The Hudson Planning Commission met on Monday, December 13, 2021 at 7:30 PM in Town Hall, preceded by the Industrial Design Subcommittee at 6:45 PM. All seven commissioners were present. The commission approved two public hearing items and accepted a design subcommittee recommendation, all unanimously. The meeting also included recognition of outgoing commissioners and the city solicitor.
I'm calling the order a uh meeting of the industrial design subcommittee for this evening. Uh this is prior to our stated uh planning commission meeting. Um Mr. Sugar, would you like to leave it off with a description of what's before us? Yes, thank you. Um back in September of this year, uh the board and planning commission approved a site plan and uh design request for construction of the Western Reserve Hospital Medical Office building. Um as part of that review industrial design subcommittee uh you know submitted a recommendation to planning commission, so that old recommendation is uh was attached to the materials and we have that available um uh for the subcommittee. Um but the applicant has requested uh changes to the design and um changes to the extent that would require review again from the subcommittee and a recommendation to the planning commission. So um uh you know I'll add uh crit Chris here with the applicant um go over those changes, but just uh on a high level, um the the building footprint has been reduced a bit. Um a mass on the north elevation uh was removed that's gonna be incorporated into landscaped areas. Um eFIS material has been proposed um to be added along the um uh elevations in lieu of uh some of the face brick that was previously proposed. And then there's some um alterations to some of the windows. Uh for example, the uh corner windows have been removed from the south and west elevations on that on that corner. So um with that, we did have uh comments that we sent to both the applicant and the board. Those are in front of you, printed those out. Uh Chris has prepared some uh additional renderings that I printed out. Those are in front of in front of you. And uh with that, I'll turn it over to Chris for an introduction on the on the changes in the proposal. So thank you, Mr. Sugar. So thank you. Um we have you should probably give your full name and affiliation and all that since we're getting in on the record. Perfect. Uh my name is Christopher Haight. I'm with design group architects. We're out of Plummas, Ohio. We're here on behalf of uh Western Reserve and Anchor Health Properties, who are the two co-owners of this um site and development. Um really the in order to make this project feasible, there was some square footage and cost reductions that had to be made to keep the project moving forward in order to align sort of the the loan agreement with then what was physically going to get constructed day one uh so that we could keep moving. Uh inevitably it was roughly around 5800 square feet that we had to pull out of the building. That was at the time when you saw it was mostly shelled space uh in order to align the the equity side of it, was looking for a fully occupied building, hence the reduction. And so that's really kind of what drove it. Um the site is planned for that mass to come back, and so the internal planning works such that it can get back to a 62,000 square feet that was originally planned for. Uh, and the team has really accounted for that in the programming planning. So understanding through that, I can walk you through sort of the internal plan moves uh or the external um plan moves. Uh so when we were looking at the opportunities and how the program was working internally, really trying to constitute a lot of natural light and uh clinical space, but really highlight locations, which is the large glass mass that you see on the back where staff are gonna congregate. That's their break room space, so it looks out towards the wetland area. Um the predominant view is really the southeast corner of the site as I see it from entry. It's really set up for that building to grow uh long term and the campus to grow with it organically. Um and then really trying to play down the backside of it since we're really trying to build a public and a service side because the service side you really do not see from seasons road because of the height and the growth of the trees. Uh oddly enough, that's how I ended up here tonight was driving the back way up seasons road uh and the tree canopy and its um height is meant to be maintained, and you really do not get a lot of visibility from the site in that direction because you're coming from about 30 feet down up the hill towards seasons road at route eight. Um you're coming at a higher elevation on from route eight to the site entry, and so you really kind of see it from that direction a more prominent way. Can I stop you a second? Can you help move that screen so that it's tilted a little bit this way? Oh small thank you for bringing that up. Thank you for bringing that up. I've been looking at the smaller one. It's just not enough. Thank you. That's good. Oops.