The Historic Preservation Commission held a workshop on April 14, 2022, to review three applications: the steeple rehabilitation at Trinity Chapel (10 West Church Street), a new duplex construction at 252 South Carroll Street, and the comprehensive rehabilitation of the building at 10 North Carroll Street. The commissioners provided feedback and guidance on materials, design, and preservation approaches, with decisions deferred to future meetings.
Welcome back, everybody. Um, I would like to call to order the April 14th, 2022 workshop of the City of Frederick Historic Preservation Commission. Uh, again, a reminder that listening devices are available should anyone require them. Um, anyone who's going to uh well, I should say all applicants or authorized agents or members of the public who wish to speak tonight. Um, please stand to be sworn in. Do you solemnly swear or affirm that the responses given in statements made in this hearing before the Historic Preservation Commission will be the whole truth? If so, answer I do. Thank you very much. Be seated. I'm going to call HPC 22-210 regarding the property at 10 West Church Street. Um like to invite the applicant to come forward and if you would please introduce yourselves. Okay. Microphones on. And it's nice to be back in front of you guys in person this time. I think the last time was um through uh Zoom or online. My name is Peter Brehm. I'm president of the consistory of the Evangelical Reform United Church of Christ, which is the governing body for the congregation. Wonderful welcome. Um let's see. Martin Koskey, this is your baby this evening. Um how would you like to proceed? This is a little bit of a different environment for us. It is, so we're a bit winging it, but I did talk to the applicant a little bit to come up with a game plan. So I think we're gonna, I'm gonna do a quick introduction to the project. We're gonna um there's basically two sections of the project, the roofing aspect and then the the siding elements. So we're gonna talk about the the roofing project, um, give my presentation, and then I'm gonna let the applicant speak so they can kind of give you some more background information, and then we'll have a discussion on that. When we feel that's resolved, we'll move forward with the siding. That way we won't have so much back and forth between the different aspects of the project. So I'll enter the entire staff report in the uh the record. This application. This application addresses the following rehabilitation work to the steeple at Trinity Chapel to replace the slate on the lower section of the tower with a synthetic, excuse me, a synthetic slate from EcoStar Majestic Slate to cover the existing siding and quarter and boards on the belfry and clock levels of the tower with a PVC material to fabricate and install a new PBC porthold panels to temporarily remove the city clock and to replace the bases of the corner finials. Real briefly, I do want to go over the the history and significance of this feature and the site in general. Much of the structure at Trinity Trinity Chapel dates to 1881. However, the Stone Tower is original to the 1764 construction. A steeple was incorporated on top of the Stone Tower in 1807. And this feature was designed and built uh by Steven Steiner, uh, who lived between 1767 and 1829. He was a prominent citizen and town council member. Uh, his home still uh stands on West Patrick Street. The design of the steeple uh was most likely influenced by the famed architect uh Sir Christopher Wren. Uh and the four-sided town clock is located within the tower. So I briefly want to go over what the guidelines provide for your parameters for review uh when we're talking about the the slave roofing project. Slate roofs can often be repaired, and this treatment uh should be pursued and discussed um at workshop to see if uh uh repair is possible. Um slate roof that are beyond repair can be replaced in kind, or the commission may consider the use of synthetic slate on a case-by-case basis. The replacement project must match the historic feature in terms of size, color, texture, finish, and shape. The overall pattern of the tiles uh also need to be replicate, also replicate the historic. The front of Trinity Chapel is currently covered in slate tile. Photographs and other documents indicate that it is a historic roofing material, and at a site visit, staff observed that the tiles feature a dark gray color, which were laid in a plain pattern. And at a site visit, staff observed that the tiles feature a dark gray color, which were laid in a plain pattern. The individual slate tiles appear to be small in scale, but the size of the tile isn't specified in the application, so it's unknown. The guidelines encourage repairing existing slate loose whenever possible, and again, we should discuss this uh tonight.