'EWA
DEVELOPMENT PLAN
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
City and County of Honolulu • Department of Planning and Permitting | July 2013 (Amended 2020)
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
⬚ figure
City and County of Honolulu • Department of Planning and Permitting | July 2013 (Amended 2020)
ORDINANCE 20-45 BILL 64 (2020), CD1, FD1
TO ADOPT AN AMENDMENT TO THE EWA DEVELOPMENT PLAN (2013) FOR THE CITY AND COUNTY OF HONOLULU.
BE IT ORDAINED by the People of the City and County of Honolulu:
SECTION 1. Purpose. The purpose of this ordinance is to amend portions of the existing Development Plan ("DP") for Ewa, Article 3, Chapter 24, Appendix 24-3, Revised Ordinances of Honolulu 1990.
This development plan ordinance amends portions of the development plan for Ewa to create greater consistency with the development guidelines for the East Kapolei Neighborhood Transit-Oriented Development Plan and to more accurately reflect current circumstances. The amendments are consistent with the objectives and policies of the General Plan 1992 (Amended 2002).
This ordinance is enacted pursuant to the powers vested in the City and County of Honolulu by Chapter 46 and Section 226-58 of the Hawaii Revised Statutes.
SECTION 2. Chapter 24, Article 3, Revised Ordinances of Honolulu 1990 ("Ewa"), is amended by replacing Appendix 24-3 ("Ewa Development Plan July 2013") with the amended Ewa Development Plan attached hereto as Exhibit A and incorporated herein by this reference.
1
ORDINANCE 20 - 4 6
CITY COUNCIL CITY AND COUNTY OF HONOLULU HONOLULU, HAWAII
BILL 64 (2020), CD1, FD1
SECTION 4. This ordinance takes effect upon its approval.
DATE OF INTRODUCTION:
August 31, 2020 Honolulu, Hawaii
APPROVED AS TO FORM AND LEGALITY:
Deputy Corporation Counsel DUANE W.H. PANG APPROVED this 23rd day of December , 20 20 .
Mayor City and County of Honolulu
INTRODUCED BY:
Ikaika Anderson (br)
Councilmembers
CITY COUNCIL CITY AND COUNTY OF HONOLULU HONOLULU, HAWAII CERTIFICATE
O R D I N A N C E 20 - 46 BILL 64 (2020), CD1, FD1
Introduced: 08/31/20 By: IKAIKA ANDERSON – BY REQUEST Committee: ZONING, PLANNING AND HOUSING
Title: A BILL FOR AN ORDINANCE TO ADOPT AN AMENDMENT TO THE EWA DEVELOPMENT PLAN (2013) FOR THE CITY AND COUNTY OF HONOLULU.
Voting Legend: * = Aye w/Reservations
| 09/09/20 | COUNCIL | BILL PASSED FIRST READING AND REFERRED TO COMMITTEE ON ZONING, PLANNING AND HOUSING. 8 AYES: ANDERSON, ELEFANTE, FUKUNAGA, KOBAYASHI, MANAHAN, MENOR, PINE, WATERS. 1 ABSENT: TSUNEYOSHI. |
| NOTE: EFFECTIVE SEPTEMBER 23, 2020, COUNCILMEMBER IKAIKA ANDERSON, REPRESENTING COUNCIL DISTRICT III, RESIGNED FROM OFFICE. [Refer to Communication CC-256(20)] NOTE: THE APPOINTMENT OF ALAN KEKOA TEXEIRA TO FILL A VACANCY IN THE OFFICE OF COUNCILMEMBER FOR COUNCIL DISTRICT III WAS APPROVED ON WEDNESDAY, SEPTEMBER 23, 2020. (refer to RES20-236, FD1) CC-269(20) KOBAYASHI - COUNCIL STANDING COMMITTEE ASSIGNMENTS. | ||
| 10/29/20 | ZONING, PLANNING AND HOUSING | CR-266 – BILL REPORTED OUT OF COMMITTEE FOR PASSAGE ON SECOND READING AND SCHEDULING OF A PUBLIC HEARING AS AMENDED IN CD1 FORM. 5 AYES: ELEFANTE, MANAHAN, MENOR, TEXEIRA, WATERS. |
| 10/23/20 | PUBLISH | PUBLIC HEARING NOTICE PUBLISHED IN THE HONOLULU STAR-ADVERTISER. |
| 11/05/20 | COUNCIL/PUBLIC HEARING | CR-266 ADOPTED. BILL PASSED SECOND READING AS AMENDED, PUBLIC HEARING CLOSED AND REFERRED TO COMMITTEE ON ZONING, PLANNING AND HOUSING. 9 AYES: ELEFANTE, FUKUNAGA, KOBAYASHI, MANAHAN, MENOR, PINE, TEXEIRA, TSUNEYOSHI, WATERS. |
| 11/13/20 | PUBLISH | SECOND READING NOTICE PUBLISHED IN THE HONOLULU STAR-ADVERTISER. |
| 11/19/20 | ZONING, PLANNING AND HOUSING | CR-313 – BILL REPORTED OUT OF COMMITTEE FOR PASSAGE ON THIRD READING. 4 AYES: ELEFANTE, MENOR, TEXEIRA, WATERS. 1 EXCUSED: MANAHAN. |
| 12/09/20 | COUNCIL | AMENDED TO FD1 (OCS2020-1271/12/2/2020 3:58 PM). 9 AYES: ELEFANTE, FUKUNAGA, KOBAYASHI, MANAHAN, MENOR, PINE, TEXEIRA, TSUNEYOSHI, WATERS. CR-313 ADOPTED. BILL 64 (2020), CD1, FD1 PASSED THIRD READING AND FINDINGS OF FACT ADOPTED. 9 AYES: ELEFANTE, FUKUNAGA, KOBAYASHI, MANAHAN, MENOR, PINE, TEXEIRA, TSUNEYOSHI, WATERS. |
I hereby certify that the above is a true record of action by the Council of the City and County of Honolulu on this BILL.
GLEN I. TAKAHASHI, CITY CLERK ANN KOBAYASHI, CHAIR AND PRESIDING OFFICER
20 - 46
20 - 4 6
| PAGE | |
|---|---|
| PREFACE AND EXECUTIVE SUMMARY | ES-1 |
| Preface | ES-1 |
| The Development Plan Five Year Review Process | ES-1 |
| A Sustainable Future for O‘ahu | ES-3 |
| Integrating Principles of Sustainability into | |
| Decision-Making Processes | ES-5 |
| The Honolulu Land Use Planning and Management System | ES-5 |
| Authority of the Development and Sustainable | |
| Communities Plans | ES-6 |
| Executive Summary | ES-7 |
| ‘Ewa's Role in O‘ahu's Development Pattern | ES-8 |
| The Vision to 2035 | ES-8 |
| Elements of the Vision | ES-9 |
| Implementing Policies and Guidelines | ES-9 |
| 1. ‘EWA'S ROLE IN O‘AHU'S DEVELOPMENT PATTERN | 1-1 |
| 2. THE VISION FOR ‘EWA'S FUTURE | 2-1 |
| 2.1 VISION STATEMENT | 2-1 |
| Protect Agricultural Lands and Open Space | 2-2 |
| Develop the Secondary Urban Center | 2-3 |
| Build Master Planned Residential Communities | |
| That Support Walking, Biking, and Transit Use | 2-4 |
| Protect Natural, Historic, and Cultural Resources | 2-5 |
| Provide Adequate Infrastructure to Meet the Needs | |
| of New and Existing Development | 2-6 |
| 2.2 KEY ELEMENTS OF THE VISION | 2-7 |
| 2.2.1 Community Growth Boundary | 2-7 |
| 2.2.2 Retention of Agricultural Lands | 2-11 |
2.2.3 Open Space and Greenways 2-13 2.2.4 Kalaeloa Regional Park 2-16 2.2.5 Secondary Urban Center 2-16 2.2.6 Master Planned Residential Communities 2-18 2.2.7 Communities Designed to Support Non-Automotive Travel 2-18 2.2.8 Conservation of Natural Resources 2-20 2.2.9 Preservation and Enhancement of Historic and Cultural Resources 2-21 2.2.10 Planned Regional Development 2-22
3. LAND USE POLICIES AND GUIDELINES 3-1 3.1 OPEN SPACE PRESERVATION AND DEVELOPMENT 3-1 3.1.1 General Policies 3-2 3.1.2 Relation to Open Space Map 3-2 3.1.3 Guidelines 3-3 3.1.3.1 Mountain Areas 3-3 3.1.3.2 Natural Gulches and Drainageways 3-4 3.1.3.3 Shoreline Areas 3-4 3.1.3.4 Agricultural Areas 3-5 3.1.3.5 Parks 3-5 3.1.3.6 Golf Courses 3-7 3.1.3.7 Wildlands-Urban Fire Hazard Setbacks 3-7 3.1.3.8 Greenways and Open Space Corridors 3-7 3.2 REGIONAL PARKS AND RECREATION COMPLEXES 3-8 3.2.1 General Policies 3-9 3.2.2 Guidelines 3-11 3.2.2.1 Appropriate Scale and Siting 3-11 3.2.2.2 Environmental Compatibility 3-11 3.2.2.3 Community Integration 3-11 3.2.2.4 Islandwide and Regional Parks 3-12 3.2.2.5 Sports and Recreation Complexes 3-12 3.2.2.6 Siting 3-13 3.3 COMMUNITY-BASED PARKS 3-13 3.3.1 General Policies 3-14 3.3.2 Guidelines 3-17
3.3.2.1 Development of Community-Based Parks 3-17 3.3.2.2 Access to Mountain Trails 3-17 3.3.2.3 Siting 3-17 3.4 HISTORIC AND CULTURAL RESOURCES 3-18 3.4.1 General Policies 3-18 3.4.2 Guidelines 3-19 3.4.2.1 Sites Under Review 3-19 3.4.2.2 Impacts of Development on Historic and 3-22 Cultural Resources 3-22 3.4.2.3 OR&L Historic Railway 3-22 3.4.2.4 Lanikūhonua 3-23 3.4.2.5 Native Hawaiian Cultural and Archaeological Sites 3-24 3.5 NATURAL RESOURCES 3-25 3.5.1 General Policies 3-25 3.6 CITY OF KAPOLEI 3-26 3.6.1 General Policies 3-26 3.6.1.1 Districts 3-27 3.6.1.2 Key Open Space Elements 3-29 3.6.2 Major Themes 3-31 3.6.3 Guidelines 3-32 3.6.3.1 Urban Form 3-32 3.6.3.2 Natural Environment and Landscaping 3-33 3.6.3.3 Public Access and Circulation 3-33 3.7 ‘EWA PLANTATION VILLAGES 3-34 3.7.1 General Policies 3-35 3.7.2 Guidelines 3-35 3.8 OCEAN POINTE/HOAKALEI 3-37 3.8.1 General Policies 3-38 3.8.2 Ocean Pointe/Hoakalei Land Use Map 3-39 3.8.3 Guidelines 3-39 3.9 EXISTING AND PLANNED RESIDENTIAL COMMUNITIES 3-44 3.9.1 General Policies 3-44 3.9.2 Guidelines 3-47 Residential 3-47 Low Density Apartment 3-47
| Medium Density Apartment | 3-48 |
| Circulation System | 3-49 |
| 3.9.3 | Relation to Urban Land Use Map |
| 3.9.4 | Relation to Zoning |
| 3.10 | PLANNED COMMERCIAL RETAIL CENTERS |
| 3.10.1 | General Policies |
| 3.10.2 | Guidelines |
| All Commercial Centers | |
| Neighborhood Commercial Centers | |
| Community Commercial Centers | |
| Regional Commercial Centers | |
| 3.11 | KO OLINA RESORT |
| 3.11.1 | General Policies |
| 3.11.2 | Ko Olina Land Use Map |
| 3.11.3 | Guidelines |
| 3.12 | INDUSTRIAL CENTERS |
| 3.12.1 | General Policies |
| 3.12.2 | Guidelines |
| 3.12.3 | Relation to Urban Land Use Map |
| 3.13 | KALAELOA |
| 3.13.1 | General Policies |
| 3.13.2 | Guidelines |
| 3.14 | PEARL HARBOR NAVAL BASE (WEST LOCH) |
| 3.15 | UNIVERSITY OF HAWAI‘I WEST O‘AHU |
| 3.15.1 | General Policies |
| 3.15.2 | Guidelines |
| 4. | PUBLIC FACILITIES AND INFRASTRUCTURE POLICIES AND |
| GUIDELINES | |
| 4.1 | TRANSPORTATION SYSTEMS |
| 4.1.1 | Existing Roadway Network |
| 4.1.2 | Planned Extensions of the Roadway Network |
| 4.1.3 | Additional Elements of the Roadway Network |
| 4.1.4 | Transit |
| 4.1.4.1 |
4.1.4.2 Planned Rail Transit Corridor 4-8 4.1.4.3 Commuter Ferry System 4-10 4.1.5 Bikeway System 4-10 4.1.6 General Policies 4-11 4.1.7 Guidelines 4-16 4.2 WATER ALLOCATION AND SYSTEM DEVELOPMENT 4-17 4.2.1 General Policies 4-20 4.3 WASTEWATER TREATMENT 4-24 4.3.1 General Policies 4-24 4.4 ELECTRICAL POWER DEVELOPMENT 4-25 4.4.1 General Policies 4-25 4.5 SOLID WASTE HANDLING AND DISPOSAL 4-26 4.5.1 General Policies 4-27 4.6 DRAINAGE SYSTEMS 4-28 4.6.1 General Policies 4-30 4.6.2 Guidelines 4-32 4.7 SCHOOL FACILITIES 4-33 4.7.1 General Policies 4-35 4.7.2 Guidelines 4-35 4.8 PUBLIC SAFETY FACILITIES 4-36 4.8.1 General Policies 4-39 4.9 OTHER COMMUNITY FACILITIES 4-39
5. IMPLEMENTATION 5-1 5.1 PHASING OF DEVELOPMENT 5-1 5.1.1 Private Development Phasing 5-3 5.1.2 Public Facility Investment Priorities 5-3 5.2 SPECIAL AREA PLANS 5-4 5.3 FUNCTIONAL PLANS 5-5 5.4 REVIEW OF ZONING AND OTHER DEVELOPMENT APPLICATIONS 5-7 5.4.1 Environmental Assessment 5-7 5.4.2 Project Master Plans 5-9 5.4.2.1 Coverage and Scope 5-9 5.4.2.2 Key Elements 5-10
5.4.2.3 Review Procedures 5-11 5.4.2.4 Modification of Master Plans for Future Phases 5-11 5.4.3 Adequate Facilities Requirement 5-12 5.4.4 Zoning Application Review 5-12 5.4.5 Unilateral Agreements 5-13 5.4.6 Development Agreements 5-13 5.5 ANNUAL CIP REVIEW 5-14 5.6 BIENNIAL REPORT 5-14 5.7 FIVE YEAR DEVELOPMENT PLAN REVIEW 5-15 5.8 DEVELOPMENT PLAN COMMON PROVISIONS AND EXISTING LAND USE APPROVALS 5-15 5.9 RELATION TO GENERAL PLAN POPULATION GUIDELINES 5-16 5.10 REVIEW AND REVISION OF DEVELOPMENT CODES 5-16 5.11 IMPLEMENTATION MATRIX 5-18
| PAGE | |
|---|---|
| Table 2.1: ‘Ewa Development Capacity and Entitlement Status | 2-10 |
| Table 2.2: ‘Ewa Open Space and Greenways Network | 2-14 |
| Table 3.1: ‘Ewa Public and Private Parks and Golf Courses | 3-15 |
| Table 3.2: Significant ‘Ewa Historic and Cultural Resources | 3-21 |
| Table 3.3: Height Guidelines for the City of Kapolei | 3-33 |
| Table 3.4: Density and Height Guidelines by Residential Density Category | 3-46 |
| Table 3.5: Guidelines for Appropriate Zoning | 3-53 |
| Table 3.6: Kalaeloa Land Conveyance Status | 3-76 |
| Table 4.1: Planned and Proposed ‘Ewa Roadway Network Improvements | 4-3 |
| Table 4.2: Potential Sources of Potable and Nonpotable Water for ‘Ewa | 4-21 |
| Table 4.3: Existing and Planned Schools in the ‘Ewa Development Plan Area | 4-34 |
| Table 4.4: Existing and Planned Public Safety Facilities in the ‘Ewa Development Plan Area | 4-37 |
| Table 4.5: Existing Public Emergency Shelters in ‘Ewa, 2009 | 4-38 |
| Table 5.1: Implementation Matrix | 5-19 |
| LIST OF EXHIBITS | PAGE |
|---|---|
| Exhibit ES-1: Development Plan and Sustainable Communities | |
| Plan Areas for O‘ahu | ES-2 |
| Exhibit 1.1: Development Plan and Sustainable Communities | |
| Plan Areas for O‘ahu | 1-3 |
| Exhibit 2.1: Community Growth Boundary for ‘Ewa and Central O‘ahu | 2-8 |
| Exhibit 2.2: ‘Ewa Enterprise Zone | 2-17 |
| Exhibit 2.3: Existing and New Master Planned Communities | 2-19 |
| Exhibit 3.1: Parks in the ‘Ewa Development Plan Area | 3-6 |
| Exhibit 3.2: Natural, Historic and Scenic Resources | |
| in the ‘Ewa Development Plan Area | 3-20 |
| Exhibit 3.3: City of Kapolei Land Use Map | 3-28 |
| Exhibit 3.4: ‘Ewa Plantation Villages Location | 3-36 |
| Exhibit 3.5: Ocean Pointe/Hoakalei Land Use Map | 3-40 |
| Exhibit 3.6: Ko Olina Land Use Map | 3-64 |
| Exhibit 4.1: ‘Ewa Bikeway System | 4-12 |
| Exhibit 4.2: Street Network | 4-17 |
| Exhibit 4.3: ‘Ewa Drainage Basins Map | 4-31 |
| APPENDIX A: CONCEPTUAL MAPS | |
| Glossary of Terms | A-2 |
| Common Elements | A-2 |
| Open Space Map | A-5 |
| Urban Land Use Map | A-6 |
| Public Facilities Map | A-9 |
| Phasing Map | A-12 |
| ‘Ewa Open Space Map | A-15 |
| ‘Ewa Urban Land Use Map | A-17 |
| ‘Ewa Public Facilities Map | A-19 |
| ‘Ewa Phasing Map | A-21 |
The ‘Ewa Development Plan has been prepared in accordance with the Charter-prescribed requirements for development plans and is to be accorded force and effect as such for all Charter- and ordinance-prescribed purposes.
It is one of a set of eight community-based plans intended to guide public policy, infrastructure investment, and land use decision-making over the next 25 years. Each plan addresses one of eight planning areas of O‘ahu, responding to specific conditions and community values of each region. The map on the following page illustrates these planning regions.
The plans for ‘Ewa and the Primary Urban Center, as the areas where the General Plan says population growth and development activity is to be directed over the next 25 years, are designated as "Development Plans."
Plans for the remaining six areas, which are envisioned as relatively stable regions for which public actions will focus on supporting existing populations, have been entitled "Sustainable Communities Plans" to indicate the intent to focus on retaining and sustaining the unique qualities and characteristics of each of these areas.
This Plan is a revision of the ‘Ewa Development Plan which was adopted by the City Council in 1997. The 1997 ‘Ewa Development Plan was the first of the eight plans to be revised in response to a 1992 City Charter amendment which changed the nature of
Exhibit ES-1 Development Plan and Sustainable Communities Plan Areas for Oʻahu
⬚ figure
the Development Plans from relatively detailed, parcel-specific plans to conceptual, visionary plans.
As amended in 2000, the Plan is to be reviewed every five years to determine if:
This document is the culmination of a community-based planning effort led by the Department of Planning and Permitting which involved public meetings and workshops, interviews, focus groups, and numerous meetings over the past six years.
In its final form, the Plan incorporates and responds to comments received from public outreach to community leaders, business and labor representatives, landowners, developers, and public and private agency staff through a variety of formats since 2002.
The ‘Ewa Development Plan Review Report provides documentation of the comments and suggestions received, and details the Department’s assessments of what revisions or implementation recommendations should be made as a result.
There has been a recent surge in widespread community discussions, actions and laws adopted to address sustainability. In 2005, the State Legislature convened a statewide group to draft a Hawai‘i 2050 Plan, whose primary purpose is to provide policy recommendations for creating a sustainable Hawai‘i. In 2007, greenhouse gas emissions goals for 2020 were enacted. Public service announcements dealing with conserving water and electricity abound. The concept of buildings that are designed, built and occupied with environmental considerations at the forefront largely did not exist when the current Development Plans and Sustainable Communities Plans were adopted. This setting raises the question of the role of the Development Plans and Sustainable Communities Plans. Are they the City’s version of a sustainability plan?
The answer is that they are the land development portion of a larger blueprint for sustainability. As discussed below, the General Plan sets long term goals for the City and County of Honolulu, across 11 major elements. Perhaps its most substantive chapter deals with population, and hence land development distribution. It sets the growth management strategy for O‘ahu. The Development Plans and Sustainable Communities Plans provide more detail on this land management strategy, assuring that how we use the land now, and in the future, responds to the three major elements of a Sustainable Place: economic health, social equity, and environmental protection.
Since 1977, the City’s policy, as adopted by the City Council in the O‘ahu General Plan, has been to "keep the Country country" by fully developing downtown Honolulu from Pearl City to Kahala, by building O‘ahu’s Second City in ‘Ewa, and by developing surrounding suburban “urban fringe” areas in ‘Ewa and Central O‘ahu. Millions of dollars of taxpayers’ monies have been paid for roadways, schools, sewers, water systems, and other infrastructure to support this pattern of development.
Our most recent projections show that O‘ahu will need over 88,000 new homes to meet expected population growth between 2005 and 2035. The General Plan, and the Development Plans and Sustainable Communities Plans adopted by the City Council to implement the General Plan provide capacity for most new homes to be built either in downtown Honolulu, ‘Ewa, or Central O‘ahu.
Inevitably, this requires that some prime agricultural land in ‘Ewa inside the Community Growth Boundary be used to provide the required single and multi-family housing (even though the ‘Ewa Development Plan does protect some 3,000 acres of prime agricultural land outside the Community Growth Boundary). The loss of prime agricultural land in ‘Ewa is the cost of insuring that the rural areas in Wai‘anae, North Shore, and the Windward side and along Kunia Road in Central O‘ahu are protected against development.
The issues addressed either directly or indirectly by these regional plans certainly overlap with other planning responsibilities of other departments, such as water delivery and consumption, crime reduction, increasing public health, and developing responsive transportation systems. Collectively, these efforts comprise the strategy of developing a Sustainable Future for O‘ahu.
‘Ewa Development Plan Preface and Executive Summary ES-4
A community that can successfully manage change will flourish and prosper in the future. For this plan, this means ensuring that planned growth and development respects and adheres to the principles of sustainability.
These principles of sustainability are intended to promote the long-term health of O‘ahu, its people, and its community resources for current and future generations:
The City and County of Honolulu guides and directs O‘ahu land use and development through a three-tier system:
It has been amended several times, but the basic objectives and policies set forth in the 1977 plan remain intact.
The second tier of the system is formed by the Development Plans and Sustainable Communities Plans, which are adopted and revised by ordinance. These plans address eight geographic regions of the island, including the Primary Urban Center, ‘Ewa, Central O‘ahu, Wai‘anae, North Shore, Ko‘olau Loa, Ko‘olau Poko, and East Honolulu.
The third tier of the system is composed of implementing ordinances and regulations, including the Land Use Ordinance (Honolulu's zoning code), the Subdivision Rules and Regulations, and the City's Capital Improvement Program. Mandated by the City Charter, these ordinances and regulations constitute the principal means for implementing the City's plans. These ordinances and regulations are required to be consistent with the General Plan, the Development Plans, and each other.
In addition, the Development Plans and Sustainable Communities Plans are supplemented by two planning mechanisms that are not mentioned in the Charter:
Functional plans (such as the O‘ahu Regional Transportation Plan or the O‘ahu Water Management Plan), some of which are mandated by state or federal regulations, provide long-range guidance for the development of public facilities and infrastructure; and
Special Area Plans (such as the Waipahu Town Plan or the Wahiawa Urban Design Plan) give specific guidance for neighborhoods, communities or specialized resource areas.
The authority of the Development Plans and Sustainable Communities Plans (hereinafter referred to as "Development Plans" for simplicity) is derived from the City Charter, which mandates preparation of a General Plan and Development Plans to guide "the development and improvement of the city."
Together with the General Plan, the Development Plans provide policies to guide land use and budgetary actions of the City and to evaluate progress toward the General Plan objectives.
The Charter provides that "public improvement projects and subdivision and zoning ordinances shall be consistent with the development plan for that area." Although the Development Plans are not themselves regulatory and require implementing ordinances (the “third tier” discussed in the previous section), they provide guidance that decision makers and administrators should follow, to the extent it is sensible, in approving project development and in revising rules and regulations and standard policies. They are policy tools that are to be used, in conjunction with the programs and budgets of the City, to accomplish the objectives of the City and as guides for decisions made by the private sector. Consistent with the Charter’s description of the Development Plans as “conceptual schemes” and “a policy guide,” the language, maps, and illustrations of the Development Plans should not be deemed to be regulatory.
The plans are also intended to aid decisions made in the private sector by clearly indicating what the City's development priorities are, where development is appropriate, and what kinds of development are appropriate in each location. The 1992 Charter amendments established that the purpose of the Development Plans is to provide:
The revised plan presented in this document conforms to that mandate.
This plan is organized in five chapters and an appendix, as follows:
The following summarizes the vision, and lists the land use and infrastructure policies of the Plan and the means of implementation.
‘EWA’S ROLE IN O‘AHU’S DEVELOPMENT PATTERN
THE VISION TO 2035
ELEMENTS OF THE VISION
IMPLEMENTING POLICIES AND GUIDELINES
Chapter Three provides land use development policies and implementing guidelines for:
Chapter Four contains infrastructure policies and implementing guidelines, including policies on:
Chapter Five describes the means for implementing the ‘Ewa Development Plan through:
Page left blank intentionally
'Ewa plays a key role in implementing the directed growth policies of the General Plan of the City and County of Honolulu (City). Campbell Industrial Park opened in the early 1960's, bringing industry and jobs to the Leeward Coast, which previously had been predominantly a sugar economy and plantation lifestyle. In the 1970's, residential growth began in 'Ewa with the development of Makakilo and 'Ewa Beach.
In 1977, the Honolulu City Council approved a new General Plan, which designated 'Ewa as the location for a Secondary Urban Center for O'ahu to be centered in the Kapolei area. The Secondary Urban Center was to be the focus of major economic activity and housing development, and a center for government services. While the General Plan promotes full development of the Primary Urban Center (PUC), it also encourages development of the Secondary Urban Center at Kapolei, and residential development of the urban fringe areas in 'Ewa and Central O'ahu.
This revision of the 'Ewa Development Plan reaffirms that role and amplifies how the role can be accomplished. In support of the General Plan policies, the 'Ewa Development Plan:
Exhibit 1.1 Development Plan and Sustainable Communities Plan Areas for O‘ahu
⬚ figure
Page left blank intentionally
This chapter presents a statement of the vision for ‘Ewa's future, discusses the key elements of the vision, and presents illustrative maps and tables.
This vision for ‘Ewa has two horizons. The first horizon extends from the present to the year 2035. This horizon was used to project likely socio-economic change in ‘Ewa and to assess the infrastructure and public facility needs that have to be met over that period.
The Vision to 2035 - By 2035, the ‘Ewa Development Plan area shown in Exhibit 1.1 will have experienced tremendous growth, and will have made significant progress toward providing a Secondary Urban Center for O‘ahu. Population will have grown from 68,700 people in 2000 to over 164,000. Between 2000 and 2035, over 35,000 new housing units will have been built in a series of master planned communities.
Job growth will be equally impressive, rising from 16,400 non-construction jobs in 2000 to over 87,000 in 2035. O‘ahu residents and visitors will be attracted to ‘Ewa by a new university campus, the Ko Olina Resort, the Hoakalei Resort, a major super regional park, and a thriving City of Kapolei which has retail and commercial establishments and private and government offices.
Beyond 2035 - In the course of the Development Plan revision in 1995, it became clear that there was value in looking beyond the planning horizon to identify what ‘Ewa should look like when "fully" developed.
Such a perspective helped identify where open space should be preserved within the urbanized area, and where to set the limits to development in ‘Ewa for the foreseeable
future. As such, this second horizon might be called the "built-out" horizon and is probably 40 to 50 years in the future.
Urban growth will be contained within a boundary that will protect prime agricultural lands along Kunia Road and within the Pearl Harbor Naval Munitions Command Explosive Safety Quantity Distance (ESQD) arc for diversified agriculture. Preservation of prime agricultural lands mauka of H-1 and on the Wai‘anae side of Kunia road for use in diversified agriculture will help retain open space and views, in addition to supporting economic diversification.
Within the Community Growth Boundary, ‘Ewa will be built around a regional system of open space and greenways so that ‘Ewa has the feel of a network of communities "within a garden", as opposed to an unbroken suburban sprawl from Ko Olina to ‘Ewa Beach.
Residents of these communities will enjoy easy access to the ocean through two major marinas, numerous beaches and a shoreline walkway from Ko Olina to ‘Ewa Beach. Those interested in boating and ocean fishing will be able to use marina facilities and boat ramps at Ko Olina, Kalaeloa, and Hoakalei.
Residents will be able to easily access beaches, swimming and surfing spots all along the entire ‘Ewa coastline by road or a network of pedestrian paths and bikeways. Linear shoreline access will be provided along the coast from Ko Olina to ‘Ewa Beach. At its center will be a major new regional park and recreation complex at Kalaeloa (on the former Barbers Point Naval Air Station), which will provide access to the ocean and beaches as well as offering significant active and passive recreation facilities.
A network of greenways will link the communities together, with landscaping along major roads such as Kapolei Parkway, Kualaka‘i Parkway (formerly North-South Road), and Fort Weaver Road, and pedestrian and bike paths along grassed drainageways and utility corridors. A major pedestrian and bike path will be provided by the Pearl Harbor Historic Trail, which extends about 18.5 miles from the U.S.S. Arizona Visitor Center through the ‘Ewa Development Plan area and on to Nānākuli along the OR&L Railroad right-of-way.
Open space will be preserved in parks, golf courses, and agricultural areas that will help to protect significant public views. Wildlife habitats will be located at Kalaeloa, Hoakalei, and West Loch.
Prime agricultural land loss. Development of jobs in the City of Kapolei and the areas around it and creation of master planned residential communities in the ‘Ewa Urban Fringe Areas has been a key element in the City's growth management strategy adopted as part of the 1977 <u>General Plan</u> and reinforced by subsequent City actions approving land use plans and infrastructure investments since 1977. It is true that the development of ‘Ewa lands within the Community Growth Boundary has resulted in the conversion of thousands of acres of highly productive agricultural land as the sugar plantations closed, and new homes and job centers were developed.
However, this is the cost of protecting agricultural lands and open space in the rural areas of O‘ahu. By focusing new job growth and residential development in ‘Ewa, Central O‘ahu, and Honolulu's core urban area from Pearl City to Kahala, the vision of keeping the Country country can be achieved. Thousands of acres of agricultural lands in the SCP areas are protected by the Community Growth Boundaries in those plans, including 50,000 acres in the Central O‘ahu and North Shore SCP areas and hundreds of acres in other SCP areas including Wai‘anae, near Kahuku, in Waiāhole/Waikāne, and in Waimānalo.
A key component of the vision is the <u>Secondary Urban Center</u>, which will provide a wide range of jobs located at visitor units and activity centers in Ko Olina and Hoakalei, in heavy and light industrial areas near the Kalaeloa Barbers Point Deep Draft Harbor, in offices and retail centers located at the City of Kapolei and community and neighborhood centers in residential communities, at the University of Hawai‘i West O‘ahu (UHWO) campus, and in diversified agriculture activities located along Kunia Road and around the Pearl Harbor Naval Munitions Command.
At the heart of the Secondary Urban Center will be the City of Kapolei with an urban mix of retail, office and residential uses. By 2035, it is projected that the City of Kapolei will house over 8,000 residents and provide work sites for over 17,000 private jobs and 2,400 City and State jobs (located primarily at the City's Civic Center and Judicial
Center). The City Center will become a regional commercial center, attracting customers from all parts of O‘ahu.
Many of the jobs in the City of Kapolei will be supported by development of the UHWO campus, which is expected to have 7,600 students and 1,040 staff and faculty by 2025. Continued expansion of industrial uses at Campbell Industrial Park, Kalaeloa Barbers Point Deep Draft Harbor, and Kapolei Business Park; and growth of the Ko Olina Resort and the Hoakalei Resort to include over 7,200 visitor units by 2035 will also provide basic jobs which will support office and retail jobs in the City of Kapolei.
Build Master Planned Residential Communities That Support Walking, Biking, and Transit Use
Growth in ‘Ewa will mean community building, not just project development. Substantial residential growth (over 35,500 new units between 2000 and 2035) will occur primarily in master planned communities including the City of Kapolei, East Kapolei (Department of Hawaiian Home Lands East Kapolei, University of Hawai‘i West O‘ahu, and Ho‘opili), ‘Ewa by Gentry, ‘Ewa Villages, Kapolei West, Ko Olina, Makaīwa Hills, Makakilo, Ocean Pointe/Hoakalei, and the Villages of Kapolei. (See Exhibit 2.3.)
The master plans and design of new developments must demonstrate how they would create communities that interact with neighboring communities and support the vision for development of the entire ‘Ewa region. Such communities should be designed with identifiable and easily accessible town and village centers or “main street areas” and incorporate a mixture of residential and commercial development. While not every community will have a “main street”, all should have a community center.
These communities must be designed to meet the needs of a wide range of families and age groups. Ample housing should be provided for families needing affordable units and starter homes as well as for those seeking large multi-family and single-family units. Housing for persons of all ages will be needed, including students going to school at the UHWOcampus, young families seeking their first home, and senior citizens wanting a retirement home close to their grandchildren. Such a desirable variety in housing types could be partially achieved through the inclusion of “granny
flats” (small, accessory apartments) and/or “‘Ohana” units where infrastructure will support these additions. Separate identities should be created for existing and planned communities by using open space, architectural design, streetscape treatments and landscaping which links to the regional open space and greenway network.
Communities Designed to Reduce Automobile Use - ‘Ewa will be developed with a transportation system which reduces congestion by providing connectivity, both within and between subdivisions, provides easy access to transit, uses traffic calming design, and encourages people to walk and bike, reducing the need for use of the automobile.
Where allowed by terrain, communities will be designed with multiple street/walkway connections to adjacent communities and collector roads at approximate 1/4 mile intervals, thereby facilitating and encouraging convenient auto, pedestrian and bikeway access to parks, schools, neighborhood shopping and transit corridors. These connections will also reduce congestion on major regional roads by offering multiple alternative routes and facilitate improved neighborhood access for emergency and utility vehicles.
Medium density housing and commercial development will be built along a rail transit corridor extending from the City of Kapolei to Waipahū and will support efficient use of buses and other forms of mass transit along the corridor, allowing some residents to minimize automobile use.
An elevated rail transit line will be developed on the rail transit corridor. The first segment of the elevated rail transit line will start near the Salvation Army Kroc Center on Kualaka‘i Parkway and continue on to Waipahū along Kualaka‘i Parkway and Farrington Highway. Sufficient land will be reserved to allow extension of the elevated rail transit line through Kalaeloa to the City of Kapolei, ending near the intersection of Kapolei Parkway and the planned extension of Hānu‘a Street. See Appendix A: Pubic Facility Map, and Phasing Map.
The ‘Ewa Development Plan provides a vision for preservation, conservation, and enhancement of community resources.
Natural resources will be conserved through retaining natural drainageways, protecting valuable plant and wildlife habitats, by cleaning up contaminated areas and by efficiently using all water supplies through conservation measures and distribution system leak repair, by developing a dual water distribution system with potable water for drinking and other clean water uses and non-potable water for irrigation and industrial uses, and reclamation of non-potable water from waste-water effluent where feasible.
Cultural and historical resources will be preserved by retaining visual landmarks and significant views, and by preserving significant historic, cultural, and archaeological features from ‘Ewa's past, and by conducting surveys to thoroughly assess the historical significance of sites and structures affected by development projects and to identify the appropriate measures to preserve the historic and cultural values of the resources.
Public agencies will work with the community (residents, businesses, developers, and landowners) to address current deficiencies in roads, schools, and parks and to create adequate infrastructure to meet the needs of the residential and working population of the area.
Completion of the first increment of the elevated rail transit line (from East Kapolei to Ala Moana Shopping Center) is critical to the O‘ahu General Plan policy of relieving development pressure elsewhere on O‘ahu by developing the Second City and the Urban Fringe in ‘Ewa. It is needed to provide an effective and reliable alternative to commuting by auto for a significant number of commuters by 2020. Without the project, traffic delays for ‘Ewa commuters would increase by 46% compared to today according to the Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement (p. 3-28).
Where possible and practical, construction of new development that generates increased service demands for public schools, emergency medical services, and roadway capacity, will be coordinated with the provision of needed infrastructure capacity.
Public-private mechanisms for financing infrastructure such as Tax Increment Financing (TIF) and Community Facilities Districts (CFD) should be considered to support timely infrastructure provision.
Public agencies' planning for infrastructure needs will be guided by the Development Plan priorities for residential and commercial development. See the discussion of Planned Regional Development in Section 2.2.10.
The vision for ‘Ewa’s future will be implemented through the following key plan elements: 2.2.1 Community Growth Boundary 2.2.2 Retention of Agricultural Lands 2.2.3 Open Space and Greenways 2.2.4 Kalaeloa Regional Park 2.2.5 Secondary Urban Center 2.2.6 Master Planned Residential Communities 2.2.7 Communities Designed To Support Non-Automotive Travel 2.2.8 Conservation of Natural Resources 2.2.9 Preservation and Enhancement of Historic and Cultural Resources 2.2.10 Phased Development
Each of these elements is discussed in the following sections.
The Community Growth Boundary for ‘Ewa gives long-range protection from urbanization for over 3,000 acres of prime agricultural land and for preservation of open space while providing adequate land for urban development in ‘Ewa for the foreseeable future. The Community Growth Boundary for ‘Ewa is illustrated in Exhibit 2.1 and shown in greater detail on the four conceptual maps in Appendix A as described below.
Exhibit 2.1 Community Growth Boundary for ‘Ewa and Central O‘ahu
⬚ figure
‘Ewa Development Plan 2-8 The Vision for ‘Ewa's Future
Boundary Description - The mauka portion of the boundary follows the Special Management Area boundary around Kahe Point, runs along the northern boundary of the Makaīwa Hills project and the existing Makakilo development, and then follows the proposed extension of Makakilo Drive to the H-1 Freeway. It then follows the H-1 Freeway to the intersection with Kunia Road and then up Kunia Road to the boundary between the Central O‘ahu Sustainable Communities Plan and ‘Ewa Development Plan areas.
The makai portion of the boundary excludes the Explosive Safety Quantity Distance (ESQD) zone for the Pearl Harbor Naval Munitions Command.
Protection for Prime Agricultural Land - The Community Growth Boundary protects prime agricultural lands on the Wai‘anae side of Kunia Road and mauka of H-1 freeway from urban development for the foreseeable future, thereby providing an incentive for landowners to give long term leases to farmers. No proposals for urban uses outside the Community Growth Boundary will be considered.
Open Space Network - Within the Community Growth Boundary, significant acreage will be retained in open space in parks, wildlife habitats, golf courses, and natural and grass-lined drainageways. (Of the estimated 23,000 acres within the Community Growth Boundary, 5,000 acres or 22 percent of the acreage will be in open space.)
Capacity for Growth - Even with the amount of land reserved for agriculture, parks, and open space, there is ample capacity within the Community Growth Boundary for residential, commercial, and industrial development extending beyond the 20-year horizon (2035).
As shown in Table 2.1, over 4,100 acres was available for residential development; almost 700 acres for retail and office development; and over 1,600 acres for industrial development as of July 2009. Providing this capacity allows for competition and promotes more affordable residential, commercial, and industrial development.
Over 50 percent of the residential development acreage is already zoned. Developers of these parcels can apply for subdivision, construction permit, and building permit approvals as needed to meet market demand. However, these projects will be subject to
TABLE 2.1: ‘EWA DEVELOPMENT CAPACITY AND ENTITLEMENT STATUS
| PROJECT AREA (1) | Potential Housing Units | Number of Units which | DEVELOPABLE LAND AREA (Gross Acres) | |||||
|---|---|---|---|---|---|---|---|---|
| Need LUC (2) | Need ZON (3) | Resid. | Resort | Retail | Ind. | Total | ||
| A Kalaeloa Barbers Point Harbor & vicinity | 210 | 210 | ||||||
| B City of Kapolei | ||||||||
| Mehana at City of Kapolei | 1,130 | 93 | 2 | 95 | ||||
| Leihano Senior Community | 714 | 43 | 43 | |||||
| Kapolei Mixed Use (4) | 4,000 | 91 | 91 | |||||
| Kapolei Commercial (incl. Kapolei Commons) | 91 | 91 | ||||||
| C Ewa by Gentry (5) | 658 | 94 | 64 | 158 | ||||
| D Ocean Pointe/Hoakalei | 2,095 | 269 | 39 | 45 | 28 | 381 | ||
| E Ewa Villages | 590 | 54 | 54 | |||||
| F Kapolei Business Park & vicinity | 268 | 268 | ||||||
| Kapolei Harborside | 339 | 339 | ||||||
| G Kapolei Knolls | 0 | |||||||
| H Pālailai Residential | 350 | 30 | 14 | 44 | ||||
| I Kapolei Shopping Center | 0 | |||||||
| J Ko Olina Resort | 3,286 | 50 | 42 | 16 | 108 | |||
| K Makaiwa Hills (Lower) | 2,280 | 424 | 31 | 455 | ||||
| L Makakilo C& D1 | 422 | 105 | 105 | |||||
| M Villages of Kapolei | 660 | 28 | 27 | 55 | ||||
| N Kapolei West (6) | 2,500 | 234 | 12 | 246 | ||||
| O, R Ewa by Gentry Makai: East and West | 1,067 | 172 | 172 | |||||
| P East Kapolei: Ho‘opili (7) | 11,750 | 11,750 | 11,750 | 925 | 145 | 50 | 1,120 | |
| Q Laulani Commercial | 20 | 20 | ||||||
| S Makakilo D2 | 400 | 400 | 400 | 96 | 96 | |||
| T UH West O‘ahu Campus(8) | 4,040 | 184 | 169 | 353 | ||||
| U Makaiwa Hills (Upper) | 2,000 | 484 | 484 | |||||
| V DHHL East Kapolei (9) | 2,513 | NA | 341 | 67 | 408 | |||
| W Kapolei North | 1,200 | 1,200 | 1,200 | 150 | 150 | |||
| Kalaeloa (HCDA) (9) | 6,500 | NA | 267 | 8 | 685 | 960 | ||
| TOTAL | 48,155 | 13,350 | 13,350 | 4,043 | 81 | 738 | 1,644 | 6,506 |
| TOTAL ZONED OR EXEMPT | 34,805 | 2,872 | 81 | 593 | 1,594 | 5,140 | ||
| TOTAL EXEMPT FROM CITY ZONING | 9,013 | 608 | 0 | 75 | 685 | 1,368 |
NOTES: See Exhibit 2.3 for location of projects. Estimated capacity and entitlements of existing projects as of July 2009.
(1) Parts may not sum to totals shown due to rounding. (2) Project needs State Land Use Commission approval of a Land Use District amendment. (3) Project needs City Council approval of a zone change (and may need State Land Use District Boundary Amendment). (4) As of December 2008, included around 84 acres of vacant BMX-3 zoned lands which could provide residential units as well as commercial and office space. (5) Industrial acreage partly zoned for industrial mixed use. (6) Formerly Ko Olina Phase II. Thirty seven of the residential acres are for mixed use residential development and may include 100,000 s.f. of commercial space. Twenty seven of the commercial acres include mixed-use residential development of 300 units. (7) Twenty acres near Farrington/Fort Weaver intersection for community commercial center; remainder intended for neighborhood commercial use. Some residential acreage may also support retail and office uses in mixed use projects. (8) The 116 retail acres are lands zoned BMX-3 which can include both retail space and residential units. The residential acreage includes lands set aside for student housing. (9) DHHL and HCDA can exempt themselves from County zoning.
infrastructure capacity requirements established through unilateral agreements and subdivision approval requirements.
An additional 19 percent of the residential development acreage is exempt from County zoning and land use regulations. Almost 1,400 acres are controlled by either the State Department of Hawaiian Home Lands (DHHL) or the Hawai‘i Community Development Authority (HCDA) who are developing their lands under master plans approved by the Governor. The timing and conditions of the development of these lands are not subject to review and approval by the City Council.
The remaining residential development acreage which is neither zoned nor exempt will require land use approvals by the State Land Use Commission (LUC) and the City Council before development can proceed. About 1,400 acres of the lands indicated for development are in the State Agriculture Land Use District, and will first have to be approved for transfer to the State Urban District by the LUC and then have urban zoning approved by the City Council before they can be developed.
Table 2.1 shows the projected number of housing units and the approximate gross acreage by land use category for previously approved and proposed projects. These represent general indicators of the land areas involved and possible densities. In determining actual land uses and densities, project planning, design and review of project zoning change applications should be directed by the planning policies and guidelines provided in Chapters 3 and 4.
The closure of the O‘ahu Sugar Company in 1995 raised serious questions about how thousands of acres of former sugar lands in ‘Ewa should be used in the future. The ‘Ewa Development Plan protects the highest value prime agricultural lands from urban development.
These high value lands are located in two areas: lands mauka of H-1 Freeway and on the Waianae side of Kunia Road, and lands in the Explosive Safety Quantity Distance (ESQD) arc around the Pearl Harbor Naval Munitions Command. State agencies
indicated in 1996 that these prime agricultural lands should have the highest priority for retention of all the prime agricultural lands in ‘Ewa.
These 3,000 acres of agricultural land, protected by the Community Growth Boundary, have been rated, in the most authoritative studies, as potentially among the most productive lands for diversified agriculture in the State.
The State Department of Agriculture's (HDOA) November 1977 study, Agricultural Lands of Importance to the State of Hawaii (Revised), indicates that the Kunia lands and a portion of the lands within the Navy’s ESQD arc are "prime" agricultural lands which generally produce the largest yields and the best quality crops for the least expenditure of energy.
The University of Hawai‘i Land Study Bureau's December 1972 bulletin, Detailed Land Classification - Island of O‘ahu, rated productive capacity of the Kunia lands as either A or B and the lands within the Navy’s ESQD as B or C (An A rating was given to the highest productivity lands and E was given to the lowest.)
These high value agricultural lands have unique advantages in weather, soil productivity, infrastructure, and water availability from the Wai‘ahole Ditch, and access to the local markets of Honolulu and to export markets through Honolulu International Airport.
Successful agricultural operations are currently being pursued on the former sugar lands in the Kunia area, including seed crops, vegetables, melons, and other truck crops. In addition, the Hawai‘i Agriculture Research Center (HARC) at the corner of H-1 and Kunia Road is conducting studies on vegetable crops and forage to help diversified agricultural activities in the area. Agricultural lands along Kunia Road and north of H-1 have recently been sold to agricultural companies committed to maintaining those lands in agriculture. In addition, the Navy currently leases out 1,025 acres for agriculture on its lands surrounding the Pearl Harbor Naval Munitions Command. However, agricultural operations on these lands are limited by military safety restrictions and the brackish water supply.
By protecting agricultural lands from urban development, an opportunity is created for retention and development of diversified agriculture on small farms and agricultural
parks. Public-private partnerships will be needed to solve problems of lease terms and tenure, access to capital, research, and marketing if this vision is to be realized.
A network of Open Space and Greenways will link the Secondary Urban Center and associated employment centers, new master planned residential developments and revitalized established communities, an ‘Ewa shoreline park, and a major regional park at Kalaeloa. See the Open Space Map in Appendix A.
Table 2.2 lists the major components of the ‘Ewa Open Space and Greenways Network.
The Open Space and Greenways Network:
An important new element in the ‘Ewa Open Space and Greenways Network will be an ‘Ewa Shoreline Park that will stretch along the ‘Ewa coastline from the entrance to Pearl Harbor to Ko Olina. It will be anchored by the Kalaeloa Regional Park planned for Kalaeloa.
The Pearl Harbor Historic Trail, running partly along the Pearl Harbor shoreline and across the ‘Ewa Plain on the OR&L right-of-way, will allow bikers and pedestrians to travel as far as Nanakuli to the west. Running east, the path will create a greenbelt linking Ko Olina, Kapolei West, Kapolei Harborside, the City of Kapolei, Kalaeloa, the Villages of Kapolei, ‘Ewa Plantation Villages, ‘Ewa by Gentry, and West Loch to Rainbow Marina near Aloha Stadium and to the Waipahū Cultural Garden Park.
TABLE 2.2: ‘EWA OPEN SPACE AND GREENWAYS NETWORK
Mountain and Agricultural Areas Waianae Mountains Conservation District (Including the State's Honouliuli Forest Reserve) Pu‘u Makakilo Pu‘u Pālailai Agricultural Lands mauka of H-1 and Wai‘anae side of Kunia Road Agricultural Lands in the Pearl Harbor Naval Munitions Command ESQD arc
Natural Gulches and Drainageways Honouliuli Stream Kalo‘i Gulch Makalapa Gulch Makakilo Gulch Awanui Gulch Pālailai Gulch Makaīwa Gulch Keone‘ō‘io Gulch Limaloa Gulch
Shoreline Areas ‘Ewa Shoreline Park (Lateral Public Access/Easement from Ko Olina to Pearl Harbor) Wetlands and Wildlife Habitats Honouliuli National Wildlife Refuge Apoka‘a Ponds Batis Salt Marsh at Hoakalei Kahe Point Beach Park Tracks Beach Park Ko Olina Beach Parks (2) Barbers Point Beach Park One‘ula Beach Park ‘Ewa Beach Park Iroquois Point Beach Park (military) West Loch Shoreline Park
Continued on next page
TABLE 2.2: ‘EWA OPEN SPACE AND GREENWAYS NETWORK (Continued)
Regional and District Parks Ocean Pointe District Park Kalaeloa Regional Park ‘Ewa Mahikō District Park East Kapolei District Park (planned) Kapolei Regional Park Makaiwa Hills District Park (planned)
Golf Courses Ko Olina Golf Club Kapolei West Golf Course (planned) Kapolei Golf Course ‘Ewa Villages Golf Course Coral Creek Golf Course Barbers Point Golf Course (military) Hoakalei Country Club Hawai‘i Prince Golf Club ‘Ewa Beach Golf Club West Loch Golf Course
Greenway Corridors Farrington Highway Kapolei Parkway Pearl Harbor Historic Trail / Historic OR&L Railway Kualaka‘i Parkway Fort Weaver Road Ali‘inui Drive (Ko Olina) Kealanui Avenue (Villages of Kapolei) Kama‘aha Avenue (Villages of Kapolei) ‘A‘awa Drive (West Loch Fairways) Keone‘ula Boulevard (Ocean Pointe)
See Exhibits 3.1 and 3.2 for locations of Pu‘u, parks, wetlands and wildlife habitats. See Exhibit 4.3 for locations of major natural gulches and drainageways.
Kalaeloa Regional Park will provide needed open space, recreational opportunities, and access to the beaches and ocean.
Kalaeloa Regional Park is envisioned as a major nucleus of community activity, attracting visitors from all of O‘ahu. To be developed on surplus lands at Kalaeloa, itwill feature a regional park with sports and recreation facilities. Taking advantage of its extensive land resources, cultural sites, and spectacular ocean setting, it will offer extensive community-oriented recreation facilities, and public facilities. Ocean recreation areas at Kalaeloa will feature coastal lands providing a setting for ocean sports, beach activities, picnicking and family camping.
The Secondary Urban Center (See Exhibit 1.1) will provide a wide range of employment opportunities by 2035 and consists of:
See the ‘Ewa Urban Land Use Map in Appendix A.
Almost the entire ‘Ewa Development Plan area (as shown in Exhibit 2.2) has been approved as an Enterprise Zone by the Honolulu City Council.
Exhibit 2.2 ‘Ewa Enterprise Zone
⬚ figure
Under enabling legislation approved by the City Council in 1995 (Resolution 95-292) and in 2002 (Resolution 02-227), qualifying businesses receive a package of incentives including rebates on City property taxes for two years, and waiver of certain county fees for seven years. In addition, under State law (Chapter 209E, Hawai‘i Revised Statures), the businesses may receive exemptions from State excise taxes for seven years, a decreasing State income tax credit for seven years, and a State income tax credit for unemployment insurance premiums.
A network of master planned residential communities will provide a wide variety of housing and accommodate the need for affordable housing. Master plans will guide new developments in the City of Kapolei, East Kapolei (DHHL East Kapolei, UHWO, Ho‘opili), ‘Ewa by Gentry, Ocean Pointe/Hoakalei, Ko Olina, Makaīwa Hills, Kapolei West (previously part of Ko Olina), and the Villages of Kapolei; the rehabilitation of existing structures and development of new housing in ‘Ewa Villages; and the redevelopment of Kalaeloa. (See Exhibit 2.3 for locations.)
These master plans will incorporate planning principles and guidelines to preserve historic and cultural values, establish open space and greenway networks, and create well-designed, livable communities. Such communities should be designed with an identifiable, distinct and easily accessible main street, town center or neighborhood center which may include a mixture of residential and small scale community related commercial development.
The master planned residential communities will be designed or redeveloped to support pedestrian and bike use within the community and transit use for trips both within and outside of the community.
Connectivity will be established within subdivisions by use of block and street standards and between subdivisions by establishing and implementing a 1/4 mile collector/connector master road plan, where permitted by terrain.
The elevated rail transit line built on the east-west Rail Transit Corridor will link Kapolei West, the City of Kapolei, the UHWO campus, Waipahū, Leeward Community College, and the PUC. Medium density residential development will be built along the rail transit corridor within walking distance of the rail transit stations.
Existing and New Master Planned Communities
⬚ figure
LEGEND
| A | Kalaeloa Barbers Point Harbor | O | ‘Ewa by Gentry (Makai East) |
| B | City of Kapolei | P | Ho‘opili |
| C | ‘Ewa by Gentry | Q | Laulani Commercial |
| D | Ocean Pointe/Hoakalei | R | ‘Ewa by Gentry (Makai West) |
| E | ‘Ewa Villages | S | Makakilo D2 |
| F | Kapolei Business Park | T | UHWO |
| G | Kapolei Knolls | U | Makaiwa Hills |
| H | Pālailai Residential | V | DHHL East Kapolei |
| I | Kapolei Shopping Center | W | Kapolei North |
| J | Ko Olina | ||
| K | Makaiwa Hills | ||
| L | Makakilo (C + D1) | ||
| M | Villages of Kapolei | ||
| N | Kapolei West |
Medium density residential and commercial mixed-use development will be developed at eight transit nodes whose general locations are indicated on the Urban Land Use Map in Appendix A. Transit nodes are meant to be located at activity focal points, which would serve as natural points for transferring from one transportation mode to another. Communities are further supported by these transit nodes as the rail transit stations are developed and the City establishes transit-oriented development plans that encourage rail transit and multimodal transportation
The first segment of the elevated rail transit line will start near the Kroc Center on Kualaka‘i Parkway and continue on to Waipahū along Kualaka‘i Parkway and Farrington Highway. Sufficient right-of-way will be reserved for the extension of the elevated rail transit line, which would extend through Kalaeloa to the City of Kapolei in the west, continuing on to the PUC in the east. Such a system will require a 28-foot to 32-foot right-of way-along the route and a 75-foot right-of-way at the rail transit station sites.
‘Ewa Natural Resources, including potable water, coastal water quality, and wetlands and other wildlife habitat, will be conserved by:
See Exhibit 3.2 in Chapter 3 for a mapping of key natural resources.
‘Ewa's Historic and Cultural Resources will be preserved and enhanced by:
Planned development of ‘Ewa will support the City of Kapolei‘s development and conserve scarce infrastructure dollars. It will be characterized by:
Table 2.1 shows the approximate land area and projected number of housing units of projects shown in Exhibit 2.3 and on the Land Use Map and Phasing Map in Appendix A. The projects are categorized by status of land use approvals (fully entitled, need zoning, or need State Urban Land Use District designation and zoning). The estimates of land areas involved and densities for proposed projects are based on proposals and historic behavior. If the proposed project is approved, the actual acreages and densities as well as project design requirements will be determined by Council as part of the approval of the project zone change application.
The capacity for development of 48,100 units in Table 2.1 represents only the Potential Supply of Housing Units based upon projects previously approved or proposed. It is important to emphasize that these projects are not necessarily expected to be completed within the next 25 years.
It is expected that housing development activities at many projects would continue for ten years or more after the initial zoning approval. The number of units actually produced and sold, and the timing of their production, will depend upon market forces. Absorption of new units is projected to be almost 26,500 units between 2009 and 2035, which would use only around 55 percent of potential supply identified in Table 2.2.
Page left blank intentionally
The vision for development of ‘Ewa described in the preceding chapter will be implemented through application of land use general policies, and guidelines. These policies and guidelines are not regulations, but provide guidance that decision makers and administrators should follow, where sensible, in approving projects and revising rules, regulations, and best practices standards.
3.1 Open Space Preservation and Development 3.2 Regional Parks and Recreation Complexes 3.3 Community-Based Parks 3.4 Historic and Cultural Resources 3.5 Natural Resources 3.6 City of Kapolei 3.7 ‘Ewa Plantation Villages 3.8 Ocean Pointe/Hoakalei 3.9 Existing and Planned Residential Communities 3.10 Planned Commercial Retail Centers 3.11 Ko Olina Resort 3.12 Industrial Centers 3.13 Kalaeloa 3.14 Pearl Harbor Naval Base (West Loch) 3.15 University of Hawai‘i West O‘ahu
The open space system consists of areas in active use, as well as passive areas. Active areas include parks, golf courses and agricultural fields. Passive areas include lands in the State Conservation District, fallow land in the State Agriculture District, drainage and utility corridors. Shoreline areas may be either active or passive.
Use open space to:
The following areas shown on the Open Space Map in Appendix A are components of the regional open space system:
Mountain and Agricultural Areas - These are the areas outside of the Community Growth Boundary, including areas within the State Conservation District.
Natural Gulches and Drainageways - Within the Community Growth Boundary, the major gulches, including the Kalo‘i Gulch drainage channel, are shown in preservation uses. (See the listing in Table 2.2.)
Shoreline Areas - The proposed lateral public easement/access along the shoreline is indicated by a dotted line. Nearshore, coastal-dependent uses and features such as beach parks and wetlands are indicated as parks and preservation areas, respectively.
Parks - Only island-wide and regional district parks are shown. Community and neighborhood parks are part of the open space system, but they are generally too small to display on a regional map, and their location is determined more by community design considerations (see Section 3.3) than by their relationship to the regional open space network.
Golf Courses - All golf courses are shown, whether public or private-owned, since their visual contribution to the open space system is the same.
Greenways or Open Space Corridors - These corridors are indicated on the map following certain public right-of-ways that are extensive enough to make a significant contribution to the regional open space network as a linear connector.
The following guidelines suggest how the general policies for Open Space Preservation and Development should be implemented:
⬚ figure
and adjacent to the easement, consistent with all applicable operations, maintenance, and safety requirements.
The following section presents general policies, and guidelines for development of regional parks and recreation complexes.
Regional parks and recreation complexes include the Kalaeloa Regional Park proposed for surplus lands at the former Barbers Point Naval Air Station, Kapolei Regional Park, various beach and shoreline parks, and public and private golf courses.
The City and the U.S. Department of the Interior are negotiating the conveyance of the lands for Kalaeloa Regional Park to the City. In the meantime, the Department of Parks and Recreation (DPR) is operating a beach camping area at Kalaeloa under a licensing agreement with the Navy. DPR also operates two Kalaeloa baseball parks on land recently conveyed from the Navy to Ford Island Properties, Inc.
(FIP), and is negotiating an agreement with FIP to continue operating the parks. The Navy operates the Nimitz and White Sands beach parks at Kalaeloa which are open to the public. (The Navy intends to retain the two beach parks.)
Existing City beach and shoreline parks are located at Tracks, Kahe Point, Barbers Point, One‘ula, ‘Ewa Beach, and West Loch.
Two beach parks at either end of the Ko Olina shoreline have been built and will be turned over to the City at some point in the future as required by ordinance. The larger park at the northern end of the resort provides for picnicking and other passive recreation. A park at the southern end provides direct access to one of the four swimming lagoons. A boat-launching ramp, which is available for public use, is being relocated to the eastern end of the Ko Olina marina.
‘Ewa has nine golf courses. In addition, one more course is planned for the Kapolei West development. (See Table 2.2)
The City's courses include the West Loch and ‘Ewa Villages golf courses. The ‘Ewa Village golf course also provides flood protection and storm water detention for ‘Ewa Villages.
Privately owned golf courses include the Hawai‘i Prince Golf Club, ‘Ewa Beach Golf Club, Hoakalei Country Club, Coral Creek Golf Course, Kapolei Golf Course, and Ko Olina Golf Club. The U.S. military operates a golf course at Kalaeloa. The Coral Creek Golf Course opened in March 1999. The Hoakalei Country Club opened for play in 2008. An 18-hole golf course is planned as part of the proposed Kapolei West project. Plans for golf courses at Makakilo and Makaīwa Hills have been cancelled. Sports and recreation complexes designed to attract visitors from throughout the region and the rest of O‘ahu have been proposed for a number of areas in ‘Ewa.
The following guidelines suggest how the general policies for Regional Parks and Recreation Complexes should be implemented.
Definition of Use Areas
Transportation Facilities
Views
The following section provides general policies and guidelines for community-based parks and recreation areas.
Community-based parks (and associated recommended size and service radius) include mini-parks (no size specified and 1/2 mile), neighborhood parks (5 acres and 1/2 mile), community parks (10 acres and one mile), and district parks (20 acres and two miles).
Table 3.1: ‘Ewa Public and Private Parks and Golf Courses
| NAME AND TYPE OF PARK | ACRES |
|---|---|
| Regional Parks | |
| Kalaeloa Heritage Park (1) | 96.2 |
| Kalaeloa Regional Park (2) | 409.5 |
| Kapolei Regional Park (1972) | 69.4 |
| Regional Park Total | 575.1 |
| Community Based Parks | |
| District Parks | |
| Ocean Pointe District Park (3) | 20.0 |
| ‘Ewa Mahikō District Park (1998) | 25.0 |
| Ho‘opili District Park (4) | 25.0 |
| Kalaeloa Parks (OS-10, 11, & 12) (4) | 70.0 |
| Makaīwa Hills District Park (5) | 20.0 |
| District Park Total | 160.0 |
| Community Parks | |
| Asing Community Park (1996) | 12.8 |
| DHHL East Kapolei II (3) | 11.0 |
| ‘Ewa Beach Community Park (1961) | 13.3 |
| Geiger Community Park (1996) | 10.0 |
| Kamokila Community Park (1977) | 5.9 |
| Kapolei Community Park (1999) | 12.0 |
| Kapolei West Community Park (3) | 12.3 |
| Ko ‘Olina Community Park (3) | 11.0 |
| Laulani Community Park (3) | 16.4 |
| Makaīwa Hills Community Park (3) | 10.0 |
| Makakilo Community Park (1977) | 8.5 |
| Community Park Total | 123.1 |
| Neighborhood Parks | |
| DHHL East Kapolei II Mauka & Makai (3) | 10.5 |
| East Kapolei UH WO I & II (3) | 11.5 |
| ‘Ewa by Gentry Area 19C (3) | 9.2 |
| Ho‘opili Mini-Neighborhood Parks (4) | 35.0 |
| Iroquois Point Neighborhood Park (3) | 12.1 |
| Kalaeloa Downtown Neighborhood Park(2) | 7.0 |
| Kapolei Neighborhood Park (3) | 6.0 |
| Kapolei West Neighborhood Park (3) | 5.0 |
| Ko ‘Olina Neighborhood Park (3) | 5.1 |
| Makaīwa Hills Neighborhood Parks I and II (3) | 11.5 |
| Makakilo Neighborhood Park (1968) | 4.0 |
| Maukalani Neighborhood Park (1976) | 4.4 |
| Pālailai Neighborhood Park (1999) | 5.0 |
| Pu‘uloa Neighborhood Park (1961) | 4.3 |
| Neighborhood Park Total | 130.6 |
| Private Parks and Recreation Centers | |
| ‘Ewa by Gentry (1989-2005) | 19.0 |
| Ocean Pointe (2001-2004) | 4.3 |
| Kroc Center(4) | 15.0 |
| Villages of Kapolei (1995-1999) | 10.3 |
| Makakilo (1998) | 0.4 |
| Makaīwa Hills (4) | 15.0 |
| Kapolei West (4) | 12.0 |
| Ko Olina (2005) | 1.0 |
| Private Parks Total | 76.9 |
| Community Based Parks Total | 490.6 |
Table 3.1: ‘Ewa Public and Private Parks and Golf Courses (Continued)
| NAME AND TYPE OF PARK | ACRES |
|---|---|
| Beach Parks | |
| Barbers Point Beach Park (1964) | 7.4 |
| ‘Ewa Beach Park (1951) | 4.9 |
| Iroquois Point Beach Park (military) | 2.0 |
| Kahe Point Beach Park (1954) | 4.5 |
| Ko Olina Beach Park (1993)$^{(6)}$ | 9.0 |
| Makaiwa Beach Park (1993)$^{(6)}$ | 18.0 |
| Nimitz Beach Park (military) | 21.3 |
| HCDA Nimitz Expansion Shoreline Access$^{(7)}$ | 2.0 |
| Kalaeloa Regional Park Nimitz Expansion$^{(2)}$ | 4.2 |
| One‘ula Beach Park (1969) | 30.0 |
| Tracks Beach Park (1988) | 14.3 |
| West Loch Shoreline Park (1991) | 5.8 |
| White Plains Beach Park (military) | 15.4 |
| Beach Park Total | 138.7 |
| Public & Private Parks Total | 1,204.5 |
| Golf Courses | |
| Barbers Point Golf Course (military) | 145.0 |
| Coral Creek Golf Course | 195.0 |
| ‘Ewa Beach Golf Club | 130.0 |
| ‘Ewa Villages Golf Course$^{(8)}$ | 235.0 |
| Hawai‘i Prince Golf Club | 270.0 |
| Hoakalei Country Club (Ocean Pointe) | 189.0 |
| Kapolei Golf Course | 190.7 |
| Kapolei West Golf Course$^{(4)}$ | 203.0 |
| Ko Olina Golf Club | 170.0 |
| West Loch Golf Course$^{(8)}$ | 187.0 |
| Golf Course Total | 1,914.7 |
| Parks and Golf Course Total | 3,119.2 |
| Key: | |
| $^{(1)}$ Land conveyed or pending transfer to HCDA which is to be part of a cultural park, endangered plant refuge and wildlife habitat. | |
| $^{(2)}$ Land proposed for conveyance to the City as part of the Barbers Point Naval Air Station closure. As of April 2011, the land had not yet been conveyed. Includes beach camping areas now operated by the City under license from the Navy. | |
| $^{(3)}$ Land set aside for future parks to be developed and dedicated to the City. | |
| $^{(4)}$ Planned. | |
| $^{(5)}$ Land set aside for a future District Park to be developed by the City. | |
| $^{(6)}$ Beachfront parks developed by Ko Olina Resort. Currently, they are owned, maintained, and managed by Ko Olina Resort, but will be dedicated to the City in the future, as required by ordinance. | |
| $^{(7)}$ Land adjacent to Nimitz Beach Park to be transferred to HCDA for development for aquaculture and fisherman’s access. | |
| $^{(8)}$ City-owned golf courses. |
The following guidelines suggest how the general policies for Community-Based Parks should be implemented:
Community and Neighborhood Parks should be reviewed and decided at the time the Project Master Plan is submitted, prior to the granting of a zone change.
‘Ewa contains several different types of historic and cultural sites, which are representative of its history and valuable as historic records and cultural references. In addition, public views which include views along streets and highways, mauka-makai view corridors, panoramic and significant landmark views from public places, views of natural features, heritage resources, and other landmarks, and view corridors between significant landmarks, can be important cultural resources.
This section provides policies, and guidelines for the preservation and development of historic and cultural resources in ‘Ewa.
assume that the mitigations carry out the Plan vision and policies for preservation and development of historic and cultural resources in ‘Ewa.
Exhibit 3.2 indicates the locations of a number of ‘Ewa's significant historic and cultural resources, which are also listed in Table 3.1.
The following guidelines suggest how the general policies for Historic and Cultural Resources should be implemented:
Natural, Historic & Scenic Resources in the ‘Ewa Development Plan Area
⬚ figure
| Legend | |||
|---|---|---|---|
| ● | Single and Concentrated Archaeological Sites | ▲ | Pu‘u |
| Dispersed Archaeological Sites | ⬭ | Rare/Endangered Native Species | |
| ■■■ | Historic Archaeological District | ▱ | Natural Preserves/Wildlife Refuges |
| ▰▰▰ | Plantation Villages | ■ | Wetland/Waterbird Habitat |
| ▤▤▤ | Historic Railway/Bikeway Corridor | ⌃ | Panoramic Views |
Note: Some dispersed archaeological sites and rare/endangered species habitat were identified in project Environmental Impact Statements. In such areas, subsequent development approvals and associated mitigation measures should be reviewed to identify which sites still retain archaeological or environmental resource value.
| TABLE 3.2: SIGNIFICANT ‘EWA HISTORIC AND CULTURAL RESOURCES |
|---|
| SIGNIFICANT HISTORIC FEATURES AND LANDMARKS |
| ‘Ewa Plantation Villages<br>‘Ewa Marine Corps Air Field<br>Honouliuli Internment Camp<br>Lanikūhonua |
| NATIVE HAWAIIAN CULTURAL AND ARCHAEOLOGICAL SITES |
| Barbers Point Archaeological District<br>‘Ewa Beach Midden Site |
| SIGNIFICANT VIEWS AND VISTAS |
| <ul><li>Distant vistas of the shoreline from the H-1 Freeway above the ‘Ewa Plain;</li><li>Views of the ocean from Farrington Highway between Kahe Point and the boundary of the Wai‘anae Development Plan Area;</li><li>Views of the Wai‘anae Range from H-1 Freeway between Kunia Road and Kalo‘i Gulch and from Kunia Road;</li><li>Views of Nā Pu‘u at Kapolei, Pālailai, and Makakilo;</li><li>Mauka and makai views; and</li><li>Views of central Honolulu and Diamond Head, particularly from Pu‘u O Kapolei, Pu‘u Pālailai, and Pu‘u Makakilo.</li></ul> |
Method of Preservation
Adaptive Reuse
Adjacent Uses
Public Access
Method of Preservation
Adjacent Uses
Public Access
This section describes the general policies, and guidelines that are to be applied to protect ‘Ewa natural resources.
This section describes the general policies and guidelines that are to be applied to development of the City of Kapolei.
This section incorporates key policies and guidelines for the City of Kapolei from the amended The City of Kapolei Urban Design Plan approved by the City Council by resolution in 2008, and the Unilateral Agreements adopted as part of zoning ordinances in 1990 and 2004.
The original Unilateral Agreement required revisions and updates to the Urban Design Plan be submitted for review and approval by the City Council every two years. However, in June 1998, the City Council passed a resolution (No. 98-227) which approved revisions to The City of Kapolei Urban Design Plan and stated that no further amendments or revisions to the Urban Design Plan should be made unless they are first recommended by the Kapolei Design Advisory Board, endorsed by Campbell Estate and approved by a City Council resolution.
(Note: The Urban Design Plan applies to Campbell Estate's properties covered by the 1990 Unilateral Agreement and to adjacent areas also covered by unilateral agreements adopted as part of subsequent zone changes.)
Future revisions to The City of Kapolei Urban Design Plan, when adopted by the City Council, should take precedence over the following policies, and guidelines in the case of a conflict and should not require an amendment to the Development Plan.
The City of Kapolei should be composed of six different districts that should accommodate the full array of business, commercial, residential, cultural and public uses that characterize a city center. The six districts are described below:
Exhibit 3.3
City of Kapolei Land Use Map
⬚ figure
‘Ewa Development Plan 3-28 Land Use Policies
Four key open space elements should link together and unify Kapolei's districts into a distinctive, vibrant city. Each of these important spaces is described below:
o Facilities for public concerts and gatherings, such as an amphitheater and pavilions, as well as amenities for broader use and enjoyment, such as a formal garden, restaurants and water features, should also be included to help generate both day and evening activity in and around the park. o The makai edges of the park adjacent to the City of Kapolei’s downtown should be designed to ensure a strong relationship between City and park. The various structures in this area and elsewhere in the park should be designed to ensure compatibility and integration with adjacent commercial uses.
Ala Kahawai Street should function as a “Main Street” and major open space axis and amenity within the most central and highest density area of the City. Ala Kahawai Street connects the Regional Park and Civic Center and comprises the central spine for the City Center district.
Pālailai Mall should provide an open space cross axis to Ala Kahawai Street, extending mauka-makai and connecting the City of Kapolei’s residential sector to the heart of its business district.
Seven major themes define key characteristics of the City of Kapolei used in the planning and design of developments in the City of Kapolei.
The following guidelines suggest how the general policies for the City of Kapolei should be implemented:
| TABLE 3.3 HEIGHT GUIDELINES FOR THE CITY OF KAPOLEI | |
|---|---|
| DISTRICT | HEIGHT |
| City Center | 150 feet |
| Civic Center | 150 feet mauka of Kapolei Parkway<br>90 feet makai of Kapolei Parkway |
| Mixed Use Districts | 120 to 60 feet |
| Commercial Districts | 60 feet |
| Village Center District | 60 feet |
| Mehana District | 60 to 25 feet |
Source: The City of Kapolei Urban Design Plan (November 2007) adopted by Res. 07-372 (January 2008).
Wākea Street, with Fort Barrette Road and Kalaeloa Boulevard bounding the City of Kapolei on the east and west.
This section incorporates key elements for ‘Ewa Plantation Villages from the former ‘Ewa Development Plan and the ‘Ewa Villages Master Plan (Department of Housing and Community Development, 1992) to provide guidance in the event that changes are proposed for the Master Plan or zoning in the future. The ‘Ewa Villages Master Plan is scheduled for updating and revision in the near future. When approved, the updated Master Plan policies and guidelines will take precedence over the following in the event of a conflict and should not require an amendment to the Development Plan.
The City acquired the 600 acres surrounding and including Tenney, Renton and Varona Villages in 1993. Subsequently, the City did extensive rehabilitation of housing and community facilities, a City golf course was developed to provide storage for storm waters, and ‘Ewa Mahikō District Park was built to provide a needed community-based recreation area. The Villages have been on the Hawai‘i Register of Historic Places since 1996.
The following guidelines suggest how the general policies for ‘Ewa Villages should be implemented.
Exhibit 3.4: ‘Ewa Plantation Villages Location
⬚ figure
Ocean Pointe/Hoakalei’s development is guided by the Ocean Pointe/Hoakalei Urban Design Plan approved by the Department of Planning and Permitting (DPP) in August 2008 and by land use, environmental, and design requirements included in the Special
Management Area Use Permit and in the Unilateral Agreements attached to the zone change ordinances (1985, 1993, 2002, 2004, and 2007).
Development of Ocean Pointe/Hoakalei can proceed under the existing zoning and Unilateral Agreement. This section incorporates key policies and guidelines from the former Development Plan as well as from the Ocean Pointe/Hoakalei Urban Design Plan, the Special Management Area Use Permit, and the Unilateral Agreements in order to provide guidance as changes are proposed for the Urban Design Plan or the zoning.
The Ocean Pointe/Hoakalei Land Use Map, Exhibit 3.5, illustrates conceptual land uses described above and provides a schematic view of the roadway system within Ocean Pointe/Hoakalei.
The boundaries between the golf course and the Waterfront Mixed-Use and Low- to Medium-Density Residential areas are intended to be flexible. Integration of urban uses with the golf course area is encouraged, as long as the golf course area remains effective in retaining storm water drainage.
The following guidelines suggest how the general policies for Ocean Pointe/Hoakalei should be implemented:
Appropriate Scale and Siting
Environmental Compatibility
Exhibit 3.5 Ocean Pointe/Hoakalei Land Use Map
⬚ figure
| LEGEND | |
|---|---|
| P | Preservation |
| GC | Golf Course |
| PK | Park |
| School | |
| Low-Med Density Residential | |
| WMU | Waterfront Mixed Use |
| ........ | Pedestrian Walkway |
This section provides general policies and guidelines for the development of new communities and the expansion or renovation of existing communities. Guidelines are provided for three types of residential uses: Residential, Low Density Apartment, and Medium Density Apartment.
without existing UAs may be subject to affordable housing requirements established by the City.
Table 3.4 gives an overview of the density and height guidelines for planned and existing residential developments.
| TABLE 3.4: DENSITY AND HEIGHT GUIDELINES BY RESIDENTIAL DENSITY CATEGORY | ||
|---|---|---|
| Residential Category | Density (Housing Units) | Building Height |
| Residential | 5-12/acre | not over two stories |
| Low Density Apartment | 10-30/acre | not over three stories |
| Medium Density Apartment | 25-90/acre | not over 90 ft 1, 2 |
Conceptual locations for residential, low-density apartment, and medium-density apartment development are shown on the Urban Land Use Map in Appendix A and in maps of specific developments in Exhibits 3.3, 3.5, and 3.6. See Section 3.9.3 for further discussion of the Urban Land Use Map.
The following guidelines suggest how the general policies for Existing and Planned Residential Communities should be implemented.
Residential
Density
Building Height
Site Design
Building Form
Low Density Apartment
Density
Height
Building Form
Compatibility
Medium Density Apartment
Location
Density
Height
Master-planned projects should each have a circulation plan or "circulation element" in their Project Master Plan (see Chapter 5).
Residential areas are shown on the ‘Ewa Urban Land Use Map in Appendix A as follows:
Residential and Low Density Apartment - Areas with this designation should be zoned to allow residential or low density apartment uses, subject to appropriate siting considerations and the General Policy for "Overall Density" provided in Section 3.9.1.
Medium Density Apartment - Areas with this designation should be zoned predominantly for medium density apartment use. Mixed use, with retail activities at the ground level, is encouraged.
City of Kapolei – Areas within the City of Kapolei should be zoned for medium density apartment use. Mixed use with retail and office activities at the ground level and second floor should be encouraged.
The following uses are not specifically designated on the Urban Land Use Map, but are allowed in all residential areas:
All residential developments should be compatible with Aircraft Approach and Clearance Zones for Honolulu International Airport and Kalaeloa Airport.
Table 3.5 provides guidelines for the zoning that may be appropriate to each of the land use designations indicated in the revised Development Plan.
It is intended for use as a reference, which would permit modification or creation of Land Use Ordinance zoning categories and land use regulations in response to changing conditions without needing to amend the Development Plan.
| Land Use Designation | Appropriate Zoning Districts |
|---|---|
| Park, Golf Course, Preservation/ Conservation Military Training Area | P-2 if in State Urban or Agriculture District<br>P-1 if in State Conservation District; otherwise P-2<br>F-1 |
| Agriculture | AG-1 for all areas except where there is a predominant pattern of lots under 5 acres in size<br>AG-2 for areas where lots are under 5 acres in size |
| Residential and Low Density Apartment | R-5, R-7.5, R-10 for conventional single-family subdivisions<br>R-3.5 if identified by Project Master Plan for innovative small lot site design<br>A-1 for low-rise flats, apartments, and townhouses<br>A-2 if identified by Project Master Plan for medium density apartment development<br>AMX-1, AMX-2 if within a transit node |
| Medium Density Apartment | A-2, A-3<br>AMX-2, AMX-3 if within a transit node<br>BMX-3 if within a transit node |
| Commercial Centers | B-2 with limits on floor area for office use for all types of centers except Neighborhood Commercial Centers<br>B-1 for Neighborhood Commercial Centers (not shown on Urban Land Use Map)<br>BMX-3, Resort for the Ko Olina Marina Mixed Use area |
| Town Center | B-2, BMX-3<br>A-1, A-2<br>I-1, IMX-1 in fringe areas where present use is predominantly service industrial |
| Resort | Resort |
| Technology Park | New zoning category designed specifically for this use; for interim, retain the existing IMX-1 and B-2 zoning with use limitations as specified in the UA. |
| Industrial | I-2 for heavy industrial areas in Barbers Point Industrial Area<br>I-1, IMX-1 for service industrial areas near City of Kapolei and master-planned communities<br>I-3 in vicinity of Barbers Point Deep Draft Harbor and of Hoakalei Marina |
This section provides general policies and guidelines for the development of commercial retail centers in ‘Ewa.
These planned commercial centers differ from commercial areas within towns such as Waipahū or the City of Kapolei because they are typically managed as a unit with shared parking and centralized management.
Definitions - Four types of commercial centers can be defined based on size and function:
Regional Shopping Center on 67 acres near the intersection of Kualaka‘i Parkway and Kapolei Parkway. Included in the project are two hotels with 300 rooms and two office towers with 100,000 square feet of office space.]
The following guidelines suggest how the general policies for Planned Commercial Retail Centers should be implemented.
Orientation to "Main Street" or the Town/Village Center
Visual Screening
The ‘Ewa Development Plan prior to 1997 included specific development objectives, planning principles, and standards for Ko Olina Resort, under its former name of West Beach. The Unilateral Agreement to the 1986 zoning ordinance for the Resort includes detailed conditions regarding the master plan of the resort, building design, design of the public shoreline area, and public access to the shoreline.
Development of the Resort can proceed based on the existing zoning and Unilateral Agreement. This section incorporates key elements for Ko Olina from the former Development Plan and the Unilateral Agreement.
Ko Olina Resort is designated in the General Plan as one of four "secondary" resort destinations, which are part of an overall strategy to relieve growth pressure on Waikīkī. The resort is located on 640 acres between Kahe Point Beach Park and the Kalaeloa Barbers Point Deep Draft Harbor. When developed, Ko Olina Resort should be a water-oriented residential and resort community with at least 4,000 visitor units in hotels and resort condominiums and 5,200 residential units.
Ko Olina is master-planned to incorporate recreational features in addition to visitor accommodations. Recreational facilities include a golf course, a small boat marina, and four man-made swimming lagoons. Development of the golf course and the swimming lagoons, and installation of roads and utilities are completed.
The first hotel opened in 1993 with almost 400 rooms. The first phase of a 750 unit time-share resort began construction in 2001, and by September 2009, over 500 units had been completed. Construction of a third 800 unit hotel/time-share project began in 2008. In addition, over 1,100 homes, second homes, and resort condominiums have been built and sold in recent years.
The Ko Olina Land Use Map, Exhibit 3.6, shows land uses and a schematic view of the roadway system within the Ko Olina Resort. Land uses include the following:
Exhibit 3.6 Ko Olina Land Use Map
⬚ figure
| LEGEND | |
|---|---|
| Residential and Low Density Apartment | |
| Medium Density Apartment | |
| R | Resort |
| MMU | Marina Mixed Use (Marina Activity Center) |
| GC | Golf Course |
| PK | Park |
| -- | Pedestrian Walkway |
The following guidelines suggest how the general policies for Ko Olina Resort should be implemented:
Urban Form
3.6. Limit hotel and apartment buildings in this area to generally not exceed 150 feet.
Kapolei, and ‘Ewa Villages, and for a bikeway continuing on from ‘Ewa Villages to Waipahū and ‘Aiea as part of the Pear Harbor Historic Trail.
Landscape Treatment
This section provides general policies and guidelines for development of industrial centers and industrial uses in ‘Ewa.
Industrial centers in ‘Ewa include the Barbers Point Industrial Area, Kalaeloa, Honouliuli Industrial Area, Kahe Valley, and an area near the Hoakalei marina.
Barbers Point Industrial Area includes Campbell Industrial Park, Kalaeloa Barbers Point Deep Draft Harbor, Kenai Industrial Park, Kapolei Harborside, and Kapolei Business Park. It is the site of the State's largest heavy industrial area (Campbell Industrial Park) and an important industrial harbor and fuel transfer point.
The Barbers Point Redevelopment Commission approved continuation of the airport at Kalaeloa to provide a reliever airport for Honolulu International Airport, and a site for general aviation operations. As a result, the Pacific Aerospace Training Center, a program of the Honolulu Community College, was established to provide flight training for Hawai‘i, Mainland, and international students. A number of opportunities for
aviation-oriented industrial and training developments associated with the Center have been identified.
In 2002, the State Legislature transferred redevelopment responsibility for Kalaeloa to the HCDA. The HCDA prepared a Master Plan for redevelopment of Kalaeloa. The Master Plan (approved in 2006) identifies lands capable of providing over two million square feet of light industrial floor space.
Honouliuli includes 44 acres of land zoned industrial/commercial mixed use in the ‘Ewa by Gentry project, the 49-acre Honouliuli Wastewater Treatment Plant, and the 72-acre ‘Ewa Industrial Park zoned for intensive industrial uses.
Barbers Point Industrial Area/Kalaeloa
Honouliuli Industrial Area
Other Industrial Areas
The following guidelines suggest how the general policies for Industrial Centers should be implemented.
Industrial zoning should generally be limited to those areas shown as "Industrial" on the Urban Land Use Map in Appendix A, provided that industrial zoning may be granted for an individual activity which, because it is a public transportation or utility use or because of its unique characteristics, is unable to locate in a planned industrial area.
Heavy industrial uses should be located at Campbell Industrial Park, transitioning to lighter industrial uses closer to the City of Kapolei.
Kalaeloa (formerly Barbers Point Naval Air Station) is designated as a Special Area within the ‘Ewa Development Plan Area because of the need to provide strategies for the redevelopment of the area, to coordinate the activities of the many private, City, State, and Federal agencies involved in the area, and to coordinate redevelopment of Kalaeloa with the development of the rest of ‘Ewa.
In 1999, the Barbers Point Naval Air Station was closed, and the process of transferring the Navy lands to civilian control for public benefit began. Approximately 1,050 acres was retained by the Navy, and 457 acres were transferred for use by various other Federal Agencies. The balance of 2,180 acres were declared surplus and made available for transfer to various State and City agencies for public use. Table 3.6 lists the acreage retained by Federal agencies, acreage under negotiation for conveyance, and the acreage which has been transferred to City and State agencies.
The Kalaeloa Redevelopment Plan was prepared for Kalaeloa in December 2000 by the Barbers Point Naval Air Station Redevelopment Commission and accepted as the Kalaeloa Special Area Plan by the City Council (Res. 01-86, April 2001).
In July 2002, the State Legislature transferred responsibility for Kalaeloa to the HCDA. HCDA prepared a Kalaeloa Master Plan for redevelopment of Kalaeloa that was approved by the HCDA Board and the Governor in 2006. The Master Plan identifies the need to upgrade all major infrastructure systems (roads, drainage, water supply and wastewater) to City standards in order to support the substantial residential, retail, office and industrial development envisioned in the Master Plan. The Master Plan should be
submitted for acceptance by the City Council as the Special Area Plan for Kalaeloa, replacing the 2000 Kalaeloa Redevelopment Plan.
| TABLE 3.6: KALAELOA LAND CONVEYANCE STATUS (in acres) | ||||
|---|---|---|---|---|
| ACREAGE | ||||
| AGENCY | PROPOSED USE | retained | conveyed | pending |
| U.S. Navy | Golf Course, Horse Stables, two beach parks, Landfill, Public Works Center, and Defense Reutilization and Marketing Office | 437 | 0 | 0 |
| Ford Island Properties | Lands brokered for Ford Island Development | 0 | 492 | 0 |
| U.S. Coast Guard | Air Wing Headquarters | 0 | 44 | 14 |
| U.S. Federal Aviation Agency | Navigational Aid Beacon | 0 | 18 | 0 |
| U.S. Fish & Wildlife | Pearl Harbor National Wildlife Refuge | 0 | 37 | 0 |
| U.S. Veterans Affairs | Homeless Assistance and Social Services | 0 | 7 | 0 |
| U.S. Postal Service | Existing Post Office | 0 | 1 | 0 |
| Hawaiʻi National Guard | Consolidated Headquarters & Operations | 0 | 148 | 0 |
| State DOE | Barbers Point Elementary School | 0 | 14 | 0 |
| State DHHL | Leases for commercial and industrial purposes | 0 | 556 | 0 |
| State HCDA | Kalaeloa Heritage Park | 0 | 77 | 19 |
| State HHFDC | Holo Loaʻa Shelter | 0 | 12 | 0 |
| State DOT | Kalaeloa (John Rodgers) Airport | 0 | 752 | 53 |
| State DOT | Various Roads | 0 | 91 | 0 |
| UH Honolulu CC | Pacific Aerospace Training Center | 0 | 6 | 0 |
| City BWS | Reverse Osmosis Facility | 0 | 20 | 0 |
| City DTS | Various Roads | 0 | 66 | 0 |
| City Parks & Recreation | Kalaeloa Regional Park, Kalaeloa Downtown Neighborhood Park | 0 | 0 | 421 |
| Ford Island Housing LLC | On-Station Housing | 0 | 53 | 0 |
| Carmel Partners | Orion, Makai, and Orion Park Housing | 0 | 73 | 0 |
| State HCDA | Unallocated1 Parcels | 0 | 0 | 259 |
| Unallocated1 | Roads and Easements | 0 | 0 | 26 |
| TOTAL | 437 | 2,467 | 792 |
Notes:
The following guidelines suggest how the general policies for Kalaeloa should be implemented:
Appropriate Scale
Circulation System and Transportation Facilities
Landscape Treatment
The West Loch Annex of the Pearl Harbor Naval Munitions Command is proposed to be the principal site where U.S. Department of Defense ordnance handling and storage for O‘ahu is consolidated. The existing Explosive Safety Quantity Distance (ESQD) arc at West Loch will remain, but would not need to be enlarged. City general policies for these areas are:
This section contains general policies and guidelines for development of the University of Hawai‘i West O‘ahu.
In 1997 at the time when the revised ‘Ewa Development Plan was adopted, the University of Hawai‘i West O‘ahu campus was planned to be developed on a 991-acre site mauka of the H-1 Freeway. In 2004, the Board of Regents decided to move the site of the initial UHWO campus back to a 500 acre parcel at the makai-Wai‘anae corner of the Kualaka‘i Parkway – Farrington Highway intersection. A large portion of the makai campus lies within the Kalo‘i Gulch watershed.
The City Council approved a zone change allowing development of a campus and a mixed use community within the 500-acre makai site in 2008. The 2010 State Legislature approved $48 million in bond financing, allowing construction of the first phase of the campus to begin in the fall of 2010 with first classes on the new campus planned for the Fall of 2012. The University is currently evaluating options for the development of the adjacent residential and residential-commercial mixed use lands, and plans to sell 15 acres to finance a portion of the first phase construction.
The mauka site still remains part of the UHWO lands and could be used in the future for university and university-related uses.
Projected size is 4,600 students by 2019, and 7,600 students by 2025. The projected 2025 faculty and staff is 1,040.
Orient the campus to support pedestrian access to and transit usage from two rail transit stations, one located near the corner of Farrington Highway and Kualaka‘i Parkway, and a second located on the Kualaka‘i Parkway midway between Farrington and Kapolei Parkway.
Design the campus to use open space areas for flood detention and retention as part of the Kalo‘i Gulch watershed master plan.
Establish a clear identity and "sense of place" for the main campus through attentive design and careful integration with the adjacent mixed-use commercial area referred to as “University Village”. Major campus buildings surrounding the Great Lawn should serve as one anchor for the University Village “main street” commercial/residential area anchored at the other end by a major transit station near the *mauka* entry from Kualaka‘i Parkway (in the vicinity of the Farrington/Kualaka‘i Parkway intersection).
Design the campus and surrounding mixed-use/residential community to function as a fully integrated community within the context of the broader regional community. The campus and surrounding community should include housing, support services, community and business facilities, in addition to the required academic facilities.
Design the campus to be community-oriented and to serve the Kapolei area and West O‘ahu as an urban park and cultural center, providing community services, and cultural opportunities.
Design the campus to reflect appropriate functional relationships, internal compactness, and accessibility between academic functions and supporting facilities, providing a pleasant and efficient study environment.
This chapter sets forth policies and guidelines to guide planning and construction of proposed public and private public facility projects and infrastructure systems to carry out the vision for future development of ‘Ewa, as described in Chapter 2. These policies and guidelines are not regulations, but provide guidance that decision makers and administrators should follow, where sensible, in approving projects and revising rules, regulations, and best practices standards.
Information on timing and phasing of both planned and proposed infrastructure and public facility projects, which was available during the plan revision period, is also included. However, each project proposal is only identified and presented conceptually; not on a site-specific basis. More detailed information on the specific need, route alignment, site boundaries, capacity, and other specifications for each project, as applicable, will be prepared at the master planning stage required before a specific project can be approved. As noted in Chapter 5, existing Unilateral Agreements, Zoning and Urban Design Plans will continue to guide development in the area.
Policies and principles are provided for the following public facilities and infrastructure systems:
4.1 Transportation Systems 4.2 Water Allocation and System Development 4.3 Wastewater Treatment 4.4 Electrical Power Development 4.5 Solid Waste Handling and Disposal 4.6 Drainage Systems 4.7 School Facilities 4.8 Public Safety Facilities 4.9 Other Community Facilities
This section describes the existing conditions, plans, and proposals for development of ‘Ewa's roadways, transit system, and bikeways. (See the Public Facilities Map in Appendix A and the Planned and Proposed ‘Ewa Roadway Network Improvements listing in Table 4.1.) The section concludes with general policies and guidelines to guide future transportation system development in ‘Ewa.
The planned and proposed roadway elements and other transportation system features which are listed as potentially being needed to meet the projected development in ‘Ewa were identified through the regional planning and transportation analysis done for the initial ‘Ewa Development Plan Revision Program from 1994 to 1997, subsequent revisions of the O‘ahu Regional Transportation Plan (ORTP), the ‘Ewa Highway Master Plan and the 2009 ‘Ewa Roadway Connectivity Study.
Because of its generally even, gradually sloping terrain, ‘Ewa offers decided advantages for transportation.
Act 54 (May 2009), requires State and County transportation departments to adopt and implement a complete streets policy and establishes a task force to determine necessary standards and guidelines. The intent of a complete streets policy is to create and configure a connected street system that provides for all users; including, but not limited to, pedestrians, bicyclists and transit passengers of all ages and abilities.
Table 4.1 Planned and Proposed ‘Ewa Roadway Network Improvements
| ‘Ewa Hwy Master Plan(2) | ORTP 2035 Project Numbers (3) | ORTP 2035 Phasing (3) | |
|---|---|---|---|
| Planned Extensions (1) | |||
| Existing Roads Improvements | |||
| o Widen Farrington Hwy (4 lanes, Ft. Weaver to Golf Course Road) | 2020 | 20C | 2011-2020 |
| o Widen Farrington Hwy (Kalaeloa Blvd to Kamokila) | |||
| o Widen Ft. Barrette Rd | |||
| [] (4 lanes, Farrington to FDR Avenue) | 2010/2020 | 21S | 2011-2020 |
| [] (4 lanes, FDR Avenue to Saratoga Avenue) | 56C | 2011-2020 | |
| o Widen Kunia Road/Ft. Weaver Road | |||
| [] (4 lanes, Anonui Street to Kupuna Loop) | 71S | (Illustrative) | |
| [] (6 lanes, Kupuna Loop to Farrington Hwy.) | 71S | (Illustrative) | |
| [] (6 lanes, Geiger Road to North Road) | 2010 | ||
| o Widen Kalaeloa Boulevard Phase II (Lauwiliwili St. to Olai St.) | 17C | 2011-2020 | |
| o Extend Hānu‘a Street to Farrington Hwy. | 2020 | 16S | 2011-2020 |
| o Widen Farrington Hwy (6 lanes, Kaleloa Blvd. to Hakimo Rd. [Nānākuli]) | 54S | 2021-2035 | |
| o H-1 contraflow lane | |||
| o Extend Kamokila Boulevard from Roosevelt Avenue to Saratoga Avenue | 55C | 2021-2035 | |
| New Roads | |||
| o Kapolei Parkway | |||
| [] Aliinui Dr. [Ko Olina] to Kalaeloa Blvd | 2010, 2020 | 18C | 2011-2020 |
| [] Kamokila Blvd to Kamaaha Ave. | 2010, 2020 | 19C | 2011-2020 |
| o Kalaeloa East-West Spine Road | S57 | 2021-2035 | |
| o Kualaka‘i Pkwy (North-South Road) | |||
| [] Widen to 6 lanes from H-1 to Kapolei Pkwy | 22S | 2011-2020 | |
| [] Extend from Kapolei Pkwy to Keoneula Blvd. | 2020 | 23S | 2011-2020 |
| o Makakilo Drive extension | 35C | 2011-2020 | |
| o Makakilo Mauka Frontage Road, Makakilo Dr. to Kalaeloa Blvd | 58S | 2021-2035 | |
| Interchange Improvements | |||
| o H-1 Kunia Interchange (Add eastbound lane) | 71S | (Illustrative) | |
| o H-1 Pālailai Interchange | 2020 | 16S | 2011-2020 |
| New Interchanges | |||
| o H-1 Kapolei Interchange | 2010, 2020 | 15S | 2011-2020 |
| o Makaiwa Hills |
Additional Proposed Elements (4) o Develop additional north-south and east-west roads near the City of Kapolei o Develop an additional north-south road in East Kapolei o Develop an additional east-west road in East Kapolei connecting between Farrington Highway, Kualaka‘i Pkwy, and Fort Weaver Road
Notes: (1) Some projects listed in previous editions of the O‘ahu Regional Transportation Plan (ORTP) were not listed in the ORTP 2035 adopted in April 2011. If no number appears, the project was not included in the ORTP 2035.
(2) 2010: Project identified in the Ewa Highway Master Plan (2002) as needed by 2010. 2020: Project identified in the Ewa Transportation Impact
(3) The ORTP 2035 was approved in April 2011. Project Numbers from Table 8 of the ORTP2035. C indicates a City project; S is a State Project. Phasing indicates the period when funding and construction is anticipated for the project. Illustrative projects could be added if additional funding is available.
(4) A number of additional north-south and east-west connections needed to provide connectivity as ‘Ewa develops are identified on the public facilities map in Appendix A.
The major east-west arterials of the ‘Ewa roadway system includes:
North-south roads distribute traffic onto and off the east-west arterials at several locations. They include:
According to the O‘ahu Regional Transportation Plan 2035, the number of people traveling on H-1, Farrington Highway, and Fort Weaver Road just before the Kunia Interchange is projected to increase from 183,600 trips per day in 2007 to 276,600 in 2035, an increase of 51 percent. Traffic congestion on east-west and north-south collector and connector roadways in ‘Ewa is also increasing, even outside the peak commuting hours.
As noted in Section 4.1.6, the substantial development of Secondary Urban Center jobs (from 19,900 jobs in 2000 to over 103,000 jobs by 2035) is expected to increase the number of ‘Ewa residents who work in the area. However, even with this substantial job growth, it is projected that the number of commuters traveling to the PUC from ‘Ewa and Central O‘ahu will still increase, although at a lower rate than would occur if development of the Secondary Urban Center was not supported.
Planning and development of major roadways is the shared responsibility of the State Department of Transportation (DOT) and the DTS and use of federal transportation funds is coordinated through the O‘ahu Metropolitan Planning Organization (OMPO), a joint City-State agency.
A consortium of landowners and developers working with the DOT and the DTSfunded the ‘Ewa Highway Master Plan which identified major roadway improvements needed to meet projected development in ‘Ewa through 2025.
Based on the Ewa Highway Master Plan, the City Council, in 2002, adopted Ordinance 02-52 establishing the ‘Ewa Highway Impact Fee which is added to all building permits in ‘Ewa and in the Royal Kunia and Village Park areas of Central O‘ahu. Funds collected from the fees are to be used to provide the local contribution for seven major ‘Ewa roadway projects needed by 2010 to meet projected growth. (See Table 4.1 for details.)
The 2002 ‘Ewa Highway Master Plan was recently updated as part of an update to the ‘Ewa Highway Impact Fee program. The updated Plan identifies eight roadway and intersection projects needed to meet growth in ‘Ewa traffic by 2020.
The O‘ahu Regional Transportation Plan (ORTP) 2035 was adopted in April 2011. It is the State and County plan for what transportation projects are needed through 2035 for O‘ahu. In order to receive Federal funding, projects need to be listed in the ORTP. See Table 4.1 for listings of the ‘Ewa roadway projects in the ORTP 2035 and the 2002 and 2011 versions of the ‘Ewa Highway Master Plan.
The ‘Ewa Highway Master Plan and the ORTP 2035 show major elements of the future ‘Ewa roadway network. These major improvements include:
Recognition in this Plan of these major improvements to future roadway networks for ‘Ewa in no way implies City Council approval of these projects. Any projects requiring City funding will have to be approved through the Capital Improvements Program process.
The planned development of East Kapolei and redevelopment of Kalaeloa will eventually open additional areas for use and increase transportation needs beyond the levels planned for the ‘Ewa Highway Master Plan and the ORTP 2035.
Additional east-west and north-south roadways will be needed to enhance movement between the various parts of the ‘Ewa region and to provide improved access to activity centers such as Ocean Pointe/Hoakalei and the Kalaeloa Regional Park, including:
The need for these roads has been established only at the conceptual stage, and further study, planning, and approvals will be required to establish need, appropriate route, capacity, and other characteristics.
DPP has completed a road connectivity study for the ‘Ewa region to identify where east-west and mauka-makai connector roads should be located to link adjacent subdivisions. Results of the study are used by the Department in the approval of subdivision layouts.
With population growth, the City should increase transit service in ‘Ewa in order to enhance circulation among ‘Ewa communities and between ‘Ewa and the adjacent Wai‘anae and Central O‘ahu areas, and to provide suitable service for peak-hour commuting.
Bus service is provided through the DTS, which currently contracts with O‘ahu Transit Services (OTS) for operation of TheBus and Handi-Van system.
The Comprehensive Bus Facility and Equipment Requirements Study, published in 1994 by the Honolulu Public Transit Authority, examined bus system expansion and financing needs for the period 1994 - 2006. This study has not been updated. Currently, there are no plans to expand the bus fleet beyond the current 531 buses. For the fleet to expand its service, public review and Council approval will be necessary.
The DTS has identified and proposed for development two park-and-ride facilities in ‘Ewa, one near the Kualaka‘i Parkway/Kapolei Parkway intersection, and another near the corner of Kualaka‘i Parkway and Farrington Highway. An alternatives analysis will be conducted for a third facility near the civic center area of the City of Kapolei.
Policies, planning principles, and guidelines in this Development Plan support the establishment of transit service throughout ‘Ewa and creation of linkages feeding into transit nodes along the rail transit corridor (see Section 4.1.4.2).
In 2006, the DTS completed a planning Alternatives Analysis to evaluate alternatives that would provide high-capacity transit for the rail transit corridor between the University of Hawai‘i at Mānoa, downtown Honolulu, and the fast growing ‘Ewa region. On December 22, 2006, the City Council selected, as the Locally Preferred Alternative, a fixed-guideway transit system, now known as the elevated rail transit line, extending from the City of Kapolei to the University of Hawai‘i Mānoa with a connection to Waikīkī. This initial phase will begin in East Kapolei near the Salvation Army Kroc Center and the DHHL headquarters, and will end at the Ala Moana Shopping Center.
As shown on the Phasing Map in Appendix A, a rail transit corridor is planned to connect the City of Kapolei with Waipahū, and onward to the PUC. Service on the rail transit corridor could provide a shuttle service between Kapolei West, the City of Kapolei, Kalaeloa, East Kapolei (DHHL East Kapolei, UHWO, Ho‘opili), and Waipahū, and an express commuter service to and from the PUC. In peak-hour commuting, the elevated rail transit line will provide high-speed dedicated transit service.
By connecting to the PUC to Kapolei via Waipahū, the rail transit corridor will provide for a future high-speed connection between UHWO, Leeward Community College, Honolulu Community College, and the University of Hawai‘i at Mānoa.
The ‘Ewa portion of the elevated rail transit line is being constructed from Waipahū through Ho‘opili, turning south to run along Kualaka‘i Parkway to extend into Kalaeloa where it turns west and runs along Saratoga Road until it turns north and enters the City of Kapolei on Wākea Street, turning west on Kapolei Parkway until reaching its terminus near the Kapolei Commons shopping center.
Developments along the rail transit corridor should set aside appropriate sized right-of-way and space for pedestrian-station interface areas for the establishment, when needed in the future, of an elevated rail transit line. Such a system will require a 28-foot to 32-foot right-of-way along the route and a 75-foot right-of-way for rail transit stations.
Land has been set aside for a rail transit right-of-way in the median of Kapolei Parkway and along the east side of the Kualaka‘i Parkway corridor.
DR Horton, Schuler Division, has purchased the former Campbell Estate lands along Farrington Highway between Kualaka‘i Parkway and Fort Weaver Road. They have made a commitment to provide a rail transit corridor right-of-way between Kualaka‘i Parkway and Fort Weaver Road.
Land has been set aside in the City of Kapolei for a transit station/bus terminal/park-and-ride facility, and provisions should be made for transit stations/park-and-ride facilities at each of the transit nodes along the rail transit corridor.
Medium density apartment and commercial development should be developed at greater densities within transit nodes. These transit nodes should be designed to give priority to pedestrians and areas intended for pedestrian access and circulation. The objective is to create a land use pattern that would allow residents to minimize use of the private automobile and encourage use of transit for longer trips and walking or biking for short trips.
TheBoat, a high-speed commuter ferry system, operated between September 2007 and June 2009, and provided an alternative way to commute to the PUCfrom ‘Ewa and West O‘ahu. The ferry ran between Kalaeloa Barbers Point Harbor and the Aloha Tower.
Renewal of the service may be possible if an ‘Ewa terminus in the ‘Ewa Beach area could be obtained.
The Kapolei Area Bikeway Plan (KABP), published by Campbell Estate in 1991, establishes a comprehensive bikeway network to serve the ‘Ewa Plain. The network would include 56 miles of bikeway facilities, including bike paths (separated from the roadway), bike lanes (four- to six-foot lanes) and bike routes (shared curbside vehicle lane, with minimum 12-foot width).
The Kapolei Area Bikeway Plan is part of the City of Kapolei Urban Design Plan, which was updated and adopted by the City Council in 2008. The KABP covers all of ‘Ewa except for military bases in the area. Elements of the KABP have been adopted by the State Department of Transportation as part of the State bikeway plan, Bike Plan Hawai‘i (2003), and have been included in draft O‘ahu Bike Plan maps for ‘Ewa which are being reviewed as part of a City update to the 1999 Honolulu Bicycle Master Plan.
In addition, the DPP has completed the ‘Ewa Roadway Connectivity Study (May 2009) which provides a proposed bikeway facility plan for ‘Ewa to be used in evaluating roadway master plans submitted as part of subdivision applications.
The ‘Ewa Development Plan includes all the projects found either in the KABP, in the State's Bike Plan Hawai‘i, or the ‘Ewa Roadway Connectivity Study. As shown in Exhibit 4.1, major bike paths should run along the OR&L right-of-way, Kapolei Parkway, the Kualaka‘i Parkway, and Fort Weaver Road. Bikeways should also be incorporated into other major roadways, and there should be an extensive network of bike lanes within the City of Kapolei and the Villages of Kapolei.
Exhibit 4.1 ‘Ewa Bikeway System
⬚ figure
‘Ewa Development Plan 4-12 Public Facilities and Infrastructure Policies
Transit-Oriented Community Street Systems
Bikeway System
The following guidelines suggest how the general policies for transportation system development in ‘Ewa should be implemented.
Exhibit 4.2 Street Network
⬚ figure
In 1987, the State enacted the State Water Code in order to protect, control, and regulate the use of the State's water resources for the benefits of its people. Under the
Code, the City is responsible for preparing the water use and development plan for the City and County of Honolulu.
This plan, called the Oʻahu Water Management Plan (OWMP), is prepared by the Board of Water Supply with the assistance of the State Commission on Water Resource Management and the DPP, and approved by the City Council following extensive public review and comment. The goal of the OWMP is to provide guidance for the sustainable management and use of Oʻahu's valuable and finite surface and ground water resources in meeting demands consistent with the City land use plan. The current OWMP was adopted by the State Commission on Water Resources and the City Council in 1990.
The Board of Water Supply (BWS) has begun the development of eight district-wide Watershed Management Plans for each of the eight Development Plan and Sustainable Communities Plan areas. The Waiʻanae Watershed Management Plan, and Koʻolau Loa Watershed Management Plan are the first two plans to be prepared. They will be followed by plans for the North Shore and Koʻolau Poko, and then ʻEwa, Central Oʻahu, the Primary Urban Center, and East Honolulu. When completed, the eight Watershed Management Plans will be used to update the Oʻahu Water Management Plan.
Water Reclamation - Under the City's agreement through a Consent Decree with the U.S. Environmental Protection Agency and the State Department of Health, the City established a water reclamation facility at Honouliuli Wastewater Treatment Plant (WTP) to recover nonpotable water for beneficial uses such as irrigating parks and golf courses, providing water for industrial cleaning, and for making steam used in oil processing.
Construction of the secondary treatment unit at the Honouliuli WTP was completed in 1996. The facility is capable of providing 13 million gallons per day (mgd) of non-disinfected secondary treated reclaimed water (R-3 quality). The R-3 quality water receives further treatment known as tertiary treatment at the Honouliuli Water Recycling Facility (WRF) which produces two grades of recycled water: R-1 for irrigation and RO (Reverse Osmosis) demineralized water for industrial uses. The WRF can process up to 12 mgd which is distributed to customers throughout ʻEwa through separate lines for
each grade of water. The Board of Water Supply is planning expansion of the distribution system, in conjunction with expansion of both the Honouliuli WTP and WRF, to provide over 26 mgd of nonpotable water for use in ‘Ewa.
Desalination Project - Following the success of a small State of Hawai‘i sponsored pilot project, the Board of Water Supply is planning to construct an initial 5 mgd desalination plant on a 20-acre parcel at Kalaeloa. Capacity of the plant could be increased to 15 mgd in future phases. The plant is expected to have an operational life of 30 to 50 years.
The Board of Water Supply evaluated the water development needs of the existing and new residential and commercial (including retail, office, resort, recreational, and industrial) development likely by 2035, as a result of implementation of the ‘Ewa Development Plan.
Potable water system infrastructure has been master planned by the Board of Water Supply to accommodate ‘Ewa’s planned growth. Ultimately, potable water demands of the remaining lands within the Community Growth Boundary should be met by desalination or additional groundwater sources in Central O‘ahu if sustainable yield is determined available.
The demand for nonpotable water for urban irrigation and other urban purposes and for agricultural irrigation for lands over the ‘Ewa Plain nonpotable aquifer; will be met with a combination of recycled water, brackish caprock water, and brackish basal water. Infrastructure providing R-1 recycled water connects the Campbell Industrial Park with
Fort Weaver Road, and brackish water systems exist in several developments. Demineralized recycled water is also provided by the Board of Water Supply to refineries and power plants in Campbell Industrial Park for industrial purposes. The demand for nonpotable water for agricultural irrigation of lands over the Pearl Harbor potable water aquifer should be met with low chloride irrigation water such as the Wai‘ahole Ditch or freshwater wells.
As shown in Table 4.2, the Board of Water Supply has identified potential sources of potable and nonpotable water to meet the projected demand in ‘Ewa through 2035. These sources will be pursued as part of the Board's development and operation of a diversified and integrated island-wide water system.
Strategies in the Watershed Management Plan promote on-going groundwater source development coupled with efforts to increase water delivery efficiency, water conservation, and continued development of alternative sources of water, such as recycled and brackish water and desalination.
The remainder of the section provides general policies and guidelines for water allocation and water system development in ‘Ewa.
| TABLE 4.2 POTENTIAL SOURCES OF POTABLE AND | |
|---|---|
| NONPOTABLE WATER FOR ‘EWA | |
| POTABLE GROUNDWATER RESOURCES | |
| Estimated Source | |
| GROUND WATER SOURCE | Yield (mgd) |
| 1. Kunia Wells III[^p156-1] | 3.00 |
| 2. Waipahū Wells IV[^p156-1] | 3.00 |
| 3. Honouliuli Wells[^p156-2] | 1.62 |
| 4. ‘Ewa Shaft | 10.00 |
| 5. Additional Central O‘ahu Wells[^p156-3] | |
| Total | 17.62 |
| ALTERNATIVE WATER RESOURCES | |
| Available Resource (mgd) | |
| SOURCE | Minimum |
| POTABLE | Estimate |
| 1. Kalaeloa Seawater Desalination Plant | 5.00 |
| 2. Kapolei Brackish Desalination Plant | 0.20 |
| Total Potable | 5.20 |
| NONPOTABLE | |
| 3. ‘Ewa Caprock[^p156-4] | 8.70 |
| 4. Brackish Basal Water[^p156-5] | 4.00 |
| 5. Recycled Water[^p156-6] | 12.00 |
| 6. Waiāhole Ditch (‘Ewa only)[^p156-7] | 4.73 |
| Total Nonpotable | 29.43 |
| NOTES: | |
| mgd = million gallons per day mg/l = milligram per liter | |
| [^p156-1] Portion of the source will supply water for Wai‘anae's growth. | |
| [^p156-2] Of the 6.72 mgd permitted use, 1.62 mgd remains available for new development. | |
| [^p156-3] Unpermitted sustainable yield is available but hydro-geologic analysis must be conducted. | |
| [^p156-4] Minimum is existing use July 2005. Maximum was 1996 proposed sustainable yield. ‘Ewa caprock is now managed by a chloride limit of 1,000 mg/l. | |
| [^p156-5] Based on existing brackish basal sources, EP-2 (1mgd), EP-5&6 (2mgd), EP-10 (1-2 mgd). | |
| [^p156-6] Expansion of recycled water supply beyond 12 mgd is possible but not planned at this time.. | |
| [^p156-7] Minimum estimate is Campbell Estate 3.98 mgd and Pu‘u Makakilo 0.75 mgd allocation. Max adds possible unpermitted water. | |
| Allocation of groundwater sources require the approval of the State Commission on Water Resource Management (CWRM). | |
| Source: | |
| Honolulu Board of Water Supply, 2008, Watershed Management Plan | |
| CWRM Database 2005 |
Water Use Efficiency and Conservation
Use of Nonpotable Water
brackish waters as nonpotable irrigation sources in the coastal caprock area such as the ‘Ewa Plain should be given high priority.
Significant demand exists for nonpotable water for golf courses, landscape irrigation, and industrial uses on the ‘Ewa Plain.
In addition to the compatibility of the source to the demand in the area, the infrastructure to distribute the recycled water in that area is being planned and developed by the Board of Water Supply.
Recycled water from the Honouliuli Water Recycling Facility and brackish water should, therefore, be used to meet demand in the ‘Ewa Plain where there are no adverse consequences to the drinking water resources.
Require nonpotable water used for irrigation above Pearl Harbor aquifer to be low in chlorides and total dissolved solids to protect the quality of drinking water withdrawn from wells located down-gradient of the application. Experiences with increasing chloride, nitrate, and pesticide contamination of groundwater indicate that activities on the surface of the land can have a detrimental effect on the quality of drinking water.
Use of Wai‘ahole Ditch Water - Request that the State Commission on Water Resource Management consider all sources of water in making allocations. A sufficient amount of water is needed to meet the diversified agricultural needs for ‘Ewa and Central O‘ahu along with providing for high quality recharge of the Pearl Harbor aquifer. A number of potential sources are identified in Table 4.2, including: caprock, surface water, spring waters, Wai‘ahole Ditch Water, and recycled water recovered from wastewater effluent. The amount of water available and the potential use of each of these sources vary according to location.
conditioning, photovoltaics, efficient plumbing and lighting fixtures, wave energy, and bio-fuels.
The City's West Māmala Bay Wastewater Facilities Plan (2001) provides estimates that treatment/disposal capacity at the Honouliuli WTP will need to be increased from existing capacity for primary treatment of 38 mgd to almost 51 mgd by 2020 to meet projected population and economic growth in ‘Ewa and Central O‘ahu resulting from implementation of the Development Plans. In addition, the capacity of specific sewer lines and pump stations will need to be increased.
As noted above, the City is meeting its commitment to the U.S. Environmental Protection Agency and the State Department of Health to reclaim and use, islandwide, up to 10 mgd of recycled water recovered from wastewater effluent.
The remainder of the section provides general policies for wastewater system development in ‘Ewa.
elements, such as pump stations and mains, should not require such comprehensive review and policy approval.
The Hawaiian Electric Company (HECO) forecasts that increased demand, the need for different types of generation to help reliably integrate additional renewable energy from intermittent sources, and the possible retirement of the Honolulu Power Plant from service will create a need for additional island-wide power generation capacity by 2025. Potential sites in ‘Ewa for additional generating units include Campbell Industrial Park and Kahe Point.
In May 2007, the State Public Utilities Commission approved HECO’s proposal to build a 110-megawatt generating plant adjacent to the company’s Barber’s Point Tank Farm in Campbell Industrial Park. The new generator is planned to come on line in 2009.
HECO has a number of renewable energy initiatives and activities including rebates to help homeowners install rooftop solar water heating systems, funding for biofuels crop research, and support for installations of photovoltaic systems with net energy metering. (Net energy metering allows the owner of the photovoltaic system to receive credit for the export of surplus energy into the island-wide grid.)
The remainder of the section provides general policies for electrical power development in ‘Ewa.
in Appendix A. Existing power plants are shown on the Urban Land Use Map and Public Facilities Map in Appendix A. Other system elements, such as sub-stations and transmission lines, are not shown on the map and should be reviewed and approved administratively.
Two major solid waste handling and disposal facilities are located in ‘Ewa:
To comply with a 2003 LUC order setting 2008 as the limit for Waimānalo Gulch Landfill operations, a special Advisory Committee was convened to locate new landfill sites. In its December 2003 report, the Advisory Committee recommended four sites for consideration, including Makaīwa Gulch. In December 2004, the City Council adopted Resolution 04-348 which: a. required the City to develop alternative technologies and extract the maximum recyclable materials, energy, and alternative products to minimize the waste placed in landfills in order “to effectively eliminate, to the extent possible, the need for a landfill by 2008;” b. selected the Waimanalo Gulch site as the site for the City’s landfill; and c. requested the City administration to immediately contact the Planning Commission, the State Department of Health, and the State Land Use
Commission to satisfy any necessary requirements for continued use of Waimānalo Gulch as the City's landfill site.
In May 2008, the LUC approved an extension of the Waimānalo Gulch Sanitary Landfill land use permit until November 2009.
The Final Environmental Impact Statement (EIS) for proposed expansion of the Landfill by 93 acres was accepted in October 2008. In September 2009, the LUC approved a new Special Use Permit to allow the expansion, but required that after July 31, 2012, only ash and residue from the City's H-Power plant can be deposited in the Landfill. Approval from the Department of Health will also be required before the landfill footprint can be expanded.
In 2009, the City reached agreement on a contract to ship 100,000 tons of waste per year from Kalaeloa Barbers Point Harbor to the Mainland in order to reduce the amount of waste being disposed at the Waimānalo Gulch Landfill. However, the City has cancelled the contract since permit problems and lawsuits have prevented any shipments, and the intent for entering into the contract was to fill the gap until a third boiler was added at the H-Power Plant, which is expected in late 2011.
The Integrated Solid Waste Management Plan was updated in 2008 and, following a public hearing and a 60-day public comment period, was submitted to Council for approval.
The remainder of the section provides general policies for solid waste handling and disposal in ‘Ewa.
Low-lying parts of the ‘Ewa Plain are subject to flooding during intense rainstorms. Flood control has typically been provided for urbanized areas through the development of concrete-lined channels to convey storm waters to the ocean. Discharge of stormwater to the ocean, however, is a major source of non-point source pollution of nearshore waters, negatively affecting coral growth, fish populations and use of the shoreline for swimming, surfing, and other types of ocean recreation.
The federal government has initiated a major program to reduce non-point-source pollution, mandating response by the State and the counties. In general, the City requires all residential, commercial, public facilities, and transportation development and redevelopment projects to address storm water quality through the use of best management practices in accordance with the City’s Rules Relating to Storm Drainage Standards. In many watersheds, however, undeveloped mountain areas generate a disproportionately large share of the total storm flow, and no party appears to be responsible for mitigating the environmental impact.
Concrete-lined drainage channels can have other negative environmental impacts, including disruption of lateral shoreline access, beach erosion, down drift of channel mouths, and visual blight.
Drainage improvements are planned for:
The Makaīwa Hills system may have detention basins mauka of the H-1 Freeway and a concrete-lined channel to convey storm waters to an ocean outlet just south of Kalaeloa Barbers Point Harbor. It is being planned by Kapolei Property Development LLC (KPD). KPD is also planning to expand the existing channel on the western boundary of Kalaeloa.
Drainage improvements in the West Loch Drainage Basin need to be constructed to handle storm water runoff from existing and proposed projects located in the basin. These projects include the City's West Loch residential project, Phase I of the ‘Ewa by Gentry residential project, and the proposed Ho‘opili master-planned community project.
The developer for Phase I of the ‘Ewa by Gentry East project had planned to construct a grass-lined drainage channel running immediately east of the project's boundary to terminate at a detention basin immediately makai of the Honouliuli National Wildlife Refuge. However, currently the developer is considering using a large retention pond to hold storm waters, in lieu of constructing the grass-lined channel.
The Kalo‘i Gulch Drainage Basin is one of the larger drainage basins in the region. It encompasses an area of approximately 7,140 acres, and has a peak design flow of approximately 11,500 cubic feet per second (cfs). Historically, the drainage pattern in this basin has flowed from the Wai‘anae Mountain Range above Makakilo through the Kalo‘i Gulch toward the ocean terminating at One‘ula Beach Park. Floodwaters typically spread out in sheet flows through the former sugarcane fields below Farrington Highway.
Prior to 2000, drainage flow through the Kalo‘i Gulch basin was constrained by the elevation of the OR&L right-of-way which formed a man-made barrier that impeded storm water runoff. However, this constriction was addressed by the construction of a new railroad bridge in 2000.
In the interim until an ocean outlet is constructed, the ‘Ewa Villages, ‘Ewa by Gentry, and Ocean Pointe projects handle drainage within their projects through use of golf courses. The golf courses provide detention of storm waters and meet the DPP drainage requirements for stormwater runoff.
Other development projects in the basin include the UHWOcampus and associated residential and commercial development which has not yet received City approval for its drainage master plan, and the DHHL East Kapolei project whose drainage master plan has been approved.
The drainage system serving the Villages of Kapolei, which consists of golf course retention and disposal of storm water into large pits and a large ditch near the Kalaeloa boundary, may need to be augmented in the future.
Both the regional drainage system and the on-site drainage facilities for Kalaeloa need to be addressed during the redevelopment of Kalaeloa. The existing regional drainage channel and box culverts that discharge into the coral pit near the intersection of Fort Barrette Road and Franklin D. Roosevelt Road are inadequate to handle the runoff from the 100-year storm, according to the Kalaeloa Master Plan. In addition, the Master Plan notes that the Navy’s system of drywells, installed to handle runoff within Kalaeloa, do not conform to City standards.
See Exhibit 4.3 for the location of ‘Ewa Drainage Basins.
The remainder of the section provides general policies and guidelines for drainage systems in ‘Ewa.
Exhibit 4.3 ‘Ewa Drainage Basins Map
⬚ figure
The following guidelines suggest how the general policies for drainage systems in ‘Ewa should be implemented.
The following guidelines apply specifically to development within the Kalo‘i Gulch drainage basin.
approved. The ‘Ewa Villages drainage design assumes that runoff will not exceed levels previously received from sugarcane fields north of the golf course, will enter the ‘Ewa Villages golf course water retention areas through a number of dispersed channels, and will not be at velocities which would scour out the golf course water retention areas.
Statewide, the DOE faces an enormous shortfall in funding to meet projected needs for new classrooms. Act 245, 2007, established a system for collecting school impact fees from new residential developments. Developers are required to provide "their proportionate share of the land and the construction cost of new or expanded school facilities needed to serve new residential developments."
DOE is in the process of establishing the school impact districts required under the Act in order to collect land and money from developers. In January 2012, the Board of Education approved creation of a Leeward O‘ahu Impact District that includes the Kapolei Complex and Campbell Complex areas in ‘Ewa.
As shown in Table 4.3, the DOE has projected a need by 2030 for ten new elementary schools, three new intermediate schools, and two new high schools in ‘Ewa. (Needs estimates could change if estimates of housing production and density or school operation policies and funding are revised.)
Conceptual locations of three new intermediate schools and two new high schools are shown on the Urban Land Use Map and the Public Facilities Map in Appendix A. Elementary schools are not mapped because their sites are of community rather than regional concern and should be determined as part of a master planning and design process. Sites have been reserved for all of the planned elementary schools, the three planned intermediate/middle schools, and one high school. (Minimum site size for elementary schools is 8 to 15 acres, for intermediate schools is 15 to 20 acres, and for high schools is 45 to 55 acres.)
TABLE 4.3 EXISTING AND PLANNED PUBLIC SCHOOLS IN THE 'EWA DEVELOPMENT PLAN AREA
| School | FY 2011 Enrollment | Capacity | Site Reserved | Opening Date |
|---|---|---|---|---|
| Elementary Schools | ||||
| Campbell Comolex | ||||
| 'Ewa Beach Elementary | 507 | 544 | Existina | NA |
| 'Ewa Elementary | 1,003 | 798 | Existina | NA |
| Holomua Elementary | 1,382 | 1,264 | Existinq | NA |
| Iroquois Point Elementary | 718 | 995 | Existinq | NA |
| Ka'imiloa Elementary | 610 | 716 | Existinq | NA |
| Keone'ula Elementary | 847 | 742 | Existinq | NA |
| Pohakea Elementary | 565 | 626 | Existinq | NA |
| Kaoolei Comolex | ||||
| Barbers Point Elementary | 491 | 636 | Existina | NA |
| Kaoolei Elementary | 1,043 | 1,233 | Existina | NA |
| Makakilo Elementarv | 502 | 627 | Existinq | NA |
| Mauka Lani Elementary | 563 | 702 | Existinq | NA |
| Total | 8.231 | 8.883 | ||
| Planned | ||||
| Kapolei II Elementary (Mehana)¹ | 400 to 750 | X | 2014 | |
| East Kapalei UH WOC I, II²,³ | 400 to 750 | X | N.D. | |
| East Kapolei DHHL² | 400 to 750 | X | N.D. | |
| East Kaoolei Ho'ooili I, II, III² | 1 ,200 to 2,250 | X | N.D. | |
| MakaTwa Hills² | 400 to 750 | X | N.D. | |
| Kapolei West² | 400 to 750 | X | N.D. | |
| Ko Olina² | 400 to 750 | X | N.D. | |
| Total | 3,600 to 6,750 | |||
| Intermediate/Middle School | ||||
| 'Ewa Makai Middle (Campbell Complex) | 587 | 700 | Existinq | NA |
| 'Ilima Intermediate (Campbell Complex) | 777 | 1,330 | Existinq | NA |
| Kaoolei Middle (Kapolei Comolex) | 1,424 | 1,744 | Existinq | NA |
| Total | 2.ZBB | 3_II_4 | ||
| Planned | ||||
| East Kapolei Middle (DHHL)² | 500 to 1,000 | X | N.D. | |
| East Kapolei Middle (Ho'opili)² | 500 to 1,000 | X | N.D. | |
| West Kapolei Middle (Makaiwa Hills)² | 500 to 1,000 | X | N.D. | |
| Total | 1,500 to 3,000 | |||
| Hiah School | ||||
| Campbell Hiah | 2,639 | 2,022 | Existina | NA |
| Kapolei Hiqh | 2,107 | 1,841 | Existina | NA |
| Total | 4 746 | 3.863 | ||
| Planned | ||||
| East Kapolei High I (HHFDC land)² | 800 to 1,600 | N.D. | ||
| East Kapolei High II (Ho'opili)² | 800 to 1,600 | X | N.D. | |
| Total | 1,600 to 3,200 | |||
| NOTES: | ||||
| ¹ Received appropriation for added design and construction funds in FY2012-2013. | ||||
| ² No leqislative appropriation | ||||
| ³ Includes a UHWO labschool. | ||||
| X Site Reserved | ||||
| NA Not Applicable | ||||
| N.D. Not Determined | ||||
| Source: State Department of Education Facilities Development Branch, 2011 |
Private schools play an important role in Hawaiʻi with private school graduates averaging around 16 per cent of all graduates for the last 25 years. There were four private schools in ‘Ewa with enrollment of almost 1,300 students in the fall of 2008 which, compared with public school enrollment in ‘Ewa, is less than half what would be expected based on the statewide average.
The remainder of the section provides general policies and guidelines for school facilities development in ‘Ewa.
The following guidelines suggest how the general policies for schools facilities development in ‘Ewa should be implemented.
Table 4.4 provides a listing of existing and planned public safety facilities in the ‘Ewa Development Plan area.
To meet projected population and economic growth by 2035, the Fire Department estimates ‘Ewa will need four new fire stations. They also plan to establish an island-wide training facility at Kalaeloa.
Because police operate primarily in the field and do not have a need for outlying stations, only one substation is projected by the Police Department to be needed to serve the 2035 population of 164,500. A new regional station was built in the City of Kapolei on donated land and became operational in 2001. Land has been offered for a substation in the proposed Ho‘opili development.
The expected population growth and development of new communities and community facilities in ‘Ewa will result in a need for additional emergency medical service facilities and response units. The State Department of Health has not identified how many new stand-alone emergency medical service facilities in ‘Ewa will be needed to meet expected growth.
TABLE 4.4 EXISTING AND PLANNED PUBLIC SAFETY FACILITIES IN THE ‘EWA DEVELOPMENT PLAN AREA
| Facilities | Site | Service Area | Service Date |
|---|---|---|---|
| Fire Stations | |||
| Makakilo | Makakilo | Makakilo, Ko Olina, Villages of Kapolei | Existing |
| Kapolei | Kapolei | Campbell Industrial Park, City of Kapolei, Kapolei Business Park | Existing |
| ‘Ewa Beach1, 2 | Ocean Pointe | ‘Ewa by Gentry, Ocean Pointe, ‘Ewa Beach, Iroquois Point | 2012 |
| East Kapolei | DHHL East Kapolei | East Kapolei, Villages of Kapolei, UH West O‘ahu, Tenney Village, Kalaeloa | 2011 |
| Kalaeloa | Old Federal Fire Station Site | Kalaeloa, ‘Ewa, and Kapolei | N.D. |
| ‘Ewa Villages | Tenney Village | West Loch, ‘Ewa Villages, East Kapolei | N.D. |
| Ko ‘Olina | Ko Olina | Ko Olina Resort | N.D. |
| Makaīwa Hills | Makaīwa Hills | Makaīwa Hills | N.D. |
| Kalaeloa Tactical Training Facility | Kalaeloa (Former BPNAS site) | Island-wide | N.D. |
| Ho‘opili | Ho‘opili | Ho‘opili, Ewa by Gentry, Kapolei, Tenney Village, Waipahu, Royal Kunia | N.D. |
| Police Stations | |||
| ‘Ewa Plains Regional Station | City of Kapolei | ‘Ewa Region | Existing |
| Ho‘opili Substation | Ho‘opili | East Kapolei, ‘Ewa Beach | N.D. |
| Emergency Medical Services Facilities | DOH has not identified needed sites | ||
| NOTES: |
Population growth will also result in need for additional public emergency shelters. There is a state-wide shortage of shelters, compounded by the fact that around a third of the existing shelters need to be retrofitted if they are to withstand any hurricane strength winds, and few of the existing shelters are capable of withstanding a Category 3 hurricane like Hurricane ‘Iwa. Civil defense analysts expect 35 percent of the population will seek public shelter in a disaster. Based on that standard, ‘Ewa needed public shelter space for 29,000 residents in 2005, and will need space for 57,600 in 2035. Table 4.5 lists existing ‘Ewa shelters and their capacity.
It makes sense to supplement the public shelters with shelters in private buildings since most of the population is not expected to seek a public shelter during a disaster. A State law provides immunity to private organizations which create hurricane resistant shelters that meet State standards. There are no State or City programs providing incentives or support for private organizations who create hurricane shelters or individuals who build hurricane-resistant "safe rooms" in their homes. However, by 2012 at the latest, the building code will require that all new homes either have a safe room or be equipped with hurricane resistant glass.
| TABLE 4.5 EXISTING PUBLIC EMERGENCY SHELTERS IN ‘EWA, 2009 | |
|---|---|
| Shelter Location | Capacity |
| Barbers Point Elementary | 385 |
| Campbell High (S/P) | 5,877 |
| ‘Ewa Beach Elementary | 1,966 |
| ‘Ewa Elementary | 2,689 |
| ‘Ilima Intermediate (S/P) | 2,629 |
| Ka‘imiloa Elementary | 1,748 |
| Kapolei Elementary (S) | 1,255 |
| Kapolei High (S) | 511 |
| Makakilo Elementary | 2,088 |
| Mauka Lani Elementary (S) | 874 |
| Pōhākea Elementary | 1,165 |
| TOTAL | 21,187 |
| NOTES: | |
| S Facility designated to serve as a Special Needs Shelter and General Population Shelter | |
| P Pet Friendly Shelter co-located with General Population Shelter | |
| (and, in some cases, Special Needs Shelter). |
Other existing and proposed community facilities shown on the Urban Land Use Map in Appendix A include hospitals, and colleges. Key facilities include the planned University of Hawai‘i West O‘ahu campus. Hawai‘i Medical Center West is the major medical facility serving the ‘Ewa region.
Location of new community facilities should comply with the following policies:
Antennas have been around as long as we have had radio and television services. Antennas associated with communication purposes have grown tremendously especially since the U.S. introduction of mobile communication devices in the early 1980s. While the telecommunication industry has provided more convenient communication capabilities for individuals, it has also increased the public agencies’ ability to provide faster and more efficient response to those in need, particularly on an emergency basis.
While the benefits of the telecommunications industry cannot be disputed, communities have opposed the antennas due to aesthetic impacts, particularly on public views and on neighborhood character. Their visibility has increased, especially where antennas are mounted on free-standing towers.
The general public has also raised concerns about the environmental effects of electromagnetic field exposure associated with radio transmissions, as evidenced by the presence of antennas. However, the Federal Communications Commission (FCC) is responsible for evaluating the human environmental effects of radio frequency (RF) emissions from FCC-regulated transmitters. The federal guidelines specifically preclude local decisions affecting environmental effects of radio frequency emissions, assuming that the provider is in compliance with the Commission’s RF rules.
The following are general principles governing utilization of antennas:
Implementation of the ‘Ewa Development Plan will be accomplished by:
Active projects in various stages of the development process are proceeding for all the undeveloped areas in ‘Ewa within the Community Growth Boundary.
The City Council, in reviewing and deciding on the zone changes for these latter projects, will have the opportunity to evaluate the availability of infrastructure and require conditions that the developer must meet as a condition of zoning to insure infrastructure adequacy and attainment of key elements of the Plan vision.
However, there are two major projects involving substantial amounts of residential, commercial, and office development which are not required to gain Council approval or incorporate conditions regarding infrastructure adequacy or other elements of the ‘Ewa Plan vision.
that almost 6,500 dwelling units could be developed at Kalaeloa by 2025, and over 116 thousand square feet of commercial space, 725 thousand square feet of office space, 1.8 million square feet of light industrial space, and 470 thousand square feet of light industrial mixed use space.
The City will seek the cooperation of the DHHL and the HCDA in implementing the vision for ‘Ewa's development.
The ‘Ewa Development Plan provides a clear signal to private landowners and developers as to where development will be supported.
The Urban Expansion Area is shown on the Phasing Map in Appendix A. The Urban Expansion Area shows where new urban development is occurring and where applications for new urban development will be accepted for processing.
Projects in the Urban Expansion Area needing zone changes and other development approvals would be eligible for processing with the adoption of the revised Plan and will be supported if:
No additional areas should be approved for development beyond the Community Growth Boundary in order to protect agricultural and preservation lands.
The regional directed growth strategy requires the cooperation of both public and private agencies in planning, financing, and constructing infrastructure. The City must take an active role in planning infrastructure and coordinating construction of needed infrastructure, such as expansion of Honouliuli Wastewater Treatment Plant and recovery of nonpotable water from its effluent, development of drainage systems for the
Kalo‘i Gulch and Kapolei watersheds, provision of recreational open spaces, and development of the regional transportation system, parks, police and fire facilities.
Significant Capital Improvement Projects of the highest priority for the ‘Ewa Development Plan are:
Special Area Plans provide more detailed policies, principles, and guidelines than the Development Plan for areas requiring particular attention. The form and content of Special Area Plans depends on what characteristics and issues need to be addressed in greater detail for the planning and guiding of development or use within the Special Area.
Special Area Plans can be used to guide land use development and infrastructure investment in Special Districts, Redevelopment Districts, or Resource Areas. Plans for Special Districts would provide guidance for development and infrastructure investment
in areas with distinct historic or design character or significant public views. Plans for Redevelopment Districts would provide strategies for the revitalization or redevelopment of an area. Plans for Resource Areas would provide resource management strategies for areas with particular natural or cultural resource values.
Kalaeloa is the only area in ‘Ewa currently identified for Special Area Plan status. Its Special Area Plan is a combination of a Redevelopment District and Resource Area Plan.
The Kalaeloa Redevelopment Plan, a Special Area Plan of the ‘Ewa Development Plan, was prepared by the Barbers Point Naval Air Station Redevelopment Commission in December 2000 under guidelines of the Federal Base Realignment and Closure Act (BRAC). It was accepted by the City Council as the Special Area Plan for Kalaeloa in April 2001.
Responsibility for planning for and coordinating redevelopment of Kalaeloa was transferred from the Redevelopment Commission to the HCDA in 2002 by the Hawai‘i State Legislature. HCDA has prepared a community-based Kalaeloa Master Plan that was approved by the HCDA Board and the Governor in 2006, and should be submitted to the City Council for acceptance as the revised Special Area Plan for Kalaeloa.
Functional Plans are meant to provide guiding principles and strategies, which will be used by the various functional agencies to determine needs, assign priorities, phase infrastructure and facilities development, and secure financing to meet the needs identified in the Development Plan.
City agencies responsible for developing infrastructure and public facilities shall review existing Functional Plans, and in consultation with the Director of the DPP, update the existing Plans or prepare and submit to the Mayor new long-range Functional Plans for providing facilities and services for ‘Ewa to the year 2035.
Agencies with Functional Planning responsibilities (and representative plans) include:
The Functional Plans should provide:
A resource-constrained program is one that identifies the fiscal resources that can be reasonably expected to be available to finance the improvements.
Level of Service Guidelines for determining adequacy of public facilities and infrastructure to support new development shall be established by the responsible City line agencies as part of their review and update of Functional Plans. Level of Service Guidelines for infrastructure and utilities which are primary State agency responsibilities (such as schools) shall be established by the DPP in consultation with the responsible State agencies.
In preparing the Functional Plans, a proactive public involvement process should be established which provides the public with access to complete information about
infrastructure and public facility needs assessment, alternatives evaluation, and financing. Outreach activities should involve the Neighborhood Boards, community organizations, landowners, and others who might be significantly affected by the infrastructure or public facilities projects to be developed under the Functional Plan.
The process should be characterized by opportunities for early and continuing involvement, timely public notice, public access to information needed to evaluate the decision, and the opportunity to suggest alternatives and to express preferences.
A primary way in which the vision of the ‘Ewa Development Plan will guide land use will be through the review of applications for zone changes and other development approvals. Approval for all development projects should be based on the extent to which the project supports the policies, and guidelines of the Development Plan.
All applications for projects requiring zone changes will be reviewed by the DPP for consistency with the policies, principles, and guidelines of the ‘Ewa Development Plan during the Zone Change Application process. Those projects requiring environmental assessments shall follow the provisions of Hawaii Revised Statutes, Chapter 343.
All projects involving significant zone changes will require either an Environmental Assessment or an Environmental Impact Statement (See Section 5.4.1) which must include a Project Master Plan when 25 acres or more are involved (See Section 5.4.2). This is submitted to the DPP for review and acceptance prior to initiation of the first Zone Change Application for the project. (See definition of significant zone change in Section 5.4.1 below, and the definition of Project Master Plan in Section 5.4.2 below.)
Projects involving a significant zone change will be required to submit an Environmental Assessment (prepared in compliance with procedures for Chapter 343, Hawai‘i Revised
Statutes) to the DPP to help the Department determine whether the project involves a significant environmental impact and if the project is supportive of the vision for ‘Ewa's development.
A project will be considered to involve a significant zone change if:
The Director of the DPP will determine, based on review of the Environmental Assessment, whether an Environmental Impact Statement (prepared in compliance with procedures for Chapter 343, Hawaii Revised Statutes) will be required or whether a Finding of No Significant Impact should be issued.
In applying for a zoning change, the applicant must either:
Before an application for a significant zone change can be accepted for processing by the DPP, the applicant must either:
All Environmental Assessments/Environmental Impact Statements (EA/EIS) required for a significant zone change involving 25 acres or more should include a Project Master
Plan (See Section 5.4.2 following). The scope of the EA/EIS must cover, at a minimum, the specific development associated with a particular zone change application, but at the option of the applicant, may cover subsequent phases of a larger project, as well.
Zone change applications for a project already assessed under the National Environmental Policy Act, Hawaii Revised Statutes Chapter 343, Revised Ordinances of Honolulu Chapter 25 (Shoreline Management), or a preceding zoning change application, will not require a new Environmental Assessment so long as the Director of Planning and Permitting determines that the desired zoning and land use generally conform to that described in the existing Environmental Assessment/Environmental Impact Statement.
The Project Master Plan is intended solely as a guide to help describe in words and illustrations how a project promotes the vision, policies, and guidelines for ‘Ewa.
Projects associated with a significant zone change for 25 acres or more, shall include a Project Master Plan as part of the Environmental Assessment or Environmental Impact Statement submitted to the DPP. The Project Master Plan shall cover all project phases. It shall be reviewed to determine whether the project supports the vision, policies, and guidelines of the ‘Ewa Development Plan. In the event a FONSI or Final EIS has already been accepted by the City for a particular project, a subsequent Project Master Plan will not be required.
The Project Master Plan should be based on the best information available to the applicant at the time the Zone Change Application is submitted to the City.
The Project Master Plan should cover all phases of the project and should describe, using narrative and graphic illustration, how the project conforms to the vision for ‘Ewa, and the relevant policies, and guidelines for the project site, the surrounding lands, and the region.
While the scope and detail will vary according to the scope and complexity of the project, the Project Master Plan should contain the following elements. When a key element enumerated below is adequately addressed elsewhere in an EA/EIS, discussion of related issues should be referenced within the Master Plan portion of the document.
o General street patterns and the application of street and block standards which minimize dead end streets and provide adequate connectivity; o Intended connections to the regional roadway network and adjacent communities; and o Potential transit routes and pedestrian and bicycle routes.
The DPP shall review the Project Master Plan concurrently with the Environmental Assessment/Environmental Impact Statement and shall determine whether the Project Master Plan supports the ‘Ewa Development Plan vision or whether changes are needed.
Often, projects are developed in phases. As a result, the Project Master Plan is likely to cover more land than the developer is currently requesting for a zone change. The feasibility and desirability of plans for later phases of the Project Master Plan can be greatly altered in light of more detailed study of site characteristics and site planning, or change in market forces or government policies.
As a result, elements of Master Plans covering lands in phases which are not included in a current Zone Change Application should be considered only conceptual and intended to serve only as a working guide for future development. Changes to these parts of a Master Plan can be made by the developer at any time without requiring approval by the City.
If a Master Plan has been revised in planning for a subsequent phase of a project, an updated version of the Master Plan should be submitted with the zone change application for that phase. No new Environmental Assessment or Master Plan review should be required unless there has been a major alteration in the project vision and land uses from that proposed in the original Master Plan.
All projects requesting zone changes shall be reviewed to determine if adequate public facilities and infrastructure will be available to meet the needs created as a result of the development. Level of Service Guidelines to define adequate public facilities and infrastructure requirements will be established during the Capital Improvement Program.
In order to guide development and growth in an orderly manner as required by the City's General Plan, zoning and other development approvals for new developments should be approved only if the responsible City and State agencies indicate that adequate public facilities and utilities will be available at the time of occupancy or if conditions the functional agency indicates are necessary to assure adequacy are otherwise sufficiently addressed.
The DPP will review and summarize any individual agency's findings regarding public facilities and utilities adequacy which are raised as part of the EA/EIS process. The DPP will address these findings and any additional agency comments submitted as part of the agency review of the zone change application, and will recommend conditions that should be included in the Unilateral Agreement or Development Agreement to insure adequacy of facilities.
Zoning applications will be reviewed by the DPP for consistency with the General Plan, the ‘Ewa Development Plan, and any applicable Special Area Plan provisions as part of the Zone Change application review.
The Director of the DPP will recommend either approval, approval with changes and/or conditions, or denial within the prescribed period as set forth in ROH
Section 21-2.40, and the Director’s written review of the application shall address the consistency or inconsistency of the project with the General Plan, the ‘Ewa Development Plan and any applicable Special Area Plan and shall become part of the zone change report which will be sent to the Planning Commission and the City Council.
Before the enactment of an ordinance for a zone change, conditions may be associated with the zone change approval. These conditions are set forth in the applicant's Unilateral Agreement which is recorded with the Bureau of Conveyances and/or the Land Court so that the conditions set forth in the agreement run with the land and bind all subsequent owners of the property.
The Director of Planning and Permitting evaluates zone change requests and may initially recommend conditions of approval in a report to the Planning Commission which evaluates the requested zone change and recommends approval, denial or approval with conditions. The Director’s recommendations and the Planning Commission recommendations are sent to the City Council which makes the final decision on the proposed development, including what conditions should be included in the Unilateral Agreement.
In the evaluation, the Director of Planning and Permitting evaluates the proposed zone change for consistency with the ‘Ewa Development Plan vision, policies and guidelines. In addition, Project Master Plans submitted for large projects at the time of the zone change application may be referenced as a working guide in formulating conditions of approval.
Before the enactment of an ordinance for a zone change, the City and the applicant may negotiate a Development Agreement. The Development Agreement sets forth mutually acceptable contractual conditions agreed upon by the City and the applicant once an ordinance for a zoning change has been approved. The Development Agreement conditions are recorded with the Bureau of Conveyances and/or the Land Court so that the conditions of the agreement run with the land and bind all subsequent owners of the property.
Development agreements negotiated by the City Council shall be consistent with the Development Plan vision for ‘Ewa and should incorporate key conditions that are necessary to implement the Development Plan vision.
Annually, the Director of Planning and Permitting will work jointly with the Director of Budget and Fiscal Services and the City agencies to review all projects in the City's Capital Improvement Program (CIP) budget for conformance to the purposes of the General Plan, the ‘Ewa Development Plan, and other Development Plans, any applicable Special Area Plan provisions, and the appropriate Functional Plans. The Director of Planning and Permitting will make a written report of findings in the budget submittal to the Council, pursuant to Revised Charter Section 6-1503.
Public review of how projects in the City's CIP budget help accomplish the vision of the ‘Ewa Development Plan should be a high priority. Public review should be encouraged both in the screening of agency CIP budget proposals in the preliminary draft CIP Budget (which is available in November), in review of projects included in the Draft CIP Budget (typically completed sometime in January or February), and in the City Council's formal public review and CIP Budget adoption processes.
Every two years, the DPP prepares the Biennial Report. The Report is a review of the City in terms of the General Plan and the Development Plans.
Each Biennial Report should address the achievements and progress in fulfilling the vision of the ‘Ewa Development Plan.
5.7 FIVE YEAR DEVELOPMENT PLAN REVIEW
The DPP shall conduct a comprehensive review of the ‘Ewa Development Plan and shall report its findings and recommended revisions to the Planning Commission and the City Council five years after adoption and every five years thereafter.
In the Five Year review, the ‘Ewa Development Plan will be evaluated to see if the regional vision, policies, guidelines, and implementing actions are still appropriate.
5.8 DEVELOPMENT PLAN COMMON PROVISIONS AND EXISTING LAND USE APPROVALS
This Development Plan will go into effect upon adoption by ordinance. At that time, the revised Development Plan will become a self-contained document, not reliant on the Development Plan Common Provisions which formerly applied to the ‘Ewa Development Plan as well as all the other Development Plans.
Land use approvals granted under previously approved Development Plan amendments will remain in force and guide zoning decisions unless clearly inconsistent with the vision and policies of the ‘Ewa Development Plan.
Development can proceed in accordance with existing zoning, Unilateral Agreements, and approved Urban Design Plans.
If an Environmental Assessment or Environmental Impact Statement (EA/EIS) was accepted in the course of a Development Plan land use approval for a project, it should be acceptable to meet the requirement for an initial project EA/EIS when zone change applications are submitted for subsequent phases of the project unless the project scope and land uses are being significantly changed from that described in the initial EA/EIS.
The <u>‘Ewa Development Plan</u> implements the <u>General Plan</u> population distribution policies (in Population Objective C) as follows:
The <u>General Plan</u> population distribution guidelines will continue to be used as a guide to direct the pattern of growth and development in the ‘Ewa Development Plan Area. Assessments of this performance will be reported in both the Biennial Report and in the Five Year Reviews of the Development Plan.
Under the <u>‘Ewa Development Plan</u>, all proposed projects will be evaluated against how well they fulfill the vision for ‘Ewa set forth in the Development Plan and how closely they meet the policies, principles, and guidelines selected to implement that vision.
To insure that the vision, policies, and guidelines of the <u>‘Ewa Development Plan</u> and other Development Plans and Sustainable Communities Plans are implemented, current regulatory codes and standards should be reviewed and revised, as necessary, including the following:
land need to be revised to reflect transportation policies, principles, and guidelines in the Development Plan.
This section provides a summary of the Plan's policies and guidelines from Chapters 3 and 4 to help understand how the Plan will be implemented. This implementation matrix presents the policies and guidelines as generalized and consolidated statements. Chapters 3 and 4 should be consulted for the specific language of each policy or guideline.
For each policy and guideline statement, the matrix identifies:
Implementation of the policies and guidelines will depend on each agency's priorities and availability of resources.
The DPP is either a regulator or an implementer for many plan components, while simultaneously acting as the advocate for implementation of all the Plan vision elements and policies.
The key to abbreviations used in the table is found at the end of the table.
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| OPEN SPACE | |||
| Provide long-range protection for diversified agriculture on lands outside Community Growth Boundary. Protect scenic views and natural, cultural, and historic resources | SLUDBA | LUC DPP | Regulator Advocate/ Regulator |
| ZC | DPP | Regulator | |
| Mountain Areas | |||
| Protect and expand access to recreational resources in the mountains. Acquire and maintain a public campground and hiking trails in the area mauka of the Community Growth Boundary on the Wai‘anae Range. Acquire and maintain public access to mountain trails in the Pālehua Ridge area via Pālehua Road and Makakilo Drive. | State Trails State Parks | DLNR | Implementer / Regulator |
| ZC/UA UDP | DPP | Regulator | |
| Maintain the forest at higher elevations in the State Conservation District. Plan utility corridors and other uses to avoid disturbance to areas with high concentrations of native species. | Cons Distr | LUC DLNR | Regulator Implementer |
| Identify and protect areas that are important to Native Hawaiian cultural practices | Cons Distr | LUC DLNR | Regulator Implementer |
| Hist Pres | DLNR | Regulator | |
| Natural Gulches and Drainageways | |||
| Preserve the natural gulches on the slopes of the Wai‘anae Range foothills within the Community Growth Boundary as part of the open space system. | ZC | DPP | Advocate |
| LUO SUB | DPP | Regulator | |
| Integrate planned improvements to the ‘Ewa drainage systems into the regional open space network by emphasizing the use of retention basins and recreational access in the design approach. | Drain MP | DPP | Regulator |
| View drainageways and utility corridors as opportunities to link major open spaces with pedestrian and bike paths along open corridors in order to create the regional open space network. | Drain MP UDP | DPP | Regulator |
| Where practical, retain drainageways as natural or man-made vegetated channels rather than concrete channels. | Drain MP | DPP | Regulator |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Shoreline Areas | |||
| Protect and expand access to recreational resources at the shoreline and in the ocean. Provide public pedestrian access, with limited improvements (e.g., parking, potable water supply), except where access is restricted by the military for security reasons. | SMA SUB Shore Stbk | DPP | Regulator |
| Maintain and enhance near-shore wetlands and mangroves as wildlife habitats. | ESA/MBTA | USFWS/NOAA | Implementer Regulator |
| USACE | Regulator | ||
| DLNR | Implementer Regulator | ||
| INRMP | USDOD | Implementer | |
| ZC | DPP | Advocate | |
| SMA LUO/UA | DPP | Regulator | |
| Identify and protect areas that are important to Native Hawaiian cultural practices | Cons Distr | LUC DLNR | Regulator Implementer |
| Hist Pres | DLNR | Regulator | |
| Coordinate private and public landowners’ efforts to create continuous shoreline easements to ensure the maximum feasible degree of lateral public access. | KMP | HCDA | Regulator |
| SMA SUB Shore Stbk UDP | DPP | Regulator | |
| Provide, at a minimum, a 60-foot setback along the shoreline, and, where possible, expand the setback to 150 feet where justified, based on historic or adopted projected coastal erosion rates. | SUB Shore Stbk | DPP | Regulator |
| Analyze the possible impact of sea level rise for new public and private projects in shoreline areas and incorporate, where appropriate and feasible, measures to reduce risks and increase resiliency to impacts of sea level rise. | CZM | OP | Regulator |
| SMA SUB Shore Stbk | DPP | Regulator |
Table 5.1: Implementation Matrix
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Avoid the use of breakwaters or jetties at the Ocean Pointe/Hoakalei marina entrance in order to preserve surf sites. | SMA Shore Stbk | DPP | Regulator |
| Expand limited public access to the shoreline waters of West Loch beyond the West Loch Shoreline Park. | INRMP | DOD | Regulator Implementer |
| Agricultural Areas | |||
| Permit facilities necessary to support intensive cultivation of arable agricultural lands. | Agric Distr | LUC | Regulator |
| LUO | DPP | Regulator | |
| Permit facilities to support limited outdoor recreation use, such as camping, horseback riding, and hiking, in areas where agricultural use is not feasible. | Agric Distr | LUC | Regulator |
| SUP LUO | DPP | Regulator | |
| Permit residential use only to the extent that it is accessory to the agricultural use. | LUO | DPP | Regulator |
| Design and locate buildings and other facilities that are accessory to an agricultural operation to minimize impact on nearby urban areas, arterial roads, and major collector streets. | LUO | DPP | Regulator |
| Golf Courses | |||
| Locate and design golf courses to optimize their function as drainage retention areas. | UDP Drain MP | DPP | Regulator |
| Design golf courses to consider public safety and potential impacts on views and recreational resources, and accommodate and incorporate pedestrian paths and bikeways. | UDP LUO | DPP | Regulator |
| Wildland-Urban Fire Hazard Setbacks | |||
| As determined appropriate by the Honolulu Fire Department, require residential or commercial developments that are adjacent either to preservation areas within the Community Growth Boundary or to lands within the State Conservation District to provide a setback to reduce the risk of fire spreading from the "wildlands" to the developed area. | SUB | DPP HFD | Regulator Advocate |
| Greenways and Open Space Corridors | |||
| Provide additional connectivity for bicyclists and pedestrians by developing the Pearl Harbor Historic Trail between ‘Aiea and Nānākuli. | State CIP City CIP | DOT DDC | Implementer Implementer |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Provide sufficient easement width for the major trunk lines and transmission and distribution lines for utility systems to allow landscaping within and adjacent to the easement, consistent with all applicable operations, maintenance, and safety requirements. Place new transmission lines underground, where possible, under criteria specified in State law. | Cons Distr<br>SUB<br>BID/CFD | DLNR<br>DPP<br>PUC<br>BFS<br>HECO<br>DA | Regulator<br>Regulator<br>Regulator<br>Regulator<br>Implementer<br>Implementer |
| Permit the use of utility easements for pedestrian and bicycle routes, consistent with all applicable operations, maintenance, and safety requirements. | SUB | DPP<br>HECO | Regulator<br>Implementer |
| Design the rights-of-way for major and minor arterials as landscaped parkways or greenways, complete with a landscaped median strip, landscaped sidewalks, and bikeways. | SUB<br>UDP | DPP | Regulator |
| REGIONAL PARKS AND RECREATION COMPLEXES | |||
| Consider using public-private partnerships to build, and maintain new regional parks and recreation complexes in order to sustain economic development. | City CIP | DPR<br>DDC | Implementer<br>Implementer |
| BID/CFD | DES<br>BFS<br>DA | Implementer<br>Regulator<br>Implementer | |
| Develop a major regional park within Kalaeloa that provides beach-oriented recreation, camping, and support facilities near the shoreline, other active recreation facilities in mauka areas, and preserves for cultural and archaeological resources and for wildlife habitats such as wetlands and endangered plant colonies. | KMP | HCDA | Regulator |
| City CIP | DDC<br>DPR | Implementer<br>Implementer | |
| Complete development of Kapolei Regional Park to provide diverse active and passive recreation within easy walking distance of both the City Center and the Villages of Kapolei. | City CIP | DDC | Implementer |
| Park MP | DPR | Implementer | |
| Use best practices in the architectural and landscaping design, incorporation of natural features and indigenous plants, siting of facilities, connectivity, and provision of transit for regional parks and recreation complexes. | City CIP | DDC | Implementer |
| Park MP | DPR | Implementer | |
| UDP<br>SUB | DPP | Regulator | |
| Develop additional beach and shoreline parks along the ‘Ewa coastline. | City CIP | DDC<br>DPR | Implementer<br>Implementer |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Maintain prominent landforms at Pu‘u O Kapolei and Pu‘u Pālailai as natural visual features and regional landmarks. Develop Pu‘u Pālailai Park as a private nature park. | City CIP | DDC | Implementer |
| DPR | Implementer | ||
| ZC | DPP | Regulator | |
| BID/CFD | BFS | Regulator | |
| DA | Implementer | ||
| Retain, protect, and incorporate wetland, and other wildlife habitat and environmentally sensitive areas as passive recreational resources. | ESA/MBTA | USFWS/NOAA | Regulator |
| USACE | Implementer | ||
| DLNR | |||
| INRMP | DOD | Regulator | |
| Implementer | |||
| SMA | DPP | Regulator | |
| COMMUNITY-BASED PARKS | |||
| Provide adequate parks and supporting amenities to meet residents' recreational needs. | Park Dedic. | DPP | Regulator |
| City CIP | DDC | Implementer | |
| DPR | Implementer | ||
| Co-locate parks with elementary or intermediate schools. Coordinate design, development and use of recreational facilities with the DOE where efficient and effective. | State CIP | DOE | Implementer |
| City CIP | DDC | Implementer | |
| DPR | Implementer | ||
| Where feasible, site parks near the center of neighborhoods, in order to maximize accessibility and connectivity. Provide pathways to parks from surrounding streets. | UDP | DPP | Regulator |
| SUB | |||
| Use xeriscaping, non-potable irrigation water, and efficient irrigation systems wherever possible. | City CIP | DDC | Implementer |
| DPR | Implementer | ||
| Support continuation of controlled access to the Wai‘anae Range mountain trails via Pālehua Road. | State CIP | DLNR | Implementer |
| State Trails | |||
| HISTORIC AND CULTURAL RESOURCES | |||
| Emphasize physical references to ‘Ewa's history and cultural roots to help define ‘Ewa's unique sense of place. Protect existing visual landmarks, and support creation of new culturally appropriate landmarks. Preserve significant historic features from the plantation era and earlier periods as recommended by the State Historic Preservation Officer. Retain significant vistas whenever possible. | ZC/UA | DPP | Regulator |
| UDP | |||
| Hist Pres | SHPD | Regulator | |
| City CIP | DDC | Implementer | |
| DFM | Implementer |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Assume that historic, cultural, and archaeological site mitigations approved as part of prior development approvals carry out the Plan vision and policies. | UA<br>UDP | DPP | Regulator |
| Hist Pres | SHPD | Regulator | |
| Sites Under Review | |||
| Vary the treatment of sites according to their characteristics and potential value. Use in situ preservation and appropriate protection measures for historic, cultural, or archaeological sites with high preservation value Allow historic sites to be converted from their original intended use to serve a new function if historic value is maintained, especially if interpretive value is enhanced. | Hist Pres | SHPD | Regulator |
| LUO | DPP | Implementer | |
| City CIP | DDC | Implementer | |
| DFM | Implementer | ||
| Protect the Honouliuli Internment Camp site and the ‘Ewa Marine Corps Air Field site in Kalaeloa from development while the value and appropriate treatment of the two sites are being determined. | Hist Pres | SHPD | Regulator |
| KMP | HCDA | Regulator | |
| DPR | Implementer | ||
| Impacts of Development on Historic and Cultural Resources | |||
| Plan and design adjacent uses to avoid conflicts or abrupt contrasts that detract from or destroy the physical integrity and historic or cultural value of the site. | Hist Pres | SHPD | Regulator |
| City CIP | DDC | Implementer | |
| DFM | Implementer | ||
| Design and site all structures, where feasible, to reflect the need to maintain and enhance available views of significant landmarks and vistas. Whenever possible, relocate or place underground overhead utility lines and poles that significantly obstruct public views, under criteria specified in State law. | UA<br>UDP | DPP | Regulator |
| BID/CFD | PUC | Regulator | |
| BFS | Regulator | ||
| HECO | Implementer | ||
| DA | Implementer | ||
| OR&L Historic Railway | |||
| Maintain or repair the existing track to the extent feasible to permit historic and educational rides. Extend the route from ‘Ewa Villages to Nānākuli. To allow connectivity within the region, accommodate cross-traffic at appropriate intervals along the right-of-way. Set back new development a minimum of 50 feet on either side of the R-O-W. Allow railroad accessory structures, parking, and loading areas in the R-O-W and setback areas. | Hist Pres | SHPD | Regulator |
| U&OA<br>DOT | HiRS<br>Regulator | Implementer | |
| ZC | DPP | Advocate | |
| LUO<br>SUB | DPP | Regulator |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Develop a parallel paved bikeway along the length of the rail route as part of the Pearl Harbor Historic Trail, even in those sections where railroad rides are not operational. Design structures and elements to reflect the historic nature of the railway. Provide landscaping, interpretive signs, and occasional rest stops | State CIP | DOT | Implementer |
| BPH | DOT | Implementer | |
| Hist Pres | SHPD | Regulator | |
| Lanikūhonua | |||
| Maintain the visual identity and unique setting of Lanikūhonua as closely as possible to its present condition through the use of native landscaping, maintenance of the architectural style of the original buildings, and limits on public access and use. | SMA LUO | DPP | Regulator |
| Hist Pres | SHPD LCI | Regulator Implementer | |
| Native Hawaiian Cultural and Archaeological Sites | |||
| Determine the appropriate preservation method, site boundaries, setbacks, and restrictions for adjacent uses on a site-by-site basis, in consultation with the State Historic Preservation Officer. | Hist Pres | SHPD | Regulator |
| ZC/UA UDP | DPP | Regulator | |
| Determine the appropriate level of public access on a site-by-site basis, in consultation with the State Historic Preservation Officer, Hawaiian cultural organizations, and the land owner. | Hist Pres | SHPD | Regulator |
| OHA | Advocate | ||
| ZC/UA UDP | DPP | Regulator | |
| NATURAL RESOURCES | |||
| Conserve potable water by supporting water conservation measures (e.g. non-potable irrigation, xeriscaping). | WUP | CWRM BWS | Regulator Advocate |
| SUB | DPP | Regulator | |
| Protect valuable habitat for waterbirds, fish, invertebrates and other endangered animals and plants. Require surveys for proposed new developments to identify endangered species habitat, and require appropriate mitigations for adverse impacts. | ESA/MBTA | USFWS/NOAA USACE DLNR | Regulator Regulator Regulator |
| SMA ZC/UA UDP | DPP | Regulator |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Clean up contaminated areas that pose hazards to soil and water quality, especially in Kalaeloa. | EPA Act | EPA | Regulator |
| DOH | Regulator | ||
| HCDA | Regulator | ||
| DHHL | Implementer | ||
| Reduce light pollution's adverse impact on wildlife and human health and its unnecessary consumption of energy by using, where possible, fully shielded lighting fixtures using lower wattage. | ESA/MBTA | USFWS | Regulator |
| DLNR | Regulator | ||
| DOT | Implementer | ||
| DTS | Implementer | ||
| BC UDP LUO | DPP | Regulator | |
| MASTER PLANNED COMMUNITIES | |||
| City of Kapolei | |||
| Develop the City of Kapolei as the downtown for the Secondary Urban Center with a balanced mix of business and residential areas, complemented by the recreational, social and cultural activities of a city. Allow development of a business hotel in the Mixed Use District of the City. Create a grid system of public streets and keep block lengths relatively short. Allow buildings up to 150 feet high in the City Center. Use best practices to conserve potable water, make the City a garden city, and encourage walking, biking, and transit usage. | UDP UA SUB TOD | DPP | Regulator |
| ‘Ewa Plantation Villages | |||
| Preserve and enhance the rural form and historic character of the Villages. Use the ‘Ewa Villages Master Plan as a vehicle for preservation and redevelopment efforts within the existing villages. Rehabilitate or adapt existing village structures in the ‘Ewa Villages for reuse. Develop additional neighborhood parks/open space and a small shopping center. Make infrastructure improvements. Establish community facilities and a market place for local businesses. | EVMP/MOA | DPR | Implementer |
| DFM | Implementer | ||
| FmHA | Implementer | ||
| ACHP | Advocate | ||
| HHF | Advocate | ||
| City CIP | DDC | Implementer | |
| Hist Pres | SHPD | Regulator | |
| 201H | DPP | Regulator | |
| CC&R | AOHO | Implementer |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Ensure continued tenancy and ownership opportunities for current residents. | Hist Pres | SHPD | Regulator |
| Develop or rehabilitate 1,900 affordable and market housing units. | EVMP/MOA | DFM | Implementer |
| CDBG/HOME | DCS | Implementer | |
| 201H | DPP | Regulator | |
| City CIP | DDC | Implementer | |
| RPT | BFS | Implementer | |
| Ocean Pointe/Hoakalei | |||
| Develop Hoakalei as the region's principal recreational marina for local residents and visitors. Develop the project by following best practices to ensure environmental compatibility. Provide expanded public recreation areas and access to shoreline and waterfront areas. Develop a mix of activities around the marina basin, including a Marina Mixed Use area with resort and commercial development, a Medium Density Residential area, and a Marine Industrial area. Develop the marina as a commuter ferry terminal if feasible and if financing for improvements can be found. Retain, enhance, and protect wetlands and other wildland habitat. Develop the golf course to provide open space and detention basins for run-off from light storms. | UDP<br>UA<br>SUB<br>Drain MP<br><br>ORTP<br>TIP<br>City CIP | DPP<br><br><br><br>OMPO<br><br>DDC<br>DTS | Regulator<br><br><br><br>Implementer<br><br>Implementer<br>Implementer |
| Other Existing and Planned Residential Communities | |||
| Develop suburban residential areas with housing density of 10 to 15 units per acre. Develop residential areas along the rail transit corridor at housing densities of 25 units per acre, and mixed use residential/commercial areas within ¼ mile of transit stations at densities from 25 to 90 units per acre. Require that 30 percent of the housing units be affordable to low and low-moderate income households. | KMP<br>KRMP<br><br>ZC/UA<br>UDP<br>TOD | HCDA<br>DHHL<br><br>DPP | Regulator<br>Regulator /<br>Implementer<br>Regulator |
| Develop or redevelop residential communities to have an identified pedestrian-friendly town center or "Main Street" area, and design commercial development to help establish and support that center. Encourage walking and biking and bus transit usage by providing ample path and roadway connectivity both to the town center and throughout the community, and by providing sufficient right-of-way to provide bus shelters and pull-outs. | KMP<br>KRMP<br><br>ZC/UA<br>UDP<br>SUB<br>TOD | HCDA<br>DHHL<br><br>DPP | Regulator<br>Regulator /<br>Implementer<br>Regulator |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Provide land for community facilities including churches, community centers, and elderly and child care centers. | KMP | HCDA | Regulator |
| KRMP | DHHL | Regulator / Implementer | |
| ZC/UA UDP TOD Park Dedic. | DPP AOHO | Regulator Implementer | |
| City CIP | DDC | Implementer | |
| Park MP | DPR | Implementer | |
| Use xeriscaping, non-potable water for irrigation, and efficient irrigation systems wherever possible to conserve groundwater resources. | SUB | BWS DPP | Regulator Regulator |
| Ko Olina | |||
| Develop Ko Olina as an integral part of the Secondary Urban Center. | UA UDP SUB | DPP | Regulator |
| Provide substantial waterfront areas for public use and retain the shoreline as natural open space softened by landscaping and focused on the beach and swimming lagoons. Avoid adverse impacts on natural resources or processes in the coastal zone. Follow best practices with respect to urban form, natural environment, shoreline access, views and vistas, circulation system and transportation facilities, water conservation, and landscaped treatment. | UA UDP SMA SUB | DPP | Regulator |
| Kalaeloa | |||
| Develop Kalaeloa in ways that integrate the circulation system and land use pattern of the ‘Ewa Plain. Provide additional ways for ‘Ewa residents and workers to cross ‘Ewa from east to west and north to south. | KMP | HCDA | Regulator |
| State CIP | DOT | Implementer | |
| City CIP | DDC | Implementer | |
| Develop a major new regional park. Provide continuous lateral shoreline access with links to adjacent pathways in Ocean Pointe/Hoakalei and Campbell Industrial Park. | KMP | HCDA | Regulator |
| City CIP | DDC | Implementer | |
| Park MP | DPR | Implementer | |
| Provide ample lands devoted to uses that will create long-term jobs for ‘Ewa residents. | KMP | HCDA | Regulator |
Table 5.1: Implementation Matrix
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Follow best practices for shoreline setback and access; protection of archaeological, cultural, historical, and natural resources; separation of use areas; appropriate scale; accessibility and connectivity; landscaping; and water conservation. | KMP City CIP Park MP | HCDA DDC DPR | Regulator Implementer Implementer |
| University of Hawaiʻi West Oʻahu | |||
| Develop University of Hawaiʻi West Oʻahu campus to be environmentally and culturally sensitive to the site, to be reflective of the Hawaiian culture and Ewa, and, in combination with an adjacent University Village, to be an important civic and cultural institution for Ewa. Follow best practices for place making, design, landscaping, circulation, open space, and views. | ZC/UA UDP LUO PRU TOD | DPP UHWO | Regulator Implementer |
| Provide direct vehicle access to the campus from both Farrington Highway and Kualakaʻi Parkway. Orient the campus to support pedestrian access to and transit usage from two rail transit stations planned for locations on Kualakaʻi Parkway. | PRU SUB | DPP DOT UHWO | Regulator Regulator Implementer |
| Design the campus to use open space areas for flood detention and retention as part of the Kaloʻi Gulch watershed master plan in order to reduce the downstream impact of major storm events and keep storm water flows and velocity below design levels used for earlier developments in the Kaloʻi Gulch watershed. | Drain MP | DPP | Regulator |
| PLANNED COMMERCIAL RETAIL CENTERS | |||
| Develop planned commercial centers, outside of the City of Kapolei, to provide retail shopping and offices delivering services for the ‘Ewa residential communities in which they are located. Concentrate commercial uses in central locations instead of in continuous commercial strips along arterial roads, and design the centers to support pedestrian-friendly centers or "Main Streets" for their communities. Allow medium density mixed use commercial development near rail transit stations on the rail transit corridor. | KMP KRMP ZC/UA UDP TOD | HCDA DHHL DPP | Regulator Regulator / Implementer Regulator |
| Locate Major Community Commercial Centers or Regional Commercial Centers and major office buildings in the City of Kapolei. Allow offices providing support to the University of Hawaii West Oʻahu to be located in the TOD areas around the two transit stations closest to the campus. | KMP KRMP ZC/UA | HCDA DHHL DPP | Regulator Regulator / Implementer Regulator |
Table 5.1: Implementation Matrix
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Permit multi-family residential use above the first floor and include it wherever possible in commercial centers. | KMP | HCDA | Regulator |
| KRMP | DHHL | Regulator / Implementer | |
| ZC/UA LUO | DPP | Advocate Regulator | |
| Follow best practices for architectural character, building siting, building height and density, accessibility, connectivity, pedestrian and bicycle facilities, visual screening, water conservation, lighting, and signage. | KMP | HCDA | Regulator |
| KRMP | DHHL | Regulator / Implementer | |
| ZC/UA UDP LUO SUB | DPP | Advocate Regulator | |
| INDUSTRIAL AREAS | |||
| Maintain the Barbers Point Industrial Area as one of O‘ahu’s and the State's most important industrial areas. Develop the northern parts of Kapolei Business Park, Kapolei Harborside, and any Kalaeloa lands designated for industrial use for light industrial uses or compatible commercial uses as a transition between heavy industry at Campbell Industrial Park and the City of Kapolei. Allow development of marine industrial uses at Hoakalei. | KMP LUO UDP | HCDA DPP | Regulator Regulator |
| If a major film studio is developed within the Barbers Point Industrial Area, allow accessory uses, such as film production offices, film crew overnight accommodations, a "back lot" area with commercial uses, and visitor attractions. | LUO | DPP | Regulator |
| Develop Honouliuli as a smaller industrial area, used for wastewater treatment and for light industrial and industrial-commercial mixed uses to serve the surrounding communities. Expand the Honouliuli Wastewater Treatment Plant to accommodate additional growth in the region as well as to provide additional facilities for higher levels of wastewater treatment. | UA LUO City CIP | DPP DDC ENV | Regulator Implementer Implementer |
| Allow the Hawaiian Electric Company generating plant in Kahe Valley to be expanded to take advantage of available land area, cooling system capacity, and power transmission lines. | PUC | PUC HECO | Implementer Implementer |
| LUO | DPP | Regulator |
Table 5.1: Implementation Matrix
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Follow best practices for appropriate scale, environmental compatibility, building height and mass, shoreline setback and access, roadway setbacks, water conservation, and landscape treatment. | KMP<br>ZC/UA<br>UDP<br>LUO<br>SUB | HCDA<br>DPP | Regulator<br>Regulator |
| TRANSPORTATION SYSTEMS | |||
| Provide adequate access between residences and jobs, shopping, and recreation centers in ‘Ewa as development occurs. To improve connectivity, provide a multi-modal network of interconnected routes that safely accommodate walkways, bikeways, and streets throughout ‘Ewa and that efficiently link arterials, residences, schools, parks, community facilities, commercial and employment centers, and transit stops. | ORTP<br>TIP<br>State CIP<br>City CIP<br><br>KMP<br>ZC/UA<br>UDP<br>ECS<br>SUB | OMPO<br><br>DOT<br>DDC<br>DTS<br>HCDA<br>DPP | Implementer<br><br>Implementer<br>Implementer<br>Implementer<br>Regulator<br>Regulator |
| Provide improved access and capacity to and from adjacent areas, especially Central O‘ahu. | ORTP<br>TIP<br>State CIP<br>City CIP<br><br> | OMPO<br><br>DOT<br>DDC<br>DTS | Implementer<br><br>Implementer<br>Implementer<br>Implementer |
| Provide adequate capacity for major peak hour commuting to work in the Primary Urban Center. Meet demand for peak-period transportation capacity by increased use of transit, and by transportation demand management (improved HOV lane service, provision of park-and-ride facilities, and reduction of single occupant automobile traffic). Establish a commuter ferry from Hoakalei Marina if feasible and if financing for improvements can be found. | ORTP<br>TIP<br>State CIP<br>City CIP | OMPO<br><br>DOT<br>DDC<br>DTS | Implementer<br><br>Implementer<br>Implementer<br>Implementer |
| Reserve land for the right-of-way for the Council-identified rail transit corridor in ‘Ewa and plan to develop medium density land uses in transit nodes. | KMP<br>KRMP<br><br>ZC/UA<br>AHR<br>UDP<br>TOD<br>City CIP | HCDA<br>DHHL<br><br>DPP<br>DTS<br><br><br>HART | Regulator<br>Regulator /<br>Implementer<br>Regulator<br>Advocate<br><br><br>Implementer |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| WATER ALLOCATION AND SYSTEM DEVELOPMENT | |||
| Require new developments to provide adequate potable and nonpotable water, and implement water conservation measures. Require developments with large landscaped areas, roadway landscaping, or industrial processes to have dual water lines (potable and non-potable) to conserve use of potable water through use of non-potable water for irrigation and other appropriate uses | ZC/UA<br>SUB | DPP<br>BWS | Implementer<br>Regulator |
| Develop an adequate supply of nonpotable water for irrigation and other suitable uses on the ‘Ewa Plain. Require nonpotable water used for irrigation above Pearl Harbor aquifer to be low in chlorides and total dissolved solids. Request that the State Commission on Water Resource Management consider all sources of water in making allocations of nonpotable water. | Water<br>OWMP<br>City CIP | CWRM<br>BWS<br>DDC | Regulator<br>Implementer<br>Implementer |
| Develop alternative water supplies using new technologies in water reclamation, membrane and distillation desalination and deep ocean water applications. Encourage use of technologies conserving water and using renewable energy that could support alternative water supplies. | Water<br>OWMP<br><br>City CIP | CWRM<br>BWS<br>ENV<br>DDC | Regulator<br>Implementer<br>Implementer<br>Implementer |
| WASTEWATER TREATMENT | |||
| Require all wastewater produced by new developments in ‘Ewa to be connected to a regional or municipal sewer service system. | SUB | DPP<br>ENV | Regulator<br>Implementer |
| Where feasible, use recycled water recovered from wastewater effluent for irrigation and other uses below the Underground Injection Control (UIC) line and the "No-Pass" Line. | WP<br>OWMP<br>ZC/UA<br>SUB | DOH<br>BWS<br>DPP | Regulator<br>Implementer<br>Regulator |
| Locate wastewater treatment plants in areas shown as planned for industrial use and away from residential areas | WP<br>City CIP<br>WMBFP<br>LUO | DOH<br>DDC<br>ENV<br>DPP | Regulator<br>Implementer<br>Implementer<br>Regulator |
| ELECTRICAL POWER DEVELOPMENT | |||
| Analyze and approve system improvements based on island-wide studies and siting evaluations. Give strong consideration to placing any new transmission lines underground. | PUC<br><br>LUO<br>BID/CFD | PUC<br>HECO<br>DPP<br>BFS<br>DA | Regulator<br>Implementer<br>Regulator<br>Regulator<br>Implementer |
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Locate electrical power plants in areas shown as planned for Industrial use and away from residential areas | PUC | PUC HECO | Regulator Implementer |
| LUO | DPP | Regulator | |
| SOLID WASTE HANDLING AND DISPOSAL | |||
| Analyze and approve siting and/or expansion of sanitary landfills based on island wide studies and siting evaluations. Do not develop Makaīwa Gulch as a landfill. | SUP | LUC | Regulator |
| DPP | Advocate | ||
| SWIMP | ENV | Implementer | |
| For master-planned communities, in consultation with the Department of Environmental Services, estimate the amount of solid waste to be generated and plan how solid waste will be collected and recycling will be encouraged. | ZC/UA SUB | DPP | Regulator |
| ENV | Implementer | ||
| DRAINAGE SYSTEMS | |||
| Design drainage systems to emphasize flood control, minimize non-point source pollution, and retain and/or detain storm water. Use storm water for aquifer recharge. Use natural and man-made vegetated drainageways and retention basins as the preferred solution to drainage problems. Permit concrete-lined channels if there is no other feasible alternative. Insure that solutions to handling drainage problems on lands above ‘Ewa Villages are compatible with the drainage design of the ‘Ewa Villages Master Plan and other developments in the Kalo‘i Gulch drainage basin. | NPDES | DOH | Regulator |
| Drain MP | DPP | Regulator | |
| Integrate planned drainage system improvements into the regional open space network by allowing recreational use of retention basins, and creating passive recreational areas and pathways for pedestrians and bikers. | Drain MP | DPP | Regulator |
| SCHOOL FACILITIES | |||
| Request DOE to report to DPP if adequate school capacity can be provided as part of the project review and approval process, both at the entitlement and permit approval stages. | ZC/UA SUB | DPP | Implementer |
| Require developers to comply with DOE school impact fees requirements and/or existing UA school impact conditions and pay their fair share of all costs needed to provide adequate school facilities for the children living in their developments. | SIF | DOE | Regulator |
| ZC/UA | DPP | Implementer | |
| Design school facilities to facilitate community use during non-school hours and weekends. | State CIP | DOE | Implementer |
| DPP | Advocate |
Table 5.1: Implementation Matrix
| Policies and Guidelines Statements | Programs | Agencies | Roles |
|---|---|---|---|
| Co-locate neighborhood or community parks with elementary and intermediate schools and coordinate design of facilities with the DOE when needless duplication of parking and of athletic, recreation, and meeting facilities can be avoided. | State CIP | DOE | Implementer |
| City CIP | DDC | Implementer | |
| DPR | Implementer | ||
| PUBLIC SAFETY FACILITIES | |||
| Provide adequate facilities and staffing to ensure public safety and provide fire protection, police protection, and emergency medical service for existing and new development. | City CIP | DDC | Implementer |
| Op Bud | BFS | Implementer | |
| HFD | Implementer | ||
| HPD | Implementer | ||
| EMS | Implementer | ||
| Survey and retrofit, as appropriate, existing DOE and other public buildings to make up the shortfall in hurricane resistant shelters. Require new City buildings which are “critical facilities used for public assembly and able to perform as shelters” to be designed and built to withstand a Category 3 hurricane. | State CIP | HSCD | Implementer |
| DOE | Implementer | ||
| City CIP | DDC | Implementer | |
| DEM | Implementer | ||
| BC | DPP | Regulator | |
| Provide incentives for private organizations to create hurricane resistant shelter areas in their facilities and for homes to include hurricane resistant “safe rooms.” | CDBG/HOME | DCS | Implementer |
| DEM | Implementer | ||
| Op Bud | BFS | Regulator | |
| OTHER COMMUNITY FACILITIES | |||
| Encourage co-location of antennae. Mount antennae on existing buildings or structures so that public scenic vistas and open spaces will not be negatively affected. Use “stealth” technology to minimize visual impacts. | LUO | DPP | Regulator |
Key to Abbreviations
| Programs | Agencies | Roles |
|---|---|---|
| • Agric Distr: State Agriculture District, Chapter 205, Hawaii Revised Statutes (HRS)<br>• BC: Building Code, Chapter 16, ROH<br>• BID: Business Improvement District, Chapter 34, Revised Ordinances of Honolulu (ROH)<br>• BPH: Bike Plan Hawai‘i<br>• CDBG: Community Development Block Grant, HUD<br>• CFD: Community Facilities Districts, Chapter 34, ROH<br>• CIP: Capital Improvement Program<br>• Cons Distr: State Conservation District, Ch. 205, HRS<br>• CZM: Coastal Zone Management, Chapter 205A, HRS<br>• Drain MP: Drainage Master Plan<br>• ECS: ‘Ewa Connectivity Study<br>• EPA Act: Environmental Protection Agency Act<br>• ESA: Endangered Species Act<br>• EVMP/MOA: ‘Ewa Villages Master Plan / Memorandum of Agreement<br>• HOME: Home Investment Partnerships Program, HUD<br>• Hist Pres: Historic Preservation, Chapter 6E, HRS<br>• HSCD: Hawaii State Civil Defense<br>• INRMP: Integrated Natural Resource Master Plan<br>• Kapolei MP: Kapolei Area Long Range Master Plan, The Estate of James Campbell<br>• KMP: Kalaeloa Master Plan<br>• KRMP: Kapolei Regional Master Plan, DHHL<br>• LUO: Land Use Ordinance, Chapter 21, ROH<br>• MBTA: Migratory Bird Treaty Act<br>• NPDES: National Pollutant Discharge Elimination System<br>• OMTP: O‘ahu Metropolitan Transportation Plan | • AOHO: Association of Home Owners<br>• BFS: Department of Budget and Fiscal Services<br>• BWS: Board of Water Supply<br>• CWRM: State Commission on Water Resource Management<br>• DA: Business Improvement District Association<br>• DCS: Department of Community Services<br>• DDC: Department of Design and Construction<br>• DEM: Department of Emergency Management<br>• DES: Department of Enterprise Services<br>• DFM: Department of Facility Maintenance<br>• DLNR: State Department of Land and Natural Resources<br>• DOD: United States Department of Defense<br>• DOE: State Department of Education<br>• DOH: State Department of Health<br>• DOT: State Department of Transportation<br>• DPP: Department of Planning and Permitting<br>• DPR: Department of Parks and Recreation<br>• DTS: Department of Transportation | • Implementer<br>• Advocate<br>• Regulator |
| Programs | Agencies | Roles |
|---|---|---|
| • Op Bud: City Operating Budget<br>• Park Dedic: Park Dedication, Chapter 22, ROH<br>• Park MP: Park Master Plan<br>• PRU: Plan Review Use<br>• PUC: Public Utilities Commission , Ch. 269, HRS<br>• RPT: City Real Property Transactions, Chapter 37, ROH<br>• SIF: School Impact Fees, Chapter 302A-1601 to 1611, HRS<br>• Shore Stbk: Shoreline Setback, Chapter 23, ROH<br>• SLUBDA: State Land Use District Boundary Amendment<br>• SMA: Special Management Area, Chapter 25, ROH<br>• State Parks: DLNR State Parks; Division of Forestry and Wildlife Camping permits<br>• State Trails: DLNR Nā Ala Hele State Trails and Access Program<br>• SUB: Subdivision<br>• SUP: Special Use Permit<br>• SWIMP: Solid Waste Integrated Management Plan<br>• TIP: Transportation Improvement Plan<br>• TOD: Transit Oriented Development<br>• UA: Unilateral Agreement, LUO Sec. 21-2.80<br>• U&OA: Use and Occupancy Agreement<br>• UDP: Urban Design Plan<br>• Water: State Water Code, Chapter 174C, HRS<br>• WMBFP: West Māmala Bay Facilities Plan<br>• WP: Water Pollution, Chapter 342D, HRS<br>• WUP: Water Use Permit/Well Permit, CWRM<br>• ZC: Zone Change | Services<br>• ENV: Department of Environmental Services<br>• EPA: Environmental Protection Agency<br>• HART: Honolulu Authority for Rapid Transportation<br>• HCDA: Hawaiʻi Community Development Authority<br>• HECO: Hawaiian Electric Company<br>• HiRS: Hawaiian Railway Society<br>• HFD: Honolulu Fire Department<br>• HSCD: Hawaiʻi State Civil Defense<br>• HUD: U.S. Department of Housing and Urban Development<br>• LCI: Lanikuhonua Cultural Institute<br>• LUC: State Land Use Commission<br>• NOAA: National Oceanic and Atmospheric Administration<br>• OHA: Office of Hawaiian Affairs<br>• OMPO: Oʻahu Metropolitan Planning Organization<br>• OP: State Office of Planning<br>• PUC: State Public Utilities Commission<br>• SHPD: State Historic Preservation Division of the Department of Land and Natural Resources<br>• UHWO: University of Hawaiʻi West Oʻahu<br>• USACE: United States Army Corps of Engineers<br>• USFWS: United States Fish and Wildlife Service |
This appendix includes the four primary conceptual maps used to illustrate the vision for ‘Ewa’s future development. The maps include:
| PAGE | |
|---|---|
| OPEN SPACE | A-15 |
| URBAN LAND USE | A-17 |
| PUBLIC FACILITIES | A-19 |
| PHASING | A-21 |
These maps illustrate the long-range vision of the future of the plan area and the major land use, open space, and public facility policies that are articulated in the plan. In using these maps, the reader should keep in mind that:
The maps are considered illustrations of the policies. However, the text should be consulted to determine the appropriate application of the Plan vision, policies, and guidelines for any specific project or location. In case of disagreement, the text should prevail over the map depiction.
A brief explanation of the terms used in each of these maps follows.
Glossary: Common Elements
Descriptions of elements common to each of the four maps are presented in the following section. Descriptions of elements specific to each map (Open Space, Land Use, Public Facilities, Phasing) are presented in separate sections for each map which follow the section on Common Elements.
Preservation areas are lands with natural, cultural, or scenic resource value.
They include the following types of land:
Glossary: Common Elements
Agricultural areas are lands with agricultural value by virtue of current agricultural use or high value for future agricultural use, including those areas identified as Prime, Unique, or Other Important lands on the Agricultural Lands Important to the State of Hawai‘i (ALISH) maps. These are lands suitable for crop growing, grazing and livestock raising, flower cultivation, nurseries, orchards, aquaculture, or similar activities.
Under the State Constitution, the State is to identify Important Agricultural Lands (IAL). Once identified, these lands cannot be rezoned except under a “super majority” vote. To date, IAL lands have not be identified. In 2005, Act 183 was adopted to address this mandate. It established a two-step process:
Act 233, enacted in 2008, adopted the incentive programs. To date, no state funding has been appropriated to the counties for the mapping. Lands identified for agricultural purposes by this plan can serve as the basis for the county mapping process.
The maps show locations of existing public and private parks and recreational facilities, including regional parks, district parks, shoreline parks, and nature parks and conceptual locations for planned and proposed parks. Smaller community-based parks, including community parks, neighborhood parks, and mini-parks, are not shown.
Glossary: Common Elements
The maps show the locations of existing and proposed public and private golf courses.
The corridor shown on the ‘Ewa maps is part of the Pearl Harbor Historic Trail, a continuous greenway stretching from Nānākuli across the ‘Ewa Plain to West Loch and then along the shores of Pearl Harbor to Rainbow Marina near Aloha Stadium with a connection to the Waipahū Cultural Garden Park. The corridor will include a major pedestrian and bike path and a restored OR&L right-of-way that would allow train operations between ‘Ewa Plantation Villages and Nānākuli.
The Community Growth Boundary defines and contains the intended extent of developed or "built up" areas of urban and urban fringe communities. Its purpose is to provide adequate land to support established or developing communities while protecting lands outside this boundary for agriculture or open space values. Areas within this boundary are generally characterized by extensive tracts of residential, commercial, industrial, or mixed-use development clearly distinguishable from undeveloped or more "natural" portions of a region's environment.
In the ‘Ewa Development Plan, the mauka portion of the Community Growth Boundary follows the Special Management Area boundary around Kahe Point, runs along the mauka boundary of the Makaīwa Hills project and Makakilo, follows the proposed extension of Makakilo Drive to the H-1 freeway, and then follows the H-1 freeway to the Kunia Road where it turns and follows Kunia Road to the boundary between the ‘Ewa Development Plan area and the Central O‘ahu Sustainable Communities Plan area. It excludes all State Agricultural and Conservation District lands mauka of the boundary from urban development.
The makai portion of the Community Growth Boundary excludes the area within the Explosive Safety Quantity Distance (ESQD) arc for the West Loch Naval Magazine from urban development.
Glossary: Open Space Map
Highways, Arterials, and Major Collector Streets Major existing and proposed roadways providing east-west and mauka-makai linkages across the ‘Ewa Development Plan area.
OPEN SPACE MAP
The Open Space Map illustrates the vision for the ‘Ewa Open Space Network. The Open Space Network consists of large areas of preservation and agricultural lands outside the Community Growth Boundary and a network of parks, wildlife habitats, golf courses, agricultural lands, ravines, grass-lined drainageways, and greenways along utility corridors and major arterials within the Community Growth Boundary. (See definitions of terms and discussion in Sections 2.2.1, 2.2.2, 2.2.3 in Chapter 2 and in Section 3.1 in Chapter 3.)
The Open Space Map shows major open space elements and resources, including agricultural and preservation lands, major recreational facilities, important "panoramic" views, natural stream corridors and drainageways, and important boundaries.
Terms on the Open Space Map which are not common to all of the maps include:
Natural Drainageways/Gulches Natural waterways which are to be retained as flood plains and open space resources and protected from development, disturbance, or channelization except where absolutely necessary to protect existing urban development from flooding.
Panoramic Views Significant views and vistas which are to be retained, whenever possible. (See Table 3.2, Exhibit 3.2, and Section 3.4.2.)
Shoreline Access The proposed lateral public easement/access along the ‘Ewa shoreline with public pedestrian access to the shoreline at intervals of approximately 1/4 mile.
Glossary: Urban Land Use Map
Urban Areas Areas which have been developed or are planned for development for residential, retail, office, and industrial uses.
Landscaped Boulevard/Greenway Major arterials and major collector streets which should be developed as landscaped parkways, complete with a landscaped median strip, landscaped sidewalk, and bikeways. (See Sections 3.1.3.8 and 3.8.3.)
URBAN LAND USE MAP
The Urban Land Use Map illustrates the desired long-range land use pattern for ‘Ewa resulting from implementation of the plan's vision and policies. It portrays the vision for development of the City of Kapolei, for the development of master planned residential communities, and for creation of new jobs at the Ko Olina Resort, Campbell Industrial Park, Kapolei Business Park, West Kalaeloa Industrial Park, Kalaeloa, the University of Hawai‘i West O‘ahu, and the resort area at Ocean Pointe/Hoakalei. (See definition of terms and discussion in Sections 2.2.4, 2.2.5, 2.2.6, 2.2.7, and 2.2.10 in Chapter 2, and in Chapter 3.)
Terms on the Urban Land Use Map which are not common to all the maps include:
Residential and Low-Density Apartment. Suburban communities characterized by:
In addition to residential uses, these areas may include neighborhood commercial centers, elementary schools, parks, churches, community centers, elderly care centers, child care centers, fire stations and other public facility and utility uses serving the community.
Glossary: Urban Land Use Map
Mixed use communities adjacent to transit nodes or resort areas which are characterized by medium density, low- to mid-rise multi-family residences with retail or service commercial uses on the ground or lower floors, where appropriate.
This type of center principally serves the community in which it is located, providing for basic shopping and service needs on a larger scale than the neighborhood center. Community Commercial Centers may contain up to 250,000 sq. ft. of floor area. Major attractions typically include a large grocery store, a drug store, and/or a department store.
The urban core or "downtown" for 'Ewa which is intended to be 'Ewa's center for shopping, civic activity, and municipal services. It offers a wide range of shopping and dining opportunities and professional, business and industrial services, and provides housing in high and medium density residential mixed-use buildings.
Areas at Ko Olina and Ocean Pointe/Hoakalei to be developed for hotels, apartments, and accessory commercial and recreational facilities for resort use.
Areas shown include the State's prime location for heavy industry at Campbell Industrial Park and Kalaeloa Barbers Point Harbor as well as areas designated for light- and service-related industrial uses associated with repair, processing, construction, manufacturing, transportation, wholesaling, distribution, storage and similar economic activities. Industrial areas also can include a range of compatible commercial activities. See Sec. 3.11 for more details on the appropriate uses for specific industrial locations in 'Ewa.
Lands for military and military support purposes.
Glossary: Urban Land Use Map
Major facilities for public use or benefit.
Areas of medium density apartment and commercial development located around rail transit stations on the rail transit corridor, which extends from the City of Kapolei through Waipahū to downtown Honolulu. (See Sections 3.9, 3.10, and 4.1.4.2.)
The regional center with City and State offices and facilities providing services to all O‘ahu residents.
Existing power plants at Kahe Point and Campbell Industrial Park.
The existing wastewater treatment plant at Honouliuli.
Existing intermediate/middle schools, ‘Ilima Intermediate in ‘Ewa Beach, and Kapolei Middle School in the Villages of Kapolei and conceptual locations for new intermediate/middle schools at ‘Ewa by Gentry (Makai), East Kapolei (DHHL and Ho‘opili), and Makaīwa Hills.
Existing high schools, James Campbell High in ‘Ewa Beach, and Kapolei High School in the Villages of Kapolei, and conceptual locations for new high schools near the intersection of Kualaka‘i Parkway (formerly North-South Road) and Farrington Highway and near the corner of H-1 and Kunia Road.
Campus located on 136 acres near the intersection of Kualaka‘i Parkway and Farrington Highway.
Glossary: Public Facilities Map
Hospital The existing Hawaiʻi Medical Center West on Fort Weaver Road.
Small Boat Marina The existing Ko Olina Marina and the proposed Hoakalei Marina.
Commercial Harbor The existing Kalaeloa Barbers Point Deep Draft Harbor.
Airfield The existing airfield at Kalaeloa.
Quarry The existing quarry in Makakilo on the slopes of Puʻu Makakilo.
The Public Facilities Map illustrates the major infrastructure needed to implement the vision for ‘Ewa. It shows the location of existing facilities and conceptual locations for some of the future required infrastructure facilities.
It is not meant to be amended between revisions of the Plan, and should not be confused with the Public Infrastructure Map used in the Capital Improvement Program budget process.
Major public facilities which are to be funded through Capital Improvement Program budget appropriates must be shown on the Public Infrastructure Map (PIM). The PIM is not part of the ‘Ewa Development Plan, and is adopted and amended by resolution.
Projects which are not listed in the ‘Ewa Development Plan or not shown on the ‘Ewa Development Plan maps can still be added to the Public Infrastructure Map by Council resolution if the Council finds them to be consistent with the vision and policies of the
Glossary: Public Facilities Map
‘Ewa Development Plan. (For definitions, information about existing and planned public facilities, and functional planning processes, see Chapter 4 and Sec. 5.3 in Chapter 5.)
Terms on the Public Facilities Map which are not common to all maps include:
Urban Areas Areas which have been developed or are planned for development for residential, retail, office, and industrial uses.
Grade Separated Interchange Existing interchanges at Kunia Road and H-1 Freeway, Kualaka‘i Parkway and H-1 Freeway, Makakilo Drive and H-1 Freeway, Kalaeloa Boulevard and H-1 Freeway, and Ali‘inui Drive and H-1 Freeway, and proposed interchanges at Kapolei (Wākea Street and H-1 Freeway), and Makaīwa Hills.
Elevated Rail Transit Line A rail line raised above ground for high speed rail service in urban areas.
Rail Transit Station A dedicated rail transit facility providing passengers access to high-speed rail service on the elevated rail transit line.
Park and Ride Site Special parking lots where commuters park their cars and continue their commute by mass transit.
‘Ewa Development Plan Appendix A: Conceptual Maps A-10
Glossary: Public Facilities Map
HOV (High Occupancy Vehicle) Lane An exclusive lane on a roadway reserved for transit and vehicles with more than one occupant which is developed to improve transit speed and to provide incentives for commuters to opt for mass transit or carpooling.
Bike Lane A biking facility (bikeway) which is a four- to six-foot lane exclusively for bike use which is included in a roadway.
Bike Path A biking facility (bikeway) which is separate from the roadway network.
Civic Center The regional center with City and State offices and facilities providing services to all Oʻahu residents.
Electric Power Plant Existing power plants at Kahe Point and Campbell Industrial Park.
Wastewater Treatment Plant The existing wastewater treatment plant at Honouliuli.
Intermediate/Middle School Existing intermediate/middle schools, Ilima Intermediate in ʻEwa Beach, and Kapolei Middle School in the Villages of Kapolei and conceptual locations for new intermediate/middle schools at ʻEwa Makai, East Kapolei (DHHL, and Hoʻopili), and Makaīwa Hills.
High School Existing high schools, James Campbell High in ʻEwa Beach, and Kapolei High School in the Villages of Kapolei, and conceptual locations for new high schools near the intersection of Kualakaʻi Parkway and Farrington Highway and near the corner of H-1 and Kunia Road.
Glossary: Phasing Map
University of Hawai‘i West O‘ahu (UHWO) Campus located on 136 acres near the intersection of Kualaka‘i Parkway and Farrington Highway
Hospital The existing Hawai‘i Medical Center West on Fort Weaver Road.
Small Boat Marina The existing Ko Olina Marina and the proposed Hoakalei Marina.
Commercial Harbor The existing Kalaeloa Barbers Point Deep Draft Harbor.
Airfield The existing airfield at Kalaeloa.
Corporation Yard The existing Kapolei Corporation Yard in Campbell Industrial Park.
Landfill The current Waimānalo Gulch Landfill site.
Desalination Plant The Board of Water Supply's existing deactivated pilot desalination plant located in the Kapolei Business Park and the proposed desalination plant site located in Kalaeloa adjacent to the Campbell Industrial Park.
PHASING MAP
The Phasing Map shows where urban development has already occurred in ‘Ewa, where new development will take place within the Community Growth Boundary, and the only area in Ewa that has a Special Area Plan (Kalaeloa).
Glossary: Phasing Map
Terms on the Phasing Map which are not common to all of the maps include:
Existing Urban Areas Areas which already have been developed for residential, retail, office, institutional, or industrial uses. Growth in such areas can occur through re-development or in-fill.
Urban Expansion Areas Undeveloped areas formerly in agricultural uses which are either already approved or will be considered for approval for development for residential, retail, office, institutional, or industrial uses. Applications for zone changes and other development approvals needed for new urban development in the Urban Expansion Area will be accepted for processing, and will be supported for approval if the project supports the vision and implementing policies of the ‘Ewa Development Plan and if adequate infrastructure can be provided. (See Sections 2.2.10, 5.1.2, and 5.3.) Total acreage as of July 2009 was estimated at over 6,500 acres with capacity for development of over 48,000 housing units (See Table 2.1.)
Kalaeloa Special Area Special areas are areas which require more detailed planning than can be provided in a Development Plan (See Section 5.2). Kalaeloa is the only area in ‘Ewa currently designated for a Special Area Plan.
Rail Transit Corridor An area designated for establishment of communities that encourage use of transit, walking, and biking to go to work, to school, to shop, or to have fun by providing easy access to high speed mass transit; designing streets, public places, and pathways to be friendly to pedestrians and bikers; and locating medium density housing and commercial development within easy walking distance of the nearest rail transit station. Sufficient land will be reserved in the corridor so that an elevated rail transit line and rail transit stations may be developed in the future. (See Sections 2.2.7, 3.9.1, 3.10.1, and 4.1.4.2.).
Glossary: Phasing Map
Rail Transit Station A dedicated rail transit facility providing passengers access to high speed rail service on the elevated rail transit line.
Landscaped Boulevard/Greenway Major arterials and major collector streets which should be developed as landscaped parkways, complete with a landscaped median strip, landscaped sidewalk, and bikeways. (See Sections 3.1.4.8 and 3.8.2.)
⬚ figure
| P | Preservation Areas |
| A | Agricultural Areas |
| PK | Regional, District, Shoreline and Nature Parks |
| GC | Golf Courses |
| Natural Drainageways/Gulches | |
| Panoramic Views | |
| Historic Railway/Bikeway Corridor | |
| Shoreline Access | |
| Urban Areas | |
| Community Growth Boundary |
| EXISTING | FUTURE |
|---|---|
| Highways, Arterial and Major Collector Streets | |
| Landscaped Boulevard/Greenway |
Department of Planning and Permitting City & County of Honolulu
A-15
Page left blank intentionally
'EWA DEVELOPMENT PLAN
Urban Land Use Map
| Residential and Low Density Apartment | |
| Medium Density Apartment/Commercial Mixed Use | |
| Community Commercial Center | |
| City of Kapolei (Medium and High Density Residential and Commercial) | |
| Resort/Recreation Area | |
| Industrial | |
| Military | |
| Public Institution | |
| Agricultural and Preservation Area | |
| Parks and Golf Courses | |
| Transit Node | |
| Community Growth Boundary |
EXISTING FUTURE
| Civic Center | ||
| Electric Power Plant | ||
| Wastewater Treatment Plant | ||
| Intermediate/Middle School | ||
| High School | ||
| University of Hawai‘i West O‘ahu | ||
| Hospital | ||
| Small Boat Marina | ||
| Commercial Harbor | ||
| Airfield | ||
| Quarry | ||
| Highways, Arterial & Major Streets | ||
| Historic Railway |
⬚ figure
Department of Planning and Permitting City & County of Honolulu
A-17
Page left blank intentionally