4:17We're gonna start our study session.
4:21Thank you for joining us today.
4:25All right, here we go.
4:28Um Counselor Oh, do we have any no Monday?
4:41Um that one did we uh that one's ready, right?
4:46Reintroduced the table last time.
4:47We're ready with that one.
4:50Uh resolution approving um Counselor, I mean item nine.
5:03I have item 10 to 18.
5:06I think the first item have any taking the first item?
5:12Good afternoon, counselors.
5:13Evan loving Budge Director.
5:14Um item 10 is a renewal of an existing contract with energy automation.
5:19Energy automation gives us um expertise and support on our energy utilization, including preparing our annual energy budget.
5:27Um so we work with them frequently, as we all know, energy costs are rising, and so this continues to be a vital service.
5:33We originally RFP'd this, and we just had one more renewal.
5:36When the renewal's up, we will go back out for RFP.
5:40Did they did they produce any report at all?
5:43They produce a lot of ad hoc reports, they also review our bills, and so we work with them on I work with them on a daily or weekly basis.
5:51In terms of what they produce annually, it's usually the budgeted numbers that we that we include in the proposed budget.
6:00Any other part of that new thing that the mayor's office signed off on with the letters that went out?
6:08They they we they were consulted as part of the solar initiative.
6:11They that's not what they do, but we do include them.
6:14Like I said, they're a resource on energy.
6:16They have decades of experience in the field, so we did talk to them about the program as well.
6:20But they were they were not a part of setting that up or putting it out.
6:33Hello, county counselors and president.
6:39Oh, sorry, first deputy commissioner and Fordak.
6:43Um so 11 is amending agreement.
6:46So the original agreement came before you in 2025, and that's for the uh building.
6:51It's considered a temporary structure, and it's to hold all the trash and recycling carts, parts and pieces.
6:57This is just an amendment um because we had to add some insurance for the builders when they're on site building it.
7:04So that was not in the original bid and pricing, so the price did go up a little, and that's what this is for.
7:12And do you have a um uh updated number on well, just any number on the amount of individuals who've asked for additional carts who have been.
7:24Oh, who paid for yeah, we can get that.
7:26Vicky sends me a list uh every week of who they are, and we add them to a list for delivery, so we can get you that.
7:33Can you send it to everybody?
7:35Can you send it to a little?
7:40You know, one one of the concerns when we when these legislation was passed, and was that certain individual were going to take out the people cart.
7:50Have you had heard of any of that of that at all?
7:53So I mean it I feel like it's a constant uh thing for us, and it's usually people using them for other things, such as collecting bottles and cans or metal, and so um if it's a metal or bottle place, we have to go there weekly typically to pick up and retrieve the carts.
8:12Um we did you know try to make sure there wasn't say abuse of that by requesting that you do a police report.
8:20But um, more than I would like sitting here.
8:27There's a few sitting at the Mondo's gas station just sitting there.
8:32Yeah, definitely let me know if there's any uh lingering, but uh our guys typically know where they where these carts hang out, and we have to go collect them.
8:45Item 12 good afternoon, counselor's Mary Robison, city engineer.
8:56Items 12 through 14 are associated with um the parking lot that we call the Harbor Brook parking lot, which is a small parking lot, um basically off of Fowler High School's parking lot and between the baseball field and Harbor Brook, which will provide some parking spaces and pedestrian access from the lot that we're leasing for parking along Geddis Plaza to get right to 1153 West Fayette.
9:27So in 12, we are requesting um seeker, an unlisted action um with no significant impact for the construction phase of this parking lot.
9:39Um 13 is increasing the bond ordinance by 500,000 for a total of 650,000.
9:47And 14 is the project authorization for the construction of that Harbor Brook parking lot.
9:55Which has an address of what's the address?
10:02Did the bit came back higher, Mary?
10:05We're completing the design.
10:07We're authorizing the whole construction phase.
10:10So the first time I came to you was strictly for the design phase for 1171 West Fayette, and then also the um parking lot on the east side of Geddis, 11 Magnolia Street and 1171, and then the pedestrian access over the abandoned railroad bridge.
10:31So we're building two parking lots and pedestrian access over the um abandoned railroad bridge, but this 500,000 is for the um Magnolia Street lot.
10:43And how many um parking lots do they expect to get out of that?
10:47How many parking spaces?
10:49Uh approximately 16.
10:52But it's also got security and is allowing the people that park um in the Geddis Plaza to get access directly to the new building.
11:06So they cross Harbor Brook, go through this secure lot and directly to the new police building.
11:15Any other questions?
11:1715, 16, 17 are companion pieces, right?
11:22This is related to the demolition of the Fayette parking garage at 300 East Fayette.
11:28It's uh seeker in 15 is a type two action.
11:33Um and then the bond ordinance for uh cost not to exceed three million dollars and project authorization not to exceed three million dollars.
11:41Can you just talk a little bit more for those that are listening as to why we are doing this?
11:46Uh we the parking garage is not um safe for people to park in it right now, and the cost to repair it is exorbitant, and we have no guarantee how long that if we did spend a lot of money to repair it, it still may have a very limited short lifespan.
12:13All right, 18 18 is request for a local law to grant a permanent easement to Niagara Mohawk at the airport for the installation, operation, and maintenance of an underground power line to the new consolidated rental car facility along Eileen Collins Boulevard question Thank you, Mary.
12:40Um item 19 is the resolution uh to put a check box into our RPs to for a disclosure from individuals that are doing business with the city, and uh I want to thank Evans.
13:00I want to thank Joe Barry, I want to thank Michael Collin uh for coming together to do this uh with us.
13:08Any questions everybody on board?
13:12Everybody else yes, 100% all right.
13:18Um so counselor Airmank is not present who's in the Patrona.
13:24Do you want to take those names?
13:25Yeah, I have item 19.
13:28So resolution urging a director of management.
13:34Oh, I'm sorry, I thought we were there.
13:38I have items 20 through 26.
13:42Good afternoon, council.
13:43Uh Chris Abbott, deputy commissioner of the parks department.
13:46Um items 20 and 21 relate to our annual after uh end of the year program uh for our after-school programs in the parks.
13:56Um one is with hail transportation on behalf of uh the parks department to provide uh passenger coach buses for the trip at a cost not to exceed 14,000.
14:08Uh their questions there.
14:11Yeah, and our annual trip to Dorney Park.
14:15So item number 21 is uh to authorize payment uh to Dorney Park for the purchase of tickets uh for all of the participants in the cost not to exceed $12,000 serving over 200 youth questions.
14:32Let me ask you a question.
14:33I'm looking at numbers, right?
14:35So is it 210 and or 224?
14:38Because I'm looking at 210, then it's 224.
14:41Um Jason Howard, our program director here to answer the question.
14:46But uh numbers tickets for uh Jason Howard program director city parks.
14:52Uh I was waiting for this, I was waiting to come up here anyway.
14:55So we have some question again?
15:00It says purchase tickets for 210 U.
15:02Dennis says catering lines for 224.
15:04So is that the chaperones included in the two?
15:07So what it is is 210 purchase tickets, and then those are the extra tickets that come along with it.
15:12So a total of 224 people that'll be going.
15:15But we're only paying for 210.
15:17Because once you purchase so many tickets, they give you so many.
15:20Correct, but the total number of people tickets to enter, but the other, you know, I'm always taking so the other money is just to feed them.
15:29So they give you so many tickets.
15:30Once you purchase so many tickets, they give you free ones.
15:32So that's what you want to say.
15:35Any other questions?
15:42Item number uh 22 is uh authorization to proceed with a 25-26 capital improvement program for the public arts initiative, uh an amount not to exceed 35,000 dollars.
15:55Um these funds are used to repair, replace, improve existing public art, uh provide some site preparation uh for the public art projects.
16:10Have we ever had a not an audit, but any reports on um the public arts stuff as far as like uh yearly how many get repaired, replaced or installed.
16:26Happy to invite uh Josh Wilcox, our planner up to potentially answer that question.
16:36Uh Josh Wilcox landscape designer uh parks department.
16:39Question on has there been any audits?
16:41Not necessarily no audits because we try to repair things as we see it as they come.
16:46Um we're currently in the process of inventorying everything.
16:49We have an idea of what everything we have had uh initiated in the in the public arts program over the years, but there's been no process.
16:58Well, when you have that information, if you could just give it away.
17:01We can give you the little inventory as well.
17:07Where are we with home are we in?
17:09So that's an intake right now.
17:10It's in permitting right now for the review with uh the right departments, and then we're good to go with the bid.
17:16So we'll be out to bid within the next six weeks.
17:18And that's for the that's for concession stand and a splash pad at Holman Wheaton Park.
17:23So what about Westmoreland and Barrie Park?
17:25Where are we with those?
17:26Uh with Barrie Park, we do have some community engagement planned that we haven't announced yet, but we will be planning some community engagement um early summer before the end of the school year.
17:35And then Westmoreland, we are under contract with a consultant.
17:38We've already had the survey conducted, so we have an entire new topographic land survey.
17:43Um we already have the equipment, so we're just putting the the pieces together now so that we can get it installed.
17:48Can you later oh I'm sorry, go ahead.
17:50Can you let us know about the community engagement um dates times?
17:54Yeah, uh right now we don't have a specific dates, but we're looking at May and June for community engagement for at least three playgrounds.
18:00So Westmoreland will be done this summer.
18:03We will have a splash pad this summer.
18:05Yeah, because we have the equipment, we don't have to worry about procurement, we just have to worry about construction.
18:11And Josh, um one to thank you.
18:13I know that you helped coordinate the flags over at Comfort Tyler.
18:17Um it feels like a little thing, but you know, having a new American flag and the the new first light flag over in that park makes uh a really big difference.
18:28Um and the the neighborhood is very proud and and love having it up there.
18:32So thank you for that coordination.
18:34We've seen many photos already, so thank you for letting us know.
18:42Josh and uh that was 2020.
18:44That was item 22, right?
18:47Yeah, so we're on two twenty-three.
18:50Uh items twenty-three and twenty-four related to uh uh authorization to proceed with the capital improvement program for wayfinding uh and signage on behalf of the parks department and total amount not to exceed 150,000 dollars.
19:05Uh 23 is uh authorizing the issuance of sale uh sale of bonds, uh items 24.
19:12Chris, what signage?
19:13What are you guys doing?
19:16Yeah, a uh actually Josh has a physical uh example of what we will plan to do with the uh uh at least capital funds, and it is to um replace update uh the signage throughout the parks department.
19:33Well Josh, you can correct me if I'm wrong, but it's really starting, you know, beginning and just going throughout the parks.
19:40Um so it's just to replace the signs that are kind of already.
19:44We have right the for many years, decades the wooden signs.
19:48Yeah, um these right?
19:50So these would be our the entrance signs to the parks, right?
19:53Entry signs into the parks, and as well as some additional wayfinding in the parks.
20:00And and um, and I mentioned last year, um, and probably the year prior, but the South Ave side of Kirk Park.
20:08There's no signage at the South Av area, so people don't realize like well, not South Av.
20:15I think it's like at that Kirk Park turn.
20:18Yeah, when you come from that sideway.
20:20No one knows that there's no way to get back into Kirk Park if you turn down.
20:24Is that Kirk Park way or something?
20:28And uh the sign that the model that you see right now, it's uh uh meant to be concrete with wood, and that concrete column right there is multi-faced, so we can put banners on the side, we can put the icons on the side, yeah.
20:40But then we could put the directional arrows and the panels for where people should go to get to the main community center.
20:46Okay, Josh, can you um part of what I've asked um for multiple years?
20:50But can we please get signs this year for this ticks?
20:56Yes, can we please figure out a way to make sure, especially those high uh population where there's deers at that we have a signage, a picture, and a picture with a tick look like that is posted through the parks.
21:08Yeah, right now it probably is a little bit too small on the sign for how big the sign is.
21:12So our intention is to blow them up a little much larger.
21:16Because if you never was exposed to deer, you wouldn't know, but can we please put that in?
21:23Definitely thank you.
21:24And before you leave, um Josh, is uh any of this signage related to like the creek walk, like is the creek walk gonna have any because I know like there's been conversations for a couple years now about some type of way wayfinding on the creek walk, and I know that some local organizations have tried to take that on on their own, but for their portion of the creek walk, and that's we want it to be you know across the entire creek walk, so that wasn't something that we 100% and uh consistency is big.
21:56So having the consistent signage, especially the mapping right now.
21:59We only have one map that really shows the phase one creek walk.
22:02So we want to expand that to include even the potential phase three and the route that that could take.
22:07Um having much larger signage that people could see it very clearly.
22:10If we could look at uh lighting with our signage, that would be awesome.
22:14But I think that's definitely a different conversation.
22:16But um, having signs that are accessible to all and that everybody could actually see from a distance.
22:24So is that something you're gonna have to come back is in here and ask for more money, a part of this signage because we want to make sure that as you're doing this that you're actually putting those up to?
22:35Yeah, those signs we already have a design uh ready to go.
22:38We just gotta get them printed.
22:39We plan on using the existing stanches, the the um poles that hold them in place, and then we have to install some more of them.
22:46Um a lot of that has been internally redesigned so that we could start to implement pretty quickly.
22:51Um we're looking at this summer and using some of the existing funds here because this covers our our larger brand signage, but then our smaller.
22:58And I know we're sort of off topic, but is considering the signs and the trash cans through the creek walk.
23:06We need more trash cans, like the Disney study I've been saying for the last five years.
23:12After so many steps, you have to have trash cans.
23:14They're gonna end up on the floor.
23:16That's in the parks too.
23:17We don't have enough trash cans that are in places where people can throw stuff trash at.
23:23So I'll send you our new trash signage too.
23:28That's uh already drafted and ready for implementation.
23:31Okay, one more thing, Josh.
23:33At the bottom of that, is that like a little flower bed?
23:36Yes, the little planting bed.
23:38So any neighborhood uh neighborhood groups could go ahead and take uh some ownership over, or we could just use uh typical annual planting pallet.
23:46And what's the material?
23:49I have another question to Josh.
23:52Uh I got a report on Monday.
23:55There was a group of teenagers at Scholler Park.
23:58Uh they got in a few fights.
24:01It was alternating to violence.
24:03Neighbor had called 911.
24:05Um, I don't know if Saisha's here.
24:08But uh I just want to bring it to your attention at Scholler Park.
24:12And it was forwarded to the commissioner.
24:14It was forwarded to Captain Don Patty.
24:18Um, and and I'm like, someone said to me, Well, doesn't search police don't pay patrol shoulder park during the day.
24:28And I really didn't have uh a response.
24:31I couldn't add, but I want to bring that to your attention that we have to maybe follow up, especially when there's a school break and kids are hanging out.
24:39Uh and it did bother some of the older people who were visiting the park as well.
24:46Yeah, and our sites are open you know earlier this week with the school break.
24:49So we're yeah, we're there.
24:51And I mentioned it at commission um Commissioner Byrd regarding the cameras that we gotta make sure that our cameras, I know that she said there's some updating to happen, but all this park should have the cameras up and ready to roll.
25:00I know this said there's some updating to happen, but all this parts should have the cameras up and ready to roll.
25:04So we're getting follow-up of that as well.
25:13And item 25 is uh to accept from coordinated care services corporated funds um reimbursement funds for our after school programs, so municipal funds um that uh are offered every year.
25:31In an amount not to exceed 18,741.
25:41Okay, thank you, Chris.
25:4426 is a resolution um recognizing April 26th.
25:51I'm sorry, April 2026 as autism awareness month in the city of Syracuse in an effort to increase awareness and re reduce the stigma, encourage early diagnosis and intervention, and promote policies and programs that support individuals on the autism spectrum.
26:12Is this uh all right?
26:24Good afternoon, counselors Vinny Scipio and Chief Information Officer.
26:28Uh 27 is an agreement uh with Site Improve, which is a uh platform which uh ensures compliance on our digital assets such as our websites for accessibility purposes.
26:40Uh so this is mandated by the federal government that we uh do so and uh this was the platform that we determined to best suit our needs to in order to do that.
26:49So you said it was the platform that you determine did your RFP any of the low the RFP threshold.
26:55We went and got multiple quotes, and uh this is the one that uh you know best scored on our internal evaluation process.
27:04The next one is with SurveyMonkey, uh, another platform.
27:08Uh you've probably heard of it and/or used it before.
27:11Uh it's used by multiple departments, the communications department, the city payment center, and beyond for uh engaging with residents, constituents, and uh obtaining information uh relative to their operations.
27:24So uh also another one below the RFP threshold.
27:40Good afternoon, counselors.
27:42Uh Gentep Director of Strategic Initiatives.
27:44Uh item number 29 is an agreement with the Syracuse Urban Partnership, which owns the Chimes building on Salinas Street.
27:53Um this is for a no-cost uh access agreement, basically, for the city to install fiber at the building um to connect into the Northland telecommunications room that exists there.
28:04I think some people are aware Chimes is one of our two um internet closets in the city of Syracuse.
28:11So this is just a standard build for our broadband infrastructure.
28:16Um this will the the current um uh end date for this is basically set to coincide with our current um contract with the state of New York for our broadband grant.
28:29Um it will likely need to be extended because we will keep the equipment there longer term.
28:34Um but we initially we just scoped it so that the contracts are in alignment, and then we'll come back obviously when we need to extend it.
28:41So, what happens if um what happens when this contract ends with the state and broadband and we're done with this?
28:51What happens with this?
28:52So we'll need to keep this because this is for the the infrastructure itself.
28:57The city is going to continue to own the fiber, all of the network equipment, and we will need to continue to you know keep that infrastructure deployed in the community.
29:07So um, so it'll still be the city's responsibility to maintain the fiber that is going to be at this particular site as a part of the city's um network so we can continue to use that infrastructure.
29:20But the city was a conversation that well for both for both.
29:27You're probably about to ask one on that.
29:28The last conversation that we had um before our last allocation of funds was that the city would be looking for someone to take over this project um because we have not been doing a good job at getting it out there.
29:43So the city will we be why would we hold on to any of this after the contract?
29:48So the city is still gonna be responsible for owning the infrastructure.
29:52The city owns the fiber, the city owns the the infrastructure.
30:00We have a contractual agreement with the state of New York to maintain this infrastructure as a condition of receiving the grant from the state for 10 years.
30:05What we do with that infrastructure can change.
30:09So we will need to have a conversation when the time is right about what we do with that infrastructure.
30:16We can lease that infrastructure to other providers, um, which will generate revenue for the city in the future, potentially.
30:23There are a number of things that we can do, um, which is different from what we're currently doing.
30:29But as it stands, as it stands right now, the city um owns the assets, um, and then we can use those assets obviously for both municipal purposes as well as for um community-based broadband.
30:43And what what year are we in?
30:51I thought it was it should be it's three years of we did this during our product during we executed our contract in 2023.
31:03And these goes to it goes through 2026.
31:09How are you looking with the broadband?
31:12In terms of subscriber numbers?
31:15So I can pull new numbers and get those to you.
31:18I don't have it off the top of my head.
31:19I think the last time I checked, which was a month ago, we were um somewhere between 1500 and 1600.
31:29Yeah, we'll send we'll send updates to everyone.
31:35Any other questions?
31:42Okay, thank you very much.
31:43Uh Councillor Moore.
31:45Thank you, Madam President.
31:46I have items 30 through 38.
31:49We are going to hold 30 through 32.
31:53Oh, you can come up speak.
31:59Good afternoon, council.
32:01Um Chief Johnson Kinsey, Director, Mayor's Office Reduce Gun Violence.
32:05So I have items 30 through 32.
32:08Um just want to talk a little bit about why we're here.
32:11So just to be clear that uh this program was paused due through uh to the Trump administration back in April 2025.
32:21So just about a year ago, uh, the Trump administration held over 500 million dollars from different organizations, um, which led the last administration here, the Walsh administration, to pause services, so we would not be paying out organizations and not then not being getting reimbursed by the federal government.
32:41So that's why we're here.
32:41So when we look at the amount that we have not used, it's not because nobody was working, it's just simply was a pause of service uh due to again the Trump administration's pause of services.
32:54Absolutely T with with that.
32:56So I understand how long were they paused for?
33:00It's been over a year now.
33:01So with that one year, just out of curiosity, none of these organizations stayed working with the kids.
33:08They just thought it was because the money wasn't there, they were just like, hey, we were done, and then they just restarted that.
33:15I'm sure they would they continue to work with uh kids, the organizations that are listed um in different capacities, of course, not what would with our contract with us, um, but I'm sure the organizations continue to do work.
33:26Uh remember originally our original contract with them was to do outreach, which we've changed over the last over the last few months meeting with the DOJ uh back in September 2025.
33:38Uh we decided to really work with individuals more along with doing out with the outreach component added.
33:44So two parts to it, which is working with individuals, uh those those high-risk individuals, but also doing outreach uh to communities.
33:54Also, really expanding our capacity of what we're doing on each side of town.
33:58Also, remember we have those memberships with the YMCA.
34:01Um, we've already given out at least 60 to 70 or more Y memberships.
34:07Um, so we still have that contract.
34:09And Salvation Army uh continue to do family functional therapy.
34:14Um also with these organizations.
34:20Um is it I know part of on the gun violence task force that I sit on, everyone has to be vetted through the through the police department.
34:35If these were to go through all of everyone that is gonna be a part of if this extension goes through and we move money through all everyone's gonna be vetted through the police department, right?
34:46Yeah, so we decided that uh late last year that any contractor that works with the city of Syracuse with the mayor's office to reduce gun violence, uh they would go through a vetting process, so they will possibly interview first with uh the organization that we're contracted with, and then the second interview would be with um our office along with um uh SPD and the district attorney's office and a couple of other uh law enforcement organizations that are part of our coalition.
35:13And nobody has been hired pointing time, right?
35:15No, okay because we don't have a contract with anyone.
35:18Um they can't hire anyone because we we're not paying anyone at this time.
35:22So the contractor who's vetted, the contractor and the staff, or just the contractor.
35:31So the contractor will go through with trying trying to find individuals to hire, they'll have a pool of people.
35:36They'll do the first set of interviews in-house.
35:39Um if they pass through that interview process, the second interview will be with us.
35:48Is it the contractor or is it the staff?
35:52Yeah, the staff will get vetted.
35:57And tell me the age group of this program right here.
36:02So this is the 14 and 24.
36:04And exalt is what age group?
36:09So it's gotta be uh school age.
36:14It can't be no more than 18 or 20 because it's exalt is school.
36:19I'm just trying to see the word of overlap.
36:20So 14 and 24 for this one.
36:23Exalt, we don't know exalt age group.
36:29Yeah, the exalt group is about 16 to 19.
36:33Yeah, 16 to 19, and then the other program is what?
36:39That's the only one we have.
36:41There's another one.
36:42Well, project rise through the six of the New York City.
36:45Oh, yeah, that's I believe that's uh 14 to 19, because again, that's like school age.
36:55And Donna, you're having a committee meeting, right?
36:57Are you having a committee meeting for that?
36:59Or we already had a committee meeting on this.
37:04Yeah, um you you was tied up.
37:12You guys still want me to hold, right?
37:19Are there any questions?
37:21If not, we're good to go with that.
37:25I'm sorry, I want to give you a handout so you guys have some context of no I got some something else for you all.
37:31Uh, have the data give you a narrative of what we've been doing, so you guys won't get lost with what we're doing, because we're doing a lot.
37:36So I think giving you a narrative along with a budget will kind of help you out.
37:40So you requested last meeting, the old budget from 2023, the original budget.
37:45I have that, and also the the updated budget.
37:47So I'll I'll pass that around.
37:49Don't want to interrupt, take a lot of your time, but I'll get that to you right now.
37:53I do have a question about exalt.
38:01Stephanie Pasqual, Chief Strategy Officer.
38:04So with the exalt program, and I know it just started, and they're just on the process of going.
38:09Is there any way we can like um find out like get a quick committee meeting meeting with them just to see what they're doing?
38:16What they're doing with the service, who they're provide, where they are just you know, I mean, I know yeah, if you give us a date and a time, we'll coordinate with them, they're happy to do it.
38:25And um, their program's been underway as we reported um for several weeks now.
38:29Okay, happy to do that.
38:31Yeah, thank you, sir.
38:33I'm sorry, I was trying to get Latif.
38:38I was if I can go back for one second.
38:43Sorry, that's when he's gonna be um I'm sorry.
38:49Y'all like to run me.
38:53I I wanted to just ask about the outreach part.
38:57You said that you stopped outreach.
39:00So we're not paying them, we can't have them do something we're not paying them to do.
39:03So we pause services.
39:04So you pause the buttons are gonna pick that back up.
39:06Well, as soon as you all approve it, yeah, they'll start working whenever y'all get ready.
39:09We ready to rock and roll, we'll go through the process of finishing hiring and vetting, and then we'll get things rolling.
39:17Okay, before the summer come.
39:19Did we didn't we didn't know if you'd name it?
39:21That's a good question.
39:22Did we actually come to council and pause it?
39:24Or did you guys just pause it?
39:26Because that's what I like to have agreement.
39:28No, but we didn't say don't do anything.
39:30So I don't understand why because of the bills.
39:36So last about a year ago, when the president issued an executive order regarding a bunch of Department of Justice grants, it was unclear if we had kept this going that we would get reimbursed and be able to pay our service providers for that work performed.
39:51So we made a decision not to continue programming and to have the agencies pause.
40:00At the same time, when we finally got all that worked out in the fall, there was, as you all know, there was um oh my god, I can't think of my words.
40:06Furlough, the the there's a shutdown.
40:08So there was a federal shutdown.
40:09So we also couldn't reimburse folks, but the planning work was was going all the time.
40:14So that's where we were trying to, and I think um Letif shared in that document how we shifted from just an outreach plan to an actual case management and using the um a national model to work with these individuals as well as provide some larger scale outreach events this summer in collaboration with McMahon Ryan and the mobile outreach.
40:35No, I get that stuff.
40:37Um, but um what I'm saying is we never stopped the council.
40:40We never met and said the only thing that we're really determined now is moving that one sum of money from one to me that didn't do it to make sure to three different entities.
40:52So moving these far as we know, these programs should already be working.
40:56We never stopped that money.
40:57We know you didn't stop the money.
40:59We were the federal there was no indication from the federal government a year ago, if we had kept it going that we could reimburse the individuals.
41:06So this grant for all those resources that you'll see in there, there was no source to repay them if we if the federal government decided not to honor those um those contracts.
41:17Right, but what I'm saying is just so I can understand, maybe I'm confused.
41:20Only thing that was changed as of right now was to give organizations more money.
41:26Is that they should be already working because they have money that's already in the books that's in the contract that we proved.
41:33I got neach ever stopped them.
41:35No, and I don't know if you recall when we when we came two weeks ago.
41:38Um, everyone's contract originally with us ended either January 31, 2026 or February 14, 2026.
41:47That was a contract that was executed years ago.
41:49So we're coming to you to both extend the term of these contracts and increase the amount.
41:54So they legally after as of Jan 31, I think for two of the organizations in February.
41:59When we executed these contracts way back in 2024, that was the end date.
42:04They had a legal end date.
42:06We are coming before you.
42:07That's why we were scrambling to sort of extend some of those contracts as well as increase the amount to reprogram funds that weren't used.
42:14So when was their end date?
42:16What was the end date?
42:17Two of the organizations, I believe I can get you which ones was was Jan 31, 2026.
42:23And then February 7th were the other two.
42:26So they had exp expiration, contract expiration.
42:30So right now, no one is legally under contract with us, the city of Syracuse for this program.
42:37Their contracts ended as of January, February of this year, but prior to that, they were correct.
42:44So they could have been billing out November, December, J of this 2025 and January 2025.
42:51They could have, as long as we weren't under that federal shutdown or the other executive order pause that the that we were unsure about reimbursement.
43:00Okay, if that makes sense.
43:02All right, thank you.
43:05Jesus did you want someone to talk on 33 still?
43:18Um number 34 is gonna be withdrawal.
43:20It's um we voted on that already.
43:23They're withdrawing.
43:24Yeah, it ended on an agenda by arrow.
43:33Councilman present, Dave Met the Circus Police Department Investigation Bureau Chief.
43:37It's for us to authorize an agreement with New York State DCGS with the Byrne Memorial Justice grant for an amount not to exceed 27,500.
43:48Really, essentially, this funding will be used to um uh enhance our stride program, which we talked about before.
43:54It's the training on the danger assessment for law enforcement, it's the Dell form.
43:58It's for the Geiger Institute to come in to train our personnel once our personnel is trained.
44:02It'll be the kind of the train the trainer concept and to push that program out there for enhanced domestic violence, not only um investigations, prosecutions, and all the services go along with it.
44:12So it's basically get us to have the form so we can go out and go forward with that.
44:19No, good, thank you.
44:23Anyone speak on that?
44:31Council Eric Trace, Sergeant Syracuse Police Department.
44:34Uh item 36 is uh for a grant uh that would be funding our CIT program for uh three years.
44:44The grant requires a 20% match for the first two years and then a 40% match for the third year.
44:50Uh the first two years we went top heavy so that it would uh alleviate a lot of the funds from that third year extra 20%.
45:00So the first two years would fund a um continued uh proactive unit involving two officers working along with uh mental health workers to go out into the community and have that correspond or service that we provide.
45:15And uh the additional funding would be for training new CIT officers to uh to give us uh a lot more officers who are especially skilled in this type of work with uh our areas of need regarding our persons in crisis, and then further training for uh the leadership uh in our department to give that same training.
45:43Uh item 37 afternoon, everybody.
45:56I'm Mike Mons, the fire chief.
45:58I'm 37 and 38 as uh a request um to purchase vehicles, our light first response vehicles and our capital improvement plan.
46:07Um the goal is to buy two um F 350s, two SUVs, those respond to all of our emergencies, um, two incident command vehicles and three motor pool vehicles.
46:19Um that's a total of 775,000.
46:22Uh those vehicles were replaced to F 350s, two SUVs, uh one um truck that's a um a whole ton truck, um, two additional SUVs for incident command and three other motor pool vehicles.
46:38So um we're requesting these vehicles and they're gonna replace um the vehicles I named, and they're either gonna go to auction or they're gonna get trickled down to other departments that may be able to use them, but these vehicles go to auction that are no longer in use.
46:55But is there any way you can give us mileage on these vehicles in here?
46:59Yes, and and these are all by our uh guidelines of NFPA, which is a standard of our first response vehicles, so I can give you the information um that I verbalize if you want it in um um digital form.
47:14Okay, and the mileage, um, there's just for a point of information the mileage is one thing, the amount of hours that they're running is another thing, so we have all that information.
47:24So there's a lot of things that go into the replacement of the vehicles, but I'll get all that information to you.
47:29So when you say hours running, you're talking about them maybe sitting at a scene, sitting at the scene, um, doing all other um a lot of other things um but not driving around um basically on the scene of calls or um doing uh inspections and things like that.
47:44So we I know that we talked about it uh years ago that we've never invested in vehicles.
47:52So are we almost to the point of where we're so right now we have a pretty comprehensive plan?
47:58Um I can lay everything out um offline or I could come and talk to you online um in a meeting like this.
48:05But if we place these orders right now, there's also a backlog and how long these vehicles take.
48:10So if we order these right now, they're not gonna come to the spring of 2027.
48:14Right now we're a little bit behind schedule.
48:16Um these will put us on schedule, and the goal is that continually every year have a replacement program so we never go behind schedule again like we have in the past.
48:27So the goal is every year to come to you with the minimum amount of vehicles we need to keep the replacement program up and running.
48:33But one year, if it's decided not to buy vehicles, and that's happened in the past, then I'm coming asking for double the amount because then it's an emergency and we can't have vehicles um to respond in a safe manner.
48:46So the goal is to always have um this plan put together that we're asking for a small amount every year instead of waiting for the wheels to fall off and come with an emergency that we need a bunch of vehicles because we haven't bought them consistently over the years.
49:02Are we like 80% close to the scheduling?
49:06I think that's what we're so there's a total amount of vehicles that we have, our large heavy fleet, and then we have this light fleet.
49:12The goal is to have the same amount of fleet every year as these vehicles get mileage, wear and tear, um, all these different considerations we have with our operation.
49:22When those get to the end of the life, they get auctioned off, or if other departments can use them, we try to see if DPW or somebody else can use them for the last few years of their life, but they can't be first response vehicles.
49:34And so, what was your question?
49:37I was asking, you know, how far are we to that schedule where you are persistently because you said we were behind.
49:48We're a little bit behind.
49:49If we buy these vehicles, we're we'll be right up to speed.
49:52But I just want to um reiterate we have to continually every year come and ask for replacements for all the vehicles because if not, that's how the plan works is to have um purchases every year, so we never get behind.
50:07If that makes sense to you, does that explain?
50:10Yep, and then every year there's a replacement vehicle program that you buy a certain amount of minimum every year, and then that will keep you from having highs and lows in your replacement program, which this way you could plan for the money accordingly, and we should know what we need for the next six years in our capital plan.
50:27And in our capital plan, I have this laid out the next six to ten years.
50:31How many vehicles we need over the next 10 years if we maintain this minimum replacement program?
50:44Uh counselor Williams.
50:46Thank you, madam president.
50:49And Commissioner, I appreciate you calling with the extended version of the uh yeah, Matt OJ department.
50:57Ugrid version to update my colleagues.
50:59We're gonna use as few words as possible.
51:01Um looking to amend ordinance five of 2026.
51:06Um there was uh just one error in the ordinance that didn't match my request letter.
51:10Um, but but a crucial one.
51:11We need the effective date to be January 1st of 27, not 26.
51:18But a little more but a little more.
51:20Um we we finalized an assessment roll yesterday.
51:22Um this this was um this is an extent uh expansion of the senior exemption.
51:27Um really popular, really really terrific policy, something we love.
51:31Um, something that we were um a in no way prepared to administer this current year, um, right down to the fact that New York State hasn't provided the update for the software to make it happen.
51:41Um, but also the fact that 1800 senior citizens applied for a different exemption uh exemption program over the course of the fourth quarter of last year.
51:48Um didn't seem fair and equitable to uh change the terms on them after the fact.
52:03Thank you, Commissioner.
52:05Uh counts thank you, Councilor James Crowser.
52:11Thank you, Madam President.
52:12I have item 40 and 41.
52:15Um item 40 is just to oh for 40 years, I'm sorry.
52:20I was just being ready for 41.
52:22Item 40 is just to advertise the um public hearing for um the CDBG year 51 last year's um allocations uh some replacement funds.
52:37Um so that uh public hearing will be held um April 20th at 1 p.m.
52:46Uh Michael Collins, Commissioner for Neighborhood and Business Development, and the reason we're getting together for uh that meeting that uh counselor Joe Brouser just announced is uh for the current program year, uh which ends at uh um uh the end of the month, we had two agencies that after the um executive orders came down from uh the uh president's office chose not to contract uh to receive their award.
53:15And so uh with Peace Incorporated, uh they've asked to transition their award and uh to their tax prep program from their weatherization program.
53:28Uh the tax pack tax prep program.
53:31I know many of you are familiar with it, it's an excellent program and really ensures that people are not just compliant, but they get free tax services rather than going to HR or uh or some of the other places and and pay for them.
53:45So those are the different submissions.
53:48So uh this fits within uh these two changes fit within the HUD rules.
53:53Uh so uh we can do that as long as we do this, as long as we have a public process to it.
53:59And so we did uh so the other one is that we are taking a center state CEO decided to uh completely forgo their workforce uh development award.
54:08So we were simply adding that money into home headquarters urgent care program, program you know, we we know is just incredibly popular.
54:16Uh but yeah, the um uh we need to do this the standard process that we're doing uh we just did with the program year uh 42, so we've got an open comment period that uh uh is a 30-day period.
54:31Uh it started uh March 9th, went through April 8th.
54:36Uh our department meeting, uh public meeting was March 25th.
54:40We did not have uh anybody come forward and speak at that meeting.
54:44And I just want to be clear for my colleagues that the reasoning for this is because of the whole reporting um situation that is so these organizations didn't want to have to do that, so they went to reallocate the funds.
55:00So thank you, counselor.
55:05Yeah, so item 41 will also be held until after the public hearing.
55:20Um item 42 is the appropriation of funds or cash capital or something.
55:30Good afternoon again.
55:31Uh yes, as Councillor Jones Razer was saying, um, this is a request to appropriate cash capital uh in the amount of 108,388 and 83 cents.
55:42Um this is a administrative requirement for our New York State grant for our broadband infrastructure.
55:50Um the fee is payable to Empire State Development, which is the funder.
55:55Um this uh needs to be paid before they will accept our first request for reimbursement, which we just passed that milestone.
56:04So we'd really like to be able to submit our reimbursement request.
56:08Um that's uh about an eight million dollar reimbursement.
56:12Um so we'd really like to collect that.
56:15Um logo yeah, we just need to pay the administrative fee associated with the grant before they will pay us.
56:24So do you have a like a sense of because we I mean the state also is quite a bit of money, correct?
56:33From other, you know, grants.
56:35Yes, so do you have a cross of when this is coming?
56:39Um well, so they they tell us for this program.
56:42Um it's been taking other grantors that have been you know doing their reimbursements.
56:46It's been taking about four weeks from the time you submit the reimbursement in their portal to getting you know them approving it to getting paid.
56:56Um every grantor is obviously a little bit different.
57:00You know, I know it's it's all the state of New York, but um, so I I have no reason to believe that that's not true, but we can't even you know have them start the process to review our voucher until we pay this.
57:16Any other questions?
57:23Thank you, President Benny.
57:24I have items 43 through 46.
57:31Take we're okay with 43.
57:32Counselor Anric just had a couple questions on that.
57:34Those have been resolved, so you can go right to 44.
57:38Uh item number 44 is a special use permit to approve a greenhouse manufacturing plant use.
57:44This is for accessory residential greenhouses.
57:47They're basically like sheds.
57:49Um at 2956 East Genesee Street, uh planning commission recommends approval, they meet all the approval criteria.
58:00Jake, um this falls within my district, and I have gotten some outreach uh from a number of individuals.
58:08I know the two of them were at the planning commission that night speaking in opposition to the project.
58:12Um will you run me through the kind of the nuance of the application because the way that I understand it, it would not be allowed under the current rezone.
58:25So there we had a complete application prior to amendments made last October uh for this use, so it continues under the code at that time.
58:34So it's a permitted use by special use permit, which isn't allowed use, just as a reminder, there's just a higher level of review, which we went through uh and they check all the boxes.
58:44Um what I will say is planning commission was very intentional in the conditions that are attached to this recommendation um that it will be exclusively for maybe uh greenhouse manufacturing.
58:58So if any they were to sell it after six months, like you know, somebody couldn't move in and start to say, now I'm gonna build houses here, I'm gonna build something else.
59:08Um they'd have to come back and get a special use permit.
59:10So it's it's very uh the the conditions limit it to exactly what they're applying for, which is all interior um is it's all done inside and then it's delivered to residential houses.
59:22Um and there's limits to trucking routes, the timing of pickups and deliveries and the activity, all that was considered and thought about throughout the entire process with the planning commission.
59:35Will you just for me?
59:37I know that Commissioner Collins explained it.
59:40What is that exact change that impacted this parcel?
59:46What is it, and how do we you know how do we fit within that?
59:50So with uh within that zone district that the use of the general manufacturing land use is no longer permitted in that district and then uh on after the amendment was made.
1:00:00So that's that was the change.
1:00:02Sorry, what was that?
1:00:04The land use category that this is under prior to the amendment in October of last year, it was permitted.
1:00:10The change makes it no longer permissible in that zone district, but um the land use.
1:00:18Uh general manufacturing.
1:00:21You make this is going next to the Dollar General?
1:00:24Uh yeah, it's a wooded area down on the uh the south end of John C Street if you're headed towards Nottingham.
1:00:31So on the right side.
1:00:32Not next to the Bulldogs.
1:00:34Not next to the Bulldogs, right?
1:00:36Oh, it's on the way.
1:00:40Yeah, so it's more right in that right in that in that quarter over there.
1:00:43You didn't get it, Jay.
1:00:44Um, we're bulldogs, I'm a bulldog.
1:00:46So they just made it.
1:00:49The company just made the little backyard.
1:00:51Yeah, they're so they're 10 by 10 by 15.
1:00:53It's it's basically it looks like a shed, but it's a greenhouse for people to put in their backyard to have you know plants and and yeah, manufacturing.
1:01:06Some of the concerns.
1:01:06Do we know like the concerns that uh um ranging from I know the traffic was one of them for sure.
1:01:13Um, you know, I think the typical concerns related to manufacturing facilities, but then also one of them, you know, one of the women who came down to the planning commission was concerned with uh what is now non-conforming use of the site compared to you know the old zoning code, new versus old zoning code.
1:01:36Um next is also a special use permit to approve a smoking establishment business at 911 North Salina Street.
1:01:44This is for a uh New York State licensed cannabis dispensary, um, similar to item 44, it meets all the criteria uh of the zoning code, and we're gonna go into a department approval.
1:01:56We're gonna go to executive session for this one after.
1:01:58Yep, uh, just if there's any other questions or anything that we can talk about here, we can do that.
1:02:03Yeah, so he's here if she's gonna work on going next to the case.
1:02:05There isn't any kind of um with with this being next to the church, there's a community center, the youth centers like isn't there like a I'm just like 500 or something like that.
1:02:20So not to speak for New York State, but it meets the New York State's requirements for licensing and it meets our requirements for land use for a smoking establishment.
1:02:31And this is the first time this came in front of us, correct?
1:02:35It is a similar uh prior to October of last year, we did not have a smoking establishment, so these fell under retail general, which is more broad, like it could be a clothing store, was in that same category.
1:02:46So we kind of narrowed it, which we can do at the local level through zoning, uh, and we put it into its own category for smoking establishment um by special use permit.
1:02:56So that's the only reason why it's coming down within the council, right?
1:03:00Previously, yeah, it would have been an administrative review as retail general.
1:03:03We would have made them get a C of U and building permits, and that's all the other ones have opened prior to October of last year, and within city limits.
1:03:19So uh couple questions.
1:03:23Number one, I did not appreciate the planning commission rammed this through.
1:03:28It's a four-hour meeting, it ran through quarter to ten.
1:03:31I think we should have paused and waited to have more voices heard on on both sides of the issue.
1:03:39Um across the street, there is an illegal shop.
1:03:44There's a canvas shop.
1:03:45I've been told my Mr.
1:03:46Campani, it's doing business, and I've asked why haven't we shut that down?
1:03:51Hasn't been shut down.
1:03:52It's still open, it's still open, it's doing illegal business.
1:03:56That's that's that's an issue I have.
1:03:59One voice we've not heard, and he's Captain Trudell, Syracuse Police.
1:04:04I'd like to get his opinion on this.
1:04:08I'd like to get his opinion on this because this is the department that's gonna have to handle all those calls, whether there's gonna be an incident where the property owner, Mr.
1:04:21Capani, might be, you know, his security may be challenged as well.
1:04:27So I really would like um voice under Syracuse Police Department, because their voice has not been heard except for Lieutenant Romain, who's told me he has a lot of reservations.
1:04:40So I'm concerned about that in the safety.
1:04:49Sue Katzov Corporation Counsel for the City of Syracuse.
1:04:52First of all, I apologize for my attire.
1:04:54I wasn't planning on being in City Hall today, so please excuse please excuse the genes.
1:05:00The issue with illegal shops come before my office.
1:05:04We work hand in hand with codes to try to cite them in a manner that will allow us to be successful when we go to court.
1:05:12SPD works with us, but it is very difficult for them to shut down on their own illegal establishments because that trips a criminal statute, which you need the DA to prosecute.
1:05:24So we have found a way internally to go after these shops because they violate our code.
1:05:30But it is not something my office or codes can do overnight.
1:05:34You have to build a case, you have to serve.
1:05:42So are they open while you're building the case?
1:05:44Or can we shut them down while you build it?
1:05:46I can't I can't I can't.
1:05:48Legally, I can't, but we try to identify them and go after them as quickly as we can, as I'm sure you can appreciate.
1:05:54We all have limited resources, but we have a task force in my office that works directly with codes on all sorts of violations, that being one of them, large apartment complexes, another.
1:06:06So there's a lot going on that we try to address in a way that we can do it most efficiently.
1:06:13So is this particular shop that um counselor Nave is talking about on the radar right now?
1:06:21Yes, yes, let me just say yes, it is but if you want to know, I mean I can't tell you legally exactly what we're doing, but all illegal established under review.
1:06:33I understand that.
1:06:37I will turn it over to the Chief Trudell.
1:06:42Sue, do you want us to have Chief?
1:06:44Do you want to have Chief Trudell come into executive session with us?
1:06:47That's exactly what I was gonna ask.
1:06:49Yeah, we'll do that, please.
1:06:51I I'm gonna put it out there, and it's nothing against businesses.
1:06:55Um please don't take this against because I think we need more businesses in our community, but I'm gonna be very transparent in that neighborhood as well as on the west side.
1:07:06We allow certain old businesses open.
1:07:08I'll just watch somebody just have an overdose awesome.
1:07:11Um right in that neighborhood on my way here, and it is already a neighborhood that is decimated with drugs and alcohol and people falling out, and I'm just concerned um about when we put those things in neighborhoods.
1:07:28First of all, the vandalism that's gonna happen, right?
1:07:31Because when people need what they need, they're gonna get it.
1:07:34And then second of all, what we're offering a community that's already dealing with crisis, that north side that connects to the west side, it just hurts my heart because I don't know if that makes sense for the community.
1:07:48So I'm just speaking that transparency.
1:07:52I would encourage the board to go into executive session to discuss this, but I also would like to your um points to make it clear that the establishment seeking the SUP is a legal establishment for cannabis and cannabis only um products that are authorized in New York State as legal.
1:08:09What you're discussing, and I completely appreciate that, are illegal narcotics that are causing those kinds of deaths.
1:08:18No, I'm talking about legal, just like the liquor store and everything.
1:08:21I it's just where they're located, where people are.
1:08:25So not Marty was talking about the illegal ones.
1:08:29There's legal things that are people are having access to is still causing, right?
1:08:33That neighborhood over there, literally just watched somebody and like a block away, was having an overdose, right?
1:08:40So I'm I'm not saying that I don't, the businesses aren't needed, absolutely, and there's people that definitely need it, you know, they get prescriptions, but in that neighborhood, just like liquor stores are certain places, it's just it puts people that are already in vulnerable need access to things that they really shouldn't be accessing.
1:09:00That's my own concern.
1:09:01So I'm just speaking at the speech and there it is.
1:09:04I just want to make one point.
1:09:06It's because I am concerned about the safety of the potential new owners of the Copani family.
1:09:12I'm concerned about their concern safety goes along.
1:09:14You say other businesses across the street.
1:09:17I'm afraid of retribution towards them.
1:09:23Okay, we'll do executive session for that.
1:09:26Uh last one, this is a uh zone change uh amendment from a resubdivision at 910 Bellevue.
1:09:34It's on a corner, they basically combined with a lot next door because they want to do a driveway and a fence.
1:09:40Um so they were different zones, so we've done this a different number of times before you were we don't want a split zone parcel, so just kind of change the entire new big parcel into a new zone.
1:09:49This is the one that Lampbank spoke on, right?
1:09:52Yeah, and it's it's it's so they can add a driveway and a fence.
1:09:56Yeah, any questions on that one?