0:58We're gonna start any minute here, and just remember when you're not speaking, make sure you mute your uh mic, okay?
1:04Okay, thank you, Mary.
1:18Good evening, everybody.
1:19Welcome to tonight's city council meeting.
1:21It is Monday, August 26, 2024.
1:24Uh times approximately six oh three.
1:26Now call this meeting to order.
1:27If I get a roll call, please.
1:29Councilmember Sutton.
1:31Councilmember Wanavato Rodriguez.
1:39Councilmember Snyder.
1:41Councilmember Garcia?
1:44Councilmember Twangle.
1:48Anybody here for invocation?
1:51If we could all stand for a moment of silence and continue standing for the Pledge of Allegiance.
2:32No public appearances.
2:33Next we're gonna go to report.
2:35We're gonna go to recognition of the Arizona chapter of the APWA Project of the Year Award.
2:45Mayor, Madam Vice Mayor, members of the Council.
2:47It's my pleasure to come before you today on behalf of Penell County, who is the project owner of this award to um present to the City of Eloy that um an award for the Transportation Project of the Year through the Arizona chapter of the American Public Works Association in the transportation category between five and twenty-five million dollars.
3:11Uh if you'll indulge me, I'll just provide a few brief um accomplishments of of this project.
3:17As you know, this is the Houser and Hannah Road project.
3:20It was funded through the the better utilizing investments to leverage development grant, the build grant.
3:28Um Pennell County applied for that we with cooperation from the City of Velo, the City of Coolidge and uh um ADOT as well.
3:37Um this project was is a crucial project that that provides um much needed improvements along State Route 87 where there have been historically some fatalities, some incapacitating injury accidents as well as um some minor injuries accidents that that all were going into factor the the project for the safety.
4:00Um some of the things that that were found and identified excuse me in the in the design concept in the design stage of this was first and foremost the environmental clearance.
4:11Uh typically the the National Environmental Protection Agency process takes up to two years for environmental clearances.
4:19This one, however, was uh was considered a categorical exclusion, which drastically reduces the time and and effort needed to provide of environmental clearances for this project.
4:30Uh there was no impact to the design or the construction phases because of the categorical exclusion that was that was granted.
4:37Uh one of the other challenges that was one of the other major accomplishments that were that we focused on in this project was was f um replacing identifying and replacing unsuitable materials.
4:48As as you may recall when this was under construction about two years ago, we had above average rainfall during the construction duration and and we had high clay soils content on Hannah Road and Houser Roads, and and which required an over excavation of the existing material and replacing it with suitable materials.
5:08And one of the things that they did with that is they introduced a Tensar TriAx Geo Grid, uh, which is basically a uh a rubber mat that holds the pavement in place and keeps the the roadway base from from shifting and pumping and and and getting out of out of grade when it's going through.
5:31And that's also something that that is is really considered a sustainable action.
5:36Um it provides for uh environmentally sound and environmentally responsible uh materials to be going down.
5:43One of the other challenges that would that we overcame with this project was historically the Arizona Department of Transportation or ADOT had not allowed pre-cast box culverts because they didn't have anybody on site to inspect it.
5:58Um the only allowed cast in place structures which take significantly longer to construct and to move forward with.
6:08However, with the with the design team, TY Lynn, um they were able to get an approval from the Department of Transportation to use pre-cast box cults, which which added substance which included a shorter construction, which allowed us to move forward with the construction phase with that.
6:27Um those are just some of the highlights.
6:29Um the Arizona chapter of of the American Public Works Association sent out projects for nominations for projects of the year.
6:38Uh this project was applied was nominated for and subsequently awarded the Transportation Project of the Year for $5 million to $25 million.
6:47Uh a week and a half ago, um, some of the project team members were there at the APWA conference to receive the award for the project, and it's it's now my pleasure to present it to you, Mr.
7:03Mayor and and members of the council.
7:15We have a Pinell County and the project team.
7:28I remember when that project was getting started.
7:31I thought it was going to take forever to do it, and uh they they did a good record time.
7:35They only not only do they do it in on Hannah, they did it on or Hauser, they did on Hannah as well, too.
7:42And there's also plans to improve um shed road.
7:49That's that's a future project that is is working through the development.
7:54So yeah, that this is a it's a great area.
7:56I mean, it's nice and wide with lights, and I mean um people still need to pay attention going through that area, but uh uh it's a really well done, and um I'm happy for that whole area uh for developments that's safe.
8:10And um I think it wasn't the um the the rail yard, the rail they were kind of easy to work with when I've heard so many tragic stories of how hard they used to be, but they're very easy to work with to get this done.
8:24Um and so now with all the development in that area, you know.
8:28Um we'll we'll we'll um prosper off that as well too.
8:33So uh this is hard work from all of us.
8:36I remember Dave and Lee, David Lynn did the the groundbreaking for that.
8:40So um it's nice, but thank you.
8:43It's not just us, it's it's what team effort team effort, 100% very much.
8:47And even to say we worked with Coolidge very well to get this thing done.
8:50So uh as hard as it is for me to say that, you know, I'm glad that we're able to work with Coolidge to get it all done.
8:55So in Penelope was a great team as well, too.
9:03Mary does have a uh the video that was that was presented at the at the awards banquet, if you would please, Mary.
9:25Say goodbye to old costly cable TV once and for all.
9:29This revolutionary invention gives you access to your the inland port of Arizona is a strategically located piece of property that's between Phoenix and Tucson along the I-10 corridor.
9:42In 2019, Pinall County was awarded uh build grants from the United States Department of Transportation.
9:48Z did some paving improvements along Hannah Road.
9:51We also put a traffic signal at the State Route 87 in Hannah, and then we also did some rehabilitation construction along Hauser.
10:00And we also installed a much needed traffic signal for those folks trying to get to Interstate 10.
10:07Any improvements to transportation look favorably to potential economic development opportunities.
10:13And they also provide safety enhancements for the traveling public who's working nearby.
10:19This was the first federally administered USDOT discretionary grant that the county has worked on.
10:27It took about a year to get the grant agreement figured out with federal highways.
10:30Our administration encourages us to work really closely with local government agencies.
10:35And we relied heavily on our consultants and contractors to get the project done.
10:41We built a strong relationship with Panawh County, with the City of Coolidge, with Eloy, with the state of Arizona.
10:46Our construction manager was CEI Consultants.
10:49Our contractor was Sumlin Asswell.
10:52Our design consultant was TY Lynn International, St.
10:56Holdings, who donated some right-of-way that we needed for the project.
10:59So it was really a group effort to make sure that we got from that point a few years ago just receiving the grants all the way through construction.
11:07What is the old adage?
11:08Surround yourself with great people and you'll receive great success.
11:12This was a huge honor.
11:13It's a recognition and incredible partnership of teamwork that made the local project a huge success.
11:20This award is a testament to our collective efforts and commitments and improvements to transportation that are both public and private.
11:36Well, thank you, Matt.
11:39There was proof that I was actually there.
11:43Next we're gonna go to council member reports or announcements.
11:47We'll start on my right side.
11:52This is just a recap of some of the things, some of the gatherings I attended over the past two weeks, and at these gatherings, there were other council members, city staff, and council members elect were at some of them as well.
12:03So on Thursday the 15th, they attended the Eloy Chamber luncheon over at the museum.
12:10Always a good time there mingling with the uh members of the chamber.
12:15And while we were there, Cypress Creek Renewables actually donated a 20 made a 25,000 dollar donation to the Santa Cruz Valley Historic Museum.
12:27That's well needed funds gonna work for some ADA stuff and help with their operations.
12:33On Friday the 16th, Panell Alliance breakfast, where we heard all about the virtues of solar power from their perspective.
12:42It was very informative, but it's still my opinion that the city needs a bigger slice of that pie in the end.
12:50On Thursday, the 22nd, we along with uh yourself and city staff attended the Panel Alliance lunch discussing water needs for Arizona and Penell County.
13:02Some of the topics discussed with water management, affluence out and in, and new rules with ADOS concerning volumetric measuring of water.
13:13I know this is riveting information.
13:17And yeah, I kind of like this information because I'm like a science geek, so it was it was really interesting to me.
13:24And that's about it.
13:28Sylvia on the line, do you have anything you want to report or announce?
13:36Anybody on my left side?
13:42Um first I'd like to apologize for our um our video for last week's or two weeks ago's meeting.
13:52Um you could see us, but you couldn't hear us, and we couldn't present some of the power points.
13:57And so we have somebody here on Friday, and they worked out some of the bugs, the kinks, and they have they're coming, are they they're coming back to finish it?
14:06Yes, we're gonna replace the parts.
14:07Yep, replace some parts that we're doing.
14:09And then uh we decided a while ago that we have want to replace all the video audio system.
14:18So we'll be going to the town of uh Paradise Valley where they just had uh their their system installed.
14:25So we'll be going there uh next week to see how we can better improve our image and perception on line and um when you play it back, so it's also for us here as um this sometimes works and sometimes it doesn't.
14:43So uh we want to be professional, so that's why we're doing it.
14:45We it's in the budget already.
14:47So that's the first thing.
14:49So I hope you accept my apology on that.
14:51But it was a very good meeting as well, too.
14:53I thought I thought it was a good meeting, just that people can't hear it.
15:00No, I went to the luncheon with that Andy spoke of, and we had a good time with David.
15:02David was there, and that was it.
15:07And so it was it was nice to hear that Penell County does have water versus all the scary tactics that was there too.
15:18I always forget Dan.
15:20I don't know why, I always forget this guy.
15:22He sat right next to me.
15:23Um, but yeah, the the scare tactics that Panaw County is in a drought.
15:28The Panaw County does have water, so that's always good to know.
15:32Um tomorrow, myself, my some of my fellow council members.
15:35I don't think Jose's going.
15:38Staff members will be attending the League of Uh Cities and Towns conference, annual conference.
15:43It's going to be in Phoenix.
15:44So we'll be there from Tuesday till Friday checkout.
15:49Um and uh we'll be there all day um meetings and classes, and um Dan's getting the award for eight years of service.
16:01And you are and I'm getting one for 12 years of service.
16:04Um but yeah, it's it's a it's a nice time to network as well, too.
16:08Because we we go and you see a lot of people that from the past years, and it's just a great time just to go up and just kind of see what other communities are doing.
16:17Um and hear what the changes, the updates of different things.
16:22Social media is always a big one that that really goes to.
16:25And so it's gonna be fun.
16:27Um, we're gonna enjoy it.
16:30I think no that's it.
16:38Uh a couple things on the uh manager's update for today.
16:42Um, where do I start?
16:44Oh, let's start with the happy stuff.
16:45We've got new police officers that have started.
16:48So we've had two uh new laterals that will be starting with the PD, one last week and one next week.
16:53And then we've got two new officers that will be starting the academy in September for the next 24 weeks.
17:00So we had uh luck last year with two graduate two graduates from uh the Gilbert Academy and got two more going through coming up.
17:07So that's exciting news.
17:08We're slowly but sure you refill in the ranks in the police department.
17:13Um, but on the sad news, it's the last weekend for the pool.
17:16So free swim on Monday though.
17:18Everybody can swim for free, and then uh the parks in a career are gonna be closing it down for the season.
17:24They're they're sad too.
17:26Paul's shedding a tear over there.
17:28Uh, but then on a happy note, they opened they did a sat soft opening of the teen center.
17:32If you remember a little while back, the we were awarded a grant to do improvements in the Santa Cruz library to create a teen center back there, and those guys have got it about 80% complete.
17:42And as a part of that, they wanted to invite some teens from the community.
17:4632 of them came out to just check it out, see what's going on.
17:49Uh, they liked it a lot, they got some really great feedback on that.
17:53They were concerned about the noise level.
17:54It is the library, and you got a bunch of teens hanging out, but that seemed to be all right.
17:58Uh moving forward, they're gonna keep on with their plans.
18:01They got some ideas to purchase some additional uh stuff.
18:05I I'm not quite sure what it is, but some additional things that the teens wanted as part of this uh program in this area in the library.
18:11So we're looking at an October opening for that.
18:14Um the photo change out in the the lobby here will happen on September 9th.
18:19So a lot of folks have been coming in looking at the all the old Eloy pictures, reminiscence, seeing relatives, friends, family, etc.
18:26So that'll be swapped out with some newer photos of Eloy, and then that'll be on display for the next several weeks, too.
18:32So you anybody folks in the audience, those listening that want to come and see those pictures, we'll have brand new pictures up on display September 9th, starting that week.
18:41And then what do we got next?
18:46We're painting the poles in the park.
18:48So if you recall, about a month or so or more ago, an email went out about what color we wanted to do the polls.
18:54We put a bunch of swatches on those different ones in the main street park and desert sand crop to the top.
19:00So we'll be repainting all the polls a desert sand color in the this this week.
19:11Yeah, I was talking about the poll.
19:14Meyers says, we are also closed on Monday in the servants of Labor Day.
19:18Yes, yes, we'll be closed on Monday.
19:21So we'll be back Tuesday.
19:27No, that's good information.
19:28That's that's all I have.
19:29Mayor, members of council, unless there's any questions on any of these updates.
19:33That's all I have for tonight.
19:35I think I forgot to uh talk about um the last meeting.
19:39We had a visitor, our Congressman Juan Ciscomani visited us, and uh he met with all of us in the staff where um he was able to um fund us a million dollars for uh uh frontier street project, mill and field project.
19:56So it was nice that he was here he's here for about about an hour and a half, actually, and had a good time.
20:00And so we had a we it was very nice for him to come and spend time.
20:04Then we swee um took him to uh Main Street where Frontier is at, and he saw where actually the work's gonna be be done at.
20:12So it was nice that he was here and uh Saul, he toured uh the city hall, and um yeah, it was really nice that he came down.
20:19So I got to mention that last time.
20:21That was one Zamani's a great supporter of the city and we'll continue to work with him.
20:26Uh last on the agenda is uh presentation by Brian Wright for our quarterly financial update.
20:32All right, thank you.
20:34Brian Good evening, Mr.
20:44Mayor, members of the council.
20:45Um, I'll just go over briefly the the quarterly report.
20:49Um it's up on the screen.
20:51So what we'll do is just kind of go through the very first page that's up there right now, is just kind of a summary of this, just talking about our our vacancies that we have, um statistics from departments from this quarter, which is April through June compared to the last.
21:09So I won't go really over the statistics page if you want.
21:13Um this uh this page that we're gonna go through.
21:16I'm just gonna touch on the the financial update part.
21:21So ending June 30th, which was the end of our fiscal year, uh the general fund, which is our main fund um for the public for operating, um, ended on a very good note.
21:33Uh the variance between revenues over expenses was uh about 4.8 million.
21:39And you're looking wow, that's a lot, you know.
21:41What what kind of affected that?
21:43Well, we actually had above average uh collections in our construction sales tax.
21:49I'll get a little more into it, but uh as we go into the sales tax side, but that was about almost 1.9 million above what we what we projected.
21:59What we do use our one-time revenues for, which those are construction sales tax, we use those for capital projects.
22:05So those don't affect our operating budget uh just for the public's knowledge on it.
22:10We also are um service or service charges were up, and that's where we get into things when it comes into our permits and fees.
22:22Um when it comes to housing, planning and zoning fees, those were up substantially this last year.
22:28Um with the interest revenue, that was up um it really that grew a lot this year.
22:35Um we didn't anticipate as much when we were doing the budget, but that exceeded our budget expectations by about 300 and 400,000.
22:43So that was up quite a bit.
22:46Then state income tax and state um set sales tax was up.
22:51When we first came to council, we were anticipating that was gonna be below expectations.
22:57But as the year went on, we were actually above what uh the state was projecting to give into us.
23:04So when we first entered the budget, if you remember, I came and said, you know, based upon our population projections, they were anticipating it'd be below what we budgeted.
23:14We were looking at maybe about three hundred thousand dollars less between VLT state income tax and state share revenue.
23:22But once the end of the year came around, we were actually above in each of those categories.
23:27So those exceeded our budget expectations we were looking at this year.
23:31So the state uh distributed a little more based upon those projections, but also that equals into that 4.9 million.
23:40We had a lot of unfilled vacancies throughout the year.
23:44Um departments only spent 80 per seven percent of their overall budget, so there was salary savings throughout the budget on it.
23:53So there was a combination of what that 4.9 million equal to, but most of it, almost half of it, was on construction sales tax side.
24:03Um as we dive into a little more on the um the city sales tax, city sales tax overall, we collected about 10.2 million this year.
24:13Um that was um up about 1.7 million over the overall budget, what we projected.
24:20So we we ended a good year with our local sales tax.
24:24Um the categories like mentioned the construction sales tax was um it's actually not 1.9, but it was 1.2 uh that exceeded our target this year.
24:36So that actually exceeded our target in the local sales tax.
24:40Manufacturing uh tax was also actually so surpassed budget expectations, but we thought by about 240,000 or 28 percent.
24:50So we had uh some sales tax categories, retail sales tax, for example, was barely um about 50,000 more than what we collected last year.
25:01So it wasn't that category, some other categories that we had uh overall on it.
25:06Um talked about the state share revenues, those were above uh projections actually by 584,000 between all three of those.
25:16Um in the special revenue funds, everything uh came in of what we were we were looking at budgetarily wise, and then ash and also enterprise funds, those are up a little bit.
25:27We actually had a little more housing, I think um, per the impact fee report that council approved two council meetings ago.
25:36It was that uh we had about 90 um single family dwellings uh that affected impact fees at the time when we were looking at it.
25:46We were looking at with impact fees maybe 6070, so that exceeded it.
25:50But when you have the impact fees on the homes, that comes back with the water and sewer connections.
25:55So um, but those water, sewer, and sanitations are all above what it was last year at the time with uh water and revenue sales and sanitation itself.
26:07These next uh few slides, just more of the historical nature, looking from April to June.
26:14You can see that the there are some categories within our sales tax, that's a fluctuation.
26:19But I'll just look at the retail retail as you see has dropped, you know, when it comes to um by month.
26:29You'll see it because of the winter visitors.
26:32You get the April collection and how it tapers off.
26:35So this is by month, but it's just more of a uh something to give the you the understanding of where we're at and what it looks like by month.
26:45A lot of these are um fluctuate based upon especially retail due to the winter visitors, and this one is just more by quarter.
26:55You'll see, you know, in 22 23, look at the construction sales tax through the roof.
27:01That's when national gypsum was going strong.
27:05That and then it tapers off as the the next year.
27:09If you look at retail, we're almost deadlocked where we were last year with collection and retail sales, and that is true in a lot of the other cases on that all the other service categories that we that we report.
27:24This right here is just uh another chart of our sales tax by category, gives you the perspective of where most of our money comes from.
27:33Construction sales tax is the largest compared to next to retail, and then the chart right below that is just our reporting categories that we can report on how it's lumped and uh a five-year comparison of of those data.
27:48So we're actually we're trending a lot of the categories keep going up, but they're not growing up substantially, you know, but they are going up.
27:56The biggest one in retail, just to point out is in between 21 to 22 fiscal year to 22, 23.
28:03That's when actually a lot of the inflation, a lot of the prices go up went up.
28:08We collect a little more as prices go up.
28:10So we do reflect that in our 2526 budget.
28:15Then this is just getting in the revenue categories for all the special revenues.
28:20I won't touch base on that.
28:23And then this is our we get into expenses.
28:26This is uh showing where the budget's at compared to budget the actual.
28:32If there's any variance of what we're looking at through the end of the fiscal year, one thing to note on expenses, we're still closing out our books for the 24 or 23, 24 year.
28:43So we do still have expenses coming in through the end of this month reporting back.
28:47It's it's our part, it's a 60-day accrual for our those expenses.
28:51So I gave you a forecasted what we believe it might end up based upon some of those recruits.
28:57But uh everything's running fine, uh, meeting budget expenses, nobody's exceeding the budget.
29:03And this is just gets into the major categories for the operational funds uh for you to review, and then we give the report by category and give you uh some ideas of where a lot of the savings were.
29:20And this one I gave a little forecast based upon what the remember fund balance think of your savings account, what those are and how it's reported by uh signed for the general fund.
29:33We're looking at because that 4.9 million, the general funds fund balance will go to about 31 million.
29:40However, you'll see 22 million would be considered unassigned.
29:44We have nine million of that committed.
29:46That's due the fund balance policy of the 5 million, and what we still have on the um the American the rescue plan, the ARP money.
29:56So just gives you that idea.
30:00And then the last few pages is all capital projects.
30:02It gives you if the what the budget was, if it's been completed, uh give you a little title of what's the CP means, CNP.
30:11So these are all the descriptions.
30:13If the projects complete, just give you the uh information where our projects ended as of uh June two uh 30th, 2024.
30:23So if you guys have any questions related to that, uh glad to entertain them.
30:29Um and then uh as we're moving into the new fiscal year, I'll give you the I'll I'll try to uh get right in October and give you an update um with that, but just one thing with the 2425 budget.
30:43I just want to mention that we did get our final uh population numbers from the state for VLT state income tax, and what actually we we presented the budget um that population actually on the thing went up over um what our final estimates were from when we presented the council, and actually the good news on it is so you know I'll leave you with some good news is our state income tax VLT and state shared revenue, those are state and um sales tax, those figures are about a little over 500,000 more than what we present in the budget, so those will be a positive figure as we move forward throughout the 2520 or 2425 budget.
31:28So what do they say our population was?
31:31I thought it was close to uh 18,500 uh when they gave it to us when we were doing the budget, it was like 17 yeah 174 something around that mark, so it was about 1100 more than what uh they gave us in the preliminary estimates.
31:49Okay, yeah, those numbers didn't come out until like almost end of June.
31:53Okay, and we were already done with our budget adopted and final everything.
31:57All right, thank you.
31:58Any questions uh Brian looking at these uh and this is more for study staff, not necessarily for you, but looking at the uh projects, project summary, the budget versus expended.
32:14It appears from this that uh we probably maybe a little bit over optimistic on what kind of projects, how many projects we're gonna get done?
32:22Because it seems like we're not spending the money, so maybe it could be a lot of different reasons, you know.
32:28But uh, I think going forward, maybe staff should keep this in mind and not be too too aggressive in projects.
32:34Let's be sure we get projects done with got budgeted.
32:38This is just a well as good as the good of years we had to look at these projects that oh man, we we had the money but we couldn't spend it.
32:46Yeah, it looks like they did a lot of projects too.
32:51And we had 70, I want to say there's about a little over 7 projects throughout the budget, and a lot that are still in progress too.
33:01Yeah, uh the the what I liked it to that I saw was um the bar rest restaurant, restaurant bar.
33:10Um it really hasn't gone.
33:13I mean, is 178,000 difference, $173,000 difference?
33:20And that's even with um decreasing the the sales the the tax one percent was it one percent, yeah.
33:28So I mean it's it's not that far off the the project projection that you guys had, and we have like almost 300,000.
33:35And we were at two about 230 to 40 based upon when we were presenting it.
33:40So as data as prices went up, there's probably a little bit of that variance in there, but you know, or people are drinking more prices.
33:50So I I think that's a win to be honest with you, you know.
33:54So um we were anticipating a bigger hit, but we weren't.
34:00All right, anybody else have any questions?
34:04All right, thank you, Brian.
34:07All right, next we go to consent agenda.
34:08All items listed with an asterisk are considered to be a routine matter, will be enacted by one motion and roll one roll call vote of the council.
34:16There'll be no separate discussion of these items unless the council members sell request, in which event the items will be removed from the consent agenda and considering its normal sequence on the agenda.
34:26So yeah, three items AB and C approval minutes authorizing the police department to renew federal equitably creditable sharing agreement, and then uh request city council to approve approval of case number PPE 2023-004-E1, which is a two-year time extension for eight preliminary flats and ropes and ranch.
35:00Do I hear a direction of council?
35:02Mayor, I'll make a motion to approve the consent agenda as written.
35:11The roll call, please.
35:13Councilmember Sutton.
35:15Councilmember Wanowatho Rodriguez.
35:24Councilmember Snyder?
35:26Councilmember Garcia?
35:28Councilmember Tarango.
35:30The motion passed unanimously, Mayor.
35:32We're gonna go to business.
35:33Um acceptance of a proposal from Joseph Painting Company.
35:43Madam Vice Mayor members of the council.
35:45This item is being brought to you for consideration and discussion uh regarding some improvements that need to some repairs that need to be done to our wastewater treatment plant.
35:57As you know, we have one central wastewater treatment plant that that could um accepts all of the all of the residential and commercial and industrial wastewater discharge uh into our our influent lift station.
36:11The influent lift station is basically the entry point to our treatment facility.
36:16Uh we had ADEQ, the the Arizona Department of Environmental Quality came down for an inspection in April.
36:22They found some some damage to the interior of the what of the wet well, the wet well is is the area where all the influent comes into and then it from there it goes into the treatment works.
36:33Um so when they found some inspection when they did their inspection, they found some some of the concrete had had peeled away and and it needed to be replaced.
36:42Um, and that's something that that we need to address.
36:46Uh as a result of that inspection, as as a result of the findings, we were issued a notice of violation, which gave us a certain amount of time and certain steps that we needed to come back into compliance with the environmental protection agency or or the Department of Environmental Quality.
37:05Uh we were we solicited a uh proposal from Joseph Painting Company Incorporated, known as uh doing business as JPCI.
37:13They have a contract with the town of Gilbert to provide some of these repairs for the influent wet well structures.
37:19Uh their original proposal came in for just on just over 200,000, uh, but that didn't include any bypass, any um maintenance, anything that we needed to do to keep the influent lift station in operation.
37:35We can't really shut down the wastewater treatment plant to repair this, so we have to have some way to bypass the existing wet well structure so that we can do the repairs and then get the the equipment and the facilities back in service.
37:49And so the second price proposal that we received was was from their subcontractors, came in at about 247,000.
37:57Um we know as uh projects move forward, there are always um unforeseen circumstances, and and so we're we're recommending a $50,000 contingency with that uh for a total price not to exceed $100,000.
38:12I'd be happy to answer any questions.
38:15All right, thank you.
38:16Anyway on council have any questions?
38:22Anyone in the audience have any questions?
38:25All right, so we're voting for one uh agreement with two different prices.
38:32No, it's it's the one agreement that covers both proposals, both the JPCI work and the work from their subconsultants or their subcontractors.
38:42Since there's no questions and discussion about this, do I hear a decision from council?
38:49Mayor, I make a proposal.
38:50We I make should we accept the proposal from Joseph Banking uh not to exceed $500,000?
39:12Councilmember Garcia.
39:15Councilmember Wannawatho Rodriguez.
39:20Councilmember Sutton.
39:23Councilmember Tarango.
39:29Councilmember Snyder.
39:31The motion pass unanimously, Mayor.
39:33All right, thank you.
39:34Thank you very much.
39:34All right, item B, adoption of resolution number 24-1588.
39:42Uh Vice Mayor members of council.
39:45We uh last week we set out the strategic this item as well.
39:49Let's jump back here.
39:50This item is an adoption of the strategic plan that we've been working on for the better part of this year.
39:55Uh staff initially leadership team met in the early part of the January-February time frame.
40:01I think it was February.
40:02I'm looking at the assistant city manager McKenzie.
40:06Um, and we initiated that with our consultant after we established the the base work for the strategic plan.
40:12We followed up late months later with council for to solidify this, put it all together and present it to you all tonight.
40:20We put it together, had it ready to go.
40:22Unfortunately, with email snafu, I'm not sure what happened there.
40:27Several council members were unable to open that, and we again tried on February or February.
40:31We can try it on Friday.
40:33We still had issues.
40:35So as a result of that, we would like to petition the council tonight to pull this item to give council an opportunity to review the strategic plan, whether it be a hard printed copy or we send it via email again to you all, and then come back for work session discussion on September 9th, Monday at 5 o'clock for us, myself and the assistant city manager McKinsey Letcher to be able to talk to you all about any questions that you may have.
41:00But the purpose here is to give you that ample time to review this document.
41:04It's been a little bit of a lag between when we met with the consultant and then presented this document with you for resolution of approval tonight.
41:11Following uh work session discussion, uh, we would plan to bring that back to council on Monday, September 23rd for final approval of this resolution.
41:21If council agrees with that, that would be the course of action.
41:24I think the only thing is start at 5 30.
41:275 30, we can do that.
41:28Some of us were okay, Jose?
41:36We have a council meeting already that day.
41:38So we would just start at 5 30.
41:44Can you participate on the phone?
41:48She's gonna be on an airplane.
41:50Oh movie that you always is.
41:55Well tell you all about it.
42:01Um what do you think?
42:08Can everybody I I think this is uh we've been talking about this for a while now, and about a strategic plan and strategic direction, so we don't have to get together every year and say what are we gonna do next year?
42:20And this lays out the groundwork, and I think it's important enough uh that we spend a time and get tour agreements so that uh when it comes budget time and we start talking about projects next year, we know exactly what we're talking about, and uh we've got the direction, and everybody buys into it, so I think it's very important to get it right, and so I'm agreeable to moving it.
42:42Okay, uh we're closed that day.
42:48Yeah, what about the 10th?
42:51The next day, the Tuesday, yeah.
43:03Oh we can do Tuesday, Tuesday is 6 p.m.
43:09Would you be able to be there at 6 p.m.?
43:11Which day the Tuesday, the 10th.
43:1410th, I could conflict.
43:20You're gone the whole week?
43:29So can't we do the 16th?
43:33Well, I think I think the reason why they want to do it, so is if anybody had questions and want to talk to staff, it gives everybody plenty of time to do that.
43:42So the 16th, that kind of does it only gives you like a month or a week.
43:48Well that I was told that has to be approved by October by the end of the time we're done.
44:03Andy and Sarah uh both won't be here.
44:07How about the third?
44:10Okay, Tuesday the third, which is like next week.
44:17For for just a work session, just do a work session if that works for council.
44:24That'll work Sylvia.
44:27Are you okay on the September third?
44:34That's the only conflict that is is our agenda meeting.
44:39Yeah, we can do it before.
44:42I mean, I re I'd rather focus on okay.
44:45This shell, you're good on that day, Jose?
44:48530 six five thirty on the third on September 3rd.
45:00That's what I'm hearing.
45:03No, I'm I'm good with it.
45:04Just want to make sure.
45:05Does that give you all enough time to review the document as well?
45:08Because even though we're going to be using that as a work session, we just want to make sure that you guys come prepared with your questions and everything so we can hash it all out and then have it ready to go for adoption.
45:16So as long as you guys are cool with it, I'm good.
45:22Sylvia, are you okay with that?
45:29That's something put us to sleep next this week.
45:37It's uh recover from the the conference that we're gonna be at.
45:41All right, so let's change it to Tuesday the third, 5 30 work session.
45:53Be there, be square.
45:57Okay, so we're gonna go.
45:58Oh, so I need to have a motion to table this item until further notice.
46:09All in favor say aye.
46:20We're gonna go to item C adoption resolution number 24-1589.
46:28Approving the appointment of Andrew Sutton as a citizen commissioner on the Eloy Housing Authority Board of Commissioners.
46:39Um for consideration tonight is the adoption of the resolution to appoint Andrew Sutton as a citizen commission at the UA Housing Authority for a term effective August 26th today through December 31st, 2025.
46:52It basically has been historical that the Eloy City Council appoints housing commission members.
47:00This has been the case since 2008-ish.
47:03It's in the bylaws for the housing commission that the council appoints them.
47:06The mayor serves as the commissioner of the board for that group.
47:10Recently, it's it's generally comprised of five members, but due to the recent news of the dissolution that we've been working through through the past two years, members have dropped off.
47:19They they've lost interest, all their obligations within their lives have come up, so it is now just down to Mayor Powell as the chairman and Andrew Rodriguez as a commissioner.
47:28The board needs to have a quorum in order to make decisions to move forward with the dissolution as part of HUD requirements.
47:34So as a result, uh Councilmember Andy Sutton has been recruited as a citizen member to fill Stephanie Blanco's vacant seat.
47:42Well, there's also a reason when when I he takes over as mayor, yes, I think he automatically becomes a board member.
47:50And so that's kind of the thinking that he just already there.
47:54You're still staying on.
47:55And I'm still staying on, I'm not going anywhere.
47:58So and you're still recruiting.
48:02So we're uh we're still working through that dissolution at this time.
48:05It's just become imperative at since Stephanie Blanco announced her resignation two weeks ago that we fill her vacancy in order to make sound decisions moving forward for for HUD for HUD actions and EHA.
48:17So unless there's any uh specific questions from council members, the recommendation is to move forward uh appointing councilmember Sutton as that member, the third member.
48:31Do I hear a motion to read by title only for resolution number 24-1589?
48:46All in favor say aye.
48:54A resolution of the mayor and council of the city of Eloy, Arizona, approving the appointment of Andrew Sutton to serve on the Board of Commissioners of the Eloy Housing Authority of the City of Eloy, effective August 26, 2024 through December 31st, 2025.
49:12Do I hear a motion to approve or uh resolution number 24-1589 as presented?
49:21Mayor, like motion we approve 24-1589 as read.
49:29Can I get a roll call, please?
49:32Councilmember Tarango.
49:36Councilmember Wanowatho Rodriguez.
49:44Councilmember Snyder?
49:49Councilmember Garcia?
49:51Councilmember Sutton.
49:53The motion passed unanimously, Mayor.
49:56I'm glad he didn't ask how much it pays.
50:00So he doesn't realize how much boards and commissions he's going to be on being the new mayor.
50:06So good luck, brother.
50:09Next item we're going to go into executive session.
50:12You guys are more than willing to will to stay if you want.
50:15But we're going to go into executive session at this time.
50:18It's going to go with uh staff.
50:21Mary, David, Steve for our legal counsel.
50:24Now, Steve, I've been watching like other um other meetings, council meetings.
50:30Then they don't a lot of places don't put times.
50:33And I know that we always run out of time because we like to talk.
50:36Can we just go in there and just say we're going to execute session with staff and then go?
50:42Mayor and council members, there is a not a uniformity when interpreting the Arizona open meeting law throughout the state of Arizona.
50:51I tend to follow the agency guideline book from the Arizona Attorney General's office for the reason that if you do if you follow their book, it's hard to get in trouble when they're telling you what you should do.
51:02A lot of times uh communities will basically call that executive session, give a time limit if they have some continuing business coming on the agenda.
51:12So for example, you want to talk about an item, get executive, you know, you want to get legal advice or some other reason, then come back.
51:19Um what you you certainly have the option of not doing not putting a time on it.
51:25I know and and especially given the fact your agenda now does not have anything else other than to adjourn at the conclusion of it.
51:32I do think the better practice is probably to give some estimate as to what the time frame would be, and and I would always err towards the side of being a little longer and everything on what you would expect on there.
51:43So for example, on this discussion, I don't know how long you need.
51:46You could go an hour, hour and a half.
51:49That's what I'm saying.
51:54No, I think two hours can be sufficient.
51:57I'm just thinking of my contract if I could pay over time.
52:03Okay, so so just to yeah, all right.
52:06Well make a motion we go in executive session for two hours with said staff.
52:17All in favor say aye.
52:22Thank you, ladies and gentlemen, for attending tonight's meeting.
52:24I said you're more than welcome to stay.
52:26Yeah, and uh for two hours.