Chapter 7:

ACTION PROGRAM

The Historic Preservation Element has 66 actions. Implementing all of them will be ambitious and will probably take years to complete.

The City’s "Action Program" for completing the actions is set forth in Table 7-1. The table divides the actions into four priority groups, states the "priority factors" determining the groups and, in a "comments" column, discusses the priority factors further and identifies some of the specific implementation issues to be considered for each action. To facilitate reference, Table 7-2 lists the actions in numerical order showing the priority group for each.

The "Implementing Organization" column identifies City departments or other organizations with primary responsibility for completing each action. The Office of Planning and Building, Comprehensive Planning Division will have overall responsibility for coordinating the Action Program’s completion and for monitoring the progress of other organizations with primary responsibility for implementing specific actions. The Comprehensive Planning Division should be assisted by the Landmarks Preservation Advisory Board and the Board’s staff in performing these functions. The Board should also assist identification of future changes to the Action Program and to the Element itself as the need for changes becomes apparent.

For further discussion of implementation issues, see the text accompanying each action in Chapters 3-6 and in the corresponding chapters of the Technical Report.

The Element’s 66 actions are distributed among the four priority groups as follows:

Priority Group 122
Priority Group 229
Priority Group 311
Priority Group 44
TOTAL66

Within Priority Group 1, three actions (1.1.1, 1.1.3, and 1.2.1) have already been started as part of the Oakland Cultural Heritage Survey and Action 5.1.12 has been started by the City Clerk’s Office. An additional action (3.9.1) will be part of the Oakland General Plan’s Land Use Element and is probably the most ambitious. Eleven Priority Group 1 actions relate to Objective 2 (Preservation Incentives and Regulations) and should be implemented as a package. Two Priority Group 1 actions (5.1.2 and 5.1.3) will probably be very easy to implement.

Within Priority Group 2, some actions are listed together because they relate to the same subject (e.g. Housing Code compliance), have the same implementing organization (e.g OHND or OEDE) or are variations of each other and require special expertise (e.g. design guidelines).

Priority Group 1 includes all actions which are considered to have "windows of opportunity" because of either availability of special funding, significant public or staff support, or linkage opportunities with other projects or studies.

Implementation of the four priority groups will probably overlap: once significant work (but not all work) has been completed on a particular group, work on the next highest priority group will begin. Work on some actions (e.g. Action 3.9.1) may be spread over several years and could overlap all the groups.

Future changes to the priority group assignments may be made by staff, but only after the City Planning Commission and Landmarks Preservation Advisory Board have been given an opportunity to comment on the changes. The Commission could also refer the changes to the City Council for direction. These changes will not require formal amendments to the Historic Preservation Element nor to other Oakland General Plan components.

TABLE 7-1: HISTORIC PRESERVATION ELEMENT ACTION PROGRAM

Priority Group 1

ACTIONPriority Factors
NumberTitleSee PageImplementing Organization[^p2-1]ProductsPreservation Impact[^p2-2]Time UrgencyImplementation Constraints[^p2-4]Estimated Time Needed to Implement (Months)[^p2-6]
Prerequisite to Other ActionsPrior Action RequiredWindow of Opportunity[^p2-3]Funding[^p2-5]Other[^p2-4]
OBJECTIVE 1 ACTIONS: IDENTIFYING PROPERTIES POTENTIALLY WARRANTING PRESERVATION
1.1.1Complete the Reconnaissance Survey3-3OPB-CPField maps & notes; photos; photo index.$36
1.1.3Database, lists and maps of Reconnaissance and Intensive Survey results3-3OPB-CPDatabase; property lists & maps1.1.1$24
1.2.1List of Potential Designated Historic Properties3-4OPB-CPList1.1.3$18
OBJECTIVE 2 ACTIONS: PRESERVATION INCENTIVES AND REGULATIONS
2.1.1Amend zoning text to incorporate new preservation incentives and regulations4-2OPB-CPRevised zoning text; admins. guidelines2.3.1$12
2.3.1Criteria for designation of Landmarks over owner objections4-8OPB-CPGeneral Plan amendment and/or zoning text changes¢2
2.6.1Mills Act contracts4-25OPB-CPA.I. (procedure and contract format); fiscal impact analysis$6
2.6.2Conservation easements4-25OPB-CPA.I. (including procedure, easement recordation format & criteria for easement boundaries).¢6
2.6.3Transferable development rights4-26OPB-CPZoning text changes; TDR marketplace.$12
2.6.4Limit to Landmarks and Preservation Districts existing zoning provisions conditionally permitting additional uses in historic buildings4-26OPB-CPZoning text changes¢3
2.6.5Broader range of conditionally permitted uses for Landmarks and Preservation Districts in certain zones4-27OPB-CPZoning text changes¢6+
2.6.9Waivers and reductions of permit fees4-29OPBMaster Fee Schedule revisions.$6+
2.6.10Apply State Historical Building Code to Designated Historic Properties and other qualified historical buildings4-29OPB-BSA.I.¢X3
2.6.11State Historical Building Code information sheet4-30OPBBrochure2.6.10¢1

Abbreviations: A.I. = Administrative Instruction; CC = City Council; C Clt. = City Clerk; CM = City Manager; CPC = City Planning Commission; DHP = Designated Historic Property; EDAC = Economic Development Advisory Commission; HAAB = Housing Advisory and Appeals Board; LPAB = Landmarks Preservation Advisory Board; M/Cncl. = Mayor/City Council; OCIS Office of Corporate Information Services; OEDE = Office of Economic Development and Employment; OFD Oakland Fire Department; OGS = Office of General Services; OHND = Office of Housing and Neighborhood Development; OPB = Office of Planning and Building; OPB-BS = OPB-Building Services Department; OPB-CC = OPB Code Compliance Division; OPB-CP = OPB City Planning Department; OPB-Op = OPB Operations Division; OPR = Office of Parks and Recreation; ORA = Oakland Redevelopment Agency; OSP = 1992 Oakland Strategic Plan ("Oakland - Sharing the Vision"); PDHP = Potential Designated Historic Property; SOP = Standard Operating Procedure.

Notes: [^p2-1] Refers to organization with primary responsibility for implementation. Organizations with secondary responsibility are indicated in the comments. [^p2-2] Preservation impact: ● = Major - direct; ○ = Major - indirect; • = Minor - direct; ◦ = Minor - indirect [^p2-3] Refers to current opportunities such as: availability of special funding; significant public support; linkage opportunities with other projects or studies. Applicable to Priority Group 1 only. [^p2-4] Refers to funding for both staff and materials: ¢ = minimal; $ = moderate; $$ = significant. [^p2-5] Other implementing constraints include: (a) special expertise not presently available to the City, and (b) need for significant interorganizational cooperation. [^p2-6] Indicated time is from date work begins on action item. Assumes all necessary staff, funding, and other resources are available and that all necessary prerequisite actions are complete. [^p2-7] There are no Objective 4 actions in Priority Groups 1, 2 or 3 -- see Priority Group 4.

TABLE 7-1: HISTORICAL PRESERVATION ELEMENT ACTION PROGRAM (continued)

Priority Group 1 (Continued)

ACTIONPriority Factors
NumberTitleSee PageImple- menting Organi- zation[^p3-1]ProductsPreservation Impacts[^p3-2]Time UrgencyImplemen- tation ConstraintsEstimated Time Needed to Implement (Months)[^p3-8]
Prerequisite to Other ActionsPrior Action RequiredWindow of Opportunity[^p3-3]Funding[^p3-4]Other[^p3-5]
OBJECTIVE 3 ACTIONS: HISTORIC PRESERVATION AND ONGOING CITY ACTIVITIES
3.2.2Historic preservation management procedure for City-owned properties5-2CMA.I.1.2.1$X
3.5.2Standard conditions for discretionary permit approvals5-5OPB-CP/BSOPB SOP¢X
3.8.1Include historic preservation impacts in City's Environmental Review Regulations5-11OPB-CPCEQA Thresholds of Significance¢
3.9.1Rezoning studies and possible zoning text changes to promote consistency with existing or eligible Preservation Districts.5-12OPB-CPLand Use Element amendments; Zoning map & text changes1.2.1$$X
3.10.1Review and possible amendment of emergency response documents5-13CM-OES; OPB-BSAmendments to Oakland General Plan Safety Element, Emergency Plan, Departmental Operations Manuals and Earthquake Repair Ordinance; OPB-BS SOP$X
OBJECTIVE 5 ACTIONS[^p3-7]: INFORMATION AND EDUCATION
5.1.2Present Landmark certificates at City Council meetings6-2M/Cncl.A.I.¢
5.1.3Preservation District certificates6-2OPB-CPCertificate design¢
5.1.12City records management and archives program.6-5C.ClkRecords inventory and retention schedules; Archival Holdings Manual; Policies and Procedures Manual$X
5.1.14Design and construction bookstore6-6OPB-OpBookstore$

Abbreviations: A.I. = Administrative Instruction; CC = City Council; C.Clk. = City Clerk; CM = City Manager; CPC = City Planning Commission; DHP = Designated Historic Property; EDAC = Economic Development Advisory Commission; HAAB = Housing Advisory and Appeals Board; LPAB = Landmarks Preservation Advisory Board; M/Cncl. = Mayor/City Council; OCIS Office of Corporate Information Services; OEDE = Office of Economic Development and Employment; OFD Oakland Fire Department; OGS = Office of General Services; OHND = Office of Housing and Neighborhood Development; OPB = Office of Planning and Building; OPB-BS = OPB Building Services Department; OPB-CC = OPB Code Compliance Division; OPB-CP = OPB-City Planning Department; OPB-Op = OPB Operations Division; OPR = Office of Parks and Recreation; ORA = Oakland Redevelopment Agency; OSP = 1992 Oakland Strategic Plan ("Oakland - Sharing the Vision"); PDHP = Potential Designated Historic Property; SOP = Standard Operating Procedure.

Notes: [^p3-1] Refers to organization with primary responsibility for implementation. Organizations with secondary responsibility are indicated in the comments. [^p3-2] Preservation impact: ● = Major - direct; ◍ = Major - indirect; ◐ = Minor - direct; ○ = Minor - indirect [^p3-3] Refers to current opportunities such as: availability of special funding; significant public support; linkage opportunities with other projects or studies. Applicable to Priority Group 1 only. [^p3-4] Refers to funding for both staff and materials: ¢ = minimal; $ = moderate; $$ = significant. [^p3-5] Other implementing constraints include: (a) special expertise not presently available to the City, and (b) need for significant interorganizational cooperation. [^p3-6] Indicated time is from date work begins on action item. Assumes all necessary staff, funding, and other resources are available and that all necessary prerequisite actions are complete. [^p3-7] There are no Objective 4 actions in Priority Groups 1, 2 or 3 -- see Priority Group 4.

TABLE 7-1: HISTORICAL PRESERVATION ELEMENT ACTION PROGRAM (continued)

Priority Group 2

ACTIONPriority Factors
NumberTitleSee PageImplementing Organization[^p4-1]ProductsPreservation Impact[^p4-2]Time UrgencyImplementation ConstraintsEstimated Time needed to Implementation(Months)[^p4-6]
Prerequisites to Other ActionsPrior Action RequiredWindow of Opportunity[^p4-3]Funding[^p4-4]
OBJECTIVE 1 ACTIONS: IDENTIFICATION OF PROPERTIES POTENTIALLY WARRANTING PRESERVATION
1.1.2Long range plan for completing the Intensive Survey3-3OPB-CPPriority list of property types and areas; schedule; funding sources.1.1.1¢
1.1.4Process for updating the Surveys3-4OPB-CPWritten procedure¢
OBJECTIVE 2 ACTIONS: PRESERVATION INCENTIVES AND REGULATIONS
2.1.2Redesignate existing Landmarks and Preservation Districts. Reclassify existing preservation study list properties as Heritage Properties.4-3OPB-CPRedesignations and reclassifications.2.1.1$
2.2.1Guidelines for determination of Preservation District eligibility.4-3OPB-CPAmendments to LPAB Rules of Procedure.2.1.1¢
2.4.1Landmark and Preservation District design guidelines.4-18OPB-CPCPC "100" series publication.$
2.6.6City development assistance priority to historic preservation projects involving Designated Historic Properties.4-28OEDE; OHNDA.I.; SOPs2.1.1¢
2.6.7Historic preservation revolving fund.4-28OEDE; OHNDReports to CPC and CC; fund established by CC and/or ORA resolution.2.1.1$$
2.6.8Marks bonds.4-28OEDEReports to CPC and CC; bond program established by CC resolution.2.1.1$
2.6.12State Historical Building Code interpretations.4-30OPB-BSSOP; Code Interpretation Bulletins.2.6.10¢
OBJECTIVE 3 ACTIONS: HISTORIC PRESERVATION AND ONGOING CITY ACTIVITIES
3.3.2Definition of small-scale projects exempt from Policies 3.3 and 3.6 and Action 3.3.1.5-3OPB-CPPart of A.I.s & SOPs for Actions 3.3.1 and 3.6.1.¢
3.4.1Ordinance for acquisition by eminent domain.5-4OPB-CPOrdinance¢
3.4.2Procedures and criteria for historic preservation property acquisitions.5-4OPB-CPA.I.¢
3.5.1Design guidelines for discretionary permit approvals.5-5OPB-CPCPC "100" series publication.1.2.1$
3.6.1Evaluation and selection procedures for City-sponsored or assisted projects.5-7CMA.I.; SOPs.1.2.1$
3.7.1Property relocation procedures and design guidelines for all projects.5-9OPB-CPA.I.(procedure); CPC "100" series publication (design guidelines).¢

Abbreviations: A.I. = Administrative Instruction; CC = City Council; C.CIk. = City Clerk; CM = City Manager; CPC = City Planning Commission; DHP = Designated Historic Property; EDAC = Economic Development Advisory Commission; HAAB = Housing Advisory and Appeals Board; LPAB = Landmarks Preservation Advisory Board; M/Cncl. = Mayor/City Council; OCIS Office of Corporate Information Services; OEDE = Office of Economic Development and Employment; OFD Oakland Fire Department; OGS = Office of General Services; OHND = Office of Housing and Neighborhood Development; OPB = Office of Planning and Building; OPB-BS = OPB Building Services Department; OPB-CC = OPB Code Compliance Division; OPB-CP = OPB City Planning Department; OPB-Op = OPB Operations Division; OPR = Office of Parks and Recreation; ORA = Oakland Redevelopment Agency; OSP = 1992 Oakland Strategic Plan ("Oakland - Sharing the Vision"); PDHP = Potential Designated Historic Property; SOP = Standard Operating Procedure.

Notes: [^p4-1] Refers to organization with primary responsibility for implementation. Organizations with secondary responsibility are indicated in the comments. [^p4-2] Preservation impact: ● = Major-direct ❍ = Major-indirect ⚪ = Minor-direct ◔ = Minor-indirect [^p4-3] Refers to current opportunities such as: availability of special funding; significant public support; linkage opportunities with other projects or studies. Applicable to Priority Group 1 only. [^p4-4] Refers to funding for both staff and materials: ¢ = minimal; $ = moderate; $$ = significant. [^p4-5] Other implementing constraints include: (a) special expertise not presently available to the City; and (b) need for significant interorganizational cooperation. [^p4-6] Indicated time is from date work begins on action item. Assumes all necessary staff, funding, and other resources are available and that all necessary prerequisite actions are complete. [^p4-7] There are no Objective 4 actions in Priority Groups 1, 2 or 3 - see Priority Group 4.

TABLE 7-1: HISTORICAL PRESERVATION ELEMENT ACTION PROGRAM (continued)

Priority Group 2 (Continued)

ACTIONPriority Factors
NumberTitleSee PageImplementing Organization1ProductsPreservation Impacts2Time UrgencyImplmentation ConstraintsEstimated Time Needed to Implement(Months)3
Prerequisite to Other ActionsPrior Action RequiredWindow of Opportunity4Funding5Other6
OBJECTIVE 3 ACTIONS: HISTORIC PRESERVATION AND ONGOING CITY ACTIVITIES (continued)
3.7.2Property relocation procedures for City-sponsored or assisted projects.5-9CMA.I.; SOPs3.7.1¢X
3.7.3Building relocation assistance program.5-9OEDE, OHND, OPB-BS/CP/OpJoint OPB, OEDE & OHND SOP.¢X
3.11.2Design guidelines for building safety programs.5-16OPB-BS (incl. OPB-CC)Joint HAAB & CPC "100" series publication.$X
3.12.1Housing Code procedures and notices.5-17OPB-CC; OHND; OEDEReport to CPC & HAAB; Housing Code amendments; joint OPB/OHND/OEDE SOP.¢X
3.12.2Incentives for returning vacant properties to service.5-17OPB-CCReport to CPC & HAAB; Housing Code amendments.¢
3.12.3Earlier property acquisitions.5-18OPB-CC; OHND; OEDESee Action 3.12.1.¢X
3.12.4Additional property acquisition and third-party transfer methods.5-18OPB-CC; OHND; OEDESee Action 3.12.1.¢X
3.12.5Repair by City with liens.5-19OPB-CC; OHND; OEDESee Action 3.12.1.¢X
3.12.6Substandard and public nuisance abatement procedures and criteria.5-19OPB-CC; OHND; OEDESee Action 3.12.1.3.12.3 3.12.4 3.12.5¢
3.13.1Review existing security procedures and methods.5-20OPB-CCReport to CPC, A.I.; SOP and revised standards.$
3.14.1Historic preservation commercial revitalization project identification and promotion.5-21OEDEReport to EDAC and CPC; SOP; publications.1.2.1$/¢
GROUP 5 ACTIONS⁷: INFORMATION AND EDUCATION
5.1.1Marker program.6-2OPB-CPCC resolution; SOP; initial plaques$
5.1.4Heritage Property certificates.6-3OPB-CPCertificate design2.1.1¢
5.1.5Dissemination of Historical and Architectural Inventory.6-3OPB-CPMail-outs of property lists and individual property information to community organizations and property owners. SOP for ongoing distributions.1.2.1$
5.1.7Improved historic preservation information availability within City departments. Possible Historic Preservation Coordinator.6-4OPB-CPA.I.; report to CPC and CC on Hist. Pres. Coordinator; possible integration of hist. pres. information with citywide land-use database1.2.1$/¢

Abbreviations: A.I. = Administrative Instruction; CC = City Council; C.Clk. = City Clerk; CM = City Manager; CPC = City Planning Commission; DHP = Designated Historic Property; EDAC = Economic Development Advisory Commission; HAAB = Housing Advisory and Appeals Board; LPAB = Landmarks Preservation Advisory Board; M/Cncl. = Mayor/City Council; OCIS Office of Corporate Information Services; OEDE = Office of Economic Development and Employment; OFD Oakland Fire Department; OGS = Office of General Services; OHND = Office of Housing and Neighborhood Development; OPB = Office of Planning and Building; OPB-BS = OPB Building Services Department; OPB-CC = OPB Code Compliance Division; OPB-CP = OPB-City Planning Department; OPB-Op = OPB Operations Division; OPR = Office of Parks and Recreation; ORA = Oakland Redevelopment Agency; OSP = 1992 Oakland Strategic Plan ("Oakland: Sharing the Vision"); PDHP = Potential Designated Historic Property; SOP = Standard Operating Procedure.

Notes:

Footnotes

  1. Refers to organization with primary responsibility for implementation. Organizations with secondary responsibility are indicated in the comments.

  2. Preservation impact: ● = Major - direct ○ = Major - indirect ▪ = Minor - direct ▫ = Minor - indirect

  3. Other implementing constraints include: (a) special expertise not presently available to the City, and (b) need for significant interorganizational cooperation.

  4. Refers to current opportunities such as: availability of special funding; significant public support; linkage opportunities with other projects or studies. Applicable to Priority Group 1 only.

  5. Refers to funding for both staff and materials: ¢ = minimal; $ = moderate; $$ = significant.

  6. Indicated time is from date work begins on action item. Assumes all necessary staff, funding, and other resources are available and that all necessary prerequisite actions are complete.

TABLE 7-1: HISTORICAL PRESERVATION ELEMENT ACTION PROGRAM (continued)

Priority Group 3

ACTIONImplementing Organization1ProductsPriority FactorsComments
NumberTitleSee PagePreservation Impacts2Time UrgencyImplementation ConstraintsEstimated Time Needed to Implement (Months)3
Prerequisite to Other ActionsPrior Action RequiredWindow of Opportunity4Funding5Other6
OBJECTIVE 3 ACTIONS: HISTORIC PRESERVATION AND ONGOING CITY ACTIVITIES
3.2.1Designated Historic Property status for City-owned properties5-2OPB-CPDHP eligibility determinations; possible DHP designations.¢Number of City-owned eligible DHPs is expected to be small. OSP action step (p. 49).
3.3.1City assistance contract provisions requiring Designated Historic Property status5-3OHND; OEDERevised contract formats3.3.2¢OSP action step (p. 48).
3.6.2Development and design assistance for City-assisted projects involving existing or Potential Designated Historic Properties5-7OHND; OEDESOPs; revised informational publications.$X6
3.7.4Building relocation permit regulations5-10OPB-BS/CP/OpReport to CPC; possible Building Code amendments.¢6
3.11.1Review building codes and other documents related to building safety.5-15OPB-BS; OFDReport to CPC; possible Building, Housing and Fire Code amendments.$9
3.14.2California Main Street projects5-21OEDEReport to EDAC and CPC; possible initiation of Main Street projects.$X9
OBJECTIVE 5 ACTIONS7: INFORMATION AND EDUCATION
5.1.6Walking tours and guidebooks6-3Oakland Tours Program; OPB-CPReport to CPC; new tours; guidebooks and other publications.¢/$24
5.1.8Design assistance and referral6-4OHND; OEDE; OPBSOPs; provision of staff; informational publications.3.6.2$X6
5.1.10Rehabilitation training and apprenticeship programs6-4School District; Peralta Colleges; private organizationsReport to CPC. Training courses and apprenticeship programs.¢/$X24
5.1.11Oakland history and architecture curriculum in the public schools6-5School DistrictReport to CPC. Curriculum document.¢18

Priority Group 4

OBJECTIVE 4 ACTIONS: ARCHEOLOGICAL RESOURCES
4.1.1Archeological sensitivity study5-23OPB-CPMap and Commentary$X6
4.1.2Archeological protection criteria and procedures5-23OPB-CPAI; SOPs4.1.1¢X3
OBJECTIVE 5 ACTIONS: INFORMATION AND EDUCATION
5.1.9Preservation trade fairs6-4To be identifiedReport to CPC. Regularly scheduled trade fairs.¢X3
5.1.13Rehabilitation publications6-6OPB-CPUpdates of Rehab Right and Retrofit Right with possible Spanish and Chinese translations. Possible new publications.$12

Abbreviations: A.I. = Administrative Instruction; CC = City Council; C.Clk. = City Clerk; CM = City Manager; CPC = City Planning Commission; DHP = Designated Historic Property; EDAC = Economic Development Advisory Commission; HAA B = Housing Advisory and Appeals Board; LPAB = Landmarks Preservation Advisory Board; M/Incl. = Mayor/City Council; OCIS Office of Corporate Information Services; OEDE = Office of Economic Development and Employment; OFD Oakland Fire Department; OGS = Office of General Services; OHND = Office of Housing and Neighborhood Development; OPB = Office of Planning and Building; OPB-BS = OPB Building Services Department; OPB-CC = OPB Code Compliance Division; OPB-CP = OPB-City Planning Department; OPB-Op = OPB Operations Division; OPR = Office of Parks and Recreation, ORA = Oakland Redevelopment Agency; OSP = 1992 Oakland Strategic Plan ("Oakland - Sharing the Vision"); PDHP = Potential Designated Historic Property; SOP = Standard Operating Procedure.

Notes:

Footnotes

  1. Refers to organization with primary responsibility for implementation. Organizations with secondary responsibility are indicated in the comments.

  2. Preservation impact: ● = Major - direct; ◑ = Major - indirect; ◐ = Minor - direct; ◌ = Minor - indirect

  3. Indicated time is from date work begins on action item. Assumes all necessary staff, funding, and other resources are available and that all necessary prerequisite actions are complete.

  4. Refers to current opportunities such as: availability of special funding; significant public support; linkage opportunities with other projects or studies. Applicable to Priority Group 1 only.

  5. Refers to funding for both staff and materials: ¢ = minimal; $ = moderate; $$ = significant.

  6. Other implementing constraints include: (x) special expertise not presently available to the City, and (b) need for significant interorganizational cooperation.

  7. There are no Objective 4 actions in Priority Groups 1, 2 or 3 -- see Priority Group 4.

TABLE 7-2: PRIORITY GROUP ASSIGNMENTS FOR HISTORIC PRESERVATION ELEMENT ACTIONS LISTED BY ACTION NUMBER

Priority GroupAction No.Action TitleHist. Pres. Element Page No.
1Action 1.1.1:Complete the Reconnaissance Survey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3
2Action 1.1.2:Long range plan for completing the Intensive Survey . . . . . . . . . . . . . . . . . . . . .3-3
1Action 1.1.3:Database, lists and maps of Reconnaissance and Intensive Survey results . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3
2Action 1.1.4:Process for updating the Surveys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4
1Action 1.2.1:List of Potential Designated Historic Properties . . . . . . . . . . . . . . . . . . . . . . . .3-4
1Action 2.1.1:Amend zoning text to incorporate new preservation incentives and regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-2
2Action 2.1.2:Redesignate existing Landmarks and Preservation Districts. Reclassify existing preservation study list properties as Heritage Properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3
2Action 2.2.1:Guidelines for determination of Preservation District eligibility . . . . . . . . . . . . . .4-3
1Action 2.3.1:Criteria for designation of Landmarks over owner objections . . . . . . . . . . . . . . .4-8
2Action 2.4.1:Landmark and Preservation District design guidelines . . . . . . . . . . . . . . . . . . .4-18
1Action 2.6.1:Mills Act contracts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-25
1Action 2.6.2:Conservation easements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-25
1Action 2.6.3:Transferable development rights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-26
1Action 2.6.4:Limit to Landmarks and Preservation Districts existing zoning provisions conditionally permitting additional uses in historic buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-27
1Action 2.6.5:Broader range of conditionally permitted uses for Landmarks and Preservation Districts in certain zones . . . . . . . . . . . . . . . . . . . .4-27
2Action 2.6.6:City development assistance priority to historic preservation projects involving Designated Historic Properties . . . . . . . .4-28
2Action 2.6.7:Historic preservation revolving fund . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-28
2Action 2.6.8:Marks bonds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-28
1Action 2.6.9:Waivers and reductions of permit fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-29
1Action 2.6.10:Apply State Historical Building Code to Designated Historic Properties and other qualified historical buildings . . . . . . . . . . . . . . . .4-29
1Action 2.6.11:State Historical Building Code information sheet . . . . . . . . . . . . . . . . . . . . . . .4-30
2Action 2.6.12:State Historical Building Code interpretations . . . . . . . . . . . . . . . . . . . . . . . . .4-30
3Action 3.2.1:Designated Historic Property status for City-owned properties . . . . . . . . . . . . .5-2
1Action 3.2.2:Historic preservation management procedure for City-owned properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-2
3Action 3.3.1:City assistance contract provisions requiring Designated Historic Property status . . . . . . . . . . . . . . . . . . . . . . . . . . .5-3
2Action 3.3.2:Definition of small-scale projects exempt from Policies 3.3 and 3.6 and Action 3.3.1 . . . . . . . . . . . . . . . . . . . . . .5-3

TABLE 7-2: PRIORITY GROUP ASSIGNMENTS FOR HISTORIC PRESERVATION ELEMENT ACTIONS LISTED BY ACTION NUMBER (continued)

Priority GroupAction No.Action TitlePage No.
2Action 3.4.1:Ordinance for acquisition by eminent domain . . . . . . . . . . . . . . . . . . . . .5-4
2Action 3.4.2:Procedures and criteria for historic preservation acquisitions . . . . . . . . . . .5-4
2Action 3.5.1:Design guidelines for discretionary permit approvals . . . . . . . . . . . . . . .5-5
1Action 3.5.2:Standard conditions for discretionary permit approvals . . . . . . . . . . . . . .5-6
2Action 3.6.1:Evaluation and selection procedures for
City-sponsored or assisted projects . . . . . . . . . . . . . . . . . . . . . . . . . . .5-7
3Action 3.6.2:Development and design assistance for City-assisted projects
involving existing or Potential Designated Historic Properties . . . . . . . . . .5-7
2Action 3.7.1:Property relocation procedures and design guidelines for all projects . . .5-9
2Action 3.7.2:Property relocation procedures for
City-sponsored or assisted projects . . . . . . . . . . . . . . . . . . . . . . . . . . .5-9
2Action 3.7.3:Building relocation assistance program . . . . . . . . . . . . . . . . . . . . . . . .5-9
3Action 3.7.4:Building relocation permit regulations . . . . . . . . . . . . . . . . . . . . . . . . .5-10
1Action 3.8.1:Include historic preservation impacts in
City's Environmental Review Regulations . . . . . . . . . . . . . . . . . . . . . . .5-11
1Action 3.9.1:Rezoning study and possible zoning text changes to promote
consistency with existing or eligible Preservation Districts . . . . . . . . . . . .5-12
1Action 3.10.1:Review and possible amendment of
emergency response documents . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-13
3Action 3.11.1:Review building codes and other documents related
to building safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-15
2Action 3.11.2:Design guidelines for building safety programs . . . . . . . . . . . . . . . . . . .5-16
2Action 3.12.1:Housing Code procedures and notices . . . . . . . . . . . . . . . . . . . . . . . .5-17
2Action 3.12.2:Incentives for returning vacant properties to service . . . . . . . . . . . . . . .5-17
2Action 3.12.3:Earlier property acquisitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-18
2Action 3.12.4:Additional property acquisition and third-party transfer methods . . . . . .5-18
2Action 3.12.5:Repair by City with liens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-19
2Action 3.12.6:Substandard and public nuisance abatement procedures and criteria . . .5-19
2Action 3.13.1:Review existing security procedures and methods . . . . . . . . . . . . . . . .5-20

TABLE 7-2: PRIORITY GROUP ASSIGNMENTS FOR HISTORIC PRESERVATION ELEMENT ACTIONS LISTED BY ACTION NUMBER (continued)

Priority GroupAction No.Action TitlePage No.
2Action 3.14.1:Historic preservation commercial revitalization project identification and promotion5-21
3Action 3.14.2:California Main Street projects5-21
4Action 4.1.1:Archeological sensitivity study5-23
4Action 4.1.2:Archeological protection criteria and procedures5-23
2Action 5.1.1:Marker program6-2
1Action 5.1.2:Present Landmark certificates at City Council meetings6-2
1Action 5.1.3:Preservation District certificates6-2
2Action 5.1.4:Heritage Property certificates6-3
2Action 5.1.5:Dissemination of Historical and Architectural Inventory6-3
3Action 5.1.6:Walking tours and guidebooks6-3
2Action 5.1.7:Improving historic preservation information availability within City departments; possible Historic Preservation Coordinator6-4
3Action 5.1.8:Design assistance and referral6-4
4Action 5.1.9:Preservation trade fairs6-4
3Action 5.1.10:Rehabilitation training and apprenticeship programs6-4
3Action 5.1.11:Oakland history and architecture curriculum in the public schools6-5
1Action 5.1.12:City records management and archives program6-5
4Action 5.1.13:Rehabilitation publications6-6
1Action 5.1.14:Design and construction bookstore6-6

F-HP82 4HP7.CB