm here on behalf of your bicycle and pedestrian advisory committee.

1:13:05

We thank you so much for using repaving as an opportunity to create safer streets and acknowledge the difficulty in reformatting older streets which are car-centric to create pathways for multimodality use.

1:13:18

At the same time, we must encourage efforts to create the safest possible streets in alignment with San Jose City Stated Goals of Safe Streets for all.

1:13:27

Given Measure T will expire in 2028, we have recommendations for priorities before our city's pavement improvement fundings significantly dis diminishes.

1:13:37

Please make sure our Measure T money is being used for the greatest impact, not just to maintain a status quo, use it for improvements that will achieve both street safety and our city's climate smart climate action, vision vision zero, and mode shift goals.

1:14:01

Street repaving is a once-in-a-decade opportunity to restripe our roads for maximum safety.

1:14:07

Please ensure that our city's repaving standards employ the best practices.

1:14:11

Daylighting, narrow, narrowest allowed width, crosswalk and cross-bike markings, and multimodal expansion, including protected bike lanes.

1:14:22

And again, please align this department's paving and repaving with our city's climate action goals.

1:14:27

Thank you.

1:14:29

Thank you.

1:14:30

Next speaker.

1:14:48

Bonds, in my view, are something that you build something new and it benefits future generations, not something that you repave a road every 10 or 15 years.

1:15:00

So I really encourage the city to look at ways of trying to reduce the cost burden.

1:15:06

One of the most effective ways that we can do that is to figure out ways to get people out of their cars so that there's less cars on the road doing less damage to the pavement and it lasts longer.

1:15:17

So I really encourage the city to find ways to stretch its money.

1:15:21

I've passed out a policy proposal where I think we should use some of our SB1 gas tech money to fund more Vision Zero and bike plan projects.

1:15:34

Again, this will allow people to get out of cars and into their bikes, and it will also save lives and all the costs associated with emergency care.

1:15:42

So I hope you will consider doing that and also consider more bus lanes, which will also get people out of cars.

1:15:50

And then regarding the ADA ramps, I have pictures up above.

1:15:55

Top is a typical intersection, bottom is something that you see in parts of downtown where the entire angle is flush to the ground.

1:16:04

And that feels more uh more people can use the intersection, and it also naively feels to me like it requires a lower volume of concrete.

1:16:13

So I've always been curious if there's a way for us to do the latter as part of our standard design.

1:16:18

And so I'd be interested in hearing whether that's possible or if there's reasons why that is not possible.

1:16:25

But if it's possible, I think we should consider doing it.

1:16:28

Um a lot nicer when you can walk out into the street in any place rather than one like little.

1:16:37

Thank you.

1:16:38

Back to the committee.

1:16:40

Okay.

1:16:40

Thank you.

1:16:41

We'll start with Vice Mayor Foley.

1:16:44

Thank you.

1:16:44

Thank you for the presentation and the work you're doing to repave our streets.

1:16:50

I think those residents who've had their streets repaved are very happy, and those who are waiting are doing so patiently and very anxious to have their roads repaved.

1:17:01

Uh and I'm also know that this is an opportunity, particularly on our major streets, to night to take an opportunity to put in quick builds and uh protected bike lanes and more bike lanes because we can do it all at the same time instead of adding the bike lanes after the fact.

1:17:18

So I appreciate the uh members of the public speaking as well.

1:17:23

And I received your uh policy briefing earlier, so I I will take a look at it as we we get through the budget, uh, move further into the budget.

1:17:32

I do have a question about the ADA ramps.

1:17:35

It seems that we are redoing our ADA ramps.

1:17:40

Um, well, the public would think we do them all the time, redo them all the time.

1:17:44

So now with this new federal, this is a federal regulation on how we're supposed to redo our ramps.

1:17:52

Are we under obligation to implement these within a certain time frame?

1:17:58

And and I raised concerns about that because as we're redoing all of our streets, we're redoing our ramps, and in many areas that do not did not have ADA ramps, they do now with the repaving.

1:18:12

So this seems like an added major expense for areas we already have ADA ramps.

1:18:20

Yeah, you want to buy a question.

1:18:21

Thank you for the question.

1:18:22

Um the the Pro Ag guidelines were moving ahead steadily at the federal level a couple years ago, and with the change in administration with the Trump administration coming in, they just put the brakes on it.

1:18:33

So we're looking carefully at what the timing looks like.

1:18:38

Um, but it would be a change in direction from what we've been implementing, uh, the diagonal ones versus the directional ones.

1:18:46

And um we're anticipating when it might hit and what the impact will be, but it would be significantly more expensive to do.

1:18:56

So when we are redoing all of our streets now, we are still complying with the ADA requirements and making sure that our corners all have ADA ramps.

1:19:10

Correct.

1:19:11

Okay, so this is just a different level of accessibility.

1:19:15

Can you address the public comment about the in the downtown where we have the crosswalks that are or the curbs that are flush with the street?

1:19:25

Is that a possibility?

1:19:26

Uh the guidelines are very strict and that type of a treatment is not allowed in the guidelines, um, but we will be looking at that just to be sure.

1:19:35

It's not allowed in these future guidelines.

1:19:37

Correct.

1:19:39

Maybe I could just add to uh Jordan's uh photo.

1:19:43

I wasn't exactly sure where that is, but we do when we are doing certain streets, we do consider that full flush.

1:19:50

If you have been out to uh Valley Fair where it crosses, this is just an example.

1:20:00

If it crosses Stevens Creek from north, excuse me, south to north along that area right there at uh Valley Fair.

1:20:06

We actually rebuilt that street.

1:20:08

This was costed by the developer when they rebuilt built that.

1:20:12

And it actually is flush all the way across that street on purpose to make it very easy for pedestrians to get one side to the other.

1:20:20

That's a unique situation.

1:20:22

We do look at doing those kinds of things in other places where funding exists and/or the pedestrian levels are high that we want to do that.

1:20:31

It is not something we're going to be able to regularly do because those are expensive when we have to redo, completely redo that street profile to make that work.

1:20:39

I would love to do more of them.

1:20:40

It's just maybe a cost issue right now.

1:20:43

The and just on top of what Jennifer was talking about, that the ADA ramps that we do all at all the corners.

1:20:49

We do about 2,000 of those per year.

1:20:51

It is part of our paving program in advance of when we're getting there.

1:20:56

That's following the existing ADA requirements.

1:20:59

And in some cases, uh, we have had to remove ramps that were done a number of years ago because the ADA requirements changed slightly.

1:21:09

Then we had to go back in and redo them.

1:21:11

So some people notice that, bring it to our attention, and we have to explain it that way that we still have to comply with that ADA requirement as it is today.

1:21:20

Pro Wag is something bigger and different and quite more.

1:21:24

We're going to be keeping an eye on, but right now we're just anticipating that may come back again in the future, but we're just planning on it right now.

1:21:32

Okay.

1:21:32

Well, thank you for bringing the future plan to our attention and that it's on pause.

1:21:39

Thank you for all of your work.

1:21:40

With that, I'll move approval of the item.

1:21:44

Is this a cross-reference or no?

1:21:47

No.

1:21:47

No.

1:21:48

Um, just one just one question.

1:21:51

Um the lower carbon, the 40 percent lower, is it 40 percent reduction?

1:21:59

I've heard I've heard some in um recent reports of uh actually negative carbon um materials.

1:22:08

Have you has the city looked at that at all in terms of carbon capture uh paving materials?

1:22:15

We we have not.

1:22:16

We we have also heard about some other technology that we uses completely cement-free concrete.

1:22:22

Uh there's there are a couple of startups actually in the Bay Area that have that technology.

1:22:27

Uh, but that's something that we could definitely look into.

1:22:31

I assume we want to keep our eye on the latest and greatest.

1:22:34

All right.

1:22:34

Thank you.

1:22:35

I don't see any other hands, so let's vote.

1:22:42

Okay.

1:22:42

Motion carries 5-0.

1:22:44

Thank you all.

1:22:45

And we on to our last item.

1:22:46

This is our sewer rate setting audit report.

1:22:49

Previous presenters leave the table and the next group of staff members take their seats.

1:22:54

Joe Royce walks down the aisle steps with a colleague and takes a seat at the presentation table.

1:23:16

Good afternoon.

1:23:16

I'm Joe Royce, City Auditor.

1:23:18

I'm here with Abella Obi from our office to present our audit of sewer rates, reviewing rate model assumptions and developing reserve policies would improve the rate setting process also in the box.

1:23:27

Jeff Provenzano from the environmental service department or each other.

1:23:31

A lower third identifies Joe Royce, city auditor.

1:23:48

Slides don't see me moving.

1:23:50

That's okay.

1:23:50

The city sets sewer rates to recover the costs of providing sanitary sewer and wastewater treatment services to residents and businesses.

1:23:58

ESD sets the rates based on the overall volume of the customer's wastewater.

1:24:02

And the concentration of pollutants in the wastewater.

1:24:05

The concentration of pollutants is also referred to as the strength of the wastewater.

1:24:09

All customers pay the same unit rate for each wastewater component that ESD treats.

1:24:15

How a customer is billed, however, depends on the type of residence or business and the assumed or actual volume and strength of the wastewater.

1:24:22

The objective of this audit was to assess the city's process for setting sewer rates.

1:24:27

We had three findings.

1:24:28

The first finding was that ESD should review assumptions within its race rate model.

1:24:33

The rate model follows guidelines set by the state, which provides a reasonable basis for allocating costs to users.

1:24:39

And integral to the rate model are assumptions about the volume and strength of wastewater, which affect how San Jose sets rates.

1:24:46

We found that in 2014, the state determined the city's rate model complied with clean water state revolving funds.

1:24:53

We also found that a 2015 consultant study reported that the strength of wastewater reaching the regional wastewater facility did not match what was assumed in the rate model.

1:25:01

However, the study recommended that the city should continue it with its current strength parameters until field sampling occurs.

1:25:08

This field sampling has not yet occurred, but I want to note that during the audit, ESD hired a consultant to begin that work.

1:25:15

In this finding, we had recommendations for the ESD to study assumptions in the rate model and update them as necessary.

1:25:21

Update procedures around when assumptions should be reviewed and consider implementing a software solution for rate calculations.

1:25:29

The second finding was that ESD should develop formal reserve policies.

1:25:32

ESD maintains reserves and the sewer service and use charge fund for operations and capital projects.

1:25:37

We found that the amount of funds held in reserve and unrestricted fund balance in the fund has fluctuated over time, and that ESD does did not have a formal policy that defined the intended purpose or set target levels for the for the different reserves.

1:25:51

Formal reserve policies or practices are common among other wastewater facilities.

1:25:56

So we had a recommendation to develop a formal policy, pursue our fund reserves that defines our intended use and target levels.

1:26:04

Our last finding was that ESD can improve transparency around the rate setting process.

1:26:08

We found that consolidating procedures on the frequency of wastewater sampling would improve transparency for how bills are calculated for industrial users.

1:26:16

We also noted that ESD's sewer rate web page could be enhanced with clean clearer explanations of how rates are set.

1:26:23

And for this finding, we had recommendations to document procedures or sampling decisions and notifying users of changes as appropriate and updating the sewer rate web page to add clear rate setting explanations.

1:26:36

The report has six recommendations.

1:26:38

I'd like to thank the environmental service departments for their time and insight during the audit process.

1:26:43

I ask you to accept the report and cross-reference to the March 3rd City Council meeting.

1:26:47

We're happy to answer any questions, but first I'll turn it over to Jeff for the administration's response.

1:26:51

Thank you.

1:26:54

All right.

1:26:54

Thank you, Joe and team, for the uh audit.

1:26:56

Oh, response from Jeff.

1:27:02

No response.

1:27:03

Uh no response.

1:27:04

Uh just uh we're uh always happy to work with Joe and the team, and that we really appreciate uh the deep dive into our program.

1:27:10

So I always look for improvements, and so thank you.

1:27:12

It's been a always always is a very positive.

1:27:14

Prepared to implement the recommendations.

1:27:17

Okay.

1:27:17

All right.

1:27:18

Uh let's go with uh go to Vice Mayor Foley.

1:27:20

Oh, wait, we don't have a public comment, do we?

1:27:22

No public comment.

1:27:23

Back to Vice Mayor.

1:27:24

As always, thank you for the presentation on your audit and uh thank you for the the briefing.

1:27:29

With that, I will move acceptance of the report and cross-reference to the council meeting.

1:27:36

All right, we have a motion and a second.

1:27:38

I don't see any other hands, so let's vote on this one.

1:27:45

Motion carries five zero.

1:27:46

Thank you all so much.

1:27:48

And we're on to open forums.

1:27:52

We have one speaker card for Jordan Maldau.

1:27:55

Please make your way down.

1:27:56

You will have two minutes to speak.

1:27:57

Thank you.

1:27:58

A public comment or walks from the audience down to the speaker podium.

1:28:03

Thank you, Jordan Muldau, District 3.

1:28:06

Uh so I went downtown the past couple of nights checking out the festivities.

1:28:12

Um, and I think when we have March Madness and the World Cup, I hope we can do better in terms of traffic safety.

1:28:20

Um I was walking and biking around East Santa Clara Street Friday night.

1:28:26

It was crazy.

1:28:28

Um I I hope we can, you know, maybe get some more uh, you know, motor motorbike cops and parking enforcement officers on bicycles, you know, around downtown during times when we have these big events, and especially if um if we have parts of Santa Clara Street uh blocked.

1:28:52

Um, yeah, I was trying to cross a particular street, and I guess we we must have maybe changed the I don't know if we changed the signal timings for the event or if it was just all the buses stuck in traffic and the new TSP thing messing things up.

1:29:10

Um but I was trying to cross Santa Clara Street at um Alma Din, and there were three light cycles where it just kept going straight and it never gave pedestrians or cars the opportunity to cross the street, uh, which created a dangerous situation because people started crossing anyway, and there were buses and cars partially blocking the intersections, so lots of blind corners.

1:29:35

Um I hope no one got hurt Friday evening in the traffic.

1:29:40

Um, and I hope when we have more of these downtown events, we can figure out better traffic plans.

1:29:46

Um and you know, I did see a lot of cop cars downtown, but I don't believe the cop cars do traffic enforcement, and they're also just very bulky.

1:29:55

There you can't maneuver a cop car around downtown when there's gridlock.

1:30:00

And so if we can get more folks on bicycles, e-bikes, motorcycles, I think that'll make it easier to do enforcement when we've got these really big events.

1:30:11

Thank you.

1:30:12

Thank you.

1:30:13

Back to the committee.

1:30:14

A lower third identifies open forum.

1:30:29

A lower third shows adjournment in the city website www.sanjoseca.gov.

Discussion Breakdown — Share of Meeting
Climate and Environment█████████████████████████████29%
Transportation████████████████████████24%
Technology and Innovation█████████████████17%
Economic Development████████8%
Public Comment███████7%
Municipal Finance█████5%
Transportation Safety███3%
Public Safety███3%
Procedural██2%
Summary of Proceedings

San Jose Transportation and Environment Committee Meeting - February 9, 2026

The Transportation and Environment Committee (T&E) met on February 9, 2026, from approximately 9:30 AM. The agenda included four substantive items: (1) an update on the Climate Advisory Commission work plan (considered on consent), (2) a large load energy customer development status report, (3) the Climate Adaptation and Resilience Plan, (4) a citywide pavement conditions update, and (5) a sewer rate setting audit report. The committee also heard public comments and an open forum item. All items were approved unanimously (5-0).

Consent Calendar

  • The committee voted unanimously (4-0 initially, then 5-0) to add the Climate Advisory Commission work plan update to the consent calendar and then adopted it without discussion or public comment.

Public Comments & Testimony

  • Item 2 – Large Load Energy Customers: Two speakers addressed concerns. A lifelong San Jose resident (Alina) criticized the lack of study on public health and environmental impacts, noting that the EIR for the South Bay Great Oaks facility showed no recycled water use and that 36 diesel generators would be installed. She raised issues of cumulative health impacts. Michan Allgood, an AI ethicist and South Bay resident, expressed concern about air quality and water scarcity, critiquing the sufficiency of the environmental review process and urging the city to exercise oversight.
  • Item 3 – Climate Adaptation and Resilience Plan: Anne Ferris, representing the Bicycle and Pedestrian Advisory Committee (BPAC), urged prioritizing shaded infrastructure for pedestrians and flood control along major bicycle pathways. Jordan Moldale (District 3 resident) supported the plan and stressed the economic incentives for climate-positive investments.
  • Item 4 – Pavement Conditions: Anne Ferris again spoke, emphasizing using repaving opportunities for safer street design (daylighting, narrower lanes, multimodal expansion). Jordan Moldale recommended using SB1 gas tax funds for Vision Zero and bike projects, and asked about flush crosswalks as a cost-saving ADA design.
  • Open Forum: Jordan Moldale reported traffic safety issues during downtown events (March Madness, World Cup), suggesting more bicycle and motorcycle enforcement.

Discussion Items

Large Load Energy Customer Development Status Report

  • Staff (Erica Grafo, Assistant to the City Manager) presented a status update. Key points: Two large load projects energized by June 2026 (on time); three projects in building plan review; two projects in planning entitlement (goal of five may not be met). The city tracks 12 projects under the PG&E implementation agreement; PG&E is on schedule for the remaining 10 by 2030. LS Power transmission projects are on track. Data centers generate $3–7 million annually in utility user tax for a 50-99 MW facility. Environmental requirements (CEQA, water supply, recycled water, renewable energy) were summarized.
  • Councilmember Ortiz questioned water monitoring, generator runtime, and rate impacts on residents. Staff (Jeff Provinzano, Chris Bowden) responded: water supply available; generator runtime is limited by air permits and monitored by the Bay Area Air Quality Management District; cost allocation is through CPUC Rule 30, which places most costs on developers. Ortiz requested a study session on data centers; the city manager offered to consider both a study session and an annual council report. Chair Cohen supported the idea.
  • The item was approved 5-0.

Climate Adaptation and Resilience Plan

  • Staff (Lori Michelle, Julie Benavente, Jeff Provinzano, Michael Gonzalez) presented the plan. A vulnerability assessment identified key hazards: flooding (most impactful to infrastructure), extreme heat, sea level rise, wildfire smoke, and drought. The plan includes 62 strategies across four categories (knowledge, governance/policy, structural, communications). Extensive community engagement was conducted. Current grant-funded activities include a resiliency hub at Roosevelt Community Center and a sub-regional shoreline adaptation plan.
  • Councilmember Tordillas highlighted the importance of shaded infrastructure and resilient building design. Councilmember Ortiz moved approval.
  • The committee approved the plan 5-0, to be cross-referenced to the March 3, 2026 City Council meeting.

Citywide Pavement Conditions, Funding, and Maintenance Program

  • Staff (John Risto, Jennifer Sagan, Frank Parshidi) reported the city’s Pavement Condition Index (PCI) is 73 overall (up from 63 ten years ago). Local streets PCI is 74; major streets PCI is 71. Annual funding need to maintain PCI at 70 is $66.3 million. Due to Measure T sunset in 2028, projected funding will drop, causing a deferred maintenance backlog of $673 million by 2036. The 2026 pipeline includes 201 miles of paving (60 miles from winter suspension), 20 projects totaling $50 million for local streets. Innovations include low-carbon concrete (40% reduction in CO2), permeable pavement pilots, and CapeSeal treatment.
  • Vice Mayor Foley asked about ADA ramp requirements (federal PROWAG guidelines currently on hold). Staff confirmed current ramps comply with existing ADA standards. Foley moved approval.
  • The item was approved 5-0.

Sewer Rate Setting Audit Report

  • City Auditor Joe Royce presented three findings: (1) ESD should review assumptions in its rate model (a 2015 study found mismatched strength parameters; sampling has just begun); (2) develop formal reserve policies; (3) improve transparency (sampling frequency documentation and web page updates). Six recommendations. ESD Director Jeff Provinzano accepted the recommendations.
  • Vice Mayor Foley moved acceptance and cross-reference to council. Passed 5-0.

Key Outcomes

  • All four agenda items were approved unanimously (5-0).
  • The Climate Adaptation and Resilience Plan will go to the full City Council on March 3, 2026.
  • The Sewer Rate Setting Audit report will be presented to council on March 3, 2026.
  • The committee signaled support for an annual council report or study session on data centers to address environmental and ratepayer concerns.

Meeting Transcript

A title card displays the City of San Jose logo with capital of Silicon Valley. Text shows Transportation and Environment Committee in February 9th, 2026. The graphic reads will begin shortly. Today's the February 2026 meeting of the Transportation Environment Committee to order and start with roll call, please. Tordillos. Here. Compos Absent. Ortiz. Present. Vice Chair Foley. Here. And Chair Cohen. Here. You have a quorum. Thank you. All right. We have one work plan review item. That's a um an update of the Climate Advisory Commission work plan. Um think we have any presentation on this or anything. Is there any public comment? No public comment. Okay. We I'll take a motion on this item. So move. Okay. Let's go. And then Tatan's currently down. We'll take a verbal vote if that's okay. All in favor say aye. Aye. Aye. Thank you. That passes unanimously. Motion carries four zero. Thank you. And we have a consent calendar. Oh, wait. Oh, I'm sorry. We were supposed to that was to add this item to the agenda so we could consider it in consent calendar. Why is it listed twice? One is to add it, one is two. So that item was just to have it so we can now have it on the consent calendar. So now we're on to consent calendar. I assume there's still no public comment on this item. No public. And now we'll need a motion to adopt this. All right. All in favor say aye. Aye. Opposed.