Um craddock and a second by Commissioner Bullmash for the approval of item one.

0:20

All those in favor?

0:22

Opposed, and that item is approved.

0:26

We don't have any consent agenda items.

0:29

So, Mr.

0:29

Secretary, we please read our rules.

0:32

Sure.

0:33

In order to conduct the public hearing in an orderly manner, we ask that you abide the following rules.

0:40

The commissioner will first hear from the staff for an explanation of the application, physical facts of the property under application, and the surrounding property, followed by a presentation of the staff's recommendation.

0:55

The commission commission will then hear the applicant's presentation not to exceed 15 minutes.

1:01

Next, the commission will hear from any interested parties or protestants.

1:06

A time limit may per speaker may be imposed.

1:09

Those wishing to speak must use the sign-in sheet over to my left by the door.

1:15

For the record, please state your name and address if you choose to speak.

1:19

Finally, the commission will hear the applicant's rebuttal if any not to exceed 10 minutes.

1:25

During the hearing, the commission will hear the applicant's rebuttal if any not to exceed 10 minutes.

1:32

I said that.

1:34

During the hearing, the commission may ask questions of staff, the applicant, or interested parties.

1:40

In the room are representatives of the City Legal Department and Development Services Department and the Tulsa Planning Office staff.

1:48

We do have a taping system, therefore, please direct all of your comments into the microphone.

1:54

And these proceedings are broadcast live on cable channel 24.

1:59

Thank you.

2:00

Thank you, Mr.

2:01

Secretary.

2:02

Moving on to the public hearing rezoning.

2:05

Items two and five are together.

2:08

Nathan, do you want to come up or no?

2:11

All right.

2:14

So both item two and five, we've received a request from the applicant to continue those items to April 1st.

2:23

And I'll answer any questions if you have any, but as of right now, it's just a continuance request.

2:28

Okay.

2:29

Any questions for Nathan?

2:31

Okay, just so the audience knows, um, we typically grant a continuance to the applicant and a continuance to staff or the opposition historically.

2:44

So for items two and five, we will be discussing the continuance.

2:52

And if you've signed up to speak on those items, I can call you up, but we will be speaking to the continuance only and not hearing the case today, in all likelihood.

3:04

There's a chance we could, but historically, we've can granted these continuances.

3:12

So would the applicant like to come up.

3:29

Mr.

3:29

Chairman, Lou Reynolds, 2727 East 21st Street, suite 200, Tulsa 74114.

3:36

Uh we've asked for this continuance in order to prepare more information to address the concerns raised by staff in the report.

3:43

We couldn't have time to get that done in time for today's meeting from the time we got that.

3:47

So that's why we requested.

3:49

Any questions for the applicant?

3:51

Okay, thank you, sir.

3:53

Thank you.

3:54

So I will call the speakers now, and if you wish to not come up because of the continuance, you can just decline.

4:01

But if you would like to speak to the continuance, you can come up and have five minutes if you need it.

4:08

Uh first speaker, Adam Levitt.

4:14

Thank you.

4:14

Adam Levitt, 2259 South Troost Avenue, Tulsa, Oklahoma 74114.

4:22

And first one to say just appreciate the commission, what you guys are doing.

4:27

I think it's fantastic and really important.

4:29

Um I'm representing Ann Landworth Holdings, which owns 78 acres to the west, adjoining this phase two.

4:38

Um I'm hoping to be included in the continuance because they're actually considering making an offer on the property.

4:49

To be frank, I'm in I'm against it, but I represent the LLC, which my sister is the other beneficial interest owner, and she wants to sell.

5:00

So for her benefit, we're hoping they just offer us an amazing value because she would love to sell the property.

5:07

So you could see that as a landowner and as the manager of the LLC, you know, I'm even have conflicted uh thoughts around it, as perhaps some of you on the commission.

5:18

So I can identify with that.

5:19

All I know is that we support the city of Tulsa, the master plan, and the purposeful uh zoning from agriculture where we stand now, you know, potentially even to light industrial if it suits the master plan.

5:37

But as you know, so are are you we're just speaking to the continuance case?

5:41

So all I would say is uh yeah, that I'm waiting like you are.

5:45

Okay, thank you, sir.

5:46

Thank you so much.

5:47

Jessica Perazo.

5:55

Please give your name and address Jessica Peraza, 515 North Atlanta Place, Tulsa, Oklahoma, 74110.

6:13

Um I am just a citizen in Tulsa.

6:16

I'm in opposition of the continuance of rezoning in phase two.

6:22

So you would like to hear the continuance today?

6:28

I mean, I we you would like to hear the case today and not have it continued.

6:32

Um, I don't understand.

6:37

So we we are most likely going to continue this case to April 1st.

6:43

Okay.

6:43

So if you'd like to comment on just the continuance, you may.

6:48

Oh, I mean, I want to hear about it, yes.

6:52

Today.

6:53

Yeah, if we could, yeah.

6:54

Instead of continuing it.

6:56

Commissioner Bullmesh?

6:58

I think just to clarify, the the app typically when these cases come before us, the applicant makes a presentation, we then listen to that.

7:06

We hear from staff presentation, we then hear from anybody who may be opposed to the actual request, which is a rezoning request.

7:13

Today, the applicant has asked for more time to make that presentation.

7:16

So all that we are likely to consider is whether we grant an extension to the applicant to present their case to this body in two weeks.

7:25

Um so if anybody here is opposed to that continuance and they want to hear the case today, that's what we're listening to.

7:31

If you're fine with the continuance, you can either submit comments via email to staff or you can come back on the April 1st.

7:38

No, I want to hear it today.

7:40

Okay, okay.

7:41

Thank you.

7:43

Vivian Allen.

7:48

No, Vivian Allen.

7:50

Uh Vivian's Oh.

7:54

Please give your name and address.

7:57

My name is Vivian Allen.

7:58

It's a 702 South Phoenix Avenue.

8:02

Um I think we're all here.

8:05

I would rather not have a continuance and not everyone have to come back in two weeks.

8:10

Okay, thank you.

8:12

Mike Raines?

8:13

I declined to comment.

8:14

Okay.

8:15

Linda Allegro.

8:27

Hello.

8:28

Linda Allegro, 208 East 19th Street, Tulsa, Oklahoma 74119.

8:34

I'd like to hear it today.

8:36

Okay, thank you.

8:37

Kelly uh Borgman.

8:44

I I have a question.

8:46

Yeah, you can come up.

8:52

Please give your name and address.

8:56

I apologize, I have not had this type of situation in a meeting before.

9:00

I'm Kelly Bogaman, 18176 South Highway 88 in Claremore, Oklahoma.

9:04

If I make a comment on the continuance, am I able to make a comment if it is heard today?

9:12

Since I signed up to I would be able to if it is heard, we can have you back.

9:15

Okay, I'm gonna decline to comment on the continuance.

9:18

All right.

9:19

Thank you.

9:19

Thank you.

9:20

You bet.

9:20

Cheyenne Morgan.

9:22

Cheyenna Morgan.

9:31

Hello, my name is Cheyenna Morgan, 9 South 180 Fifth East Avenue, Tulsa, Oklahoma.

9:36

Um I am in disagreement with a continuance today.

9:42

Phase one has been approved since 2024.

9:44

What's so different between 2024 and now?

9:48

Thank you.

10:00

Hi, Jordan Harman, 3336 East 45th Street, Tulsa.

10:03

And I am recommending to deny the continuance and move ahead with hearing the issue.

10:09

Project Anthem has been on the table since 2024.

10:13

And now they're asking for something very different, twice as large as the original proposal.

10:19

And I think that we're prepared to hear about it today.

10:21

Thank you.

10:22

Okay.

10:22

Thank you, Ms.

10:23

Harmon.

10:24

Terry Gilliland.

10:26

Okay.

10:28

Bradford Love It.

10:38

Hi.

10:38

My name is Bradford Lovett, 715 North Columbia Place, 74110.

10:43

Also disagree with the continuance, so I'd like to hear it today.

10:46

Okay, thank you.

10:47

Robert Ross.

10:59

Robert Ross, 3519 East Sixth Street, Tulsa, Oklahoma.

11:03

I'm also against the continuance.

11:13

Okay.

11:14

Thank you.

11:16

Nira Singh.

11:23

Hello.

11:23

My name is Nera Singh, 1019, East 35th Place, Tulsa 74105.

11:30

I just encourage us to deny the continuance.

11:43

Okay.

11:43

Thank you, Ms.

11:44

Singh.

11:45

Harley Haley Parmenter.

11:59

Hi, I'm Haley Parmenter, 1439 South College Avenue.

12:03

Excuse me, South Florence Place, Tulsa 74104.

12:09

I recommend that we hear the case today that and deny the continuance.

12:19

And if we continue to grant continuances on this issue, I fear that the public will not have continued faith on this issue.

12:32

So that's all.

12:33

Okay, thank you.

12:36

Mitchell Gilliam.

12:44

This is the first continuance for the S.

12:46

Thank you.

12:46

Mitchell Gilliam, 521 North 29th West Avenue.

12:51

I am also against the continuance.

12:54

We all live in Oklahoma here.

12:58

We're running out of farmland, clean water.

13:01

We're in a global crisis.

13:03

What are we continuing for?

13:05

They've had this planned and they couldn't get their plan together to speak today.

13:10

They should be ready to speak.

13:11

I vote against the continuance.

13:12

I want to hear it.

13:13

Okay, thank you.

13:14

That is all the speakers for item two and number five.

13:20

So we are in review for the applicant's request for continuance.

13:36

I know it's not easy in the middle of a work day.

13:39

Um however I would be in favor of the request for continuance because I think the applicant just recently learned from the staff uh the report, and so I think that allowing them more time to explore other options may be beneficial for um a lot of the concerns that I've heard in the past.

13:58

So um open for others, but I would be either ready or willing to make a motion, but don't want to stay above other comments.

14:07

Okay.

14:07

Anyone else?

14:08

Troy?

14:09

Um I'd like to know what the additional request for information was.

14:13

When was it given?

14:16

Okay.

14:17

We can have the applicant back up.

14:29

Mr.

14:29

Chairman, I've asked for some breakdowns of data that that and mapping that showed in supporting this cause and and the purpose for it and why that this was justified in this case, and it's just gonna take time to assemble.

14:42

And and I know that some of my people are out for spring break this week and and could tell they just said Lou, we can't get it to you in time.

14:50

So it's our presentation to put on to support what we're asking for with respect to what we've heard from staff.

14:56

And Ms.

14:56

Ronald, this is a new application with this is the first request for a continuance.

15:01

Yes, sir.

15:01

We have not asked for any continuance on this before.

15:05

Okay.

15:05

So I guess I misunderstood earlier there wasn't a request from staff for additional information from you.

15:10

You requested additional information from staff.

15:13

No, sorry, I requested additional time so I could respond to what the staff has written.

15:18

To what they have written.

15:19

Okay.

15:20

Okay.

15:21

Thank you, sir.

15:22

Thank you.

15:24

All right.

15:24

Any other discussion?

15:26

Just for clarity.

15:28

So I heard individuals say this was phase one was approved in 2024.

15:34

That's a separate application.

15:36

That was a separate application.

15:37

So this is a new application.

15:39

Okay.

15:39

Just want my clarity.

15:42

I would move to grant a continuance for if we do them separately.

15:47

We need these separate, Jeff.

15:50

Together.

15:50

Okay.

15:51

I would move to grant a continuance for items number two and five, based on the applicant's request, noting that this is the first request for a continuance for these cases.

15:59

Okay.

16:00

Second.

16:00

Okay.

16:01

We have a motion by Commissioner Bullmash.

16:03

A second by Commissioner Q for the continuance of item number two and number five to April 1st.

16:10

All those in favor?

16:13

Opposed.

16:14

And those items are continued.

16:19

Item number three.

16:27

A little bit of deja vu.

16:28

Item three has also made a request for a continuance.

16:32

This request for continuance was to April 15th.

16:36

There is some additional property that is being added to that application that required new notices to be sent out as well as new maps to be created.

16:46

So on this particular case, uh staff is supportive as well so that we can make sure we have all the property included in the materials.

16:52

Okay.

16:53

Any questions for Nathan?

16:55

Okay.

16:55

We do not have any speakers for item three.

16:58

Is the applicant here?

17:02

Okay.

17:03

Okay.

17:05

I would I would move that we uh on item number three that we continue that to uh April 15th, 2026.

17:13

Second.

17:13

Okay.

17:14

We have a motion by Commissioner Craddock, a second by Commissioner Shivel for the continuance of item three to April 15th.

17:20

All those in favor?

17:22

Opposed.

17:23

And that item is continued.

17:26

Item number four.

17:29

We do have a speaker here.

17:32

Item number four is a rezoning request, Z seven eight five three.

17:36

Um this request was actually initiated by the Tulsa City Council, and it is intended to rezone a small partial, I mean a half acre uh piece of property adjacent to the historic Route 66 village on Southwest Boulevard from RS3 to CH.

17:53

Um this is a piece of property that is owned by the City of Tulsa and currently serves as the Route 66 Main Street office.

18:00

The intent is for it to be a supporting use for the historical village that's located on the adjacent properties and that are all already zoned commercial.

18:08

There was a request to add a gift shop to the existing office located on this property, and it was determined that the zoning had not been sufficient for the uses that were being proposed.

18:18

And so the council initiated that change.

18:34

Found it consistent with the comprehensive plan, and we've recommended approval of the rezoning.

18:38

So we're just coming into compliance here.

18:41

Um I mean we're we're catching up uh basically.

18:43

I think that over time some pieces of these properties have been acquired by the city to continue to enhance the the area around the historical village, and so this is going to allow those goals to continue and and I think that will ultimately allow more tourist attractions at this location.

19:00

Commissioner Q.

19:02

I need to I have a question for Jack today.

19:06

For Jeff.

19:07

You mean Jeff?

19:08

Yeah.

19:09

Jeff.

19:14

Jeff.

19:14

I'm sorry, I don't know why I called you Jack, Jeff.

19:17

I know.

19:18

Um since I was involved in that of the allegation of the money, should I recuse myself from the vote?

19:28

I've been involved in all the decision making and where the money was allotted.

19:36

In this case that were forced in yes, probably.

19:40

Yeah, okay.

19:41

Okay.

19:41

I just wonder.

19:42

I mean I mean that's that's up to you.

19:44

Yeah, I think I should because if you feel like you have a conflict, then you know the cat the district money then I lauded for that.

19:51

So that's fine.

19:56

So Nathan, are you the applicant?

20:00

the decision making and where the money was allotted in this case that we're worse than yes probably okay I just wonder I mean I mean that's that's up to you yeah I think I should because if you feel like you have a conflict then you know the can the district money then okay I allotted for that so okay that's fine so Nathan are you the applicant so you are so we'll have we'll have we'll have one speaker here we can have you back up um Baree Barrett yeah would you like to come up sure oh you're with the city I'm sorry you didn't have to but yeah um I just wanted I um the project manager for um some of the work we're doing over for the Main Street House and the historical village my name is Bree Barrett um I'm with City of Tulsa um City Architectural Building Services which is a division on parks and recreation and um I just wanted to speak about this it's gonna really help um the area uh and the goals for the user groups which is the Tulsa Route 66 Main Street House as well as the historical village.

20:53

Okay any questions Ms.

20:55

Barrett Okay thank you for coming that is all our speakers move to approve item number four per staff recommendation second okay we have a motion by Commissioner Craddock a second by Commissioner Turner Addison for the approval of item four per staff recommendation all those in favor opposed uh abstained recused that item is approved item number six six Mr.

21:26

Chairman before Austin gets there can I read my uh spiel and my role you can go ahead and ask awesome to take a minute in my role as senior advisor for housing in the mayor's office I met with this developer and discussed this proposal uh regardless of those discussions I believe I can remain impartial and unbiased and will base my vote in this matter on the information provided and heard at the hearing today.

21:45

Okay thank you.

21:49

Uh item number six is a uh minor plat for a new subdivision called Flat Rock Ridge.

21:56

Um the planning commission has actually heard um a preliminary plat for this property prior um previously it was called flat rock terrace um their original preliminary approval expired in February and so they are ready to move forward and get this filed all of the infrastructure is in place um and been released by development services so we can process it as a minor plat which basically means after this meeting uh we can go straight into the signature process with the city council and the mayor um with that uh we recommend approval um a couple notes on the cover page that I sent you an updated uh version it is not three and a half acres it is 78.6 acres um and in addition to that uh staff is not tying any conditions to this request um all of the infrastructure and everything has already been addressed so um we are ready to move forward um and just recommend approval okay any questions for Austin thanks sir is the applicant here are you in agreement with staff recommendation okay we don't have any speakers move approval of item six okay we have a motion by commissioner turner addison a second by commissioner whitlock for the approval of item six per staff recommendation all those in favor opposed and that is approved item number seven Mr Chairman if I could read my feel again these are kind of related developments but uh again in my role of senior advisor for housing in the mayor's office I met with this developer and discuss this project regardless of those discussions I believe I can remain impartial and unbiased and will base my vote in this matter on the information provided and heard at today's public hearing um item number seven is another minor plat for Phoenix at 36th Street North or Phoenix at 36 in what this is is another uh plat this is a multi um or I'm sorry mixed use uh subdivision um so it's the Phoenix at 36th Street North it already has building permits and is constructed uh they were granted an accelerated release similarly to the previous application their preliminary plat um expired um and they're ready to move forward so we do have a release um infrastructure is in place um by the applicant and also there's infrastructure as a part of a capital improvement program um that was put in place so uh staff recommends approval okay any questions for Austin is the applicant here are you in agreement with staff okay thank you we we're interviewed no speakers move approval okay we have a motion by commissioner turner addison a second by commissioner craddock for the approval of item seven per staff recommendation all those in favor opposed and that item is approved um item number eight is a preliminary plat so it has been continued twice um by the commission it is located at the southwest southwest corner of east forty first street south and south 145th east avenue it is a single family subdivision zoned RS5 um I did send an amended staff report today um showing their

25:11

Is a preliminary plat.

25:12

So it has been continued twice by the commission.

25:16

It is located at the southwest southwest corner of East 41st Street South and South 145th East Avenue.

25:22

It is a single family subdivision zoned RS5.

25:25

I did send an amended staff report today showing their new alignment on the plat.

25:33

Staff recommends approval in addition to that approval.

25:37

Staff also recommends approval of a modification of the subdivision and development regulations to increase block length.

25:44

We worked with the applicant and they were able to add another connection point and eliminated a previously requested modification for the length of a dead end street.

25:54

So they did accommodate us there.

25:57

Staff does recommend approval of both the preliminary plat and the modification.

26:08

But City Legal drafted a sample motion for you all that you might want to use.

26:13

Okay.

26:14

So I will just hand that out.

26:16

Yeah.

26:20

But staff does recommend approval.

26:22

Any questions for Austin?

26:24

Okay, thanks, Austin.

26:27

Is the applicant here?

26:28

Would you like to come up?

26:41

Good afternoon, Commissioners.

26:42

My name is Kevin Mavers.

26:43

I'm the director of development services for the Robson Companies 901 North Forest Ridge Boulevard in Broken Arrow.

26:50

Um Third Times the charm.

26:52

Thank you so much for uh granting us the uh additional time to work out some of our details.

26:58

One of the things we wanted to do was uh ensure that we were bringing forward the best possible development with the uh most number of units that would meet a variety of housing types and sizes and styles.

27:10

What you have in front of you today is the result of the last couple of three or four weeks of revisions.

27:16

The major revision is down in the southeast corner of the site.

27:21

We did have a uh a portion of the property that was originally going to be a rent-to-own type unit or a book build-to-rent type unit.

27:30

Uh that particular uh builder decided that they did not want to be a part of this project.

27:35

So we went back to our other developers, our other builders, and they decided we'll take another neighborhood of our small lots.

27:42

We have designed this intentionally with all of our most compact lots adjacent to the street and away from the existing developments, and then they gradually get larger.

27:51

They go from the uh the smallest ones to the medium-sized ones to the larger ones, the further you move west and the closer you get to the other development.

27:59

Uh one of the unique uh aspects of this particular project is we have nearly 20 percent open space thanks to some of the flood areas.

28:08

We also have a very large easement.

28:10

You'll see along the which was discussed by uh Austin a minute ago, the easement along the easterly uh property line there that is for a future significant transmission line.

28:22

I believe it's an 84-inch transmission line that's going to be coming uh through that area.

28:26

So we are providing space for the city of uh uh Tulsa to go ahead and provide water to the balance of the city.

28:33

So with those thoughts in mind, unless you have any questions.

28:36

I do have our engineer with us if there's any specific engineering questions, but if you have any questions, we are here to answer questions, and we look forward to gaining your approval.

28:45

Okay, any questions for Mr.

28:47

Mavers?

28:48

Okay, thank you, sir.

28:50

We do not have any speakers.

28:54

I will make a motion for the approval of item eight per staff recommendation subject to the conditions noted in the staff report and including approval of the phasing plan consisting of two phases and approval of the requested modification to section 5-030, table 5.1 of the subdivision and development regulations to permit greater block links for blocks 10 and 16 for the rezoning stated in the staff report and provided by the applicant.

29:24

Second any discussion?

29:28

We have a motion by Commissioner Walker, a second by Commissioner Humphrey for the approval of item eight.

29:34

All those in favor, opposed, and that item is approved.

29:44

Number nine.

29:46

Um item number nine is actually the same request, so it's a preliminary plat approval uh located at the southwest corner of East 31st Street South and South 193rd East Avenue.

29:55

It is a single family subdivision and that will also be requesting uh modifications of the block length.

30:02

Similarly, they have significant floodplain on the property that will cut off certain portions of the development.

30:10

Staff's in agreement with the modification of the subdivision development regulations.

30:43

So with that staff recommends approval.

30:46

Okay.

30:47

Any questions for Austin?

30:49

Thanks, sir.

30:51

Is the applicant here?

30:52

Are you in agreement with staff recommendation?

30:55

Come on up.

31:04

Good afternoon, Chair, Commissioners.

31:07

Eric Enyard with Tanner Consulting at 5323 South Lewis Avenue Tulsa.

31:12

I'm also joined here with the client.

31:16

We are in essential agreement with the staff recommendations.

31:20

I did want to point out we had a very productive technical advisory committee meeting, including with uh the county about the roundabout design.

31:31

And we'll be working through uh the IVP process in concert with staff to make sure that all of these several moving parts are all in alignment ultimately.

31:43

A lot of these things won't be ready or fully designed or finalized until we get through the IDP process.

31:49

So when it comes to the alignments of the sewer line, the new water line, the easements that are needed from this property, uh they will be in fully fully in concert with uh the needs of the city and in balance with the client by the time we get through the process.

32:07

So, yes, uh in agreement as stated.

32:11

And if you have any questions for me, I'll do my best to answer.

32:14

Any questions from Mr.

32:15

Inyard?

32:16

Okay, thank you, sir.

32:17

Thank you.

32:18

Thank you.

32:19

We don't have any speakers.

32:21

So I will make a motion for item nine that we approve per staff recommendation subject to the conditions noted in the staff report and including approval of the phasing plan consisting of two phases and approval of the requested modification to section 5-030 table 5.1 of the subdivision and development regulations to pend a greater block links for the reasoning state in the staff report provided by the applicant.

32:49

Okay, we have a motion by Commissioner Walker, second by Commissioner Humphrey for the approval of item nine.

32:55

All those in favor?

32:56

Opposed, and that item is approved.

33:05

Item 10.

33:08

Uh item number 10 is another preliminary plat.

33:11

Um there are no modifications requested on it.

33:13

It is located at the east east of the northeast corner of East 41st Street, south and south 177th East Avenue.

33:19

Uh the commission um in a relative terms uh recently heard a rezoning request on this property uh that I believe has been approved by city council and is pending ordinance publication uh to become effective, so that will become RS5 property.

33:33

Um it's a 40-acre tract consisting of I don't have it in front of me, but um uh a decent amount of lots.

33:45

Um there is a decent amount of floodplain shown um on the the face of their plat that they are working through um to pull that into their reserve areas.

33:55

So um with that noted staff does recommend approval.

33:59

Okay, any questions for Austin?

34:03

Okay.

34:09

Motion to approve item 10 for staff's recommendations.

34:14

Okay, we have a motion by Commissioner Humphrey, a second by Commissioner Shivill for the approval of item 10 per staff recommendation.

34:20

All those in favor?

34:22

Opposed.

34:24

Nope.

34:24

And that is approved.

34:26

Item 11.

34:34

Uh if you don't mind, I would like to discuss item 11 and item 12 together.

34:40

Um so this is another preliminary plat.

34:43

Um associated with the preliminary plat is a request for an accelerator release of building permits.

34:48

Um and just to remind the commission what that is is uh they are able to start construction and get building permits um prior to all the infrastructure being in place and prior to the plat being filed.

35:00

As a part of that, they will also uh provide financial guarantees for the infrastructure outstanding um at a hundred and ten percent the value.

35:08

Um the actual request is located in the northwest corner of East 51st Street South and South 136 East Avenue.

35:16

Um this is a pretty exciting project, um especially if you travel along the BA and need something to look at.

35:23

It will be a new uh church for the church of uh Jesus Christ of Latter-day Saints, and I apologize.

35:30

I think it will be a meeting house and a temple, uh, which is one of the first in Oklahoma.

35:35

Uh staff does recommend approval of both the preliminary plat and the accelerator release.

35:41

Okay, any questions for Austin?

35:43

Okay.

35:44

Is the applicant here?

35:46

Yes, sir.

35:46

Are you in agreement with staff recommendation?

35:48

Very much so.

35:49

Okay, thank you.

35:51

We do have one speaker.

35:54

Roger Ferguson.

35:57

Yes.

35:58

Would you like to come?

35:59

I'm on the venture remaining.

36:01

Oh, you're 13, sorry, it says 12.

36:05

I'll have you back up.

36:09

Uh then we do not have any speakers, so we are in review.

36:14

Together, Jeff, that's fine.

36:15

Okay, yep.

36:19

Move approval of items number 11 and 12 per staff recommendation.

36:25

Second.

36:26

Okay, we have a motion by Commissioner Shivill, a second by Commissioner Turner Addison for the approval of items 11 and 12 per staff recommendation.

36:33

All those in favor?

36:35

Opposed, and those items are approved.

36:38

Item 13.

36:41

Chair, if I may, my last time today, uh, just letting you know that uh in my role as senior advisor for housing in the mayor's office.

36:48

I've met with the developer of these two, 13 and 14, and have discussed these this project.

36:53

Regardless of those discussions, I believe I can remain impartial and unbiased and will base my vote in this matter on the in on these matters in the information provided and heard at today's public hearing.

37:02

Thanks.

37:07

Umil, if we could take items 13 and 14 together, um it uh item 13 is a preliminary plat for the ventura at Mingo.

37:17

It is a uh proposed subdivision north of the northwest corner of East 91st Street uh in South Amingo Road.

37:24

Um it is intended for a multifamily development.

37:27

Um the property is owned corridor um with CO19 as a development plan placed on the property.

37:33

Uh the proposed uh layout um as shown will meet those standards.

37:38

Um staff recommends approval of the subdivision uh or excuse me, of the proposed subdivision.

37:44

Um in addition, they are also requesting an accelerated release.

37:48

Uh similarly, they would like to get construction of the infrastructure in the building at the same time.

37:54

And so they would like to move forward with that, and they will be uh placing financial guarantees uh for the outstanding infrastructure with the city.

38:02

So staff does recommend approval.

38:04

Okay, thank you, Austin.

38:06

Any questions for Austin?

38:10

Uh we do have one speaker's applicant here.

38:13

Would you like to come up?

38:15

I can come up.

38:17

Okay, I'll have the speaker up.

38:18

Good idea.

38:20

Roger Ferguson.

38:38

Tulso, Oklahoma, 74133.

38:41

My property backs up to this property, and it is a floodplain.

38:45

I just would like to see some clarification as to what is going in and how far back it's going to come.

38:52

There is a tributary to Hakey Creek that runs through the back of this property.

38:59

Okay.

39:00

Um I would suggest you meet with Mike after this, and I'll bet he would visit with you.

39:05

Okay, thank you.

39:05

You bet.

39:06

Thank you for coming.

39:09

And we don't have any more speakers.

39:15

For items 13 and 14.

39:20

No, they're just gonna visit.

39:26

I think a motion for item 14 and item 13 and 14 process recommendations.

39:32

Okay, we have a motion and by Commissioner Humphreys, second by Commissioner Wintlock for the approval of items 13 and 14 per staff recommendation.

39:45

All those in favor?

39:47

Opposed, and those items are approved.

39:52

Any commissioner comments?

40:02

None.

40:04

I will make a motion for adjournment.

40:06

Second.

40:07

We have a motion and a second.

40:10

All those in favor?

40:12

We are adjourned.

Discussion Breakdown — Share of Meeting
Procedural█████████████████████████████████████████████49%
Housing███████████████████████████████34%
Zoning██████7%
Engineering And Infrastructure██████7%
Historic Preservation███3%
Summary of Proceedings

Tulsa Planning Commission Public Hearing - March 19, 2026

The commission considered multiple rezoning, minor plat, and preliminary plat requests. Key actions included granting continuances for two rezoning cases (Items 2 and 5) to April 1 and one case (Item 3) to April 15, approving a small rezoning for the Route 66 Village, and approving several plats for residential and mixed-use developments.

Public Comments & Testimony

  • Items 2 & 5 (Continuance): Several members of the public spoke against the continuance, urging the commission to hear the case that day. Speakers included Jessica Peraza (515 North Atlanta Place), Vivian Allen (702 South Phoenix Avenue), Linda Allegro (208 East 19th Street), Cheyenna Morgan (9 South 180th Fifth East Avenue), Jordan Harmon (3336 East 45th Street), Bradford Lovett (715 North Columbia Place), Robert Ross (3519 East Sixth Street), Nira Singh (1019 East 35th Place), Haley Parmenter (1439 South Florence Place), and Mitchell Gilliam (521 North 29th West Avenue). One speaker, Adam Levitt (2259 South Troost Avenue), representing an adjoining landowner, expressed conflicted views but supported the continuance for potential negotiations.
  • Item 13 (Ventura at Mingo): Roger Ferguson (Tulsa, 74133), whose property backs up to the site, asked for clarification on development plans and floodplain impacts.

Discussion Items

  • Items 2 & 5 (Rezoning – Continuance): Applicant Lou Reynolds (2727 East 21st Street, Suite 200) requested a continuance to April 1 to prepare additional information responding to staff concerns. Staff noted this was the first continuance request for these cases. The commission granted the continuance despite public opposition, with Commissioner Bullmash stating the additional time could allow the applicant to address concerns.
  • Item 3 (Rezoning – Continuance): Staff reported the applicant requested a continuance to April 15 because additional property was being added, requiring new notices and maps. No speakers; the continuance was granted unanimously.
  • Item 4 (Rezoning – Route 66 Village): Staff described a city-initiated rezoning of a half-acre parcel at 6627 Southwest Boulevard from RS-3 to CH to allow a gift shop and support the historic village. Bree Barrett of City Architectural Building Services spoke in support. Commissioner Q recused himself due to involvement in district funding allocations. The item was approved per staff recommendation.
  • Items 6 & 7 (Minor Plats – Flat Rock Ridge and Phoenix at 36th): Staff recommended approval of two minor plats with all infrastructure in place. No public testimony. Both were approved unanimously. Commissioner Bullmash disclosed meetings with the developers as senior housing advisor but affirmed impartiality.
  • Items 8 & 9 (Preliminary Plats – Single-Family Subdivisions): Applicants presented revised plans, including increased open space and compliance with staff requests. Staff recommended approval with modifications to block length regulations. No speakers. Approved with motions incorporating conditions from staff reports.
  • Item 10 (Preliminary Plat – 40-acre tract): Staff recommended approval of a preliminary plat pending final zoning. No questions or speakers; approved per staff recommendation.
  • Items 11 & 12 (Preliminary Plat & Accelerated Release – LDS Church): Staff presented a new church meeting house and temple, the first of its kind in Oklahoma, with an accelerated release for building permits. The applicant agreed. No speakers. Approved per staff recommendation.
  • Items 13 & 14 (Preliminary Plat & Accelerated Release – Ventura at Mingo): Staff recommended approval of a multi-family subdivision with accelerated release. Commissioner Bullmash again disclosed prior discussions. One neighbor voiced concerns about floodplain; staff suggested meeting afterward. Approved per staff recommendation.

Key Outcomes

  • Items 2 & 5 (Z-7853): Continued to April 1, 2026 (motion by Commissioner Bullmash, second by Commissioner Q; vote in favor, no opposition recorded).
  • Item 3 (Z-?): Continued to April 15, 2026 (motion by Commissioner Craddock, second by Commissioner Shivel; unanimous).
  • Item 4 (Z-7853): Approved per staff recommendation (motion by Commissioner Craddock, second by Commissioner Turner Addison; one recusal, rest in favor).
  • Item 6 (Flat Rock Ridge minor plat): Approved (motion by Commissioner Turner Addison, second by Commissioner Whitlock; unanimous).
  • Item 7 (Phoenix at 36th minor plat): Approved (motion by Commissioner Turner Addison, second by Commissioner Craddock; unanimous).
  • Item 8 (Preliminary plat with modifications): Approved with conditions including phasing and block length modification (motion by Commissioner Walker, second by Commissioner Humphrey; unanimous).
  • Item 9 (Preliminary plat with modifications): Approved with conditions (motion by Commissioner Walker, second by Commissioner Humphrey; unanimous).
  • Item 10 (Preliminary plat): Approved per staff recommendation (motion by Commissioner Humphrey, second by Commissioner Shivel; unanimous).
  • Items 11 & 12 (Preliminary plat and accelerated release): Approved per staff recommendation (motion by Commissioner Shivel, second by Commissioner Turner Addison; unanimous).
  • Items 13 & 14 (Preliminary plat and accelerated release): Approved per staff recommendation (motion by Commissioner Humphrey, second by Commissioner Whitlock; unanimous).

Meeting Transcript

Um craddock and a second by Commissioner Bullmash for the approval of item one. All those in favor? Opposed, and that item is approved. We don't have any consent agenda items. So, Mr. Secretary, we please read our rules. Sure. In order to conduct the public hearing in an orderly manner, we ask that you abide the following rules. The commissioner will first hear from the staff for an explanation of the application, physical facts of the property under application, and the surrounding property, followed by a presentation of the staff's recommendation. The commission commission will then hear the applicant's presentation not to exceed 15 minutes. Next, the commission will hear from any interested parties or protestants. A time limit may per speaker may be imposed. Those wishing to speak must use the sign-in sheet over to my left by the door. For the record, please state your name and address if you choose to speak. Finally, the commission will hear the applicant's rebuttal if any not to exceed 10 minutes. During the hearing, the commission will hear the applicant's rebuttal if any not to exceed 10 minutes. I said that. During the hearing, the commission may ask questions of staff, the applicant, or interested parties. In the room are representatives of the City Legal Department and Development Services Department and the Tulsa Planning Office staff. We do have a taping system, therefore, please direct all of your comments into the microphone. And these proceedings are broadcast live on cable channel 24. Thank you. Thank you, Mr. Secretary. Moving on to the public hearing rezoning. Items two and five are together. Nathan, do you want to come up or no? All right. So both item two and five, we've received a request from the applicant to continue those items to April 1st. And I'll answer any questions if you have any, but as of right now, it's just a continuance request. Okay. Any questions for Nathan? Okay, just so the audience knows, um, we typically grant a continuance to the applicant and a continuance to staff or the opposition historically. So for items two and five, we will be discussing the continuance. And if you've signed up to speak on those items, I can call you up, but we will be speaking to the continuance only and not hearing the case today, in all likelihood. There's a chance we could, but historically, we've can granted these continuances. So would the applicant like to come up. Mr. Chairman, Lou Reynolds, 2727 East 21st Street, suite 200, Tulsa 74114. Uh we've asked for this continuance in order to prepare more information to address the concerns raised by staff in the report. We couldn't have time to get that done in time for today's meeting from the time we got that. So that's why we requested. Any questions for the applicant? Okay, thank you, sir. Thank you. So I will call the speakers now, and if you wish to not come up because of the continuance, you can just decline. But if you would like to speak to the continuance, you can come up and have five minutes if you need it. Uh first speaker, Adam Levitt. Thank you. Adam Levitt, 2259 South Troost Avenue, Tulsa, Oklahoma 74114.