Parks, Recreation and Forestry Board Meeting - April 20, 2026
Parks, Recreation and Forestry Board Meeting - April 20, 2026
The Parks, Recreation and Forestry Board of the City of Waukesha met on Monday, April 20, 2026, at 5:30 PM in the Council Chambers at City Hall (1900 Aviation Drive). The meeting lasted approximately one hour, concluding after a series of reports and a unanimous decision on a playground project. Seven members were present (Rico Camacho, Steve Johnson, Sarah Roth, Jack Wells, Erica Yoss, Jennifer Wallner, Eric Huemmer); John Schmitz was absent.
Consent Calendar
- Approval of Minutes (March 30, 2026): Motion by Eric Huemmer, seconded by Steve Johnson to approve the draft minutes. The motion passed unanimously (7-0).
Public Comments & Testimony
- No members of the public addressed the board. The public comment period ended at 6:00 PM as noted in the agenda.
Discussion Items
- Greenway Terrace Park Playground Design and Equipment Purchase (2026 Approved CIP): The board reviewed the proposed design and equipment for the oldest playground in the system, originally built prior to 2000 (28 years old). The project budget is approximately $300,000. A public input meeting on March 24, 2026, featuring three design options from Northland Recreation, resulted in a community preference for an Eric Carle (The Very Hungry Caterpillar) themed playground. Special features include a two-to-five-year-old structure with a fruit bridge, a sculpted caterpillar, a five-to-twelve structure with a caterpillar arched bridge and monkey bars, translucent butterfly wings for seating, sensory panels for infants, an inclusive swing seat, and a revolution spinner accommodating up to 10 children. Board member Jack Wells raised concerns about potential fall risks from a climber with rings, but staff noted safety surfacing (poured-in-place rubber) would mitigate serious injury and that the climber could be substituted if desired. The design includes a find-and-seek activity with medallions. The timeline aims for a community build on July 24, 2026, with equipment removal by end of June and full completion by mid-August 2026. The surfacing contract will be handled separately by the engineering department.
Director and Staff Report
- Park and Recreation System Master Plan: The comprehensive plan (formerly Park and Open Space Plan) is being updated for the first time since 2007. Consultant Damon Farber conducted three days of tours covering approximately half of the city's parks, focusing on three categories: undeveloped sites (e.g., Cardinal Ridge), partially developed sites (e.g., Meadow View), and sites needing significant renovation (e.g., Saratoga Complex, Lowell Park). Recent flooding highlighted challenges with river-adjacent parkland.
- Other Projects: Engineering is preparing bids for Greenway Terrace playground concrete ribbon and Prairie Park improvements (tennis court reconstruction, LED lighting, replacing the oldest sports lighting in the system). A RAISE grant ($1 million+ for design) has been finalized for two pedestrian/bicycle bridges over the bypass. The Saratoga Lake dam/dredging study continues. The formal gardens are undergoing renovation with new drainage, conduit for future lighting and sound, and permeable pave paths; completion is expected soon. Horob Pool zero-depth features will be replaced in fall 2026, with equipment already in cold storage.
- Staffing and Operations: A new plumber (Grant) joined the buildings crew. Two arborist positions are open, and seasonal hiring is underway. Shelters and bubblers are being opened by May 1. Recent flooding has undone some fall cleanup; grounds crews are in triage mode.
- Recreation Programs: Baseball/softball/t-ball registration ended with 46 teams. Fifteen youth sports organizations are renting fields. The Trailbreaker event had 500+ runners. The Remember Our Fallen Memorial (August 19–23, 2026) is being planned. Volunteer Week saw 1,944 volunteers contributing 34,733 hours in 2025. Before/after school program secured a $3,000 Screen-Free Week grant from Aurora, and a 5K fun run is set for May 9. A financial assistance walk raised $8,000 for scholarships. A six-figure sponsor for Mendiola is being pursued (Generac approached). Pools are set to open June 6; lifeguard classes are underway with high staff turnover expected.
- Registration: Activity guides were mailed two weeks earlier than prior years. Resident registration day saw 100 in-person registrations, up from 62 last summer, and generated $157,000 in revenue versus $11,000 last summer.
- Keyless and Camera Installations: Completed at Rivers Crossing and Pebble Valley; Bethesda delayed due to flooding; Horob scheduled for this week.
- Annual Meeting: Next month will include board elections.
Key Outcomes
- Unanimous approval (7-0) of the Greenway Terrace Park Playground design and equipment purchase, with a motion by Jennifer Wallner and second by Alderman Wells. The playground is expected to be installed by mid-August 2026 following a community build on July 24.
Meeting Transcript
Everyone. Welcome to Monday, April 20th meeting of the City of Waukeshaw Parks Recreation and Forestry Board. We'll call to order with roll call. All right. Alderman Camacho. Steve Johnson. Here. Sarah Roth. Here. John Schmitz is absent. Alderman Wells. Erica Jos. Looks like I'm missing a few. So Eric. Hummer. Here. And then Jennifer Walner. Here. Okay. I'm going to pull it over. Okay, great. Next on we will move on to public comment. If there's anyone here from the public who would like to come forward and make comment, you are welcome to do so now. Okay. No public comment. So we'll move on to approval of minutes from the board meeting on March 30th of 2026. Motion motion by Eric Hummer, second by Steve Johnson. Any further discussion? Okay, we'll take it to a vote. All in favor say aye. Aye. Opposed. That passes unanimously. Okay. Moving on to discussion decision items. Review and possible action on proposed greenway terrace park playground design and equipment purchase equipment purchase as in the 2026 approved CIP. All right, we have a full battery of uh presenters here to go through the project and also any uh questions, hopefully supply answers for you as well. And uh so I think you know Travis McFarland, our grounds maintenance supervisor. He's part of the process, Megan Phelan. She helps us all with projects, special projects coordinator, and uh and we have Erica here from Northland Recreation that uh is uh gonna tell us how exciting this new playground is going to be. Uh and of course, uh Mark Shram's involved with the public information meetings, and and certainly not last and certainly not least, uh Melissa Lipska with the uh uh facilitating the process. So we have a lot of folks that are involved, but the playground project's gotten to be uh pretty hefty. Uh we're talking about $300,000 type budgets for uh atypical playground now. And uh Greenway Terrace is one of the is our oldest playground in the system. So definitely time. Uh do it was built uh prior to 2000 to give you some insight on that. And well, Mark, you're always involved in something, so don't want to forget you either. All right, with that, uh I don't know, Melissa, if you want to do a little or Megan, yes. All right, so um Megan Fallon, as Ron mentioned, I've been helping um mostly Melissa with our special parks projects, and playgrounds are always a fun one for me. Um so like Ron said, Greenway Terrace is one of our oldest or is our oldest playground right now in the park system.
openpublica.com