Mandan City Commission Meeting - July 21, 2026: Construction Updates and Change Order Policy Adoption
Mandan City Commission Meeting - July 21, 2026
The Mandan City Commission met on July 21, 2026, at 5:30 PM in the Ed Bosch Frelick meeting room at Mandan City Hall. Mayor Frelick presided, with Commissioners Bolavik, Schoberg, Heinshon, Braun, and Mayor Frelick present. The meeting began with the Pledge of Allegiance led by new City Commissioner Heidi Bolavik, followed by construction project updates, approval of minutes and consent agenda, and adoption of a revised change order policy.
Construction Project Updates
- Memorial Highway (East Half): Nearing completion; all lanes open. Punchlist items and landscaping ongoing.
- Memorial Highway (West Half): Completed removal on eastbound lane; storm sewer work near Third Avenue ongoing with no traffic impact.
- Terra Valley Decommissioning: Old lift station officially offline; gravity line now in service.
- First Street Reconstruction: Phase one wrapping up; phase two paving starting soon. Intersection of 5th and First left unpaved temporarily. Segment three removal begun early to maintain schedule.
- Water and Sewer 65 (Lewis and Clark Elementary): Nearing substantial completion; manhole rehabilitations expected by end of month.
- Project 3A, SID 241 (Red Trail Elementary): Concrete work finishing; subgrade preparation in Pollock Court area done; fog and chip seals planned; expected completion mid-August.
- Collins Reservoir: Substantially complete; punchlist items being addressed; seeding, irrigation, and lighting installed.
Consent Calendar
- Agenda Approval: Approved unanimously (motion by Commissioner Heinshon, second by Commissioner Bolavik; roll call: all yes).
- Minutes Approval – July 7, 2026 Regular Meeting: Approved unanimously (motion by Commissioner Bolavik, second by Commissioner Schoberg; roll call: all yes).
- Minutes Approval – July 10, 2026 Special Meeting: Approved unanimously (motion by Commissioner Schoberg, second by Commissioner Heinshon; roll call: all yes).
- Consent Agenda (Items 1-7): Approved unanimously (motion by Commissioner Heinshon, second by Commissioner Schoberg; roll call: all yes). No items were removed.
Public Comments & Testimony
- No public comments were received online or in writing.
Discussion Items
- Updated Change Order Policy (Engineering Department): City Engineer Riley presented a revised policy to replace the 2009 version. The new policy introduces a percentage-based cumulative cap on change orders that can be approved administratively (by the engineer) without commission approval. The caps: 5% for projects up to $1M, 4% for $1M–$2.5M, 3% for projects over $2.5M, with a statutory maximum of 20% on any change order. Previously, the administrative limit was a flat $25,000 regardless of project size, which was deemed too restrictive for large projects and too permissive for small ones. Riley clarified that cumulative change orders cannot exceed the percentage cap; the dollar amounts in the packet were informational. A commissioner asked about tracking cumulative totals: Riley stated that internal tracking will be used, and the finance department can assist. Discussion included adding a requirement to report change orders to the commissioner portfolio holder. No formal amendment was made, but the commission appeared receptive.
Key Outcomes
- The revised change order policy was adopted unanimously (motion by Commissioner Schoberg, second by Commissioner Bolavik; roll call: all yes).
- Future meeting dates were announced: August 4, 2026; August 18, 2026; September 1, 2026, all at 5:30 PM.
- Meeting adjourned.
Meeting Transcript
Today is July 21st, 2026. We are in the Ed Bosch Frelick meeting room in Mandan City Hall, and it is 5:30 p.m. Mr. Newbauer. Could you please take the roll? Commissioners Bolavik. Here. Schoberg. Here. Heinshon. Here. Braun. Here. Mayor Frelick. Here. And at this time we will have our new City Commissioner Heidi Bolavik lead us in the Pledge of Allegiance. Under Individual Liberty and Justice Raw. Thank you, Heidi. And we'll start out with announcements. Construction project updates. Riley. Should be pulled up on the screen here. So yeah, you get me this week for this. It should be as exciting as ever. We'll start off with Memorial Highway. We kind of have the two phases here. We have the east and the west half. Going for start with the east half. It's nearing completion. All lanes of the roadway are open, which is super exciting news. They're kind of working through some punchless items, kind of doing some seating, landscaping, fixing up everything else. And we plan doing a project walkthrough here pretty soon, along with doing our hall road inspection. So that'll be pretty exciting once we get that done. On the west half, uh the completed removal is on the eastbound lane. They're gonna pick up some storm server work near third. Uh they'll have traffic control installed for that already. So if you're driving down third, you'll see that. Um there'll be no impact to traffic on third. That show should be two inches of traffic at all times. Umerground work uh still been underway, kind of between Riverwood RB and Faulkner's Market, as well, kind of just south of the main intersection. Uh Terry Valley decommissioning. The old Terra Valley list station is officially offline. Uh you can see that picture. Um highlight here a little bit. Right here is the old lift station vault. So they're digging that up and uh reclaiming that as well as backfilling the rest of the gravity line, but the gravity line is now in service. Uh so that's exciting for public works not to have that as a maintenance item anymore. Uh the first street reconstruction project. Uh they're still kind of working on phase one, wrapping it up, kind of finishing up paving and getting everything squared away for that. Uh they're gonna start paving phase two here pretty soon if they haven't already.