The Bourne Planning Board held a regular meeting on June 18, 2026, at 7:08 PM. The meeting was audio-recorded only due to technical difficulties. The board approved the previous meeting minutes and then considered two site plan review/special permit applications (SPR SP 05-2026 and SPR SP 06-2026) for redevelopment projects in town. The board also discussed concerns about traffic safety around the Cape Cod Canal bridges and the impact on school transportation.
All right, good evening everybody. Due to technical difficulties, it being 7.08 p.m. Uh this meeting is being audio recorded, not video recorded that we know of. Um if anybody in the audience is recording, please raise your hand. Seeing and hearing none. Uh we're gonna call to order the open session. Um first agenda item is the meeting minutes from June 11th, 26. Mr. Chair, I'll make a motion we accept the minutes as print. Uh motion to accept by Jim. I'll second it. Second by Rob. Any questions or comments from the board? Okay, hearing, seeing none, take a vote to accept as written. Steve? Present. Mandy? Yes. Dave. Jim. Yes. Chair vote six. Thank you. Next up on our agenda. Application for site plan review special permit, SPR SP number 05-2026. 130 MacArthur Boulevard, map 27, parcel 78, continued from May 28, 2026. An application request redevelop the existing parcel for use of the granite countertop facility. Good evening. It's presented at the last meeting. Um existing business in town currently operating on Plate Pond Road. We're looking to move on to McCalka Boulevard. This is the old RMA gym site. Um as reviewed special permit site plan review being requested. Uh the meeting was continued last time because we were still working out the drainage design with the conservation commission. And we were back in front of them last Thursday night and we're granted approval. Um this was the drainage design that was presented at the last meeting to the planning board. We were containing everything on site, recharging everything on site. Um after meeting with the conservation commission, they've asked us to go back and actually reduce the on-site draining so that we can protect the off-site vernal pool located on the Cape Cape White cannabis uh site to the north. Uh we've had conversations with Mr. Howef, he's on board with us working on his property and with Mr. Ferris who owns the electrical company right behind us. So long and short of it, we've reduced the on-site drainage systems. This is only even designed now to treat the increasing pavement to meet the stormwater management act. Once the system fills up, we're gonna be sending the water back towards the vernal pool and protecting uh them. Um with the conservation commission, there was a condition in their permit, and I believe we're gonna uh if we could put it into the planning board. The final drainage design, we have to work with staff during construction and make sure that we preserve the existing trees out in the area out there. So it's gonna be a more of a design build process with the contractor on site. So we're gonna do a pre-construction meeting with the conservation agent uh once we have the design together and then um again review it with Mr. Howe uh at 120 and Mr. Ferris in the back.