The Brunswick Planning Board met on May 12, 2026, at 4:00 PM (ET) to review four major development applications: a sketch plan for Thomas Point Campground Phase 3, a site plan amendment for Wilbur's Woods 2, a sketch and final plan for the Von Shack wall replacement, and a sketch plan for a new motor vehicle fueling station at 117 Bath Road. The board approved all applications with conditions.
Good evening. Welcome to the May 12th Brunswick Planning Board meeting. I'll introduce members of the board here on my far right, Kelly Matson next to Kelly, Rob Burgess, Planning Board Vice Chair. Next to Rob Steve Walker, next to Steve, Chris Baldwin. Laura may be joining us. I'm not positive. On my near left, Alison Harris, next to Alison, Julie Erdman, Director of Planning and Development, and next to Julie, Matthew James, our land use planner. We have four projects before us tonight. Wilbur Woods, we have a public hearing for a site plan amendment. The Vaughn Shack wall replacement replacing a crib wall with riprap. And 117 Bath Road Motor Vehicles Fueling Station. With that, Matt, would you introduce Thomas Point? First up, we have case number 2614, Thomas Point Campground Phase 3. The planning board will review and act upon a major development review sketch plan application submitted by SFC Engineering Partnership Inc. on behalf of Thomas Point RV LLC for the relocation of 33 campsites outside of the 125 foot shoreland protection overlay setback area. Electricity, private sewer, and water will be extended to each of the proposed gravel campsites. And the subject property is located on 29 Meadow Road, Map 43 Lot 3A, and within the Rural Protection 1 or RP1 zone, the Shoreline Protection Overlay or SPO subdistrict, the Rural Protection Stormwater Management Overlay or RPSMO subdistrict, the Shoreland Protection Overlay, Stream Protection or SPO SP subdistrict, and the Shoreland Protection Overlay Resource Protection or SPORP subdistrict. Thank you, Matt. And before I ask you to come up, Tara, Laura Hatmakers joined us. And now Tarlac Aquilina, it's your show. Good evening, Chairman, members of the board. It's good to see you all again. My name is Tara Aquilina. I'm a civil engineer with SFC Engineering representing Thomas Point RV LLC, and here with me tonight, Brian Lund. I'm presenting our sketch plan application for phase three at 29 Meadow Road, map 43 lot 3A. The property fronts on Meadow Road in the Butts Thomas Bay, about 78 acres of land. The property has been occupied by an existing campground since the 1950s. The campground recently received both town and state approval for phase one and two, which includes upgrades to 91 campsites, which are currently under construction. Moyes Environmental Services had completed a natural resource delineation of the property, identifying a stream and a coastal wetland. The stream is subject to a 75-foot buffer while the coastal wetland is subject to 125-foot buffer. The property is served by a private transient non-community public water system with two wells. Both wells were tested in August of 2025, which demonstrated the existing wells provide sufficient yield to meet the campground's design demand and have no adverse effects on the abutters wells. The engineer septic system serves the campground. It has been designed to have capacity for all three phases. The goal is to remain below three acres of impervious, which is main site law threshold. The sketch plan you each have shows stormwater management areas, which we propose bioretention areas to treat runoff and attenuate flow, peak flow. We are also looking into implementing forested and meadow buffers for our stormwater features. We have water distribution system to serve the campsites and connect to the existing uh private transient non-community public water supply well. They'll be new underground electric brought to each site, and the septic collection system will connect each site and flow to the septic tanks for treatment. In response to the staff review comments from last month, the campground will have no proposed remote road names in emergency. The appropriate address will be 29 Meadow Road and then the site number. We've added to the phase three sketch plan site numbers to each also a trip generation and erosion control plan will be included in the final development plan. And the stormwater BMPs will be sized and designed as a part of the final development review application with the goal of locating the BMPs outside of the 125 shoreline coastal buffer where it's feasible. So that concludes my presentation for the phase three sketch plan for Thomas Point campground at 29 Meadow Road. This proposed plan brings the campground up to current standards in my moving all the sites out of the 125 shoreline coastal buffer and complies with all applicable zoning and design requirements. And I am happy to answer any questions you all may have. Okay. Thank you, Tara. Um I'd like a motion before we come to the board that the staff review committee concurs or that the planning board concurs with staff's conclusion that the basic sketch plan major development review application materials have been submitted and that the application is complete such that the committee, the board may proceed with substantive review of the application and identification of any further information required from the applicant. Motion by Chris, second by Laura.