⬚ figure
MOVING CLAYTON FORWARD
2024 COMPREHENSIVE PLAN — A VISION FOR THE FUTURE
⬚ figure
September 2024
⬚ figure
⬚ figure
September 2024
(blank page)
⬚ figure
Prepared by Sizemore Group in association with Kimley-Horn and Sycamore Consulting Unless otherwise specified, all images are provided by the consultant teams or courtesy of Clayton County.
September 2024
CLAYTON COUNTY
BOARD OF COMMISSIONERS
Jeffrey E. Turner, BOC Chairman Gail Hambrick, Assistant Director, District 2 Commissioner Felicia Franklin, Assistant Director, District 3 Commissioner DeMont David, Vice Chair District 4 Commissioner
COMMUNITY DEVELOPMENT STAFF
Patrick Ejike, Director, Community Development Cheryl Brooks, Assistant Director, Community Development Mary Darby, Planning Administrator, Community Development
CONSULTANT TEAMS
SIZEMORE GROUP
Bill de St. Aubin, AIA, LEED AP Principal-in-Charge Deanna Murphy, AICP Project Manager & Lead Planner Randy G. Gibbs, AICP Planner Nishant Ostwal Planner Ashlyn Oakes Planner
SYCAMORE CONSULTING
Jen Price, AICP Senior Project Manager Madison Davis, AICP Planner
KIMLEY-HORN ASSOCIATES
Jon Tuley, AICP Economic Development Planner Elena Oertel, AICP Transportation Engineer
STEERING COMMITTEE
Levon Allen, Clayton County Sheriff's Office Meia Ballinger, D4 Resident Glenn Baker, D4 Resident Garvey Cills, Resident Altimese Dees, D3 Resident Clea Etheridge, Resident Lawanda Folami, D3 Resident Montrese Adger Fuller, Clayton State University Tasha Galloway, D1 Resident Troy Hodges, Clayton County Parks and Recreation Nicole Hornes, Clayton County Office of Youth Services Shannon James, Aerotropolis Atlanta Daunta Long, Pastor, Seed Planters Church Captain Sean Macdonald, Clayton County Code Enforcement Unit Gerald McDowell, ATL Airport CIDs Jeff Metarko, Clayton County Transportation & Development Mokita Rials, D1 Resident Scott Parham, Clayton County Library System Tamara Patridge, See Clayton County Convention and Visitors Bureau Kevin Roberts, Clayton County Police Department Erica Rocker-Wills, Clayton County Economic Development Greg Scandrett, D4 Resident Daniel Small, Clayton County Soil & Water Conservation District Andrew Smith, Atlanta Regional Commission Anthony W. Smith, Clayton County Board of Education Tori Strawter-Tanks, Clayton County Senior Services Tim Sweat, Clayton County Fire & Emergency Services Nicole Tubner, D1 Resident Valencia Williams, Clayton County Chamber of Commerce Larry Vincent, Development Authority of Clayton County
1.1 The Plan 7 1.2 What is the Comprehensive Plan Process? 8 1.3 What are the Benefits of a Comprehensive Plan? 9 1.4 How to Use this Comprehensive Plan 10 1.5 History and Context 12 1.6 Clayton County: Where the World Lands and Opportunities Take Off 13 1.7 Regional Trends of Concern 18 1.8 Report of Accomplishments 20
2.1 Existing Studies 43 2.2 Demographics 58 2.3 Housing Analysis 62 2.4 Economic Analysis 68 2.5 Transportation Analysis 76 2.6 Broadband Element 88 2.7 Regional Water Plan and Environmental Planning Criteria 92 2.8 Land Use Analysis 96 2.9 Community Engagement 113
3.1 Vision 125 3.2 Goals 125 3.3 Future Land Use Map (2039) 138 3.4 Character Areas 148 3.5 Community Work Program 174
MOVING CLAYTON FORWARD
Moving Clayton Forward - 2024 Comprehensive Plan A—Vision for the Future (2039) serves as a forward-looking blueprint that outlines the vision for the county’s development over the next two decades. It is designed to guide citizens, business owners, community leaders, and elected officials in making informed decisions regarding land development and public investment. With a focus on initiatives to be completed within the next five years, the plan encompasses various aspects, including an assessment of existing conditions, updates to the vision, goals, and policies, revisions to the future land use map and character areas, the formulation of a new Community Work Program, and a summary of the community engagement process.
The existing conditions assessment covers essential elements mandated by the Georgia Department of Community Affairs (DCA). These elements include economic development, housing, broadband services, regional water and environmental planning, transportation, and land use. By evaluating these key factors, the plan aims to identify current strengths, challenges, and opportunities within Clayton County, laying the groundwork for informed decision-making and strategic planning to support the county’s growth and prosperity.
In accordance with the requirements set forth by the DCA, this document presents a major update to the 2018 Comprehensive Plan and the 2019 Amendment, focusing on the development of a new five-year Community Work Program. The Community Work Program outlines priority projects that the county will undertake over the next five years, aligning with the established community vision and goals outlined in this report. By building upon the foundation laid by the previous plan and incorporating new insights and priorities identified through the community engagement process, this update seeks to ensure that the comprehensive plan remains relevant, responsive, and reflective of the community’s evolving needs and aspirations.
Clayton County, in partnership with its consultant teams—Sizemore Group, Sycamore Consulting, and Kimley-Horn Associates—conducted a community engagement process spanning twelve months. This process included two public hearings at Board of Commissioner meetings, two Zoning Advisory Group meetings, three core team meetings and six community meetings designed to identify opportunities and areas of concern within the county. Announcements and flyers were distributed throughout the county to publicize meetings, and residents were encouraged to participate in a public survey available online. This extensive public process provided an opportunity for the county’s residents, business owners, and community leaders to share their vision for the county and engage in conversations about its future growth.
⬚ figure
Image Caption: Community engagement event at the Flint River Community Center (2023)
The 2024 Clayton County Comprehensive Plan process is a collaborative effort involving residents, business owners, and elected officials to shape the future growth and development of the county. It entails a thorough analysis of the community’s physical, economic, social, and political factors, with robust public engagement to gather input and insights from stakeholders.
Comprehensive plans are designed to cover a long-range period and establish guiding principles for a community’s economic growth and development. In the case of Clayton County, the plan will serve as a blueprint for the county’s trajectory over the twenty-year blueprint. Importantly, it will be regularly updated at least every five years to ensure that the county’s vision for the future remains relevant and achievable in the face of evolving challenges and opportunities.
By involving diverse voices and perspectives in the planning process, the 2024 Comprehensive Plan aims to reflect the collective aspirations and priorities of the Clayton County community. Through strategic planning and informed decision-making, the plan will help shape a prosperous, equitable, and sustainable future for all residents of the county.
In the comprehensive planning process, the county must meet the requirements set forth by the DCA, which include:
⬚ figure
⬚ figure
Image Caption: View of a community member and draft work program (2024)
1.3 WHAT ARE THE BENEFITS OF A COMPREHENSIVE PLAN?
The planning process for the community yields several benefits that positively impact the entire community:
By engaging residents, planning experts, county staff, and elected officials in discussions about land development, transportation, economic development, and other objectives, the planning process enables the community to make informed decisions that promote long-term sustainability and well-being.
⬚ figure
Image Caption: View of a steering committee meeting (2023)
This document is intended for use by a wide range of stakeholders, including elected officials, county staff, property owners, developers, business owners, and citizens of Clayton County. It serves as a comprehensive guide for both private and public development decisions within the county.
Organized around core components required by the Georgia Department of Community Affairs (DCA) for local comprehensive plans, this document includes the following key elements:
The comprehensive plan articulates a consolidated vision for Clayton County, comprising a vision and goals associated with the seven overarching goal areas of focus: land use; transportation; housing; intergovernmental coordination; economic development; health, wellness, and sustainability; and broadband. This vision is informed by technical analysis and input gathered through the community engagement process, providing a framework for future development and decision-making.
An analysis of assets and challenges identifies major needs and opportunities that the county must address.
Findings from the assets and challenges assessment inform the development of plan policies and action steps aimed at addressing identified challenges and capitalizing on opportunities for growth and improvement.
The Community Work Program outlines specific steps and initiatives that need to be undertaken to ensure the comprehensive plan’s effectiveness and success. It serves as a roadmap for implementing the plan’s goals and policies, guiding the county’s actions over the plan’s timeframe.
The plan includes updates to the Future Land Use Map. This map serves as a guiding tool for future development and zoning, as future land use categories identify preferred land uses. This map is recommended to ensure that there is consistency and compatibility in the rezoning and development approval decisions so that any growth occurs in line with the community’s vision for its future.
The plan includes a Character Area Map that delineates specific areas within Clayton County, each with unique characteristics or development potential. These areas may be supported by Livable Centers Initiative (LCI) grants, or other means of financing, such as Tax Allocation Districts (TADs) as appropriate. This map serves as a guiding tool for future development, helping to identify areas for preservation, revitalization, or targeted growth based on existing conditions and the community’s vision for the future. The Character Area Map also identifies development and design principles for each character area.
By incorporating these essential components, the plan provides a comprehensive and strategic framework for guiding development and decision-making in Clayton County, ensuring that the county’s growth and prosperity are guided by a shared vision and informed by careful analysis and planning.
⬚ figure
Image Caption: View of vision and goal boards at a community engagement event (2024)
1.5 HISTORY AND CONTEXT
Established in 1858, Clayton County, Georgia emerged from the territories of the adjacent Fayette and Henry counties. Named after Judge Augustin S. Clayton, a prominent figure in the Georgia General Assembly and United State Congress, the county has a rich history and significant modern-day importance both regionally and nationally.
Before its official formation, Clayton County was inhabited by Creek Indians, and remnants of their farming culture can be found along the Flint River. Following the Revolutionary War, many veterans were granted land in Georgia, and in the Treaty of Indian Springs in 1821, the Creeks ceded their land to the state. Settlers from various parts of Georgia and southern coastal states began moving into the area, leading to the founding of Leaksville (later known as Jonesboro) in 1823. This town played a pivotal role as a stop on the railroad connecting Macon to Terminus, which was later named Atlanta, establishing a vital link between the southeast and the port city of Savannah.
Clayton County shares its borders with several neighboring counties including DeKalb, Henry, Spalding, Fayette, and Fulton. Positioned in the southern metropolitan area, Clayton County is located roughly ten miles south of the City of Atlanta and hosts within its own boundaries seven cities: a portion of College Park, Forest Park, Jonesboro, Lake City, Lovejoy, Morrow, and Riverdale.
With an estimated population of around 297,600 as of the 2020 U.S. Census, Clayton County ranks as the fifth most populous county in Georgia and within the Atlanta region. Covering an area of approximately 144 square miles, it stands as the third smallest county in the state and the second smallest in the eleven-county Atlanta region, second only to Rockdale County.
Clayton County is home to several notable landmarks and institutions, including Clayton State University, acclaimed water reclamation facilities, and various nature preserves. Additionally, a substantial portion of the Hartsfield-Jackson Atlanta International Airport (H-JAIA), the world’s busiest airport (regarding passenger travel) and a major regional employer, resides within the county’s confines.
The county has also left its mark on the entertainment industry, with ties to popular media such as Gone with the Wind, Flight, and Smokey and the Bandit. Significant cultural venues include Spivey Hall, an internationally renowned and premier recital hall situated on the Clayton State campus. In 2003, the Georgia Archives relocated to Morrow from downtown Atlanta. Amidst the growing urban landscape, the 146-acre Reynolds Nature Preserve stands as an integral element of natural beauty within the county.
⬚ figure
Image Caption: Location of Clayton County and adjacent counties in the state of Georgia Source: David Benbennick (2006)
1.6 CLAYTON COUNTY: WHERE THE WORLD LANDS AND OPPORTUNITIES TAKE OFF
The southern metro-Atlanta communities are experiencing a surge of positive momentum, driven by ambitious projects and initiatives. Clayton County finds itself at the heart of this growth, poised to benefit tremendously from the major investment in metro-Atlanta’s Southern Crescent.
In March 2024, the ARC received a significant $50 million bipartisan federal grant for a multi-purpose trail connecting the Atlanta BeltLine to the Flint River. In May 2024, ARC received another $14.9 million from the US Department of Transportation to supplement the initial grant benefiting Clayton County along with the Cities of Hapeville, College Park and East Point. Together, this funding will facilitate the study and development of a 31-mile trail system throughout the South Atlanta Metro region, linking the world-renowned Atlanta BeltLine to Lovejoy in Clayton County. This grant underscores a broader trend towards enhancing natural resources to promote healthier communities while also improving community access and mobility. It is a significant step towards integrating environmental sustainability into urban planning efforts, ensuring a greener and more resilient future for all.
Located in both Fulton and Clayton County, Hartsfield-Jackson Atlanta International Airport (H-JAIA) remains a cornerstone of the region’s economy. Earning the title as the world’s busiest airport, it continues to grow and upgrade itself to better accommodate the 100+ million travelers passing through its gates every year. The airport supports hundreds of thousands of jobs and contributes billions of dollars to Georgia’s economy. The planned terminal revitalization, parking enhancements, addition of a 400-room Intercontinental Hotel, and expansion of concourses demonstrate H-JAIA Jackson’s commitment to remaining the global transportation leader.
The Aerotropolis and Airport Area Community Improvement Districts (CID) play pivotal roles in driving progress and fostering economic growth in the surrounding areas. The combined efforts of these organizations facilitate efficient vehicular travel, exceptionally manicured landscaping, and a sense of safety and security that permeates their respective districts. These initiatives contribute to the development of vibrant communities and support local businesses surrounding the world’s most traveled airport.
The Six West Development, comprising 311 acres in nearby College Park, represents a significant urban revitalization effort, promising to transform the area with a diverse mix of office space, hotels, commercial venues, and residential units. The Six West development will also introduce new entertainment and dining offerings to College Park.
Additionally, Fort Gillem’s evolution into a bustling employment center marks a pivotal development in Clayton County’s economic landscape. With a strategic focus on logistics and the burgeoning film industry, the former Army base has attracted major players such as Amazon, Kroger, and Blue Star Studios. These new industries at Fort Gillem speak to the area’s appeal as a prime location for business growth and investment.
Finally, the US Soccer Federation’s decision to establish its new home in Fayette County is a testament to the region’s growing prominence as a hub for sports and entertainment. The site, comprising more than 200 acres will be the home to all twenty-seven of the American national teams will be located to the west of Veterans Parkway and north of Trilith Studios – yet another burgeoning community in south-Metro Atlanta. The presence of the US Soccer’s new facility will undoubtedly attract attention and interest from both national and international audiences and, in turn, is expected to spur economic activity, drive tourism, and create new opportunities for local businesses and communities.
With the emergence of the Mountain View community and the expansion of MARTA’s Bus Rapid Transit (BRT) services, many more exciting developments are in store for the southside. Collectively, these initiatives underscore the dynamic growth, vibrancy, and future success of the southern metro-Atlanta communities, especially Clayton County.
Clayton County Opportunities
Clayton County is a bustling hub of education, business and industry, driving job creation and enhancing the lives of both residents and enterprises. Renowned for its robust transportation infrastructure, the county boasts access to major U.S. interstate highways such as I-75, I-85, I-285, and I-675, along with reliable rail services courtesy of Norfolk-Southern and CSX.
At the heart of the county lies the Hartsfield-Jackson Atlanta International Airport, the busiest airport globally, offering unparalleled air travel convenience. Clayton County’s population continues to soar, reaching 298,300 in 2023 according to the U.S. Census Bureau, with an impressive annual growth rate of 12.2%. The median household income witnessed a substantial increase, rising to $53,398 in 2023 from $43,287 in 2014.
The Metropolitan Atlanta Regional Transit Authority (MARTA) is advancing Bus Rapid Transit (BRT) expansion in Clayton County with two new lines. The first line, along State Route 54, will feature seventeen proposed stops, connecting East Point to Mountain View, Clayton State University, and the cities of Forest Park, Jonesboro, and Lovejoy. The second MARTA Rapid route, the Southlake project, is an innovative BRT system that aims to enhance transit service and job access within Clayton County and establish connections within Clayton County, including to Hartfield-Jackson Atlanta International Airport, Riverdale, Morrow, as well as key destinations, such as the Shops of Riverdale, Southlake Mall, and the Southern Regional Medical Center. The BRT route will cover approximately 15 miles and operate on dedicated right-of-way and mixed traffic along existing roadways. Planning and design of this project began in 2020, and it is anticipated the BRT service will begin in 2030. This route is expected to include thirteen new stations and will use ten BRT-branded electric buses and electric vehicle charging stations.
Both projects aim to enhance job access, provide reliable and frequent transit services, and improve connections within Clayton County and the greater metro-Atlanta region, in addition to the improved connectivity facilitated by the aforementioned multi-purpose trail grant funding.
⬚ figure
Image Caption: View of Clayton County Water Authority (CCWA) facilities (2024)
In recent years, Clayton County’s government has actively fostered stronger partnerships with many stakeholders such as Aerotropolis CIDs and Alliance, Clayton State University, the Council for Quality Growth, MARTA, and various departments and agencies to drive economic development initiatives. Notably, the county’s Economic Development Office has crafted an enticing incentive package aimed at attracting and retaining top businesses and talent. In addition, on March 19 2024, the Clayton County Board of Commissioners (BOC) approved Ordinance No. 2024-60: BOC-2402-0394 to amend the Future Land Use Map (FLUM) process. This includes the implementation of an economic development matrix to assist with sustaining growth in the county.
Clayton County’s employment landscape flourishes with 192,000 full-time jobs across diverse sectors, further bolstered by the proactive efforts of the Clayton County Office of Economic Development. Key industries driving growth include Health Care and Social Services, Accommodation and Food Services, Professional, Scientific, and Technical Services, and Transportation and Warehousing.
Clayton State University stands out as a beacon of higher education in the Southern Crescent, offering a comprehensive range of accredited programs, including masters, baccalaureate, associate, vocational, and technical degrees. The university produces more than 600 graduates every year. Nestled within its picturesque campus lies Spivey Hall, a globally acclaimed recital hall attracting renowned artists and serving as a cultural nexus for the community.
For nine years running, the Clayton County School Board has secured the esteemed Exemplary School Board distinction, showcasing steadfast leadership and educational excellence. Additionally, Clayton County Public Schools’ reception of the Leading Edge Award from the Georgia School Boards Association underscores their commitment to preparing students for a dynamic global market, affirming the board’s profound influence on educational quality and student achievement in the county.
⬚ figure
Image Caption: View of Lakeview Discovery and Science Center at Clayton State University Source: Clayton State University (2023)
Southern Regional Medical Center, founded in 1971 in Riverdale, GA, has expanded to 331 beds, serving Riverdale and its environs. Recognized nationally and statewide for exceptional patient care, it hosts specialized units such as a Certified Primary Stroke Center, accredited Chest Pain Center, Women’s Life Center, labor and delivery suites, and a Level III Neonatal Intensive Care Unit.
The Clayton County Water Authority (CCWA) remains an esteemed utility, delivering exceptional water and services to the community, consistently meeting or exceeding federal and state standards for drinking water quality. Additionally, the Newman Wetlands Center, owned and operated by CCWA, provides an enriching environment for environmental education and fosters a deeper connection to the county’s ecosystems, promoting conservation efforts and watershed protection.
Clayton County residents now have access to the new Lake Spivey Recreation Center in Jonesboro, located within the International Park. This state-of-the-art, 32,000 square foot facility is situated along the Lake Spivey walking trail and houses the Parks and Recreation administration. The center boasts an array of amenities including an indoor saltwater pool, a cardio and exercise area, a multipurpose room, a rock-climbing wall, and an indoor café on the lower level. The new administrative offices are located on the second floor. This facility promises to provide enjoyment for Clayton County residents for years to come.
In May 2024, the Andrew J. Young Foundation, in partnership with Forever Young Aquaponics and in collaboration with the Clayton County Board of Commissioners, hosted a groundbreaking ceremony for the Forever Young Aquaponics facility. Situated in the City of Jonesboro, this 70,000-square-foot facility intends to revolutionize the local agricultural landscape and contribute to urban development by providing sustainable, organic produce to nine major cities throughout the Southeast.
Integrating aquaculture and hydroponics, aquaponics represents a cutting-edge approach to urban farming. It establishes a self-sustaining ecosystem where fish waste fertilizes plants, and the plants, in turn, filter the water returning to the fish. This facility will produce pesticide- and chemical-free, USDA organic produce within a closed-loop system that
⬚ figure
Image Caption: View of Spivey Hall on the campus of Clayton State University Source: Thomson200 (2015)
eliminates environmental discharge. This innovative project marks a crucial advancement in sustainable city planning and urban development, promoting healthier food production with minimal environmental impact. Forever Young Aquaponics is set to support the county in demonstrating sustainable and ethical agricultural practices which thrive within urban settings and are economically viable.
Mountain View is an unincorporated community located in the northwestern part of the county, immediately east of Hartsfield-Jackson Atlanta International Airport (H-JAIA). Recognizing Mountain View’s potential as a valuable area within the county, several planning initiatives have been undertaken to position the community as a world-class destination. These efforts include a 2014 Livable Centers Initiative (LCI), a 2017 Urban Land Institute (ULI) development strategy report, a master plan in 2018, and other initiatives led by Aerotropolis Atlanta and the Aerotropolis Atlanta Community Improvement Districts (AACIDs).
Mountain View is a historically significant community with the potential to complement the world’s busiest airport. It offers ample opportunities to attract residents, businesses, and travelers, creating a vibrant environment that enhances its regional importance.
Clayton County remains committed to progress, evident in its ongoing investments in public safety, infrastructure, and community development projects such as the Tara Boulevard Livable Centers Initiative (LCI) Gateway Study and the state-of-the art Clayton County Convocation Center which will host local graduations, community events, and corporate conferences. With a steadfast focus on innovation, professionalism, and inclusive growth, Clayton County is poised to thrive as a vibrant and competitive player in the dynamic metro-Atlanta region. In August 2024, Aerotropolis supported an Aero-Clayton “Moving Clayton Forward” event to assist the county with sustainable growth.
⬚ figure
Image Caption: View of Newman Wetlands Center Boardwalk Trail (2024)
As the Comprehensive Plan process addresses the County's vision for the next twenty years, 2039, it is important to consider current and anticipated community planning trends that are impacting Clayton County and beyond. In the following section, key planning issues, challenges, and opportunities are discussed. The vision, goals, and recommendations within this report aim to address these planning trends, as community tools and capacity allows.
According to ESRI and US Census Bureau data, Clayton County has seen a population growth rate of 1% as it approaches 300,000 residents. Many of these households are young families with children under 14 years old. Notably, Clayton County's median age is 33.9 years, which is more than three years younger than the median age of the Atlanta MSA. Conversely, Clayton County has a higher proportion of its population aged 55-84 years. With age increase comes age related disabilities, increased medical needs, and mobility limitations that necessitate careful consideration during planning efforts. These trends suggest that special accommodations are needed for both younger and older age groups. However, they also indicate that the county is not attracting adults in their prime working years. It is imperative that communities are equipped to provide the necessary services, housing, and infrastructure to support this aging population effectively, while also creating a desirable county for young adults and families.
Similarly, another persistent planning issue is the ongoing affordable housing crisis which has impacted both the metro-Atlanta area and the entire country. In general, there is a shortage of housing stock in many local communities to accommodate current and future growth. However, most alarming is the shortage of affordable housing to match Area Median Income (AMI). This issue does not just impact the poorest communities, but many middle-wage earning families as well. According to the Atlanta Regional Commission, there is a significant gap in rental housing availability for the 50% AMI or below cohort.
In recent years, transportation has witnessed remarkable advancements, introducing a diverse range of options such as e-scooters, Bus Rapid Transit (BRT), self-driving vehicles, and pods. Excitingly, the horizon holds even more promise with the imminent mainstream adoption of electrical vertical take-off and landing (eVTOL) vehicles. These innovations present communities with an expanded repertoire of mobility solutions, catering to both mass transit and individual travel requirements. However, the successful implementation of these transit alternatives necessitates a robust infrastructure network comprising rail systems, internet connectivity, and reliable power sources.
Moreover, it's essential to consider how these modes of transportation will interact with major hubs like Hartsfield-Jackson Atlanta International Airport (H-JAIA). Understanding the impact of these new modes of transit and travel is crucial as we strive to plan environments that are not only functional but also enjoyable to navigate.
Additionally, there is anticipated infrastructure and economic impact of the Savannah Harbor Expansion Project on the metro-Atlanta region, with a particular focus on Clayton County. This ambitious $1 billion, 20-year initiative involves deepening the channel by forty-seven feet over a 38-mile stretch. As a result, the expanded harbor will now accommodate the largest vessels on the East Coast, facilitating the arrival of 16,000 container vessels at the port. A significant portion of this cargo is destined for H-JAIA for distribution. Consequently, Clayton County serves as a crucial thoroughfare for freight movement both within Georgia and across the region. Understanding the implications of this project is essential for assessing its impact on economic activity and infrastructure development in Clayton County and beyond.
There's a growing recognition of the significance of urban planning, coupled with an increased appreciation for the role of green infrastructure in creating sustainable environments. The federal government's investments in this area are aimed at fostering a more environmentally friendly future. The headwaters of the Flint River begin in Clayton
County near the Hartsfield Jackson Atlanta International Airport. Clayton County – with the support of regional partners of the Atlanta Regional Commission (ARC), Aerotropolis, and surrounding governments - have led the investments of the Flint River Gateway Trails. The Flint River Gateway Trails is a crucial component of ARC’s initiative to reconnect the region and it received tremendous federal financial support in 2024.
The long-term effects of COVID-19 have heightened awareness and readiness regarding the spread of illness, prompting communities to reshape their environments to prioritize health and well-being. One such solution involves increasing and making greenspace and park space more accessible. Additionally, the pandemic has influenced where people work, leading to a greater demand for remote work facilities, both within local areas and within homes. These shifts reflect a broader recognition of the importance of creating environments that support both physical and mental health, as well as adaptability to changing circumstances.
⬚ figure
Image Caption: View of concourses A and T at Hartsfield-Jackson Atlanta International Airport Source: Matthew Groh (2018)
Smart cities are becoming increasingly intertwined within the urban planning discipline. Within these urban environments, existing data, such as cell phone data, is harnessed to optimize efficiency through the integration of Internet of Things and AI-enhanced technologies, tracking the movement of people. Additionally, data-driven decision-making plays a crucial role in enhancing safety, security, utilities, resilience, and various other aspects that influence the quality of life for local community members.
Furthermore, the momentum of social justice movements in 2020 has spurred a rise in initiatives aimed at fostering social justice and equity within communities. This is exemplified by the renaming of places and streets to align with contemporary values and honor revered figures. Efforts are also underway to mend the divisions caused by past infrastructural projects, such as highways, which historically marginalized minority communities. Finally, there is a push for increased transparency in local processes, alongside the integration of social and mental health training, and the introduction of mental health programs to assist communities in coping with the traumas stemming from systemic marginalization.
As part of a collaborative effort of the consultant teams and other partners, Clayton County is working to address these issues to better serve its residents and business communities.
The Report of Accomplishments is an account and explanation of all the projects listed in the Community Work Program from the previous Comprehensive Plan. The projects are identified with the following terminology:
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|
| ‘20 | ‘21 | ‘22 | ‘23 | ‘24 | |||
| Economic Development | |||||||
| 1 | Trade Center and Small Business Incubator - Class A office building at the entrance to Clayton State University to attract | X | X | X | X | X | $1-10 million, depending on size and build-out detail |
| 2 | "Welcome to Clayton County” signage strategically placed at North, South, East, and West entrances into the County. The signs are anticipated to measure approximately 10 to 20 feet in width and be constructed of brick, stone or concrete. The greeting signs will showcase the County's new brand and image | X | X | $100,000- 200,000 |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|
| '20 | '21 | '22 | '23 | '24 | |||
| Economic Development | |||||||
| 3 | Develop formal agreement and approach between the Cities and County to collectively shape a positive image for Clayton County, both internally and externally | X | X | X | X | X | Staff time or up to $100,000/ year for County |
| 4 | Elevate importance of retaining and expanding existing industry in Clayton County. Broaden the number of people formally involved in the effort to visit, retain and expand existing industry | X | X | Staff time | |||
| 5 | Broaden responsibility for industry retention and expansion by organizing committee of outreach participants within an existing economic development organization | X | X | X | X | X | Staff time |
| 6 | Track progress using basic database system (Excel, Access, etc.), that can be easily shared and used across multiple organizations | X | X | X | X | X | $4,000 |
| # | Activity | '20 | '21 | '22 | '23 | '24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Economic Development | |||||||||||
| 7 | Prioritize workforce development as a key economic development tool for improving family self- sufficiency and reducing unemployment | X | Staff time | Atlanta CareerRise Working Group/Econ. Dev. Office | Econ. Dev. Office/ Dev. Auth. | Currently underway | |||||
| 8 | Coordinate with Atlanta CareerRise in efforts to create career- ladder pathways within the logistics industry | X | X | X | X | X | Staff time | Atlanta CareerRise Working Group/Econ. Dev. Office | Econ. Dev. Office/ Dev. Auth. | Completed | |
| 9 | Evaluate success of Atlanta CareerRise logistics initiative as a model for other industrial sector in Clayton County | X | X | X | Staff time | Atlanta CareerRise Working Group/Econ. Dev. Office | Econ. Dev. Office/ Dev. Auth. | Completed | |||
| 10 | Develop separate webpages for each initiative (Tourism, Film, Production, Recruitment, etc.) of the Clayton County Office of Economic Development’s website outlining the work being done in each area | X | X | $5,000-15,000 | Econ. Dev. Office/ Dev. Auth. | Econ. Dev. Office/ Dev. Auth. | No longer relevant | The Economic Development Department website restructure has been refocused and separate webpages no longer are required |
| # | Activity | ‘20 | ‘21 | ‘22 | ‘23 | ‘24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Economic Development | |||||||||||
| 11 | Create a new initiative around Clayton County's water resources. Clayton County's existing food and beverage industry concentration, internationally recognized water system, and transportation network makes the case for finding more ways to leverage Clayton's water resources | X | X | $10,000-50,000 | Econ. Dev. Office/ Clayton County Water Authority | County/ Clayton County Water Authority | Completed | ||||
| 12 | Build upon existing activities that promote entrepreneurship and strengthen the small business community in Clayton County | X | X | $10,000 | Econ. Dev. Office/ Chamber of Commerce/ Comm. Development Dept. (CDD)-Planning & Zoning (P&Z) | County/ Chamber of Commerce | Currently underway | Anticipated completion 2025 | |||
| 13 | Measure number and type of small business support activities occurring in Clayton County | X | X | X | X | Staff time | Econ. Dev. Office/ Chamber of Commerce/ CDD-P&Z | Econ. Dev. Office/ Dev. Auth. | Currently underway | Anticipated completion 2028 | |
| 14 | Formally outline roles for existing organizations focused on supporting small businesses | X | X | Staff time | Econ. Dev. Office/ Chamber of Commerce/ CDD-P&Z | NA | Currently underway | Anticipated completion 2028 |
| # | Activity | '20 | '21 | '22 | '23 | '24 | Estimated Cost | Responsible Dept./ Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Economic Development | |||||||||||
| 15 | Develop a revolving-loan fund for small-to-medium sized businesses that are looking to expand | X | $200,000-$2 million | Collaborative decision on whether housed in government (Econ. Dev. Office), quasi-government, (Dev. Auth.) nonprofit or for profit entity | Typically requires one public source for initial capitalization, plus private or philanthropic funds. Will requires personnel to manage the RLF | No longer relevant | There was a restructure in the economic development department and development authority and this task is no longer a priority for either department | ||||
| 16 | Develop and implement incentives and programs to encourage redevelopment of vacant and underutilized commercial properties | X | X | X | X | X | Varied, but could be significant depending on consensus | Econ. Dev. Office/ Chamber/ Dev. Auth. | County/ Chamber/ Dev. Auth. | Currently underway | Anticipated completion 2026 |
| 17 | Coordinate with the City of Morrow to address the decline of Southlake Mall and the loss of businesses in commercial areas on Mt. Zion Road | X | X | X | Staff time | Econ. Dev. Office/ Chamber/ Dev. Auth. | County/ Chamber/ Dev. Auth. | Completed |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|
| '20 | '21 | '22 | '23 | '24 | |||
| Economic Development | |||||||
| 18 | Develop a framework within Clayton State University that fosters internal collaboration and external engagement towards the benefit of community and economic development initiatives | X | X | X | X | Staff time | |
| 19 | Promote the formation of Community Improvement Districts, especially near the airport, industrial districts, and along major commercial corridors | X | X | X | Staff time | ||
| 20 | Encourage establishment of businesses and activities that will provide for activity in the evening hours, particularly entertainment, shopping and dining options | X | X | X | Staff time (could range from minimal $ for ordinance/ overlay re- write to more $ for targeted recruitment and marketing effort) | ||
| 21 | Conduct redevelopment studies for declining or vacant strip shopping centers and "big-box" commercial structures throughout the County | X | X | $20,000 per study |
| # | Activity | '20 | '21 | '22 | '23 | '24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Economic Development | |||||||||||
| 22 | Form and coordinate business associations for each of the County’s commercial corridors | X | 0 | Staff time | Econ. Dev. Office | Grants/ Staff time | Completed | ||||
| 23 | Develop a current marketing plan for the County which determines the most effective media for promoting opportunities in Clayton County; i.e. magazines, Web sites, advertising, etc. | X | Staff time | Clayton County Public Information Office/Econ. Dev. Office/ Chamber of Commerce | Staff time | Currently underway | Anticipated completion 2028 | ||||
| 24 | Identify and develop plans for the revitalization of declining or vacant strip shopping centers and “big-box” commercial structures throughout the County | X | X | Staff time | CDD-P&Z/ Dev. Auth. | General Fund | Currently underway | Anticipated completion 2025 | |||
| 25 | Pursue funding assistance for the continuation of efforts to improve the Tara Boulevard entrance to Clayton County | X | X | X | $400,000 | CDD-P&Z/ Dev. Auth. | Staff time | Completed |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments | | :--- | :--- | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | | | | ‘20 | ‘21 | ‘22 | ‘23 | ‘24 | | | | | | | Community Development | | | | | | | | | | | | | | | 1 | Determine land use requirements that would support the concept of Aerotropolis | X | X | X | X | X | Staff time | CDD-P&Z | Staff time | Currently underway | Mountain View Overlay and update was completed September 2020 | | 2 | Revise residential building codes to increase minimum quality level acceptable | X | X | X | X | X | Staff time | CDD-P&Z | Staff time | Completed | Codified Residential Architectural Standards completed September 2023 | | 3 | Develop a Planning Handbook to be used as an educational tool and quick reference by the Zoning Advisory Group and County Commissioners | X | X | X | X | X | $5,000 | CDD-P&Z | General Fund | Completed | Provided updated municode with recent code changes to Zoning Advisory Group in October 2023 | | 4 | Pursue funding assistance for the continuation of efforts to improve the Tara Boulevard entrance to Clayton County | X | | | | | $400,000 | CDD-P&Z/ ARC | ARC | Currently underway | Received a LCI grant and project is currently underway | | 5 | Pursue funding for streetscape improvements to enhance the visual quality of Clayton County’s major roadways | X | | | | | Staff time | CDD-P&Z/ Transporta-tion | Staff time | Currently underway | This project has been reprogrammed into the SPLOST 2020. | | 6 | Develop a formal forum for coordination between the Clayton County Board of Education and Clayton County with regard to new schools and residential developments deemed to have a significant impact on school capacity | X | X | X | X | X | Staff time | CDD-P&Z / CCPS | Staff time | Currently underway | This currently exists and ongoing through the coordination of a standing committee - Clayton County Government and Clayton County Board of Education intergovernmental cooperation. |
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments | | :--- | :--- | :---: | :---: | :---: | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | | | | '20 | '21 | '22 | '23 | '24 | | | | | | | Transportation | | | | | | | | | | | | | | 1 | Roadway Capacity Improvements - Battle Creek Road from Southlake Pkwy to Valley Hill Road | X | X | X | X | X | $6,826,000 | Transportation/GDOT | 2014-2019 TIP/County | Currently underway | Anticipated completion 2027; this item is being combined with item 2 for a total $100,000,000 project | | 2 | Roadway Capacity Improvements - Mt. Zion Blvd from Southlake Pkwy to Lake Harbin Rd. | X | X | X | X | X | $6,370,000 | Transportation/GDOT | 2014-2019 TIP/County | Currently underway | Anticipated completion 2027; this item is being combined with item 1 for a total $100,000,000 project | | 3 | Roadway Capacity Improvements - Flint River Rd. from Glenwood Rd. to Kendrick Rd | X | | | | | $2,600,000 | Transportation/GDOT | 2014-2019 TIP/County | Completed | | | 4 | Conley Road/ Aviation Blvd Extension from I-285 to St R 3 | X | X | X | X | X | $11,150,000 | Transportation/GDOT | 2014-2019 TIP/County | Completed | | | 5 | Roadway Capacity Improvements – Godby Road from Southampton Rd. to SR 314 | X | X | X | X | X | $3,085,000 | Transportation | SPLOST | Completed | | | 6 | Road improvements to support other SPLOST Capital Projects | X | X | X | X | X | $1,000,000 | Transportation | SPLOST | Completed | | | 7 | Traffic Signal, Signing and Pavement marking-related improvement in unincorporated areas | X | X | X | X | X | $5,500,000 | Transportation | SPLOST | Currently underway | On-going |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|
| '20 | '21 | '22 | '23 | '24 | |||
| Transportation | |||||||
| 8 | County-wide sidewalk construction | X | X | X | X | X | $5,500,000 |
| 9 | C-Tran Buses, para-transit vehicles and bus shelters | X | X | X | X | X | $7,000,000 |
| 10 | Miscellaneous safety improvements in unincorporated areas | X | X | X | X | X | $2,000,000 |
| 11 | Bridge/culvert upgrades and replacements in unincorporated areas | X | X | X | X | X | $4,000,000 |
| 12 | CEI Services for projects | X | X | X | X | X | $1,000,000 |
| 13 | Street Resurfacing in unincorporated areas Maintenance | X | X | X | X | X | $60,000,000 |
| 14 | Stockbridge Road: 5-Foot Sidewalks and Accessible Crossings along ARC Regionally Significant Transportation System (RSTS) Routes North McDonough Street to Walt Stephens Road | X | $99,266 |
| # | Activity | '20 | '21 | '22 | '23 | '24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Transportation | |||||||||||
| 15 | C.W. Grant Parkway (Aviation Boulevard) – Pedestrian improvements for transit corridor From International Parkway to US 19/41-SR 3 (Old Dixie Highway) | X | X | X | X | X | $152,113 | Transportation / GDOT | 2014-2019 TIP/ County | No longer relevant | Transit corridor priorities have shifted and this project is no longer a transit priority |
| 16 | Flint River Road – Pedestrian improvements for transit corridor From Taylor Road to Flint River Crossing | X | X | X | X | X | $124,032 | Transportation / GDOT | 2014-2019 TIP/ County | Completed | Completed as part of Item 3 |
| 17 | Godby Road – Pedestrian improvements to fill gaps in system From Southampton Road to Phoenix Parkway | X | X | X | X | X | $3,085,000 | Transportation / GDOT | 2014-2019 TIP/ County | Completed | Competed as part of Item 5 |
| 18 | C.W. Grant Parkway Grade Rail Separation At Norfolk Southern RR Line – Includes realignment of Conley Road and US 19/41 in vicinity | X | X | X | X | X | $36,781,418 | Transportation / GDOT | 2014-2019 TIP/ County | Completed | Completed as part of Item 4 |
| 19 | Roadway Maintenance and Resurfacing | X | X | X | X | X | $32,400,000 | Transportation | 2015-2020 SPLOST | Currently underway | On-going |
| 20 | Traffic Signals, Signage and Striping | X | X | X | X | X | $44,650,000 | Transportation | 2015-2020 SPLOST | Currently underway | On-going |
| 21 | Bridge/Culvert upgrades, Repairs and Replacements | X | X | X | X | X | $4,750,000 | Transportation | 2015-2020 SPLOST | Currently underway | On-going |
| # | Activity | '20 | '21 | '22 | '23 | '24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Transportation | |||||||||||
| 22 | Roadway Safety Improvements | X | X | X | X | X | $3,500,000 | Transportation | 2015-2020 SPLOST | Currently underway | On-going |
| 23 | Sidewalk Installation | X | X | X | X | X | $13,500,000 | Transportation | 2015-2020 SPLOST | Currently underway | On-going |
| 24 | Valley Hill Rd. Widening (Battle Creek Rd. to City of Riverdale) | X | X | X | X | X | $17,300,000 | Transportation | 2015-2020 SPLOST | Currently underway | Under construction; anticipated completion 2026 |
| 25 | Gilbert Rd. Reconstruction (Mountain View Area) | X | X | X | X | X | $4,750,000 | Transportation | 2015-2020 SPLOST | Completed | |
| 26 | Landscaping/ Lighting | X | X | X | X | X | $684,279 | Transportation | 2015-2020 SPLOST | Currently underway | On-going |
| 27 | Transit Capital | X | X | X | X | X | $5,000,000 | Transportation | 2015-2020 SPLOST | Completed |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments | | :--- | :--- | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :--- | :--- | :--- | | | | ‘20 | ‘21 | ‘22 | ‘23 | ‘24 | | | | | | | | School System | | | | | | | | | | | | | | 1 | Eddie White Elementary School 14 | | X | | | | $15M | CCPS Board of Education | SPLOST & CAPITAL OUTLAY | Completed | Completed in 2021 for $40M | | 2 | New 57 Classroom Middle School (Forest Park) | | | X | | | $15M | CCPS Board of Education | SPLOST | Currently underway | Under-construction, anticipated to be complete by 2025 for $75M | | 3 | Middle School #8 | X | | | | | $18M | CCPS Board of Education | SPLOST | No longer relevant | No longer a necessary project based on BOE strategic building focus | | 4 | Lovejoy HS Auxiliary | | | X | | | $16M | CCPS Board of Education | SPLOST & CAPITAL OUTLAY | Currently underway | Project expanded to a modernization of the entire facility for $110,000,000; anticipated to be complete by 2026 | | 5 | General Renovations at Existing Schools | X | X | X | X | X | $95M | CCPS Board of Education | SPLOST & CAPITAL OUTLAY | Currently underway | On-going, anticipated spending from 2024-2028 is $800,000,000 |
| # | Activity | '20 | '21 | '22 | '23 | '24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Intergovernmental Coordination | |||||||||||
| 1 | Officially launch the Clayton County Economic Development Collaborative (CCEDC) which was started in 2013 by the COO which will allow the County and Cities to unite to build the economic landscape for the County and monitor the progress of the economic development strategic plan | X | X | X | X | X | Staff time | County Commission/ COO's Office | Staff time | Currently underway | Ongoing |
| 2 | Create a coordinated channel between the County and Cities to be updated on the progress of the 2009-2015 SPLOST programs for projects that are executed in the Cities and unincorporated areas | X | X | X | X | X | Staff time | COO's Office | 2015 and 2021 SPLOST | Currently underway | Ongoing |
| 3 | Create coordinated channels for economic development between County and surrounding Counties to plan economic landscape for the region | X | X | X | X | X | Staff time | County Commission., COO's Office, Econ. Dev. Depart, neighboring Counties | Staff time | Currently underway | Ongoing |
| 4 | Develop a County-wide recycling and sanitation program to assist with beautification across the County | X | X | X | X | Staff time | County Commission. COO's Office | Staff time | Currently underway | Ongoing | |
| 5 | Assess and amend the County's current dispute resolution process as needed to ensure its effectiveness | X | X | Staff time | County Commission | Staff time | Currently underway | Ongoing | |||
| 6 | Update procedures to include only two opportunities for Future Land Use Map amendments per year | X | Staff time | Intergovernmental Coordination/ Community Development Department | Staff time | Completed |
| # | Activity | '20 | '21 | '22 | '23 | '24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Parks and Recreation | |||||||||||
| 1 | (Morrow/Lake City Park) Convert the concrete pad behind the concession building to a basketball court | X | $10,000 | Parks and Recreation | General/ SPLOST/ REC | Currently underway | Project underway with anticipated completion 2025; project scope increased due to foundation problems and building demolition needed increasing cost to $250,000 | ||||
| 2 | (Jim Huie Recreation Center) Educational Program area | X | Cost determined at time of scope | Parks and Recreation | General/ SPLOST/ REC | Currently underway | On-going; anticipated completion 2028; Working with the Huie Foundation to get additional land donated to the Greenspace Program; cost anticipated at $35,000 | ||||
| 3 | (Independence Park) Landscaping around park to assist with crime prevention. | X | X | X | X | X | Cost determined at time of scope | Parks and Recreation | General/ SPLOST/ REC | Currently underway | Work in Progress. Improvements have been made to the park to include lighting, tree removal, fencing repairs, etc. Plans are underway to add a restroom facility, construct a modular bathroom. Anticipated cost $200,000 |
| 4 | 10 additional swing sets needed throughout the County (specifically for toddlers), | X | $30,000 | Parks and Recreation | General/ SPLOST/ REC/ HUD Grant | Currently underway | Some playgrounds will be replaced using SPLOST Funding. Our playgrounds are becoming very outdated and we need more advance equipment to stay relevant in the recreation field. Anticipated completion 2026 for $1,500,000 | ||||
| 5 | Toddler play features in parks adjacent to existing playgrounds | X | X | X | Cost determined at time of scope | Parks and Recreation | General/ SPLOST/ REC | Currently underway | On-going and to be combined with the above item; Our playgrounds will be replaced using SPLOST funding. Our playgrounds are becoming very outdated and we need more advance equipment to stay relevant in the recreation field. |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| ‘20 | ‘21 | ‘22 | ‘23 | ‘24 | |||||||
| Library System | |||||||||||
| 1 | New Headquarters Library | X | X | X | X | X | Cost to be determined at time of scope | Clayton County Library System | Staff time | No longer relevant | No longer an activity we are pursuing at this time as priorities have shifted and this facility is no longer needed . |
| 2 | Build more meeting rooms at Headquarters, move Jonesboro to Headquarters library location | X | X | X | Cost to be determined at time of scope | Clayton County Library System | Staff time | No longer relevant | Similar to item 1, priorities have shifted and this facility is no longer needed. | ||
| 3 | Landscape all libraries | X | X | Cost to be determined at time of scope | Clayton County Library System | Staff time | Currently underway | On-going. BOC Initiative. Unaware of when the new contract will take affect and library landscaping needs will be addressed. | |||
| 4 | Repair roof at Headquarters | X | $47,000 | Clayton County Library System | SPLOST/ GPLS | Completed | B&M worked with contractor to repair roof leaks at HQ. Work was completed Spring of 2023. | ||||
| 5 | Repair roof at Morrow | X | $23,000 | Clayton County Library System | SPLOST/ GPLS | Currently underway | On-going. Work has not begun yet on Morrow Roof | ||||
| 6 | Repair bathroom wall at Riverdale | X | $23,000 | Clayton County Library System | SPLOST/ GPLS | Completed | Project completed 2023 | ||||
| 7 | Renovate bathrooms at Headquarters | X | X | Cost to be determined at time of scope | Clayton County Library System | SPLOST | Completed | Work was completed in early 2023 | |||
| 8 | Family Computer Lab | X | X | Cost to be determined at time of scope | Clayton County Library System | To be determined | Completed | Project completed 2023 |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|
| '20 | '21 | '22 | '23 | '24 | |||
| Library System | |||||||
| 9 | Repair Circulation Desk at all Branch Locations | X | Cost to be determined at time of scope | ||||
| 10 | Paint library interior at all locations | X | Cost to be determined at time of scope | ||||
| 11 | Purchase additional volumes for each branch to meet the State's minimum level of service standards | X | X | X | X | X | $638,000/ year ($441,000 proposed) |
| 12 | Implement a plan to replace public and staff computers at the County's public libraries every three years | X | X | X | Cost to be determined at time of scope | ||
| 13 | Construct 20,000 sq. ft. Library in NW Clayton County (land acquisition, new books, design and construction) | X | X | $7,600 | |||
| 14 | Improvement and renovation of existing Libraries | X | X | X | X | X | $55,000 |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|
| '20 | '21 | '22 | '23 | '24 | |||
| Police Department | |||||||
| 1 | Police vehicles with equipment | X | X | X | X | X | $2M |
| 2 | Police helicopter replacement | X | X | $4.5M | |||
| 3 | Police mobile command vehicle | X | $1.3M | ||||
| 4 | Construction of a Sector 2 Police Precinct located in the NW section of Clayton County | X | Cost to be determined at time of scope |
| # | Activity | ‘20 | ‘21 | ‘22 | ‘23 | ‘24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Fire and EMS | |||||||||||
| 1 | Develop and implement new EMS Delivery Model for Clayton County | X | X | X | X | X | Will vary based on model. | Clayton County Fire & Emergency Services | General Fund | Currently underway | CCFES has implemented three of the four phases of the EMS system delivery model. Phase four was funded partly in FYE 19 and fully in FYE 20. With the onset of the COVID-19 Pandemic, the EMS system delivery model was placed on-hold as a worldwide pandemic became our top concern. Years later we have emerged from the pandemic and placed our focus back on the EMS system delivery model. With the addition of 2 Mobile Health Clinics, the approval of a new 10,000 Square Foot Clinic (In the design phase), as well as dedicated Clinical Social Worker, we are back on track. It is our hopes to finalize the new EMS system delivery model by 2025. |
| 2 | Implement vehicle replacement initiative for EMS and Fire | X | X | X | X | X | $8M | Clayton County Fire & Emergency Services | 2015 SPLOST/ Fire tax/ General Fund | Completed | CCFES along with Transportation and Development have successfully replaced a large portion of the fleet assigned to CCFES. As part of the 2015 SPLOST, the following units were replaced: 11 Ambulances, 7 Pumpers, 2 Mini Pumpers and an assortment of administrative vehicle's. CCFES and Fleet maintenance remain committed to assessing and replacing vehicles to ensure a safe operating environment for our employees and citizens. This item was completed in 2024. |
| # | Activity | '20 | '21 | '22 | '23 | '24 | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Fire and EMS | |||||||||||
| 3 | Build new fire stations to address 2012 ISO evaluation. (Stockbridge and Lovejoy) | X | X | X | X | X | $4M | Clayton County Fire & Emergency Services | Fire tax/ General Fund | Postponed | Needs assessment and risk analysis study completed by the department, coupled with the addition of Lake City to our coverage area changed the plans for these two stations. Funding for the following Station relocation/additions have been secured: Fire Station #1, Fire Station #2, Fire Station #9, Fire Station #15 and Fire & Emergency Services Headquarters. The department will still seek to add additional station's in Stockbridge and Lovejoy to meet the needs of the 2016 Standard of Cover Report as funding is identified and positions allocated by the BOC. |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments | | :--- | :--- | :---: | :---: | :---: | :---: | :---: | :--- | :--- | :--- | :--- | :--- | | | | '20 | '21 | '22 | '23 | '24 | | | | | | | Water Authority | | | | | | | | | | | | | 1 | Emergency Generator – Hooper WPP | | X | | | | $300,000 | CCWA | User Fees | Completed | Completed 2022; increased to $400,000 | | 2 | Sewer system rehabilitation | X | X | X | X | X | $1M/year | CCWA | User Fees/ General Fund | Completed | Completed 2023; increased to $8,500,000/ year | | 3 | Galvanized Water Main Replacement | X | X | X | X | X | $1M/year | CCWA | User Fees | Completed | Completed 2023; increased to $6,500,000/ year | | 4 | Stormwater System Rehabilitation | X | X | X | X | X | $1M/year | CCWA | User Fees | Currently underway | On-going; this represents ongoing annual spending for continual renewal of stormwater infrastructure; increased to $3,500,000/year | | 5 | Emergency Generator - all Water Facilities | X | | | | | $3M | CCWA | User Fees | Currently underway | Walnut Creek is complete; but his is an ongoing task. Jonesboro Repump Station - currently has a natural gas engine that runs only 1 pump; a new generator for this entire station is anticipated; Noah's Ark Repump Station - generator will be upgraded in the future. Estimated cost has been increased to $9,000,000 |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | Status | Comments |
|---|---|---|---|---|---|---|---|
| '20 | '21 | '22 | '23 | '24 | |||
| Building and Maintenance | |||||||
| 1 | Renovate Old 911 Building 7946 N. McDonough St. Jonesboro, GA 30236 | X | X | X | X | X | $130,000 - 150,000 |
| 2 | Adopt a County wide policy of using multi-story construction for all public buildings when feasible | X | X | X | X | Staff time | |
| 3 | Annex remodel of 3rd and 4th floors | X | $467,000 | ||||
| 4 | Jonesboro Library - New roof | X | X | $195,000 | |||
| 5 | 123 N. Main Street - New roof | X | X | X | $35,000 |
⬚ figure
The following section is a compilation of recent and/or relevant studies, documents, and visionary plans which have informed, overlapped with, or otherwise influenced this 2024 Comprehensive Plan Update. These sources provide valuable data, key insight, and diverse perspectives. These studies collectively contribute to the plan update and help to ensure a holistic and informed approach to shaping Clayton County’s vision and future development.
State Route 54 (SR 54) plays a vital role as a major corridor connecting Clayton County’s communities to the greater Atlanta region. The route connects Clayton State University, Southlake Mall, and the Cities of Forest Park, Jonesboro and Lovejoy to the Hartsfield-Jackson International Airport, and the Cities of East Point and Hapeville. Key components under consideration include fully dedicated Bus Rapid Transit (BRT) lanes, Transit Signal Priority (TSP) technology, near-level boarding/off-boarding ticket collection, and unique vehicle branding.
This ongoing study project is open to public input and feedback, with the aim of incorporating community perspectives into the planning process. The anticipated timeline aims to have the BRT lanes operational by 2030, signaling a significant investment in sustainable and efficient transportation infrastructure for Clayton County.
⬚ figure
Image Caption: SR 54 BRT Potential Connections Source: Connect Clayton (2023)
Clayton County recently conducted an Analysis of Impediments to Fair Housing (AI) study, as required after receiving a grant from the Department of Housing and Urban Development (HUD). The study, informed by extensive community input, aimed to identify barriers to fair and affordable housing and provide recommendations to address these challenges.
Key findings from the AI study highlighted various concerns, including a lack of quality and diverse housing options for seniors, displacement risks, and inadequate housing options across income levels. In response, the study outlined five prioritized fair housing goals:
Increase Quality, Variety, and Affordability: Implement strategies to enhance the quality, diversity, and affordability of housing stock in Clayton County, ensuring that residents have access to suitable and affordable housing options.
Enhance Housing Choice for People with Disabilities: Work to increase housing choice and accessibility for individuals with disabilities, ensuring that housing options accommodate diverse needs and preferences.
Invest in Underserved Areas: Prioritize investment in areas with high poverty rates and limited access to resources and services, aiming to improve living conditions and promote equitable development across the county.
Promote Economic Opportunities: Increase engagement in the labor market and expand access to higher-paying job opportunities, addressing economic disparities and supporting residents’ financial stability.
Expand Fair Housing Education: Strengthen fair housing education initiatives in Clayton County to raise awareness about housing rights, promote inclusive practices, and combat discrimination in housing.
By prioritizing these fair housing goals, Clayton County aims to foster inclusive, equitable, and vibrant communities where all residents have access to safe, affordable, and suitable housing. Implementation of the AI study recommendations will be essential in advancing fair housing principles and promoting positive outcomes for residents throughout the county.
The Tara Boulevard Livable Center Initiative (LCI) Study is a comprehensive initiative aimed at reimagining the Tara Boulevard corridor, as part of a shared vision for Clayton County, and the cities of Jonesboro and Lovejoy. The study is focused on identifying opportunities for housing, services, and mobility improvements and included an evaluation of transportation, land use, economic factors, and community needs to understand the corridor’s strengths and weaknesses.
At the time of writing, the plan is in its “Framework” phase, which involves the translation of the vision into an actionable plan. This is being accomplished through the establishment of various implementable elements, such as design land use strategies, transportation improvements, and urban design guidelines. Initial feedback from community open houses included walkability and safety concerns, desire for streetscape revitalization, flood mitigation, and downtown development.
⬚ figure
Image Caption: Tara Boulevard LCI Public Design Workshop Flyer Source: POND (2024)
The Comprehensive Plan serves as a critical tool for elected and public officials, providing essential guidance by establishing policies, priorities, and a community vision for development within Clayton County. It outlines where, how, and what types of development should occur, offering direction on land use decisions, zoning regulations, and capital improvements. By doing so, it creates a framework for evaluating development proposals, ensuring credibility and predictability in land use decisions for citizens and developers alike.
Moreover, the plan incorporates criteria for assessing development proposals, including compatibility with surrounding land uses and compliance with environmental regulations. Its overarching goal is to foster sustainable growth and development in Clayton County, emphasizing the creation of vibrant, walkable communities accessible to all residents. Additionally, the plan addresses challenges related to economic development, transportation, and housing, while safeguarding the county's natural and cultural resources.
In 2022, an amendment was made to the 2018 Comprehensive Plan to support the Bus Rapid Transit efforts in the County.
The 2024 Comprehensive Plan Update builds upon the foundation laid by the previous plan, reassessing goals, action items, and recommendations to reflect evolving needs and priorities. This iterative process ensures that the plan remains responsive to changing circumstances and continues to serve as a valuable tool for guiding responsible development and enhancing the overall quality of life in Clayton County.
⬚ figure
Image Caption: Clayton County 2034 Comprehensive Plan, Amended Source: Clayton County (2022)
MARTA's Clayton County High-Capacity Transit Transit-Supportive Land Use Study (2022)
MARTA's Transit Supportive Land Use Study was initiated to enhance transit support along Clayton County's high-capacity corridors. The study was guided by three primary goals:
Additionally, the study embraced an “unofficial goal” of fostering collaboration and cohesion along the transit corridors. By encouraging stakeholders to work together towards common objectives, the study sought to build a sense of community and shared purpose among residents, businesses, and government entities along the corridors.
Overall, the Transit Supportive Land Use Study aimed to enhance Clayton County's capacity to support higher-density development, create vibrant and diverse mixed-use environments, improve walkability, promote people-centric design principles, and effectively manage parking to ensure the success and sustainability of transit-oriented development initiatives.
⬚ figure
Image Caption: Graphic depicting the “Big “Five” goals of the Transit Supportive Land Use Study Source: Connect Clayton (2023)
⬚ figure
Image Caption: Aerotropolis Atlanta Blueprint 2.0 Source: Aerotropolis Atlanta (2024)
The original Aerotropolis Atlanta Blueprint, first published in 2016, underwent a significant update in 2022, reflecting new insights and priorities following the formalization of a workforce development component within the Aerotropolis Community Improvement Districts (CIDs), along with the development of a comprehensive implementation action plan. This update involved reassessing targeted economic sectors, identifying catalytic sites, and fostering consensus among key stakeholders, compiling a series of catalytic sites throughout the region that could be transformed into nodes or major gateways to the airport, supporting the plan’s unified vision.
The Atlanta Airport region’s transit priorities are centered on enhancing multimodal connectivity, promoting transit-oriented development, and improving user experience through strategic infrastructure upgrades within a ten-mile radius of the Hartsfield-Jackson Atlanta International Airport (H-JAIA). Key initiatives include improving walking and biking amenities, introducing on-demand micro-mobility options, developing the Aero Corporate Crescent for better east-west connectivity, and expanding the regional trail network. Coordination with stakeholders such as MARTA and the Atlanta Regional Commission is essential for funding and the implementation, of a more integrated and user-friendly transit system.
Throughout the Blueprint 2.0 update process, elected officials from the associated counties and cities within the region were actively engaged. Their input and perspectives were integral to ensuring that the final document accurately reflected the vision, goals, and values of their constituents. This collaborative approach underscores the commitment to inclusive decision-making and community involvement in shaping the future of the Aerotropolis Atlanta region.
Clayton County Highway 138 CID Feasibility Study (2022)
In 2022, Clayton County, in collaboration with the City of Stockbridge and Henry County undertook a study along State Route (SR) 138, which includes a portion traversing southeast Clayton County and intersecting with I-675. SR 138 serves as a significant roadway and is designated for several critical action items in cities within Clayton County, such as Riverdale and Jonesboro. The focus of the investigation was the CID boundary located on the Clayton-Henry County border near the city of Stockbridge. The study revealed that a majority of the parcels within Clayton County were CID exempt or non-eligible.
As of late 2022, the study is pending confirmation of the CID formation process. This indicates that further steps are required to formalize the establishment of the CID, likely involving coordination and approval from relevant authorities and stakeholders.
⬚ figure
Image Caption: Highway 138 CID Feasibility Study Map Source: Clayton County (2022)
In 2017, the Aerotropolis Atlanta Alliance and Aerotropolis Atlanta Community Improvement Districts (AACIDs) collaborated to develop the AeroATL Greenway Plan, building upon concepts introduced in the previous Aerotropolis Atlanta Alliance Blueprint. The AeroATL Greenway Plan aimed to implement several key recommendations, including the following:
⬚ figure
Image Caption: AeroATL Greenway Model Miles Source: Aerotropolis Atlanta Alliance (2021)
As part of this plan, a Model Mile was identified within Clayton County. This Model Mile encompasses a 1.2-mile multi-purpose trail along the Flint River, linking the Loop Road trail to Forest Parkway. Additionally, there is a 1-mile segment in Forest Park, extending from Starr Park-Fountain Elementary to Forest Parkway along Lake Drive and West Street. These segments serve as key components of the AeroATL Greenway, fostering connectivity and accessibility while promoting outdoor recreation and economic vitality in the region.
The Tara Boulevard Corridor Study was undertaken with the goals of reducing traffic congestion, enhancing operations, and improving connectivity at key locations along the corridor. A significant recommendation arising from the study was the implementation of a one-lane, bi-directional Elevated Priced Arterial Lane (EPAL) south of SR 54 at the on- and off-ramps of I-75. Additionally, it was proposed to expand Tara Boulevard from four lanes to six lanes between Tara Road and Lovejoy Road.
Furthermore, the study identified several intersections in need of operational and/or safety enhancements, resulting in the formulation of twelve recommended traffic operational improvement concepts along the corridor.
⬚ figure
Image Caption: Tara Boulevard Corridor Study Source: Georgia Department of Transportation (2021)
Clayton County Water Authority 2020 Strategic Master Plan (2020)
The Clayton County Water Authority (CCWA) plays a vital role in providing essential services such as water, wastewater, and stormwater management to residents across seven cities within the county. Renowned for its sustainable and innovative practices, CCWA has been at the forefront of infrastructure development since its strategic planning process commenced in 1960. Regular updates to its strategic plan ensures that priority projects are identified to meet the evolving needs of the community.
The 2020 master plan represents a comprehensive approach to addressing infrastructure needs, with a focus on various categories including Utility-wide initiatives, Information Technology, Stormwater Management, Water Production, Distribution and Conveyance, Water Reclamation, and General Services. Through a meticulous process, projects were identified, scored, and projected over a twenty-year timeline, emphasizing watershed protection and stormwater management as key priorities.
⬚ figure
Image Caption: Clayton County Water Authority 2020 Strategic Master Plan Source: Clayton County Water Authority (2020)
Freight Cluster Plan (2019)
The Aerotropolis Atlanta Community Improvement District (AACID) conducted a comprehensive fourteen-month study focusing on freight industry operations within the South Metro area. This study involved analyzing the movement of goods throughout the region and assessing both current and future conditions of freight transportation. Key findings indicated a projected seventy-six percent increase in freight movement across the Atlanta region from 2013 to 2040, with forty-five percent of jobs in the study area linked to freight-dependent industries.
The study provided the following recommendations:
⬚ figure
Image Caption: Freight Cluster Plan Technical Memorandum Source: Aerotropolis Atlanta CIDs (2019)
In 2019, Aerotropolis Atlanta initiated a multi-jurisdictional land use assessment with technical support from the Atlanta Regional Commission’s (ARC) Community Development Assistance Program (CDAP). This assessment was prompted by Action Items outlined in the previous Aerotropolis Atlanta Blueprint and focused on analyzing land use within critical transportation corridors and jurisdictional boundaries.
The assessment process involved categorizing challenges, opportunities, and recommendations across different study subareas. Many of these recommendations emphasized the need for enhancing walkability, improving traffic management, fostering collaboration among stakeholders, and achieving greater coordination and cohesion in large-scale zoning efforts.
⬚ figure
Image Caption: Aerotropolis Atlanta Land Use Analysis and Recommendations Source: Aerotropolis Atlanta (2019)
⬚ figure
Image Caption: AACID Transit Feasibility Study Summary and Recommendations Source: AACID (2019)
In 2019, the AACID embarked on a feasibility study guided by an aspirational vision: “Transit in the South Metro area should provide easy and efficient movement of people to live, work, play, and travel without relying on the automobile.” This vision underscored the importance of establishing a comprehensive transit system to enhance mobility and accessibility within the region. In support of this venture, the study outlined three major elements:
Immediate actions recommended in the feasibility study included the implementation of the Mobility District, high-quality bus stops and shelters, and increased collaboration between local and regional agencies to encourage the first- and last-mile upgrades.
Comprehensive Transportation Plan (CTP) (2018)
In 2018, the Clayton County Department of Transportation and Development undertook the task of updating its 2008 Comprehensive Transportation Plan (CTP). This initiative aimed to articulate a forward-looking vision for the county’s transportation network, ensuring it could effectively meet the evolving needs of residents both presently and in the future. The CTP update lists the following goals and objectives:
Careful consideration has been given to aligning this comprehensive plan update to the CTP goals, recommendations, and actionable steps.
⬚ figure
Image Caption: Clayton County Comprehensive Transportation Plan Source: Clayton County (2018)
The Clayton County Transit Initiative began in early 2015 with the intention of improving the following transit factors in the county: 1) local bus services, 2) bus stop amenities, 3) high-capacity transit, and 4) park-and-ride facilities, and maintenance facilities. Through public outreach, surveying, and technical data, the initiative developed multiple transit recommendations across seven high-priority corridors to provide greater access to jobs and education, improve regional connections and travel options, address growing demand for transit, and support land use and development. These recommendations spanned high-capacity transit network routes, a new operations and maintenance facility, and additional transit amenities and programming.
⬚ figure
Image Caption: Clayton County Transit Initiative Stakeholder Advisory Committee Webinar Source: MARTA Planning (2017)
The Huie Nature Preserve Foundation, overseen by the Clayton County Water Authority (CCWA), is an environmental conservation organization dedicated to managing a vast site spanning over 4,000 acres. This preserve plays a crucial role in supporting water and wastewater services in Clayton County while also serving as a valuable resource for environmental education and public engagement. Through the master plan, the Foundation aimed to enhance the Huie Nature Preserve’s role as a valuable community asset while furthering its mission of environmental conservation and education.
⬚ figure
Image Caption: Huie Nature Preserve Master Plan Source: Clayton County Water Authority (2017)
In 2014, the Clayton County Board of Commissioners approved the Mountain View Livable Centers Initiative study, focusing on the development of the roughly 712-acre area located just east of Hartsfield-Jackson International Airport. This initiative aimed to create a vibrant and sustainable community that enhances livability, economic vitality, and connectivity within the Mountain View area.
Subsequently, in 2017, the Urban Land Institute (ULI) conducted a Technical Assistance Panel to further refine the development vision for Mountain View and formulate a Comprehensive Development Strategy study. The study compiled the following recommendations:
By implementing these recommendations, the Mountain View area has the potential to become a thriving hub of activity, innovation, and economic opportunity, contributing to the overall prosperity and vitality of Clayton County and the surrounding region.
⬚ figure
Image Caption: Comprehensive Development Strategy to Implement the Atlanta Aerotropolis: Recommendations for the Mountain View Area Source: Urban Land Institute (2017)
The Aerotropolis Atlanta Blueprint 1.0 (2016)
The Aerotropolis Atlanta Blueprint serves as a vision strategy for the region which leverages the Hartsfield-Jackson Atlanta International Airport as a major factor and driver in economic investment, job growth, and overall quality of life in the immediate and surrounding areas. The Blueprint listed three goals:
⬚ figure
Image Caption: The Aerotropolis Atlanta Blueprint 1.0 Source: Aerotropolis Atlanta (2016)
Atlanta Regional Freight Mobility Plan Update (2016)
The 2008 Atlanta Regional Freight Mobility Plan aimed to better accommodate the increasing movement of freight, goods, and services in the Atlanta region through the identification and programming of key improvements. The plan envisioned these mobility enhancements to support both people and goods, and to mitigate congestion, safety concerns, and any negative impacts on the environment and quality of life.
The 2016 update to the 2008 Atlanta Regional Freight Mobility Plan sought to: assess the plan given any changes to current conditions and projected forecasts; update the plan according to recent policies changes at the federal, state, and local levels; support the development of a FAST Act compliant Regional Transportation Plan (RTP) with consideration of corresponding freight provisions; identify key projects at national, state, and regional levels; and define methods of project investment and responsive strategies.
⬚ figure
Image Caption: Atlanta Regional Freight Mobility Plan Update Final Report Source: Atlanta Regional Commission (2016)
Clayton County Strategic Economic Development Plan (2013)
In 2013, Georgia Tech’s Enterprise Innovation Institute completed the Clayton County Strategic Economic Development Plan with intentions of attracting more businesses which would bolster a healthy economy in the county. The plan delineated fifteen goals and eight strategies which would support the implementation of these goals. The plan also established six recommendations that would improve the overall economic development of the county:
The plan concluded with next steps which encouraged the establishment of incentivized development overlays, mixed-use development, increased coordination with the cities of Atlanta and Savannah, non-profit partnerships, and the creation of a task force between the Economic Development and Community Development departments.
⬚ figure
Image Caption: Clayton County Strategic Economic Development Plan Source: Clayton County (2016)
Clayton County Department of Parks and Recreation Master Plan (2008)
The Clayton County Department of Parks and Recreation (CCDPR) initiated the development of its Master Plan in 2008 to strategically guide future initiatives in line with the needs of residents. The Master Plan included a comprehensive assessment of trails, parks, and recreational services, which were prioritized based on their potential impact and associated costs. The plan aimed to enhance organizational effectiveness, ensure balanced service delivery, improve marketing and public participation, optimize guest services, and promote efficient planning processes.
A key aspect of the plan was fostering collaboration with the Clayton County Transportation and Development Department to synchronize efforts and enhance recreational and leisure services across the county.
⬚ figure
Image Caption: Clayton County Department of Parks and Recreation Master Plan Source: Clayton County Department of Parks and Recreation (2008)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
Assessment - The Takeoff
Timeline of studies within the last decade
2016: Atlanta Regional Freight Mobility Plan Update; Aerotropolis Atlanta Blueprint 1.0 2017: Comprehensive Development Strategy to Implement the Atlanta Aerotropolis: Recommendations for the Mountain View Area; Huie Nature Preserve Master Plan 2018: Clayton County Transit Initiative; Comprehensive Transportation Plan (CTP) 2019: AACID Transit Feasibility Study; Aerotropolis Atlanta Land Use Analysis and Recommendations; Freight Cluster Plan 2020: Clayton County Water Authority 2020 Strategic Master Plan 2021: Tara Boulevard Corridor Study; AeroATL Greenway Model Mile 2022: Clayton County 2034 Comprehensive Plan Update (2019) and Amended; Clayton County Highway 138 CID Feasibility Study; The Aerotropolis Atlanta Blueprint 2.0; MARTA’s Clayton County High-Capacity Transit Transit-Supportive Land Use Study 2023: Tara Boulevard Livable Center Initiative; Analysis of Impediments to Fair Housing Choice Study; State Route 54 Alignment Evaluation
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
2021
2022
2023
2024
Clayton County, with an estimated 2023 population of 299,806, has experienced a cumulative growth rate of 13.4% since 2010. The population of the Atlanta Metropolitan Statistical Area (MSA) has grown by 19.4% during the same period, reaching a total of just over 6.3 million. The median age in Clayton County is 33.9, slightly younger than the MSA median age of 37.0. In terms of households with children, Clayton County surpasses the MSA, with 42.1% compared to 38.2%.
⬚ figure
Figure 1. Demographic overview graphic Source: ESRI Business Analyst, Woods & Poole (2023)
Experiencing an annual growth rate of 1.0%, Clayton County has achieved a total population of approximately 299,806 in 2023. As mentioned earlier, the County boasts a median age of 33.9, with 52% of its residents being younger than 34. The County specifically attracts a higher proportion of young families, as evidenced by 42.1% of households having children, and the predominant age group being children under 14. In comparison to the MSA, the County exhibits lower percentages of residents aged 35 to 54, and a higher percentage of residents aged 65-84.
⬚ figure
Figure 2. Comparison of Age Cohorts, 2023 Source: ESRI Business Analyst (2023)
⬚ figure
Figure 3. Clayton County Population Projections
Source: 1970 to 1990 Data from 2034 Comprehensive Plan, 2000 to 2050 Data from Woods & Poole (2023)
Clayton County is characterized as a minority-majority community, with a racial distribution of 70% Black, 0.7% American Indian, 4.9% Asian/Pacific Islander, 9.7% White, 5.9% Two or More Races, and 9.1% Other Race. In comparison, the MSA exhibits a racial composition of 44% White, 34% Black, 1% American Indian, 7% Asian/ Pacific Islander, 8% Two or More Races, and 6% Other Race. Within the County, 14.8% of residents identify as Hispanic, a slightly higher percentage than the 12.6% observed at the MSA level. According to ESRI's diversity index, which gauges racial and ethnic diversity on a scale from 0 (no diversity) to 100 (complete diversity). A higher diversity index score signifies a more equitable representation of various racial groups within a particular community. Clayton County's Diversity Index stands at 61.8, while the MSA level is 74.6.
⬚ figure
Figure 4. Racial Make-up, 2023
Source: ESRI Business Analyst
⬚ figure
Figure 5. Comparison Of Diversity Index, 2023
Source: ESRI Business Analyst (2023)
Note: ESRI's diversity index measures the racial and ethnic diversity of an area on a scale ranging from: 0 (no diversity) to 100 (complete diversity). As more race groups are evenly represented in an area's population, the diversity index increases.
A total of 22.5% of Clayton residents aged 25 and above hold a college degree or higher, in contrast to the MSA, where 43.2% of the population has attained a similar advanced degree. Nearly half of Clayton County residents, accounting for 46.2%, hold a high school diploma or have educational attainment below that level.
⬚ figure
Figure 6. Comparison of Educational Attainment, 2023 Source: ESRI Business Analyst (2023)
Developed by ESRI, Tapestry Segmentation classifies households based on 67 distinct classifications that mirror national trends in housing preferences, spending habits, and participation in the labor force. Typically, smaller areas are more uniform, featuring fewer represented segments, while larger areas display a greater number of segments at varying percentages, showcasing a spectrum of diverse households.
Clayton County is characterized by five tapestry segments, with two (Urban Edge Families and Metro Fusion) surpassing 10% representation of the population. Urban Edge Families, the most prominent tapestry segment in the County, consists of younger married couples with children residing in more affordable homes situated farther from urban centers. This group is known for its tech-savvy nature and mindful spending habits. The second-largest segment, Metro Fusion, represents non-native English speakers in single-parent or single-person households. Members of this segment are diligent professionals focused on advancing their careers and social status.
Middleburg households, constituting 8.0% of households, are traditional family-oriented consumers located in semi-rural settings. This group, which is growing in size and assets, prefers purchasing products made in the United States. Whereas, Traditional Living households reside in low-density neighborhoods, primarily working in manufacturing, retail trade, and healthcare. They are budget-conscious and comfortable with online platforms.
Finally, the Young and Restless tapestry represents only 7.2% of households, featuring well-educated young workers either living alone or in shared non-family dwellings. This highly mobile market, just beginning their careers, tends to relocate frequently. They are avid internet users and discerning shoppers.
⬚ figure
Figure 7. Tapestry Segments Source: ESRI Business Analyst (2023)
The median household income in Clayton County is $53,398, which is lower than the Atlanta MSA’s $81,148. Within Clayton, 65% of households earn less than $75,000. The predominant income bracket in the County falls within the range of $50,000-74,999, encompassing 18.2% of households. Additionally, 34.1% of households make between $35,000 and $75,000.
In contrast, 54% of households in the Atlanta MSA earn more than $75,000. Additionally, Clayton County exhibits a slightly higher household size compared to the Atlanta MSA for both 2010 and 2023.
⬚ figure
Figure 8. Median Household Income, 2023 Source: ESRI Business Analyst (2023)
⬚ figure
Figure 9. Household Income, 2023 Source: ESRI Business Analyst (2023)
⬚ figure
Figure 10. Household Size Comparison Source: ESRI Business Analyst (2023)
The breakdown of housing units in Clayton closely mirrors that of the MSA, with single-family homes representing the largest segment, followed by multifamily units as the second largest. Both the County and the MSA exhibit a smaller proportion of townhomes and mobile homes/other housing types.
In Clayton, 49.3% of the housing inventory is owner-occupied, while 44.5% is renter-occupied, leaving 6.2% of the housing stock vacant. In contrast, the MSA has a higher share of owner-occupied units at 61.2% and a lower rate of renter-occupied units at 32.6%, with the same vacancy rate. The median home values in the MSA are significantly higher at $318,382 compared to Clayton County’s $189,383.
The majority of Clayton’s housing stock was constructed between 1970 and 2010, with peaks in the 1970s and early 2000s. Clayton County has a higher percentage of housing units built in the 1960s and 1970s compared to the MSA, contributing to a slightly older average median year built of 1987 within the County, versus the MSA average year built of 1992.
⬚ figure
Figure 11. Housing Units By Type, 2023 Source: ESRI Business Analyst
| 2023 | Clayton County | Atlanta MSA |
|---|---|---|
| Median Year Built | 1987 | 1992 |
| Median Home Value | $189,383 | $318,382 |
| Owner-Occupied | 49.3% | 61.2% |
| Renter-Occupied | 44.5% | 32.6% |
| Vacant | 6.2% | 6.2% |
Figure 12. Housing Summary Facts Source: ESRI Business Analyst (2023)
⬚ figure
Figure 13. Share Housing Units by Decade Source: ESRI Business Analyst (2023)
The following maps provide some insight into housing in Clayton County using census tract boundaries. Figure 14 displays the median year homes were built with darker colors representing older homes and lighter colors representing newer homes. Figure 15 displays the median home value with darker colors indicating higher-valued homes and lighter colors being lower-valued homes. Together the maps in Figures 14 and 15 illustrate housing trends across the County. Development has spread south over the years, with homes in the northern portion of the County and along US 41 and SR 54 generally older and lower-value. Homes in the southern portion are generally newer and higher-value. One exception is Lake Spivey Estates which are slightly older homes but the highest-value in the County
⬚ figure
Figure 14. Median Year Homes Built Source: ESRI Business Analyst (2023)
⬚ figure
Figure 15. Median Home Value Source: ESRI Business Analyst (2023)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Residential building permit activity dropped significantly after the 2007-2009 Great Recession. While single-family home permits have been the leading residential permit type in Clayton County, annual totals have not returned to pre-recession levels. The pre-recession (2004-2007) average annual total number of single-family permits was 1,902 homes, whereas the post-recession (2010-2022) total has only been 445. There have been a limited amount of residential developments post-recession, with the majority being single-family.
| Residential Building Permits | Single-Family | Multi-Family |
|---|---|---|
| Pre-2008 Avg Annual Total | 1,902 | 84 |
| Pre-2008 Share of Total | 88% | 12% |
| Post-2008 Avg Annual Total | 438 | 10 |
| Post-2008 Share of Total | 94% | 6% |
Figure 16. Clayton County Summary Facts Source: U.S. Census Bureau (2023)
⬚ figure
Figure 17. Residential Building Permit Trends, 2004 – 2022 Source: U.S. Census Bureau (2022)
66 | Assessment - The Takeoff
The Atlanta Regional Commission developed the Metro Atlanta Housing Strategy that provides housing market data and information, as well as potential implementation strategies, for cities and counties throughout the ARC Eleven County Region. Clayton County consists of 5 submarkets with almost half being suburban neighborhoods with lower-to-moderate priced housing. From 2013 to 2020, there has been a 55% increase in median home sale price and a 12% growth in home’s price per square foot. As of 2020, the median home sale price is $139,000 and the median building area is 1,222 sq ft.
| COUNTY SNAPSHOT | |
|---|---|
| Median Home Sale Price (2020) | $139,900 |
| Change in Median Home Sale Price (2013-20) | +155% |
| Home Sale Price Per Sq Ft (2020) | $112.00 sq ft |
| Percent Change in Home Sale Price Per Sq Ft (2013-20) | +112% |
| Median Building Area of Home Sales (2020) | 1,222 sq ft |
Data source: ARC analysis of Zillow’s ZTRAX home sale transactions, 2013 & 2020. Explore this data
49% SUBMARKET 7 Suburban neighborhoods with lower-to-moderate-priced housing, biggest increase in renters Learn more
19% SUBMARKET 9 Lower-priced rural areas Learn more
17% SUBMARKET 8 Suburban neighborhoods with lowest-priced single-family homes, mix of renters and owners Learn more
6% SUBMARKET 4 Lower-priced core neighborhoods vulnerable to increasing housing costs Learn more
4% SUBMARKET 6 Suburban neighborhoods with moderate-to-higher-priced housing Learn more
5% NOT COVERED BY SUBMARKET
⬚ figure
Figure 18. MAHS Clayton County Map Source: County Snapshot and Subarea Map, Atlanta Regional Commission (2023)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Evaluating the economic statistics for the County, the largest industry sector is Transportation and Utilities, while Health Care and Social Assistance is the largest industry sector for the Atlanta MSA. The County has a lower white collar occupation percentage than the MSA at 48.1%, and a higher unemployment rate at 4.8.
⬚ figure
Figure 19. Economic overview graphic Source: Georgia Department of Labor Statistics, ESRI Business Analyst, Woods & Poole (2023)
On average, Clayton County has averaged 220 new jobs annually. Job losses seen during the Great Recession and onset of the COVID-19 pandemic were consistent with national trends with job growth entering negative values.
⬚ figure
Figure 20. Annualized Job Growth Clayton County, 2001-2022 Source: Georgia Department of Labor Statistics (2022)
Clayton County’s top industry is Transportation and Utilities, making up 42% of its jobs. Mirroring the MSA, Clayton also has a high share of retail trade, accommodation and food services, and health care and social assistance jobs. In the figures on the following page, the red boxes are highlighting the overlapping top industries in both Clayton County and the MSA. The Atlanta Regional Commission is projecting that by 2030, there will be an influx of 37% jobs available in Clayton County. By 2050, employment opportunities will have grown by 50%.
| Atlanta MSA Top Three Industries | Counts |
|---|---|
| Health Care and Social Assistance | 322,774 (12%) |
| Retail Trade | 294,951 (11%) |
| Accommodation and Food Services | 248,261 (9%) |
| Clayton County Top Three Industries | 2022 |
|---|---|
| Transportation & Utilities | 47,043 (42%) |
| Retail Trade | 12,191 (11%) |
| Accommodation and Food Services | 9,731 (9%) |
Figure 21. Atlanta MSA and Clayton County Top Three Industries, 2022 Source: Georgia Department of Labor (2022)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Atlanta MSA Jobs Per Industry*
⬚ figure
Figure 22. Atlanta MSA Industry Classification, 2022 Source: Georgia Department of Labor (2022)
Figure 23. Clayton County Business License Classification, 2022 Source: Clayton County (2024)
*Note: The Atlanta MSA data depicts Jobs per Industry, while the Clayton County data shows Business Licenses per Industry. Although they provide similar data, they are not a one-to-one comparison.
Clayton County Business Licenses Per Industry*
⬚ figure
⬚ figure
Figure 24. Clayton County Employment Projections Source: Atlanta Regional Commission and Woods and Poole (2023)
⬚ figure
Figure 25. Comparison of Jobs by Industry, 2022 Source: GA Department of Labor, Business Analyst *GA Department of Labor did not report of Mining, Utilities, and Educational Services for Clayton County **Educational Services number was pulled from ESRI’s Business Analyst
The job density maps illustrate the distribution of employment within the County across its five primary industry sectors. A significant portion of employment opportunities in the County is centered around the airport, a pattern shown in the transportation and warehousing maps. In contrast, Retail Trade is found along key corridors or in nodes throughout the County. Accommodation and Food Services exhibit a concentration around the airport and along the I-75 highway. Clusters in Administrative and Waste Services are found around key office and industrial centers, like the airport and the City Morrow. Additionally, Health Care Employment is predominantly focused around the Southern Regional Medical Center.
All Jobs - 123,628
⬚ figure
Transportation & Warehousing – 48,939
⬚ figure
Retail Trade – 11,910
⬚ figure
Accommodation & Food Services – 8,608
⬚ figure
Administrative and Waste Services – 9,393
⬚ figure
Health Care and Social Assistance – 7,943
⬚ figure
Figure 26. Job Density Maps Source: LEHD On The Map (2023)
Overall, more people commute into Clayton County for work than commute out. Almost 100,000 employees commute daily into the County, 24,000 both live and work in the County, and almost 84,000 commute out of the County for work. There are approximately 38,000 that commute into airport area, indicating that the airport brings in a large amount of employment activity for the County.
⬚ figure
Figure 27. Inflow Outflow Workers to Clayton County
Source: LEHD On The Map (2023)
⬚ figure
Figure 28. Inflow Outflow Workers to Airport
Source: LEHD On The Map (2023)
Of those 38,000 employees in the airport area, roughly 3,500 live in Clayton County. This would appear to indicate that many of the jobs in the airport area are held by people living outside the County.
| 2020 Count | Share | |
|---|---|---|
| Fulton County | 7,438 | 19.5% |
| Clayton County | 3,651 | 9.6% |
| DeKalb County | 3,289 | 8.6% |
| All Other Locations | 23,842 | 62.3% |
Figure 29. Job Counts by Counties Where Workers Live Source: LEHD on the Map (2023)
⬚ figure
⬚ figure
Image Caption: View of City of Morrow Municipal Complex signage (2023)
Roadways are divided into categories based on the mobility and accessibility the roadway provides. The categories are:
Within Clayton County, the road network has a greater variety in the northern portion of the County including Interstate 75, Interstate 285, Interstate 675, State Route GA-85, Old Dixie Highway/U.S. Highway 19, and Jonesboro Road . The southern portion has no direct access to the Interstates and fewer arterial roads.
⬚ figure
Figure 30. Roadway Functional Classification Source: GDOT, ESRI, FHWA (2022)
Annual Average Daily Traffic (AADT) gives a count for the total volume of vehicle traffic in both directions for the year divided by the number of days in a year. This data is provided by Georgia Department of Transportation in their road inventory data.
The map displays the roadway volumes throughout the County and shows that I-285 has the largest volume with 178,000 vehicles, followed by I-75 and I-675. Outside of highways, some of the highest road volumes can be seen on State Route 85, Tara Boulevard (US-41), and Jonesboro Road.
⬚ figure
Figure 31. Roadway Volumes Source: GDOT (2022)
All Crash Data
The map shown is a heat map for crashes throughout the County from 2018 to 2022 with red areas indicating a higher amount of crashes. The top intersection for all crashes was Old Dixie Highway and Tara Boulevard/West Lees Mill Road. Old Dixie Highway at Tara Boulevard and at Wilson Road were the intersections with highest fatality crashes. These intersections are located in the northwest region of the County.
Top five intersections:
For Crashes
For Fatalities
⬚ figure
Figure 32. All Crash Data Source: AASHTOWare (2022)
Top five intersections for pedestrian crash data:
For Crashes
For Fatalities
⬚ figure
Figure 33. Bike and Pedestrian Crash Data Source: AASHTOWare (2022)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
MARTA and Xpress provide transit service throughout Clayton County as shown in the map. MARTA runs a total of 16 local routes, while Xpress has seven commuter routes. The network of transit routes in the northern half of the County provides a more extensive coverage than in the southern half of the County.
MARTA Bus Routes within Clayton County (16):
Xpress Bus (7)
⬚ figure
Figure 34. Existing Transit Routes Source: ARC, ESRI (2022)
Top 10 stops by average daily ridership (Dec 2022 - Apr 2023):
Bus Rapid Transit (BRT) is a fast, efficient, and frequent service operating in mixed traffic and dedicated lanes. MARTA identified two future BRT routes within Clayton County, including the State Route 54 Bus Rapid Transit (BRT) and the Southlake BRT lines. Both BRT lines are currently in the design phase with the Southlake line scheduled to begin service in 2026 and the State Route 54 line scheduled to begin service in 2030.
Southlake BRT Overview:
SR 54 BRT Overview:
⬚ figure
Figure 35. Proposed Bus Rapid Transit Routes Source: Connect Clayton (2022)
The proposed trails map includes trails inventoried by the Atlanta Regional Commission (ARC) and are collected from local trail and bicycle and pedestrian plans, including Clayton County’s Greenway Trail Master Plan: Clayton Connects and AeroATL Greenway Plan. Several multi-use paths have been implemented around the County, and the majority are near parks or the H-JAIA. The proposed plan connects major employment centers, neighborhoods, and parks throughout the County creating a multi-modal transportation system/recreational system. As part of the cumulative $69 million in federal grant funding received from the U.S. Department of Transportation, the County is participating in the study and development of 31-mile trail system throughout the South Atlanta Metro region, linking the Atlanta BeltLine to Lovejoy in Clayton County.
Several multi-use paths have already been implemented around the county, mostly near parks or Hartsfield-Jackson Atlanta International Airport (H-JAIA). The proposed plan aims to connect major employment centers, neighborhoods, and parks throughout the county, creating a multi-modal transportation and recreational system. As part of constructing the Flint River Trail and its connection to the BeltLine, this strategy aims to implement the AeroATL Greenway Plan and other trail initiatives. This will create a cohesive, healthy, and economically stimulating trail network that enhances regional connectivity and supports active transportation.
In Clayton County, transportation planning and funding is primarily facilitated through two mechanisms: the Comprehensive Transportation Plan (CTP) and the Special Purpose Local Option Sales Tax (SPLOST). The CTP serves as a strategic roadmap for the county’s transportation infrastructure development, outlining long-term goals and objectives to address current and future transportation needs. Through extensive community input and collaboration with stakeholders, the CTP identifies key projects such as road expansions, intersection improvements, and public transit enhancements. The CTP identified $121.8 million of transportation spending in the 5-year action plan (2021-2025) and projected transportation revenue at $123.88 million, of which $113.33 million is from SPLOST revenues and $10.55 million is from Local Maintenance and Improvement Grant (LMIG).
Meanwhile, the SPLOST is a crucial funding mechanism that allows Clayton County to finance these transportation initiatives through a dedicated sales tax. This revenue stream ensures that infrastructure projects outlined in the CTP can be adequately funded and implemented, benefiting residents by improving mobility, reducing congestion, and enhancing overall transportation efficiency within the County. Together, the CTP and SPLOST play integral roles in shaping Clayton County’s transportation landscape, ensuring sustained development and accessibility for its residents.
The County could explore additional sources of revenue, such as grants awarded under SS4A, grants from the Georgia Governor’s Office of Highway Safety (GOHS), and grants provided through the GDOT Highway Safety Improvement Program (HSIP).
⬚ figure
Figure 36. Proposed Trails Source: GDOT (2022)
Broadband, or high-speed internet access, allows users to access information via digital transmission at typically faster speeds than traditional dial-up internet access connections. The types of broadband platforms include: Digital Subscriber Line (DSL), Cable Modem, Fiber, Wireless, and Satellite. While broadband can serve as a tool for education, economic development, and equity, it is not universally accessible. Clayton County envisions a region which promotes digital equity and affordable connectivity for all its households and, in consideration of this, broadband availability has been assessed throughout the county. The corresponding Broadband Coverage map depicts locations within the study area which have access to consumer-level, fixed, terrestrial broadband. The Federal Communications Commission’s (FCC) current benchmarks for broadband service are downstream speeds of 25 Megabits per second (Mbps) and upstream speeds of 3 Megabits (subsequently written as 25/3). Census blocks where more than 80% of its locations meet these speed criteria are considered “Served.” Those census blocks which do not meet the aforementioned criteria are designated “Unserved.” Census blocks with no listed broadband coverage are labeled as “No Locations.”
As of June 2023, data according to the FCC states that 99.54% of units are covered with residential broadband speeds of 25/3, roughly 124,000 units total. The top providers are Hughes Network Systems LLC (HughesNet), Space Exploration Technologies Corp (Earthlink), Viasat, Inc, Comcast Corporation (Xfinity), and AT&T Inc.
According to BestNeighborhood, the average number of internet service providers (ISP) available to a home is 5.7; the average number of service types available (fiber, DSL, etc.) is 3.6, and on average ISPs have broadband speeds greater than 25/3. Overall, broadband access in Clayton County is competitive from a service perspective, above adequate in speed, and relatively more accessible than most areas. BestNeighborhood notes that internet speeds tend to be faster in eastern parts of the county than in western areas.
In 2021, the FCC established the Affordable Connectivity Program (ACP) through the Emergency Broadband Benefit Program once the Infrastructure Investment and Jobs act became law. The ACP allowed eligible households to apply for benefits such as discounted access to broadband and one-time discounts to purchase internet-accessible devices (laptops, computers, or tablets). Approximately 37,000 Clayton County residents were eligible for Federal Affordable Connectivity Program; however, only sixty-seven residents enrolled since October 2022. The ACP stopped accepting new applications in February of 2024 due to a lack of funding at the federal level.
The Clayton County Office of Digital Equity recognized the persistent dissatisfaction among residents regarding broadband connectivity issues and high internet fees. In response, the Office initiated the development of a comprehensive Digital Equity Strategic Plan and Broadband Feasibility Study in 2022. This strategic initiative aimed to systematically address the county’s connectivity challenges and to explore viable solutions for improving broadband access and affordability. The Office also took measures to qualify for federal Broadband Equity, Access, and Deployment (BEAD) grant funding.
In 2018, Georgia launched its state Broadband Program in coordination with the DCA, the Georgia Technology Authority, the Department of Economic Development, the State Properties Commission, and the Georgia Department of Transportation (GDOT). A major component of this program is the Georgia Broadband Deployment Initiative (GDBI), which facilitates the promotion and deployment of broadband services throughout the state. The GDBI accomplishes this by providing for the expansion of broadband infrastructure and services through state and local planning policies. The program designates “Broadband Ready,” or “expansion ready,” communities as those which prioritize the need for infrastructure expansion and high-speed internet as a critical need.
⬚ figure
Figure 37. Broadband Service (2024)
In coordination with the DCA, the Georgia Department of Economic Development attributes the “Broadband Ready” status to those facilities and developments which offer broadband services at a rate of not less than 1 gigabit per second (or 1000 Mbps) in the downstream to end users that can be accessed for business, education, health care, government, and other public purposes, and in accordance with the eligibility requirements listed in O.C.G.A § 50-40-81. Any political subdivision in Georgia pursuing improved broadband infrastructure and services is eligible to apply; the certification process requires a Comprehensive Plan which promotes the deployment of broadband services and a Broadband Ordinance Model.
⬚ figure
Image Caption: “Separate Fountains” mural in City of Jonesboro Source: Atlanta Regional Commission
⬚ figure
Image Caption: View of Clayton County Courthouse in Jonesboro Source: Thomson200 (2015)
2.7 REGIONAL WATER PLAN AND ENVIRONMENTAL PLANNING CRITERIA
Clayton County is geographically split between the Upper Ocmulgee and the Upper Flint River Basins. The eastern portion of Clayton County, between Forest Park and Lovejoy, is located in the Upper Ocmulgee River sub-basin of the Altamaha River basin. The western portion of the county is located in the Upper Flint River sub-basin of the ACF River Basin (Apalachicola-Chattahoochee-Flint River Basin).
Flooding is a significant concern within the county. According to data gathered by climate risk modeling agency RiskFactor, roughly 10%, or over 6,000 properties in Clayton County have greater than a 26% chance of being severely impacted by flooding over the next thirty years. Community concerns have been raised about flooding due to H-JAIA’s fifth runway expansion and along the Flint River, especially near the Southern Regional Medical Center, making it difficult to access a regionally significant hospital. In March 2023, $2.6 million in federal funds were allocated to support flood mitigation infrastructure in northern Clayton County, near the Camp Creek Watershed. Households in Clayton County are also eligible to apply for assistance through the Federal Emergency Management Agency (FEMA).
Flint River runs through Clayton County, and the river has been significantly impacted by adjacent developments, especially those originating from H-JAIA. There are multiple opportunities to mitigate flooding from the Flint River, including but not limited to: dredging the river, exploring acquisition of Vulcan Quarry, raising the Upper Riverdale Road bridge, and potentially buying out houses and properties in floodplains to create greenspace and manage flooding downstream.
As depicted on the Georgia Water Planning Regional Water Plan’s River Basins and Water Planning Regions map, Clayton County is located within three Small Water Supply Watersheds and two Large Water Supply Watersheds. According to the Environmental Protection Agency (EPA), a Large Water Supply Watershed is that which has “100 square miles or more of land within the drainage basin upstream of a governmentally owned public drinking water supply intake” and a Small Water Supply Watershed consists of an area less than 100 square miles.
The small drinking water supply watersheds and respective reservoirs are as follows:
The Shoal Creek Watershed in southern Clayton County, location of the 240-acre J.W. Smith Reservoir and 387-acre Shoal Creek Reservoir.
Pates Creek Watershed, location of the 8-acre Shamrock Reservoir and 263-acre Edgar Blalock Jr. Reservoir.
Little Cotton Indian Creek Watershed, location of the William J. Hooper Reservoir.
The two large drinking supply watersheds are the Flint River and Big Cotton Indian Creek Watersheds. The small watersheds are the primary sources of water production, while the Flint River Watershed is used to supplement. These watersheds are managed by the Clayton County Water Authority (CCWA), an industry-leading water reclamation, production, and management facility. As Clayton County and its municipalities do not rely on Lake Lanier or the Chattahoochee River for its water supply, the five raw water reservoirs “surface” water systems collect rainfall in the county and have a potable water production capacity of 42 million gallons per day for county residents and businesses. The CCWA also operates three award-winning production facilities: the W.J. Hooper Water Production Facility, the Terry R. Hicks Water Production Facility, and the J.W. Smith Water Production Facility.
The CCWA additionally boasts an efficient water reclamation system to aid in managing the county’s limited water resources, wherein up to 38.4 million gallons of wastewater can be treated per day through its three reclamation facilities: Northeast Water Reclamation Facility, Shoal Creek Water Reclamation Facility, W.B. Casey Water Resource Recovery Facility.
Legend
| ☐ | Water Council |
Major River Basins
| ■ | Altamaha |
| ■ | Chattahoochee |
| ■ | Coosa |
| ■ | Flint |
| ■ | Ochlockonee |
| ■ | Ocmulgee |
| ■ | Oconee |
| ■ | Ogeechee |
| ■ | Satilla |
| ■ | Savannah |
| ■ | St. Marys |
| ■ | Suwannee |
| ■ | Tallapoosa |
| ■ | Tennessee |
⬚ figure
Image Caption: River Basins and Water Planning Regions of Georgia with Clayton County overlay Source: Georgia Water Planning Upper Flint Regional Water Plan (2023)
It should be noted that levels of PFOS (Perfluorooctane Sulfonate) have been observed in the drinking water. PFOS is a synthetic chemical and global pollutant that is commonly used to make products water, soil, grease and stain resistant. In recent years, levels of PFOS has been found in many water sources through out the world and at certain levels may have negative health impacts. This is a nation-wide issue and CCWA is exploring ways to upgrade their filtration systems to lower levels.
The CCWA also manages stormwater in the county and has in recent years prioritized the maintenance and revitalization of the 500 miles of stormwater infrastructure in the county. Stormwater activities managed by the CCWA include Construction Plan Reviews and Inspections, Floodplain Management, Illicit Discharge/Illegal Connection Inspections, and maintenance of stormwater infrastructure within the road right-of-way and directly connected to the right-of-way. Because of this, all property owners and developed properties are billed a monthly fee (an amount of $3.75 for residential properties) in order to maintain a dedicated fund for these critical stormwater management services. The CCWA does offer discounts and financial assistance such as the “Veteran Discount Program.” The Stormwater Utility operating budget is roughly $9.4 million as of 2017.
According to the 2017 Huie Nature Preserve Master Plan, the CCWA has an approximate operating budget of $84 million, with an additional utilization of over $546 million in public assets for the provision of its services to customers. The CCWA has positioned itself to be self-sustaining without any reliance on tax dollars.
In 1978, the CCWA purchased the Huie Nature Preserve, located in the City of Morrow. The Huie Nature Preserve comprises over 4,000 acres of land and over 625 acres have now been transformed into an educational, science-based water area for the community. As part of the CCWA’s 2000 Water Resources Initiative Master Plan, the E.L. Huie Jr. Constructed Treatment Wetlands was one of twenty-eight completed capital improvement projects, allowing the CCWA to reclaim up to 20 million gallons of used water per day. The more efficient constructed wetlands replaced now the non-operational sprayfield irrigation system, the land from which has been left available for recreational purposes.
The CCWA also manages the Newman Wetlands Center, a nature preserve and educational facility located in Hampton, GA. Since opening in 1995, the center has been dedicated to environmental education and wetland conservation, and serves an important cultural amenity to its community.
⬚ figure
Image Caption: View of Clayton County Water Authority facilities (2024)
⬚ figure
Image Caption: View of Clayton County Water Authority facilities (2024)
The Land Use Element is a key component of the Comprehensive Plan. Land uses define and guide the character of the county and land use patterns have significant impacts on our communities. They affect transportation, natural resources, property values, compatibility of adjacent properties, and future growth. Clayton County’s existing land uses, existing Future Land Use Map (FLUM), rezonings over the past five years, and development patterns were assessed to identify conflicts and inconsistencies. An updated FLUM and a new Character Area Map were developed based on this assessment. These two maps are intended to guide future development and growth in the county. They provide a decision making tool for rezonings and zoning amendments through the identification of preferred land use by parcel throughout the county.
The primary land use in the county is residential, currently making up over 47% of the total land acreage. The majority of residential is low-density at approximately 43%. High-density makes up roughly 5% of total land. Compared to the 2005 Existing Land Use Distribution Table from the 2005 Clayton County Comprehensive Plan, these numbers have increased as infill residential and multi-family units have expanded over the past twenty years. Industrial land uses (comprising 2024 land uses Heavy Industrial, Light Industrial, and Mixed-use Commercial Industrial) have also increased from 5.2% to roughly 13% since 2005. Commercial and Office uses have remained relatively the same over the past 20 years at approximately 5.4%. Notably, there was no mixed-use category in the 2005 land use designations.
| Existing Land Use - Unincorporated Clayton County | ||
|---|---|---|
| Land Use | Acres | % |
| Low-density Residential | 6,550 | 8.5% |
| Medium-density Residential | 29,945 | 39.0% |
| Multi-family Residential | 2,641 | 3.4% |
| Manufactured Housing Residential | 725 | 0.9% |
| Commercial & Office Professional | 4,147 | 5.4% |
| Industrial | 3,994 | 5.2% |
| Public/Institutional | 1,566 | 2.0% |
| Transportation/Communications/Utilities | 6,032 | 7.9% |
| Parks/Recreation/Conservation | 904 | 1.2% |
| Wetlands | 3,386 | 4.4% |
| Agriculture | 2,253 | 2.9% |
| Forestry | 12,015 | 15.7% |
| Vacant/Undeveloped | 895 | 1.2% |
| Lakes/Reservoirs | 1,677 | 2.2% |
| TOTAL Unincorporated Clayton County | 76,729 | 100.0% |
| Existing Land Use (2024) | Sum of Acreage | Acreage % |
|---|---|---|
| Agriculture | 13,118 | 19.78% |
| Conservation Residential | 3,170 | 4.78% |
| General Commercial | 2,373 | 3.58% |
| Heavy Industrial | 7,686 | 11.59% |
| High Density Residential | 3,430 | 5.17% |
| Light Industrial | 700 | 1.06% |
| Low Density Residential | 26,510 | 39.98% |
| Medium Density Residential | 1,979 | 2.98% |
| Mixed Use | 2,120 | 3.20% |
| Mixed Use Commercial-Industrial | 303 | 0.46% |
| Office/Business | 1,187 | 1.79% |
| Parks/Recreation/Conservation | 194 | 0.29% |
| Planned Unit Development | 3,545 | 5.35% |
| Grand Total | 66,313 | 100.00% |
Figure 38. 2005 Existing Land Use distribution (above) Figure 39. 2024 Existing Land Use distribution (below) Source: Clayton County 2005 Comprehensive Plan (2005); Clayton County (2024)
⬚ figure
Figure 40. Existing Land Use Map (2024)
The Future Land Use Map (FLUM) identifies land uses that are anticipated to occur in the county over a ten-to twenty-year period and align with the county’s vision for the future. The map is intended to support and guide long-term planning decisions for the county, including rezonings and zoning amendments. The following is an assessment of the 2019 FLUM, which includes fifteen distinct land uses. Below are the described land uses.
The current Future Land Use Map (FLUM) forecasts land uses expected to emerge in the county within a span of ten to twenty years, in alignment with the city’s envisioned future. It serves as a tool to facilitate and direct long-term planning decisions for the county, encompassing rezonings and zoning amendments. The map delineates these land uses and is accompanied by an evaluation of associated needs and opportunities.
| Current Future Land Use | Sum of Acreage | Acreage % |
|---|---|---|
| Agriculture | 8,333 | 12.44% |
| Conservation Residential | 8,770 | 13.09% |
| General Commercial | 2,598 | 3.88% |
| Heavy Industrial | 2,267 | 3.38% |
| High Density Residential | 2,464 | 3.68% |
| Light Industrial | 29 | 0.04% |
| Low Density Residential | 12,204 | 18.22% |
| Medium Density Residential | 13,819 | 20.63% |
| Mixed Use | 5,285 | 7.89% |
| Mixed Use Commercial-Industrial | 6,239 | 9.31% |
| Neighborhood Commercial | 147 | 0.22% |
| Office / Business | 32 | 0.05% |
| Parks/Recreation/Conservation | 1,861 | 2.78% |
| Public/Institutional | 259 | 0.39% |
| Transportation/Utilities | 2,681 | 4.00% |
| Grand Total | 66,988 | 100.00% |
⬚ figure
Figure 41. 2034 Future Land Use Distribution (2024) Source: Clayton County
⬚ figure
Figure 42. 2034 Future Land Use Map (2024)
Future Land Use (FLU) Categories
⬚ figure
Image Caption: View of UGArden Student Community Farm Source: University of Georgia (2020)
Agriculture: A low-density land use primarily including agricultural uses, forestry and estate residential areas.
⬚ figure
Image Caption: View of a single-family home in Riverdale, Georgia Source: Google Street View (2023)
Conservation Residential: The lowest density of residential uses, intended for single-family housing without use of public utilities. Densities are lower than two dwelling units per acre (du/ac).
⬚ figure
Image Caption: View of Southlake Mall in Morrow, Georgia (2023)
General Commercial: Intended for land dedicated to non-industrial business uses including retail sales, service, and entertainment facilities. General commercial is the most intense, allowing facilities that may target larger businesses.
⬚ figure
Image Caption: View of industrial plant Source: Mica Asato (2018)
Heavy Industrial: This category is for land dedicated to manufacturing facilities, processing plants, factories, warehousing and wholesale trade facilities, mining or mineral extraction activities, or other similar uses. These uses are often loud, disruptive, or whose effects may be felt by nearby uses. Flex-offices may be located in the Industrial Park District (INDP).
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
⬚ figure
Image Caption: View of a multi-family development in Clayton County Source: Summit Contracting Group (2023)
High-density Residential: The highest single-use residential density in unincorporated Clayton County, with densities from 8 to 18 du/ac.
⬚ figure
Image Caption: View of a gas station Source: Mehluli Hikwa (2019)
Light Industrial: This category is for land dedicated to assembly, warehousing, wholesale trade facilities, and other industrial uses which could coexist with some business uses.
Assessment - The Takeoff
⬚ figure
Image Caption: View of a single-family home in Georgia (2023)
Low-density Residential: Low-density residential developments which may or may not use public utilities. Densities range from 2 to 4 du/ac.
⬚ figure
Image Caption: View of a multi-family homes in Georgia (2023)
Medium-density Residential: Moderate-density residential housing, including some duplex housing with densities ranging from 4 to 8 du/ac.
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
⬚ figure
Image Caption: View of Avalon mixed-use development in Alpharetta, Georgia Source: KnowAtlanta (2021)
Mixed-use: Allows a mixture of retail, residential, and office uses in a town center style. Uses may include residentially compatible retail uses such as grocery stores, drugstores, banks on ground floors or fronting on commercial streets. There may also be a residential component including lofts, condominiums, apartments, town homes, and smaller single-family houses located above commercial uses or in other portions of the development. Residential densities of 4 to 16 dwelling units per acre are appropriate. Higher densities may be allowable if the mix of uses results in a town center style development which can be expected to cut down the number of car trips that would otherwise be generated. A key method for reducing car trips would be balancing the likely jobs with supplied appropriately priced housing. Mixed-use development must be designed to encourage walking and bicycling as well as be designed to be transit-ready. Densities should be approximately 72 du/ac.
Mixed-use Commercial Industrial: Allows a mixture of office, commercial, and light industrial uses as well as possible recreational uses. Industrial uses should be oriented towards producing value rather than extracting it, and industrial uses that undermine office uses such adult-oriented businesses, landfills, etc. should look elsewhere. Mixed-use Commercial-Industrial development must be designed to encourage walking and bicycling between uses as well as be designed to be transit-ready. Open space and green space areas, should be networked to create corridors of recreational areas, further layering the allowed uses.
104 Assessment - The Takeoff
⬚ figure
Image Caption: View of Halycon development in Forsyth County
Source: Josh Green (2021)
Transit-Oriented Development (TOD): Includes land uses of moderate to high-density near transit stations or a range of mobility options. TOD areas should encourage a mix of uses, walkability, appropriate redevelopment of vacant and/or underutilized properties. Uses may include medical offices and services, offices and businesses uses, mixed-use multi-family residential and retail, and adequate greenspace. Densities should be at minimum 15du/ac with no recommended maximum.
⬚ figure
Image Caption: View of a small commercial node in Riverdale, Georgia
Source: Google Street View (2023)
Neighborhood Commercial: Areas designed to serve the daily needs of adjacent neighborhoods with smaller-scale retail and service uses. These areas are intended to cater to smaller markets within a quarter- to half-mile radius and must be at least one mile apart from each other. Drive-thru uses and fast food restaurants are prohibited. Pedestrian and bike access, as well as sit-down restaurants with outdoor seating, are encouraged.
⬚ figure
Image Caption: View of Victory Landing Logistics Center in Clayton County (2023)
Office/Business: Land use dedicated to office, banking, or other personal business services and not focused on retail uses.
⬚ figure
Image Caption: View of Newman Wetlands Center in Clayton County (2023)
Parks and Recreation Conservation: This category is intended for land dedicated to active or passive recreational uses. These areas may be either publicly or privately owned and may include playgrounds, public parks, nature preserves, wildlife management areas, natural forests, golf courses, recreation centers, or similar uses.
⬚ figure
Image Caption: View of a planned unit development Source: Daniel R. Mandelker (2007)
Planned Unit Development: This category provides flexibility in the regulation of land development and encourages innovation in land use in terms of variety, design, layout, and structure type. These areas encourage a combination of single-family detached/attached housing and a mixture of compatible residential and commercial uses. The mixture of uses is intended for a sixty (60) to forty (40) ratio. It allows the preservation and protection of natural features, pedestrian trails and open space, promotes the efficient provision of public services and utilities, and minimizes adverse traffic and environmental impacts.
⬚ figure
Image Caption: View of Southern Regional Medical Center (2023)
Public/Institutional: This category includes certain state, federal or local government uses, and institutional land uses. Government uses include government building complexes, police and fire stations, libraries, prisons, post offices, schools, military installations, etc. Examples of institutional land uses include colleges, churches, cemeteries, hospitals, etc.
⬚ figure
Image Caption: View of a sewerage treatment plant Source: Patrick Federi (2021)
Transportation/Utilities: This category includes such uses as major transportation routes, public transit stations, power generation plants, railroad facilities, radio towers, telephone switching stations, airports, port facilities or other similar uses.
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
| Future Land Use Designation | AG | ER | CS | RS-180 | RS-110 | RG-75 | RMH | RMTSF | RM | RTH | PUD | UV | MXR | NMX | MX | MMX | MCD | MC | MXI |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Agriculture | |||||||||||||||||||
| Conservation Residential | |||||||||||||||||||
| General Commercial | |||||||||||||||||||
| Heavy Industrial | |||||||||||||||||||
| Light Industrial | |||||||||||||||||||
| Low-Density Residential | |||||||||||||||||||
| Medium-Density Residential | |||||||||||||||||||
| High-Density Residential | |||||||||||||||||||
| Mixed-Use | |||||||||||||||||||
| Mixed-Use Commercial-Industrial | |||||||||||||||||||
| Transit-Oriented Development | |||||||||||||||||||
| Neighborhood Commercial | |||||||||||||||||||
| Office/Business | |||||||||||||||||||
| Parks/Recreation/Conservation | |||||||||||||||||||
| Planned Unit Development (PUD) | |||||||||||||||||||
| Mixed-use PUD | |||||||||||||||||||
| Public/Institutional | |||||||||||||||||||
| Transportation/Utilities |
AG — Agriculture ER — Estate Residential District CS — Conservation Subdivision District RS-180 — Residential District 180 RS-110 — Residential District 110 RG-75 — Residential District 75 RMH — Mobile Home District RMTSF — Residential Multi-Family to Single-Family RM — Multi-family Residential District RTH — Single-Family Residential Attached Townhome PUD — Planned Unit District UV — Urban Village MXR — Mixed-Use Residential NMX — Neighborhood Mixed-Use MX — Mixed-Use District MMX — Medical Mixed-Use MCD — Medical Center District MC — Medical Center MXI — Mixed-Use Commercial-Industrial
| Zoning Classifications | Future Land Use Designation | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RMX | GB | OI | OIV | WH | LI | HI | INDP | IP | TOD | MVEDU | MVIMO | MVMME | MVMUR | MVREN | MVRMR | ODGRN | ODMUR | ODHTL |
RMX — Regional Mixed-Use GB — General Business OI — Office/Institutional OIV — Office Institutional Vertical WH — Warehouse District LI — Light Industrial HI — Heavy Industrial INDP — Industrial Park District IP — Industrial Park TOD — Transit-Oriented Development MVEDU — Mountain View Overlay - Education MVIMO — Mountain View Overlay - International Mixed-Use Office MVMME — Mountain View Overlay - Mixed Use Makers and Advanced Manufacturing MVMUR — Mountain View Overlay - Mixed-Use Residential MVREN — Mountain View Overlay - Regional Entertainment MVRMR — Mountain View Overlay - Regional Mixed-Use Retail ODGRN — Overlay District - Greenspace ODMUR — Overlay District - Mixed-Use Residential ODHTL — Overlay District - Hotel & Mixed-Use Retail ODMMX — Overlay District - Medical Mixed-Use
In assessing land use during this process, the following development patterns emerged:
Through various site tours, stakeholder input, and public engagement, a series of Development Nodes were identified throughout the county. Many of these nodes are located within the county boundaries, as they are projected to have a significant impact on the county’s future development and growth. The development nodes are shown on the following three maps as: Existing Assets; Metro Atlanta Regional Transit Authority (MARTA) Bus Rapid Transit (BRT)/Transit-Oriented Development (TOD) Nodes and Proposed Tara Blvd LCI Locations; and Proposed Clayton County Comprehensive Plan Development Nodes. Together these three maps showcase areas of interest for investment and redevelopment for the County.
| Type | Name | # |
|---|---|---|
| Mountain View | 1 | |
| Clayton State University | 2 | |
| Southlake Mall | 3 | |
| Southern Regional Medical Center | 4 | |
| Hartsfield-Jackson Atlanta International Airport | 5 | |
| Existing | Fort Gillem | 6 |
| Assets | Virginia Burton Gray Recreation Center | 7 |
| South Clayton Recreation Center | 8 | |
| Lake Spivey Recreation Center | 9 | |
| Jim Huie Recreation Center | 10 | |
| Carl Rhodenizer Recreation Center | 11 | |
| J.W. Smith Reservoir | 12 | |
| Shamrock/Blalock Reservoir | 13 | |
| Shoal Creek Reservoir | 14 | |
| MARTA | Overlay 1 | 15.1 |
| BRT/ TOD | Overlay 2 | 15.2 |
| Nodes | Overlay 3 | 15.3 |
| Overlay 4 | 15.4 | |
| Proposed Tara | Tara Boulevard Node | 16.1 |
| Boulevard LCI | Jonesboro Node | 16.2 |
| Locations | Lovejoy Node | 16.3 |
| Aerotropolis | Forest Square (Aerotropolis) | 17.1 |
| Blueprint | Owens-Illinois ( Outside County) | 17.2 |
| Catalytic Site | 1001 International Blvd. ( Outside County) | 17.3 |
| Aerotropolis | Dixie Road | 17.4 |
| Blueprint | 5711 Jonesboro | 17.5 |
| Community | Old National | 17.6 |
| Sites | Mountain View | 17.7 |
| Anvil Block | 18 | |
| Conley | 19 | |
| Harvest Urban Village | 20 | |
| Proposed | Rex Village | 21 |
| Clayton | Clayton County Facility Headquarters | 22 |
| County | Tara Boulevard at Freeman Road | 23 |
| Comp Plan | Ellenwood | 24 |
| Development | Noahs Arc at Industrial Boulevard | 25 |
| Node | Panhandle Road & New Hope Road | 26 |
| Panhandle Road & Hampton Road | 27 | |
| Fortson Road & Wildwood Road | 28 | |
| Inman Road & Woolsey Road | 29 |
⬚ figure
Figure 43. Development Nodes Map (2024)
Key Land Use and Development Takeaways:
⬚ figure
Image Caption: View of consultant team and community members at a community engagement event (2024)
Clayton County utilized a variety of techniques and levels of involvement to gain a complete understanding of existing conditions, community goals and values, needs and opportunities, and desires for the future. As detailed below, this process included both traditional and non-traditional techniques to reach broad and diverse audiences such as project management team meetings, stakeholder interviews, a Steering Committee, public meetings, pop-up events, social media and an interactive website through Social Pinpoint. The Team advertised all events and engagement opportunities in coordination with the Clayton County Office of Communications to utilize CCTV23/99, Facebook, Instagram, and Twitter to promote engagement and to maximize outreach to the public as approved by the County. We also directly produced and distributed flyers to key locations across the county in the lead up to each public meeting series and encouraged participation though an email communication list and the steering committee.
In this chapter, we detail the engagement tools, techniques, and methods that were used throughout the planning process.
This engagement process began with an initiatory presentation to the Zoning Advisory Group on August 28, 2023, and a formal presentation to the Clayton County Board of Commissioners by way of Public Hearing on September 19, 2023. Participation in this standing hearing of the County officially kicked off the planning process with the public. The Team also made a second appearance with these bodies at conclusion of the process to officially request adoption of the Future Focus Clayton County Comprehensive Plan on July 1, 2024 and July 16, 2024, respectively.
⬚ figure
Image Caption: View of a community engagement event (2023)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Soon after, we began to conduct interviews with key stakeholders to further understand the needs that are most important to the community and the opportunities that may exist throughout the County. Between September and October 2023, we met with 22 stakeholders to learn more about the community’s issues and opportunities, and to learn what values and objectives to prioritize in the planning process. This feedback was crucial to help guide the Future Focus Clayton Comprehensive Plan in reflecting a wide and representative variety of wants, needs, and desires within Clayton County. Below is the list of interviewees:
⬚ figure
Image Caption: View of a community members participating at a community engagement event (2023)
⬚ figure
Image Caption: View of a community members participating at a community engagement event (2024)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
We worked closely with a Steering Committee comprised of stakeholder groups including residents, business and property owners, non-profit organizations, community groups, and others identified with guidance from the County. The Team met with the committee as a group three times during the planning period and consulted them individually as necessary to provide input to the identification of goals, vision, needs, and proposed solutions. Additionally, all significant findings and recommendations were presented to the committee for review, validation, and feedback, as well as any boards, handouts, and presentations prior to public meetings.
The Steering Committee was comprised of members representing:
⬚ figure
Image Caption: View of the steering committee at Newman Wetlands Center during a county bus tour (2023)
Steering Committee Meeting 1 – Project Orientation
Steering Committee Meeting 1 consisted of a virtual presentation to introduce the project’s intent, process and schedule, and set expectations for the steering committee while collecting initial input on the previous Comprehensive Plan’s vision and goals. The Team also used this meeting as an opportunity to encourage committee members to advertise Public Meeting Series 1 with their networks.
Steering Committee Meeting 2 – Goals and Visions
Steering Committee Meeting 2 consisted of a brief presentation covering existing conditions analysis and the results of Public Meeting Series 1’s goals/visioning input. Additionally, the Team collected input on needs, and identified and brainstorm ideas for future development, strategies, and improvements. The Team also used this meeting as an opportunity to encourage committee members to advertise Public Meeting Series 2 with their networks.
Steering Committee Meeting 3 – Community Work Program
Steering Committee Meeting 3 consisted of a brief presentation to review Comprehensive Plan draft concepts and collect feedback on various plan elements, particularly the Community Work Program (CWP), as well as an interactive display of five character area maps for discussion. The Team also used this meeting as an opportunity to encourage committee members to advertise Public Meeting Series 3 with their networks.
⬚ figure
Image Caption: View of the steering committee at during a community engagement event (2023)
The Team hosted six public workshops and open houses between October 2023 and April 2024. These public workshops and open houses were hosted at key stages in the planning process to educate and gain feedback from stakeholders in and around the County. Each series prioritized different aspects of the comprehensive planning process, and exercises were developed and available at the events to provide attendees with knowledge about the project and encourage active participation in the process. For additional details regaring the public meetings and gathered feedback, view the accompanying plan appendix.
⬚ figure
Image Caption: View of a community members participating at a community engagement event (2023)
Public Meeting Series 1 consisted of two meetings (#1 and #2) to officially kick off the project, introduce the project’s intent, process and schedule, and collect input on existing conditions and the previous Comprehensive Plan’s vision and goals, as well as launch the project site (futurefocusclayton.com) and its associated community survey and interactive map series. The Team presented a brief presentation followed by an interactive workshop with seven activity boards. These activity boards served as a SWOT Analysis, asking for public input on the Strengths, Weaknesses, Opportunities, and Threats within the county. The input received at this juncture not only provided a framework for understanding the current state of the community, but also provided critical insight for the development of an actionable, goals-centric plan and new community work program items. For five of the activity boards, each participant was given sticky notes and directed to write down different issues and opportunities they support and want prioritized within the previous comprehensive plan’s major elements (economic development, housing, intergovernmental coordination, land use, and transportation). For the second activity, participants were given dot stickers and asked to indicate locations where they would like to see more development on a study area map of Clayton County. For the last activity, participants were given sticky notes and asked to provide their thoughts on the prompts: 1) “Who is Clayton County?” and 2) “Who do we want to be?”
Public Meeting Series 2 - Design Charrette
Public Meeting Series 2 consisted of two meetings (#3 and #4) to present existing conditions analysis and the results of visioning input, collect additional input on needs, and identify and brainstorm ideas for future development, strategies, and improvements. The Team presented a brief presentation to followed by an interactive workshop with seven activity boards and two large maps. One map displayed Clayton County’s current future land use map (FLUM) and highlighted areas where potential FLUM changes would be recommended. Participants were given sticky notes and asked to provide their thoughts on these highlighted areas and indicate other potential development nodes. The other map displayed the County’s road network; and participants were asked to provide their thoughts on mobility changes throughout the county on sticky notes. Input received via the maps was incorporated into the SWOT analysis. The boards contained the same activities as in Public Meeting Series 1.
⬚ figure
Image Caption: View of a community members at a community engagement event (2023)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Public Meeting Series 3 – Recommendations Open House
Public Meeting Series 3 consisted of two meetings (#5 and #6) to present the Draft Comprehensive Plan draft concepts, collect feedback on plan elements, and to present an opportunity to remain engaged in the process going forward. For the final in-person meeting, the Team showed a brief presentation before shifting to an open house, drop-in style meeting with voting and budgeting exercises to highlight critical aspects of the final plan to the public. Attendees were given $100 USD in faux money and asked to “fund” various aspects of the CWP by placing their money in specified buckets for each plan element. They were also given four stickers to “vote” for their highest priority CWP item and encouraged to speak amongst themselves about priorities within the County. For the virtual meeting, attendees were presented the same information via Zoom and asked to complete the voting and budgeting exercises virtually on the project’s website.
⬚ figure
Image Caption: View of a community members participating at a community engagement event (2024)
The Team tabled two pre-existing events between October 2023 and April 2024 as pop-up opportunities. Pop-up events are an excellent way to connect with the community right where they are, at places or events where a significant number of people is expected.
Pop-up Event 1 – Communities on the Rise
We participated in District 3 Commissioner Franklin’s Communities on the Rise Event during the first phase of this planning process. This Pop-up was used primarily as an opportunity to inform the public about the planning effort and drive traffic to the online engagement activities between Public Meeting Series 1 and 2. The Team presented the same material at this event as Public Meeting Series 1, including a brief presentation followed by an interactive workshop with seven activity boards. The Team also distributed study information, meeting flyers, call to action flyers to participate in online activities and comment forms for the public to provide input.
⬚ figure
Image Caption: View of a community members during a pop-up event at Clayton County SpringFest (2024)
Pop-up Event 2 – SpringFest 2024
The Team participated in Forest Park’s annual SpringFest Event during the final phase of this planning process. This Pop-up was used primarily as an opportunity to solicit feedback about the comprehensive plan from families with young children while promoting the upcoming Public Meeting Series 3. Attendees were invited to interact with three activity boards showing a series of photos of different density typologies and asked to review the images. Participants were then asked to apply a red or green dot on what they felt is an appropriate or inappropriate density for potential development nodes and to leave sticky note comments describing why they felt a particular way about the images. As a youth-oriented activity, participants were given dry erase markers and asked to write or draw their responses to the prompts: 1) “My favorite thing about Clayton County is…,” 2) “My favorite place to go Clayton County is…,” and 3) “My favorite thing to do in Clayton County is…” Additionally, adolescent participants were encouraged to write themselves “postcards from the future” and talk about their idealized future vision of Clayton County. The Team also distributed meeting flyers and comment forms for the public to provide input.
⬚ figure
Image Caption: View of community feedback collected during a pop-up event at Clayton County SpringFest (2024)
Online engagement provides a convenient way to engage with the public and to share information. During the first phase of engagement, we launched a project site, FutureFocusClayton.com, as an online hub to serve as the central location for project information including project overview and schedule, outreach event announcements, and plan documents. The site also hosted two engagement activities, the community survey and interactive map, as a convenient way to engage with the public and collect feedback on issues that could influence the comprehensive plan’s visions and goals.
Additionally, timely and strategic content was developed for the County to post on its own social media channels as calls to action for engagement opportunities and events. We also coordinated with Clayton County Communications Department to utilize existing County marketing outlets such as CCTV23/99, the Clayton Connected Podcast, and the Mobile Community to maximize digital outreach.
We launched an online survey and interactive map to collect feedback on issues relating to Clayton County. Though originally intended to end following the first public meeting series, both the survey and the map remained available for feedback until March 2024, and each received 140 and 135 responses, respectively. Stakeholders and the general public accessed the community survey and interactive map through the project website, and the results from these activities were incorporated into the updated vision and goals for the plan.
The community survey was divided into five parts based on the major topic areas identified in the previous comprehensive plan (housing, transportation, economic development, land use, and intergovernmental coordination). Each section began by presenting a preselected list of priorities derived from the previous comprehensive plan and asked respondents to rank those priorities on a scale from one (low priority) to five (high priority). Respondents then had an opportunity to identify their top priority in a few words before continuing to the remainder of the section-specific questions. Respondents were also asked about their demographic information at the end of the survey.
Similarly, the community contributed to the interactive map by leaving a comment and sharing their thoughts about Clayton County’s direction across seven categories (Destinations/ Hotspots; Development Concerns; Development Potential; Mobility Issues; Parks and Greenspace; Safety Concerns; Other Ideas and Suggestion). They accomplished this by zooming the map to the area of concern, clicking “Add Comment” at the top of the webpage, deciding which pin category most closely aligned with their comment or concern, and then dragging that pin to the location and dropping it. After placing the pin, they added comments to provide more information and had the option to upload a photo to support the comment or provide an example of a good solution.
⬚ figure
Image Caption: Comments on the Social PinPoint interactive map (2024)
CLAYTON TAKES FLIGHT
⬚ figure
This section addresses the assessments and community engagement outlined in the previous pages by summarizing identified assets and challenges and sharing the overarching community vision, goals, and policies to address these goals. The specific actionable tasks and projects are listed in the Community Work Program at the end of this section.
The Community Vision serves as the foundation of the comprehensive plan, directly derived from engaging community members. It represents the collective aspirations and desires of the community. All aspects of the plan, such as goals, needs, opportunities, action items, and the work program, are intricately tied to and guided by this vision. By aligning efforts with the community’s vision, the aim is to create a more inclusive and prosperous future for Clayton County.
⬚ figure
"Clayton County aims to create a safe, accessible, and vibrant community, through collaborative partnerships, with abundant economic opportunities, diverse housing options, and enhanced healthcare. The County is a destination where the world lands and opportunities take off for all to stop, stay, and experience the beauty of our county while ensuring everyday needs and services are within reach."
The 2024 updated goals address the needs and opportunities within each of these areas while supporting the overall community vision. The goals are aligned with the following key areas of focus: Land Use; Transportation; Housing; Economic Development; Intergovernmental Coordination; Broadband; and Health, Sustainability, and Wellness.
⬚ figure
Land Use
⬚ figure
Transportation
⬚ figure
Housing
⬚ figure
Economic Development
⬚ figure
Intergovernmental Coordination
⬚ figure
Broadband
⬚ figure
Health, Sustainability, and Wellness
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
⬚ figure
TRANSPORTATION GOAL
⬚ figure
Policies
Policies
Policies
INTERGOVERNMENTAL COORDINATION GOAL
⬚ figure
Image Caption: View of Atlanta State Farmers Market entrance and signage in Forest Park Source: Atlanta State Farmers Market (2021)
The Future Focus Clayton 2040 Comprehensive Plan places a strong emphasis on Land Use as a crucial element. The community’s vision for future development is established and clarified through the new Future Land Use Map (FLUM), Character Area Map, and associated policies.
The FLUM serves as a guiding document for staff to develop recommendations for rezoning applications and as a framework to guide future development decisions. It identifies the desired future use of land and the development vision of the community. Meanwhile, the Character Area Map provides more detailed planning guidance for specific geographic areas. Both maps heavily reflect the feedback received from the community during the planning process. New land uses and changes from the previous FLUM are noted in the table below and on the following map. More detailed area maps highlighting specific parcel changes can be found on the following spreads. These maps depict FLU changes to specific parcels as a result of this comprehensive planning process; they do not include those modifications approved by the Board of Commissioners (BOC) between 2014 and the time of writing this document.
| Future Land Use (2039) | Sum of Acreage | FLU 2039 Acreage % | FLU 2034 (Previous) Acreage % | % of Area Increased/ Decreased* |
|---|---|---|---|---|
| Agriculture | 13,082 | 19.73% | 12.44% | 7.29% |
| Conservation Residential | 3,160 | 4.77% | 13.09% | -8.32% |
| General Commercial | 2,178 | 3.28% | 3.88% | -0.60% |
| Heavy Industrial | 2,818 | 4.25% | 3.38% | 0.87% |
| High Density Residential | 3,113 | 4.69% | 3.68% | 1.01% |
| Light Industrial | 591 | 0.89% | 0.04% | 0.85% |
| Low Density Residential | 26,442 | 39.87% | 18.22% | 21.65% |
| Medium Density Residential | 1,974 | 2.98% | 20.63% | -17.65% |
| Mixed Use | 2,972 | 4.48% | 7.89% | -3.41% |
| Mixed Use Commercial-Industrial | 5,335 | 8.04% | 9.31% | -1.27% |
| Office / Business | 1,077 | 1.62% | 0.05% | 1.57% |
| Parks/Recreation/Conservation | 194 | 0.29% | 2.78% | -2.49% |
| Planned Unit Development | 3,378 | 5.09% | 0.00% | 5.09% |
| Public/Institutional | N/A | N/A | 0.39% | N/A |
| Transportation/Utilities | N/A | N/A | 4.00% | N/A |
| Neighborhood Commercial | N/A | N/A | 0.22% | N/A |
| Grand Total | 66,313 | 100.00% | 100.00% |
Figure 44. 2039 Future Land Use Distribution (2024).
“% of Area Increased/Decreased” shows the percent acreage changed between the 2034 FLU and 2039 FLU of a specific land use category. Numbers highlighted in red represent a decrease in overall area, meaning there is a smaller portion of that land use in the 2039 FLU map. Numbers highlighted in green represent an increase in area, meaning those land use categories have a greater amount of acreage in the 2039 FLU map as compared to the 2034 FLU map.
⬚ figure
Figure 45. 2039 Future Land Use Map (2024)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Land Use Legend
| Agriculture | Heavy Industrial | Low-Density Residential | Mixed-Use Commercial-Industri | Planned Unit Development |
| Conservation Residential | High-Density Residential | Medium-Density Residential | Office / Business | |
| General commercial | Light Industrial | Mixed-Use | Parks/Recreation/Conservation |
15.1: BRT Route 54 Overlay 1: Southlake Mall, County Schools Concert Space
⬚ figure
⬚ figure
15.2 & 16.1: BRT Overlay 2, SRMC, Tara Boulevard Node
⬚ figure
⬚ figure
15.3: BRT Overlay 3: Garden Walk Boulevard
⬚ figure
⬚ figure
15.4: BRT Overlay 4
⬚ figure
⬚ figure
Land Use Legend
| Agriculture | Heavy Industrial | Low-Density Residential | Mixed-Use Commercial-Industri | Planned Unit Development |
| Conservation Residential | High-Density Residential | Medium-Density Residential | Office / Business | |
| General commercial | Light Industrial | Mixed-Use | Parks/Recreation/Conservation |
18: Anvil Block: Gateway into Fort Gillem
⬚ figure
⬚ figure
21: Rex Village Arts District
⬚ figure
⬚ figure
22: Claytonton County New Facilities Headquarters
⬚ figure
⬚ figure
23: Tara Boulevard at Freeman Road
⬚ figure
⬚ figure
Land Use Legend
24: Ellenwood
⬚ figure
⬚ figure
25: Noahs Arc at Industrial Boulevard
⬚ figure
⬚ figure
26: Panhandle Road & New Hope Road
⬚ figure
⬚ figure
27 Panhandle Road & Hampton Road
⬚ figure
⬚ figure
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Land Use Legend
| Agriculture | Heavy Industrial | Low-Density Residential | Mixed-Use Commercial-Industri | Planned Unit Development |
| Conservation Residential | High-Density Residential | Medium-Density Residential | Office / Business | |
| General commercial | Light Industrial | Mixed-Use | Parks/Recreation/Conservation |
⬚ figure
⬚ figure
146 Implementation - Clayton Takes Flight
Hwy 85 and Forest Parkway
⬚ figure
⬚ figure
The Character Area Map acts as a blueprint for Clayton County’s future development, pinpointing specific regions destined to embody distinct or special traits. These traits stem from existing conditions or aspirations for the future. Some areas already possess unique character, while others hold the potential to cultivate such identity through forthcoming board decisions. These character areas delineate suitable development types for each locale, aiming to foster a sense of identity, stimulate infill development, offer diverse employment opportunities, and promote alternative transportation options. This segment comprises concise descriptions of each character area alongside envisioned futures. It outlines recommended land uses, corresponding zoning, and development and design strategies tailored to realize these visions.
⬚ figure
Image Caption: View of community members participating at a community engagement event (2024)
⬚ figure
Figure 46. Character Area Map (2024)
The Commercial Redevelopment character area is intended to be redeveloped and revitalized to encourage economic growth and activity. The focus is the retrofit and/or redevelopment of large commercial strip centers into mixed-use, high-quality developments that provide amenities and support to the Clayton community.
Recommended Land Uses: Mixed-use, Retail (sales and services), Restaurant (sit-down), Family entertainment center/game room center, Medium-density Residential, and Office
⬚ figure
⬚ figure
Figure 47. View of Woburn Village in Woburn, MA Source: (2022)
⬚ figure
Figure 48. View of a redevelopment office building in Chamblee, GA Source: Google Street View (2023)
This character area comprises natural lands and environmentally sensitive areas unsuitable for development, including scenic views, coastlines, steep slopes, floodplains, wetlands, watersheds, wildlife management areas, and other ecologically significant regions.
Recommended Land Uses: Wildlife Habitat, Natural Reserves, Ecological Restoration, and Passive Recreation
⬚ figure
Conservation/Environmental
⬚ figure
Image Caption:
⬚ figure
Image Caption: View of Newman Wetlands Center Image Caption: See Clayton County (2024)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Situated along the Flint River in Clayton County, this character area protects and enhances the areas adjacent to the Flint River. The character area includes required conservation buffers along the waterway to protect this natural resource, as well as encouraging complimentary uses, amenities, and activities to enhance the livability and accessibility to this resource. This includes trails, open space, recreation, as well as retail, restaurants, commercial, office, and residential located outside of the required buffer.
Recommended Land Uses: Wildlife Habitat, Natural Reserves, Ecological Restoration, Passive Recreation, Medium Density Residential, High Density Residential, Office, Commercial, and Mixed-use
⬚ figure
154
Implementation - Clayton Takes Flight
⬚ figure
Image Caption: View of the Flint River Source: Clayton News Daily (2013)
⬚ figure
Image Caption: View of Flint River shoals Image Caption: American Rivers (2023)
The employment center is designed as a campus-style development. It features high accessibility for vehicular traffic and, if applicable, transit options, along with ample on-site parking. The center is characterized by a moderate floor-area ratio and a accessible open space.
Recommended Land Uses: Office, Commercial, Retail, Dining, Services, Parking, Green Space, Transit Hub, and Residential
⬚ figure
⬚ figure
Image Caption: Mixed-use development in Atlanta, GA Source: Juneau Construction Company/ Bryn House (2024)
⬚ figure
Image Caption: View of Clayton State University Source: Clayton State University (2011)
This character area is specific to the Tara Boulevard and Old Dixie corridor. The Gateway Corridor stands as a vital artery and gateway to the community. Its purpose is to provide a major transportation route and act as a focal point for accessibility, connecting the community to essential services, businesses, and amenities. As this corridor welcomes residents and visitors into the community, the visual appeal is important to promote a welcoming, inclusive, and attractive environment.
Recommended Land Uses: Mixed-use, Retail (sales and services), Restaurant (sit-down), Family entertainment center/game room center, Hotel, Medium- to High-density Residential, and Office
⬚ figure
Gateway Corridor
⬚ figure
Image Caption: View of restaurants along Hugh Howell Road in Tucker, Georgia Source: Google Street View (2023)
⬚ figure
Image Caption:
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Located at the junction of Homestead Road, Rex Road, and Mill Street, this historic area showcases distinctive features, landmarks, and cultural sites of historical significance. The intent is to preserve historic areas and revitalize to create places that benefit and enhance the community.
Recommended Land Uses: Heritage Buildings, Monuments and Memorials, Preservation Zones, Cultural Districts, Interpretive Centers, Archaeological Sites, Heritage Trails, Conservation Areas, Mixed-Use, Residential, Office, and Commercial
⬚ figure
⬚ figure
Image Caption: View of Clayton County Courthouse in Jonesboro Historic District Source: Thomson200 (2015)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Mainly located in northern Clayton near Hartsfield-Jackson Atlanta International Airport (H-JAIA) and the Ellenwood area along I-675, the Industrial Area facilitates manufacturing, wholesale trade, and distribution activities, with varying levels of environmental impact such as noise, particulate matter, and odor emissions.
Recommended Land Uses: Manufacturing Facilities, Warehouses, Distribution Centers, Industrial Parks, Logistics Terminals, Processing Plants, Assembly Plants, Industrial Yards
⬚ figure
162 Implementation - Clayton Takes Flight
⬚ figure
Image Caption: View of a distribution center Source: McColly Bennett Commercial Advantage (2019)
⬚ figure
Image Caption: View of a logistics center in Tucker, GA Source: City of Tucker (2022)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
The Mixed-Use Industrial character area blends industrial activities with commercial and residential components, creating a vibrant and diverse urban environment. This area accommodates a range of functions, from manufacturing and distribution to retail and office spaces, creating opportunities for live-work-play lifestyles and promoting economic vitality. The Mixed-Use Industrial area serves as a hub of innovation, commerce, and community engagement. This character area also provides a transition zone from residential to mixed-use industrial uses.
Recommended Land Uses: Light Manufacturing Facilities, Commercial Offices, Retail Spaces, Warehouses, Live-Work Units, Residential Apartments, Research and Development Centers, and Flex Spaces
⬚ figure
Mixed-use Industrial
⬚ figure
Image Caption: View of a retail area in Chamblee, GA Source: City of Tucker (2022)
The intent of the Neighborhood Center is to have a concentration of activities such as general retail, school, service commercial, professional office, higher-density housing, and appropriate public and open space uses easily accessible by pedestrians to serve the surrounding residential neighborhoods.
Recommended Land Uses: Public and civic facilities, Mixed-Use, General Commercial, Neighborhood Commercial, Medium- to High-Density Residential, Public Institutions, Office/Business, Parks & Recreational
This area is focused on preserving and enhancing residential neighborhoods. Strategies include:
⬚ figure
⬚ figure
Image Caption: View of a neighborhood retail area in Brookhaven, GA Source: City of Tucker (2022)
⬚ figure
Image Caption: View of a brewery Source: Clarence Boston (2021)
The Regional Center character area includes two locations within Clayton County: 1) The Mountain View District and Hartsfield-Jackson Atlanta International Airport; and 2) Clayton State University and surrounding parcels. The purpose of the Regional Center is to create a regional hub that provides transit accessibility, walkability, and higher density mixed-use development that compliments and enhances these regional employers — H-JAIA and Clayton State University — along with opportunities for higher wage employment, innovative technology-based job opportunities, recreation, entertainment, and an attractive environment for the residents, businesses, visitors, and travelers alike.
Recommended Land Uses: Education, International Mixed-Use Office, Regional Mixed-Use Retail, Mixed Use Residential, Regional Entertainment, Advanced Manufacturing, and Hotel
⬚ figure
⬚ figure
Image Caption: View of Avalon development in Alpharetta, GA Source: Site Solutions (2019)
⬚ figure
Image Caption: View of Rivana at Innovation Station conceptual rendering in Loudon County, VA Source: Loudon County Economic Development (2021)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
Situated adjacent to and including Southern Regional Medical Center, this area encompasses hospitals, medical offices, and laboratories. Complementary amenities comprise townhouses, multifamily dwellings, and hotels designed specifically to accommodate medical professionals and medical users, as well as food and service establishments accessible to workers and visitors. The purpose of this zone is to foster competitiveness through convenient access to doctors’ offices, diagnostic laboratories, pharmacies, and advanced medical access. It aims to bolster existing healthcare services while accommodating advancements in medical technology and the life sciences sector.
Recommended Land Uses: Hospital, Medical office, Laboratory uses, Medical research and development, Medical production, Medical technology, Biomedical companies and technical training facilities, Continuing Care Retirement Community housing, Mixed-use redevelopment, Business-class hotels, Retail and service commercial (including casual and sit-down dining), Townhomes, and other housing for medical professionals.
⬚ figure
170 Implementation - Clayton Takes Flight
⬚ figure
Image Caption: View of a medical clinic in Chamblee, GA Source: City of Tucker (2022)
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
This character area aligns with the locations of the planned Metro Atlanta Regional Transit Authority (MARTA) Bus Rapid Transit (BRT) Transit Oriented Development (TOD) sites along Riverdale Road, Garden Walk Boulevard, Upper Riverdale Road, and Mt. Zion Road. The purpose of the Transit Oriented Development Character Area is to encourage and enable the development of moderate to high-intensity, compact, mixed-use urban neighborhoods near transit stations where people can live, work, shop, dine, and pursue cultural and recreational opportunities while enjoying a range of mobility choices. TOD development standards, combined with limits on auto-centric uses, are designed to create vibrant neighborhoods with a robust network of streets, sidewalks, and bicycle paths, providing safe and convenient access to transit stations.
Recommend Land Uses: Mixed-Use, General Commercial, High Density Residential, Public Institutions, and Office/Business
⬚ figure
172 Implementation - Clayton Takes Flight
⬚ figure
Image Caption: View of a mixed-use development and green space in Mansfield, CT Source: Leyland Alliance (2017)
⬚ figure
Image Caption: View of a multi-family development in Atlanta, GA Source: City of Tucker (2022)
A Community Work Program defines the necessary steps for ensuring the effectiveness and success of a community’s comprehensive plan. It encompasses the plan’s objectives, the strategies and tactics devised to attain these objectives, a timeline for implementation, the roles and responsibilities assigned to stakeholders, and the resources and funding required to execute the plan.
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Economic Development | |||||
| Items 1-13 are ongoing items from the 2019 CWP that are still relevant and are hence being included in this 2024 CWP | |||||
| ED-1 | Trade Center and Small Business Incubator -Class A office building at the entrance to Clayton State University to attract | X | X | X | X |
| ED-2 | “Welcome to Clayton County” Signage strategically placed at North, South, East, and West entrances into the County. The signs are anticipated to measure approximately 10 to 20 feet in width and be constructed of brick, stone or concrete. The greeting signs will showcase the County’s new brand and image | X | X | ||
| ED-3 | Develop formal agreement and approach between the Cities and County to collectively shape a positive image for Clayton County, both internally and externally | X | X | X | X |
| ED-4 | Elevate importance of retaining and expanding existing industry in Clayton County. Broaden the number of people formally involved in the effort to visit, retain and expand existing industry | X | X | ||
| ED-5 | Build upon existing activities that promote entrepreneurship and strengthen the small business community in Clayton County | X | X | ||
| ED-6 | Measure number and type of small business support activities occurring in Clayton County | X | X | X | X |
| ED-7 | Prioritize workforce development as a key economic development tool for improving family self- sufficiency and reducing unemployment | X |
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Economic Development | |||||||||
| ED-8 | Formally outline roles for existing organizations focused on supporting small businesses | X | X | X | X | X | Staff time | Econ. Dev. | Econ. Dev. |
| ED-9 | Develop and implement incentives and programs to encourage redevelopment of vacant and underutilized commercial properties | X | X | X | Varied, but could be significant depending on consensus | Econ. Dev./ County/ Chamber/ Dev. Auth. | County/ Chamber/ Dev. Auth. | ||
| ED-10 | Develop a framework within Clayton State University that fosters internal collaboration and external engagement towards the benefit of community and economic development initiatives | X | X | X | X | X | Staff time | Clayton State Univ./ County/ Econ. Dev | County/ Chamber |
| ED-11 | Promote the formation of Community Improvement Districts, especially near the airport, industrial districts, and along major commercial corridors | X | X | X | X | X | Staff time | Econ. Dev./ County Chamber/ Private | Private/ County |
| ED-12 | Develop a current marketing plan for the County which determines the most effective media for promoting opportunities in Clayton County; i.e. magazines, Web sites, advertising, etc. | X | X | X | X | X | $35,000 | Public Information Office / Econ. Dev. | General Fund / Econ. Dev. |
| ED-13 | Encourage establishment of businesses and activities that will provide for activity in the evening hours, particularly entertainment, shopping and dining options | X | X | X | Staff time (could range from minimal $ for ordinance/overlay rewrite to more $ for targeted recruitment and marketing effort) | Chamber of Commerce/ CDD-P&Z | County/ Tourism funds | ||
| Items 14 - 17 are new items in this 2024 CWP | |||||||||
| ED-14 | Develop a Clayton County marketing campaign and seek input and buy-in throughout the County. | X | X | X | X | X | Staff time | Econ. Dev. | Econ. Dev. |
| ED-15 | Expand website content with additional data related to targeted industries, workforce, programs, incentive opportunities and property tax rates. | X | X | X | X | X | Staff time | Econ. Dev. | Econ. Dev. |
| ED-16 | Develop an economic development incentive package | X | X | Staff time | Econ. Dev. | Econ. Dev. | |||
| ED-17 | Develop a program to identify, assess, and clean-up brownfield sites for redevelopment in the county | X | X | X | X | X | $7,000 | Econ. Dev./ Community Development | Grant pending |
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Development Authority | |||||||||
| Item 1 is an ongoing item from the 2019 CWP which is still relevant and is hence being included in this 2024 CWP | |||||||||
| DA-1 | Identify and develop plans for the revitalization of declining or vacant strip shopping centers and “big-box” commercial structures throughout the County | X | Staff time | Planning and Zoning/ Clayton County Development Authority (CCDA) | General Fund | ||||
| Items 2 - 12 are new items in this 2024 CWP | |||||||||
| DA-2 | Focus County resources on catalytic sites, including Mountain View, Tara Boulevard, and Clayton State University | X | X | X | X | X | Staff time | Econ. Dev./ Dev. Auth. | N/A |
| DA-3 | Continue to work with the Development Authority to consolidate Mountain View properties | X | X | X | X | X | Varies | Econ. Dev. / Dev. Auth. | SPLOST/ County General Funds |
| DA-4 | Appoint Mountain View Project Manager to oversee implementation | X | Staff time | Econ. Dev. / Dev. Auth. | Econ. Dev. Office / Dev. Auth. | ||||
| DA-5 | Implement Mountain View implementation actions | X | X | X | X | X | Staff time | Econ. Dev. / Dev. Auth. | General Fund / Econ. Dev. Office / Dev. Auth. |
| DA-6 | Leverage and market the planned MARTA BRT routes and transit center to attract higher density development and jobs | X | X | X | X | X | Staff time | Econ. Dev. / Dev. Auth. | Econ. Dev. Office |
| DA-7 | Coordinate improvements County-wide to freight operations enhancement with the Cities of Atlanta and Savannah | X | X | X | X | X | Staff time | Econ. Dev. / Dev. Auth. | Econ. Dev. Office |
Implementation - Clayton Takes Flight
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Development Authority | |||||
| DA-8 | Add workforce/labor force questions into the pre-application process as a means to connect workforce and educational offerings in the County with jobs | X | |||
| DA-9 | Continue participation in Learn4Life and support priority wrap-around services in Clayton schools | X | X | X | X |
| DA-10 | Based on Clayton Facilities Master Plan results, partner with Clayton State University on space needs within existing excess buildings on campus - consider economic develop offices, community space, etc. | X | X | ||
| DA-11 | Create a marketing campaign to highlight and build on the success of Lake Spivey housing market | X | |||
| DA-12 | Identify locations for mixed-use and residential development that can accommodate diverse housing options | X | X |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Office of Resiliency | |||||
| Item 1 is a new item in this 2024 CWP | |||||
| R-1 | Flint River Gateway Trails Master Plan | X | X | X | X |
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Community Development | |||||||||
| Items 1-4 are ongoing items from the 2019 CWP that are still relevant and are hence being included in this 2024 CWP | |||||||||
| CD-1 | Determine land use requirements that would support the concept of Aerotropolis | X | X | X | X | X | Staff time | CDD-P&Z | Included in Staff time |
| CD-2 | Pursue funding assistance for the continuation of efforts to improve the Tara Boulevard entrance to Clayton County - via an LCI study grant | X | $400,000 | Community Development/ ARC | ARC | ||||
| CD-3 | Develop a formal forum for coordination between the Clayton County Board of Education and Clayton County with regard to new schools and residential developments deemed to have a significant impact on school capacity | X | X | X | X | X | Staff time | Community Development/ CCPS | Included in Staff time |
| CD-4 | Pursue funding for streetscape improvements to enhance the visual quality of Clayton County’s major roadways | X | Staff time | CDD-P&Z/ Transportation | Included in Staff time | ||||
| Items 5 - 23 are new items in this 2024 CWP | |||||||||
| CD-5 | Develop and incorporate industrial design guides | X | X | $10,000 - 20,000 | Community Development | ARC CDAP / Comm. Dev. | |||
| CD-6 | Consider development of a mixed-use industrial zoning category that includes residential uses | X | X | Staff time | Community Development | ARC CDAP / Comm. Dev. | |||
| CD-7 | Update land use and zoning to support community greenspace policies | X | X | Staff time | Community Development / Parks and Rec | ARC CDAP / Comm. Dev. | |||
| CD-8 | Develop a small area plan for the Clayton State University area, in partnership with the City of Morrow and Lake City | X | X | X | $150,000- 200,000 | Community Development | Comm. Dev. / General Funds | ||
| CD-9 | Implement county-wide public and private space design guides | X | X | $75,000- 150,000 | Community Development | Comm. Dev. / General Funds | |||
| CD-10 | Create design standards for key overlay districts and corridors, including Mountain View, Tara Boulevard, and Clayton State University nodes | X | X | $20,000- 100,000 | Community Development | Community Develop- ment / Gen- eral Funds | |||
| CD-11 | Update zoning and land use based on recommendations from the Tara Boulevard LCI, once complete | X | Staff time | Community Development | Included in Staff time | ||||
| CD-12 | Update land use and zoning to support transit stops and the transit transfer center. | X | X | X | TBD based on scope of work | Community Development | Community Develop- ment / Gen- eral Funds / ARC CDAP |
178 Implementation - Clayton Takes Flight
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./ Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Community Development | |||||||||
| CD-13 | Create TOD regulations/standards unique to Clayton County | X | X | X | $50,000-150,000 | Community Development | Community Development / General Funds / ARC CDAP | ||
| CD-14 | Create a Medical District Overlay at Southern Regional Medical Center and surrounding parcels | X | X | Staff time | Community Development | Included in Staff time | |||
| CD-15 | Identify potential neighborhood serving nodes, particularly in high residential growth areas to ensure a balance of residential to neighborhood serving commercial | X | X | X | X | Staff time | Community Development | Included in Staff time | |
| CD-16 | Conduct a land use viability study along the Flint River to ensure land uses are compatible with the trail planning and encourage economic development along this important asset. | X | X | X | $50,000-150,000 | Community Development | Community Development / General Funds / ARC CDAP | ||
| CD-17 | Create multi-family design guidelines to ensure quality of multi-family housing is achieved | X | X | X | $20,000-50,000 | Community Development / Housing Authority | Community Development / General Funds / ARC CDAP | ||
| CD-18 | Review residential zoning to determine revisions that will encourage increased development of senior and missing middle housing | X | X | Staff time | Community Development / Housing Authority | Community Development / General Funds / ARC CDAP | |||
| CD-19 | Identify residential developments or areas in need of additional code enforcement or acquisition | X | X | Staff time | Community Development | Community Development / General Funds / ARC CDAP | |||
| CD-20 | As recommended in the Tara Boulevard LCI, induct a placemaking signage study to improve beautification of the corridor. | X | X | Staff time | Community Development | Community Development / General Funds / ARC CDAP | |||
| CD-21 | Implement action items for the Blueprint 2.0 Community Sites that are within unincorporated Clayton County, including Mountain View and Dixie Road | X | X | X | X | X | Staff time | Community Development | TBD |
| CD-22 | Identify strategies to deal with investor properties that are mismanaged/blighted, beginning with identifying and cataloging blighted properties in need of maintenance and inventorying investor-owned properties throughout the county. | X | X | X | X | X | Staff time | Housing Authority / Community Development | General Funds / Housing Authority / Community Development / ARC CDAP |
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./ Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Transportation | |||||
| Items 1-13 are ongoing items from the 2019 CWP that are still relevant and are hence being included in the 2024 CWP | |||||
| T-1 | Roadway Capacity Improvements - Battle Creek Road from Southlake Pkwy to Valley Hill Road & Mt. Zion Blvd from Southlake Pkwy to Lake Harbin Rd. (these are combined items 1 & 2 from the 2019 CWP) | X | X | X | X |
| T-2 | Traffic Signal, Signing and Pavement marking-related improvement in unincorporated areas | X | X | X | X |
| T-3 | County-wide sidewalk construction | X | X | X | X |
| T-4 | Bridge/culvert upgrades and replacements in unincorporated areas | X | X | X | X |
| T-5 | CEI Services for projects | X | X | X | X |
| T-6 | Street Resurfacing in unincorporated areas Maintenance | X | X | X | X |
| T-7 | Roadway Maintenance and Resurfacing | X | X | X | X |
| T-8 | Traffic Signals, Signage and Striping | X | X | X | X |
| T-9 | Bridge/Culvert upgrades, Repairs and Replacements | X | X | X | X |
| T-10 | Roadway Safety Improvements | X | X | X | X |
| T-11 | Sidewalk Installation | X | X | X | X |
| T-12 | Valley Hill Rd. Widening (Battle Creek Rd. to City of Riverdale) | X | X | X | |
| T-13 | Landscaping/Lighting | X | X | X | X |
| Items 14 - 27 are new items in this 2024 CWP | |||||
| T-14 | Update Comprehensive Transportation Plan; create connectivity to adjacent properties for transit systems (such as sidewalks) | X | X | ||
| T-15 | Assist, as needed, with MARTA improvements to high ridership bus stop locations | X | X | X | X |
| T-16 | Continue to partner with MARTA during the design phase of the Southlake Rapid and State Route 54 Rapid BRT lines - align with land use and economic development efforts | X | X | X | X |
180 Implementation - Clayton Takes Flight
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./ Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Transportation | |||||||||
| T-17 | Consider applying to the Safe Streets and Roads for All (SS4A) Grant Program and develop safety action plans | X | X | X | X | X | Staff time | Transportation | Included in Staff time |
| T-18 | Identify missing sidewalk infrastructure in high pedestrian locations, high ridership bus stops, and planned MARTA Bus Rapid stops | X | X | Included in item 14 | Transportation | SPLOST | |||
| T-19 | Prepare for next SPLOST and identify priority transportation projects to be funded | X | X | X | X | X | Staff time | Transportation | Included in Staff time |
| T-20 | Consider adopting TSPLOST to support infrastructure maintenance | X | X | X | X | X | Staff time | Transportation | Included in Staff time |
| T-21 | Tara Blvd LCI: Complete pedestrian improvements at Arrowhead Blvd Sidewalk Connection | X | X | X | X | X | Staff time | Transportation | County/GDOT |
| T-22 | Tara Blvd LCI: Complete intersection improvement at Valley Hill Rd and Tara Blvd crossing | X | X | X | X | X | Staff time | Transportation | County/GDOT |
| T-23 | Tara Blvd LCI: Complete pedestrian improvements at Tara Blvd | X | X | X | X | X | Staff time | Transportation | County/GDOT |
| T-24 | Tara Blvd LCI: Create a MARTA BRT Working Group | X | X | X | X | X | Staff time | Transportation | County/Jones-boro/Lovejoy/ GDOT |
| T-25 | Tara Blvd LCI: Create a Tara Blvd Design Working Group | X | X | X | X | X | Staff time | Transportation | County/Jones-boro/Lovejoy/ GDOT |
| T-26 | Tara Blvd LCI: Implement GDOT planned pedestrian hybrid beacons | X | X | X | X | X | Staff time | Transportation | County/GDOT |
| T-27 | Tara Blvd LCI: Implement High-Priority Leading Pedestrian Interval locations | X | X | X | X | X | Staff time | Transportation | County/GDOT |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | | :--- | :--- | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :--- | :--- | :--- | | | | '24 | '25 | '26 | '27 | '28 | | | | | Intergovernmental Coordination | | | | | | | | | | | Items 1-5 are ongoing items from the 2019 CWP that are still relevant and are hence being included in the 2024 CWP | | | | | | | | | | | IG-1 | Officially launch the Clayton County Economic Development Collaborative (CCEDC) which was started in 2013 by the COO which will allow the County and Cities to unite to build the economic landscape for the County and monitor the progress of the economic development strategic plan | X | X | X | X | X | Staff time | County Commission/ COO's Office | Staff time | | IG-2 | Create a coordinated channel between the County and Cities to be updated on the progress of the 2009-2015 SPLOST programs for projects that are executed in the Cities and unincorporated areas | X | X | X | X | X | $268M | COO's Office | 2015 and 2021 SPLOST | | IG-3 | Create coordinated channels for economic development between County and surrounding Counties to plan economic landscape for the region | X | X | X | X | X | Staff time | County Commission., COO's Office, Econ. Dev. Depart, neighboring Counties. | Staff time | | IG-4 | Develop a County-wide recycling and sanitation program to assist with beautification across the County | X | X | X | X | | Staff time | County Commission. COO's Office | Staff time | | IG-5 | Assess and amend the County’s current dispute resolution process as needed to ensure its effectiveness | X | X | | | | Staff time | County Commission | Staff time |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Intergovernmental Coordination | |||||
| Items 6 - 10 are new items in this 2024 CWP | |||||
| IG-6 | Conduct quarterly meetings inclusive of Clayton County, Cities within Clayton County, and Clayton State University | X | X | X | X |
| IG-7 | Conduct quarterly meetings inclusive of Clayton County and H-JAIA | X | X | X | X |
| IG-8 | Update procedures to include only two opportunities for Future Land Use Map amendments per year | X | |||
| IG-9 | Develop an outreach strategy to broadcast policy changes to county residents and property owners | X | X | X | X |
| IG-10 | Create a dashboard to provide information about ongoing and upcoming development to the Clayton community | X | X | X | X |
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| School System | |||||||||
| Items 1-3 are ongoing items from the 2019 CWP that are still relevant and are hence being included in the 2024 CWP | |||||||||
| SS-1 | New 57 Classroom Middle School (Forest Park) | X | $75M | CCPS Board of Education | SPLOST | ||||
| SS-2 | Lovejoy HS Auxiliary | X | $110M | CCPS Board of Education | SPLOST & CAPITAL OUTLAY | ||||
| SS-3 | General Renovations at Existing Schools | X | X | X | X | X | $800M | CCPS Board of Education | SPLOST & CAPITAL OUTLAY |
| Items 4 - 6 are new items in this 2024 CWP | |||||||||
| SS-4 | Communications Support | X | X | X | X | X | $117M | CCPS Board of Education | SPLOST & CAPITAL OUTLAY |
| SS-5 | Operations of events planning service | X | X | X | X | X | Staff time | CCPS Board of Education | SPLOST & CAPITAL OUTLAY |
| SS-6 | North Clayton High School | X | X | $150M | CCPS Board of Education | SPLOST & CAPITAL OUTLAY |
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./ Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Parks and Recreation | |||||||||
| Items 1-4 are ongoing items from the 2019 CWP that are still relevant and are hence being included in the 2024 CWP | |||||||||
| PR-1 | (Morrow/Lake City Park) Convert the concrete pad behind the concession building to a basketball court | X | X | $250,000 | Parks and Recreation | General/ SPLOST/ REC | |||
| PR-2 | (Jim Huie Recreation Center) Educational Program area; working with the Huie Foundation to get additional land donated to the Greenspace Program | X | X | X | X | X | $35,000 | Parks and Recreation | General/ SPLOST/ REC |
Implementation - Clayton Takes Flight
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./ Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Parks and Recreation | |||||||||
| PR-3 | (Independence Park) Landscaping around park to assist with crime prevention; add restroom facility | X | X | $200,000 | Parks and Recreation | General/SPLOST/REC | |||
| PR-4 | 10 additional swing sets needed throughout the County (specifically for toddlers) and toddler play features in parks adjacent to existing playgrounds (this is item 4 and 5 from the 2019 CWP combined) | X | X | X | $1.5 M | Parks and Recreation | General/SPLOST/ REC/HUD Grant | ||
| Items 5 - 9 are new items in this 2024 CWP | |||||||||
| PR-5 | Update the Parks and Recreation Master Plan, including updates to county-wide Trails Master Plan | X | X | X | $400,000 | Transporta- tion / Parks and Rec | SPLOST / CDAS Funds | ||
| PR-6 | Participate in the development of Flint River trails with adjacent cities, counties, and the Atlanta Regional Commission | X | X | X | Staff time | Transporta- tion / Parks and Rec | U.S. Department of Transportation's Recon- necting Communities and Neighborhoods grant | ||
| PR-7 | Develop a pollution and noise mitigation plan and potential grant funding opportunities to mitigate noise, air, and water pollution impacts on legacy residential and businesses. | X | X | X | X | X | $400,000 | Parks and Recreation / CCWA | SPLOST |
| PR-8 | Huie Nature Preserve Campground and Archery | X | X | X | $4.7M | Parks and Recreation / CCWA / Huie Nature Preserve Foundation | Georgia Outdoor Stew- ardship Grant, Georgia 319(h), Georgia Depart- ment of Natural Resources Archery Grant | ||
| PR-9 | Huie Nature Preserve Outdoor Classrooms, Disk Golf and Open Space Fields | X | X | X | $15M | Parks and Recreation / CCWA / Huie Nature Preserve Foundation | TBD |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Library System | |||||
| Items 1 - 7 are ongoing items from the 2019 CWP that are still relevant and are hence being included in the 2024 CWP | |||||
| LS-1 | Landscape all libraries | X | X | X | X |
| LS-2 | Repair roof at Morrow | X | X | X | |
| LS-3 | Repair Circulation Desk at all Branch Locations | X | X | ||
| LS-4 | Paint library interior at all locations | X | X | X | X |
| LS-5 | Purchase additional volumes for each branch to meet the State's minimum level of service standards | X | X | X | X |
| LS-6 | Implement a plan to replace public and staff computers at the County's public libraries every three years | X | X | ||
| LS-7 | Improvement and renovation of existing Libraries | X | X | X | X |
| Items 8 - 15 are new items in this 2024 CWP | |||||
| LS-8 | Riverdale Renovation and Expansion project | X | X | X | |
| LS-9 | Headquarters Library Renovations and Monument Signage | X | X | X | X |
| LS-10 | New Jonesboro Branch and Rex Branch | X | X | X | X |
| LS-11 | Install Panic Buttons for Headquarters, Love Joy, Forest Park, Morrow, Northwest, and Riverdale Branches | X | X | X | X |
| LS-12 | Install Monument Signs at Headquarters, Love Joy, Forest Park, Morrow, and Riverdale Branches | X | X | X | X |
| LS-13 | Paint interior of all library branches | X | X | X | X |
| LS-14 | Paint exterior of Headquarters branch. | X | X | X | X |
| LS-15 | Upgrade alarm systems at all branches. | X | X | X | X |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Police Department | |||||
| Item 1 is an ongoing item from the 2019 CWP which is still relevant and is hence being included in this 2024 CWP | |||||
| PD-1 | Police vehicles with equipment | X | X | ||
| Items 2 - 3 are new items in this 2024 CWP | |||||
| PD-2 | Police Academy | X | X | X | X |
| PD-3 | Refurbishing of Police Department (replace flooring) | X | X | X | X |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Fire and EMS | |||||
| Items 1 - 2 are ongoing items from the 2019 CWP that are still relevant and are hence being included in the 2024 CWP | |||||
| FE-1 | Develop and implement new EMS Delivery Model for Clayton County | X | X | X | X |
| FE-2 | Build new fire stations to address 2012 ISO evaluation (Stockbridge and Lovejoy) | X | X | X | X |
| Item 3 is a new item in this 2024 CWP | |||||
| FE-3 | Riverdale Merger | X | X | X |
MOVING CLAYTON FORWARD – 2024 COMPREHENSIVE PLAN
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | | :--- | :--- | :---: | :---: | :---: | :--- | :--- | :--- | :--- | :--- | | | | '24 | '25 | '26 | '27 | '28 | | | | | Water Authority | | | | | | | | | | | Items 1 - 2 are ongoing items from the 2019 CWP that are still relevant and are hence being included in the 2024 CWP | | | | | | | | | | | WA-1 | Stormwater System Rehabilitation | X | X | X | X | X | $3,500,000/ year | CCWA | User Fees | | WA-2 | Emergency Generators - all Water Facilities | | X | | | | $9,000,000 | CCWA | User Fees | | Items 3 - 4 are new items in this 2024 CWP | | | | | | | | | | | WA-3 | Identify the best option forward to resolve flooding issues near the SRMC - such as dredging the Flint River or raising the Riverdale Road bridge. | X | X | X | X | X | Staff time | CCWA / Inter-governmental Coordination | Included in Staff time | | WA-4 | CCWA to continue efforts to remove contaminants from the drinking water including PFOS from the drinking water. | | | X | X | X | $450,000,000 | CCWA | User Fees |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | | :--- | :--- | :---: | :---: | :---: | :--- | :--- | :--- | :--- | :--- | | | | '24 | '25 | '26 | '27 | '28 | | | | | Digital Equity | | | | | | | | | | | Items 1 - 3 are new items in this 2024 CWP | | | | | | | | | | | DE-1 | Partner with DCA to develop Broadband Ready Sites - focused on development focus areas- Mountain View and Tara Blvd at Old Dixie | X | X | X | X | X | Staff time | Digital Equity / Community Development / Economic Development | General Funds | | DE-2 | Explore the option for Clayton County to become an internet provider | X | X | X | | | Staff time | Digital Equity | General Funds | | DE-3 | As federal financial assistance programs to help cover the cost of broadband services are available, promote the offering to the Clayton community and make sign-up assistance available. | X | X | X | X | X | Staff time | Digital Equity | Included in Staff time |
Implementation - Clayton Takes Flight
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | |---|---|---|---|---|---|---|---|---| | | | ‘24 | ‘25 | ‘26 | ‘27 | ‘28 | | | | | Building and Maintenance | | | | | | | | | | | Item 1 is an ongoing item from the 2019 CWP which is still relevant and is hence being included in this 2024 CWP | | | | | | | | | | | BM-1 | Renovate Old 911 Building, 7946 N. McDonough St. Jonesboro, GA 30236 | X | X | X | X | X | $1,500,000 | Buildings and Maintenance | General Funds/2015 SPLOST | | Items 2 - 6 are new items in this 2024 CWP | | | | | | | | | | | BM-2 | Facilities Master Plan | X | X | X | | | $200,000,000 | Building and Maintenance | 2015 SPLOST / Bond Funds | | BM-3 | Administrative Building | X | X | X | | | $40,000,000 | Building and Maintenance | 2021 Bond | | BM-4 | Behavioral Health Crisis | X | X | | | | $4,400,000 | Building and Maintenance | 2020 Bond | | BM-5 | Medical Examiners Office | X | X | | | | $5,000,000 | Building and Maintenance | ARPA Funding | | BM-6 | VIP Complex Amphitheater | X | X | X | | | $5,000,000 | Building and Maintenance | 2021 Bond |
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./ Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Housing Department | |||||||||
| All items are new in this 2024 CWP | |||||||||
| HD-1 | Administrative costs to provide management and oversight of the CDBG Program. | X | $472,974 | Housing Urban Development Department | CDBG Program | ||||
| HD-2 | Administrative costs associated with the implementation of the Essential Home Repair Program | X | $80,000 | Housing Urban Development Department | CDBG Program | ||||
| HD-3 | Demolition of existing concession stand/restroom and replace with concrete pre-cast structure. | X | $100,000 | Community Development (CD)/ Housing | CDBG Program | ||||
| HD-4 | Demolition of existing concession stand/restroom and replace with concrete pre-cast structure. | X | $100,000 | CD/Housing | CDBG Program | ||||
| HD-5 | Demolition of existing concession stand/restroom and replace with concrete pre-cast structure. | X | $100,000 | CD/Housing | CDBG Program | ||||
| HD-6 | Gateway signage, lighting and landscaping at a busy County though fare | X | $100,000 | Economic Development/ CD | CDBG Program | ||||
| HD-7 | Installation of playground equipment for children ages 5-17 | X | $100,000 | CD | CDBG Program | ||||
| HD-8 | Vouchers will be provided to youth ages 5-17 to attend Parks and Recreation Summer Camp. | X | $25,000 | CD | CDBG Program | ||||
| HD-9 | Improvements to upgrade playgrounds, sport fields and picnic areas. | X | $250,000 | CD | CDBG Program | ||||
| HD-10 | Improvements to upgrade playgrounds, sport fields and picnic areas. | X | $100,000 | CD | CDBG Program | ||||
| HD-11 | The Youth Services Division, with the support of the Information Technology Department and Clayton County Library System, will create a coding bootcamp to empower Clayton County citizens with IT skills ages 16-24 years old. A free coding bootcamp will offer underrepresented groups, like at risk youth and young women, a means of exposure to IT training. | X | $48,000 | CD | CDBG Program |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source | | :--- | :--- | :---: | :---: | :---: | :---: | :---: | :---: | :--- | :--- | :--- | | | | '24 | '25 | '26 | '27 | '28 | | | | | Housing Department | | | | | | | | | | | HD-12 | The current park facility consists of sidewalks and unimproved open area. The sidewalks initially constructed of brick pavers need replacement due to shifting and uneven surfaces. A portion of the open area of the park has a low area consisting of bad soils and wet subsurface conditions creating. Funding would assist in the improvements as follows: demolish and remove current brick pavers/sidewalks; install new ADA sidewalks; install underdrain systems to properly drain low area; haul in and grade low area to provide for adequate recreational use of area; install outdoor exercise equipment; install gazebo and other sitting areas; install Wi-fi capability for persons using the park area; install recreational courts such as pickle ball and badminton courts; and construct an outdoor viewing area for movies in the park to include a retaining wall/sitting area. | | X | | | | $87,500 | CD | CDBG Program | | HD-13 | Purchase and install additional playground equipment, pavilion, tables and grilling area at the major City park | | X | | | | $50,000 | CD | CDBG Program | | HD-14 | Conversion of existing commercial building to a community facility. | | X | | | | $504,074 | CD | CDBG Program | | HD-15 | Provide access to art services for low income youth. | | X | | | | $35,000 | CD | CDBG Program | | HD-16 | HOPE Shelter provides shelter assistance to women and children facing homelessness. Emergency shelter is provided up to 90 days. During this time, clients are assisted with referral services that aid participants in regaining sustainable housing. | | X | | | | $30,000 | Homeless Prevention (HML) | CDBG Program | | HD-17 | Metro Fair Housing Services will assist the County through the provision of services which include, Education and Outreach, Intake and Counseling, and Enforcement of federal and state fair housing laws | | X | | | | $75,000 | CD/Housing | CDBG Program |
| # | Activity | '24 | '25 | '26 | '27 | '28 | Estimated Cost | Responsible Dept./ Agency | Funding Source |
|---|---|---|---|---|---|---|---|---|---|
| Housing Department | |||||||||
| HD-18 | Southern Crescent Sexual Assault Center will continue their Sexual Assault Forensic Program in Jonesboro, Georgia. The agency will conduct forensic medical examinations and evidence collection at the Jonesboro clinic, to provide direct victim assistance for LMI individuals in Clayton | X | $35,000 | Homeless Prevention (HML) | CDBG Program | ||||
| HD-19 | Administrative costs associated with the implementation of home repairs for County residents | X | $72,324 | Housing Urban Development Department (HUD) | CDBG Program | ||||
| HD-20 | Administrative costs to provide management and oversight of the HOME program. | X | $102,047 | HUD | HOME Program | ||||
| HD-21 | HOME guidelines require each year that a minimum of 15% of available funds be allocated toward projects completed by certified Community Housing Development Organizations (CHDO) within the jurisdiction. Clayton County as designated 24% of its HOME award to assist in the development of affordable housing. CHDO's that have certified with the Office of Grants Administration will become eligible to make requests against these funds. | X | $153,070 | HUD | HOME Program | ||||
| HD-22 | Construction of senior housing. | X | $500,000 | HUD | HOME Program | ||||
| HD-23 | Construction of senior housing. | X | $265,346 | HUD | HOME Program |
| # | Activity | Timeframe | Estimated Cost | Responsible Dept./Agency | Funding Source |
|---|---|---|---|---|---|
| '24 | '25 | '26 | '27 | ||
| Housing Department | |||||
| HD-24 | ESG will support the following agencies in completing activities related to homelessness prevention and emergency shelter: 1 (ESG24 Homeless Prevention) Office of Grants Administration SHIP Initiative will receive $15,000 to provide short- and medium-term security deposit, rent and utility assistance to 15 SHIP participants. 2 (ESG24 Rapid Rehousing) Hearts to Nourish Hope will receive $184,902 to provide rehousing beds, utilities, and case management for 110 homeless families in Clayton County. | X | |||
| HD-25 | Home Repair Program | X | |||
| HD-26 | Down-Payment Assistance | X | |||
| HD-27 | Tenant Based Rental Assistance | X | |||
| HD-28 | Atlanta Legal Aid | X | |||
| HD-29 | Mobile Health Clinic | X | |||
| HD-30 | Calvary Homeless Shelter | ||||
| HD-31 | NACA Public Housing Home Ownership (HOT-PHA) Assistance Program | X | X | X |
(blank page)
⬚ figure
Cultural Places | Beautiful Places