Fargo City Commission Meeting - January 20, 2026
STREAMING COPY IN PREPARATION — RECORDING AVAILABLE FROM THE ORIGINAL SOURCE
Congratulations.
Roll call.
Roll call.
Here.
Capcorn?
Here.
Strand?
Here.
Turnburg.
Here.
Mahoney.
Here.
I think the Archie broke it into three segments.
At the heart of Fargo's success is an unwavering commitment to service.
Each department, each employee, each initiative reflects one goal to serve Fargo's residents and visitors with care, integrity, and consistency.
Local gov works around the clock to keep our city safe, moving, and thriving.
From ploughing snow to maintaining streets to responding to emergencies, the dedication of Fargo employees continues to shine as a beacon this community can count on.
In 2025, we saw major roadway projects improve traffic flow on Fargo streets, enhance safety for pedestrians, and bolster existing infrastructure that supports our continued growth.
Among these projects was the reconstruction of 32nd Avenue South, which enters its final phase in 2026 with work from 15th Street to Lemke Park.
Two thousand twenty-six will also mark the start of reconstruction on Main Avenue from University Drive to 25th Street.
At Hector International Airport, we have a new parking ramp with about 1,000 new parking spaces.
This means travelers won't have to shovel out their cars in the winter.
Connecting the ramp to the airport will be an enclosed skyway.
Progress continues on the renovation of the Hector Terminal, expanding Fargo's capacity to welcome visitors and serve the travel needs of local residents.
The City of Fargo has been working to install digital water meters in every home and business to modernize the community's water infrastructure.
The new leaders will give residents better insight into their water usage, help identify leaks, and improve service efficiencies across the city.
Fargo continues to appear in national headlines celebrating what residents already know.
This city is a great place to live, work, and raise a family.
Fargo was recognized in 2025 as the second best city in the nation for veteran health care.
And as the fifth most affordable community to rent a home.
Against stiff competition from more than 300 cities, Fargo's new water tower was named Tank of the Year in a national contest.
Our tower earned the top honor for its visual design and innovation that reflects Fargo's pride, creativity, and culture.
Fargo's public safety sales tax was fully implemented in 2025 and began funding enhancements in safety and technology for our first responders.
These funds are also helping to ensure that staffing levels in our police and fire departments meet the needs of our growing community.
Significant progress on the Fargo Convention Center project was made in 2025, with site and developer selection advancing to the final phase.
Funded by a lodging tax approved by voters, the new convention center, once completed, will attract even more events and visitors to Fargo, fueling our economic engine and driving growth into the future.
Very good.
Is there a motion to approve the order of the agenda?
Moving item number 15 from consent agenda to regular agenda and adding an extra item to the end of the regular agenda for application and games of choice for TNT's kids' fitness and gymnastics for a raffle on one twenty-five twenty-six.
Is there a second?
Second.
All those in favor say aye.
Aye.
Motion carried.
Is there a motion to approve the minutes of the regular meeting, January 5th, 2026?
And move for approval.
Is there a second?
I second.
All those in favor say aye.
Aye.
Motion carried.
Is there a motion to approve the consent agenda items 1 through 26, excluding item 15, which has been moved to the regular agenda?
So move.
Is there a second?
Second.
Roll call vote, please.
Yes.
Aye.
Colpak?
Aye.
Turnberg?
Aye.
Mahoney.
Aye.
Public hearings.
Annexation of two three 236 acres, more or less a southeast quarter and east one half of the southwest quarter of section 35 Township 141 North, range 49, west of the Fifth Meridian Principal Principal Meridian, Cass County, North Dakota.
It was continued from 1110, 1124, 1208, and 1222 regular meetings.
And two is stop the annexation of the property in Section 35 in Harwood Township initiated on July 31st, 2025, and approved the new resolution of annexation for the same property.
Thank you.
Jim Gilmore.
As we recall in July, you initiated three annexations of property up by the proposed data center.
The one was in the west half of Section 3.
That one you withdrew, and that has now been annexed into the City of Harwood.
The one to the east of that east half.
We're in mediation on that one.
And so the one we are addressing tonight is this one up in Section 35.
We had notified the property owner of the annexation.
And the property owner's address that we had was an Ann Mathies and others.
And certainly we notified her.
There was no response.
However, because there's actually seven different property owners that own a piece of that, I have been advised by the city attorney that we should really notify all of them.
Because you need to notify them within seven days, we have kind of missed that window.
And so the recommendations here are one to stop this annexation that started in July and then just re-initiate that same annexation of this property, and we would begin the notices all over again.
So be happy to answer any questions.
Any questions of the Commission?
Commissioner Pipcorn.
So, Mr.
Chair, so Jim, couldn't we just continue this and just try to make an effort to contact them and then just uh act on it later instead of starting all over again?
I mean, we have already contacted them several times.
There is just no response.
And so I don't have their phone number or anything like that.
So this is how we are contacting them.
We're having to follow this entry code and notify them by uh certified mail.
But that's my question.
I I mean, if you make a best attempt, do you have to start this process all over again or can't we just continue this?
I mean I think we need to start it all over again because when we started the first annexation, we followed the law and notified kind of that main owner, but we didn't notify the others within seven days.
So the only way to really start this over is to have you adopt a new resolution of annexation, then within the next seven days we will notify all of those owners and everyone will be aware of it.
And hopefully they will get in touch with us if they are going to protest.
Should they protest, then we can decide what to do at that point.
Is there anyone present wishes to speak to this annexation?
Is anyone wanting to speak to this annexation?
If not, I close the public hearing.
Do I have a motion?
May I have a question?
Um Commissioner Strand.
Are there two motions or one motion?
It is two actions in one motion.
If you want to split the uh actions, you certainly could.
That's exactly what I would like to do.
I would like to divide the question.
So the first motion is to stop the annexation.
And the second motion would be to approve the new resolution going forward.
Is there a second?
I'll second it.
Any further discussion.
So uh Jodi, the first one would be to stop the annexation, so that's what we will take a roll call on first.
Strand?
Yes.
Hepcorn?
Aye.
Holpak?
Aye.
Turnberg?
Aye.
Mahoney.
Aye.
The second one is to restart the annexation for this piece of property.
Roll call.
Strand?
No.
Hepcorn?
Aye.
Holpak?
Aye.
Turnberg?
Aye.
Mahoney.
Aye.
Thank you.
Final design recommendation for 64th Avenue South Interchange Project Improvement.
Tom Knock was to explain.
Good evening.
As the mayor stated here, seeking a decision on build or no build alternative for ramps at the intersection of 64th Avenue and I-29.
Real brief project background timeline here.
Ultimately in 2007, the City of Fargo purchased that land from the developer of the Maple Valley edition in order to ensure that we could we could hold that land for future ramps.
And in that corridor study, I just want to highlight a couple things.
So since that time, since we've started uh improvements in this area, there have been a number of projects uh needed to support the ramps.
Uh ultimately City of Fargo has invested over 61 million dollars to get to a point where we're able to uh add ramps to 64th Avenue.
And so part of this is to really capture that investment uh in what in the infrastructure that we've improved.
So uh why 64th Avenue?
Part of the reason is uh there are operational issues currently uh at 52nd Avenue that create safety concerns uh and adding ramps at 64th Avenue alleviates the congestion safety concerns at 52nd.
Uh like I mentioned, uh also adding ramps at 64th Avenue really leverages the the investment of more than 61 million dollars uh into that area.
Also, we have been awarded 21.25 million in federal funds, uh, and those are dedicated to the 64th Avenue interchange, and they cannot be reassigned.
And so if uh city commission were to choose to not move forward with a build alternative, that funding would revert to the North Dakota DOT and they would reprogram uh in whichever manner they find best in their system.
Uh 76th Avenue Interchange does not address the operational issues at 52nd Avenue.
That's something we looked at through the traffic operation study.
Um just want to remind the commission and public as well.
Uh an interchange at 76th Avenue would require a level of investment comparable to what's already been made at 64th Avenue.
And so again, there'd be considerable investment uh in that that corridor uh if we chose when and if we choose to add ramps or an interchange at 76.
The other thing I want to say, uh, you know, why 64th Avenue?
It's really supported by the Far Growth Plan.
There are a couple spots in the here where we talk about um our super grids and really managing expectations uh from the pup to the public uh of our development pattern.
And so one of those areas that it talks about um how our growth grids are used as a tool to promote orderly growth, uh, and then by using those, we can continue to limit leapfrog, and we create critical mass in areas undergoing development and maximize the efficiency of its infrastructure investments.
There's another spot in here uh where it talks about the the new land code that um planning is currently working on.
So 64th Avenue and I-29 is situated there.
Um Commissioner Strand, I believe, asked a question at the last meeting under wanting to understand uh what we anticipate for uh land development in this area and where all this relates in in uh with the diversion footprint.
And so in blue towards the left and bottom side of the screen is that diversion input in print.
Um but one of the things I want to point out that the uh growth plan talked about are uh community centers.
And so you can see there's a community center uh anticipated at the intersection of 64th Avenue and 45th Street, and another one at 76th Avenue and and 25th Street.
Um the interchange at 64th Avenue certainly supports uh growth grid, sorry, super grids A and super grid B.
No different than 76 will also support these, uh, but um 76 really starts to support uh super grid C.
And so one of the things that the the growth plan mentions is that um you know it it's not specifically calling out a community center in super grid C or D because the timing of development those areas uh is likely a decade or more away.
And so again, it I I just bring this up because again the growth plan is is supporting that idea of this this linear growth, capturing the investment that's already been made and acknowledging that an interchange uh and future development is going to happen, uh, but it is still some time away.
Uh just a reminder from two weeks ago, we did look at uh three different build alternatives uh in this area.
Um, all of them perform really well.
Uh there's some characteristic differences.
Uh alternative one uh has a roundabout on the east side, uh, more of a traditional intersection on the west side.
Uh alternative two has roundabouts on each uh interchange um intersections, uh and then alternative three was a diverging diamond.
So we did bring this to uh the public works project evaluation committee a week ago, um, and staff is recommending alternative one as being the best option.
So if we do move forward with this, uh this is somewhat what it'll look like along that corridor.
Um I do also want to acknowledge that there have been there are property owner concerns.
Um we've had a number of meetings with those property owners.
Uh, and I'll just say, you know, if this project moves forward, if if City Commission chooses a build alternative, um, we'll continue to work with those residents to address their their concerns uh where we're able to uh feasibly through our engineering solutions.
And with that, uh here's a motion I prepared uh supporting alternative one.
We have some public speakers.
Um I want to say thank you very much.
You did work with the neighbors uh heartily and try to meet their concerns.
And I thought we had very positive meetings with the neighbors, it was very uh productive.
Uh we have uh seven speakers, Nathan Warmouth is up well, who's up first.
Nathan Thank you, Commissioners.
I'll try to be brief.
Uh Tom stole some of my thunder with uh his comments already.
So um good evening, St.
Commissioners, and thank you for the opportunity to speak.
Uh my name is Nate Voldmouth.
I'm an architect and real estate agent here in Fargo.
I'd like to speak in support of the 64th Avenue ramps uh alternate alternate number one.
I would ask that you support your planning and engineering city staff's recommendations to install the ramps at the 64th Avenue overpass.
Over the past several years, the planning department has worked, has been working to update the land development code.
The ramps at 64th Avenue support the proposed LDC 2024.
The city staff has been working tirelessly on for the past several years.
It supports it in four ways.
Density, it improved it promotes higher density and higher tax base.
Number two, orderly growth.
The LDC 2024 promotes limiting leapfrog development.
An example we would be to put the 76th Avenue interchange in before 64th Avenue.
Number three, growth with growth grid sequencing.
On page 80 of the LDC, I quote, by communicating a preferred geographical sequence of development using the growth grid, Fargo can continue to limit leapfrog, create critical mass in areas undergoing development, and maximize the efficiencies of its infrastructure investment.
64th Avenue is the next logical location for growth along 45th Street between 52nd Avenue and 64th Street or 64th Avenue.
Number four, super grid A.
The first of four super grid developments laid out in the LDC.
It currently occurs directly on 64th Avenue.
Closing remarks.
Building 64th Avenue Interchange now allows Fargo to grow orderly and not leapfrog south towards diversion.
It supports higher density revenue generating commercial development along I-29, relieves growing congestion on 52nd Avenue, and improves safety and emergency response.
This interchange also helps support investments Fargo has already made, including stormwater infrastructure, the Fargo Parks Sports Center, NDSU, NDSCS career innovation center, and long-term plans for a connected commercial corridor between Fargo and Horace.
Thank you for your time and um and service to the community.
Austin Morris.
Austin Morris Enclave Development.
When we think about approving something this major, and you think about uh the last probably four or five years of work, the DOT doesn't uh hand out interchanges uh for fun or easily.
The amount of research and time invested in traffic studies and back and forth with uh our great city staff to figure out whether it warrants it is years in the making.
You look at West Fargo, they're they're trying to get an interchange, and I believe that's probably out until 2029, 2030, and that's limiting their growth.
So I look at this interchange from uh economic development standpoint.
We have Fargo Public Schools owns sixty-eight acres out here.
You have All Sports Complex, the largest all sports complex in our state that's driving traffic from all across the state for sporting events.
You have capstone school, you have NDSCS, um, and you have an opportunity for economic impact, higher assessed value, and uh a much more productive development.
And if you don't provide great access, which this will.
We also can't have visitors uh attending these events that get to enjoy our entire city versus what they can see within a mile or two on a corridor arterial.
Um so I'm in favor of it.
Uh thank you for having me.
Rob Coast.
Hi, Commissioners.
Thanks for for having me.
And uh I appreciate all the time that many of you have spent with us over the last weeks.
Um I just ask that if this does get approved, that we remember our neighborhood and the people that were there, and that we address pedestrian safety.
We address driver safety, we address the delivery and service access, noise pollution, and special assessments.
We've been hit very hard already.
And please make sure it's part of this project if it does get approved.
Um these are valid concerns by our neighborhood, and we really need to make sure that there's engineered solutions put in place if this does go through.
Um we've had very good productive meetings.
I'm just asking for follow-through if the if this is gonna get approved.
So thank you.
Walter Samuel.
Mayor, Commission, thanks for having me again.
I'm starting to feel more like a regular in this place and an outscast, so it's good.
Um again, I'll echo what uh Rob said.
If it goes through, you know, appreciate what you guys have done, the time you've put in to talk to us.
It's really been noticed, and uh it makes the city feel more like a city as opposed to uh the city versus us.
So thanks for changing that perspective.
And um you can still vote no.
We can go to 76, just in case you're wondering.
So thanks.
Chris back.
Uh good evening, uh commissioners.
Um I'm Chris Mack with Christians and Companies.
Um I sent a letter uh last Friday uh showing support for uh this 64th Avenue interchange.
Uh Tom did a great job at showing the investment and the amount of uh time and effort that was put into the growth grids and the uh growth plan that was uh just approved um in August of 24.
Um this uh interchange will be crucial um for that development and continued uh success of of those developments.
And um I talked to uh Nathan Oerboom with uh engineering last week.
Uh and we had a good conversation about some of the safety concerns.
I I you have a great engineering staff, and uh I think there are opportunities to help alleviate some of the uh speakers before me um with some of the traffic um concerns that they are having.
And just thank you for your uh work on this and uh showing support.
Thanks.
Don Dabbert.
Good evening, uh Mr.
Mayor and City Commission.
Uh thank you for this opportunity.
Uh Don Dabber Dabber Custom Homes.
Um it's been a long time in the making, uh started you know developing some land out there uh over a decade ago, so it's nice to kind of see it.
Uh obviously we're here to speak in favor of it and uh because it really kind of aligns with the uh the growth plan that we've been talking about for over a decade to go through.
We realize that uh having some impact to the neighborhood and certainly want to be mindful of it, even some of those early meetings with the bike paths and stuff that were talked about when 64th Avenue was first developed, and would certainly like to make sure we continue on that and have continuation of um connectivity through our new developments.
Along those lines, I won't address everything else that's been talked about, but um it it's very we feel very critical for the transportation imbalance that's going on as a business owner down uh on 56th Avenue and stuff.
We see it on a regular basis of what 52nd Avenue is like in the ramps to go through there.
Um but really just overall I just want to speak in favor of it for all the other obvious reasons that have been mentioned.
So thank you.
Tyler Brandt.
Not often we get all the developers here.
Thank you, Mayor.
Thank you, commissioners, for your time.
Um I'll make this really brief because they've spoken on most of the stuff that we're concerned about.
I'm Tyler Brandt, uh Brant Family Ventures.
I'm a land developer.
Um Don said he's owned land out there for 10 years.
I think we've owned land for 60 now.
Um because that was my family, some of my family farm, and my dad said before he passed away, he said never sell this until you sell it by the square foot because someday they're gonna build an overpass here.
So he had a little, you know, um, I guess premonition, and you know, I don't want to see the the community leapfrog and have 76 built first.
I think that would be stretch resources, stretch um stuff that's already in place to put in 64th.
I understand the the local neighbors and I think most of the traffic I would anticipate would head west, going to the the um Fargo Parks and and uh you know 52nd Avenue is already too busy.
We all know that.
So I don't think there's any more for me to touch on other than this is gonna be a great corridor for more commercial development and more taxes for the city and and uh I think overall it'll be um for all the visitors to Fargo, it'll be it's well it's needed.
So um I'm here to support it and uh I hope you uh find uh it has a need.
Thank you for your time.
Have a good day.
Thank you.
Tom, you want to come back to the podium?
Uh any commissioners have any questions of Tom?
Mr.
Pipcorn.
I got a couple of questions for Tom.
First of all, Tom, can you talk a little bit?
So some of those parcels are big parcels.
And so back in the day it's converting from uh kind of a rural to urban.
So the special assessments, is there a way we can help them, especially going forward when they're right on 64th?
Are there things we can do?
Can you talk a little bit about that?
Yeah, and excuse me.
Uh wish I would have had Doug Durgen here to help better explain it than I could.
But um in in general, uh what happens when we have these larger residential parcels adjacent to our materials, uh, we have um a practice in place where we limit the initial special assessment and defer anything for uh typically it's been 10 years uh beyond that initial.
Um there are some triggers that if they redevelop to a higher um and better use um those deferrals go away.
But but there are some tools in place currently to limit the special assessments um on those adjacent residential parcels.
Just a couple more, Mr.
Chair.
So can you talk a little bit too on the on the west side of the interstate those are a lot of nonprofits and things like that.
Can you talk how how do the assessments work when it's an area like the park district?
Do they still have to pay uh or or how does that work?
Can you talk a little bit about that?
Yeah, so um all properties are subject to special assessments if they're within a benefiting area except for one land type, and that's a cemetery.
And so uh nonprofits, schools, churches, whatever it might be, uh do pay special assessments.
And so when we make improvements through special assessments, they certainly do pay those.
Okay.
And just one one more question.
So this is just my so we've all we were out and visited with them, and and I don't know if everybody did, but we went out there.
And I believe that 64th, when you put that interchange, the traffic is gonna change.
And and I think you talked about we can do some things to address speed concerns with those neighbors, but uh uh just when you have roundabouts and you have more uh it right now it's a straightaway for many miles.
And so I this is just my opinion.
I think it's I think the traffic is gonna be reduced just because it's gonna be a the characteristics are gonna be different.
Uh can you just talk a little bit about that?
Yeah, currently on 64th from 25th to 45th, uh there are two miles that are not controlled for a motorist traveling east to west on on 64.
So again, you can see from this image uh by having a signal at the the west um interchange uh access point and having a roundabout at the East One will change traffic patterns and speeds uh in this area.
Um so again, there there are other things.
Like I said, we we are s we are certainly committed to continuing those conversations and seeing what other things can be done.
Um I know there is a comment uh of it needs to be part of the project.
One thing I will say is that it would be separate from the project, and that is just because of the Federal funds we have here, uh the environmental clearance that was done near the interchange wasn't also done near 25th Street.
And so they do have to be separate projects, but again, it it would still be something that we we are committed to looking at and and bringing options back to City Commission.
Also, Doug Durgum, when he went through the assessments, uh Commissioner Pepkar, and you did find there is some reduction already.
We have already brought some of the pricing down.
And the second thing is that the Federal funding has really helped out.
So that also is bringing the pricing down.
So it's one of those options where you get the Federal funding, you got to grab that Federal funding, and that decreases the City's cost.
Commissioner Colpeck.
Yeah, thank you.
Just a couple of clarifying comments.
But first to the staff, the amount of time you have spent on this project.
20 years, certainly, but in the last six months, working with citizens is very much appreciated.
Appreciate the real engagement we have had from the public on this too.
A number of comments come in in the last month.
Um I just want to make one clarifying point.
Um about the proposed alternate number one is also three million dollars less.
Correct.
I don't think that point was made.
Um secondly, um, what was my second point?
Um, with in some of my conversations, also with area legislators about this, there was a little bit of confusion on Federal funding being able to be diverted if we just would now go to 76.
And the reality is it would have to all start all over again.
And so I just wanted to make sure that that point was made to the public.
But sincerely appreciate all the work and time.
Mr.
Strand.
Thank you, Mayor.
Um Thomas, I am wondering the topic of safety, just so we don't overlook the request for follow-up, because uh we've all met with the neighborhood up there, and that's front burner for them, especially and understandably.
What are the safety considerations we will uh embark upon?
I I think there are a lot of options that we can look at.
Um I think if there is uh a decision by Commission to move forward with this, um, those are the conversations we're gonna have in greater depth.
And so part of what we've talked about uh one-on-one with the property owners is uh a lot of concern about the the properties on the south side.
Uh so accessing in uh into their site and then leaving their their residential properties as well.
Deliveries, things like that.
So um we've talked about frontage roads, we've talked about uh turn lanes, we've talked about more like a call it a parking lane that wouldn't be for parking, but more for access.
Those are all opportunities.
Um maybe looking at mid-block crossings for pedestrians um with uh median refuges, um, adding planter medians and the median in certain strategic areas to to kind of create a little bit of bottlenecks that help reduce uh traffic speeds.
There are a lot of things that we've kind of spitballed so far, but again, um you know Mike Bittner uh with Bolton and Mink and Jeremy Gordon, our trap traffic engineer, those those two individuals that would have great ideas that they can bring to the table too uh when we look at these types of uh concepts that we would further evaluate.
Might I continue?
What would be the timeline of the consideration and process for those safety topics?
I would say if there is a decision uh to move forward with the build alternative tonight, uh we would kick off those conversations.
We would develop those concepts, uh, put some pricing to it and ultimately bring them back to City Commission for consideration.
And my last question, uh and and also thanks to all your staff and to your people who have put a lot of time into this uh and have been very responsive to the public, and and it's great to see that type of interaction and engagement.
Um is it safe to assume that we're gonna have both?
Because my thinking is is we are we modify our motion to uh address 64th now, and in the same motion uh lay the groundwork for opening up the discussion immediately for 76.
So there isn't any time lag on that.
Is that reasonable or is that assumed or so I anticipated that that might come up?
And so um I did put this alternative motion together, which basically uh selects alternative one is the preferred option for 64.
So that gives us the direction to move forward with that.
Uh but then it goes further to direct engineering department to prioritize program because there is a lot of work that takes place to to get um everything lined up to really pursue funding.
Um so if that's the wish of City Commission, I did provide that as an alternative motion.
So just to clarify, though, again, it tells us to move forward on 64th Avenue, alternative one, and then we go after programming 76.
But I think Commissioner Strand wanted to address the neighborhood as far as safety concerns of the neighborhood, John, almost a separate motion.
Almost a separate motion, wouldn't that be fair?
Because if we do that, so the concerns are we met with the neighbors, had great meetings, but uh what are you going to do in special assessment?
So if we do one alternative, they all get special assessed.
If you have another alternative, the city covers the cost, do another alternative.
It was it was convoluted when we met with the neighbors, they weren't quite sure which one they had.
And then where the fire station is, ultimately we may put a stoplight in there as well.
And that gets special assessed special way.
So there were concerns about let's not pile a bunch of special assessments on the neighborhood, but is there a way that we can look with paradox funds or other funding to address some of the safety issues?
So I would almost prefer let's vote on this motion, maybe alternative motion, and then have a separate motion to instruct the Union Journey Department to work with the neighborhood to address the safety concerns.
But Tom from Latitude, because we had like six or seven things we talked about, and the neighborhood wasn't convinced because if you do that frontage about those six neighbors would get a $700,000.
Well, that isn't going to work.
So Mayor, I think.
I make the alternative motion to the Commission.
Is there a second?
A second.
Discussion.
Commissioner Turnberg.
I would just like to make a couple um comments.
First of all, I would like to validate uh Travis, Walter, and Rob, your concerns, they are valid.
Uh for people who are maybe wondering why these residents are upset about this.
Imagine having your driveway enter onto 52nd Avenue.
So that's what these neighbors are worried about.
And I would not want that at all.
So absolutely, your concerns are validated, and uh we hear you.
And I think we've come up with some ideas that we can start working on.
We've had some great brainstorming sessions and uh working to fix that.
I think Commissioner Strand, too, has been part of that.
Um I would like to, if we somehow can give assurances to homeowners in a separate motion that we will be moving forward with some safety features, speed, maybe those bump outs, um, something that is not financially hurtful, like a like a frontage road, but that is that is doable for all.
I do like that the specials are spread out even to the nonprofits.
I think that helps out immensely.
And the fact that this first option not only saves $3 million, but I like how going to the east where we have residences, there is the roundabout, which seems more residential, and to the west where it's more commercial property, we have the stoplight.
So I think too, that breaks it up.
After one of our recent meetings, um, Commissioner Pepcorn and I left um one of your homes, and I wanted to see what it was like.
I mean, I drive that all the time, but just to consciously um take note, I had to put my cruise control on to follow the speed limit because it is just a wide open tract, and people were buzzing by me like crazy.
So absolutely the stoplight, the roundabout.
If we can add some friction, I've learned a lot of new engineering terms too, um, medium, whatever, but we will continue to work with you.
And I just want to make sure these residents have reassured tonight when they leave that you're not forgotten and that we're moving on with this project without your concerns taken in into mind.
And I did, I mean, I even spoke with the the fire chief, and his understanding was this was going in.
And when we have a brand new fire station on 64th Avenue, it just makes sense.
So even though my heart breaks for you guys because we have had a lot, a lot of conversations.
Um, I do think for the aggregate good, it's best for the city to move forward with 64th.
I just want you to know that your concerns are valid, that we will keep working on this, and I just think for for the the greater good that we should move forward.
Any other discussion?
Roll call vote, please.
Yes.
Aye.
Aye.
All right.
Tom, could you kind of maybe suggest a motion to John as far as I don't want to just confide it to traffic concerns or whatever.
Whatever engineering terms you would like to utilize for what to address the neighborhood's concerns.
Yeah.
I suppose the way I would frame it is is really directing the engineering team to work on um traffic calming.
Um speed reduction, safety improvements uh east of the proposed interchange.
Um I would recommend from from here all the way to university.
Um we will need some time to come forward with some concepts and some costing.
And so within the next two to three months, we could certainly be back to City Commission with some proposed ideas and have some costs associated with that.
Let's give you three months.
John, would you make that motion?
Okay.
Do you want to make the motion?
I will make the motion to come back in three months with alternative neighborhood cards.
Second.
Second.
Any other discussion?
Roll call ball, please.
Aye.
Yes.
Aye.
Pepcorn?
Mahoney.
Hi.
Thank you, everybody for getting involved.
It's a good example.
If you got people involved, you've got some good answers and you get good discussions, and that's what the city is about.
I really want to thank Tom Dockmas and his team because they did an excellent job.
And Doug came over and helped us from Sasser's office.
Just was really well done.
So appreciate that.
Next time we have the developers in the room, we'll talk about how we're going to develop Fargo.
Okay.
We're going to now have the information update and employee engagement survey.
Joel Manette to explain, as well as a couple other people.
Good evening.
So we want to start off tonight by briefly reviewing the purpose of the overall employee engagement initiative.
At the highest level, the purpose really was to first measure the level of engagement across the entire workforce for the city, and then to develop action plans that support both how we achieve high engagement currently and how we address causes of disengagement.
So we, in addition to that, really one of the most important goals is to celebrate our successes.
So again, that's one of our most important goals with this overall initiative.
And like any organization, of course, we have areas that need improvement that were identified through the survey as well.
And it's really important to recognize that our key stakeholders for this overall initiative really are the employees of the City of Fargo.
And by normalizing conversations about all the factors that affect both engagement but factors that lead to disengagement, our employees really will help to create an action plan over the course of this year to two years that will affect real positive effective change throughout the city.
And this is really through a shared responsibility with all of our employees, our leaders, and our elected officials.
So I want to briefly discuss the overall timeline just to review some of the steps that have already been completed and where we're headed next.
So as you know, the survey was launched last fall, and we received those results late October, early November.
At the end of November, November 20th, we held a cabinet retreat where we had a really lengthy discussion with all of our department leaders about the results of the survey and next steps with the overall initiative.
We provided a toolkit for our department leaders to guide the preparation for those department leadership team discussions, and then ultimately for some of the preliminary action planning as well.
So now in 2026, during the first quarter, we're going to be holding the employee discussion groups.
The departmental leadership and employee discussions are well underway with a few departments already developing their action plans, which is great.
Many of our departments have built in employee engagement as a standing agenda item, either in their leadership team meetings or their overall team meetings for their departments.
The bulk of the action plan development and implementation will begin happening in the second quarter of 26.
And then in the last half, we'll begin ongoing meetings with city administration and our department leaders to review our early progress in achieving some of those items on the action plan.
Then as we look to 2027, the action plan implementation, of course, will continue as we track our progress.
Ultimately, the next survey is planned for 2027.
And that next survey is what will really allow us to you know fully measure our progress from the results to 2025 to what progress we've made in 27.
So now that I've covered the timeline, Beth is going to give you more detailed information on our next steps for early 26.
Good evening, commissioners.
As Jill mentioned at a recent cabinet retreat, we distributed toolkits that are designed to help our department heads really support their action planning processes.
And within those tool kits are what we call an action planning worksheet, which helps support the next steps of the process, the employee discussion groups.
So prior to the discussion groups beginning, we are asking department heads to review their results to identify areas that stood out to them within the survey, things that surprised them, things that didn't surprise them, and then to identify two to three key drivers of engagement that they want to prioritize during the discussion groups.
Additionally, leadership teams will identify high impact solutions that can be acted upon quickly, assess what in the survey needs further exploration, what resources are needed, and which stakeholders will be impacted in which areas.
Additionally, we are asking them to identify areas that may need to be addressed immediately.
Leaders will also identify engagement drivers that were viewed positively in the survey, and those things should be maintained, enhanced, and celebrated.
And then once the leadership teams have identified their priorities, we will move into the employee discussion group process.
And that will help inform the action planning that we'll discuss in just a few minutes.
As far as the employee discussion groups go, we have two plans for that.
Each department will host departmental discussion groups that will be designed to discuss their individual departments' results.
And then we will have citywide groups that will consist of cross-functional teams with representatives from each department to discuss the results we received at a citywide level.
The purpose of these discussion groups really is to move beyond the survey scores and to help us identify the why behind the scores.
And so ultimately they provide qualitative context to the quantitative data that we received in the survey.
Additionally, the discussion groups are designed to demonstrate that city leadership is listening to the employees and not just measuring the engagement levels and hopefully improve the quality and the relevance of the action plans.
And then as far as the action planning framework goes, we have developed a common action plan framework that will be used to ensure consistency throughout the city.
And so we are asking each department to complete the framework that will ultimately be rolled up into an overall City of Fargo plan.
And this framework is determined to or is intended to be used to determine what areas that we're trying to address, what impact each of those drivers have on employee engagement, what might be causing problems, what actions are needed to address the potential problems, and then what are the optimal end results.
And on my next page here, I have an example of the action planning framework.
So you can see that there are several columns here.
The first one identifies the tasks or the action steps that are needed to achieve each objective, and what specific processes or actions will help address the driver of engagement.
We've asked departments to identify champions or the people that will be responsible for implementing these tasks.
We've looked at resources needed, whether that would be people, resources, financial or physical resources.
We are looking to identify milestones or key dates that indicate movement in each task, and then what those measures of success might look like.
And then progress review dates, so check-in dates that are designed for us to make sure that we are moving this initiative forward.
And then finally a communication plan and ensuring that we are communicating activities and results to employees in a way that is holding leaders accountable and keeping us open and transparent for the activities that we're engaging in.
Well, thank you, Commissioners, for the time this evening to talk about this really important initiative.
As noted earlier, this is really the very first phase of this work.
It's the first time ever that we've done this in our organization's history.
And so this is really going to help us frame our overall engagement strategy and initiative going forward.
One of our key next steps is going to be spending a lot of time within our leadership teams talking about what this means as we roll it out.
Had one of those great conversations as early as this morning within our senior leadership team talking about what we want to do within the departments.
You heard some of that feedback tonight.
We have many of our departments already off and uh running with this initiative and doing a lot of great, great activities.
But uh please know that your human resources and administration team is also going to be uh highly engaged in this process, not just today, but tomorrow and in the years that follow.
Uh, as a first-time survey, we're going to learn a lot here, but we think it's very important that we return to this in a couple of years.
And we have already planned that this will be our baseline survey.
This is going to be something that we revisit in 2027, and we're going to plan for that.
It's really an important and meaningful early stage process for us.
Uh, but we need to come back to that and revisit that.
Look at your baseline, see how we did, see how we improved, see how we made changes uh from 2025 and 2026 to 2027.
The other thing that you're going to hear us talk a lot about is supporting our department heads and our leaders to make sure that they're supporting that change management.
Beth just talked about that, making sure that they're equipped, that they have the tools, they have the resources today, tomorrow, and beyond to uh be able to help move the needle and help us move uh to a more engaged uh workforce.
And I think that's a really, really great, great thing.
This two-year cycle is really going to allow us to keep coming back to this too.
I think this is very important to note that this is not just a one-time survey and then we're done with it.
No, in fact, this is a longitudinal effort.
It's something that you have to measure today, and then you come back to it and hopefully at years four, six, eight, et cetera, you continue to show progress to your goals and you continue to show that we're doing quite a bit as an organization to engage of employees.
So I think that two-year cycle is really important and perhaps most important is we think from an employee employer perspective, it's really going to help us meet uh that expectation that we have in our action plan, which is to really uh listen to our people uh very directly to listen to them, learn from them, and then act on what they're sharing with us.
And so we're happy to answer any questions you have today.
We thought it would just be helpful to give just a very brief update, and uh we're happy to keep the commission in the loop as well on this long-range initiative for the City of Fargo.
So thank you very much.
Mr.
Kolpak, you brought this to the agenda.
Uh any comments you want to make.
Yeah, thank you.
I appreciate the update, and it's important that this stay front and center.
We made that promise to employees that we were going to do this work, that we were going to have action plans associated with how we're going to address the concerns that were raised.
I sincerely appreciated the candor and the the honesty that was shared in the 436 public comments at the end.
Um working with each department, need each division head to address what those divisional items are is going to be very important.
And making it actionable is is step one.
So we'll be asking for regular updates every quarter, hopefully.
I've talked to Mr.
Redlinger about that.
Um but I appreciate this this start.
So thank you.
Any other questions?
Thank you.
Thank you.
I have a motion for the applications of property tax exemptions.
So moved.
Is there a second?
Second.
Roll call vote, please.
Epcorn?
Hi.
Turnberg?
Aye.
Holpak.
Aye.
Strand?
Yes.
Mahoney.
All right.
Ladies on assignments, Commissioner Strand.
Do we have two more items?
No.
Okay.
I can delay liaison until after that if that's due to the mayor.
Would that be okay?
Okay.
Direct to the office to review the tobacco ordinance chapter 35.
Uh you brought this question up, Commissioner Turnberg.
I did.
My phone was blowing up this morning from business owners around the region wondering what exactly was going to be discussed at the meeting tonight.
So we wanted to make sure we were clear and transparent and coordinating with the public and businesses so they know what is being discussed at City Hall.
I will say a concern that I have after digging into this is it seems almost fruitless to me to put any restrictions on these vapes when you can order them online.
So in my mind, we would be punishing local businesses because they wouldn't be allowed to sell them, although anyone over 21 or having someone who is 21 could order them online.
So I just think that's important to bring up that people are aware.
Very well done.
We had a lot of different experts speak to us in this regard.
And Minnesota, Clay County, and I think City of Moorhead does have an ordinance in regards to this.
So really the request for the public understands that it was for your city attorney to look at this ordinance and make see what might become of it.
But it would come back to the Commission for discussion and public input as well if that happens.
But John Fowler, you want to explain what the uh dynamics of this are, please.
Sure.
Good afternoon.
Thank you, Commissioners.
The item number 15 on the agenda tonight is the direct the city attorney's office to review the tobacco ordinances Chapter 35 for the City of Fargo.
Um the memo that came over to City Hall on the 14th of January was to have staff at Fargo Cast Public Health request permission to work with the legal team to examine the components of a comprehensive tobacco ordinance to include but not limited to tobacco licensing and flavor policies.
So the uh the content on the agenda was supposed to be more clear and specific that it's it's broadening what we are looking at.
For background for the Commission and for the public, uh in in July of 2025, we did ask for permission to begin this work with the City Attorney's Office, and we were granted that permission.
As we have been working with our local and national partners on the topics, uh we are starting to process many of those components that have best practices.
Really reducing the access to flavored vapes for the youth in the communities, not just across the river, but across the state and across the nation.
To share some of the concerns and the content that we're learning from the process, we wanted to have the Board of Health and the City Commissioners become aware of what we were learning.
So we hosted a joint meeting last week, Thursday here in Chambers.
That meeting was recorded and is uh available on Fargo Cast Public Health Facebook page as well as the City of Fargo's Facebook page.
And I would direct any interested uh public members who want to learn more about that meeting to really go to those sites.
The uh recording is there in its entirety, uh, and the comments that flowed afterwards are listed as well.
I won't be able to do that meeting justice with all of those who presented in the few moments that I have here for the hour that they they took the time to be thoughtful in their comments at that meeting.
The partners for the Fargo Cast Public Health have been working with those partners and those supporting had shared many of their comments in that meeting, but those who weren't able to share within the hour meeting, they were in the room to support it as well.
Those partners include the American Heart Association, American Lung Association, American Cancer Society, Cancer Action Network, Sanford Health, Essentia Health, Southeast Behavioral Health Clinic, Fargo Public Schools, Fargo Police Department with their School Resource Officers, Campaign for Tobacco Free North Dakota, Tobacco Free Kids, Foundation for a Healthy North Dakota, the Multipartner Health Collaborative, Clay County Public Health, and the Safe Coalition.
The Multipartner Health Coalition, uh collaborative, rather, is uh a group of professionals who work closely with the North Dakota State SHIP, which is the State Health Improvement Plan.
And there is a goal in the State Health Improvement Plan to have a curbed reduction in the use of tobacco.
We are working with them to help align us to become the healthiest state of the nation once again, which has been a proud goal for North Dakota to return to.
The SAFE Coalition is a smoke-free air for everyone.
And this was formed in 2002 and is responsible for such legislation as a smoke-free air indoor workplaces.
And it's the reason why you don't have to be asked if you want to seat in the non-smoking or smoking sections in restaurants any longer.
So this group of people came together and they're helping us draft policy.
We want to continue to explore Chapter 35 within the City of Or City of Fargo's ordinances.
We don't have a specific draft yet for sharing.
That is going to come forward in future Commission meeting.
And right now we just wanted permission to continue to look at what we want to draft into and really pulling in best practices from all the different entities that have been sharing with us.
Thank you.
Any comments or discussion?
So move or a second.
Oh second, and I have just a comment.
If I may, Mr.
Comment.
Yeah, I just I want to reiterate the I was impressed with the level of expertise on that panel, the wide backgrounds on that panel, and the fact that it was so data-driven and research-based.
And so I thought it was a good start to begin the conversation and kind of level set what the issues are.
And um thank you.
I thought it was very good information.
Thank you.
Mr.
Strand.
Thank you, Mayor.
I'm just curious, Jen.
Um I serve as the chair of the Board of Health, and I'm the least health-oriented person there as far as the profession goes.
But so my job in my head is to help facilitate the wishes of the health board and public health department.
Will this get vetted, Jen, in public health initially and then come to the city?
That's what I am hoping happens that that that is the arena that the public health experts and people can talk and vet it there.
Is that what you expect?
One of the partners that I failed to mention is the Public Health Law Center in Minnesota.
Uh and they help with language and what is best practices from a public health perspective and angle.
Uh, and also working with Health and Human Services at North Dakota to make sure we are aligning with the State's initiatives as well.
So would the public health board make a recommendation to this entity in the end ultimately?
Would you is that what you would see that you can do that?
It's not the step work that I had anticipated.
Um is it?
You can tell me what you wish to have happen there, Commissioner.
I think it it will be in both arenas.
For sure it will be vetted in public health, and we will see what is natural.
But we need to get the John, are you trying to be vetted in Board of Health?
Board of Health.
And then come to the Commission.
Yes.
Yeah.
That's what I would expect with the government.
So that would allow public input at both venues.
And oftentimes we do engage the owners of the vape shops to get engaged to see what they recommend as well.
If if we jump just to the City Commission and overlook and don't have it worked through at the public health board level, we're skipping them in this process.
And I would like to know that we have their endorsement completely before it would come to us.
Okay.
Which I expect probably would happen.
Any other discussion?
We moved and seconded.
Roll call vote, please.
Strand.
Yes.
Colpak?
Aye.
Pepcorn?
Turnberg?
Aye.
Mahoney.
Aye.
Application for games of chance.
TNT Kids Fitness and Gymnastics.
Dave, you should have told them to put that in on time.
But is there a motion for it?
I will make a motion and I get to add something.
So TNT Fitness is an awesome place if anybody's been there.
And my son Alex is the director of the special needs program there, and I'm very proud of him.
And so if you're going to join or you're going to play a raffle, please play play this raffle.
That's not a conflict now for you to make the motion, right, Dave?
You make no profit off that.
But I do not have a conflict of interest.
So Commissioner Strand is always concerned about that.
But I just wanted to put a plug-in for that's a great thing.
And they do lots of services, but it's a great place.
Sorry for going on, Mr.
Chair, but that's my work.
That's my motion to approve.
Is there a second?
Second.
Moved in second at uh further discussion?
Roll call vote.
Epicorn?
Aye.
Holpak?
Aye.
Strand?
Yes.
Turnberg?
Aye.
Mahoney.
Okay, John.
Now I go to liaison assignments.
John Strand.
Well, I'm going to try and manage and contain my excitement.
But Commissioner Turnberg and maybe some others, we we toured the new airport terminal last week with members of our economic development team and committees and departments.
Oh my goodness, we have a really beautiful terminal.
It's it's beyond my expectations of what it would look like.
So any chance you get it, not just the parking ramp, which is we're all excited about, but you get inside this new terminal and you go, wow, this is Fargle.
It's spectacular.
I'll just leave it at that.
But it's absolutely spectacular.
And the folks at the Airport Authority Board of Directors, volunteers, and all the people who have done this that they put countless hours and focus into this effort for the community, and it will be a legacy project.
And I know I have pictures of Commissioner Turnberg and others there that are Paula Chair, our chair, but it's just spectacular.
I encourage you to go see it as soon as you can.
Mr.
Kolpak.
Yeah, we had a nice overview by the Chair Ekman at the Chamber of State of the Cities, John, so she did a really nice job too.
So we got to see some photos there at that event.
I have two slides.
The first is fire department, several updates.
On January 1st, the Department successfully transitioned to a new records management pre-planning inspection system called First Do.
Helps our department meet new Federal reporting requirements.
Fargo's first responders attended the Fargo Foes Hometown Heroes Night at Shields Arena.
Fargo's 1924 LaFrance Fire Engine was on display.
And this morning, 10 new fire recruits in the Metro Fire Academy kicked off their training with the Chiefs from Fargo, Moorhead and West Fargo giving a welcome address.
So good luck to all our new recruits.
And then I wanted to wrap up the Salvation Army Red Kettle Drive.
We raised 762,800 as honorary chair.
It was an honor to see all the volunteers that showed up to hit the goal at 90 percent, which was a good, a good target.
But um, you know, in today's economy, it was a fabulous turnout.
And as I said, Fargo really showed Fargo and the and our surrounding cities really showed up and helped.
And the last thing I'll add is that the North Dakota Realtors won first place in the competition, fire department got second, and police officers got third in their annual competition.
So thank you.
I think you just told us to tell who gets first.
I don't know, you need to go to the second and third part, did you?
Yes, I do.
I need to support all three.
Today we had an event here with uh Senator Hovind, and he's constantly been our champion as far as many of the projects we had.
And the exciting news is that the core, if they are under budget, you get the excess revenue that comes back to the entity that's running the project.
And he has got anywhere from 100 to 120 million that will come back into the coffers.
And what that means to the public is a sales tax will go less years.
So we voted in a sales tax that goes up to 284, but this will bring that down substantially, and more money we get back from CORE is better.
And what Hovind did that was particularly neat was that normally that would be 31 or 32 that money would come in, but we might get it this year.
So that really helps out as far as our financial productions.
Red River Valley Water Supply also uh got $50 million for the Endwas part of it.
We're looking for $450 million, and we're working on that, and we'll continue to uh to work on that.
And then uh John, I just wanted to come in.
You know, Martin Luther King Day was yesterday, and normally we have an event.
And if the public knows or didn't know, is this has been six months in advance, people knew that wasn't going to happen.
And actually, HRC was asked to go out and get public funds, and we did have donors that oftentimes donated to that event.
And the only disappointment I had is uh Frederick used to have young children or young high school kids do homes, talks, uh songs, dances, and it was a great event.
It was really enjoyable.
But as a city, we oftentimes have to turn over that to other sites, and maybe the school, like they did with youth initiative, could do something or like that.
But I would a lot like to lose the youth enthusiasm when they would do those presentations.
And they used to do a great, great presentation.
So people have to understand sometimes somebody else has to step up when the city of Fargo steps back.
Commissioner Turnberg.
Yes, thank you.
Commissioner Strand and I did have a wonderful tour of the airport.
It is fabulous, and thank you to Paul Ekman for taking us on that tour along with several other um area officials.
And I have uh pictures posted on my Commissioner Michelle Turnberg page, so you can see I mean handless bathroom faucets from soap water to dryer, you don't have to touch anything, the doors swing open so you can get your bag inside, children's play area with interactive screens, the parking ramp.
It's just it's really fabulous.
Pets, you've got to mention pets.
Oh the pet area.
You can go into the pet area, it's got artificial turf, they do their business, you use a hose, and it all drains to the sewer.
It's amazing.
So I do have pictures of that on my Facebook page, and I also have library updates, all the upcoming events that are scheduled for the next few weeks on there as well.
And thank you to Tom for the engineering update because I couldn't begin to uh summarize that.
Thank you.
Mr.
Pepcorn, sir, just real quick, the parking ramp at the airport.
I want to congratulate the mayor, because back in the day that was like pulling teeth to get them to build a ramp.
And Jim Gilmore's son was back and said, Well, this looks like a real airport now with the ramp.
And so one day there was 725 cars parked in that ramp.
And so most people now are willing to pay to not come back from Florida into a four-foot snow drift.
And so that's been great.
The good thing is it's the financial part of it.
We can add on to it down the road if we if demand.
So that's that's that's great news.
So I I apologize for not being at that, but I that's that's uh that was a challenge, and we worked on it for a long time because it was not easily done.
So anyway, that's that's my update.
And uh thank you everybody and have a good uh when when he today it was 14 degrees and you had to get outside to enjoy the warm weather.
That's North Dakota.
Public comments.
We have two public comments.
Kimberly ondo, please.
Good evening, and thank you so much for uh having me here.
Um pretty new to the area, been here just a few years, and I was met from Fargo First online, and welcome to come here by Commissioner Turnberg.
Thank you so much for having me.
I am just a resident, but my field of expertise is healthcare operations, specifically long-term care.
I've operated facilities throughout the United States, including nursing homes, assisted living facilities, memory care facilities, continuing care retirement communities, and a medical community consisting of senior living, rural health clinic, chemical dependency facility with detox and dispensary.
I'm also a graduate internal professor in healthcare administration and a subject matter expert in instructional design and clinical technology.
Over the past 15 years, I've educated thousands of students from 16 universities throughout the United States and Saudi Arabia.
Part of my expertise and experience has even been serving as an undercover professor with my students to meet healthcare facilities to make sure they're remaining compliant in taking care of the residents and patients.
To be honest, I was a bit taken aback when I heard the outrage of how the town doesn't always support the Somalian community.
It's clear the demographic is thriving and given many opportunities.
Rather than continue focusing on one group, I think we need to come together and look at what is really important.
Yesterday we saw an attack on a church.
Fargo City Commission Meeting - January 20, 2026
The Fargo City Commission met on Tuesday, January 20, 2026, at 5:00 p.m. in Commission Chambers. The meeting included a public hearing on annexation, a key decision on the 64th Avenue South Interchange design, updates on employee engagement, approval of property tax exemptions, and a directive to review the tobacco ordinance. The meeting adjourned at 6:12 p.m.
Consent Calendar
- Approved unanimously: Items 1-26 (excluding Item 15), including an interest buydown agreement with Bank of ND and Midtown Market, LLC under the PACE program; a letter of support for 7 Star Properties to the ND Opportunity Fund; appointment of Shirley Hughes to the Convention Center Committee; closing documents for BLOC Partners, LLC (TIF District No. 2023-01); games of chance applications; cost participation and maintenance agreements with NDDOT for Improvement Districts BR-26-H1 and BR-23-A1; negative final balancing change orders for PR-24-A1 (-$955,952.47) and WW1701 (-$383,633.00); amended engineer's report for BR-26-H; creation of Improvement District NR-26-A; contracts and bonds for SN-25-B1 and BR-27-E4; bid award to Key Contracting for $2,860,757.40 (Project FM-15-J3); amendment to consulting agreement with CPS HR Consulting; final interim financing agreement; memorandum of agreement with ND Air National Guard; piggyback purchases for five Ford Police Interceptors ($231,659.60) and one 2026 SBA Chassis ($127,995.00); task orders with HDR ($47,280) and AE2S ($43,400); solid waste rates resolution effective 1/1/26; street light materials awards; electrical services agreement with JDP Electric; and bills totaling $9,788,351.
Public Hearings
- Annexation (236.16 acres in Section 35, Harwood Township): The public hearing was closed. The commission first voted unanimously (5-0) to stop the previous annexation initiated in July 2025 due to insufficient notification of all property owners. Then, by a 4-1 vote (Commissioner Strand dissenting), they adopted a new resolution of annexation to re-initiate the process, which will include proper notification within seven days.
Discussion Items
- 64th Avenue South Interchange (Improvement District BN-25-A1): Staff presented the final design recommendation, citing $61 million in prior city investment and $21.25 million in federal funds that would be lost if not accepted. Three alternatives were evaluated; staff recommended Alternative 1 (roundabout on east side, signal on west side) as $3 million less than other options. Seven public speakers spoke: Nathan Warmouth (architect/realtor) supported Alternative 1, stating it aligns with the growth plan and limits leapfrog development; Austin Morris (Enclave Development) supported it for economic development and traffic relief; Rob Coast, Walter Samuel, and others from the adjacent neighborhood expressed support if safety, traffic calming, and special assessment concerns are addressed; Chris Mack (Christians and Companies) and Don Dabbert (Dabber Custom Homes) and Tyler Brandt (Brant Family Ventures) all spoke in favor, emphasizing need for orderly growth and capturing investment. Commissioners discussed special assessment deferrals, federal funding constraints, and the need for separate safety improvements (e.g., frontage roads, turn lanes, medians). Commissioner Turnberg validated neighborhood concerns.
- Employee Engagement Survey Update: Human Resources and City Administration presented an update on the 2025 citywide employee survey (first in city history). The timeline includes employee discussion groups in Q1 2026, action plan development in Q2, ongoing reviews through 2026, and a follow-up survey planned for 2027. A common action planning framework will be used across departments, focusing on engagement drivers, resources, milestones, and accountability. Commissioner Kolpack requested quarterly updates and emphasized making plans actionable.
- Tobacco Ordinance Review (Chapter 35): Item 15 was moved from the consent agenda. Commissioner Turnberg requested the City Attorney's Office review the tobacco ordinance, including possible licensing and flavor policies, after a joint meeting of the Board of Health and City Commission. John Fowler (Fargo Cass Public Health) explained the collaborative effort involving multiple health organizations. Commissioner Strand stressed that any proposed changes should be vetted first by the Board of Health for public input and expert endorsement before coming to the Commission. The motion passed unanimously.
- Applications for Property Tax Exemptions: Ten applications (five-year exemptions for building improvements) from TTE Holdings LLC (2), Michael and Hayley Hannesson, Haley Vargas and Juan Ramirez Vargas, George and Jan Boyer, Jonathan and Jennifer Hoffman, Barret and Jennifer Wood, Michael and Sarah Keim, Ahron and Stacey Walter, and Firas Omar were approved unanimously.
- Game of Chance Application: TNT Kid's Fitness and Gymnastics application for a raffle on 1/27/26 was approved unanimously. Commissioner Piepkorn noted his son is the director of the special needs program at TNT and stated he has no conflict of interest.
- Liaison Commissioner Assignment Updates: Commissioners reported on boards and committees. Highlights included a tour of the new airport terminal (described as "spectacular"), fire department updates (new records system, new recruits), Salvation Army Red Kettle Drive raising $762,800, and state legislative updates from Senator Hovind regarding potential sales tax reduction due to CORE project savings ($100–$120 million anticipated return) and $50 million for the Red River Valley Water Supply project. Commissioner Mahoney noted the absence of a Martin Luther King Jr. Day event this year and expressed a desire to retain youth involvement.
Public Comments
- Kimberly Ondo: A new Fargo resident and healthcare operations expert spoke about her background in long-term care and education. She expressed concern about perceived disproportionate support for the Somali community and urged unity, referencing a recent attack on a church. No other public comments were made.
Key Outcomes
- Annexation: New resolution adopted (4-1) to re-initiate annexation of 236.16 acres after inadequate prior notification.
- 64th Avenue Interchange: Alternative 1 approved unanimously (5-0). A separate motion directed the Engineering Department to present a traffic-calming plan addressing neighborhood safety concerns within 90 days, also passed unanimously (5-0).
- Tobacco Ordinance Review: Approved unanimously (5-0), with expectation of Board of Health vetting before any ordinance change returns to Commission.
- Property Tax Exemptions: Approved unanimously (5-0).
- Game of Chance: Approved unanimously (5-0).
Meeting Transcript
Congratulations. Roll call. Roll call. Here. Capcorn? Here. Strand? Here. Turnburg. Here. Mahoney. Here. I think the Archie broke it into three segments. At the heart of Fargo's success is an unwavering commitment to service. Each department, each employee, each initiative reflects one goal to serve Fargo's residents and visitors with care, integrity, and consistency. Local gov works around the clock to keep our city safe, moving, and thriving. From ploughing snow to maintaining streets to responding to emergencies, the dedication of Fargo employees continues to shine as a beacon this community can count on. In 2025, we saw major roadway projects improve traffic flow on Fargo streets, enhance safety for pedestrians, and bolster existing infrastructure that supports our continued growth. Among these projects was the reconstruction of 32nd Avenue South, which enters its final phase in 2026 with work from 15th Street to Lemke Park. Two thousand twenty-six will also mark the start of reconstruction on Main Avenue from University Drive to 25th Street. At Hector International Airport, we have a new parking ramp with about 1,000 new parking spaces. This means travelers won't have to shovel out their cars in the winter. Connecting the ramp to the airport will be an enclosed skyway. Progress continues on the renovation of the Hector Terminal, expanding Fargo's capacity to welcome visitors and serve the travel needs of local residents. The City of Fargo has been working to install digital water meters in every home and business to modernize the community's water infrastructure. The new leaders will give residents better insight into their water usage, help identify leaks, and improve service efficiencies across the city. Fargo continues to appear in national headlines celebrating what residents already know. This city is a great place to live, work, and raise a family. Fargo was recognized in 2025 as the second best city in the nation for veteran health care. And as the fifth most affordable community to rent a home. Against stiff competition from more than 300 cities, Fargo's new water tower was named Tank of the Year in a national contest. Our tower earned the top honor for its visual design and innovation that reflects Fargo's pride, creativity, and culture. Fargo's public safety sales tax was fully implemented in 2025 and began funding enhancements in safety and technology for our first responders. These funds are also helping to ensure that staffing levels in our police and fire departments meet the needs of our growing community. Significant progress on the Fargo Convention Center project was made in 2025, with site and developer selection advancing to the final phase. Funded by a lodging tax approved by voters, the new convention center, once completed, will attract even more events and visitors to Fargo, fueling our economic engine and driving growth into the future. Very good. Is there a motion to approve the order of the agenda? Moving item number 15 from consent agenda to regular agenda and adding an extra item to the end of the regular agenda for application and games of choice for TNT's kids' fitness and gymnastics for a raffle on one twenty-five twenty-six. Is there a second? Second. All those in favor say aye. Aye. Motion carried. Is there a motion to approve the minutes of the regular meeting, January 5th, 2026? And move for approval. Is there a second? I second. All those in favor say aye. Aye.
openpublica.com