0:03Okay, this is the Thursday, April 23rd, 2026 meeting of the Board of Public Works.
0:10And I'm gonna make a call to order.
0:19And seeing we do not have anybody here for public comment.
0:24Uh what happened to our um allegiance?
0:28Yeah, what our pledge of allegiance isn't there.
0:35Pledge of allegiance to the flag of the United States of America.
0:39And to Republican for which it stands one nation.
0:43Under MATA indivisible with liberty and justice for all.
0:53That was things were out of order.
0:56You can tell Judy's on vacation.
0:58Keeping you on your toes, Kevin.
1:00So the next order of business is the approval of minutes from April 9th, 2026.
1:08Piper, I'll make a motion to approve the minutes.
1:12We have a first and a second.
1:13Any discussion or questions?
1:22And moving on to approval of payments.
1:30None of them are final payments, but uh you have any questions on those, Brandon, or I'll try to answer.
1:37I'll make a motion to approve payments with a second.
1:43Can guys can you remind me or remind us what we're doing with the South Street ramp this year?
1:48Is this more of the joint stuff than so this was actually the yeah, it was bid out last year.
1:55It was a 25 project that continued on into the spring of this year into 26.
2:01But yes, it was primarily um we had some beam repair, some other concrete repair items kind of on the vertical on multiple floors.
2:08I guess Joe, you can jump in whenever you want to.
2:11Um, but really concrete structure structural repairs on the lower floors, and we worked our way up some of the exposed beams, some of the we had some spalling, some rebar exposure that we you know cleaned up, did full repair there, and are kind of working our way up towards the top floor.
2:27Plus, we did previously approve that change order to remove the glass block on the top story, replace that with concrete block, and replace some of the windows up there on the on the top floor as well.
2:41Okay, that's Brandon.
2:42And I that's what I was driving as.
2:44I thought we were gonna knock out some of that old barn glass there towards the top.
2:47And that is all complete, yes.
2:48Yeah, so if you're interested, drive up to the third floor, it looks a lot nicer.
2:52So this is the third floor on South Street or the third floor on Wisconsin side.
2:56Probably it's the entire like on the top floor where we had glass block.
3:01So there was a couple different locations up there that that was replaced with concrete block.
3:06All right, thank you, gentlemen.
3:07And the windows and the doors that were replaced were replaced with I forget what it's called, Joe, but uh indestructible glass.
3:14Yeah, uh all the glass was replaced with Lexon.
3:17It's a relatively cheap, high impact resistant polymer.
3:27Uh seeing discussion is finished, we can have a uh vote on approval payments.
3:34Kevin Riley, aye, Piper I.
3:41Uh there's three bids to review this evening.
3:44Uh the first one uh was received on April 10th.
3:47This is for the Fire Station 5 HVAC improvements project, the rebid.
3:51Um we received uh three bids on there.
3:53The low bid came in from Helm Mechanical, uh total bid of 42,107.
4:01Um as you can see, the budget amount is somewhat amended there to be 43,000 uh with the allocation of about $8,000 uh that the administrator and uh finance director has approved to transfer those funds.
4:17Uh Piper, I'll make a motion to approve the bid with a second.
4:25So um I know helm equipment.
4:27They're helm mechanical, they're a little bit further south.
4:31I think they're they're based out of like Southern Illinois or Northern Illinois, Southern Wisconsin.
4:36Have they done work for the city in the past?
4:38They have done work for the city.
4:40Joe, do you remember which I'm not sure which one off hands?
4:44Yeah, and we did definitely check references with their pre-qualification as well, and their references did check out.
4:51And it looks like I mean, I mean the discrepancy between first and second was still like 16 grand.
5:00So we wouldn't recommend moving forward with the second low bid at this time.
5:04They've uh performed okay in the past, and they did get uh okay reference is in the reference check.
5:10So and uh I'm no have no doubt.
5:12I mean, I know I know Helm from my family knows Helm and worked with them.
5:18So I guess my other question is is this just furnace?
5:21Is it just one furnace or is it?
5:24Yeah, if you recall the reason we didn't hold the bid or not approve uh the last round of bidding due to the amount was uh the refrigerant of the one that we're replacing in this the furnace number three was the older style refrigerant, so we did move to move forward with that piece of the of the project work instead of the other condensers that will be a future project.
5:51So that's how we decided to break it apart.
5:55And I think you answered my question, Brandon, about why this was a rebid.
6:00The first bid we were kind of came into high.
6:04We was waiting, it was well over budget.
6:07Uh so we did have to repackage that into smaller pieces to be within the 2026 budget and delay the remainder of the project entirety into a future year.
6:26We have already had a first and a second, so I believe we can go to a vote.
6:33Moving on to the next bid.
6:36Uh the next bid was uh received um the same day.
6:39This is the West Sunset Drive and Barcel Bridge Ceiling Rehabilitation Project.
6:44Um we did receive two bids.
6:46Uh we recommend moving forward with NORCON Corporation's bid uh for both the base bid and alternate one and two in the total amount of 255,585.50 cents.
6:59NORCON has completed this project in the past.
7:01Um, and the budget amount is 300,000.
7:05This is Piper, I'll make a motion to approve the bid as presented.
7:11The first and a second, any questions or comments?
7:16Seeing none, we can move to a vote.
7:18Kevin Rayleigh votes aye.
7:24Motion passes three to zero.
7:27Moving on to the next bid.
7:29Uh, the next bid, uh, we're gonna put this on hold.
7:32Uh we need to uh talk to the finance director.
7:34It came in slightly over budget.
7:36So uh we do have funds available in another project.
7:39We just need confirmation uh from admin and finance director on transferring those funds.
7:45So bring that back next time.
7:48Just uh point of information.
7:50Can I ask a question?
7:51Yes, how close were we to the 277,000 dollars over budget on a one million dollar project?
7:58So this is replacing uh two pump stations.
8:01So uh the majority of the work um involves replacing generators and controls and and things like that in in new buildings, so it's a substantial amount of uh mechanical and uh pumps and that type of equipment.
8:16So uh we got a good bid, uh, but we just need to confirm we can transfer some funds around.
8:23So thank you for explaining that, Alex.
8:26Any other questions or comments before we move on to the next uh item?
8:34On to discussion and recommendation to council regarding So letter A there.
8:41It's review and act on contract changer in a moment number one with Lee Mechanical for the library HVAC placement project.
8:48Turn this over to Brandon and uh Joe to uh report on.
8:52So I'll just give a brief overview of little bits of this change order, and then uh Joe Welter, our facilities and construction manager is also here to answer any questions uh that you may have regarding this change order, but um this project was an HVAC improvement project at the library.
9:09A big piece of this project, not only was it replacing HVAC mechanicals, but a big element of that was automated building control.
9:19Previously, with the multiple iterations of projects that we've had at the library, there was an HVAC system that had three different types of control uh across the board.
9:31It was uh we'll call it a hodgepodge system, so to speak, that was pieced together on multiple projects, and this project was going to be executed to really clean up all of those elements, have a one automated building control system, a BAS that really takes care of every everything and will give us better management of that facility from an HVAC perspective moving forward.
10:00Once we got into the project, some of the locations of the duct work and the pieces didn't line up with the plans that we had, and it did cause us some additional elements of work.
10:08There was four additional items that we did have the contractor do additional work at the request of the city.
10:15Um related to dampers, relief hoods, um, tying in the park bathroom that also is connected to the library, as well as uh ceiling temperature monitoring control panels.
10:29So it was an additional expense, a lot of it building control related.
10:33Uh the amount total of this change order is just over $30,000.
10:39Uh, if you do have really specific items on each one of these four additional elements of work, uh Joe is definitely going to be the best one to provide some explanation on really fine details of that.
10:58Um I've got some questions first.
11:02Um, gentlemen, thank you.
11:04So I guess I'm gonna work my way up from the bottom.
11:10I guess my question is I know we we talked a lot about this is the old Carnegie space, right?
11:17And we talked a lot about having to put sensors above the ceiling for fire and everything else.
11:23I guess I'm just curious, and it's I know it's 1400 bucks, but I'm just curious.
11:28We spent so much time on that.
11:30Why I'm just curious what was missed, or what why are we why are we having to spend another 1400 when we just did that like two years ago?
11:38For that for that location on number four.
11:42Yeah, so the the space above the the old Carnegie area, there is exposed piping, there's um sprinkler piping, hydronic piping up there.
11:51Um this cost is to provide additional monitoring up there.
11:56So it's an older building, sometimes it's temperature sensitive a little bit more outside.
12:00So we want to be able to monitor that.
12:02We want to be able to control that above ceiling space to ensure that all the mechanicals up there are taken care of and and not bursting pipes and causing damage.
12:10Yeah, and I Joe, I and I know this was before your time, and as you guys know, this isn't directed at you individually, this is directed at the building.
12:18Um I just was because I know we talked about that when we did this when we did the Carnegie room remodel about all of the sensors and everything up there.
12:27Was it just something the technology change?
12:30Was it just something that that the that we missed?
12:33Or did we realize that we just didn't we didn't have enough sensors up there given the first scope?
12:38Yeah, I think with the with the building automation system change, um, having additional sensors up there provides us a little a higher level of control in that space.
12:46So um it provides for monitoring, it provides for alerts if it does fall out of um temperature scale for us.
12:53So some of it is kind of that behind the scenes work where staff is getting notified when things are out of whack.
12:59Um, and it's it goes continually monitored so we can actually pull it up on the computer, understand exactly where we're at, and not have to just trust the equipment.
13:09And then number three, the park bathrooms.
13:12So those were that project was done four, three, four years ago.
13:18Yeah, three, four years ago.
13:20The addition, the additional bathrooms.
13:23So I'm gonna I'm again my I guess my question is was this something that was just that was discovered that we we needed to we needed to do this work, or why was I guess my other question is why wasn't this in the original scope of work when we put the bathrooms in?
13:36Uh this is this is something we discovered throughout the project.
13:38It's it's not ducted the way that we would expect it to work.
13:43So the library or the the park bathrooms are supported by the library mechanical system.
13:49The way it's set up right now, there's a transfer fan in the conference room that is blowing essentially taking exhaust air from the conference rooms and blowing it into the bathrooms.
13:59There are unit heaters in each of the bathrooms that should be maintaining temperature in the bathrooms, but they never run because that transfer fan is constantly dumping tempered air into the space.
14:09So we're not running efficiently right now.
14:11The cabinet unit heaters that are in the bathrooms, which are designed to heat and temper the bathrooms, should be the primary source of heat.
14:18Right now they're not being utilized because we're constantly pushing exhaust air out of the conference rooms into the bathrooms.
14:28Is it more efficient to use those kind of those electric heaters than it is to try to just continuously blow warm air in to normal duct work?
14:41And I I just as we all know, love the library, just very challenged by the physical building.
14:47So thank you, gentlemen.
14:48Joe, thanks for coming tonight.
14:49I'll make a motion to approve the change order as presented.
14:54We have a first and a second.
14:56Any additional questions or discussion before we move on?
15:00Seeing none, Kevin Riley votes aye.
15:14And we are up to the matter of a report.
15:18Um no real report, no extra report tonight.
15:21Uh just have uh the uh official notices, Greenway Terrace Playground Resilient Surface Project, uh, Prairie Park and Banting Park Facilities Upgrade Project, and the Sanitary Sewer Lining Project for the year.
15:35So those projects are being prepared and going off for bid.
15:39And Kevin, before we before we adjourn, I just wanted to take this opportunity to welcome um Alder Person Micklitz to the Board of Public Works, and also um just acknowledge uh Alderman Eric Payne and his probably over 20 years of service on the Board of Public Works as an alderman.
15:55So Eric's not here this night here this evening with us, uh, but I wanted to take this opportunity to publicly thank Eric for his time, not only as an alderman, but also his time on the board of public works and on the transit commission.
16:08We 100% uh appreciate his service to the board of public works.
16:11Absolutely that doesn't require a vote, but I will wholeheartedly second both of those motions.
16:16I do have one thing that I'd like to uh just ask uh the Lomayra, I mean not Lomayra, the prospect avenue construction.
16:25My guess is that the it got a bit slowed down because of weather, but do we are we still on track for that?
16:34Schedule wise, we're still looking good.
16:36There were some more than expected poor soils encountered on prospect during the uh removal of the existing pavements on that stretch that slowed them down a little bit.
16:48Obviously, we had a week of a lot of rain.
16:51That also didn't help.
16:52Um, but schedule wise, we're still looking good.
16:54We will start removals of sidewalk on bidwell very, very soon, as Jonathan has put out a couple updates uh today uh with that schedule.
17:04So they are plugging away and plowing forward um as far as contract time will definitely be on schedule regarding that project, but still in the target where they wanted to be complete ahead of schedule.
17:18So I'll be able to get out of my driveway in the next three weeks.
17:21Yes, okay, that is the goal.
17:25The underground contractor out there, I feel did a fantastic job getting that completed uh in a real quick manner.
17:32So moving forward with the road project.
17:34It's totally understandable with the weather, but yeah.
17:38Uh any other comments or things before we cl adjourn?